Top Banner
FINANCE DEPARTMENT GOVERNMENT OF JAMMU & KASHMIR OF PROJECTS/WORKS COMPLETED DURING 2019-20 (UT SECTOR) PICTORIAL COMPENDIUM 2A
700

PICTORIAL COMPENDIUM

Mar 17, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PICTORIAL COMPENDIUM

FINANCE DEPARTMENTGOVERNMENT OF JAMMU & KASHMIR

OF PROJECTS/WORKS COMPLETED DURING 2019-20 (UT SECTOR)

PICTORIAL COMPENDIUM

2A

PICTORIAL COMPENDIUM

2A

Page 2: PICTORIAL COMPENDIUM

of Projects/Works Completed during 2019-20 (UT sector)

PICTORIAL COMPENDIUM

2A

FINANCE DEPARTMENTGOVERNMENT OF JAMMU & KASHMIR

Page 3: PICTORIAL COMPENDIUM

Designed by Web Chasers, SrinagarPublished by Finance Department, Govt. of J&K

Publication Year: August 2020

Page 4: PICTORIAL COMPENDIUM

III

The benefits of development percolate down to the masses primarily only after projects/works get complet-ed in a time bound manner with adherence to all requisite norms and maintenance of quality parameters. The UT of J&K is committed to change the perception and tradition where by projects were executed and

tenders invited without budgetary support besides frequently changing the specifications and project designs resulting in cost and time overruns.

Finance Department has laid sharp focus on completion of development projects, their physical verification and concurrent evaluation so that remedial measures are taken even during the course of execution of the projects/works. These measures clubbed with making Administrative Approvals, Technical Sanctions, implementation of Pulse application, making photographic evidence before and after execution of projects mandatory etc. will ulti-mately lead to efficiency in planning, management and monitoring of the developmental activities.

A picture is worth a thousand words. Proper documentation of development projects completed with photo-graphic evidences is an effort towards our endeavour for brining transparency and accountability in execution of works. The pictorial compendium of projects/works completed during 2019-20 (UT sector) has been prepared by the Expenditure Division-II of the Finance Department. The compendium is in two volumes and contains dis-trict-wise/source-wise details of development projects/works of 33 Administrative Departments. I hope that the compendium will imbibe sense of accountability among the executing agencies as it is open to masses to see developmental works that have been executed in their respective areas. I felicitate my team of officers/officials in Expenditure Division-II for putting in hard efforts for completion of the compendium in a record time.

(Dr. Arun Kumar Mehta)

DR ARUN KUMAR MEHTAIAS

FINANCE COMMISSIONERFINANCE, J&K

Page 5: PICTORIAL COMPENDIUM
Page 6: PICTORIAL COMPENDIUM

Rural Development Department

Page 7: PICTORIAL COMPENDIUM

2

Const. of road from main road to Peer Dardun at Beegam.Constt. of lane with tiles at Waltengo

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Date of start: 18-08-2019

Date of completion: 20-10-2019.

Approved Cost: 150 Lakh

Completion cost: 1.50 lakh

No. of souls benefitted: 260

Comments of stakeholders: Facilitates all weather connectivity.

Date of start: 05-05-2019

Date of completion: 18-08-2019

Approved Cost: 1.00 lakh

Completion cost : 1.00 lakh

No. of souls benefitted: 320

Comments of stakeholders: Facilitates the connectivity for agricultural purpose.

Page 8: PICTORIAL COMPENDIUM

3

Drain from M/School Trahpoo to main Road to Shop of Farooq Tailor Trahpoo

Crossing Near Land Mohd Ishaq Mir at Tancha Khah Damhall

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Date of commencement: 04.11.2019

Date of completion: 03.12.2019

Approve Cost: 3.06

Completion cost : 3.06

No. of people benefited: 380

Cmments of stakeholders: Important nature of work/quality work/public utility

Date of commencement: 06.08.2019

Date of completion: 19.12.2019

Approve Cost: 3.00

Completion cost : 3.00

No. of people benefited: 260

Comments of stakeholders: Important nature of work/quality work/public utility

Page 9: PICTORIAL COMPENDIUM

4

Date of Commencement: 01.11.2019

Date of completion: 23.12.2019

Approve Cost: 4.00

Completion cost : 4.00

No. of people benefited: 170

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 9.08.2019

Date of completion: 22.12.2019

Approve Cost: 4.00

Completion cost : 4.00

No. of people benefited: 320

Comments of stakeholders: Important nature of work/quality work/public utility

F.P Bund NLO Nisar Ahmad Mir and others at Tailwani Tile path at Naikpora Tailwani

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 10: PICTORIAL COMPENDIUM

5

Fencing Graveyard at GopalporaCulvert at Thajiwara

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Date of Commencement: 11.11.2019

Date of completion: 22.12.2019

Approve Cost: 1.50

Completion cost : 1.50

No. of people benefited: 150

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 11.09.2019

Date of completion: 30.12.2019

Approve Cost: 3.00

Completion cost : 3.00

No. of people benefited: 320

Comments of stakeholders: Important nature of work/quality work/public utility

Page 11: PICTORIAL COMPENDIUM

6

Date of Commencement: 02.0.10.2019

Date of completion: 12.12.2019

Approve Cost: 5.00

Completion cost : 5.00

No. of people benefited: 180

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 02.07.2019

Date of completion: 12.12.2019

Approve Cost: 5.00

Completion cost : 5.00

No. of people benefited: 140

Comments of stakeholders: Important nature of work/quality work/public utility

Irrigation Ladh Sheikh Mohalla at Hanji Danter Link Road with E/Wall Malpora Anzullah

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 12: PICTORIAL COMPENDIUM

7

Date of Commencement: 15.10.2019

Date of completion: 29.12.2019

Approve Cost: 3.00

Completion cost : 3.00

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 14.08.2020

Date of completion: 23.12.2019

Approve Cost: 5.12

Completion cost: 5.12

No. of people benefited: 430

Comments of stakeholders: Important nature of work/quality work/public utility

Graveyard at Ruhoo Earth filling Graveyard with Drain at Ganie Check Anzwalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 13: PICTORIAL COMPENDIUM

8

Date of Commencement: 11.06.2019

Date of completion: 26.12.2019

Approve Cost: 3.00

Completion cost : 3.00

No. of people benefited: 110

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 30.09.2019

Date of completion: 28.12.2019

Approve Cos: 3.15

Completion cost: 3.15

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

irrgation Ladh from Mohd Maqbool Dar to Mongcal, Monghall Irrigation Ladh from Makahal to Rakh at Aung

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 14: PICTORIAL COMPENDIUM

9

Date of Commencement: 18.08.2019

Date of completion: 23.12.2019

Approve Cost: 3.50

Completion cost : 3.50

No. of people benefited: 135

Comments of sakeholders: Important nature of work/quality work/public utility

Date of Commencement: 02.06.2019

Date of completion: 23.12.2019

Approve Cost: 5.00

Completion cost : 5.00

No. of people benefited: 140

Comments of stakeholders: Important nature of work/quality work/public utility

Lane/Drain from S/O Shabir Ahmad to H/O Ab Rashid at Donipawa Xing to Nandi Nallah at T.Tachloo Shamsipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 15: PICTORIAL COMPENDIUM

10

Date of Commencement: 19.10.2019

Date of completion: 28.12.2019

Approve Cost: 10.00

Completion cost : 10.00

No. of people benefited: 1500

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 02.05.2019

Date of completion: 25.12.2019

Approve Cost: 5.98

Completion cost : 5.98

No. of people benefited: 370

Comments of stakeholders:

Important nature of work/quality work/public utility

Development of Play Field at Sursoona link Road Pushwariteng to kanjzigund to gund onwards soiling with edge wall

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 16: PICTORIAL COMPENDIUM

11

Date of Commencement: 28.09.2019

Date of completion: 20.12.2019

Approve Cost: 3.40

Completion cost : 3.40

No. of people benefited: 1200

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 09.08.2019

Date of completion: 28.12.2019

Approve Cost: 3.40

Completion cost : 3.40

No. of people benefited: 1200

Comments of stakeholders: Important nature of work/quality work/public utility

Irr Ladh Nlo M Maqbool Bhat And Others At Nard Bal At Laribal Krindigam

Link Road With E/Wall From PMGSY Road To Sangman Dadoo Panchpora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 17: PICTORIAL COMPENDIUM

12

Date of Commencement: 09.07.2019

Date of completion: 25.12.2019

Approve Cost: 5.00

Completion cost : 5.00

No. of people benefited: 800

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 02.10.2019

Date of completion: 19.12.2019

Approve Cost: 3.40

Completion cost : 3.40

No. of people benefited: 1500

Comments of stakeholders: Important nature of work/quality work/public utility

Link Road from Main Road Panjpora Herpora via Rather Mohalla

R/Wall Grave Yard Ziyarat Sharif At Astanpora Guree

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 18: PICTORIAL COMPENDIUM

13

Date of Commencement: 09.09.2019

Date of completion: 05.12.2019

Approve Cost: 4.00

Completion cost : 4.00

No. of people benefited: 2500

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 05.6.2019

Date of completion: 31.12.2019

Estimated Cost: 1.00

Completion cost: 1.00

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

link Roaf from Snagam Bridge to irrigation Gaguge at Sangam G.B Khalil Crossing at Lonepora chittergul B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 19: PICTORIAL COMPENDIUM

14

Date of Commencement: 07.10.2019

Date of completion: 22.12.2019

Approve Cost: 2.80

Completion cost : 2.80

No. of people benefited: 1300

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 02.10.2019

Date of completion: 22.12.2019

Approve Cost: 3.20

Completion cost : 3.20

No. of people benefited: 1500

Comments of stakeholders: Important nature of work/quality work/public utility

Road from Pyt. Ghar to L/O Gul Mohd Dar to Bilal Ahmad & others

Link Road From M/R To H/O Reyaz Malik And Others At Jablipora A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 20: PICTORIAL COMPENDIUM

15

Date of Commencement: 14.08.2019

Date of completion: 25.12.2019

Approve Cost: 3.20

Completion cost : 3.20

No. of people benefited: 1425

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 11.06.2019

Date of completion: 25.12.2019

Approve Cost: 3.40

Completion cost : 3.40

No. of people benefited: 1000

Comments of stakeholders: Important nature of work/quality work/public utility

Irr Ladh Near L/O Subhan Pandith To L/O Bashir Malik And Others Crossing near Jamia Masjid Sangam Sundbari A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 21: PICTORIAL COMPENDIUM

16

Date of Commencement: 05.05.2019

Date of completion: 26.12.2019

Approve Cost: 3.40

Completion cost : 3.40

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 02.04.2019

Date of completion: 10.12.2019

Approve Cost: 3.40

Completion cost : 3.40

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

protection work near AWC at Potonpora Hallpora Adhall Breng Irrigation Ladh at Chopan Mohallah Aoh

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 22: PICTORIAL COMPENDIUM

17

Date of Commencement: 19.08.2019

Date of Completion: 31.12.2019

Approved Cost: 3.20

Completion cost : 3.20

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 12.09.2019

Date of completion: 25.12.2019

Approved Cost: 3.00

Completion cost : 3.00

No. of people benefited: 350

Comments of stakeholders: Important nature of work/quality work/public utility

Public park near Shamshahn Ghar Ranipora P/Bund Near orchard of Javid Ahmad Bhat & others at village Chingund bewoora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 23: PICTORIAL COMPENDIUM

18

Date of Commencement: 09.07.2019

Date of completion: 28.12.2019

Approved Cost: 2.99

Completion cost : 2.99

No. of people benefited: 450

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 09.06.2019

Date of completion: 25.12.2019

Approved Cost: 2.40

Completion cost : 2.40

No. of people benefited: 450

Comments of stakeholders: Important nature of work/quality work/public utility

R/Wall NHO Showkat Ah.Ganie and others at Chinigund

Passenger Shed at Saller near Sumo Stand

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 24: PICTORIAL COMPENDIUM

19

Date of Commencement: .05.2019

Date of completion: 31.12.2019

Approved Cost: 2.00

Completion cost : 2.00

No. of people benefited: 300

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 01.08.2019

Date of completion: 27.12.2019

Approved Cost: 2.99

Completion cost : 2.99

No. of people benefited: 250

Comments of stakeholders: Important nature of work/quality work/public utility

drain with edge wall NLO Mohd Maqbool and Others at Nowpora

Drain with edge wall NLO Gh Nabi and Others at Nowpor

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 25: PICTORIAL COMPENDIUM

20

Date of Commencement 10.09.2019

Date of completion: 25.02.2020

Approved Cost: 3.70

Completion cost : 3.70

No. of people benefited: 150

Comments of stakeholders: Important nature of work/quality work/public utility

Date of Commencement: 08.06.2019

Date of completion: 25.02.2020

Approved Cost: 2.20

Completion cost : 2.20

No. of people benefited: 100

Comments of stakeholders: Important nature of work/quality work/public utility

Tile Path at Dangerpora Nanil Drain /Earth Filling Govt. Primary School ground at Akad

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 26: PICTORIAL COMPENDIUM

21

Date of Commencement 3.08.2019

Date of completion 30.12.2019

Approved Cost: 2.75

Completion cost : 2.75

No. of people benefited: 190

Comments of stakeholders: Important nature of work/quality work/public utility

Date of commencement: 19.09.2019

Date of completion: 15.02.2020

Approved Cost: 3.60

Completion cost : 3.60

No. o people benefited: 260 PPL

Comments of stakeholders: Important nature of work/quality work/public utility

Drain Bonkah Bradus at Shamispora Construction of crossing at Markibalard charigam yanner A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 27: PICTORIAL COMPENDIUM

22

Date of commencement: 21.06.2019

Date of completion: 31.2.2020

Approved Cost: 3.52

Completion cost : 3.52

No. of people benefited: 490 People

Comments of stakeholders. Much needed/community benefit/quality work

Date of commencement: 05.08.2019

Date of completion: 30.12.2019

Approve Cost: 6.00

Completion cost : 6.00

No. of people benefited: 370

Comments of stakeholders: Important nature of work/quality work/public utility

Construction Of Ghat Near Jamia Masjid Sharief Awoora Crossing near Masjid Sharief Kutbal Shelipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 28: PICTORIAL COMPENDIUM

23

Date of commencement: 19.11.2019

Date of completion: 31.12.2019

Approved Cost: 1.50

Completion cost : 1.50

Physical Status Completed Physically

No. o people benefited: 380 PPL

Comments of stakeholders

Much needed/community benefit/quality work

Date of commencement: 01.11.2019

Date of completion: 15.02.2020

Approved Cost: 3.13

Completion cost : 3.13

Physical Status Completed Physically

No. of people benefited: 180 persons

Comments of stakeholders

Much needed/community benefit/quality work

Construction Of Bund Near H/O Javaid Iqbal Shah Iram Colony Ainoo(Pyt) Aishmuqam.

C/O P/wall at Damjan Ladh on Nalla Sandarn at Sangarn

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 29: PICTORIAL COMPENDIUM

24

Date of Commencement: 13-03-2019

Date of Completion: 24-03-2020

Approved Cost: 1.66 lacs

Completion Cost: 1.66 lacs

Funds Released (CD&Pyts) = Nil

Expenditure incurred= Nil

Physical Status= Completed

No of People Benefitted: 250 Approx

Comments of Stakeholders: Enhanced rural connectivity & Provide access to agricultural fields

Much Needed/quality work:

Scheme:- CD panchayats

Date of Commencement: 10-12-2019

Date of Completion: 24-03-2020

Estimated Cost: 4.85 lacs

Completion Cost: 4.85 lacs

Funds Released (CD&Pyts) = Nil

Expenditure incurred= Nil

Physical Status= Completed

No of People Benefitted: 450 (Approx)

Comments of Stakeholders: Infrastructure development

Much Needed/quality work: Maintained Quality Standard

Scheme: C&D Panchayat + MGNREGA

C/o Culver at Eidgah Tilgam-B . C/o Fencing grave yard at Pethpora Wanigam Bala.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 30: PICTORIAL COMPENDIUM

25

Date of commencement: 2019-20

Date of Completion : March 20Estt

Cost: 2.72

Completion Cost:

No.of Population to be Benefited: 300

Comments on Stake Holder:-

Date of Commencement: 29-01-2020

Date of Completion:

Estimated Cost: = 4.80 Lacs

Completion cost =: 4.80 Lacs

Number of People Benefitted: 350

Much Needed and Quality Work.

Const of Culvert on Habligam to Hardbani road NLO mohd Sultan Mir Devbugh C/o Chopan Mohalla Drain at Mundji (Noorabad)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 31: PICTORIAL COMPENDIUM

26

Date of Start :- 28/01/2020

Date of Completion:- 15/03/2020

Approved Cost:- 2.13

Completion cost:- 2.13

No. of Souls Benefited:- 1200

Comments of Stakeholders:- There were a great need of this culvert having public demand as well as community based benefit .This Culvert is providing connectivity to vast land of Horticulture & Agriculture.

Date of start :- 25/02/2020

Date of Completion:- 23/03/2020

Approved Cost:- 2.29 lakh

Completion cost:- 2.29

No. of Souls Benefited:- 500

Comments of Stakeholders:- There were a great need of this culvert hav-ing public demand as well as community based benefit . This Culvert is providing connectivity to vast land of Horticulture & Agriculture.

C/o Culvert on Gundbal Road in Reban B C/o Culvert at sheikh Mohalla Panzalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 32: PICTORIAL COMPENDIUM

27

Date of Start - 25/02/2020

Date of Completion:- 30/05/2020

Approved Cost:- 1.85

Completion cost:- 1.85

No. of People Benefited:- 700Comments of Stakeholders:- There were a great need of this culvert having public de-mand as well as community based benefit . This Culvert is providing connectivity to two Hamlets of panchayat & it also connected vast land of Horticulture & Agriculture.

Date of Start- 01/03/2020

Date of Completion:- 3/2020

Approved Cost:- 2.17 Lakh

Completion cost:- 2.17

No. of People Benefited:- 600Comments of Stakeholders:- There were a great need of this culvert having public demand as well as community based benefit . This Culvert is providing connectivity to Pilgrims coming from different areas to pay Visit to Ziyarat Sharief & it also connected vast land of Horticulture & Agriculture.

C/o Culvert at Dar Mohalla & Ganie Mohalla Panzalla C/o Culvert near Ziyarat shareef Bibiya Khahmoh

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 33: PICTORIAL COMPENDIUM

28

Date of commencement:- 2018-19

Date of Completion :- march 2020

Estt Cost:- 3.29

Completion Cost:- 3.29

No.of Population to be Benefited:- 80

Comments on Stake Holder:-

Date of Completion:-

Approved Cost:- Rs3.90lacs

Completion cost:- 3.90 lack

Physical Status:- Under Process

No of Souls benefited:-

Comments of Stakeholder:-

Const of Culvert at Gam khul sonlipora bitehpora tangmarg

Constt. Of R/wall and Drain at New Chopan Mohalla Near land of Mohd. Yousf Chopan at Hudpora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 34: PICTORIAL COMPENDIUM

29

Date of commencement:- 2019-20

Date of Completion :- 20/03/2020

Estt Cost:- 3.00

Completion Cost:- 3.00

No.of Population to be Benefited:- 145

Comments on Stake Holder:-

Date of Commencement: 15-02.2020

Date of Completion: 3/20

Approved Cost: 4.69lacs

Completion Cost: 4.69 lacs

Expenditure incurred Nil

Const of Culvert on Tilgam Khul at Kralpora C/o R Wall Near pna Pyt Ghar Sangrama

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 35: PICTORIAL COMPENDIUM

30

Date of Commencement: 30/12/2019

Date of Completion: 18/03/2020

Estimated Cost: 2.65 lacs

Completion Cost: 2.57 lacs

No. of People benefitted: 80 Households

Comments of Stakeholders: Much needed / quality Work: Very Good

Date of Commencement: 01-03-2020

Date of Completion: 31-03-2020

Approved Cost: 3.99 lacs

Completion Cost: 3.99 lacs

Expenditure incurred; Nil

C/o Fencing of Graveyard Tang at Logripora tujjer C/o Culvert NHO Haji Ab Rehman Mir on Main Nallah Gantamulla Bala

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 36: PICTORIAL COMPENDIUM

31

Date of Commencement: 01-03-2020

Date of Completion: 31-3-2020

Estimated Cost: 4.41 lacs

Completion Cost: 4.41 lacs

Expenditure incurred= Nil

Date of Commencement: 0212-2019

Approved Cost: 4.00 lacs

Completion Cost: 4.00 lacs

Expenditure incurred= 1.5 Lacs + 0.40LacsNil

No of People Benefitted: 211 Approx

Comments of Stakeholders:Enhanced rural connectivity & Provide access to agricultural fields Much Needed/quality work:

C/o Culvert at Kesari Nallah Fatehgarh Laying of Grade 3rd from Bye Pass ( Petrol Pump) to H/O Farooq Ahmad at Nowpora A

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 37: PICTORIAL COMPENDIUM

32

Date of Commencement:- 08.01.2019

Date of Completion:- 31.01.2020

Estimated cost:- 3.00 Lakh

Completion cost :- 3.00 lakh

Expenditure CD & Pyt :- 0.87 Lkh

No. of people benefited:- 60 House Holds

Comments of stakeholders:- The work is of community benefit Much needed/quality work is satisfactory

Date of Commencement:- 20.03.2019

Date of Completion:- 19.06.2019

Estimated cost:- 2.00 Lakh

Completion cost :- 2.00 lakh

Expenditure CD & Pyt :- 0.50 Lkh

No. of people benefited:- 2300

Comments of stakeholders:- The work is of community benefit Much needed/quality work is satisfactory

Imp. of foot path with R. wall at Khojpora Const. of road Panchayat Ghar to Nagbal Halmathpora A

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 38: PICTORIAL COMPENDIUM

33

Date of Commencement:- 08.01.2019

Date of Completion:- 24.02.2020

Estimated cost:- 3.00 Lakh

Completion cost :- 3.00 lakh

Expenditure CD & Pyt :- 1.14 Lkh

No. of people benefited:-will facilitate to School going children as well as Gen. Public

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Date of Commencement:- 26.02.2020

Date of Completion:- 25.03.2020

Estimated cost:- 2.00 Lakh

Completion cost :- 2.00 lakh

Expenditure CD & Pyt :- 0.00 Lkh

No. of people benefited:- 280

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Imp. of road from Boys Middle School to Wani Mohallah Development of Park at Marazi Mohalla Halmathpora C

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 39: PICTORIAL COMPENDIUM

34

Date of Commencement:- 25.11.2019

Date of Completion:- 22.03.2020

Estimated cost:- 3.00 Lakh

Completion cost :- 3.00 lakh

Expenditure CD & Pyt :- 1.61 Lkh

No. of people benefited:- Whole village

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Date of Commencement:- 17.02.2020

Date of Completion:- 23.03.2020

Estimated cost:- 2.00 Lakh

Completion cost :- 2.00 lakh

Expenditure CD & Pyt :- 0.00

No. of people benefited:- 130

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Play field at LachiporaPublic Park at Sheikh Mohalla Halmathpora A near Masjid Abu Baker

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 40: PICTORIAL COMPENDIUM

35

Date of Commencement:- 18.12.2019

Date of Completion:- 20.03.2020

Estimated cost:- 2.50 Lakh

Completion cost :- 2.50 lakh

Expenditure CD & Pyt :- 0.00 Lkh

No. of people benefited:- 100

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Date of Commencement:- 21.11.2019

Date of Completion:- 20.03.2020

Estimated cost:- 1.93 Lakh

Completion cost :- 1.93 lakh

Expenditure CD & Pyt :- 0.70 Lkh

No. of people benefited:- 5 HHs

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

const. of Culvert near Irrigation Khul Tulwari Khan Bagh at Lassipora

Const. of 2 No Bathroom with Flush at Bhat Mohalla near G M Bhat and others at Wavoora “B”

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 41: PICTORIAL COMPENDIUM

36

Date of Commencement:- 04.02.2020

Date of Completion:- 22.03.2020

Estimated cost:- 2.00 Lakh

Completion cost :- 2.00 lakh

Expenditure CD & Pyt :- 0.00 Lakh

No. of people benefited:- 200

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Date of Commencement:- 14.02.2020

Date of Completion:- 15.03.2020

Estimated cost:- 2.08 Lakh

Completion cost :- 2.08 lakh

Expenditure CD & Pyt :- 0.00 Lakh

No. of people benefited:- 150

Comments of stakeholders:- The work is of community benefit

Much needed/quality work is satisfactory

Const. of Culvert on Nalla Dardpora Const. of Flush point near Jamia Masjid Dogerpora A

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 42: PICTORIAL COMPENDIUM

37

Date of Commencement:- 19.11.2019

Date of Completion:- March-20

Estimated cost:- 2.90 Lakh

Completion cost :- 2.90 lakh

Expenditure CD & Pyt:- 1.00 Lakh

No. of people benefited:- 35

Comments of stakeholders:- The work is of community benefit

Much needed/quality work

Date of Commencement:- 06.03.2020

Date of Completion:- 25.03.2020

Estimated cost:- 2.59 Lakh

Completion cost :- 2.59 lakh

Expenditure CD & Pyt:- 2.00 Lakh

No. of people benefited:- 800

Comments of stakeholders:- The work is of community benefit

Much needed/quality work

Const. of Tile Path and drain with R. wall NHO Fareeda Bagum and others at Gund Mancher

Const. of well with drain NLO Gh Hassan Bhat and others at Punzwa A

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 43: PICTORIAL COMPENDIUM

38

Date of Commencement:- 20.03.2020

Date of Completion:- 30.03.2020

Estimated cost:- 4.00 Lakh

Completion cost :- 4.00 lakh

Expenditure CD & Pyt:- 1.50 Lakh

No. of people benefited:- 1700

Comments of stakeholders:- The work is of community benefit

Much needed/quality work

Date of Commencement: 09-02-2020

Date of Completion: 14-03-2020

Estimated Cost : 2.15 lacs

Completion Cost : 2.15 lacs

No of people benefitted: 258

Comments of the Stake Holder: Good Quality Of Work

Const. of Public Park at Waisa Const. of drain near H/o Aijaz ah and others at Kalidar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 44: PICTORIAL COMPENDIUM

39

Date of Commencement: 14-03-2020

Date of Completion : 31-03-2020

Estimated Cost 2.37 lacs

Completion Cost : 2.37 lacs

No of people benefitted: 600

Comments of the Stake Holder: Good Quality Of Work

Date of Commencement: 11-03-2020

Date of Completion: 31-3-2020

Estimated Cost: 2.00 lacs

Completion Cost: 2.00 lacs

No of people benefitted: 150

Comments of the Stake Holder: Good Quality Of Work

Dev. Of graveyard by way of earth filling phase-ii at Gangipora

Upgradation Of Road With Drain From Link Road To H/O Gh Hassan Sofi At C.p.kalan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 45: PICTORIAL COMPENDIUM

40

Date of Commencement: 12-02-2020

Date of Completion 14-03-2020

Estimated Cost: 3.25 lacs

Completion Cost: 3.25 lacs

No of people benefitted: 600

Comments of the Stake Holder: Good Quality Of Work

Date of Commencement: 15-02-2020

Date of Completion: 15-03-2020

Estimated Cost: 1.60 lacs

Completion Cost: 1.60 lacs

No of people benefitted: 700

Comments of the Stake Holder: Good Quality Of Work

Devlopment Of Link Road From Bridge To Doon Basti With R/Wall At Behrampora Brarigund

Constt Of Link Road From Main Road To H/O M. Yaqoob , Bashir Ahmad & M. Ashraf & Others At Yarikalan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 46: PICTORIAL COMPENDIUM

41

Date of Commencement: 2019-20

Date of Completion : 15-03-2020

Estimated Cost: 0.42 lacs

Completion Cost: 0.42 lacs

No of people benefitted: 100

Comments of the Stake Holder: Good Quality Of Work

Date of Commencement: 01-03-2020

Date of Completion: 31-03-2020

Estimated Cost: 2.00 lacs

Completion Cost: 2.00 lacs

No of people benefitted: 1800

Comments of the Stake Holder: Good Quality Of Work

Construction of P/Bund From Main road to Syed Hassan Shah to Ghulam Mohmmad Mallah Wani Mohallah Paller

Improvement of Road From PMGSY-G to Doba B/W/O earth cutting soling malting at ladin

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 47: PICTORIAL COMPENDIUM

42

Date of Commencement: 15.03.2020

Date of Completion: 25.03.2020

Est. Cost: 2.99 Lacs

Completion cost: 2.99 Lacs

No. Of people benefited: 185

Comments of stakeholders:

Much needed /Quality Work:

Date of Commencement: 20.03.2020

Date of Completion: 27.03.2020

Est. Cost: 2.99 Lacs

Completion cost: 2.99 Lacs

No. Of people benefited: 110

Comments of stakeholders: Essential

Demand/ Quality Work

Construction Of Road From Main Road To Bridge At Sofipora C/O Tile Lane To Masjid Sharief At Sofipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 48: PICTORIAL COMPENDIUM

43

Date of Commencement: 18.03.2020

Date of Completion: 20.03.2020

Est. Cost: 2.99 Lacs

Completion cost: 2.99 Lacs

No. Of people benefited: 165

Comments of stakeholders:

Much needed /Quality Work:

Date of Start : 19-02-2020

Date of Completion: 18-03-2020

Approved Cost:- 2.00 Lacs

Completion cost : 2.00 lacs

No. of souls benefitted:- 60

Comments of Stakeholders:-

Connecting inhabitants.

