Top Banner
A Fairfax County, VA, publication Department of Public Works and Environmental Services Working for You! Fairfax County Park Authority, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration Project No. PR-000012-020 Task Order No. 35 Mason District May 17, 2016
12

Pinecrest Golf Course Stream Restoration April 2016

Apr 13, 2017

Download

News & Politics

Fairfax County
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pinecrest Golf Course Stream Restoration April 2016

A Fairfax County, VA, publication

Department of Public Works and Environmental Services

Working for You!

Fairfax County Park Authority, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Project No. PR-000012-020Task Order No. 35Mason District

May 17, 2016

Page 2: Pinecrest Golf Course Stream Restoration April 2016

Fairfax County Park Authority (FCPA), Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Page 3: Pinecrest Golf Course Stream Restoration April 2016

Project DetailsFCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

The purpose of this project was to stabilize and restore an eroded stream channel within Pinecrest Golf Course that is owned and operated by FCPA. This project was substantially completed on time and within budget on April 28, 2016.

Project Overview:• Channel improvement and stream bank stabilization of approximately 185 linear feet of Turkeycock Run

between the existing upper pond and the twin 54” culverts alongside the tee box of Pinecrest Golf Course hole no. 8

• Installation of imbricated rock walls and two (2) in-stream rock structures• Installation of coir log toe protection• Planting of native shrubs and grasses to promote the natural reforestation of the project site and enhance

habitat

Project Team:• Kelly Davis –FCPA• Brian Dunn and Michael Chipouras – FCPA (Pinecrest Golf Course)• Yudhie Brownson – Utilities Design & Construction Division (UDCD)• Jeff Bartlett – Inspector, UDCD

Page 4: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Pinecrest Golf Course Project Site– Tax Map No. 72-1

Pinecrest GC Stream Restoration - Approximate

Project Limits

Page 5: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Pre-Construction

Page 6: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Pre-Construction

Page 7: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

During Construction

Page 8: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

During Construction

Page 9: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Post Construction

Page 10: Pinecrest Golf Course Stream Restoration April 2016

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Post Construction

Page 11: Pinecrest Golf Course Stream Restoration April 2016

Before After

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Page 12: Pinecrest Golf Course Stream Restoration April 2016

Additional Information

For additional Information, please call

www.fairfaxcounty.gov/dpwes

FCPA, Turkeycock Run Stream Valley – Pinecrest Golf Course Stream Restoration

Capital Facilities/Utilities Design and Construction Division/Transportation & Stormwater Construction Branch

Irene Haske, Public Information Officer703-324-5500, TTY 711

[email protected]