Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Dec 18, 2015

Download

Documents

Hilary Merritt
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Piston Pumps & Package

Fluid Handling Training

Page 2: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company2

Click to edit Master subtitle styleIn Manufacturing & assembling line many parts are now glued

instead of bolted,screwed or welded

There is a constant evolution in the chemical components & assembly techniques.

Major reasons!

The Extrusion Market is constantly increasing

Extrusion

Page 3: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company3

Click to edit Master subtitle styleExtrusion pumps are frequently put in the most difficult of application

moving high viscosity fluids that are often abrasive.

Extrusion pumps are used to apply a bead of material. In some cases thepump supplies a continuous bead.

Typical high viscosity fluids pumped include caulking, heavy lubricants,mastics, sealers and inks.

When Extrusion is needed? When material does not flow by itself, or when is flowing to slow.

,

What is Extrusion

Page 4: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company4

Click to edit Master subtitle style• When traditional pump does not reach to prime in the inlet, and creates a cavity (air pocket) on the bottom.

• High viscosity fluids will not flow to pump.

Chop check

Follower plate

Seals

When an Extrusion pump is necessary

Page 5: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company5

Click to edit Master subtitle style• Utilizes 2-Ball and Chop-Check

models.

• 2-Ball models for fluid viscosity from 50,000-100,000 cP.

• Chop-Check models for higher viscosity up to more than

• 1 000 000 ctP

Pumps for Extrusion

Page 6: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company6

Click to edit Master subtitle style

Floating Washer

This technology is only usedfor high viscosity products.

Could be used from 6 000 to more than 1 000 000 cPs.

Extrusion pumps mechanically check-off fluid flow.

“Shovel” or “button” mechanically pulls fluid into pump inlet

Chop Check what is it!

Page 7: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company7

Click to edit Master subtitle styleFloor Mounts

Used when fluids are stored in large bulk containers. Gravity feeds materialinto the pump inlet. Always locate the pump as close to the fluid containeras possible.

Mounting Style

Page 8: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company8

Click to edit Master subtitle styleNP322L0X-1Pressure Ratio 22/1Carbon Steel (X = 1)Stainless Steel (X = 2)Drum 30 KgCART Single Cylinder / Simple Effect

For 25 Kg/60 Kg

650 54X-1Pressure Ratio 43/1Carbon Steel (X = 1)Stainless Steel (X = 2)Drum 30 KgCART Single Cylinder / Simple Effect

NP322R0X-1Pressure Ratio 22/1Carbon Steel (X = 1)Stainless Steel (X = 2)Drum 30 KgCART Single Cylinder / Double Effect

Package Configuration

Page 9: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company9

Click to edit Master subtitle style650 54X-1Pressure Ratio 43/1Carbon Steel (X = 1)Stainless Steel (X = 2)Drum 30 KgCART Single Cylinder / Double Effect

For 25 Kg/60 Kg

NP443R01Pressure Ratio 43/1Drum 30 KgRAM Double Cylinder / Double Effect

Package Configuration

Page 10: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company10

Click to edit Master subtitle style

For 200 Kg

NP4XXR-XX-XXX

Air Motor Series

4 : 4 ¼"Pump Information21 : 30/1 SS-2 Ball pump

22 : 22/1 SS-2 Ball pump

24 : 11/1 SS- 2 Ball pump

31 : 23/1 Chop Check pump

34 : 12/1 Chop Check pump

Packing Options

Follower Options

Package Configuration

Page 11: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company11

Click to edit Master subtitle style

For 200 Kg

NP6XXR-XX-XXX

Air Motor Series

6 : 6"Pump Information21 : 60/1 SS-2 Ball pump

22 : 45/1 SS-2 Ball pump

24 : 22/1 SS- 2 Ball pump

31 : 23/1 Chop Check pump

34 : 12/1 Chop Check pump

Packing Options

Follower Options

Package Configuration

Page 12: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company12

Click to edit Master subtitle style

For 200 Kg

NP8XXR-XX-XXX

Air Motor Series

8 : 8"

Pump Information

34 : 44/1 Chop Check pump

Packing Options

Follower Options

Package Configuration

Page 13: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company13

Click to edit Master subtitle style• 66236-X (CS)

(39.7-lpm)

• 67300-X (CS)

(22.94-lpm)

• 66243-X (CS)(12.5-lpm)

• 66266-X (CS)(7.9-lpm)

• 6710X-X (CS or SS)(2.9-lpm)

Extrusion- Configurable pumps

5 Lower ends configuring all our extrusion range

Chop Check Style

Page 14: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company14

Click to edit Master subtitle styleChop Check Model Ratio Flow/Lpm Dis.p.cyc Lower pump Motor Mounting67100-X NM2322E-11 22/1 3,7 0,031 L Carbon Steel 3" Short67101-X NM2322F-11 22/1 3,7 0,031 L St. Steel 3" Short67100-X 67 120-P43 43/1 3,4 0,045 L Carbon Steel 4" 1/4 Short67101-X 67 121-P43 43/1 3,4 0,045 L St. Steel 4" 1/4 Short67100-X 67 124-P43 43/1 3,4 0,045 L Carbon Steel 4" 1/4 Long67101-X 69 125-P43 43/1 3,4 0,045 L St. Steel 4" 1/4 Long