C/O Tile Lane From Eidgah To H/O Parvaiz Ahmad Bhat At Sofipora

Improvement of road from H/o Gh Hassan Khan to Faqir Gujree at Nagbal Dara A.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 49: PICTORIAL COMPENDIUM

44

Date of Start:- 27-01-2020

Date of Completion:- 15-03-2020

Approved Cost:- 2.00 lacs

Completion cost: 2.00 lacs

No. of souls benefitted:- 120

Comments of Stakeholders:- Safeguarding graveyeard

Date of Start:- 21-01-2020

Date of Completion:- 09-03-2020

Approved Cost:- 2.00 lacs

Completion cost: 2.00 lacs

No. of souls benefitted:- 70

Comments of Stakeholders:- Enhancing Rural Connectivity

Development of Graveyard by way of R/Wall at sheikh Mohalla Dara B

Construction of road from H/o Gh Mohuidin Ganaie to H/o Gh Mohd Ganaie at Bilal colony Theed A.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 50: PICTORIAL COMPENDIUM

45

Date of Start:- 17-03-2020

Date of Completion:- 31-03-2020

Approved Cost:- 1.80 lacs

Completion cost : 1.80 lacs

Expenditure (CD&Pyt): Nil

No. of souls benefitted:- 110

Comments of Stakeholders:- Connecting People

Date of Start:- 07-03-2020

Date of Completion:- 23-03-2020

Approved Cost:- 2.50 lacs

Completion cost: 2.50

Expenditure (CD&Pyt): Nil

No. of souls benefitted:- 80

Comments of Stakeholders:- Safeguarding Graveyard

Construction of culvert near Gairbagh Barji at Gandtha Construction of R/Wall and Fencing of Graveyard at Balhama A.

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 51: PICTORIAL COMPENDIUM

46

Date of Start :- 17-02-2020

Date of Completion:- 09-03-2020

Approved Cost:- 1.50 Lacs

Completion cost: 1.50 lac

No. of souls benefitted:- 80

Comments of Stakeholders:- Combating Soil Erosion

Date of Start:- 24-02-2020

Date of Completion:- 19-03-2020

Approved cost:- 2.00 Lacs

Completion cost : 2.00 lacs

No. of souls benefitted:- 60

Comments of Stakeholders:- Enhancing Rural Connectivity

Date of Start:- 27-01-2020

Date of Completion:- 24-02-2020

Approved Cost:- 1.50 Lacs

Completion cost : 1.50 lacs

No. of souls benefitted:- 2000

Comments of Stakeholders:-Facilitating com-muters and general Public

Construction of protection bund near Darul-Aloom sirhindi sahib at Khonmoh C.

Construction of lane from H/o Zakir Hussain Bhat to H/o Gh Hassan Dar at Firdous Colony Balhama A.

Construction of Passenger Shed near Gramin Bank at Panzinara A.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 52: PICTORIAL COMPENDIUM

47

Date of Commencement 28/12/2018

Date of Completion March 2020

Estt. Cost 2.00 Lacs

Completion cost 2.00 Lacs

No. of Souls benefitted 65

Comments of Stakeholder Provide shelter to passenger

Date of Commencement 04/01/2018

Date of Completion March 2020

Estt. Cost 2.00 Lacs

Expenditure 2.00 Lacs

No. of Souls benefitted 65

Comments of Stakeholder Provided shelter to passenger

Const of Passenger Shed at Khoo Gharat(60)Const of Passenger Shed at Zero Morh Pyt Sersundwan(59)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 53: PICTORIAL COMPENDIUM

48

Date of Commencement 17/12/2018

Date of Completion 25/03/2020

Estt. Cost 1.00 Lacs

Completion cost 1.00 Lacs

No. of Souls benefitted 139

Comments of Stakeholder Much needed work

Date of Commencement 20/12/2018

Date of Completion March 2020

Estt. Cost 3.00 Lacs

Completion cost 2.99 Lacs

No. of Souls benefitted 45

Comments of Stakeholder Quality work

Const of Pond at Buttan near Akhara Ward No 2 Akhali Buttan(61)Renovation of Panchayat Ghar Building and C/wall at Pyt Jeri(58)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 54: PICTORIAL COMPENDIUM

49

Date of Commencement 2018-19

Date of Completion 2019-20

Estt. Cost 8.785

Completion cost 8.785

No. of Souls benefitted GP

Comments of Stakeholder Quality work

Estimated Cost:- 5.00 Lacs

Completion Cost:- 5.00 lacs

Date of Start:- 09/03/2020

Date of Completion:- 25/03/2020

Total no. of People Benefitted:- 200

Comment s of the State Holder:- Much Needed/ Quality Work

Construction of lane/drain at Madina Colony near H/o Riaz & others(26), Satwari

Work done liability for Const of earth work of Tractor Road from GMS Chubbi to Moda Khad KM 2nd falling under Salalkote Block Arnas(57)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 55: PICTORIAL COMPENDIUM

50

Estimated Cost:- 1.50 Lacs

Completion Cost:- 0.75

Date of Start:- 09/03/2020

Date of Completion:- 25/03/2020

Total no. of People Benefitted:- 90

Comment s of the State Holder:- Much Needed/ Quality Work

Estimated Cost:- 1.50 Lacs

Completion Cost:- 1.50 Lacs

Date of Start:- 09/03/2020

Date of Completion:- 26/03/2020

Total no. of People Benefitted:- 100

Comment s of the State Holder:- Much Needed/ Quality Work

Construction drain at Vidhata Nagar Bathindi near H/o Farooq(27)Constt. of lane/drain at Charak Mohalla Sunjwan(23)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 56: PICTORIAL COMPENDIUM

51

Estimated Cost:- 2.50 Lacs

Completion Cost:- 1.25 Lacs

Date of Start:- 09/03/2020

Date of Completion:- 26/03/2020

Total no. of People Benefitted:- 90

Comment s of the State Holder:- Much Needed/ Quality Work

Estimated Cost:- 2.00 Lacs

Completion Cost:- 2.00 Lacs

Date of Start:- 09/03/2020

Date of Completion:- 27/03/2020

Total no. of People Benefitted:- 100

Comment s of the State Holder:- Much Needed/ Quality Work

Construction of covered drain at Fariada Enclave Sunjwan(24)Constt. Lane/drain at Bathindi near H/o Dr. Mantu(25)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 57: PICTORIAL COMPENDIUM

52

Estimated Cost:- 1.50 Lacs

Completion Cost:- 0.65

Date of Start:- 09/03/2020

Date of Completion:- 27/03/2020

Total no. of People Benefitted:- 90

Comment s of the State Holder:- Much Needed/ Quality Work

Estimated Cost:- 2.50 Lacs

Completion Cost:- 1.00 Lacs

Date of Start:- 09/03/2020

Date of Completion:- 28/03/2020

Total no. of People Benefitted:- 100

Comment s of the State Holder:- Much Needed/ Quality Work

Construction of lane/drain near H/o Wasim & others(28)Constt. of Nallah on main road NHO Farooq Ahmed at Gulmarg Colony Bathindi(30)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 58: PICTORIAL COMPENDIUM

53

Estimated Cost:- 2.00 Lacs

Completion Cost:- 0.88

Date of Start:- 09/03/2020

Date of Completion:- 28/03/2020

Total no. of People Benefitted:- 90

Comment s of the State Holder:- Much Needed/ Quality Work

Date of Commencement: 09.03.2019

Date of Completion: 25.03.2020

Estimated Cost: Rs. 3.20 Lacs

Completion Cost: Rs.3.20 Lacs

No of people benefitted: 145

Comments of the Stake Holder: Better Rural Connectivity.

Constt. of L/D from H/o Dr. Nirmal Singh to H/o Joginder Singh to Tilak Raj and allied links village Pachail. (31)Laying of Slab near H/o Hussain Malik, Mukhtar & others.(29)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 59: PICTORIAL COMPENDIUM

54

ESTIMATED COST : 3.50 LACS

EXPENDITURE: 0.45 LACS

DATE OF START : 17-01-2019

DATE OF COMPLETION : 24-03-2020

TOTAL BENEFICIARIES BENEFITTED : 60

COMMETS OF THE STAKE HOLDERS : MUCH NEEDED / QUALITY WORK

ESTIMATED COST : 4.50 LACS

COMPLETION COST : 4.00 LACS

DATE OF START : 12-01-2019

DATE OF COMPLETION : 14-03-2020

TOTAL BENEFICIARIES BENEFITTED : 55

COMMETS OF THE STAKE HOLDERS : MUCH NEEDED / QUALITY WORK

NAME OF THE WORK : COSTT OF T ROAD FROM MAIN ROAD TO MOHALLAH BADOLA(01)

NAME OF THE WORK : COSTT OF T/ ROAD FROM MAIN ROAD TO SHAMSHAN GHAT MUNDH

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 60: PICTORIAL COMPENDIUM

55

Date of Commencement: 22-10-2018

Date of Completion: 30-12-2019

Estimated Cost: 4.00 lacs

Completion Cost: 4.00 lacs (CD&Pyt) cum.

No. of People benefitted: 55

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Date of Commencement: 22-10-2018

Date of Completion: 04-09-2019

Estimated Cost: 2.50 lacs

Completion Cost: 2.50 lacs (CD&Pyt) cum.

No. of People benefitted: 35

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Name of the work(S No.13): Const. of T. Road from PWD Road to Gaward

Name of the work(S No.12): Const. of T- Road from PWD Road Bashat to Dhangal Road W.No.1

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 61: PICTORIAL COMPENDIUM

56

Date of Commencement: 08-03-2019

Date of Completion: 17-03-2020

Estimated Cost: 2.50 lacs

Completion Cost: 2.50 lacs (CD&Pyt) cum.

No. of People benefitted: 85

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Date of Commencement: 20-03-2019

Date of Completion: 31-03-2020

Estimated Cost: 5.00 lacs

Completion Cost: 4.00 lacs (CD&Pyt) cum.

Soul to be benefitted:- 100

Comments of Stockholder:- Work done is great and community getting the full benefit of it for which it has been constructed.

Name of the work(S No.15): Special Repair of thor to Paddar T/Road pyt Kanah block GhordiName of the work(S No.14): Const. of T. Road from Graveyard to

SC Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 62: PICTORIAL COMPENDIUM

57

Date of Commencement 17-09-2019

Date of completion 02-11-2019

Funds received 1.00 lacs

Final Expenditure 0.50 lacs (CD&Pyt) cum.

No. of Souls benefitted 50

Comments of Stockholder Saves a lot of time

Much needed/quality work Quality work

Date of Commencement 17-09-2019

Date of completion 02-11-2019

Funds received 0.50 lacs

Final Expenditure 0.25 lacs (CD&Pyt) cum.

No. of Souls benefitted 100

Comments of Stockholder Beneficial for school children

Much needed/quality work Quality work

Const of T/road from Barta School to DudarProvision of T/road Jakheni Kaldi road to Bathuni

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 63: PICTORIAL COMPENDIUM

58

Date of commencement 15-09-2018

Date of Completion 31-12-2019

Estt. Cost 2.50 Lacs

Completion Cost 0.50 Lacs (CD&Pyt) cum.

No. of People benefitted 300

Comments of Stakeholders Satisfactory

Much Need/ Quality Work Quality Work

Date of commencement 18-09-2018

Date of Completion 31-12-2019

Estt. Cost 2.50 lacs

Completion Cost 0.50 lacs (CD&Pyt) cum.

No. of People benefitted 500

Comments of Stakeholders Satisfactory

Much Need/ Quality Work Quality Work

Provision of Tractor Road from Pasku to SalaraProvision of Tractor Road from Ossu Kaira road to Mlkeyiann

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 64: PICTORIAL COMPENDIUM

59

Date of commencement 02/11/2019

Date of Completion 31/12/2019

Estt. Cost 0.50 lacs

Completion Cost 0.25 lacs (CD&Pyt) cum.

No. of People benefitted 30

Comments of Stakeholders Satisfactory

Much Need/ Quality Work Quality Work

Date of commencement 02/11/2019

Date of Completion 31/12/2019

Estt. Cost 0.50 lacs

Completion Cost 0.25 lacs (CD&Pyt) cum.

No. of People benefitted 30

Comments of Stakeholders Satisfactory

Much Need/ Quality Work Quality Work

Provision of T/Road from NHW to Nallah via Peer Danga_ Pyt Mand East

Const. of T/Road from Seen Tharkan Road to Badaga Mohalla Pyt Mand West

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 65: PICTORIAL COMPENDIUM

60

Date of Commencement: 22-10-2018

Date of Completion: 30-08-2019

Estimated Cost: 2.50 lacs

Completion Cost: 2.50 lacs (CD&Pyt) cum.

No. of People benefitted: 40

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Date of Commencement: 08-03-2019

Date of Completion: 30-08-2019

Estimated Cost: 3.00 lacs

Completion Cost: 3.00 lacs (CD&Pyt) cum.

No. of People benefitted: 35

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Name of the work(S No.51): Const. of Compound Wall/ Fencing near CFC building BDO Office Chenani Part -1

Name of the work(S No.50): Const. of approach and Parking in the premises Block Office Chenani.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 66: PICTORIAL COMPENDIUM

61

Date of Commencement: 08-03-2019

Date of Completion: 17-03-2020

Estimated Cost: 3.50 lacs

Completion Cost: 3.50 lacs (CD&Pyt) cum.

No. of People benefitted: 350

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Date of Commencement: 01-12-2018

Date of Completion: 31-03-2020

Estimated Cost: 4.00 lacs

Completion Cost: 4.00 lacs (CD&Pyt) cum.

No. of People benefitted: 400

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Name of the work(S No.53): Constt of Passenger Shed at Bus Stand Katwalt.

Name of the work(S No.52): Const. of Lane/drain Eid Gah Sudhmahadev

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 67: PICTORIAL COMPENDIUM

62

Date of commencement 12-12-2018

Date of Completion 09-12-2019

Estt. Cost 4.00 lacs

Completion Cost 3.50 lacs (CD&Pyt) cum.

No. of People benefitted 100

Comments of Stakeholders Satisfactory

Much Need/ Quality Work Quality Work

Date of commencement 12-12-2018

Date of Completion 09-12-2019

Estt. Cost 1.50 lacs

Completion Cost 1.23 lacs (CD&Pyt) cum.

No. of People benefitted 500

Comments of Stakeholders Satisfactory

Much Need/ Quality Work Quality Work

Const. of water tanki Near Yug devsthanConst. of Steps from Canal to Lower Thartyal W.No.1

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 68: PICTORIAL COMPENDIUM

63

Date of Commencement: 04-01-2019.

Date of Completion: 16-12-2019.

Estimated Cost: 4.50 lacs

Completion Cost: 4.50 lacs (CD&Pyt) cum.

No. Of Souls Benefitted: 180.

Comments of stakeholders: Good work

Much needed/quality work: Much needed

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 5.00 lacs

Expd.:- 2.88 lacs

No of people benefited:- 250

Comments of stakeholders

Much needed/quality work:- Good Quality

Name of Work:-Constt. Of L/D under Model Village Jakhwar(41)Name of the work(S No.56): Tiled Pathway at Morah Alsoo pyt Kail block Khoon.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 69: PICTORIAL COMPENDIUM

64

Date of commencement:- 2018-19

Date of Completion 22-12-2019

Estimated Cost:- 2.50 lacs

Completion Cost :- 1.52 lacs

No of people benefited:- 250

Comments of stakeholders

Much needed/quality work:- Good work

Date of commencement:-. 1-12-2018

Date of Completion:- 31.12.2019

Estimated Cost:- 3.00

Expd. :- 1.73

No of people benefited:- 250

Comments of stakeholders

Much needed/quality work:- Good Quality

Name of Work:- Constt. Of T/R from Dharalta Road to the h/o Kripal Singh and others(07)Name of Work:- Development of Ground at Bajohie.(37)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 70: PICTORIAL COMPENDIUM

65

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 5.00 lacs

Expd. :- 2.87 lacs

No of people benefited:- 240

Comments of stakeholders

Much needed/quality work:- Good Quality

Date of commencement:- 01.12.2019

Date of Completion:- 31.12.2019

Estimated Cost:- 6.00 lacs

Completion Cost :- 1.00 lacs

No of people benefited:- 200

Comments of stakeholders

Much needed/quality work:- Good Quality

Constt. Of T/R by way of RBM filling with protection work from SC mohalla to Rajpur moh Pyt Satura Kathua(22)

Name of Work:- Constt. Of T/R from Surara road to h/o Thakur Singh via patti Mohalla Pyt. Dewal Block Barnoti(08)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 71: PICTORIAL COMPENDIUM

66

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 2.50 lacs

Expd.:- 2.50 lacs

No of people benefited:- 150

Comments of stakeholders

Much needed/quality work:- Good Quality

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 4.32 lacs

Completion Cost :- 2.49 lacs

No of people benefited:- 100

Comments of stakeholders

Much needed/quality work:- Good Quality

Name of Work:- Constt. Of D/Channel at Moh. Panthal, pyt Pallan(38)

Name of Work:- Constt. Of Lane with protection at Thain Mohalla Khajur Singh and others at Dinga Amb B(42)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 72: PICTORIAL COMPENDIUM

67

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 7.00 lacs

Expd:- 3.52 lacs

No of people benefited:- 200

Comments of stakeholders

Much needed/quality work:- Good Quality

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 5.00 lacs

Expd.:- 2.88 lacs

No of people benefited:- 250

Comments of stakeholders

Much needed/quality work:- Good Quality

Name of Work:-Up gradation of T/R from Ghar Malti Road to mohalla Kartar Up to Jasmotra Moh.(09)

Name of Work:- Constt. Of Lane and Drain with culvert Moh. Panthal near Masjid Panthal(39)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 73: PICTORIAL COMPENDIUM

68

Date of commencement:- 06-03-2019

Date of Completion 22-12-2019

Estimated Cost:- 3.00 lacs

Completion Cost :- 1.65

No of people benefited:- 190

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Good Quality

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 2.00 lacs

Completion Cost.:- 1.38 lacs

No of people benefited:- 250

Comments of stakeholders

Much needed/quality work:- Good Quality

Name of Work:-Constt. Of L/D with culvert from link road to h/o Tirth at village Haripur Paddel(43)Name of Work:- Development of Ground at Macchedi.(36)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 74: PICTORIAL COMPENDIUM

69

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 3.00 lacs

Completion Cost :- 2.25 lacs

No of people benefited:- 300

Comments of stakeholders

Much needed/quality work:- Good Quality

Date of commencement:- 05.11.2019

Date of Completion:- 31.03.2020

Estimated Cost:- 4.00 lacs

Completion Cost :- 0.50 lacs

No of people benefited:- 50

Comments of stakeholders:- Demand of Public

Much needed/quality work:- Good Work

Name of Work:-Constt. Of Plate form with lying of tiles near Baba Birfanath at sohal pyt Kootah Block Hiranagar(62)

Name of Work:-Constt. Of road from tridwan to choie with filling and wire crates(10)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 75: PICTORIAL COMPENDIUM

70

Date of commencement:- 01.12.2018

Date of Completion:- 31.12.2019

Estimated Cost:- 16.00 lacs

Completion Cost :- 12.80 lacs

No of people benefited:- 250

Comments of stakeholders

Much needed/quality work:- Good Quality

Estt. Cost :- 1.00 Lacs

Completion Cost (Cum. Expdt):- 0.93 Lacs

Date of Start:- 23-10-2018

Date of Completed:- 20-12-2019

Number of people benefited: 110

Comments of the Stake Holder: Much needed work

Name of work:- R/wall Nr.Lal Hussain Uchhad Pyt.Uchhad(34)Name of Work:-Constt. Of culvert of Gharati Kasori Road(40)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 76: PICTORIAL COMPENDIUM

71

Estt. Cost:- 1.00 Lacs

Completion Cost(Cum.Expdt): 0.75Lacs

Date of Start:- 04-12-2018

Date of Completed:- 02-12-2019

Number of people benefited: 120

Comments of the Stake Holder: Much needed work

Estt.Cost :- 1.00 Lacs

Completion Cost (Cum. Expdt):- 0.93 acs

Date of Start:- 22-01-2019

Date of Completed:- 10-12-2019

Number of people benefited: 150

Comments of the Stake Holder: Much needed work

Name of work:- Tr. Road Uchhad Kameer(5)Name of work:- Tr. Road from main road to Bandian Balnoi(3)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 77: PICTORIAL COMPENDIUM

72

Estt. Cost :- 1.00 Lacs

Completion Cost (Cum.Expdt): 0.75Lacs

Date of Start:- 04-12-2018

Date of Completed:- 01-12-2019

Number of people benefited: 200

Comments of the Stake Holder: Much needed work

E. Cost :- 1.00 Lacs

Completion Cost (Cum. Expdt):- 0.75 Lacs

Date of Start:- 04-12-2018

Date of Completed:- 05-12-2019

Number of people benefited: 110

Comments of the Stake Holder: Much needed work

Name of work C/Wall at Moh.Cheyan Ziara Dhara Topa Pyt.Topa(32)Name of work:- Tr. Road from M/R to Bakarwallan Ghani Lower.(4)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 78: PICTORIAL COMPENDIUM

73

Estimated Cost. : 7.00 lacs

Completion Cost (Cum. Expdt):- 5.25 lacs

DOS:- 18-03-2019

DOC:- 31-12-2019

Number of people benefitted: 200

Comments of the Stake Holder: Much needed work

Date of Commencement: 20-03-2019

Date of Completion: 31-03-2020

Estimated Cost: 1.75

Completion Cost (Cum. Expdt): 1.44

No of people benefitted: 50

Comments of the Stake Holder: The Work is executed for Community Development

Name of Work with Location: Constt. of C/Path from Main Road to Naka Nr. KM 2nd to Moh. Khori Ping Nr. Waseem Raja & Other Pyt. Naka Majhari(35)

Work Name: Const. of Road at Lower Bhatidhar Nr Shamim Ahmed.(6)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 79: PICTORIAL COMPENDIUM

74

Date of commencement:- 15-11-2018

date of completion:- 31-12-2019

Estimated Cost:- 1.50 Lacs

Completion Cost:- 1.50 Lacs

No. of people benefited:- 50

Comments of stakeholders:- After completion of works people are thankful to RDD.

Date of commencement:- 08-09-2018

date of completion:- 24-12-2019

Estimated Cost:- 3.00 Lacs

Completion Cost:- 3.00 Lacs

No. of people benefited:- 300

Comments of stakeholders:-After renovation of BHQ Building accommodation of office of Block Development officer Padder has been strengthen.

Dev. Of Ground/ Allied Work and Repair of Compound Wall at BHQ Padder Pyt. Gulabgarh Block Palmar District Kishtwar.(45)

Const. of Sanitary Complex Near Ziarat Zain Ud Din Dhah (RA) Saheb at Bhanderkoot Pyt. Lower Palmar-C Block Palmar District Kishtwar.(44)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 80: PICTORIAL COMPENDIUM

75

Date of commencement:- 01-09-2018

Date of completion:- 30-12-2019

Estimated Cost:- 1.00 Lacs

Completion Cost:- 1.00 Lacs

No. of people benefited:- 40

Comments of stakeholders:- Public of the area has appreciated the work.

Date of commencement:- 10-10-2018

date of completion:- 30-12-2019

Estimated Cost:- 2.50 Lacs

Completion Cost:- 2.50 Lacs

No. of people benefited:- 450

Comments of stakeholders:- Pyt. Ghar protected by protection work .

Fencing of Pyt. Ghar Bhagna-C Pyt. Bhagna-C Block Nagseni District Kishtwar.(47)

Constt of Protection work near land of Gh. Hussain Sheikh Pyt. Inshan Block Warwan District Kishtwar.(46)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Phtograph not available

Page 81: PICTORIAL COMPENDIUM

76

Date of commencement:- 14-02-2018

Date of completion:- 30-12-2019

Estimated Cost:- 2.50 Lacs

Completion Cost:- 2.50 Lacs

No. of people benefited:- 250

Comments of stakeholders:- After completion of works people are thankful to RDD.

Date of commencement:- 12-02-2019

date of completion:- 31-12-2019

Estimated Cost:- 2.00 Lacs

Completion Cost:- 2.00 Lacs

No. of people benefited:- Public of the area is quite satisfied with the work.

Const. of Community Sanitary Complex at Agral Near Ashtadashbhuja Matta Temple Pyt. Agral Block Trigam District Kishtwar.(49)

P/Path From Chandi Mata Mandir Wasser to Shiv Mandir Bunkuleed Pyt. Lachkhazana Block Kishtwar District Kishtwar.(48)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 82: PICTORIAL COMPENDIUM

77

Date of commencement: 15/12/2019

Date of completion: 20/03/2020

Estt. Cost: 2.00 lacs

Completion Cost: 1.57 lacs

No. of people benefitted : 100

Comments of stakeholders: Improve connectivity

Date of commencement : 25/12/2019

Date of completion : 20 /03/2020

Estt. Cost : 2.00 lacs

Completion Cost : 1.51 lacs

No. of people benefitted : 50

Comments of stakeholders : Improve connectivity

Constt. Of lane/drain alongwith protection wall at kupri near the h/o sardari lal.(66)Constt. Of L/d at Amli w.no.1 moh. Naresh Kumar.(65)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 83: PICTORIAL COMPENDIUM

78

Date of commencement : 23/12/2019

Date of completion : 25 /02/2020

Estt. Cost : 3.00 lacs

Completion Cost : 2.47 lacs

No. of people benefitted : 20

Comments of stakeholders : Protection to land of locals

and houses

Date of commencement : 25/12/2019

Date of completion : 20 /03/2020

Estt. Cost : 3.50 lacs

Completion Cost : 2.82 lacs

No. of people benefitted : 100

Comments of stakeholders : Proper drainage of water.

