UNLEASHING GROWTH, STRENGTHENING SUPPLY CHAINS, TRANSFORMING SKILLS, CONNECTING PEOPLE TO OPPORTUNITIES GROWTH IN COASTAL COMMUNITIES SOUTH LAKELAND FURNESS AND BEYOND
UNLEASHING GROWTH,
STRENGTHENING SUPPLY CHAINS,
TRANSFORMING SKILLS,
CONNECTING PEOPLE TO OPPORTUNITIES
GROWTH IN COASTAL COMMUNITIES SOUTH LAKELAND FURNESS AND BEYOND
CUMBRIAN COAST AND REGIONS OF THE NORTH WITH THE HIGHEST LABOUR PRODUCTIVITY
BARROW BOROUGH
SOURCE: SOCIAL MARKET FOUNDATION sept 2017
http://www.ippr.org/read/city-systems#the-role-of-small-and-medium-sized-cities
“The fastest growing coastal community is Barrow in Furness where GVA per capita increased by 127.3% between 1997 and 2015.” “Barrow was the 3rd fastest growing local authority in Britain in terms of GVA per capita.”
“THE WORST PERFORMING AREAS FOR SOCIAL MOBILITY ARE NO LONGER INNER CITIES BUT REMOTE RURAL AND COASTAL AREAS”SOURCE: SOCIAL MOBILITY COMMISSION 2017
Barrow is 13th worst area for individuals in bad health
SUBMARINE SUPPLIERS NETWORKS 1,000 SUPPLIERS IN 444 UK TOWNS AND CITIES
A NATIONAL ENDEAVOUR£ 5bn for the north
A NATIONAL ENDEAVOUR£ 5bn for the north
FURNESS ECONOMIC DEVELOPMENT FORUM
• INFRASTRUCTURE IMPROVEMENT
• EDUCATION, EMPLOYMENT, SKILLS
• BETTER QUALITY OF LIFE
• BUSINESS ENGAGEMENT
Influencing and Delivering for
- BEIS: Industrial Strategy - Northern Powerhouse Strategy - Cumbria LEP Industrial Strategy
Vision “to use the period of prosperity to create a more diversified resilient economy enabling all sections of society in Furness to benefit from economic growth”.
W CUMBRIA CIVIL NUCLEAR
Advanced manufacturing’s global reach
Submarine Delivery Authority £525m SHIPYARD ENHANCEMENT
11,000 jobs £44bn programme£4.2bn GVA
WATERFRONT : Business Park+ O and M bases + Barrow Island village renewal +Marina Village + Cavendish Dock
Watersports + Port Master Plan
TOWN CENTRE master plan, enlarged
retail plots, Barrow Bid,
Heritage Action Zone, Housing Renewal , inspiring residents
bridging gaps
FGH health birth centre Duke St health centre
ENERGY PARK National Grid, Centrica, Spirit Energy, Conoco, Port Meridian LNG
GSK divestment sustainable pharma +gateway business park linked to S ULVERSTON LEISURE HOMES
GLOBAL REACH
DEEPER LABOUR MARKET
Rail reliable resilient
A590 improved
OPPORTUNITIES FOR ALL OUR RESIDENTS, NEW ENTREPRENEURS BUSINESSES INWARD INVESTORSSUSTAINABLE PROSPERITY DIVERSIFIED,SERVING GLOBAL MARKETS
Barrow SHIPYARD
NATIONAL ENDEAVOUR
£44BN PROJECT
£4.2BN gvaINTO BARROW BY 2037
£525M PROJECTS
HALF WAY THROUGH
IBM, CAP GEMINI ACCENTURE
11,000 JOBS
1000 FIRM SUPPLIER BASE IN
444 UK TOWNS, CITIES
CONNECTIVITY
DELIVERING A NATIONAL ENDEAVOUR£ 5bn for the North
BAE SYSTEMS QUAYS, NUCLEAR BERTH SUPPORT JACOBS, Project Manager: P Harney http://www.barrowbc.gov.uk/papps/temp_blobs/PLAN_2016_0666_DESIGN_1.pdf
Qs contact :[email protected]
Abson, Craig [email protected]
Thomas, Gary [email protected]
Robertson, Allan
Croasdale, James
Wood, Steven
Merlin, Marina
Harkness, Sharon
WINDFARM BASES ABP PORT MASTERPLAN BARROW, WALNEY 1, WALNEY 2, WALNEY EXTENSION, ORMONDE,HELIPORT BABCOCK MCS