2 Lower end pump1- Carbon Steel1- Stainless Steel= 6 models

Extrusion- Configurable pumps For 25-60Kg

Page 15: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company15

Click to edit Master subtitle style

Chop Check Model Pressure Ratio Flow Lpm Dis.per/Cycle Motor66243-X 650 491-XXX 12/1 12 0,20 L 4" 1/466236-X 650 871-XXX 13/1 40 0,66 L 8"66236-X 650 875-XXX 20/1 40 0,66 L 10"66266-X 650 492-XXX 23/1 8 0,10 L 4" 1/466243-X 650 691-XXX 23/1 12 0,20 L 6"66236-X 650 971-XXX 30/1 40 0,66 L 12"66243-X 650 891-XXX 44/1 12 0,20 L 8"66266-X 650 692-XXX 46/1 8 0,10 L 6"67300-X 650888-XXX 28/1 22 0,32 L 8"67300-X 650889-XXX 44/1 23 0,32 L 10"67300-X 650989-XXX 65/1 24 0,32 L 12"

Extrusion- Configurable pumps for 200-1000 Kg

Page 16: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company16

Click to edit Master subtitle style

Models 650 888-XXD 650 889-XXD 650 989-XXD

Air Motor 8" 10" 12"

Air Inlet 2 - 8,4 bar 2 - 8,4 bar 2 - 8,4 bar

Outlet Fluid Pressure 57 - 229 bar 90 - 270 bar 135 - 403 bar

Ratio 28/1 44/1 65/1

Volume/Cycle 327,6 cm3 327,6 cm3 327,6 cm3

Flow at 70 Cycles/mn 22,94 L/mn 22,94 L/mn 22,94 L/mn

Same Lower end for these three modelsLower end 67300-XXX

Extrusion High FlowNew Model introduced on 2001 - 65/1

Page 17: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company17

Click to edit Master subtitle style2 Ball Lower Model Pressure Ratio Dis.p. Cycle Flow Lpm Motor

66300-X 650483-C43 11/1 237,6 Cm3 12,4 Lpm 4"1/466301-X 650484-C43 22/1 122,9 Cm3 7,2Lpm 4"1/466302-X 650485-C43 30/1 90,1 Cm3 4,9Lpm 4"1/4

2 Ball Lower Model Pressure Ratio Dis.p. Cycle Flow Lpm Motor66300-X 650683-C43 23/1 237,6 Cm3 12,4 Lpm 6"66301-X 650684-C43 45/1 122,9 Cm3 7,2 Lpm 6"66302-X 650685-C43 60/1 90,1 Cm3 4,9 Lpm 6"

= 3 ModelsWith a 4”1/4

Motor

= 3 ModelsWith a 6”

Motor

2 Ball Lower Model Pressure Ratio Dis.p. Cycle Flow Lpm Motor66300-X 650883-C4X 40/1 237 cm3 13,9 8"

Integrity 2 Ball Piston Pumps

= 1 ModelWith a 8”

Motor

3 Lower ends for 7 different pump models

Page 18: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company18

Click to edit Master subtitle styleAdhesivesGreaseInksCosmeticResins MasticsVarnishes CaulksSealantsSiliconsHeavy LubricantsR.T.V. Materials

Pressure RatioNeeded 12/1-65/1

Usually most of theseproducts are conditionedin Large containers

Markets

Page 19: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company19

Click to edit Master subtitle style

Tighten applications

21/1-46/1

ARO

Doors & Windows Industries

Automotive Industry

SealersWindow Primer/SealersSound DeadenerUnderbody Anti-RustWaxWeld SealerPVCs

High potentialfor regulators

Wood IndustryHeavy gluesPolyurethaneNeoprene

Markets

Page 20: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company20

Click to edit Master subtitle style

WINDOWS INSULATIONTIGHTENNINGELECTRONIC…SETTLING COMPOUNDING

AUTOMOTIVEMisc glued pieces applications

23/1-46/1

ARO

Rifigerator, Micro waves, (White Market)

Mastics & Silicones

Markets

Page 21: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company21

Click to edit Master subtitle style The Glass industry for application of mastic silicone for insulating and gluing.

Manufactures, when the assembling mast have a certain tightness : (Ex : ELECTRICFIL, ALSTOM, SOULE, VALEO, SCHLUMBERGER, L’UNITE HERMETIQUE, EURAMAX, etc.)

Markets

Page 22: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company22

Click to edit Master subtitle style

AUTOMOTIVETRAINCABLES PASSAGEROLLING MILLPLANESIDERURGYEtc.

23/1-50/1

Heavy Industrial Grease

Markets

Page 23: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company23

Click to edit Master subtitle style

SHIP-BUILDINGTEXTILE COATING

12/1-23/1

Molding for electronic

Bases for paint varnish, inks, etc.

Warning: Often very Sticky Products

Resins

Markets

Page 24: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company24

Click to edit Master subtitle styleINK

10/1-23/1

Ad case studies and pipes installation

National News PapersColdset inks

Sheet feed, Heatset inks

High potential in Money bills Manufactures, usually using high quality abrasives ink.

UV inks, only some specifics!

Markets

Page 25: Piston Pumps & Package Fluid Handling Training. Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company 2 Click to edit Master subtitle style.

Fluid Handling Training 300 Level © 2006 Ingersoll Rand Company25

Click to edit Master subtitle style

Stinger 4-Ball Pumps• 4¼”, 6” & 8” Air Motors.

• Delivery up to (109-lpm).

• Ratios 2:1 to 7:1.

• Typically used in recirculating finishing applications.

• All Stainless parts are Passivated or Electro-Polished.

• Pumps contain NO carbon steel.

• Constructed of 17/4 hardened stainless.

• Ultra coating standard on plunger rod and pump tube.

• Stinger lowers constructed from “investment” castings