Constt. Of pacca nallah from kali dass cattelshed to onwards.(69)Constt. Of protection work at patyari w.no.2 near the h/o Avtar Singh.(67)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 84: PICTORIAL COMPENDIUM

79

Date of commencement: 30/12/2019

Date of completion: 19/03/2020

Estt. Cost: 1.50 lacs

Completion Cost: 1.17 lacs

No. of people benefitted : 300

Comments of stakeholders: Public work

E.Cost: 6.50 lacs

Expenditure : 1.05 lacs

Date of Start : 10-02-2020

Date of Completion: 15-03-2020

No Of Souls Benefitted : 275

Comments of Stakeholders:- Satisfactory

Much Need/Quality Work:- Good

E.Cost: 1.20 lacs

Expenditure : 1.20 lacs

Date of Start : 01-03-2020

Date of Completion: 30-03-2020

No Of Souls Benefitted : 275

Comments of Stakeholders:- Satisfactory

Much Need/Quality Work:- Good

Name of Work: Repair & Renovation of BHQ Banihal(63)

Name of Work: Construction of C/Path Mugal Mohalla to Railway Road , Lower Dalwah(64)

Leveling of Shamshan Ghat at Samthyal(68)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 85: PICTORIAL COMPENDIUM

80

C/o CSC Laterine near Masjid shareef Ahlihadees Bhatpora Block Larnoo(01)

3 No Sanitary Complex (Lava tory Blocks at Shri Ramkrishna) Block Achabal(02)

Date of Commencement : 12-06-2019

Date of Completion : 03-08-2019

Estimated Cost : 2.00

Completion Cost : 1.89

No of people benefitted : 120

Date of Commencement : 16/05/2019

Date of Completion : 17/09/2019

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 65

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 86: PICTORIAL COMPENDIUM

81

03. No Sanitary Complex (Lava tory Blocks at Shri Ramkrishna) part II Block Achabal(03)

Date of commencement : 17-06-2019

Date of Completion : 07-08-2019

Estt. Cost : 2.00 (SBM Share 1.80+B,S=0.20)

Completion cost (Exp) : 1.79

No. of People benefitted : 110

comments of stakeholder : Much needed /quality work :-

Date of commencement : 12-06-2019

Date of Completion : 02-09-2019

Estt. Cost : 2.00(SBM Share 1.80+B,S=0.20)

Completion cost(Exp) : 1.79

No. of People benefitted : 12

comments of stakeholder : Much needed /quality work

03. No Sanitary Complex (Lava tory Blocks at Shri Ramkrishna) (04)Part III Block Achabal

CALENDAR-ALT

CALENDAR-CHECK

`

`USER

CALENDAR-ALT

CALENDAR-CHECK

`

`USER

Page 87: PICTORIAL COMPENDIUM

82

C/O COMMUNITY SANITARY COMPLEX AT BHQ CHITTERGULL(05)

C/O COMMUNITY SANITARY COMPLEX NEAR HIGH SCHOOL CHOWGAM BLOCK CHITTERGULL(06)

Date of Commencement : 08/04/2019

Date of Completion : 30/04/2019

Estimated Cost : 2.00

Completion Cost : 2.00

No of people benefitted : 125 HH

Date of Commencement : 01/07/2019 Date of Completion : 30/07/2019Estimated Cost : 2.00Completion Cost : 2.00No of people benefitted : 300

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

``USER

Page 88: PICTORIAL COMPENDIUM

83

C/O COMMUNITY SANITARY COMPLEX NEAR JAMIA MASJID DEETHU (07)

Date of Commencement : 01/04/2019

Date of Completion : 02/05/2019

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 150

Date of Commencement : 15/05/2019

Date of Completion : 31/05/2019

Estimated Cost : 2.00

Completion Cost : 2.00

No of people benefitted : 142

C/O COMMUNITY SANITARY COMPLEX AT HIGH SCHOOL NANIL BLOCK K-PORA(08)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 89: PICTORIAL COMPENDIUM

84

C/O COMMUNITY SANITARY COMPLEX AT HANGALPAWA BLOCK K-PORA(09)

C/O COMMUNITY SANITARY COMPLEX AT RANBIRPORA BLOCK K-PORA(10)

Date of Commencement : 01/04/2019

Date of Completion : 01/08/2019

Estimated Cost : 2.00

Completion Cost : 1.80

No of people benefitted : 30

Date of Commencement : 08/03/2019

Date of Completion : 15/04/2019

Estimated Cost : 2.00

Completion Cost : 1.80

No of people benefitted : 127

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 90: PICTORIAL COMPENDIUM

85

C/O COMMUNITY SANITARY COMPLEX NEAR MASJID SHARIEF FOHAR BLOCK K-PORA(11)

Date of Commencement : 01-04-2019

Date of Completion : 25-04-2019

Estimated Cost : 1.80 Lakhs

Completion Cost : 1.80 Lakhs

No. of people benefitted : 230

Date of Commencement : 03/04/2019

Date of Completion : 05/05/2019

Estimated Cost : 2.00

Completion Cost : 1.80

No of people benefitted : 55

CSC at Kabamarg BLOCK SHAHABAD(12)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 91: PICTORIAL COMPENDIUM

86

Sanitary Scomplex at Govt. Higher Secondary School Kabamarg BLOCK SHAHABAD(13) Sanitary Complex Kreeri Masjid Shareef BLOCK SHAHABAD(14)

Date of Commencement : 22-07-2019

Date of Completion : 25-10-2019

Estimated Cost : 1.80 Lakhs

Completion Cost : 1.80 Lakhs

No . Of persons benefitted : 159

Date of Commencement : 02-04-2019

Date of Completion : April 2019

Estimated Cost : 1.80 Lakhs

Completion Cost : 1.80 Lakhs

No. of people benefitted : 230

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 92: PICTORIAL COMPENDIUM

87

CSC Constructed at Jamia Masjid Shareef Mantpora BLOCK SHAHABAD (15)

Date of Commencement : 08-05-2019

Date of Completion : 11-09-2019

Estimated Cost : 1.80 Lakhs

Completion Cost : 1.80 Lakhs

No. of persons benefitted : 118

Date of Commencement : 10-07-2019

Date of Completion : 30-10- 2019

Estimated Cost : 1.80 Lakhs

Completion Cost : 1.80 Lakhs

No. of people benefitted : 113

Community Sanitary Complex near Masjid Shareef Mukdampora Shankerpora BLOCK SHAHABAD (16)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 93: PICTORIAL COMPENDIUM

88

Community Sanitary Complex near Masjid Shareef Reshipora Zaldoora BLOCK SHAHABAD(17)

SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikha C/o Sanitary Complex at Nadikhai(18)

Date of Commencement : 11/06/2019

Date of Completion : 29/12/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No . Of persons benefitted : 290

Date of Commencement : 15-06-2019

Date of Completion : 15-08-2019

Estimated Cost : 1.80 Lakhs

Completon Cost : 1.80 Lakhs

No. of persons benefitted : 111

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 94: PICTORIAL COMPENDIUM

89

SWACHH BHARAT MISSION ( Grameen) CSC in Block Aloosa C/o Sanitary Complex Near Majid –A pyt Kehnusa(19)

Date of Commencement : 01/08/2019

Date of Completion : 30/11/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No. of persons benefitted : 300

Date of Commencement : 27/07/2019

Date of Completion : 28/09/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No. of people benefitted : 300

SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikhaie C/o Sanitary Complex GundiJahangir – A(20)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 95: PICTORIAL COMPENDIUM

90

SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikhai C/o Sanitary Complex CFC at Markundal (21)

SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikhai C/o Sanitary Complex Block Headquater Nadikhai(22)

Date of Commencement : 17/05/2019

Date of Completion : 29/09/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No . Of persons benefitted : 350

Date of Commencement : 20/04/2019

Date of Completion : 29/08/2019

Estimated Cost : 2.00 lacs

Completon Cost : 1.80 Lakhs

No. of persons benefitted : 393

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 96: PICTORIAL COMPENDIUM

91

SWACHH BHARAT MISSION ( Grameen) CSC in Block Sumbal(23) C/o Sanitary Complex at BHQ Sumbal

Date of Commencement : 21/03/2019

Date of Completion : 25/06/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No. of persons benefitted : 350

Date of Commencement : 26/05/2019

Date of Completion : 30/11/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No. of people benefitted : 393

SWACHH BHARAT MISSION ( Grameen) CSC in Block Gurez(24) C/o Sanitary Complex at Chorwan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 97: PICTORIAL COMPENDIUM

92

SWACHH BHARAT MISSION ( Grameen) CSC in Block Tulail C/o Sanitary Complex at Neeru(25)

SWACHH BHARAT MISSION ( Grameen) CSC in Block Hajin C/o Sanitary Complex at sadunara- B(26)

Date of Commencement : 17/05/2019

Date of Completion : 25/08/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No . Of persons benefitted : 350

Date of Commencement : 15/04/2019

Date of Completion : 20/08/2019

Estimated Cost : 2.00 lacs

Completon Cost : 1.80 Lakhs

No. of persons benefitted : 393

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 98: PICTORIAL COMPENDIUM

93

SWACHH BHARAT MISSION ( Grameen) CSC in Block Hajin C/o Sanitary Complex at Sadunara-B Near Masjid Sharief(27)

Date of Commencement : 20-03-2019

Date of Completion : 03-06-2019

Estimated Cost : 2.00lacs

Completion Cost : 1.80 lacs

No. of People Benefitted :

Comments of Stakeholders : Work executed to the satisfaction of local community as per guidelines of desired quality.

Date of Commencement : 17/05/2019

Date of Completion : 25/08/2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 Lacs

No. of people benefitted : 393

C/ o CSC at Tehsil office Karhama (28)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 99: PICTORIAL COMPENDIUM

94

C/o CSC near Ziyarat Sharief Dalri Pyt. Zethan (29) C/o CSC at Binner A (30)

Date of Commencement : 03-03-2019

Date of Completion : 05-04-2019

Estimated Cost : 2.00lacs

Completion Cost : 1.80 lacs

No. of People Benefitted : 200

Comments of Stakeholders : Much needed / Quality work very good

Date of Commencement : 25-10-2018

Date of Completion : 10-11-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.8 lacs

No. of People Benefitted : 270

Comments of Stakeholders : Much needed / Quality work very good

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 100: PICTORIAL COMPENDIUM

95

Construction of Sanitary complex at Dargam (31)

Date of Commencement : 12-10-2018

Date of Completion : 08-06-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.68 lacs

No. of People Benefitted : 200 (approx)

Comments of Stakeholders : Improved Sanitation in Village

Date of Commencement : 01-09-2018

Date of Completion : 16-07-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.65 lacs

No. of People Benefitted : 250 (approx)

Comments of Stakeholders : Improved Sanitation in Village

C/o CSC Machanpora fidarpora (32)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 101: PICTORIAL COMPENDIUM

96

C/o CSC at Jamia Masjid Chandilora (33) C/O CSC at Masjid Sharief Hardmadam (34)

Date of Commencement : 01-02-2019

Date of Completion : 01-12-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.43 lacs

No. of People Benefitted : 670

Comments of Stakeholders : Much needed / Quality work very good

Date of Commencement : 08-10-2018

Date of Completion : 05-02-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.39 lacs

No. of People Benefitted : 200 households

Comments of Stakeholders : Much needed / Quality work very good

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 102: PICTORIAL COMPENDIUM

97

C/O CSC at Masjid Sharief Mohyien (35)

Date of Commencement : 01-02-2019

Date of Completion : 03-04-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.8 lacs

No. of People Benefitted : 200.

Comments of Stakeholders : Improved Sanitation in Village

Date of Commencement : 01-06-2018

Date of Completion : 01-04-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.76 lacs

No. of People Benefitted : 500.

Comments of Stakeholders : Improved Sanitation in Village

C/o CSC near Jamia Masjid Nowpora (36)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 103: PICTORIAL COMPENDIUM

98

C/o CSC near little heart School Garkot B (37) C/o CSC near Darul Uloom Wailoo (38)

Date of Commencement : 03-03-2019

Date of Completion : 27-04-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.8 lacs

No. of People Benefitted : 200.

Comments of Stakeholders : Improved Sanitation in Village

Date of Commencement : 02-03-2019

Date of Completion : 19-10-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.537 lacs

No. of People Benefitted : 170.

Comments of Stakeholders : Improved Sanitation in Village

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 104: PICTORIAL COMPENDIUM

99

C/O CSC near Masjid Sharief Beigh Pati Sultanpora (39)

Date of Commencement : 02.04.2019

Date of Completion : 25.05.2019

Estimated Cost : 2.00

Completion Cost : 2.00

No of people benefitted : 300

Comments of the Stake Holder : Satisfactory

Date of Commencement : 11-09-2018

Date of Completion : 10-05-2019

Estimated Cost : 2.00 lacs

Completion Cost : 1.8 lacs

No. of People Benefitted : 230

Comments of Stakeholders : Much needed / Quality work very good

C/o CSC near Masjid sherif at Aripathan 2019-20(40)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 105: PICTORIAL COMPENDIUM

100

Block Beerwah Sanitary Complex at Village Abadpora Panchayat Parisabad Block Waterhail(41)

Sanitary Complex at Village Paris Panchayat Parisabad

Block Waterhail(42)

Date of Commencement : 10/4/201

Date of Completion : 23/7/2019

Estimated Cost : 2.00 lacs

Completion Cost : 2.00 lacs

No. of People Benefitted : 800

Date of Commencement : 10/5/2019

Date of Completion : 23/7/2019

Estimated Cost : 2.00 lacs

Completion Cost : 2.00 lacs

No. of People Benefitted : 800

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 106: PICTORIAL COMPENDIUM

101

CSC At HARMALI CHAKKA B(174)

Date of Commencement : 2706/2019

Date of Completion : 22/10/2019

Estimated Cost : 1.80 Lacs

Completion Cost : 1.80 Lacs

No of people benefitted : 178

Comments of the Stake Holder : Benefited work for public.

Date of Commencement : 1-4-2019

Date of Completion : 17-4-2019

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : Around 100

Comments of the Stake Holder : Much Needed for cleanliness

Constt of CSC at Thune-A(43)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 107: PICTORIAL COMPENDIUM

102

Constt of CSC at Thune-B(44) Const of CSC at Sonamarg-B(45)

Date of Commencement : 26/05/2019

Date of Completion : 29/12/2019

Estimated Cost : 1.80 Lacs

Completion Cost : 1.74 Lacs

No. of People Benefitted : 210

Comments of Stakeholder : Benefited work for public.

Date of Commencement : 22/04/2019

Date of Completion : 28/06/2019

Estimated Cost : 1.80 Lacs

Completion Cost : 1.79 Lacs

No. of People Benefitted : 194

Comments of Stakeholder : Benefited work for public.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 108: PICTORIAL COMPENDIUM

103

Constt of CSC at Kullan-B(46)

Date of Commencement : 25-06-2019

Date of Completion : 31-11-2019

Estimated cost : 200000

Completion cost : 180000

No. of people benefitted : 590

Comments of the Stake Holder : Better Sanitization & hygiene practices.

Date of Commencement : 22/04/2019

Date of Completion : 08/06/2019

Estimated Cost : 1.80 Lacs

Completion Cost : 1.72 Lacs

No of people benefitted : 154

Comments of the Stake Holder : Benefited work for public.

Construction of CSC at Pyt. Seri Panditan(83)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 109: PICTORIAL COMPENDIUM

104

Construction of CSC at Raipur Lower near Talab Panchayat Ghar at Pyt. Raipur lower Domana(84) CSC AT JHAJJAR KOTLI(85)

Date of Commencement : APR-19

Date of Completion : JULY-19

Estimated Cost : 1.80 Lacs

Completion Cost : 1.80 LAC

No. of People Benefitted : 100

Comments of Stakeholder : GOOD

Date of Commencement : 06-11-2019

Date of Completion : 23-12-2019

Estimated Cost : 2.00 Lacs

Completion Cost : 1.80 Lacs

No of people benefitted : 350

Comments of the Stake Holder : As per the need of the inhabitats

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 110: PICTORIAL COMPENDIUM

105

CSC AT BADSOO MOH TUFARI NEAR MASJID W NO 3(86)

Date of Commencement : 13.01 2019

Date of Completion : 20-05-2019

Estimated Cost : 1.80 Lacs

Completion Cost : 1.80 Lacs

No of people benefitted : 90

Comments of the Stake Holder : As per the need of the inhabitants

Date of Commencement : 22-06-2019

Date of Completion : NOV-19

Estimated Cost : 1.80 Lacs

Completion Cost : 1.80 Lacs

No of people benefitted : 80

Comments of the Stake Holder : GOOD

Const of CSC at Patniyal, Panchayat Sangrampur(88)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 111: PICTORIAL COMPENDIUM

106

Const of CSC near Maszid at Gujjar Basti village Kalyanpur, Panchayat Kalyanpur(87) Construction of CSC unit at Mandla Panchayat- Basohli Rural(89)

Date of Commencement : 15-06-2019

Date of Completion : 10-12-2020

Estimated Cost : 2.00 lacs

Completion Cost : 1.80 lacs

No. of people benefitted : 250 families

Comments of the Stake Holder : They are satisfied and getting proper benefits of the CSC

Date of Commencement : 13.01 2019

Date of Completion : 20-05-2019

Estimated Cost : 1.80

LacsCompletion Cost : 1.80 Lacs

No of people benefitted : 98

Comments of the Stake Holder : As per the need of the inhabitants

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 112: PICTORIAL COMPENDIUM

107

Construction of CSC unit at Ward no 5 Hatli more Chowk Gov. B(90)

Date of Commencement : 17-2-2019

Date of Completion : August 2019

Estimated Cost : 3.00 lacs

Completion Cost : 1.80 lacs

No. of people benefitted : 20 families

Comments of the Stake Holder : They are satisfied and getting proper benefits of the CSC

Date of Commencement : 17-2-2019

Date of Completion : August 2019

Estimated Cost : 3.00 lacs

Completion Cost : 1.80 lacs

No. of people benefitted : 250 families

Comments of the Stake Holder : They are satisfied and getting proper benefits of the CSC

Construction of CSC unit at JAKFED, ward no.8 Govindsar A(91)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 113: PICTORIAL COMPENDIUM

108

Date of Commencement 08.05.2019

Date of Completion 30.06.2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Date of Commencement 09.03.2019

Date of Completion 30.08.2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Name of Work with Location:- CSC Kralpora Dool(219)

Block:- Nagseni

Name of Work with Location:- CSC at Galhar(218)

Block:- Nagseni

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 114: PICTORIAL COMPENDIUM

109

Date of Commencement 11/2019

Date of Completion 12/2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.

Date of Commencement 10/2019

Date of Completion 12/2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.

Name of Work with Location:- CSC Shah Mohalla ward no 4 Mulchiter(221)

Block:- Mughal Maidan

Name of Work with Location:- CSC Panchayat Ghar Rahalthal(220)

Block:- Mughal Maidan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 115: PICTORIAL COMPENDIUM

110

Date of Commencement 07/2019

Date of Completion 09/2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.

Date of Commencement 06/2019

Date of Completion 08/2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Comments of the Stake Holder:- Unit is functional and is used by General Public.

Name of Work with Location:- CSC Aapath Nag Mandir Trigam .(226)

Block:- Trigam

Name of Work with Location:- CSC at Pyt. Ghar Heur(225)

Block:- Trigam

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 116: PICTORIAL COMPENDIUM

111

Date of Commencement 08-2019

Date of Completion 13-10-2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 50

Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.

Date of Commencement 06-2019

Date of Completion 09-2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 45

Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.

Name of Work with Location:- CSC at Panchayat Ghar Ranie-B(228)

Block:- MARWAH

Name of Work with Location:- CSC at Panchayat Ghar Nowpachi-B(227)

Block:- MARWAH

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 117: PICTORIAL COMPENDIUM

112

Date of Commencement 07-2019

Date of Completion 11-2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 55

Comments of the Stake Holder:- Unit is functional and is used by devotedies

Date of Commencement 09-2019

Date of Completion 11-2019

Estimated Cost 1.80

Completion Cost 1.80

No of people benefitted 50

Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.

Name of Work with Location:- CSC at Shahi Mohala Changer(230)

Block:- MARWAH

Name of Work with Location:- CSC Panchayat Ghar Qaderna –A(229)

Block:- MARWAH

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 118: PICTORIAL COMPENDIUM

113

Date of Commencement 1-11-2019

Date of Completion 30-11-2019

Estimated Cost 2.00

Completion Cost 1.80

No of people benefitted 60

Name of Work with Location:- CSC AT BEGANA PANCHAYAT MATTA-B(222)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 119: PICTORIAL COMPENDIUM

114

Date of Commencement 10-06-2019

Date of Completion 28-08-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 210

Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public

Date of Commencement 10-05-2019

Date of Completion 15-10-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.000

No of people benefitted 250

Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change

Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 120: PICTORIAL COMPENDIUM

115

Date of Commencement 10-06-2019

Date of Completion 28-08-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 210

Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public

Date of Commencement 10-05-2019

Date of Completion 15-10-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.000

No of people benefitted 250

SoulsComments of the Stake Holder: increases Sanitation Practices & encourages behavioural change

Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 121: PICTORIAL COMPENDIUM

116

Date of Commencement 10-06-2019

Date of Completion 28-08-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 210

Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public

Date of Commencement 10-05-2019

Date of Completion 15-10-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.000

No of people benefitted 250

Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change

Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 122: PICTORIAL COMPENDIUM

117

Date of Commencement 10-06-2019

Date of Completion 28-08-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 210

Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public

Date of Commencement 10-05-2019

Date of Completion 15-10-2019

Estimated Cost 2.00 Lacs

Completion Cost 2.000

No of people benefitted 250

SoulsComments of the Stake Holder: increases Sanitation Practices & encourages behavioural change

Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 123: PICTORIAL COMPENDIUM

118

Date of Commencement 10/11/2019

Date of Completion 20/12/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 lacs

No of people benefitted 25 Families

Comments of the Stake Holder: Benefited for community .

Date of Commencement 28/10/2019

Date of Completion 20/12/2019

Estimated Cost 2.00 Lacs

Completion Cost 1.992 Lacs

No of people benefitted 15 Families4

Comments of the Stake Holder: Benefited for community .

Name of Work with :Location: CSC Nr. Gurdwara Sahib Qazi Mohra(147)

Name of Work with Location: CSC Nr. Eidgah Masjid Jhulass (146)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 124: PICTORIAL COMPENDIUM

119

Date of Commencement 06/08/2019

Date of Completion 09/09/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 lacs

No of people benefitted 25 Families

Comments of the Stake Holder: Benefited for community .

Date of Commencement 02-08-2019

Date of Completion 09/09/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 15 Families

Comments of the Stake Holder: Benefited for community .

Name of Work with :Location : CSC Nr. Hill Pari Masjid (149)Name of Work with Location: CSC Nr. Masjid Usma Masjid hill (148)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 125: PICTORIAL COMPENDIUM

120

Date of Commencement 30/08/19

Date of Completion 31/12/19

Estimated Cost 1.80 lakh

Completion Cost 1.80 lakh

No of people benefitted 350

Date of Commencement 30/08/19

Date of Completion 31/12/19

Estimated Cost 1.80 lakh

Completion Cost 1.80 lakh

No of people benefitted 1800

Name of Work with Location:CSC Nr .Pyt Ghar Bedar (151)Name of Work with Location:CSC Nr. Gali Azamabad (150)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 126: PICTORIAL COMPENDIUM

121

Date of Commencement 30/08/19

Date of Completion 31/12/19

Estimated Cost 1.80 lakh.

Completion Cost 1.80 lakh

No of people benefitted 1500

Date of Commencement 30/08/19

Date of Completion 31/12/19

Estimated Cost 1.80 lakh

Completion Cost 1.80 lakh

No of people benefitted 850

Name of Work with Location: CSC Nr. Masjid Sundri (153)Date of Commencement:- 30/08/19Name of Work with Location: CSC Nr. Madarsa Gagrian (152)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 127: PICTORIAL COMPENDIUM

122

Date of Commencement 15-12-2018

Date of Completion 30-04-2019

Estimated Cost 1.80 lakh.

Completion Cost 1.80 lakh

No of people benefitted 200

Date of Commencement 15/9//2019

Date of Completion 22/10/2019

Estimated Cost 2.00

Completion Cost 179910

No of people benefitted 105

Comments of the Stake Holder: providing relief while prayer ing in Mosque.

Name of Work with Location: CSC Nr Masjid (161)Name of Work with LocationC:- CSC Nr. Mardasa Haveli (154)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 128: PICTORIAL COMPENDIUM

123

Date of Commencement 15-04-2019

Date of Completion:- 22-05-2019

Estimated Cost 2.00 Lacs

Completion Cost:- 1.79 Lasc

No of people benefitted:- 55

Date of Commencement 01-10-2019

Date of Completion 30-10-2019

Estimated Cost 2.00 Lacs

Completion Cost 1.78 Lacs

No of people benefitted 45

Name of Work with Location:- CSC Near Madarsa Moin ul Islam (156)

Name of Work with Location:- CSC Near Jamia Masjid Hattian (155)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 129: PICTORIAL COMPENDIUM

124

Date of Commencement 20-10-2019

Date of Completion 20-11-2019

Estimated Cost 2.00 Lacs

Completion Cost 1.79600 Lacs

No of people benefitted 55

Date of Commencement 15-09-2019

Date of Completion 17-10-2019

Estimated Cost 2.00 Lacs

Completion Cost:- 1.799 Lacs

No of people benefitted:- 60

Name of Work with Location:- CSC Near Masjid Ahele Hadees Tohid Nagar (158)

Name of Work with Location:- CSC Near Jamia Masjid Moh. Bajjaran (157)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 130: PICTORIAL COMPENDIUM

125

Date of Commencement 15-06-2019

Date of Completion 16-08-2019

Estimated Cost 2.00 Lacs

Completion Cost 1.784 LacsN

o of people benefitted 56

Date of Commencement 15-11-2019

Date of Completion 16-12-2019

Estimated Cost 2.00

LacsCompletion Cost 1.78500 Lacs

No of people benefitted 44

Name of Work with Location:- CSC Near Sumo Stand Kalasi (160)Name of Work with Location:- CSC Near Jamia Masjid (159)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 131: PICTORIAL COMPENDIUM

126

Date of Commencement 15/10/2019

Date of Completion 31/12/2019

Estimated Cost 2.00

Completion Cost 179450

No of people benefitted 100

Date of Commencement 20/9/2019

Date of Completion 20/12/2019

Estimated Cost 2.00

Completion Cost Nil

No of people benefitted 65

Name of Work with Location: CSC Nr Zariat Kallar Katta(163)Name of Work with Location: CSC Nr Masjid Rajdhan (162)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 132: PICTORIAL COMPENDIUM

127

Date of Commencement 02/09/2019

Date of Completion 16/11/2019

Estimated Cost 2.00lacs

Completion Cost 2.00lacs

No. Of people Benefitted 35 Families

Comment of Stake holders: Much Need /Community Benefited Work

Date of Commencement 07/09/2019

Date of Completion 02/10/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00Lacs

No of People benefited 35Familiy

Comment of Stake Holders Much Needed work

CSC Ward no. 04 (169)

Pyt:-Mastandara

Name of Work:-CSC Moh Azad (164)

Panchayat :- Fazalabad Lower B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 133: PICTORIAL COMPENDIUM

128

Date of Commencement 15/10/2019

Date of Complition 16/11/2019

Estimated Cost 2.00lacs

Completion Cost 2.00Lacs

No Of People benefited 35

Comments of Stake Holder Good Quality works

Date of Commencement 15/10/2019

Date of Completion 16/10/2019

Estimates Cost 2.00 lacs

Completion Cost 2.00 lacs

No of People Benefitted 50 pop

Comments of Stakeholders Good Quality works

Name of work :-CSC Near Pyt. Ghar (167)Name :-CSC Near Masjid (165)

Panchayat : Mahra A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 134: PICTORIAL COMPENDIUM

129

Date of Commencement 28/08/2019

Date of Completion 20/10/2019

Estimated Cost 2.00Lacs

Completion Cost 2.00Lacs

No of People benefited 50 pop

Comment of Stake Holders Much Needed work

Date of Commencement 10/01/2019

Date of Completion 29/05/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00Lacs

No of People benefited 50 Families

Comment of Stake Holders Much Needed work

Constt CSC near Behramgall Market (168)Work Name :- CSC Nr Pyt Ghar Buffliaz B (166)

Panchayat:-Buffliaz B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 135: PICTORIAL COMPENDIUM

130

Date of Commencement 07/09/2019

Date of Completion 02/10/2019

Estimated Cost 2.00Lacs

Completion Cost 2.00Lacs

No of People benefited 35 Families

Comment of Stake Holders Much Needed work

Date of Commencement 07/09/2019

Date of Completion 3/11/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00Lacs

No of People benefited 35pop

Comment of Stake Holders Much Needed work

Constt of CSC ward no. 08 Mastandara (171)

Pyt:-Murrah upperCSC Near Eid Gah Murrah Lower Khulai (170)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 136: PICTORIAL COMPENDIUM

131

Commencement 10-09-2019

Date of Completion 25-12-2019

Estimated Cost 2.00 LAC

Completion Cost 2.00 LAC

No of people benefitted 57

Commencement 27-08-2019

Date of Completion 26-10-2019

Estimated Cost 2.00 LAC

Completion Cost 2.00 LAC

No of people benefitted 49

CSC NR MASJID BALNOI (173)CSC NR KHIDMAT CENTRE MANKOTE (172)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 137: PICTORIAL COMPENDIUM

132

Date of Commencement 01/05/2019

Date of Completion 16/08/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 250

Comments of the Stake Holder: The CSC unit has ensured the community level sanitation and the general population are satisfied with the construction of said CSC unit under SBM-(G)

Date of Commencement 30/05/2019

Date of Completion 20/08/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted: 450

Comments of the Stake Holder :The CSC unit has ensured the community level sanitation and the general population are satisfied with the construction of said CSC unit under SBM-(G)

: CSC near Play field at Satoora(52)CSC near Masjid-i-Ahlihadees Panzoo(51)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 138: PICTORIAL COMPENDIUM

133

Date of Commencement 29/04/2019

Date of Completion 10/08/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted 650

Comments of the Stake Holder: The CSC unit has ensured the community level sanitation and the general population are satisfied with the construction of said CSC unit under SBM-(G)

Date of Commencement 03/06/2019

Date of Completion 03/09/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted: 450

Comments of the Stake Holder :The CSC unit has ensured the community level sanitation and the general population especially Sikh community are satisfied with the construction of said CSC unit under SBM-(G)

CSC near Deeri Sahab Gulshanpora(54)CSC near Jamia Masjid Panzoo(53)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 139: PICTORIAL COMPENDIUM

134

Date of commencement 04/07/2019.