WATERFRONT Barrow BUSINESS PARK SERVING BAE AND PORT –PHASE 2 COMPLETED, PHASE 2A 2100m2 Managed Business CentreRichard Hargreaves, Project Manager [email protected] 01226 320150
WATERFRONT
PORT MASTER PLAN
BAE MASTER PLAN
MARINA VILLAGE
TOWNCENTRE MASTERPLAN
WATERSPORTS ENERGY? CAVENDISH DOCK
MULTIMODAL RAILBUSINESS PARK
NATIONALGRID
INTERNATIONAL NUCLEAR SERVICES
MARINA VILLAGE OPPORTUNITY
650 HOMES
ACCESS ALMOST COMPLETED
REMEDIATION PLAN
DEVELOPER MIX STRATEGY
UNDERWAY
SUMMER 2018
HOUSING INFRASTRUCTURE FUND
BARROW SOUTH TERMINAL DECOMMISSIONING£15m removal of some of the redundant equipment on South Terminal at the Barrow Gas Terminals Tamsin Lishman, Morecambe Bay Director for Centrica’s Exploration & Production
30TH ROUND DEVELOPMENTS
SPIRIT ENERGY
DP6 DP 8 REFURBISHMENT
9 months project
two 5,000-tonne platforms
remove the lifeboats and 60-tonne cranes on both platforms so they can be refurbished and reinstalled.
East IRISH SEA ENERGY
PORT MERIDIAN ENERGY
SPIRIT ENERGY FOREWARD WORKPLAN
http://achilles.com/images/locale/en-EN/communities/FPAL/pdf/buyer/ForwardWorkPlans/Copy_of_PILOT_Forward_Workplan_Q1_2018_master.pdf
NATIONAL GRID https://www.competefor.com/nationalgrid/national-grid/working-with-our-supply-chain/
MAIN WORKS CONTRACTS
400kV overhead line;
400kV undergrounding;
Substation works;
Tunnel construction (Morecambe Bay); and
DNO works.
COMPETE FORNational Grid will be requiring Tier 1 contractors to use CompeteFor in
tendering for sub-contractor supplies and services
Tunnel Construction
a large relatively stable workforce
Located at each of the two tunnel heads for most of the tunnel construction period, estimated to be
about 6 years in total
Construction Chris Hickey Services to support gas and electricity construction
Engineering Sara Tibbatts Asset maintenance and repairs
Global information systems (IS) services Tam Curran
Tunnels Andy Smith
Substation construction Ben Adams Substation alliances and contracts
SUBSEA ENGINEERING SECTORFrom 45kv connectors tohydraLOK, battery chargers, multibeam sonars directional drilling, ROVs and the subsea factory
SHALE GAS FUTURE?
REACH COAL SEAM GAS LTD ABERDEEN
6 Rubislaw Terrace
Aberdeen
Aberdeen City
AB10 1XE
Tel: +44 (0)1224 646 613
Web: www.reachcsg.co.uk
Email: [email protected]
LIFESCIENCE SECTOR
GSK DIVESTMENT
TASKFORCE, MP LED
PROPSPECTUS
STRONG INTEREST
VISITS SOON
SOUTH ULVERSTON PLAN
INFRASTRUCTURE
CONNECTIVITY ROAD RAIL RELIABILITY
AROUND THE BAY COLLABORATIONLANCASTER POTENTIALENERGY
• HEYSHAM3
• NATIONAL GRID TUNNEL SUBSTATION/POWERLINE
HOUSING
• GARDEN VILLAGE
• 1000 HOMES CUCKOO FARM
• 1000 BEAUMONT
• 500 WINDERMERE RD CARNFORTH
• LUNESIDE EAST STUDENT HOMES
INDUSTRY
• SCIENCE PARK BAILRIGG
• NEW STRATEGIC SITE HEYSHAM
• IRELAND(EU POST BREXIT GATEWAY
• ENERGY DEVELOPMENT SUPPORT
UNIVERSITY
• HEALTH INNOVATION CAMPUS
• 4000 NEW INT STUDENTS BY 2025
RETAIL
• CANAL CORRIDOR NORTH
ROADS
• M6 JUNCTION33 ENHANCEMENT
PORT
• £10M QUAY LINKSPAN
• INCREASED THROUGHPUT TO/FROM
HEALTH
• INVESTMENT LANCASTER HOSPITAL
BAILRIGG SCIENCE PARK
LINKSPAN
CANAL CORRIDOR N.