Pipeline Mike Cox State Conservation Engineer Contractor Certification Training March 2008
Feb 11, 2016
PipelineMike Cox
State Conservation Engineer
Contractor Certification Training
March 2008
Purpose: Conveying Water from a Source of Supply to Points of Use for Livestock, Wildlife, or Recreation.
Pipeline (516)
Most Pipelines in Indiana are to
provide water for grazing livestock
Pipeline Standard (516)
• Working pressure shall not exceed 72% of the pressure rating of the pipe
• Approved backflow device shall be installed if the pipeline may be used for human consumption
• Will be buried below frost line or protected from freezing
Pipeline Installation• Must be installed to the minimum depth specified
on the plans • Typically 24” to 36” depending on area of the state
• System shall be pressure tested at the designed working pressure for 2 hours
Pipeline Installation
• If limestone or large rock is encountered, the pipe may need bedding:
– Trench shall be undercut a minimum of 4 inches
– 4 inches of sand, compacted fine grain soils, crushed limestone (#11) or pea gravel
– Final backfill material shall be free of large rocks, frozen clods, and other debris greater than 3 inches in diameter
Installation Report
IN-ENG-74
http://www.in.nrcs.usda.gov/technical/engineering/ConsDrawings/pdf/in-eng-74.pdf
United States Department of Agriculture IN-ENG-74 Natural Resources Conservation Service (8-06)
PIPELINE INSTALLATION REPORT OWNER/USER NAME: __________________________ Tract No. ______________ COUNTY: __________________ LOCATION: ________________ Section_______ Township _______ Range _______ Pipeline or Segment Number
Pipe Outside Diameter (in)
Length Installed
(feet)
Material Type
Pipe Schedule or SDR
Pressure Rating
(psi)
Grade (gravity
only) I am certifying that I have installed the pipeline, connectors, valves, etc., as stated in the engineering plans in accordance with the Natural Resources Conservation Service Construction Specifications. The pipeline is installed ______” or deeper as specified in the engineering plans. The pipeline was pressure tested in accordance with the construction specifications. CONTRACTOR: __________________________ BY: ______________________________ (PRINT) (SIGNATURE) ADDRESS: ___________________________ TITLE: ___________________________ CITY: __________________________ DATE: ____________________________