Date of completion 28/09/2019.

Estimated cost 2.00 lacs.

Completion cost 2.00 lacs

No of people benefited 389 no.

commencements of the stake holder:- people of the village happy with the Rural dev. Department .

Moreover the people of the villagers are satisfied

Date of commencement 05/07/2019.

Date of completion 12/10/2019.

Estimated cost 2.00 lacs.

Completion cost 2.00 lacs

No of people benefited: 289 no.

commencements of the stake holder:- people of the village happy with the Rural dev. Department .

Moreover the people of the villagers are satisfied

Name Of Work With Location :- C/O Of Csc Near Masjid Ahalihadees At Shahabad.(56)

C/O Of Csc Near Jamia Masjid Sharief Danapora At Noorpora B.(55)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 140: PICTORIAL COMPENDIUM

135

Date of commencement 20/07/2019.

Date of completion 18/10/2029.

Estimated cost 2.00 lacs.

Completion cost 2.00 lacs

No of people benefited 230 no.

commencements of the stake holder:- people of the village happy with the Rural dev. Department

Moreover the people of the villagers are satisfied

Date of Commencement 03/06/2019

Date of Completion 03/09/2019

Estimated Cost 2.00 Lacs

Completion Cost 2.00 Lacs

No of people benefitted: 450

Comments of the Stake Holder :The CSC unit has ensured the community level sanitation and the general population especially Sikh community are satisfied with the construction of said CSC unit under SBM-(G)

CSC near Deeri Sahab Gulshanpora(54)Name Of Work With Location :- C/O Of Csc At Peernar Noorpora Ii .(57)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 141: PICTORIAL COMPENDIUM

136

Date of commencement 19.09.2019

Date of Completion 22.11.2019

Estimated Cost 1.80 + 0.20 (Beneficiary share)

Completion cost 1.795

No. of people benefitted:- Almost 380Comments from Stakeholders:-The CSC is very beneficial as the people at large scale offer congregation prayers in the said Masjid Shareef

Date of commencement 14.08.2019

Date of Completion 22.10.2019

Estimated Cost 1.80 + 0.20 (Beneficiary share)

Completion cost 1.795

No. of people benefitted Almost 500

Comments from Stakeholders:-The CSC at play ground would be beneficial especially for the sports persons as may sports persons from different villages of the district are playing cricket in the near by play ground

Community Sanitary Complex near Play ground Achgooze .(60)

Community Sanitary Complex at Masjid Shareef Khaidora Achgooze.(59)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 142: PICTORIAL COMPENDIUM

137

Date of Commencement 04-05-2019

Date of Completion 16-07-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 25

Comments of the Stake Holder:- Urgent Requirement of People

Date of Commencement 04-05-2019

Date of Completion 29-06-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted:- 30Comments of the Stake Holder:- Much Needed Work

CSC Near Panchayat Ghar Potha(115)CSC Near Jamia Masjid ward No.05 Ladyote(114)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 143: PICTORIAL COMPENDIUM

138

Date of Commencement 07-07-2019

Date of Completion 09-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80Lakh

No. of people benefitted:- 30Comments of the Stake Holder:- Much Needed Work

Date of Commencement 21-09-2019

Date of Completion 03-11-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

CSC at Ward No.02 Jamia Masjid Saranoo Dalogra(117)Csc near Panchayat Ghar Sagote(116)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 144: PICTORIAL COMPENDIUM

139

Date of Commencement 06-06-2019

Date of Completion 01-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

Date of Commencement 09-07-2019

Date of Completion 23-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted:- 30Comments of the Stake Holder:- Much Needed Work

CSC Near Panchayat Ghar Dodasan(119) RemoteSC Near Jamia masjid chakli Dodasan lower(118)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 145: PICTORIAL COMPENDIUM

140

Date of Commencement 08-08-2019]

Date of Completion 27-10-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Commencement 06-10-2019

Date of Completion August-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People

CSC at the land of Pyt. Ghar, Gurdan bala(145)CSC near Panchayat Ghar Mehrajpura((120)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 146: PICTORIAL COMPENDIUM

141

Date of Commencement 01-09-2019

Date of Completion 29-11-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Commencement 15-06-2019

Date of Completion 29-11-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

CSC Near Masjid Bijji Kewal Upper(122)CSC Near Meera Masjid W.No.03 Nerojal(121)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 147: PICTORIAL COMPENDIUM

142

Date of Commencement 15-06-2019

Date of Completion: 13-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 25

Comments of the Stake Holder:- Urgent Requirement of People

Date of Commencement 15-06-2019

Date of Completion 21-08-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

CSC near Malik Mohalla W.No.01 Rajnagar Lower(124)CSC Near jamia Masjid Phalni. W.No.04 Phalni(123)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 148: PICTORIAL COMPENDIUM

143

Date of Commencement 15-06-2019

Date of Completion 19-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Commencement 15-06-2019

Date of Completion 11-11-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

CSC Near Jamia Masjid Upper Bathan W.No.03Rajnagar Upper(126)CSC Near najar Mohalla W. No.01 Rajnagar Lower(125)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 149: PICTORIAL COMPENDIUM

144

Date of Completion 24-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Commencement 15-06-2019

Date of Completion 10-11-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

CSC Near Masjid Targain Lower(128):- CSCnear Jamia Masjid Shahpur(127)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 150: PICTORIAL COMPENDIUM

145

Date of Commencement 15-06-2019

Date of Completion 26-08-2019

Estimated Cost Rs. 1.80

Lakh Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Completion 11-11-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

CSC at Panchayat Ghar Dhara Sanwla(130)CSC Near Jamia Masjid Targain Upper(129)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 151: PICTORIAL COMPENDIUM

146

Date of Commencement 15-06-2019

Date of Completion 24-09-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People

Date of Commencement 06-10-2019

Date of Completion Nov. 2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

CSC Near Land of Panchayat Ghar Badhal-A(132)CSC Near Panchayat Ghar Kallar(131)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 152: PICTORIAL COMPENDIUM

147

Date of Commencement 06-10-2019

Date of Completion Nov. 2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Commencement 6-10-2019

Date of Completion Nov.2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

:- CSC at the land of Pyt. Ghar, Bhella(134)CSC at the land of Panchcyat Ghar Bahi nambal (133)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 153: PICTORIAL COMPENDIUM

148

Date of Completion Nov.2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

Date of Commencement 06-10-2019

Date of Completion Nov.2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

CSC at the land of Pyt. Ghar, Gadyog Dhelari(136)CSC at the land of Pyt. Ghar , Gadyog(135)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 154: PICTORIAL COMPENDIUM

149

Date of Completion August 2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Completion Nov.2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 35

Comments of the Stake Holder:- General Demand of the People

CSC at the land of Pyt. Ghar , Khawas(138)CSC at the land of Pyt. Ghar, Gundha(137)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 155: PICTORIAL COMPENDIUM

150

Date of Completion Nov.2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 25

Comments of the Stake Holder:- Urgent Requirement of People

Date of Commencement 6-10-2019

Date of Completion Dec-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

CSC at the land of Pyt. Ghar, Atti(140) CSC at the land of Pyt. Ghar, Narla(139)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 156: PICTORIAL COMPENDIUM

151

Date of Commencement 06-10-2019

Date of Completion Dec 2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

Date of Commencement 06-10-2019

Date of Completion Dec-2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People

CSC at the land of Pyt. Ghar, Chawa(142) CSC at the land of Pyt. Ghar, Charran(141)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 157: PICTORIAL COMPENDIUM

152

Date of Commencement 06-10-2019

Date of Completion June 2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People

Date of Commencement 06-15-2019

Date of Completion August 2019

Estimated Cost Rs. 1.80 Lakh

Completion Cost Rs. 1.80 Lakh

No. of people benefitted 30

Comments of the Stake Holder:- Much Needed Work

:- CSC at the land of Pyt. Ghar, Fatehhpur Khass(144)CSC near Pyt Ghar Dhanore Dhindian(143)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 158: PICTORIAL COMPENDIUM

153

Date of Commencement: 01-11-2019

Date of Completion:- 30-11-2019 Estimated Cost: 2.00

Completion Cost:- 1.80

No of people benefitted:- 100

Comments of the Stake Holder:- Satisfactory

Date of Commencement: 01/02/2019

Date of Completion: 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacsNo of people benefitted: 350-400

Comments of the Stake Holder:_ Nil

Date of Commencement: 01/112019

Date of Completion: 31/11/2019

Estimated Cost: 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 650-700

Comments of the Stake Holder:_ Nil

Constt of CSC at Raja Manzil W No2 Pyt Bhordhar-B ( 178)

Constt of CSC at Mahakshal Mahaveshar Mandir Batroo (179)

Construction of CSC at Mominabad , Pyt:- Gool – B Block:- Gool (177)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 159: PICTORIAL COMPENDIUM

154

Date of Commencement: 01/112019

Date of Completion : 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 450-500

Comments of the Stake Holder:_ Nil

Date of Commencement: 01/112019

Date of Completion: 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 400-500

Comments of the Stake Holder:_ Nil

Date of Commencement: 01/112019

Date of Completion: 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 250-300

Comments of the Stake Holder:_ Nil

Constt of CSC near AWC Chakka (181) Constt of CSC at Upper Daingpora Khowra (182) Constt of CSC at Kralna(180)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 160: PICTORIAL COMPENDIUM

155

Date of Commencement: 01/112019

Date of Completion 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 450-500

Comments of the Stake Holder: Nil

Date of Commencement: 01/112019

Date of Completion: 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 450-550

Comments of the Stake Holder: Nil

Date of Commencement : 01.07.2019

Date of Completion : 15.12.2020

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 234-230

Comments of the Stake Holder : NIL

Constt of CSC at Chanjloo (184) CSC NEAR JAMIA MASJID SHARIF DANGANRI Pyt : DHARAM B (185)

Constt of CSC near Masjid Sharif Kote (183)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 161: PICTORIAL COMPENDIUM

156

Date of Commencement : 07.07.2019

Date of Completion : 05.12.2020

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 120-180

Comments of the Stake Holder : NIL

Date of Commencement : 07.07.2019

Date of Completion : 25.12.2020

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 180-250

Comments of the Stake Holder : NIL

CSC NEAR MASJID SHARIF CHROON Pyt : GUNDI (187) CSC NEAR Masjid Papshalana Pyt : Dharam A (186)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 162: PICTORIAL COMPENDIUM

157

Date of Commencement : 07.07.2019

Date of Completion : 25.12.2020

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 230-280

Comments of the Stake Holder : NIL

Date of Commencement : 01.09.2019

Date of Completion : 30.09.2019

Estimated Cost : 2.00

Completion Cost : 2.00

No of people benefitted : 80

Comments of the Stake Holder : Satisfactory

CSC at Barnal PYT : Gandhri (189) CSC NEAR MASJID SHARIF BHIMDASSA Pyt : BHIMDASSA (188)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 163: PICTORIAL COMPENDIUM

158

Date of Commencement : 01.09.2019

Date of Completion : 30.09.2019

Estimated Cost : 2.00

Completion Cost : NIL

No of people benefitted : 80

Comments of the Stake Holder : Satisfactory

Date of Commencement : 01.09.2019

Date of Completion : 30.09.2019

Estimated Cost : 2.00

Completion Cost : 2.00

No of people benefitted : 80

Comments of the Stake Holder : Satisfactory

CSC Near Nag Devta Tanger PYT : Tanger (191)CSC at Bhattan Near Hospital PYT : Bhattan (190)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 164: PICTORIAL COMPENDIUM

159

Date of Commencement : 01.09.2019

Date of Completion : 30.09.2019

Estimated Cost : 2.00

Completion Cost : 2.00

No of people benefitted : 90

Comments of the Stake Holder : Satisfactory

Date of Commencement : 01.09.2019

Date of Completion : 30.09.2019

Estimated Cost : 2.00

Completion Cost : Nil

No of people benefitted : 75

Comments of the Stake Holder : Satisfactory

CSC Achansulari W.No 02 PYT : KABBI (193) CSC Bhutyal Mohalla Lower Dharamkund PYT : Kanga (192)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 165: PICTORIAL COMPENDIUM

160

Date of Commencement: 15/10/2019

Date of Completion: 15/12/2019

Estimated Cost:- 1.80 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 450-500

Comments of the Stake Holder: Satisfactory Much needed or quality work Much needed

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 1.80 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at Ablar W. No.07 Allinbass B (195) Constt of CSC unit at Masjid sharief Hemen Karma. ((194)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 166: PICTORIAL COMPENDIUM

161

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 1.80 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at Lamberdar Mohallah W.No. 06 HOCHAK (197)

Construction of CSC at Jamia Masjid Sharief upper Chamahal BINGARA (196)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 167: PICTORIAL COMPENDIUM

162

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost 1.80 lakh

Completion Cost: 1.80 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at Masjid Sharief Shalgad W.No 06 Maligam B (199)

Construction of CSC at Masjid Sharief Bass W.No.02 Maligam A (198)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 168: PICTORIAL COMPENDIUM

163

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80

Completion Cost: 1.80

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 1.80 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at Masjid Sharief Adhal W.No 03 Pogal Lower (201)

Construction of CSC at Batroo Gujar Bast W.No 07 Panchal A (200)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 169: PICTORIAL COMPENDIUM

164

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 1.80 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at Upper Gujrara W.No. 03 Senabathi B (203)

Constt of CSC at bus stand senabathi W.No.01 Senabathi A (202)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 170: PICTORIAL COMPENDIUM

165

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at walldar Panla Panla (205) Construction of CSC at Bhatpora Shaman Nag. Pingloga (204)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 171: PICTORIAL COMPENDIUM

166

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 1.80 lakh

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement: 01/112019

Date of Completion: 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 650-700

Comments of the Stake Holder:_ Nil

Constt of CSC at Batroo near Shiv

Temple (207) Construction of CSC at Khill W.No.04 Balihote B (206)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 172: PICTORIAL COMPENDIUM

167

Date of Commencement: 01/112019

Date of Completion: 31/11/2019

Estimated Cost:- 2.00 lacs

Completion Cost: 1.80 lacs

No of people benefitted: 450-500

Comments of the Stake Holder:_ Nil

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Constt of CSC at Magerkote

Amarnath Morh (208)

Construction of CSC at Jawala Mandir near PWD Road to Hochak (209

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 173: PICTORIAL COMPENDIUM

168

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80 lakh

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Construction of CSC at Masjid Sharief Chevly W.No.07 Senabathi B (211)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Construction of CSC at Eidgah Mohallah Panchal B (210)

Page 174: PICTORIAL COMPENDIUM

169

Date of Commencement: 24-08-2019

Date of Completion: 25-09-2019

Estimated Cost: 1.80

Completion Cost: 0.00

No of people benefitted: 120

Comments of the Stake Holder:

Date of Commencement : 08.08.2019

Date of Completion : 29.12.2019

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 200-250

Comments of the Stake Holder : NIL

Construction of CSC at Masjid Sharief Chanka W.No. 04 (212) CSC Near Mangaloge Masjid Sharief Pyt : Dalwah Upper(213)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 175: PICTORIAL COMPENDIUM

170

Date of Commencement : 08.08.2019

Date of Completion : 29.12.2019

Estimated Cost : 1.80

Completion Cost : 0.00

No of people benefitted : 230-280

Comments of the Stake Holder : NIL

Date of Commencement : 08.08.2019

Date of Completion : 19.03.2020

Estimated Cost : 1.80

Completion Cost : 1.80

No of people benefitted : 180-250

Comments of the Stake Holder : NIL

CSC Near Najar Mohalla Ward No.04 Pyt : Dalwah Lower(214) CSC near panjgana masjid sharief sumber upper a(215) Pyt : Sumber Upper-a

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 176: PICTORIAL COMPENDIUM

171

Date of Commencement : 08.08.2019

Date of Completion : 29.12.2019

Estimated Cost : 1.80

Completion Cost : 0.00

No of people benefitted : 250-280

Comments of the Stake Holder : NIL

Date of Commencement : 08.08.2019

Date of Completion : 14.12.2019

Estimated Cost : 1.80

Completion Cost : 0.00

No of people benefitted : 250-280

Comments of the Stake Holder : NIL

CSC NEAR Pangana Masjid Sharief PYT : Chachawah B(216) Csc Near Ram Mandir Narla W No 02(217) Pyt : Chachawah A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 177: PICTORIAL COMPENDIUM

172

Date of Commencement: 05-04-2019

Date of Completion: 30-04-2019

Estimated Cost: 1.80

Completion Cost: 1.80

No of people benefitted: General Public

Comments of the Stake Holder: Good Much needed / Quality work: Much needed

Date of Commencement: 13-08-2019

Date of Completion: 25-12-2019

Estimated Cost: 1.80

Completion Cost: 1.80

No of people benefitted: General Public

Comments of the Stake Holder: Good Much needed / Quality work: Much needed

Construction of CSC Jama Masjid, Pyt. Bandhar, Block Thakrakote(176)

Construction of CSC at Pyt. Ghar Kansoli, Pyt. Mahore C, Block Mahore(175)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 178: PICTORIAL COMPENDIUM

173

Date of Commencement: 15-11-2019

Date of completion 31-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 150

Date of Commencement: 24-11-2019

Date of completion 29-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 250

Construction of Sanitary Complex at Village Chann Malagrain Panchayat Sangwali Block Ghagwal (92)

Construction of Sanitary Complex at Govt. Middle School Duree Panchayat Duree Block Nud (93)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 179: PICTORIAL COMPENDIUM

174

Date of Commencement: 23-10-2019

Date of completion 20-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 150

Date of Commencement: 19-10-2019

Date of completion 20-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Construction of Sanitary Complex at Kaloha Moh. SC Panchayat Dhora Block Nud (94)

Construction of Sanitary Complex at Government Middle School Bardan Panchayat Moutlian Kalan Block Nud (95)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 180: PICTORIAL COMPENDIUM

175

Date of Commencement: 03-07-2019

Date of completion 17-08-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 150

Date of Commencement: 03-07-2019

Date of completion 17-08-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Construction of Sanitary Complex at Mohargarh Fort Panchayat Mohargarh Block Nud (96)

Construction of Sanitary Complex at Pyt Ghar Moutlian Kalan Panchayat Moutlian Kalan Block Nud (97)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 181: PICTORIAL COMPENDIUM

176

Date of Commencement: 03-07-2019

Date of completion 18-08-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 200

Date of Commencement: 02-11-2019

Date of completion 15-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 300

Construction of Sanitary Complex at Govt. High School Sarna Panchayat Sarna Block Nud (98)

Construction of Sanitary Complex at GDC Samba Panchayat Druee Block Nud (99)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 182: PICTORIAL COMPENDIUM

177

Date of Commencement: 02-11-2019

Date of completion 15-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 300

Date of Commencement: 24-11-2019

Date of completion 22-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 90

Construction of Sanitary Complex at GDC Samba Panchayat Druee Block Nud (100)

Construction of Sanitary Complex at Palth near Eidhgah Panchayat Mananu Block Nud (101)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 183: PICTORIAL COMPENDIUM

178

Date of Commencement: 02-11-2019

Date of completion 25-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Date of Commencement: 24-10-2019

Date of completion 27-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 60

Construction of Sanitary Complex at PHC Dhora Panchayat Dhora Block Nud (102)

Construction of Sanitary Complex at Kaloha Panchayat Dhora Block Nud (103)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 184: PICTORIAL COMPENDIUM

179

Date of Commencement: 03-05-2019

Date of completion 28-05-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Date of Commencement: 03-05-2019

Date of completion 22-06-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Construction of Sanitary Complex at Abtal Panchayat Abtal Block Ramgarh (104)

Construction of Sanitary Complex at Kesso Manhasan Panchayat Kesso Manhasan Block Ramgarh (105)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 185: PICTORIAL COMPENDIUM

180

Date of Commencement: 03-05-2019

Date of completion 16-06-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Date of Commencement: 03-11-2019

Date of completion 30-12-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 70

Construction of Sanitary Complex at PHC Dhora Panchayat Dhora Block Nud (102)

Construction of Sanitary Complex at Kartholi Lower Panchayat Kartholi Lower Block Bari Brahmana (107)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 186: PICTORIAL COMPENDIUM

181

Date of Commencement: 15-06-2019

Date of completion 15-09-2019

Estimated Cost Rs. 1.80 lakhs

Completion Cost Rs. 1.80 lakhs

No. of people benefited 100

Construction of Sanitary Complex at Palli Panchayat Palli Block Bari Brahmana (108)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 187: PICTORIAL COMPENDIUM

182

Date of commencement: 06.01.2019

Date of completion: 01.05.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 350

Comments by Stake holder: Satisfied with the work execution

Date of commencement: 29.05.2019

Date of completion: 25.06.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.90 lacs

Population benefitted: 350

Comments by Stake holder: Great work by RDD

C/O CSC near Ziyarat Sharief Dachoo, Chitragam(61) C/O CSC near Masjid Sharief at Nadigam(63)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 188: PICTORIAL COMPENDIUM

183

Date of commencement: 29.05.2019

Date of completion: 25.07.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 251

Comments by Stake holder: Satisfied with the work execution

Date of commencement: 3.04.2019

Date of completion: 20.06.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.74 lacs

Population benefitted: 365

Comments by Stake holder: Long pending demand was fulfilled

C/O CSC for ladies Qaymut Ul Banat at Chitragam(64) C/O CSC near Hanfia Institue High School Losdenew (66)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 189: PICTORIAL COMPENDIUM

184

Date of commencement: 3.05.2019

Date of completion: 2.06.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 365

Comments by Stake holder: Long pending demand was fulfilled

Date of commencement: 26.09.2019

Date of completion: 26.10.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 160

Comments by Stakeholder: Long pending demand fulfilled

C/O CSC Govt.Higher Secondary Shool Nadigam(65) C/O CSC near Muqdam Mohalla Keller(62)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 190: PICTORIAL COMPENDIUM

185

Date of commencement: 26.09.2019

Date of completion: 26.10.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.99 lacs

Population benefitted: 203

Comments by Stakeholder: Public Demand

Date of commencement: 26.09.2019

Date of completion: 7.11.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 385

Comments by Stake holder: Community benefit

C/O CSC near Khanday Mohalla Keller(67) C/O CSC near Ziyarat Sharief Pehlipora(68)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 191: PICTORIAL COMPENDIUM

186

Date of commencement: 26.09.2019

Date of completion: 0 7.11.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 385

Comments by Stake holder: Community benefit

Date of commencement: 09.03.2019

Date of completion: 26.04.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.99 lacs

Population benefitted: 125

Comments by Stake holder: Long pending demand fulfilled

C/O CSC Govt.Higher Secondary Shool Nadigam(65) C/O CSC near Darul uloom Alamgung , Hermain(70)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 192: PICTORIAL COMPENDIUM

187

Date of commencement: 30.04.2019

Date of completion: 26.05.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 203

Comments by Stake holder: Community benefit

Date of commencement: 30.04.2019

Date of completion: 26.05.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 165

Comments by Stake holder: Long pending demand fulfilled

C/O CSC near Jamia Masjid Bonpora Landoora, Hermain(71) C/O CSC near Jamia Masjid Reshipora, Hermain(72)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 193: PICTORIAL COMPENDIUM

188

Date of commencement: 23.06.2019

Date of completion: 25.07.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted:: 214

Comments by Stake holder: Community benefit

Date of commencement: 23.04.2019

Date of completion: 25.05.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.70 lacs

Population benefitted: 195

Comments by Stake holder: Community benefit

C/O CSC point at Jinaz ghah at Feeripora(74)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

C/O CSC point at Feeripora(73)

Page 194: PICTORIAL COMPENDIUM

189

Date of commencement: 3.04.2019

Date of completion: 2.05.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 355

Comments by Stake holder: community benefit

Date of commencement: 30.04.2019

Date of completion: 2.06.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 1.80 lacs

Population benefitted: 355

Comments by Stake holder: Public demand was fulfilled.

Csc near at Narapora keller(76)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Csc near wani mohalla masjid sharief at keller(75)

Page 195: PICTORIAL COMPENDIUM

190

Date of commencement: 3.04.2019

Date of completion: 03.07.2019

Date of commencement: 30.04.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 2.00 lacs

Population benefitted: 355

Comments by Stake holder: Satisfied with the work execution

Date of commencement: 2.04.2019

Date of completion: 2.06.2019

Estimated cost: Rs 2.00 lacs

Bill cost: Rs 2.00 lacs

Population benefitted: 355

Comments by Stake holder: Satisfied with the work execution

Csc near Masjid Sharief Hamdania Tukroo Shopian(78)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Csc near Masjid Sharief Keegam Shopian(77)

Page 196: PICTORIAL COMPENDIUM

191

Date of Commencement: 06.04.2019

Date of Completion: 20.07.2019

Estimated Cost: 2:00

Completion Cost: 1.80

No of people benefitted: 140Comments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.

Date of Commencement: 08.03.2019

Date of Completion: 09.12.2019

Estimated Cost: 2.00

Completion Cost: 1.387

No of people benefitted: 123Comments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.

Construction of CSC Latrine near Govt. High School New Theed B(80)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Construction of CSC Latrine at Jamia Masjid Awal New Theed A(79)

Page 197: PICTORIAL COMPENDIUM

192

Date of Commencement: 28/09/2019

Date of Completion: 16/10/2019

Estimated Cost: 2.00

Completion Cost: 184292/-

No of people benefitted: 96 Students/TeachersComments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.

