Halal Hub Hyper market Design Brief• The proposed Hypermarket builds up area of approx 160,000 sq. ft. • Construc ti on gr id 105.00m x 85.00m de pe nd ing on si te configuration and levels. • Façade and Floor heights shall conform to client’s requirements. • A soft copy is enclosed for easy reference. • Provision for car parking lots is min 500 units (Covered or semi- covered) • Al l open space par king shall be semi-c ove red wi th min 1350 width for walkway car park bay shall include wheels stopper. • Provision for motorcycle bay shall be included. • Ingress-Egress, external boundaries parameters landscape shall comply with PBT’s/Authority requirements. A. The gross build up area shall be segmented into three (3) major areas of activities. i. Loading area, storage, mechanical space, staf f canteen and admini str ati on off ice = 15% of bui ld up area (appro x 20,000.00 – 25,000.00 sq. ft.) ii. Supermarket area: 55% of build up area (approx 85,000.00 – 90,000.00 sq. ft.) iii. Mall: 30% of build up area (approx 45,000.00 – 50,000.00 sq.ft.) iv. For maximum space, AHU’s shall be elevated where appropriate. v. Loading area shall have a raise d platf orm o f min 900 to 1200, vi. Min of four (4) loading bays is requires with provision for receiving boxes and a receiving office.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
• The proposed Hypermarket builds up area of approx 160,000 sq.ft.
• Construction grid 105.00m x 85.00m depending on siteconfiguration and levels.
• Façade and Floor heights shall conform to client’s requirements.
• A soft copy is enclosed for easy reference.
• Provision for car parking lots is min 500 units (Covered or semi-
covered)• All open space parking shall be semi-covered with min 1350width for walkway car park bay shall include wheels stopper.
• Provision for motorcycle bay shall be included.
• Ingress-Egress, external boundaries parameters landscape shallcomply with PBT’s/Authority requirements.
A. The gross build up area shall be segmentedinto three (3) major areas of activities.
i. Loading area, storage, mechanical space, staff canteen andadministration office = 15% of build up area (approx 20,000.00 –
25,000.00 sq. ft.)ii. Supermarket area: 55% of build up area (approx 85,000.00 –
90,000.00 sq. ft.)iii. Mall: 30% of build up area (approx 45,000.00 – 50,000.00 sq.ft.)iv. For maximum space, AHU’s shall be elevated where appropriate.v. Loading area shall have a raised platform of min 900 to 1200,
vi. Min of four (4) loading bays is requires with provision for receivingboxes and a receiving office.
vii. For double storey unit, provision for a wet and dry goods lift isnecessary.
viii. Storage area shall be partition off with security mesh.ix. An inventory office shall be provided within the storage area.x. Staff canteen requirement is approx 50 to 60 pax.
Staff access, male/ female Toilets, Suraus, Lockers security guard roomand scanning device shall be located strategically whilst theAdministration office shall include the Followings:
a. Meeting room 1 No (20pax)b. Discussion room 1 Noc. Head of Department 2 Nod. Accountant 1 Noe. Computer Server 1 Nof. Strong room 1 No
1. Supermarket Commercial Area Proper:• Min. of Twenty-four (24) paying counters bare necessities.
Construction and working drawings detail are required for theimplementation and construction used for the above works.
1.1 External WorksAction
a. Fencing and gate b. Compound drain/ external drain access panels and culvertc. Drains grating and typical sump pitd. Typical discharge pointe. Settlement joint/ expansion jointf. Kerb, Footpath and wheel stopg. Drainage system for turfing/ landscapeh. Planter box and conceal weep holei. Covered car park structure
A code j. Light bollards for trolleys
k. Project signboard and hoarding
2.1 Internal worksa. Roof gutter and down pipes b. Fascia, ridge/ gable endc. Roof scupper drain and vent pipe over metal sheetd. Roof insulation formate. Roof flashingf. Other relevant details
2.2 Railings & Ornamental Finishing
a. Lift (if applicable) b. Travelator’s and core setting outc. Conceal gutterd. Railings and other fixed and integrated elements which apply
vertically or horizontally throughout the building min. scale 1:5(working detail) 1:50 (construction detail)
e. Lift Façade (if applicable)
3.1 Architectural Detailing Schedules:a. Doors & windows schedules, b. Overhead roller-shutters & security grilles schedules
c. Shop front scheduled. Other decorative and metal and aluminum related work,e. Office prefabricated curtain claddings and blinds or otherwisef. Inter-tenancy partition (between shop lots)
8.1 Ceilinga. Gypsum plasterboard/ fibrous plasterboardb. Interfacing of ceilingc. Modular acoustic mineral board (office)d. Gondolas, racks, cold area multi deck display by other?