Date of Commencement: 05/11/2019

Date of Completion: 30/11/2019

Estimated Cost: 2.00

Completion Cost: 180000/-

No of people benefitted: 325Comments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.

Constt of Community Latrine near H/o. Ali Mohd Dar at Khazir Mohalla Balhama-B(82)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Constt of Community Latrine at Govt Girls Sec School Sikhnard Khonmoh-C(81)

Page 198: PICTORIAL COMPENDIUM

193

Date of Commencement: 04/2019

Date of Completion: 12/2019

Estimated Cost: 1.80

Completion Cost: 1.80

Comments of Stakeholders:-

Much needed / Quality work :- Good

Date of Commencement :- 11/2019

Date of Completion: 12/2019 (Phy. Completed)

Estimated Cost: 1.80 lacs

Completion Cost: 1.80 lacs

No of people benefitted 100

Comments of the Stake Holder: Work done is great and community

getting the full benefit of it for which it has been constructed

Const of CSC Unit near Mukri Mata Ghordi(110)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CSC unit at Moungri Panchayat Basnote (109)

Page 199: PICTORIAL COMPENDIUM

194

Date of Commencement :- 11/2019

Date of Completion: 12/2019 (Phy. Completed)

Estimated Cost: 1.80 lacs

Completion Cost:_ 1.80 lacs

No of people benefitted 100

Comments of the Stake Holder: Work done is great and community getting the full benefit of it for which it has been constructed

Date of Commencement :- 06/2019

Date of Completion: 12/2019

Estimated Cost: 1.80 lacs

Completion Cost: 1.80 lacs

No of people benefitted: General Public

Comments of the Stake Holder:Much needed / Quality work :-Good

CSC Unit of Nagorian Mohalla Pachound no 1((112)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Const of CSC Unit at HS Larh Ghordi(111)

Page 200: PICTORIAL COMPENDIUM

195

Date of Commencement : 10/2019

Date of Completion: 12/2019

Estimated Cost 1.80 lac

Completion Cost : 1.80 lac

No of people benefitted : 25-30

Comments of the Stake Holder: Much needed / Quality work :- Good

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CSC unit at Basantgarh(113)

Page 201: PICTORIAL COMPENDIUM

196

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.92 Lakhs

Completion Cost: Rs.0.80Lakhs

No. of people benefitted: 18

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs. 1.47 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

S.No.02:Retaining Wall at Shankerpora NLO Gh Qadir Ganie at Nallah SandranS.No.01: Renovation of Spring near Masjid Shasrief Zamalgam

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 202: PICTORIAL COMPENDIUM

197

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.85Lakhs

Completion Cost: Rs.0.85Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work.

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.084 Lakhs

Completion Cost: Rs. 1.062Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work.

S.No.04:Development of Spring at Khandar Pora DoodwaganS.No.03: Dev. Of Spring at Botishah Sahab (R.A) Naag at Nowgam near Masjid Sharief

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 203: PICTORIAL COMPENDIUM

198

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs.1.4850 Lakhs

No. of people benefitted: 32

Comments of stakeholders: Much needed/Quality work.

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.65 Lakhs

Completion Cost: Rs. 0.6362Lakhs

No. of people benefitted: 24

Comments of stakeholders: Much needed/Quality work.

S.No.06:Water Harvesting Tank at Lonepora Heeward NLO Ab Razak Lone S.No.05: Lining Wall at Bon Kul Qammer NLO Syed Abdullah

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 204: PICTORIAL COMPENDIUM

199

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.49Lakhs

Completion Cost: Rs.1.49Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work.

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.30Lakhs

Completion Cost: Rs. 0.24082Lakhs

No. of people benefitted: 14

Comments of stakeholders: Much needed/Quality work.

S.No.08: Farm Pond at Loout Qammer NLO Ab Rehman GanieS.No.07: Crate Bund at Gooriwan Deing NLO Ab Aziz Malik at Doodwagan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 205: PICTORIAL COMPENDIUM

200

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.42Lakhs

Completion Cost: Rs. 0.28285 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.42 Lakhs

Completion Cost: Rs. 0.287 Lakhs

No. of people benefitted: 17

Comments of stakeholders: Much needed/Quality work

S.No.10 Farm Pond at Lawal Qammer NLO Ab Rehman WaniS.No.09: Farm Pond at Khushipora Qammer NLO Fayaz Ah Wani

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 206: PICTORIAL COMPENDIUM

201

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs. 1.50 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.44 Lakhs

Completion Cost: Rs. 0.313 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

S.No.12. Water Harvesting Tank at Hergam Koot NLO Mohd Akbar WagayS.No.11: Create Bund at Nallah Sandran Koot NLO Imtiyaz Ah Lone

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 207: PICTORIAL COMPENDIUM

202

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs. 1.50 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion:December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs. 1.50 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

S.No.14. Create Bund at Trumbdoo Nallah Sandran at different spots

S.No.13: Create Bund at Nallah Heeward from Wahiward on roads to main Road

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 208: PICTORIAL COMPENDIUM

203

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs. 1.50 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.50 Lakhs

Completion Cost: Rs. 1.50 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

S.No.14. Create Bund at Trumbdoo Nallah Sandran at different spots

S.No.13: Create Bund at Nallah Heeward from Wahiward on roads to main Road

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 209: PICTORIAL COMPENDIUM

204

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 0.497 Lakhs

Completion Cost: Rs. 0.497 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.44 Lakhs

Completion Cost: Rs. 0.44 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.16. Water Harvesting Tank at Darbar Heeward NLO Gh Hassan

S.No.15: water Harvesting Tank at Lathnard Heeward NLO Gh Qadir Lone

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 210: PICTORIAL COMPENDIUM

205

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 0.965Lakhs

Completion Cost: Rs. 0.7708Lakhs

No. of people benefitted: 35

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.30 Lakhs

Completion Cost: Rs. 0.238 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

S.No.18. Farm Pond at Wadich Thaman NLO Gh Rasool MalikS.No.17: Land Levelling at Gogaldar Heeward NLO Mohd Ramzan Lone

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 211: PICTORIAL COMPENDIUM

206

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 0.447Lakhs

Completion Cost: Rs. 0.327Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.30 Lakhs

Completion Cost: Rs. 0.238 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.20. Farm Pond at Kadimargh Thaman NLO Mohd Maqbool Rather

S.No.19: Water Harvesting Tank at Wanigamh Thaman NLO GH Hassan Guroo

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 212: PICTORIAL COMPENDIUM

207

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 1.42 Lakhs

Completion Cost: Rs. 1.42 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.48 Lakhs

Completion Cost: Rs. 1.19 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

S.No.22. Development of spring at Magam A NLO Syed Aziz-U-dinS.No.21: Water Harvesting Tank at Choinard Gujjer Basti Rein NLO Farooq Ah Bhat

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 213: PICTORIAL COMPENDIUM

208

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 1.3311 Lakhs

Completion Cost: Rs. 1.3311akhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.00 Lakhs

Completion Cost: Rs. 0.925 Lakhs

No. of people benefitted: 32

Comments of stakeholders: Much needed/Quality work

S.No.24. Water Storage Tank at Hakura NLO Tahir Ahmad MalikS.No.23: Crate bund at Thaman

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 214: PICTORIAL COMPENDIUM

209

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 1.00 Lakhs

Completion Cost: Rs. 0.6401akhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.42Lakhs

Completion Cost: Rs. 0.37197Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

S.No.26. Conservation of Water Via Dev. Of spring near Awrin at Pethbugh

S.No.25: Water Storage Tank at Doibal Khushipora NLO Maqsood Ahmad Itoo & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 215: PICTORIAL COMPENDIUM

210

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.. 2.957Lakhs

Completion Cost: Rs. 1.814akhs

No. of people benefitted: 38

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.9566 Lakhs

Completion Cost: Rs. 0.951 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.28 Water Storage Tank at Voi NLO Nisar Ah Wagay & OthersS.No.27: Conservation of Water via Dev. Of Spring Naidnag NLO Abdul Majeed Khanday & Others at babdar phase I

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 216: PICTORIAL COMPENDIUM

211

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.00 Lakhs

Completion Cost: Rs. 0.986l akhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.1.22 Lakhs

Completion Cost: Rs. 0.97 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.30. Water Harvesting Tank at Bindroo NLO Najeeb Ah Khan & Others

S.No.29: Water Storage Tank at Voi NLO Mohd Jabar Wani & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 217: PICTORIAL COMPENDIUM

212

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 2.978 Lakhs

Completion Cost: Rs. 2.97 Lakhs

No. of people benefitted: 34

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.2.694Lakhs

Completion Cost: Rs. 2.67 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

S.No.34 Protection Bund cum fireld channel at Herpora Khandipora Hakura NLO Aijaz Ahmad

S.No.33: Lining Wall to Irrigation Ladh from both sides at Herpora Hakura NLO Mohd Yousuf parray Phase II

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 218: PICTORIAL COMPENDIUM

213

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 2.971 Lakhs

Completion Cost: Rs. 2.96 Lakhs

No. of people benefitted: 34

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.2.97Lakhs

Completion Cost: Rs. 2.97 Lakhs

No. of people benefitted: 39

Comments of stakeholders: Much needed/Quality work

S.No.36. Development of Field Channel to Check Soil Erosion at Danpath Shichen

S.No.35: Lining Wall cum field channel to check soil Erosion at dehwatoo Anipora Sichen Nlo Gh Mohammad.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 219: PICTORIAL COMPENDIUM

214

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.485 Lakhs

Completion Cost: Rs. 1.47 Lakhs

No. of people benefitted: 25

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.3.00 Lakhs

Completion Cost: Rs. 2.95 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

S.No.38. Conservation of water by development of reserviour at babdar NLO Ab Majeed Khanday and others Phase III

S.No.37: Conservation of Water via Dev. Of Spring at Pethbugh (Kahwotnag) NLO Arif ahmad Mir

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 220: PICTORIAL COMPENDIUM

215

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 3.00 Lakhs

Completion Cost: Rs. 2.84 Lakhs

No. of people benefitted: 32

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.69Lakhs

Completion Cost: Rs.0.674Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.40. Water Harvesting Tank at Kapsidar Shangramn NLO Mohd Maqbool Wani & Others

S.No.39: Conservation of water by development of reserviour at babdar NLO Ab Majeed Khanday and others Phase IV

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 221: PICTORIAL COMPENDIUM

216

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 2.00 Lakhs

Completion Cost: Rs. 1.99 Lakhs

No. of people benefitted: 34

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.853 Lakhs

Completion Cost: Rs.0.67 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

S.No.42 Development of Spring at Gilpora TrajanS.No.41: Check Dam at Sednard Nallah Halsidar

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 222: PICTORIAL COMPENDIUM

217

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.00 Lakhs

Completion Cost: Rs. 1.00 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.72 Lakhs

Completion Cost: Rs.0.58Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.44. Rain Water Harvestin Tank at Shangran AlchiwardS.No.43: Rain Water Harvesting tank at Sariean Hall

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 223: PICTORIAL COMPENDIUM

218

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.50Lakhs

Completion Cost: Rs. 1.49 Lakhs

No. of people benefitted: 37

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs.0.79 Lakhs

Completion Cost: Rs.0.59 Lakhs

No. of people benefitted: 17

Comments of stakeholders: Much needed/Quality work

S.No.46. Development od Spring at Joibal ShangranS.No.45: Nallah Bund at Bunpora Shangran near Primary School

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 224: PICTORIAL COMPENDIUM

219

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.50Lakhs

Completion Cost: Rs. 1.08 Lakhs

No. of people benefitted: 18

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.00 Lakhs

Completion Cost: Rs. 1.00 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work.

S.No.48. Development of Spring NLO Shah Wali & Gh Hassan Bumla at SaskhodanS.No.47: Nallah Bund at Joibal Shangran

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 225: PICTORIAL COMPENDIUM

220

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.386 Lakhs

Completion Cost: Rs. 0.386 Lakhs

No. of people benefitted: 14

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.943Lakhs

Completion Cost: Rs. 0.836 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

S.No.50. Development of Kokernag Spring at Jabba Peerpora Hingipora

S.No.49: Water Storage Tank NLO Manzoor Mir at Peth Halan Hingipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 226: PICTORIAL COMPENDIUM

221

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .2.17 Lakhs

Completion Cost: Rs. 1.06 Lakhs

No. of people benefitted: 24

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.54 Lakhs

Completion Cost: Rs. 0.54 Lakhs

No. of people benefitted: 16

Comments of stakeholders: Much needed/Quality work

S.No.52. Development of Spring NLO Gh Rasool Sheroo at NowgamnaadS.No.51: Check Dams at Gah Naad Nallah Khadar Kapran

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 227: PICTORIAL COMPENDIUM

222

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.37 Lakhs

Completion Cost: Rs. 0.265 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.73 Lakhs

Completion Cost: Rs. 0.73 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

S.No.54. Farm Pond NLO Gul Wani & Others at Reshipora Yakerbaru

S.No.53: Water Storage of Spring at Gamdoor Nallah NLO Nazir Pahadi , Boba Pahadi

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 228: PICTORIAL COMPENDIUM

223

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.70 Lakhs

Completion Cost: Rs. 0.67 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion December 2019

Estimated Cost: Rs. 1.09 Lakhs

Completion Cost: Rs. 0.873 Lakhs

No. of people benefitted: 25

Comments of stakeholders: Much needed/Quality work

S.No.56. Development of Spring at Moshikadal Gujer Basti HallanS.No.55: Rain Water Harvesting Tank at Laward Hallan.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 229: PICTORIAL COMPENDIUM

224

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.384 Lakhs

Completion Cost: Rs. 0.336 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of ommencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.99 Lakhs

Completion Cost: Rs. 1.036Lakhs

No. of people benefitted: 25

Comments of stakeholders: Much needed/Quality work

S.No.54. Farm Pond NLO Gul Wani & Others at Reshipora YakerbaruS.No.57: Rain Water Harvesting Tank at Naagi nard Chohan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 230: PICTORIAL COMPENDIUM

225

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.723 Lakhs

Completion Cost: Rs. 0.69 Lakhs

No. of people benefitted: 24

Comments of stakeholders:Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.92 Lakhs

Completion Cost: Rs. 0.77 Lakhs

No. of people benefitted: 18

Comments of stakeholders: Much needed/Quality work

S.No.60. Fisheries Pond NLO syed Mohd Amin at KapranS.No.59: Rain Water Harvesting Tank at Khanpora Kapran NLO Muzaffer Khan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 231: PICTORIAL COMPENDIUM

226

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .2.50 Lakhs

Completion Cost: Rs. 0.93 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.73 Lakhs

Completion Cost: Rs. 0.694 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

S.No.62. Water Harvesting Tank NLO Gulam Rasool Rather at ChohanS.No.61: Check Dams on Nowgam Nad Kapran (Phase II)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 232: PICTORIAL COMPENDIUM

227

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.979 Lakhs

Completion Cost: Rs. 1.552 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.60 Lakhs

Completion Cost: Rs. 0.546 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

S.No.66. Conseravtion of Water Via Development of Spring at Nageh Howed at Peerpora manz Dehruna

S.No.65: Water Storage Tank & Cattle Trough for Spring near Masjid Shareef Naaginad Hingipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 233: PICTORIAL COMPENDIUM

228

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.957 Lakhs

Completion Cost: Rs. 0.514 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.52 Lakhs

Completion Cost: Rs. 0.52 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.68. Water Harvesting Tank at Khalhar in Orchard of Gul Mohd BhatS.No.67: Check Dam at Shalguf Nard Kungamnag

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 234: PICTORIAL COMPENDIUM

229

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.97 Lakhs

Completion Cost: Rs. 0.4546 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.92 Lakhs

Completion Cost: Rs. 0.336 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

S.No.70. Check Dam NLO Firdous Ah Wani at Cherdokh Soaf BS.No.69: Chech Dam at Hapatnard soaf A NLO Gh Nabi Ahanger & Others g .

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 235: PICTORIAL COMPENDIUM

230

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.60 Lakhs

Completion Cost: Rs. 0.60 Lakhs

No. of people benefitted: 25

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.475 Lakhs

Completion Cost: Rs. 0.475Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.72. WHT NLO Shamis U din Rather at KhalharS.No.71: Water Harvesting Tank in the Land of Gh Qadir Bhat S/O Rama Bhat at Soaf B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 236: PICTORIAL COMPENDIUM

231

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.00 Lakhs

Completion Cost: Rs. 0.747 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.00 Lakhs

Completion Cost: Rs. 0.96 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

S.No.74: Farm Pond NLO Abdul Salam& Others at KandiwaraS.No.73: Water Harvesting Tank at Kongamnag NLO Mohd Ashraf, Abdul Salam & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 237: PICTORIAL COMPENDIUM

232

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.42Lakhs

Completion Cost: Rs. 0.408 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.46 Lakhs

Completion Cost: Rs. 0.397Lakhs

No. of people benefitted: 18

Comments of stakeholders: Much needed/Quality work

S.No.76. Water Harvesting Tank at ArhamaS.No.75: Farm pond at Bon Arhama

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 238: PICTORIAL COMPENDIUM

233

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.39Lakhs

Completion Cost: Rs. 0.39 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.50 Lakhs

Completion Cost: Rs. 0.49Lakhs

No. of people benefitted: 17

Comments of stakeholders: Much needed/Quality work

S.No.78. Water Harvesting Tank at Check Bagh NLO Reyaz Ahmad & OthersS.No.77: Perculation Tank at Wooder TChawalgam

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 239: PICTORIAL COMPENDIUM

234

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.926 Lakhs

Completion Cost: Rs. 0.369Lakhs

No. of people benefitted: 16

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.855 Lakhs

Completion Cost: Rs. 1.831Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

S.No.80. Check Dam With Nallah Baund in crates at Rukhan Nallah Hallwan Nlo Fayaz Ali & Others

S.No.79: Check Dams NLO Lass Mohd shree at MatakNad Soaf B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 240: PICTORIAL COMPENDIUM

235

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.46 Lakhs

Completion Cost: Rs. 1.455Lakhs

No. of people benefitted: 13

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.85Lakhs

Completion Cost: Rs. 1.60 Lakhs

No. of people benefitted: 24

Comments of stakeholders: Much needed/Quality work

S.No.78. Water Harvesting Tank at Check Bagh NLO Reyaz Ahmad & Others

S.No.81: Stone Bund at Khoda Dar Brad Nlo Gh Mohd Shah & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 241: PICTORIAL COMPENDIUM

236

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs . 1.00 Lakhs

Completion Cost: Rs. 0.99 Lakhs

No. of people benefitted: 13

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.50Lakhs

Completion Cost: Rs. 1.485 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.84. stone Bund at Kacha Pacca Yall NLO Mohd Shaban & Others S.No.83: Water Harvesting Pala Pather, Nagbal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 242: PICTORIAL COMPENDIUM

237

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.50 Lakhs

Completion Cost: Rs. 1.488Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.50Lakhs

Completion Cost: Rs. 1.472 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

S.No.86. Stone Bund at Kit Kul (RRM) chandrigam NLO Gh Nabi & Others

S.No.85: Nallah Bund at Banjer Hassan Noor NLO) Mohd Shaban & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 243: PICTORIAL COMPENDIUM

238

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.50 Lakhs

Completion Cost: Rs. 1.453Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.50Lakhs

Completion Cost: Rs. 1.488Lakhs

No. of people benefitted: 25

Comments of stakeholders: Much needed/Quality work

S.No.88. Loose Boulder Bund at Herdar Nallah KhayarS.No.87. Stone Bund at Khayar NLO Gh Hassan Najar

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 244: PICTORIAL COMPENDIUM

239

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.50 Lakhs

Completion Cost: Rs. 0.321Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.486Lakhs

Completion Cost: Rs. 1.423 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

S.No.90. Lining Wall Field Channel with recharge pits at Dairoo from the Land of Ab Rehman Khanday to Ab Majeeed Rather

S.No.89. Development of spring at Different Spots at Hallan Panzmullah

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 245: PICTORIAL COMPENDIUM

240

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.46 Lakhs

Completion Cost: Rs. 1.435 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.88 Lakhs

Completion Cost: Rs. 0.818 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality wor

S.No.92. Control Bund to check the soil Erosion at Ainoo NLO Mohd Amin Zarger & others

S.No.91. Lining Wall for Field chan nel with Recharge Pits at Wajura from The Land of Gh Qadoir Kumar to Ab Gani Lone Phase I

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 246: PICTORIAL COMPENDIUM

241

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.48 Lakhs

Completion Cost: Rs. 1.468 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 2.66 Lakhs

Completion Cost: Rs. 2.406 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

S.No.94. Check Dam at Various Spots at Ainoo Nlo Mohd Amin Zarger & Others

S.No.93. Lining Wall for field Channel with Recharge pits at Dayroo from the land of Zahoor Ahmad Nad to Qadir Rather

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 247: PICTORIAL COMPENDIUM

242

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.496 Lakhs

Completion Cost: Rs. 1.012 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.529Lakhs

Completion Cost: Rs. 0.402 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

S.No.96. Development of Spring at Mughal Mohalla Brai NLO Nazir Ah Paswal

S.No.95. Lining Wall for Field Channel withy Recharge pits at Ainoo from the Land of Ghulam Nabi Magray to the Land of Ab Razak Magray

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 248: PICTORIAL COMPENDIUM

243

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.50 Lakhs

Completion Cost: Rs. 1.223 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 1.50Lakhs

Completion Cost: Rs. 1.125 Lakhs

No. of people benefitted: 24

Comments of stakeholders: Much needed/Quality work

S.No.98. Lining Wall for Field Channel with Recharge pits at Gowas from the Land of Gh Nabi Khadin to Abdullah Bakod

S.No.97. Lining Wall for field channel with Recharge Pits at Gowas from the Land of Ali Mohd Ganie to Gh Hassan Sheikh

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 249: PICTORIAL COMPENDIUM

244

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.335 Lakhs

Completion Cost: Rs. 0.24 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.335 Lakhs

Completion Cost: Rs. 0.242 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

S.No.100. Farm Pond at Brai NLO Nazir Ahmad Paswal near Middle School

S.No.99. Farm Pond at Brai in the Land of Munshi Chohan naad Chohan Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 250: PICTORIAL COMPENDIUM

245

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .0.335 Lakhs

Completion Cost: Rs. 0.227 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.335 Lakhs

Completion Cost: Rs. 0.2535 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

S.No.102. Farm Pond at Brai Chohan Mohalla in the land of Ab Rashid Chohan NHO Mohd Yousuf Khan

S.No.101. Farm Pond at Brai Paswal Mohalla NLO Bashir Ah Chohan near Masjid Sharief

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 251: PICTORIAL COMPENDIUM

246

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.49Lakhs

Completion Cost: Rs. 1.485 Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs. 0.70 Lakhs

Completion Cost: Rs. 0.569 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

S.No.104. Conservation of Water Via Dev. Of Spring at Loveli Mohalla Brai

S.No.103. Lining Wall for Field Channel with recharge Pits at ainoo from the land of Habba Magray to the Land of Mohd

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 252: PICTORIAL COMPENDIUM

247

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.00 Lakhs

Completion Cost: Rs. 0.993 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.75 Lakhs

Completion Cost: Rs. 0.288 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

S.No.106. Check Dam at Poshmaiden Nagbal S.No.105. Development of Farm Pond at Gujjir Basti Nagbal NLO Mohd Dawlat Khan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 253: PICTORIAL COMPENDIUM

248

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.48 Lakhs

Completion Cost: Rs. 1.47 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.50Lakhs

Completion Cost: Rs. 1.49 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

S.No.108. Lining Wall for Field Channel at dumakha Nagbal NLO Abdul Gaffar Dar

S.No.107. Development of Spring approched with Drain at Seero Mohallah Gujjir Basti Nagbal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 254: PICTORIAL COMPENDIUM

249

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs .1.50 Lakhs

Completion Cost: Rs. 1.144 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.49Lakhs

Completion Cost: Rs. 1.472 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

S.No.110. Lining Wall for Field Channel Manzewatter Ladh Chatti Paibugh NLO Ab Ahad Bhat & Others S.No.109. Development of Spring approched with Drain at Nagbal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 255: PICTORIAL COMPENDIUM

250

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 2.00 Lakhs

Completion Cost: Rs. 1.958 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.50 Lakhs

Completion Cost: Rs. 1.488Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.112. Lining Wall for field Channel at Yadi Kha NLO Gh Rasool Mir & Others

S.No.111. Lining Wall for Field Channel at Moush ladh NLO Ab Ahad & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 256: PICTORIAL COMPENDIUM

251

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 2.81 Lakhs

Completion Cost: Rs. 2.81 Lakhs

No. of people benefitted: 36

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.50 Lakhs

Completion Cost: Rs. 1.498Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.114. Retaining Wall at Peer Mohalla NLO Peer Qamar u din & OthersS.No.113. Dev. Of Spring CUM Waterr Storage Tank at Mir Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 257: PICTORIAL COMPENDIUM

252

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.00 Lakhs

Completion Cost: Rs. 0.88 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.50 Lakhs

Completion Cost: Rs. 1.49 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

S.No.116. Dev. Of Lassi Dewan Spring of Vail Nagbal near Gravyard

S.No.115 Farm Pond at Kamni Vani Nlo Mohd Ibrahim Shah & `others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 258: PICTORIAL COMPENDIUM

253

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.489 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs1.00 Lakhs

Completion Cost: Rs. 0.892 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.118. Farm Pond at Hutmurah NLO Peer Sajad Ahmad & Others

S.No.117. Nallah Bund at checkdar Nagbal NLO Ab Gaffer Bhat & others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 259: PICTORIAL COMPENDIUM

254

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.00 Lakhs

Completion Cost: Rs. 0.89 Lakhs

No. of people benefitted: 18

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.80 Lakhs

Completion Cost: Rs. 0.80 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

Earthen Bund at Kamnivani, NagbalS.No.119. Farm Pond at Hutmurah NLO Assadullah & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 260: PICTORIAL COMPENDIUM

255

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 2.50 Lakhs

Completion Cost: Rs. 2.457Lakhs

No. of people benefitted: 28

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.48 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

S.No.122. Nallah Bund (RRM) at Mir Mohallah Nagbal NLO Gh Mohi ud din & OthersS.No.121. Lining Wall for Field channel at Paibugh near Grave Yard

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 261: PICTORIAL COMPENDIUM

256

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.495 Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.68283 Lakhs

Completion Cost: Rs. 0.68283 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.124. Crate Bund S.No.123. Crate bund at Goordar Nagbal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 262: PICTORIAL COMPENDIUM

257

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.49 Lakhs

No. of people benefitted: 17

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.50 Lakhs

Completion Cost: Rs. 0.465 Lakhs

No. of people benefitted: 17

Comments of stakeholders: Much needed/Quality work

S.No.126. Dev. Of Spring at Gujiran BatakootS.No.125. Linning Wall for Field Channel From The land Gh Hassan Deedar & Mohd Akber Deedar at Gujjir Batkoot

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 263: PICTORIAL COMPENDIUM

258

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.50Lakhs

No. of people benefitted: 23

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.459 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

S.No.128 . Lining Wall for Field Channel from the Land of Ab Khari to Mohd Yousuf Pushward batkoot

S.No.127. Lining Wall for Field Channel from Masjid Sharief to Gh Hassan Khari Pushward

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 264: PICTORIAL COMPENDIUM

259

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.00 Lakhs

Completion Cost: Rs. 0.98 Lakhs

No. of people benefitted: 34

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 2.36 Lakhs

Completion Cost: Rs. 0.968 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.126. Dev. Of Spring at Gujiran BatakootS.No.129. Check Dam at Various parts across Nallah at waibal puherpjan Phase-II

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 265: PICTORIAL COMPENDIUM

260

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 2.36 Lakhs

Completion Cost: Rs. 0.954 Lakhs

No. of people benefitted: 26

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.283 Lakhs

No. of people benefitted: 21

Comments of stakeholders: Much needed/Quality work

S.No.132. Lining Wall for Field Channel at Pushward Batakoot from the Land of Mohd Yousuf & Others

S.No.131. Check Dam at nagmargi Pushward Gujran NLO Mohd Ashraf shah

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 266: PICTORIAL COMPENDIUM

261

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.46 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.421 Lakhs

No. of people benefitted: 27

Comments of stakeholders Much needed/Quality work

S.No.134. Lining Wall for Field Channel at from the Land of Bashir Choora To Abdul Deedar

S.No.133. Lining Wall for Field Channel at Pushward Batakoot from the Land of Abdullah Deedar to Gull mohd Khan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 267: PICTORIAL COMPENDIUM

262

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.74 Lakhs

Completion Cost: Rs. 0.527 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.43Lakhs

Completion Cost: Rs. 1.43 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

S.No.136. Lining Wall of Field Channel with Recharge Pits at Charakpora from the Land of Javaid Ah Khan to the Land of Gh Nabi Tota

S.No.135. Conservation of Water Via Dev of Spring at Googledar NLO Irshad Ahmad Lone

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 268: PICTORIAL COMPENDIUM

263

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.55 Lakhs

Completion Cost: Rs. 1.53 Lakhs

No. of people benefitted: 33

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.69 Lakhs

Completion Cost: Rs. 0.562 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.138. Conservation Of Water Via Dev.of Spring NLO Ashiq Hussain Bhat

S.No.137. Check Dams at Various Spots across Nallah Changazi gagadawan Hapatnard

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 269: PICTORIAL COMPENDIUM

264

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.60 Lakhs

Completion Cost: Rs. 1.023 Lakhs

No. of people benefitted: 31

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.949 Lakhs

Completion Cost: Rs. 1.91 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

S.No.140. Check Dams At Various Spots at Aithnard Gujjer Basti NLO GH Qadir Dar & Others

S.No.139. Check Dam at spots across Nallah from Palpathri to NLO Mubarak Khan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 270: PICTORIAL COMPENDIUM

265

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.465 Lakhs

Completion Cost: Rs. 1.454 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.773 Lakhs

Completion Cost: Rs. 0.625 Lakhs

No. of people benefitted: 22

Comments of stakeholders: Much needed/Quality work

S.No.142. Development of spring at Nambal A NHO Gh Nabi BhatS.No.141. Protection Bund at Ranzpal NLO Farooq Ah & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 271: PICTORIAL COMPENDIUM

266

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.925 Lakhs

Completion Cost: Rs. 0.496 Lakhs

No. of people benefitted: 27

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 0.935Lakhs

Completion Cost: Rs. 0.63 Lakhs

No. of people benefitted: 19

Comments of stakeholders: Much needed/Quality work

S.No.144. Dev.of Spring at Gaschari Kardi KichlooS.No.143. Dev. Of Spring at Molvi Mohalla Hardi Kichloo Grandwand

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 272: PICTORIAL COMPENDIUM

267

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.50 Lakhs

Completion Cost: Rs. 1.49 Lakhs

No. of people benefitted: 34

Comments of stakeholders: Much needed/Quality work

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.997 Lakhs

Completion Cost: Rs. 1.922 Lakhs

No. of people benefitted: 39

Comments of stakeholders: Much needed/Quality work

S.No.146. Check Wall cum Field Channel at Budbar Subhan Pora NLO Ab Rehman Bhat & Others

S.No.145. Field Channel with Recharge Pits at Khaltal HP Bagh NLO Mohd Yaseen & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 273: PICTORIAL COMPENDIUM

268

Date of Commencement: November 2019

Date of Completion: December 2019

Estimated Cost: Rs 1.499 Lakhs

Completion Cost: Rs. 1.478 Lakhs

No. of people benefitted: 29

Comments of stakeholders: Much needed/Quality work

S.No.147. Check Wall cum fueld Channel at Glender Shamsipora NLO Gh Mohd Ganie & Others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 274: PICTORIAL COMPENDIUM

269

DOS: May, 2019

DOC: July,2019

EST COST: 2.94

IWMP COST: 2.94

FAMLIES BENEFITTED: 20

DOS:- May, 2019

DOC:- July,2019

EST COST: 2.34

IWMP COST: 2.34

FAMLIES BENEFITTED: 23

Figure 46 C/O Flume /Channel At Bon Rather Mohallah Nearl/O Ab Rasheed Malik

Figure 45 C/O Crate Wire Protection Bund On Nallah Panaar Near L/O Wali Malik And Others.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 275: PICTORIAL COMPENDIUM

270

DOS: May,2019

DOC:- July,2019

EST COST: 2.55

IWMP COST: 2.55

FAMLIES BENEFITTED: 15

DOS: May,2019

DOC: July,2019

EST COST: 1.90

IWMP COST: 1.90

FAMLIES BENEFITTED: 13

Figure 48C/O Wht Near L/O Gulzar Malik Bod Mohallah Mohalla Figure 47 C/O Wht Near L/O Abdullah Gashee,Shah Fatha Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 276: PICTORIAL COMPENDIUM

271

DOS: MAY 2019

DOC:- JULY 2019

EST COST: 2.89

IWMP COST: 2.89

FAMLIES BENEFITTED: 35

DOS: MAY 2019

DOC: JULY 2019

EST COST: 4.27

IWMP COST: 4.27

FAMLIES BENEFITTED: 22

Figure 2050 C/O Crate Wire P Bund Near Main Road Suresh Khul Near L/O Satar Sheikh,Mustaq Khatana 19 Figure 49 C/Oirrigation Channel Near L/O Nabi Lone To

Suresh Khul Onwards At Lone Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 277: PICTORIAL COMPENDIUM

272

DOS : May, 2019

DOC: JULY 2019

EST COST: 4.64

IWMP COST: 4.64

FAMLIES BENEFITTED: 37

DOS: MAY 2019

DOC: JULY 2019

EST COST: 3.88

IWMP COST: 3.88

FAMLIES BENEFITTED: 27

Figure 52 C/O Crate Wire P Bund Near L/O Bashir Ah Mongral Onwards At Watalpora Mohalla

Figure 51 C/O Crate Wire P Bund Near L/O Karim Ganji Malik Onwards In Karim Ganjji Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 278: PICTORIAL COMPENDIUM

273

DOS: MAY 2019

DOC: JULY 2019

EST COST: 1.87

IWMP COST: 1.87

FAMLIES BENEFITTED: 15

DOS: MAY 2019

DOC: JULY 2019

EST COST: 3.24

IWMP COST: 3.24

FAMLIES BENEFITTED: 16

Figure 54 C/O CRATE P BUND PMGSY ROAD TO GH MOHIDIN BHAT HABIB NALLAH

Figure 53 C/O Irrigation Channel Nallah Sheikh Naar Near L/O Rasheed Lone Onwards Near Primary School Masjid Daranpora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 279: PICTORIAL COMPENDIUM

274

DOS: MAY 2019

DOC: JULY 2019

EST COST: 2.17

IWMP COST: 2.17

FAMLIES BENEFITTED: 18

DOS: MAY 2019

DOC: JULY 2019

EST COST: 1.75

IWMP COST: 1.75

FAMLIES BENEFITTED: 25

Figure 56 C/O Spring Ibarahim Lone At Mongral Check Lone Mohalla. Mohalla

Figure 55 C/O Wht Near Ali Mohd Lone Near Daranpora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 280: PICTORIAL COMPENDIUM

275

DOS : May, 2019

DOC: JULY 2019

EST COST: 2.72

IWMP COST: 2.72

FAMLIES BENEFITTED: 19

DOS: MAY 2019

DOC: JULY 2019

EST COST: 4.91

IWMP COST: 4.91

FAMLIES BENEFITTED: 38

Figure 58 C/O Irrigation Channel From Main Road Near H/O Gh Qadir Wani Onwards Hajam Mohalla

Figure 57 C/O Irrigation Channel Near L/O Rasheed Najar Onwards At Chowdikar Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 281: PICTORIAL COMPENDIUM

276

DOS: MAY 2019

DOC: JULY 2019

EST COST: 4.02

IWMP COST: 4.02

FAMLIES BENEFITTED: 32

DOS: MAY 2019

DOC: JULY 2019

EST COST: 2.17

IWMP COST: 2.17

FAMLIES BENEFITTED: 13

Figure 60 C/O Wht Near L/O Mehboob Khan At Bhat Mohalla Mohalla

Figure 59 C/O Irrigation Channel From Main Road Near L/O Mohideen Bhat Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 282: PICTORIAL COMPENDIUM

277

DOS : May, 2019

DOC: JULY 2019

EST COST: 3.68

IWMP COST: 3.68

FAMLIES BENEFITTED: 33

DOS : May, 2019

DOC: JULY 2019

EST COST: 2.13

IWMP COST: 2.13

FAMLIES BENEFITTED: 14

Figure 62 C/O WHT NEAR L/O JAMAL KHATANA AT KHATNA MOHALLAFigure 61 C/O IRRIGATION CHANNEL NEAR L/O ABDULAH BHAT IN BHAT MOHALLA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 283: PICTORIAL COMPENDIUM

278

DOS: MAY 2019

DOC: JULY 2019

EST COST: 2.40

IWMP COST: 2.40

FAMLIES BENEFITTED: 17

DOS: MAY 2019

DOC: JULY 2019

EST COST: 3.24

WMP COST: 3.24

FAMLIES BENEFITTED: 23

Figure 64 C/O WHT NEAR L/O GH NABI SHEIKH AND KAWTHOR PEER MOHALLA Figure 63 C/O WHT NEAR L/O MOHIDIN ZARGER IN KHATNA

MOHALLA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 284: PICTORIAL COMPENDIUM

279

DOS : May, 2019

DOC JULY 2019

EST COST : 3.10

IWMP SHARE : 3.10

FAMILIES BENIFFITTED: 27

DOS : May, 2019

DOC : July,2019

EST COST : 2.38

IWMP SHARE : 2.38

FAMILIES BENIFFITTED: 22

Figure 66 C/O Irrigation Channel Near Gh Mohd Bhat To Ibrahim Malik At Check Tulipora Figure 65 C/O Irrigation Channel Near L/O Yousuf Khan ,Bashir

Sheikh Onwards Bonsheikhpora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 285: PICTORIAL COMPENDIUM

280

DOS : May, 2019

DOC : July,2019

EST COST : 1.80

IWMP SHARE : 1.80

FAMILIES BENIFFITED : 17

DOS: MAY 2019

DOC : JULY 2019

EST: 1.80

IWMP SHARE: BILL PENDING

FAMILIES BENIFITTED: 18

Figure 68 C/O Irrigation Channel Wover Mohalla Near L/O Reshi Khan H/O Sanullah Sheeikh

Figure 67 C/O Irrigation Channel Near L/O Bashir Ah Wani S/O Gh Ahmed Wani

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 286: PICTORIAL COMPENDIUM

281

DOS : MAY 2019

DOC: JULY 2019

EST COST: 2.50

IWMP COST: 20

FAMLIES BENEFITTED: 23

DOS: MAY 2019

DOC: JULY 2019

EST COST: 3.78

IWMP COST: 3.78

FAMLIES BENEFITTED: 32

Figure 70 C/O Irrigation Channel Near L/O Ali Mohd Bhat At Bhat Mohallah

Figure 69 C/O Irrigation Channel Vaternary Khul Near L/O Aziz Wani Onwards At Batgund

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 287: PICTORIAL COMPENDIUM

282

DOS: MAY 2019

DOC:- JULY 2019

EST COST: 1.98

IWMP COST: 1.98

FAMLIES BENEFITTED: 12

DOS: MAY 2019

DOC: JULY 2019

EST COST: 3.59

IWMP COST: 3.59

FAMLIES BENEFITTED: 25

Figure 72 C/O Wht Near L/O Mohd Yousaf Lone And Other At Rather Mohallah

Figure 71 C/O Crate Wire P Bund Near H/O Rafi Malik And Others Near Huch Khul

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 288: PICTORIAL COMPENDIUM

283

DOS: MAY 2019

DOC: JULY 2019

EST COST: 2.49

IWMP COST: 2.49

FAMLIES BENEFITTED: 17

DOS: MAY 2019

DOC: JULY 201

EST COST: 2.49

IWMP COST: 2.49

FAMLIES BENEFITTED: 18

Figure 74 C/O Irrigation Channel From Farooq Sheikh Fishries Hut Onwards In Sheikh Mohalla

Figure 73 C/O Irrigation Channel From L/O Ali Mohd Sheikh Onwards In Beigh Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 289: PICTORIAL COMPENDIUM

284

DOS: MAY 2019

DOC: JULY 2019

EST COST: 3.63

IWMP COST: 3.63

FAMLIES BENEFITTED: 29

DOS: MAY 2019

DOC: JULY 2019

EST COST: 2.63

IWMP COST: 2.63

FAMLIES BENEFITTED: 16

Figure 76 C/O Wht Near L/O Yaqoob Peer At Beigh Mohalla Figure 75 C/O Irrgation Channel Near L/O Ab Rasheed Rather At Rather Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 290: PICTORIAL COMPENDIUM

285

DOS: MAY 2019

DOC: JULY 2019

EST COST: 2.00

WMP COST: 2.00

FAMLIES BENEFITTED: 15

Figure 77 C/O Crate P Bund Near L/O Mohideen Dar And Others At Nawrooz Baba Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 291: PICTORIAL COMPENDIUM

286

D.O.S: 12-06-2019,

D.O.C: 26-07-2019,

Estimated Cost: 2.60lac,

Billed cost: 2.57 lacs,

No.of beneficiaries: 140

Much needed

D.O.S: 16-06-2019,

D.O.C: 25-07-2019

Est. Cost: 3.985 lacs

BilledCost: 2.20 lacs,

Beneficiaries: 200

Provided relief to the farmers.

C/o Water Harvesting Tank at Tanghat Bonkoot,C/o P/Bund using C/wire at Kehnusa.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 292: PICTORIAL COMPENDIUM

287

D.O.S: 26-06-2019,

D.O.C: 15-07-2019,

Estt.Cost: 2.90 lac,

Billed cost: 2.48 lacs,

No. of Beneficiaries- 190

Much needed

D.O.S:06-06-2019,

D.O.C:05-07-2019,

Estt.Cost:1.24 lacs

Billed cost:1.237 lacs,

No.of Beneficiaries-150

Much needed

C/o Irr. Field channel at Potushay C/o Field Channel at Quil Muqam,

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 293: PICTORIAL COMPENDIUM

288

D.O.S: 10-06-2019,

D.O.C: 28-07-2019,

Estimated Cost: 1.52 lac,

Billed cost: 1.50 lacs,

No.of beneficiaries: 160

Much needed

D.O.S: 20-06-2019,

D.O.C: 14-07-2019,

Estt.Cost: 1.70 lac,

Billed cost: 1.56 lacs,

No.of Beneficiaries- 110

Much needed

C/o Recharge pits at Malangam-CC/o Farm ponds at Aloosa-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 294: PICTORIAL COMPENDIUM

289

D.O.S: 16-06-2019,

D.O.C: 14-07-2019,

Estt.Cost: 2.12lac,

Billed cost: 1.50 lacs,

No.of Beneficiaries- 120

Provide relief to the farmers.

D.O.S: 09-06-2019,

D.O.C: 21-07-2019,

Estt.Cost: 2.12 lac,

Billed cost: 2.12 lacs,

No.of Beneficiaries- 80

Much Needed

C/o Protection Bund using C/wire at Binlipora-A, C/o 06 N0. Farm ponds at Bonkoot-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 295: PICTORIAL COMPENDIUM

290

D.O.S: 01-06-2019

D.O.C: 30-07-2019,

Estt.Cost: 1.64 ac,

Billed cost: 1.20 lacs,

No. of Beneficiaries- 118

Much needed

D.O.S: 18-06-2019,

D.O.C: 22-07-2019,

Estt.Cost: 2.53 lac,

Billed cost: 1.57 lacs,

No.of Beneficiaries- 145

Much needed

C/o Field Channel at kunusa Guzerbal, C/o Field Channel at Malangam-A,

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 296: PICTORIAL COMPENDIUM

291

D.O.S: 13-06-2019,

D.O.C: 05-07-2019,

Estt.Cost: 2.546 lac,

Billed cost: 2.37 lacs,

No.of Beneficiaries- 160

Useful/Quality work

D.O.S: 29-06-2019,

D.O.C: 25-17-2019

Est.Cost: 1.71 lacs,

Billed cost: 1.687 lacs,

No.of Benefaciries- 120

Useful/Quality work

C/O:- Field Channel at GuzerbalC/o Field Channel at Mantrigam,

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 297: PICTORIAL COMPENDIUM

292

D.O.S: 14-06-2019,

D.O.C: 16-07-2019,

Estimated Cost: 1.53lac,

Billed cost: 1.527 lacs,

No. of beneficiaries: 90

Provided water facilities to the farmers

D.O.S: 14-06-2019,

D.O.C: 16-07-2019,

Estt.Cost: 1.53 lac,

Billed cost: 1.527 lacs,

No. of Beneficiaries- 90

Much needed

C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 298: PICTORIAL COMPENDIUM

293

D.O.S: 22-06-2019,

D.O.C: 18-07-2019

Est.Cost: 1.30 lacs,

Billed cost: 1.04 lacs,

No.of Benefaciries- 130

Useful/Quality work

C/O:- Field Channel at Magnipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 299: PICTORIAL COMPENDIUM

294

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.36

Completion Cost:- 0.34

No. of People Benefited :- 5 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 036.

Completion Cost:- 0.34

No. of People Benefited :- 5 persons

Comments of Stock holder:- Much Needed/ quality work

Farm Pond BalgaranFarm Pond Balgara.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 300: PICTORIAL COMPENDIUM

295

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.45

Completion Cost:- 0.42700

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.45

Completion Cost:- 0.42700

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Storage Tank GwariStorage Tank Balgaran

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 301: PICTORIAL COMPENDIUM

296

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4700

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4700

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Farm Pond GwariP/w Chamoti

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 302: PICTORIAL COMPENDIUM

297

D.O.S: Nov-2019

D.OC: Dec-2019

Estimated Cost: 0.50

Completion Cost: 0.46800

No. of People Benefited : 15 persons

Comments of Stock holder: Much Needed/ quality work

D.O.S: Nov-2019

D.OC: Dec-2019

Estimated Cost: 0.60

Completion Cost: 0.54

No. of People Benefited: 15 persons

Comments of Stock holder: Much Needed/ quality work

Farm Pond ChamotiP/w Chamoti

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 303: PICTORIAL COMPENDIUM

298

D.O.S: 01-06-2019

D.O.C: 30-07-2019,

Estt.Cost: 1.64 ac,

Billed cost: 1.20 lacs,

No. of Beneficiaries- 118

Much needed

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.60

Completion Cost:- 0.54

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Farm Pond Chamoti Farm Pond Chamoti

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 304: PICTORIAL COMPENDIUM

299

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 2.06600

Completion Cost:- 1.90

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.95

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

WHT HornaR/wall Bhatta

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 305: PICTORIAL COMPENDIUM

300

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.935

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.935

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

WHT HornaWHT Horna

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 306: PICTORIAL COMPENDIUM

301

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.919

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

WHT Horna

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost: 1.00

Completion Cost:- 0.914

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

WHT Drubeel

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 307: PICTORIAL COMPENDIUM

302

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.95

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.841

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

WHT Drubeel WHT Drubeel

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 308: PICTORIAL COMPENDIUM

303

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.88

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

C/O:- Field Channel at Magnipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.811

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

C/O:- Field Channel at Magnipora

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

C/O:- Field Channel at Magnipora C/O:- Field Channel at MagniporaC/O:- Field Channel at Magnipora C/O:- Field Channel at MagniporaC/O:- Field Channel at Magnipora C/O:- Field Channel at MagniporaWHT Drubeel Field Channel Magnipora

Page 309: PICTORIAL COMPENDIUM

304

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.935

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.644

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

WHT Drubeel WHT Drubeel

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 310: PICTORIAL COMPENDIUM

305

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.91600

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Diversion Drain Drubeel

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.90

Completion Cost:- 0.85500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Diversion Drain Drubeel

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 311: PICTORIAL COMPENDIUM

306

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.66

Completion Cost:- 0.60

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.285

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

P/w Keshwan-A

Diversion Drain Drubeel

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 312: PICTORIAL COMPENDIUM

307

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

P/w Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

P/w Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 313: PICTORIAL COMPENDIUM

308

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

P/w Keshwan-AP/w Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 314: PICTORIAL COMPENDIUM

309

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

P/w Keshwan-A

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

L/L Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 315: PICTORIAL COMPENDIUM

310

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

L/L Keshwan-A

L/L Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 316: PICTORIAL COMPENDIUM

311

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.45600

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Farm Pond Keshwan-AL/L Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 317: PICTORIAL COMPENDIUM

312

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.45600

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.45600

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Farm Pond Keshwan-A Farm Pond Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 318: PICTORIAL COMPENDIUM

313

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.50

Completion Cost:- 1.32

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.50

Completion Cost:- 1.425

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Nalla-Bund Keshwan-ANalla-Bund Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 319: PICTORIAL COMPENDIUM

314

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4750

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4750

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

G-P Keshwan-AG-P Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 320: PICTORIAL COMPENDIUM

315

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4750

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.47500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Check Dam Keshwan-AG-P Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 321: PICTORIAL COMPENDIUM

316

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4750

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.47500

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

Check DamKeshwan-ACheck Dam Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 322: PICTORIAL COMPENDIUM

317

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.95000

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.95000

No. of People Benefited :- 15 farmers

(Completion Cost:-0.47500)

Comments of Stock holder:- Much Needed/ quality work

P/W Keshwan-AP/W Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 323: PICTORIAL COMPENDIUM

318

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.434

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.448

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

CP/W Keshwan-BP/W Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 324: PICTORIAL COMPENDIUM

319

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.418

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.434

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P/W Keshwan-BP/W Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 325: PICTORIAL COMPENDIUM

320

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.418

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.434

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P/W Keshwan-BP/W Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 326: PICTORIAL COMPENDIUM

321

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.43

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.428

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P/W Keshwan-BP/W Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 327: PICTORIAL COMPENDIUM

322

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.448

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.34

No. of People Benefited :- 15 persons

Comments of Stock holder:- Much Needed/ quality work

L-L Keshwan-BCheck Dam Keshwan-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 328: PICTORIAL COMPENDIUM

323

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.322

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost: 0.37

Completion Cost:- 0.325

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L Keshwan-BP/W Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 329: PICTORIAL COMPENDIUM

324

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.325

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.3400

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L Keshwan-BL-L Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 330: PICTORIAL COMPENDIUM

325

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.3500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.92

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

WHT Keshwan-BL-L Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 331: PICTORIAL COMPENDIUM

326

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.469

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4600

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Form Pond Keshwan-BForm Pond Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 332: PICTORIAL COMPENDIUM

327

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.50

Completion Cost:- 1.295

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.50

Completion Cost:- 1.295

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

N-Bund Keshwan-BN-Bund Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 333: PICTORIAL COMPENDIUM

328

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.428

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.428

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Keshwan-BG-Pluging Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 334: PICTORIAL COMPENDIUM

329

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.285

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.397

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Keshwan-BG-Pluging Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 335: PICTORIAL COMPENDIUM

330

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.397

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.397

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Keshwan-BG-Pluging Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 336: PICTORIAL COMPENDIUM

331

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.433

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.387

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Keshwan-BG-Pluging Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 337: PICTORIAL COMPENDIUM

332

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.3800

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.433

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Keshwan-BG-Pluging Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 338: PICTORIAL COMPENDIUM

333

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.397

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.46

Completion Cost:- 0.415

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Keshwan-BG-Pluging Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 339: PICTORIAL COMPENDIUM

334

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.458

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.425

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Check Dam Keshwan-BCheck Dam Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 340: PICTORIAL COMPENDIUM

335

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.436

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.425

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Check Dam Keshwan-BCheck Dam Keshwan-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 341: PICTORIAL COMPENDIUM

336

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.93

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.422

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging AnjoleG-Pluging Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 342: PICTORIAL COMPENDIUM

337

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.458

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.937

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

N-Bund AnjoleG-Pluging Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 343: PICTORIAL COMPENDIUM

338

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.94

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.43

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Check Dam AnjoleN-Bund Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 344: PICTORIAL COMPENDIUM

339

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.195

Completion Cost:- 0.185

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.195

Completion Cost:- 0.185

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

V-Pit AnjoleV-Pit Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 345: PICTORIAL COMPENDIUM

340

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.195

Completion Cost:- 0.185

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.195

Completion Cost:- 0.185

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

V-Pit AnjoleV-Pit Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 346: PICTORIAL COMPENDIUM

341

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.195

Completion Cost:- 0.185

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.195

Completion Cost:- 0.185

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

V-Pit AnjoleV-Pit Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 347: PICTORIAL COMPENDIUM

342

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4750

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4750

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P/W AnjoleP/W Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 348: PICTORIAL COMPENDIUM

343

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.285

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L AnjoleP/W Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 349: PICTORIAL COMPENDIUM

344

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L AnjoleL-LAnjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 350: PICTORIAL COMPENDIUM

345

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.347

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.47

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L AnjoleL-L Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 351: PICTORIAL COMPENDIUM

346

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.33

Completion Cost:- 0.313

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P-W SarawanL-L Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 352: PICTORIAL COMPENDIUM

347

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.35

Completion Cost:- 0.335

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.35

Completion Cost:- 0.335

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P-W Sara wanP-W Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 353: PICTORIAL COMPENDIUM

348

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.35

Completion Cost:- 0.335

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.35

Completion Cost:- 0.322

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P-W Sara wanP-W Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 354: PICTORIAL COMPENDIUM

349

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.35

Completion Cost:- 0.322

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.92700

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Nalla-Bund Sara wanP-W Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 355: PICTORIAL COMPENDIUM

350

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.92700

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.95

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Nalla-Bund Sara wanNalla-Bund Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 356: PICTORIAL COMPENDIUM

351

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.928

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.475

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Sara wanWHT Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 357: PICTORIAL COMPENDIUM

352

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.475

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.95

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-Pluging Sara wanG-Pluging Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 358: PICTORIAL COMPENDIUM

353

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.475

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.436

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Check Dam Sara wanCheck Dam Sara wan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 359: PICTORIAL COMPENDIUM

354

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.88

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.471

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

G-pluging AnjoleWHT Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 360: PICTORIAL COMPENDIUM

355

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.422

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.469

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Form Pond AnjoleG-pluging Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 361: PICTORIAL COMPENDIUM

356

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.437

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.475

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P/w AnjoleCheck Dam Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 362: PICTORIAL COMPENDIUM

357

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28300

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28400

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P/w AnjoleP/w Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 363: PICTORIAL COMPENDIUM

358

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.30

Completion Cost:- 0.28500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Land Levelling AnjoleP/w Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 364: PICTORIAL COMPENDIUM

359

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.32700

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.35100

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Land Levelling AnjoleLand LevellingAnjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 365: PICTORIAL COMPENDIUM

360

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.349

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.37

Completion Cost:- 0.349

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Land Levelling AnjoleLand Levelling Anjole

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 366: PICTORIAL COMPENDIUM

361

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.89000

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.47500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L Patnazi _BWHT Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 367: PICTORIAL COMPENDIUM

362

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.47500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.314

Completion Cost:- 0.288

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L Patnazi _BL-L Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 368: PICTORIAL COMPENDIUM

363

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.59

Completion Cost:- 0.54

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.59

Completion Cost:- 0.47500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P-Work Patnazi _BP-Work Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 369: PICTORIAL COMPENDIUM

364

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.59

Completion Cost:- 0.47500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.59

Completion Cost:- 0.54

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P-Work Patnazi _BP-Work Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 370: PICTORIAL COMPENDIUM

365

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.4990

Completion Cost:- 0.47

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.4990

Completion Cost:- 0.365

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Check Dam Patnazi _BCheck Dam Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 371: PICTORIAL COMPENDIUM

366

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.4990

Completion Cost:- 0.47000

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.4990

Completion Cost:- 0.45500

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

P-Work Patnazi _BNalla-Bund Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 372: PICTORIAL COMPENDIUM

367

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.60

Completion Cost:- 0.47500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.60

Completion Cost:- 0.54600

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Gully Plugging Patnazi _BGully Plugging Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 373: PICTORIAL COMPENDIUM

368

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.60

Completion Cost:- 0.51

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.12

Completion Cost:- 1.06

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Diversion Drain Patnazi _BG-PlugingPatnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 374: PICTORIAL COMPENDIUM

369

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.59

Completion Cost:- 0.40500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.31400

Completion Cost:- 0.29800

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L Patnazi _BGully Plugging Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 375: PICTORIAL COMPENDIUM

370

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.49900

Completion Cost:- 0.39900

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.9500

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

WHT Kither Nalla-Bund Patnazi _B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 376: PICTORIAL COMPENDIUM

371

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 1.00

Completion Cost:- 0.93500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.4590

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Form Pond Kither WHT Kither

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 377: PICTORIAL COMPENDIUM

372

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.47500

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.50

Completion Cost:- 0.475

No. of People Benefited : 15 farmers

Comments of Stock holder:- Much Needed/ quality work

L-L Kither Form Pond Kither

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 378: PICTORIAL COMPENDIUM

373

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.499

Completion Cost:- 0.34400

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

D.O.S:- Nov-2019

D.OC:- Dec-2019

Estimated Cost:- 0.49900

Completion Cost:- 0.47400

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Check Dam KitherCheck Dam Kither

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 379: PICTORIAL COMPENDIUM

374

D.O.S:- Nov-2019

D.O.C:- Dec-2019

Estimated Cost:- 0.49900

Completion Cost:- 0.47400

No. of People Benefited :- 15 farmers

Comments of Stock holder:- Much Needed/ quality work

Nallah Bund Kither

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 380: PICTORIAL COMPENDIUM

375

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.62 Lakhs

Completion cost: Rs. 1.62 Lakhs

No. of people benefited: 20

Comments of stakeholders: It saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: RS. 1.27 Lakhs

Completion cost: Rs. 1.27 lakhs

No. of people benefited: 25

Comments of stakeholders: prevention of soil loss from erosion.Much Needed/ Quality Work.

Protection wall at w. no. 3 Mohalla Soba Kassi PYT Dandi Dara (S. no. 2)Check Dam at w. no. 2 Mohalla Kerian PYT Dandi Dara(S. no. 1)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 381: PICTORIAL COMPENDIUM

376

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.17 lakhs

Completion cost: Rs. 1.17 lakhs

No. of people benefited: 25

Comments of stakeholders: Needed for water Storage

Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 lakhs

Completion cost: Rs.1.27 lakhs

No. of people benefited: 20

Comments of stakeholders: It saves the soil through harsh weather and stops erosion.

Protection wall at w. no. 6 Mohalla Paswallan Pyt Dandi Dara (S.no. 4)Water Tank at Moh. Soba Kassi w-3 PYT Dandidara (S. no.3

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 382: PICTORIAL COMPENDIUM

377

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: - Rs. 1.17 lakhs

Completion cost: Rs. 1.17 lakhs

No. of people benefited: 35

Comments of stakeholders: Good for water Storage.Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 lakhs

Completion cost: Rs. 1.27 lakhs

No. of people benefited: 22

Comments of stakeholders: It saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work

Protection wall at W. no. 1 Moh. Dakhan Pyt Dandi Dara (S. no. 6)Water Tank at Moh. Paswallan w-6 PYT Dandidara (S. no.5)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 383: PICTORIAL COMPENDIUM

378

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.62lakhs

Completion cost: Rs. 1.62 lakhs

No. of people benefited: 18

Comments of stakeholders: Good for ground water recharge and water Conservation. Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 lakhs

Completion cost: Rs. 1.22 lakhs

No. of people benefited: 16

Comments of stakeholders: prevention of soil loss from erosion. Much Needed/Quality Work.

Protection Wall at W. no. 1at W.no. 7 Moh. Saydian PYT Dandi Dara (S. no. 8)Check Dam at W. no. 1 Moh. Dhakan PYT Dandi Dara (S. no. 7)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 384: PICTORIAL COMPENDIUM

379

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29 lakhs

Completion cost: Rs. 1.29 lakhs

No. of people benefited: 22

Comments of stakeholders: t saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work.

Date of Start:- Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.17 lakhs

Completion cost: Rs. 1.17 lakhs

No. of people benefited: 25

Comments of stakeholders: Needed for water Storage

Much Needed/ Quality Work.

Water Tank at W.no. 5 Moh. Loohratarrie PYT Dandidara (S. no. 10Protection wall at W.no. 7 PYT Dandi Dara (W. no. 9)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 385: PICTORIAL COMPENDIUM

380

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 2.05 lakhs

Completion cost: Rs. 2.00 lakhs

No. of people benefited: 35

Comments of stakeholders: To prevent soil erosion.

Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: RS. 1.29 lakhs

Completion cost: RS. 1.22 lakhs

No. of people benefited: 15

Comments of stakeholders: To prevent soil erosion.

Much Needed/ Quality Work

Protection Wall W. No 8 Moh. Barwalla PYT Dandi Dara (S. no. 12)Protection wall at W.no. 5 Moh. Loohratarrie PYT Dandidara (S. no. 11)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 386: PICTORIAL COMPENDIUM

381

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.62 lakhs

Completion cost: - Rs. 1.45 lakhs

No. of people benefited: 30

Comments of stakeholders: It saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 l;akhs

Completion cost: Rs. 1.27 lakhs

No. of people benefited: 20

Comments of stakeholders: Needed for prevention of soil from erosion. Much Needed/ Quality Work.

P/Wall W. No 4 Moh. Jabbran PYT Dandi Dara (S. no. 14)Check Dam at W.no.8 Moh. Barwalla PYT Dandi Dara (S. no. 13)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 387: PICTORIAL COMPENDIUM

382

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 lakhs

Completion cost: Rs. 1.27 lakhs

No. of people benefited: 18

Comments of stakeholders: To prevent soil erosion.

Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29 Lakhs

Completion cost: RS. 1.29 lakhs

No. of people benefited: 25

Comments of stakeholders: Needed for prevention of soil from erosion. Much Needed/ Quality Work.

Protection wall at W.no. 2 near Jama Masjid PYT Lathong (S. no. 16)P/Wall W. No 4 Moh. Jabbran PYT Dandi Dara (S. no. 15)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 388: PICTORIAL COMPENDIUM

383

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.17 lakhs

Completion cost: RS. 1.17 lakhs

No. of people benefited: 26

Comments of stakeholders: Needed for Water Storage. Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 lakhs

Completion cost: RS. 1.22 Lakhs

No. of people benefited: 10

Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work.

P/Wall W No 4 near Panchayat Ghar PYT Lathong

(S. no. 18)

Water Tank W. No 8. Moh Bukhair Saydian PYT Lathong (S. no. 17)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 389: PICTORIAL COMPENDIUM

384

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29 lakhs

Completion cost: Rs. 1.29 lakhs

No. of people benefited: 12

Comments of stakeholders: Good for soil conservation Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: RS. 1.17 lakhs

Completion cost: Rs. 1.17 lakhs

No. of people benefited: 19

Comments of stakeholders: Good for water storage. Much Needed/ Quality Work.

Water Tank at W No 1 Moh. Shekehian PYT Lathong (S. no. 20)P/ Wall W.no 2 Moh. Saydian PYT Lathong (S. no. 19)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 390: PICTORIAL COMPENDIUM

385

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.28 lkahs

Completion cost: Rs.1.28

No. of people benefited: 12

Comments of stakeholders: prevention of soil loss from erosionMuch Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29 lakhs

Completion cost: Rs. 1.29Lakhs

No. of people benefited: 40

Comments of stakeholders: Good for water storage. MuchNeeded/ Quality Work.

Water Tank at W No 08 Moh. Kumrian PYT Sangla (S. no. 22)P/Wall W No 6 Moh. Saran PYT Sangla (S. no. 21)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 391: PICTORIAL COMPENDIUM

386

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.0.67 lakhs

Completion cost: Rs. 0.45 Lakhs

No. of people benefited: 30

Comments of stakeholders: Good for drinking purpose Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 0.67lakhs

Completion cost: Rs. 0.50 lakhs

No. of people benefited: 20

Comments of stakeholders: Good for drinking purpose

Much Needed/ Quality Work

Spring Renovation at W No 2 Moh. Galli Jabbar PYT Sangla (S. no. 24)

Spring Renovation/Bawli at W No 08 Moh. Kumrian PYT Sangla (S. no. 23)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 392: PICTORIAL COMPENDIUM

387

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost:Rs. 1.27 lakhs

Completion cost: Rs. 1.27 lakhs

No. of people benefited: 50

Comments of stakeholders: prevention of soil loss from erosion.Much Needed/Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.98 lakhs

Completion cost: Rs. 1.98 lakhs

No. of people benefited: 25

Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work.

Protection wall at W No 01 Moh. Upper Saydian PYT Pamrote (S. no. 26)

Protection wall at W No 03 Moh. Khalifan PYT Sangla (S. no. 25)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 393: PICTORIAL COMPENDIUM

388

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.2.05lakhs

Completion cost: Rs. 2.02 lakhs

No. of people benefited: 30

Comments of stakeholders: prevention of soil loss from erosion. Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29 lakhs

Completion cost: Rs. 1.29 lakhs

No. of people benefited: 35

Comments of stakeholders: Good for water storage.Much Needed/ Quality Work.

Water Tank at W No. 02 Moh. Lower Pamrote PYT Pamrote (S. no. 28

Protection wall at W No 02 Moh. Lower Saydian PYT Pamrote(S. no. 27)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 394: PICTORIAL COMPENDIUM

389

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.24 lakhs

Completion cost: Rs. 1.17 lakhs

No. of people benefited: 40

Comments of stakeholders: Good for water storage

Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.23 lakhs

Completion cost: Rs.1.23 lakhs

No. of people benefited: 20

Comments of stakeholders: Good for water Storage

Much Needed/ Quality Work

Water Tank at W No 04 PYT Gounthal (S. no. 30)

Water Tank W No 3 PYT Gounthal(S. no. 29)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 395: PICTORIAL COMPENDIUM

390

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.28 lakhs

Completion cost: Rs.1.25lakhs

No. of people benefited: 25

Comments of stakeholders: prevention of soil loss from erosion.Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 0.67 lakhs

Completion cost: Rs 0.45 lakhs

No. of people benefited: 35

Comments of stakeholders: Good for drinking purpose

Much Needed/ Quality Work.

Bawli at W-7 PYT Gounthal (S. no. 32)Protection wall at W No 05 PYT Gounthal (S. no. 31)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 396: PICTORIAL COMPENDIUM

391

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 0.67 lakhs

Completion cost: Rs 0.45 lakhs

No. of people benefited: 35

Comments of stakeholders: Good for drinking purpose

Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.27 lakhs

Completion cost: Rs 1.27 lakhs

No. of people benefited: 16

Comments of stakeholders: The more we conserve soil the more crops grow.Much Needed/ Quality Work

Protection Wall Moh. Dhakan w-6 PYT Gounthal (S. no. 34)Bawli at W-7 PYT Gounthal (S. no. 33)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 397: PICTORIAL COMPENDIUM

392

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost:Rs. 1.27 lakhs

Completion cost: Rs 1.27 lakhs

No. of people benefited: 15

Comments of stakeholders: To prevent soil erosion.Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29lakhs

Completion cost: Rs 1.29 lakhs

No. of people benefited: 38

Comments of stakeholders: Good for water storage.Much Needed/ Quality Work

Water Tank at w-3 Moh. Khatana PYT Phagla (S. no. 36)P/wall at W-8 Moh. Danna PYT Gounthal (S. no. 35)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 398: PICTORIAL COMPENDIUM

393

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.23 lakhs

Completion cost: Rs 1.23 lakhs

No. of people benefited: 40

Comments of stakeholders: Good for water storage. Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.29 lakhs

Completion cost: Rs 1.29 lakhs

No. of people benefited: 20

Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work

Protection wall at w-3 Moh. Booriwala PYT Mohra Bechai(S. no. 38)

Water Tank at w-3 Moh. Pajjan Saydian PYT Phagla (S. no. 37)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 399: PICTORIAL COMPENDIUM

394

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.25 lakhs

Completion cost: Rs 1.25 lakhs

No. of people benefited: 15

Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.27 lakhs

Completion cost: Rs.1.21 lakhs

No. of people benefited: 26 Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work.

Water Harvesting Tank at Moh. Luddran PYT Mohra Bechai Lower(S. no. 40)

Protection wall at Moh.Kohlian PYT Mohra Bechai(S. no. 39)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 400: PICTORIAL COMPENDIUM

395

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.27 lakhs

Completion cost: Rs1.21 lakhs

No. of people benefited: 24

Comments of stakeholders: Good for ground water recharge and water conservation. Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.17 lakhs

Completion cost: Rs 1.17 lakhs

No. of people benefited: 38

Comments of stakeholders: Good for water storage Much Needed/ Quality Work

Water Tank at Moh. Bajjran w-7 PYT Mohra Bechai (S. no. 42)Water Harvesting Tank at Moh. Daniwala PYT Mohra Bechai Lower (S. no. 41)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 401: PICTORIAL COMPENDIUM

396

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.25 lakhs

Completion cost: Rs 1.25 lakhs

No. of people benefited: 18

Comments of stakeholders: The more we conserve soil the more crops grow Much Needed/ Quality Work

Date of Start: 17/10/2019

Date of Completion: 16/12/2019

E. cost: Rs. 1.62 lakhs

Completion cost: Rs 1.18 lakhs

No. of people benefited: 38

Comments of stakeholders: Facilitate the removal of water held in the upper horizons of the soil. Much Needed/ Quality Work

Earthen Bund at Moh. Zargran w-2 PYT Sangla Lower (S. no. 44)Protection wall at Moh. Luddran w-1 PYT Mohra Bechai (S. no. 43)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 402: PICTORIAL COMPENDIUM

397

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 1.29 lakhs

Completion cost: Rs 1.29 lakhs

No. of people benefited: 20

Comments of stakeholders: Prevent of soil loss from erosion. Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.17 lakhs

Completion cost: Rs.1.17 lakhs

No. of people benefited: 45

Comments of stakeholders: Good for water Storage Much Needed/ Quality Work

Water Tank at W. no. 04 PYT Sangla (S.No. 46)Protection wall at Moh. Margan w-1 PYT Sangla (S. no. 45)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 403: PICTORIAL COMPENDIUM

398

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.17 lakhs

Completion cost: Rs.1.17 lakhs

No. of people benefited: 45

Comments of stakeholders: Good for Water Storage

Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.98 lakhs

Completion cost: Rs 1.98 lakhs

No. of people benefited: 35

Comments of stakeholders: Prevent of soil loss from erosion.Much Needed/ Quality Work

Protection Wall at W. no. 01 Moh. Kholian PYT Kallar Katal (S. no. 48)Water Tank at W. no. 04 Moh. Tand PYT Sangla (S.No. 47)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 404: PICTORIAL COMPENDIUM

399

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.54 lakhs

Completion cost: Rs 1.54 lakhs

No. of people benefited: 38

Comments of stakeholders: Prevent of soil loss from erosion. Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.98 lakhs

Completion cost: Rs 1.98 lakhs

No. of people benefited: 38

Comments of stakeholders: Prevent of soil loss from erosion.

Much Needed/ Quality Work

Protection Wall at Moh.Kholian W-1 PYT Kallar Katal(S. no. 50)

Water Tank Moh. Awana W. no. 03 (S. no. 49)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 405: PICTORIAL COMPENDIUM

400

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.85 lakhs

Completion cost: Rs 1.85 lakhs

No. of people benefited: 38

Comments of stakeholders: Good for ground water recharge and water conservation. Much Needed Quality Work

Date of Start: 08/08/2019

Date of Completion: 15/11/2019

E. cost: Rs. 2.40 lakhs

Completion cost: Rs 2.30 lakhs

No. of people benefited: 36

Comments of stakeholders: To prevent soil erosion Much Needed/ Quality Work

P/wall at Moh. Chairan Jabri PYT Nehrian (S. no. 52)Water Harvesting Tank at Moh. Mahiwala w-3 PYT Nehrian(S. no. 51

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 406: PICTORIAL COMPENDIUM

401

Date of Start: 07/11/2019

Date of Completion: 30/12/2019

E. cost: Rs.2.40 lakhs

Completion cost: Rs 2.40 lakhs

No. of people benefited: 15

Comments of stakeholders: Prevent of soil loss from erosion. Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.27 lakhs

Completion cost: Rs 1.27 lakhs

No. of people benefited: 38

Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work

Water Harvesting Tank at Moh. Noona w-4 PYT Hari Budha (S. no. 54)Protection wall at Moh. Chairan w-6 PYT Nehrian (S. no. 53)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 407: PICTORIAL COMPENDIUM

402

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.3.00 lakhs

Completion cost: Rs 2.50 lakhs

No. of people benefited: 35

Comments of stakeholders: Prevent of soil loss from erosion.

Much Needed/ Quality Work

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs.1.36 lakhs

Completion cost: Rs 1.36 lakhs

No. of people benefited: 38

Comments of stakeholders: to reduce water logging

Much Needed/ Quality Work

Drain at Moh. Deri w-4 PYT Hari Budha (S. no. 56)Protection wall at Moh. Moori Katha w-5 PYT Hari Budha (S. no. 55)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 408: PICTORIAL COMPENDIUM

403

Date of Start: 07/11/2019

Date of Completion: 30/12/2019

E. cost: Rs.1.85 lakhs

Completion cost: Rs 1.85 lakhs

No. of people benefited: 20

Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work.

Date of Start: Nov 2019

Date of Completion: Dec 2019

E. cost: Rs. 2.05 lakhs

Completion cost: Rs 2.05 lakhs

No. of people benefited: 20

Comments of stakeholders: Needed for prevention of soil loss from erosion.Much Needed/ Quality Work.

P/wall at Moh. Loohran PYT Hari Budha Upper (S. no. 58)Water Harvesting Tank at Moh. Chaiyanwali PYT Hari Budha (S. no. 57)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 409: PICTORIAL COMPENDIUM

404

Date of Start: 07/11/2019

Date of Completion: 30/12/2019

E. cost: Rs.1.85 lakhs

Completion cost: Rs 1.85 lakhs

No. of people benefited: 32

Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work.

Water Harvesting Tank at Moh. Talla Moori PYT Hari Budha (S. no. 59)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 410: PICTORIAL COMPENDIUM

405

D.o.s/ D.o.c: 14-05-2019 / 26-06-2019

Estimated Cost: 3.45300

Iwmp Share: 2.89000

Mg-Nrega Share: 0.55233

Dimensions: 255 Rft

D.O.S/ D.O.C: 05-05-2019 / 20-06-2019

Estimated Cost: 3.22000

IWMP Share: 1.79331

MG-NREGA Share: 0.63882

Dimensions: 185 rft

Const of Kuhl from l/o Gh Mohiddin onwards at Agricultural land Padgampora

Treatment Of Land By Way Of Protection Bund From L/O Mohd Ismail Khan Onwards At Nagbal Barsoo Pul-1-4

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 411: PICTORIAL COMPENDIUM

406

D.O.S/ D.O.C: 27-05-2019 / 07-06-2019

Estimated Cost: 2.40000

IWMP Share: 1.66100

MG-NREGA Share: 0.49290

Dimensions: 314rft

D.O.S/ D.O.C: 10-05-2019 / 20-06-2019

Estimated Cost: 1.45000

IWMP Share: 1.07800

MG-NREGA Share: 0.29000

Dimensions: 20*20

C/o WHT cum Storage tank in l/o Ghulam Rasool at LadhooConst of field channel from l/o Abdullah Shiekh to onwards at Ladhoo

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 412: PICTORIAL COMPENDIUM

407

D.O.S/ D.O.C: 29-05-19 / 05-06-2019

Estimated Cost: 1.37000

IWMP Share: 0.96700

MG-NREGA Share: 0.26970

Dimensions: 20*20

D.O.S/ D.O.C: 20-05-2019 / 18-06-2019

Estimated Cost: 1.37000

IWMP Share: 0.83988

MG-NREGA Share: 0.30618

Dimensions: 20*20

Construction of Water Harvesting Tank cum Storage tank near l/o Jallaluddin, at Ladhoo B

Construction of Water Harvesting Tank cum Storage tank near l/o Chunni Lal, at Ladhoo A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 413: PICTORIAL COMPENDIUM

408

D.O.S/ D.O.C: 05-05-2019 / 25-06-2019

Estimated Cost: 3.46000

IWMP Share: 2.65524

MG-NREGA Share: 0.69378

Dimensions: 515 rft

D.O.S/ D.O.C: 29-05-2019 / 18-06-2019

Estimated Cost: 2.79350

IWMP Share: 1.93693

MG-NREGA Share: 0.57288

Dimensions: 310 rft

Concreting of Field Channel from l/o Abdul Razaq Dar to onwards at Banjar Khah Lethpora A Pul-1-2

Construction of Field Channel from irrigation canal to Agriculture field at Lethapora phase I

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 414: PICTORIAL COMPENDIUM

409

D.O.S/ D.O.C: 25-05-2019/14-06-2019

Estimated Cost: 2.75800

IWMP Share: 2.05786

MG-NREGA Share: 0.55056

Dimensions: 220 rft

Treatment of land by way of p- bund near l/o Shabir Ahmad Dar at Lethapora A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Comment-dots

Page 415: PICTORIAL COMPENDIUM

410

Date of Commencement 4 July 2019

Date of Completion 5 Sep 2019

Estimated Cost 1.00

Completion Cost 1.00

No. of People benefited 40

Comments of stakeholders Much needed/quality works

Date of Commencement 1 July 2019

Date of Completion 29 sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No. of People benefited 55

Comments of stakeholders Much needed/quality works

Harvesting Tank Nlo Green Mohalla Pyt. Khablan-A Water Harvesting Tank Nlo Shakoor Din At Saaj-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 416: PICTORIAL COMPENDIUM

411

Date of Commencement 4 July 2019

Date of Completion 27 Sep 2019

Estimated Cost 1.00

Completion Cost 1.00

No. of People benefited 45

Comments of stakeholders Much needed/quality works:_

Date of Commencement 3 July 2019

Date of Completion 26 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No. of People benefited 55

Comments of stakeholders Much needed/quality works

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Harvesting Tank NLO Bowli Station Pyt. Saaj-A Harvesting Tank NLO Ab. Salam Pyt. Khablan-A

Page 417: PICTORIAL COMPENDIUM

412

Date of Commencement 1 July 2019

Date of Completion 29 Sep 2019

Estimated Cost 2.00

Completion Cost 1.80

No. of People benefited 66

Comments of stakeholders Much needed/quality works

Date of Commencement 03 July 219

Date of Completion 23 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No.of People benefited 45

Comments of stakeholders Much needed/quality works

Harvesting Tank NLO Mohd Akram Pyt. Lah Harvesting Tank NLO Akram Pyt. Lah

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 418: PICTORIAL COMPENDIUM

413

Date of Commencement 01 July 2019

Date of Completion 29 Sep 2019

Estimated Cost 2.30

Completion Cost 2.00

No. of People benefited 56

Comments of stakeholders Much needed/quality works

Date of Commencement 01 July 2019

Date of Completion 29 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No. Of People benefited 55

Comments of stakeholders Much needed/quality works

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Harvesting Tank NLO Sushil Kumar Pyt. Kallar Harvesting Tank NLO Mohd Hafeez Pyt.Chingus

Page 419: PICTORIAL COMPENDIUM

414

Date of Commencement 1 July 2019

Date of Completion 30 Sep 2019

Estimated Cost 2.50

Completion Cost 2.00

No. of People benefited 65

Comments of stakeholders Much needed/quality works

Date of Commencement 1 July 2019

Date of Completion 22 Sep 2019

Estimated Cost 2.50

Completion Cost 2.00

No.of People benefited 65

Comments of stakeholders Much needed/quality works

Harvesting Tank NLO Satvinder Singh Pyt. Bathuni Drain NLO Adnan Ali Pyt. Behrote

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 420: PICTORIAL COMPENDIUM

415

Date of Commencement 4 July 2019

Date of Completion 15 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No. of People benefited 35

Comments of stakeholders Much needed/quality works

Date of Commencement 4 July 2019

Date of Completion 29 Sep 2019

Estimated Cost 2.00

Completion Cost 1.50

No. Of People benefited 55

Comments of stakeholders Much needed/quality works

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Water Harvesting Tank at Mulla Da Pani Pyt.Totamohara Water Harvesting Tank NLO Mohd Qayoom Pyt. Khablan-A

Page 421: PICTORIAL COMPENDIUM

416

Date of Commencement 4 July 2019

Date of Completion 12 Sep 2019

Estimated Cost 2.00

Completion Cost 1.50

No. of People benefited 45

Comments of stakeholders Much needed/quality works

Date of Commencement 04 July 2019

Date of Completion 27 Sep 2019

Estimated Cost 1.50

Completion Cost 1.50

No.of People benefited 43

Comments of stakeholders Much needed/quality works

Protection Wall NLO Maroof Abdullaha Danna Pyt. Khablan-A Protection Wall NLO Mohd Bashir Pyt.Tamohara

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 422: PICTORIAL COMPENDIUM

417

Date of Commencement 4 July 2019

Date of Completion: 09 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No. of People benefited 34

Comments of stakeholders Much needed/quality works

Date of Commencement 4 July 2019

Date of Completion 12 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No.of People benefited 55

Comments of stakeholders Much needed/quality works

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Water Harvesting Tank NLO Mohd Qasim Pyt. DOC: -Totamohara Water Harvesting Tank NLO Shafat Ahmed Pyt. Rajdhani-A

Page 423: PICTORIAL COMPENDIUM

418

Date of Commencement 02- July 2019

Date of Completion 27 Sep 2019

Estimated Cost 1.50

Completion Cost 1.00

No. of People benefited 34

Comments of stakeholders Much needed/quality works

Date of Commencement 02 July 2019

Date of Completion 25 Sep 2019

Estimated Cost 2.00

Completion Cost 1.50

No.of People benefited 45

Comments of stakeholders Much needed/quality works

Harvesting Tank NLO Mohd Anwar Pyt. Plangarh Harvesting Tank NLO Mohd Zaman Pyt. Bhattian

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 424: PICTORIAL COMPENDIUM

419

C/O drain with path near Nazir Ahmad Bhat and Alshams School Qalamabad (374)

C/O well with drain near land of Gh. Hassan Bhat & others at Punzwa A (366)

Date of Commencement : 06.03.2020

Date of Completion : 25.03.2020

Est. Cost : 2.59 Lacs

Completion Cost : 2.00 lacs

No of people benefitted : 800

Stake holder comment : The work is of community benefit.

Date of Commencement : 02.02.2020

Date of Completion : 22.03.2020

Est. Cost : 2.00 Lacs

Completion cost : 2.00 Lacs

No. of People benefitted : for playing gams of Youth of whole Panchayat Stake holder comment : The work is of community benefit.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 425: PICTORIAL COMPENDIUM

420

Fencing (Chain link) around Panchayat Ghar Magam B

Date of commencement : 2018-19

Date of Completion : 03-2020

Estt. Cost : 3.40

Completion cost (Exp) : 2.545

No. of People benefitted : for playing gams of Youth of whole Panchayat Stake holder comment : The work is of community benefit.

Date of commencement : 27.12.2019

Date of Completion : 19.3.2020

Estt. Cost : 2.80

Completion cost(Exp) : 2.00

No. of People benefitted : for playing gams of Youth of whole Panchayat Stake holder comment : The work is of community benefit.

Development play field at Kulangam bag (361)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 426: PICTORIAL COMPENDIUM

421

Const of P bund NLO Ab Gafar Bhat at karihama (359)Name of Work with Location:- C/O COMMUNITY SANITARY COMPLEX NEAR HIGH SCHOOL CHOWGAM BLOCK CHITTERGULL(06)

Date of Commencement : 21.12.2019

Date of Completion : 10.03.2020

Estimated Cost : 2.500

Completion Cost : 1.750

No of people benefitted : Provides Connectivity facility of village Rawathpora Stake holder comment : The work is of community benefit.

Date of Commencement : 14.3.2019Date of Completion : 25.3.2020Estimated Cost : 2.00Completion Cost : 1.00No of people benefitted : protection of residential houses of village Kariham

Stake holder comment : The work is of community benefit.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

``USER

COMMENT-DOTS

Page 427: PICTORIAL COMPENDIUM

422

Const. of R Wall with drain near Panchayat Ghar Kundian ( Keran) (362)

Date of Commencement : 25.2.2020

Date of Completion : 25.3.2020

Estimated Cost : 2.40

Completion Cost : 1.62

No of people benefitted : 40

Stake holder comment : The work is of community benefit.

Date of Commencement : 26.3.2019

Date of Completion : 30-3-2020

Estimated Cost : 3.5

Completion Cost : 2.7

No of people benefitted : 254

Stake holder comment : The work is of community benefit.

Const. of foot path with R, wall NHO Gh Hassan Dar at Annanwan (375)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 428: PICTORIAL COMPENDIUM

423

Const. of foot path with 2 No. culverts at Khan Mohalla NHO Ab Majid Wani and others at Bumhama (372) Dev. Of Public Park at Poshpora “B” Trehgam

Date of Commencement : 01/04/2019

Date of Completion : 01/08/2019

Estimated Cost : 2.67

Completion Cost : 1.75

No of people benefitted : 1250 Stake holder comment : The work is of community benefit.

Date of Commencement : 1.2.2020

Date of Completion : 9.3.2020

Estimated Cost : 2.99

Completion Cost : 2.00

No of people benefitted : 45 house holds

Stake holder comment : The work is of community benefit.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 429: PICTORIAL COMPENDIUM

424

Const. of 2 No. Culverts at Jumgund (363)

Date of Commencement : 15.3.2020

Date of Completion : 30.3.2020

Estimated Cost : 2.000

Completion Cost : 1.350

No. of people benefitted : for safeguard of Panchayat building Stake holder comment : The work is of community benefit.

Date of Commencement : 10.1.2019

Date of Completion : 03/2020

Estimated Cost : 6.64

Completion Cost : 3.943

No of people benefitted : provides connectivity facility of village Jumgund Stake holder comment : The work is of community benefit.

Fencing of Panchayat Ghar Meelyal with leveling (370)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 430: PICTORIAL COMPENDIUM

425

const. of foot path from Sari to Mansha Lone at Hajinard Ward No. 1 (367)

Const. of foot path with drain near H/O GhMohi-ud-din Baba and others at Nowpora (368)

Date of Commencement : 15.02.2020

Date of Completion : 17.03.2020

Estimated Cost : 2.340

Completion Cost : 1.636

No . Of persons benefitted : 200

Stake holder comment : The work is of community benefit.

Date of Commencement : 18.02.2020

Date of Completion : 19.03.2020

Estimated Cost : 2.930

Completion Cost : 1.880

No. of people benefitted : 180

Stake holder comment : The work is of community benefit.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 431: PICTORIAL COMPENDIUM

426

Const. of bathroom near Jamia Masjid Darpora (360)

Date of Commencement : 14.02.2020

Date of Completion : 15.03.2020

Estimated Cost : 2.080

Completion Cost : 1.55

No. of persons benefitted : 150

Stake holder comment : The work is of community benefit.

Date of Commencement : 26.2.2018

Date of Completion : 10-03-2020

Estimated Cost : 2.00

Completion Cost : 2.00

No. of people benefitted : 200

Stake holder comment : The work is of community benefit.

Constt. of flash point near Jamia Masjid Dogerpora A (373)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 432: PICTORIAL COMPENDIUM

427

Const. of fencing around MS Jumgund (364) Const. of protection wall at Naikoo Mohalla Gund Chabutera (376)

Date of Commencement : 25.2.2020

Date of Completion : 25.3.2020

Estimated Cost : 2.95

Completion Cost : 1.87

No . Of persons benefitted : 16 House holds

Stake holder comment : The work is of community benefit.

Date of Commencement : 2018 - 2019

Date of Completion : 01.01.2020

Estimated Cost : 3.40

Completon Cost : 2.68

No. of persons benefitted : The work provides the safety of the students of the village for wild animals

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 433: PICTORIAL COMPENDIUM

428

Const./Imp. of road from Lone Mohalla to Khanpora Muqam Awoora A (527)

Date of Commencement : 2019-20

Date of Completion : 2019-20

Estimated Cost : 1.60 lacs

Completion Cost : 1.60 lacs

No. of persons benefitted : whole village

Stake holder comment : The work is of community benefit.

Date of Commencement : 8/3/2019

Date of Completion : 29/03/2020

Estimated Cost : 7.00

Completion Cost : 6.00

No. of people benefitted : 400

Stake holder comment : The work is of community benefit.

Imp. Of p wall from Gulgaz Ahmad to Gh. Rasool at Kustooripora hatbara (435)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 434: PICTORIAL COMPENDIUM

429

Cosntt. Of road with R.wall at Gundimomin (436) Construction of Field channel from l/o Ab. Ahad Matoo to l/o ab. Rashid jan at safapora (437)

Date of Commencement : 09.03.2019

Date of Completion : 25.03.2020

Estimated Cost : 3.62 lacs

Completion Cost : 3.62 lacs

No . Of persons benefitted : whole village

Stake holder comment : The work is of community benefit.

Date of Commencement : 2019-20

Date of Completion : 2019-20

Estimated Cost : 2.99 lacs

Completon Cost : 2.99 lacs

No. of persons benefitted : whole village

Stake holder comment : The work is of community benefit.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 435: PICTORIAL COMPENDIUM

430

Construction of footpath from main road to qabrestain (438)

Date of Commencement : 01.02.2020

Date of Completion : 01.03.2020

Estimated Cost : 2.08 lacs

Completion Cost : 2.08 lacs

No. of persons benefitted : whole village

Stake holder comment : The work is of community benefit.

Date of Commencement : 2019-20

Date of Completion : 10.03.2020

Estimated Cost : 3.08 lacs

Completion Cost : 3.08 lacs

No. of people benefitted : whole village

Stake holder comment : The work is of community benefit.

Development of road with r/wall from l/o ab. Qayoom sofi at bagwanpora mohalla (439)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 436: PICTORIAL COMPENDIUM

431

Construction of road from National Highway to L/o Mohd Hanief Ganaie via TK School at Panzinara B (434) Irrigation Ladh / Kull Ci Dass to Rambipora Ranipora Road (500)

Date of commencement : 16.01.2018

Date of completion : 28.3.2020

Estimated Cost : 11.96

Completion cost : 11.96

No. of people benefited : 4 villages

Comments of stakeholders : Important nature of work/ quality work/ public utility

Date of Commencement : 02-02-2020

Date of Completion : 27-02-2020

Estimated Cost : 1.50 lacs

Completon Cost : 1.49 lacs

No. of persons benefitted : whole village

Stake holder comment : The work is of community benefit.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 437: PICTORIAL COMPENDIUM

432

C/O Steps /Drain at Tengpora Shah Mohalla at Magraypora (501)

Date of commencement : 20.03.2018

Date of completion : 28.3.2020

Estimated Cost : 2.99

Completion cost : 2.99

No. of people benefited : 910

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of commencement : 16.01.2018

Date of completion : 28.3.2020

Estimated Cost : 2.99

Completion cost : 2.99

No. of people benefited : 160

Comments of stakeholders : Important nature of work/ quality work/public utility

C/o Entry Gate at Jamiya Park Tailwan Part II (502)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 438: PICTORIAL COMPENDIUM

433

C/O Drain NHO Ab Rashid Padder and others at Nopngam Nunwani Kadapora (503) C/O Crossing at Bon Tooru near lift irrigation Station (504)

Date of commencement : 16.01.2018

Date of completion : 28.3.2020

Estimated Cost : 2.99

Completion cost : 2.99

No. of people benefited : 190

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of commencement : 10.01.2018

Date of completion : 26.3.2020

Estimated Cost : 1.00

Completion cost : 1.00

No. of people benefited : 401

Comments of stakeholders : Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 439: PICTORIAL COMPENDIUM

434

C/O Crossing at Bon Tooru Gamund (505)

Date of commencement : 15.02.2018

Date of completion : 27.3.2020

Estimated Cost : 2.00

Completion cost : 2.00

No. of people benefited : 910

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of commencement : 12.01.2018

Date of completion : 23.3.2020

Estimated Cost : 2.50

Completion cost : 2.50

No. of people benefited : 190

Comments of stakeholders : Important nature of work/ quality work/public utility

C/O Graveyard Park BWO Fencing at Kanganhall (506)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 440: PICTORIAL COMPENDIUM

435

C/O Xing at Baisoo Guridraman (507) C/O Xing at Bahwatoo Pindobal (508)

Date of commencement : 15.02.2018

Date of completion : 11.03.2020

Estimated Cost : 1.60

Completion cost : 1.60

No. of people benefited : 320

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of commencement : 15.06.2018

Date of completion : 15.12.2019

Estimated Cost : 1.49

Completion cost : 1.49

No. of people benefited : 356

Comments of stakeholders : Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 441: PICTORIAL COMPENDIUM

436

C/O Foot bridge at Kandiwara and Nagam (509)

Date of commencement : 1.03.2019

Date of completion : 25.03.2020

Estimated Cost : 2.40

Completion cost : 2.40

No. of people benefited : 320

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of commencement : 10.03.2019

Date of completion : 26.03.2020

Estimated Cost : 2.00

Completion cost : 2.00

No. of people benefited : 320

Comments of stakeholders : Important nature of work/ quality work/public utility

C/o lining wall on Nallah Danji At Voy part A (510)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 442: PICTORIAL COMPENDIUM

437

Irrigation Ladh at Goriwan NLO Manzoor Ahmad Sheikh and Others at Sheilpora (511)

C/O Protection bund near house of Mohd Shafi Mochi & others at Sheikh Mohalla C.S.Pora (512)

Date of Commencement : 2.12.2019

Date of completion : 30.12.2019

Estimated Cost : 5.00

Completion cost : 5.00

No. of people benefited : 650

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of commencement : 05.12.2019

Date of completion : 03.02.2020

Estimated Cost : 1.50

Completion cost : 1.50

No. of people benefited : 430

Comments of stakeholders : Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 443: PICTORIAL COMPENDIUM

438

Construction of Irrgation Canal/Khul from CI Dass to Ranbirpora Road from RD 0 to RD 400 onwards RD 400 TO RD 1100 (513)

Date of Commencement: 28.12.2019

Date of completion 10.02.2020

Estimated Cost 3.00

Copletion cost 3.00

No. of people benefited 650

Comments of stakeholders Important nature of work/quality work/public utility

Date of Commencement : 30.11.2019

Date of completion : 16.12.2019

Estimated Cost : 4.80

Completion cost : 4.80

No. of people benefited : 650

Comments of stakeholders : Important nature of work/ quality work/public utility

C/O Drain from L/O Afhad Dar to L/O Gh Nabi at Darpora Chee (514)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 444: PICTORIAL COMPENDIUM

439

C/O X-ing near Masjid Sharief at Peth Dailgam (515) C/O Drain lane NHO Gh Nabi Bhat from M/R to M/Sharief Veeri (516)

Date of Commencement : 15.01.2020

Date of completion : 08.02.2020

Estimated Cost : 2.00

Completion cost : 2.00

No. of people benefited : 1100

Comments of stakeholders : Important nature of work/ quality work/public utility

Date of Commencement : 19.12.2020

Date of completion : 19.01.2020

Estimated Cost : 2.20

Completion cost : 2.20

No. of people benefited : 500

Comments of stakeholders : Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 445: PICTORIAL COMPENDIUM

440

C/O Drain near L/O Tariq Ahmad Khanday to bashir ah. Malik & others (517)

Date of Commencement 18.03.2020

Date of completion 26.03.2020

Estimated Cost 1.00

Completion cost 1.00

No. of people benefited 250

Comments of stakeholders Important nature of work/ quality work/public utility

Date of Commencement 21.01.2020

Date of completion 04.02.2020

Estimated Cost 2.00

Completion cost 2.00

No. of people benefited 250

Comments of stakeholders Important nature of work/ quality work/public utility

Fencing around graveyard at Kenelwon (518)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 446: PICTORIAL COMPENDIUM

441

Link road from Bongam Masjid to steel Grider Bridge at Sirhama Payeen (519

C/O Dev. of link road at Manzoo Nambal near Eidgah Nambal-B (520)

Date of Commencement 15.12.2019

Date of completion 10.03.2020

Estimated Cost 1.40

Completion cost 1.40

No. of people benefited 150

Comments of stakeholders Important nature of work/ quality work/public utility

Date of Commencement 24.12.2019

Date of completion 06.01.2020

Estimated Cost 1.00

Completion cost 1.00

No. of people benefited 650

Comments of stakeholders Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 447: PICTORIAL COMPENDIUM

442

Development of Public Park At Akoora (521) C/O Link Road from H/O Mohd Amin Tramboo to onwards at herpora Nanil (522)

Date of Commencement 25.12.2019

Date of completion 25.02.2020

Estimated Cost 1.00

Completion cost 1.00

No. of people benefited 250

Comments of stakeholders Important nature of work/ quality work/public utility

Date of Commencement 15.12.2019

Date of completion March 2020

Estimated Cost 2.00

Completion cost 2.00

No. of people benefited 150

Comments of stakeholders Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 448: PICTORIAL COMPENDIUM

443

CONSTRUCTION OF R/WALL NEAR LAND OF GH HASSAN PARRAY & OTHERS AT WAJOORADAL (523)

C/O Construction of Edge Wall/Lane near L/O Bashir Ahmad Padder & others at Schichen (524)

Date of commencement 10.02.2020

Date of completion 04.03.2020

Estimated Cost 2.80

Completion Cost 2.80

No. of people benefited 1000

Comments of stakeholders Much needed/community benefit/quality work

Date of commencement 19.12.2020

Date of completion 28.02.2020

Estimated Cost 2.20

Completion cost 2.20

No. o people benefited 320

Comments of stakeholders Much needed /community benefit/quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 449: PICTORIAL COMPENDIUM

444

C/O irrgation ladh NLO Manzoor Ahmad Ganie & others Harwanz (525

C/O Road with R/Wall from M/R to 4 way Watterut at Watchi A (431)

Date of commencement 02.03.2020

Date of completion 15.03.2020

Est. Cost 2.99 lacs

Completion cost 2.99 lacs

No. Of people benefited 400

Comments of stakeholders essential demand/ satisfactory work

Date of commencement 22.11.2019

Date of completion 12.12.2019

Estimated Cost 1.40

Completion cost 1.40

No. of people benefited 390

Comments of stakeholders Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 450: PICTORIAL COMPENDIUM

445

C/O Ghat steps near Fuki Mohalla Mohalla at Watchi (425) C/O Concrete Kull from irrigation canal to L/o M. Yousuf, M. Shafi & others at Kalidooch (424)

Date of Commencement 18.03.2020

Date of Completion 25.03.2020

Est. Cost 7.21 Lacs

Completion cost 7.21 Lacs

No. Of people benefited 231

Comments of stakeholders Essential Demand/ Quality work

Date of Commencement 10.03.2020

Date of Completion 22.03.2020

Est. Cost 3.05 Lacs

Completion cost 3.05 Lacs

No. Of people benefited 85

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 451: PICTORIAL COMPENDIUM

446

C/O culvert near Land of Aijaz Ahmad Rather at Kralcheck at Awneera (422)

CONSTRUCTION OF ROAD FROM L/O GH MOHD BHAT TO CH HAJI AND METALLING AT KEEGAM (429)

Date of Commencement 01/12/2019

Date of Completion 20.03.2020

Est. Cost 4.00 lacs

Completion cost 4.00 Lacs

No. Of people benefited 460

Comments of stakeholders Essential Demand/ Quality Work

Date of Commencement 15.03.2020

Date of Completion 30.03.2020

Est. Cost 2.99 Lacs

Completion cost 2.99 Lacs

No. Of people benefited 65

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 452: PICTORIAL COMPENDIUM

447

CONSTRUCTION OF ROAD WITH R/WALL AT DIFFERENT SPOTS FROM IRRIGATION CANAL FROM WATCHI TO HERLAMINI (430)

CONST. OF 3.NO TILE LANES AT KUMAR MOHALLA & RESHI MOHALLA AT WATCHI (427)

Date of Commencement 18.03.2020

Date of Completion 20.03.2020

Est. Cost 6.70 Lacs

Completion cost 6.70 Lacs

No. Of people benefited 441

Comments of stakeholders Essential Demand/ Quality work

Date of Commencement 15/02/2020

Date of Completion 20.03.2020

Est. Cost 2.99 lacs

Completion cost 2.99 Lacs

No. Of people benefited 235

Comments of stakeholders Essential Demand/ Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 453: PICTORIAL COMPENDIUM

448

CONSTT. OF TILE LANE FROM MAIN ROAD TO MIR MOHALLAH AT KASHOO (432)

CONSTRUCTION OF ROAD FROM WACHI TO MELHURA INCLUDING OF LINKS OF DABLIPRA GANIEPORA WITH R/WALL (526)

Date of Commencement 04/03/2019

Date of Completion 30.03.2020

Est. Cost 20.75 Lacs

Completion cost 20.75 Lacs

No. Of people benefited 550

Comments of stakeholders Much needed /Quality Work:

Date of Commencement 15/02/2020

Date of Completion 30.03.2020

Est. Cost 2.00 Lacs

Completion cost 2.00 Lacs

No. Of people benefited 65

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 454: PICTORIAL COMPENDIUM

449

CONSTRUCTION OF CAUSEWAY ON NALLAH LAR AT BERTHIPORA WATHOO ROAD (416)

CONSTRUCTION OF ROAD FROM MAIN ROAD TO BUND AT HEERPORA MELHURA (WORK DONE CLAIM ) (421)

Date of Commencement 05/12/2019

Date of Completion 30.03.2020

Est. Cost 1.35 Lacs

Completion cost 1.11 Lacs

No. Of people benefited 150

Comments of stakeholders Much needed /Quality Work:

Date of Commencement 23/02/2019

Date of Completion 30.03.2020

Est. Cost 1.80 Lacs

Completion cost 1.80 Lacs

No. Of people benefited 150

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 455: PICTORIAL COMPENDIUM

450

DEVELOPMENT OF LAND WITH BREST WALL & DRAIN AT TULIMAN AT WATCHI (423) FENCING AROUND BLOCK BUILDING AT ZAINPORA (426)

Date of Commencement 05/12/2019

Date of Completion 30.03.2020

Est. Cost 3.50 Lacs

Completion cost 3.50 Lacs

No. Of people benefited 50

Comments of stakeholders Much needed /Quality Work:

Date of Commencement 05/12/2019

Date of Completion 30.03.2020

Est. Cost 3.50 Lacs

Completion cost 3.50 Lacs

No. Of people benefited 50

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 456: PICTORIAL COMPENDIUM

451

CONSTRUCTION OF ROAD AT ZIYRAT SHARIEF SYED SHAB TO GOJAR BASTI AT BUTMURAN (419)

CONSTRUCTION OF ROAD FROM MAIN ROAD TO MUSHTAQ AHMAD MIR AT WATHOO (420)

Date of Commencement 15/12/2019

Date of Completion 30.03.2020

Est. Cost 1.00 Lacs

Completion cost 1.00 Lacs

No. Of people benefited 50

Comments of stakeholders Much needed /Quality Work:

Date of Commencement 26/07/2019

Date of Completion 30.03.2020

Est. Cost 1.80 Lacs

Completion cost 1.80 Lacs

No. Of people benefited 235

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 457: PICTORIAL COMPENDIUM

452

CONSTRUCTION OF RETAING WALL NEAR L/O GH QADIR SHERGOGRI AT BERTHIPORA (417) CONSTRUCTION OF INTERIOR LANES AT POJO (418)

Date of Commencement 02/08/2019

Date of Completion 30.03.2020

Est. Cost 1.00 Lacs

Completion cost 1.00 Lacs

No. Of people benefited 50

Comments of stakeholders Much needed /Quality Work:

Date of Commencement 05/09/2019

Date of Completion 30.03.2020

Est. Cost 1.00 Lacs

Completion cost 1.00 Lacs

No. Of people benefited 50

Comments of stakeholders Much needed /Quality Work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 458: PICTORIAL COMPENDIUM

453

Name of work: Culvert near the house of Gh Mohidin Khan and others at Chowdribagh (415)

C/o R-wall near baba Naseeb din Gazi at Hakabara –A Block Hajin (490)

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 1.70

Complection Cost 1.29

Comments of stakeholders Important nature of work/ quality work/ public utility.

Date of Commencement 2018-19

Date of completion 2019-20

Estimated Cost 2.90

Completion Cost 2.90

No of people benefitted whole Panchayat

Comments of stakeholders Much needed/Quality work: Satisfactory

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 459: PICTORIAL COMPENDIUM

454

C/o field channel from l/o Mohd Subhan Wani upto Gh. Mohd at T.A. Shah (489) C/o Fencing of grave yard at Zurimanz at Kenusa (496)

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 1.00

Completion Cost 1.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 2.10

Completion Cost 1.58

Comments of stakeholders Important nature of work/ quality work/ public utility.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 460: PICTORIAL COMPENDIUM

455

C/o road from Aloosa to sheikh muqum Ph-1st Aloosa (488) Up-gradation/Renovation of PCC Path with tile path from main Road to GH Qadir Malla Gund Dachina (494)

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 1.00

Completion Cost 1.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 2.10

Completion Cost 1.78

Comments of stakeholders Important nature of work/ quality work/ public utility.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 461: PICTORIAL COMPENDIUM

456

Constt. Of road with drain from steel bridge to Pavar Mohalla Kenusa road at Guzarbal (495) C/o link road baghi rehman sahib at Nesbal Block Sumbal (491)

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 2.00

Completion Cost 2.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 2.00

Completion Cost 2.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 462: PICTORIAL COMPENDIUM

457

C/o culvert near orchard of Gh. Rasool and others Block Sumbal 492 Fencing of Eidgah at Qazipora Phase III (493)

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 2.45

Completion Cost 2.45

Comments of stakeholders Important nature of work/ quality work/ public utility.

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 1.70

Completion Cost 1.60

Comments of stakeholders Important nature of work/ quality work/ public utility.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 463: PICTORIAL COMPENDIUM

458

C/o P-bund at Jorijoyee (499) Constt. Of P-bund near Masjid Shreef Bosgay (498)

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 1.00

Completion Cost 1.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 1.00

Completion Cost 1.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 464: PICTORIAL COMPENDIUM

459

C/o Fencing of Hut at Sheikpora Jurniyal-A (497) Name of Work :-Const of tile path at Kreeri B BLOCK Wagoora (345)

Date of commencement Aug 2019

Date of Completion march 2020

Estt Cost 3.30

Completion Cost 2.50

No.of Population to be Benefited 110

Comments on Stake Holder

Date of commencement 2018-19

Date of completion March-20

Estimated Cost 4.00

Completion Cost 4.00

Comments of stakeholders Important nature of work/ quality work/ public utility.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 465: PICTORIAL COMPENDIUM

460

Name of Work:- Const of R Wall at Tilwanpora Merchimer Block Singhpora (351) Name of Work:-Fencing of Pyt Ghar Fresthar (354)

Date of commencement 2019-20

Date of Completion march 2020

Estt Cost 2.57

Completion Cost 2.57

No.of Population to be Benefited 345

Comments on Stake Holder

Date of commencement 22-02-2020

Date of Completion march 2020

Estt Cost 2.39

Completion Cost 2.39

No.of Population to be Benefited 145

Comments on Stake Holder

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 466: PICTORIAL COMPENDIUM

461

Name of Work: C/o Culvert at near Eid khai Hakapethri zaloora tujjer (358)

Name of Work:Const of Tiles Path from link Road to H/o Imran Khan at H.No 03 Bonyar (347)

Date of commencement 04/02/2020

Date of Completion 08/03/ 2020

Estt Cost 3.16

Completion Cost 3.16

No. of Population to be Benefited 345

Comments on Stake Holder

Date of commencement 2019-20

Date of Completion march 2020

Estt Cost 3.30

Completion Cost 3.30

No.of Population to be Benefited 245

Comments on Stake Holder

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 467: PICTORIAL COMPENDIUM

462

C/o Drain from H/o Irshad Ahmad Tantray to Onwards at Gund Brath (357)

Fencing of Grave Yard Near l/o Mohd Akbar Khan at Pathan pora Nowlari (350)

Date of commencement 2019-20

Date of Completion march 20

Estt Cost 1.96

Completion Cost 1.61

No.of Population to be Benefited 200

Comments on Stake Holder

Date of Commencement 09-12-2019

Date of Completion 16-03-2020

Estimated Cost 2.50 + 1.16= 3.66 Lacs

Completion Cost 2.44 + 1.06 = 3.50 Lacs

Number of People Benefitted 1250

Comments of the Stakeholders The work has been completed as per the sanctioned estimate and people are satisfied with the work.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 468: PICTORIAL COMPENDIUM

463

Const of Oriental Fencing phase II Eidgah at Kungamdara Khore (325)

Fencing around Eidgah Near Baitul markazi jammia masjid akeek at Kungamdara Khore (349)

Date of commencement 31.12.2019

Date of Completion 10.03.2020

Estt Cost 1.48

Completion Cost 1.45

No.of Population to be Benefited 2000

Comments on Stake Holder

Date of commencement 21.02.2019

Date of Completion 07.03.2019

Estt Cost 2.45

Completion Cost 2.45

No.of Population to be Benefited 800

Comments on Stake Holder

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 469: PICTORIAL COMPENDIUM

464

Const of Drain pethpora,bala near H/o Gh hassan kumar,Ab Rehman,lone to seed bhat mohalla at wanigam bala (337)

Const of Road From Habibullah wani to onwards at wussan pattan (335)

Date of commencement 02.03.2019

Date of Completion 23.03.2019

Estt Cost 2.39

Completion Cost 2.39

No.of Population to be Benefited 1000

Comments on Stake Holder

Date of commencement 31.12.2018

Date of Completion 03.2020

Estt Cost 1.90

Completion Cost 1.83

No.of Population to be Benefited 600

Comments on Stake Holder

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 470: PICTORIAL COMPENDIUM

465

Const of R Wall near Primary School at Check jamal mir Palhalan H (338)

Const of Drain from Grave yard to Panchayat Ghar phase 2nd palhalan F (336)

Date of commencement 07.03.2019

Date of Completion 03.03.2020

Estt Cost 2.35

Completion Cost 2.14

No.of Population to be Benefited 2000

Comments on Stake Holder

Date of commencement 09.03.2019

Date of Completion 22.03.2019

Estt Cost 2.38

Completion Cost 2.33

No.of Population to be Benefited 1500

Comments on Stake Holder

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 471: PICTORIAL COMPENDIUM

466

Constt. C/o Drain at Chandoosa A (355) Constt. C/o P/bund near GMS at Drangbal (356)

Date of Commencement 15-02-2020

Date of Completion 18-03-2020

Estimated Cost Rs3.39 lacs

Completion Cost Rs3.26 lacs

No. of Population Benefitted 200

Comments of stakeholders work executed to the satisfaction of local community

Date of Commencement 04-02-2020

Date of Completion 18-03-2020

Estimated Cost Rs3.72 lacs

Completion Cost Rs3.72 lacs

No. of Population Benefitted 700

Comments of stakeholders work executed to the satisfaction of local community

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 472: PICTORIAL COMPENDIUM

467

Constt. of foot path with R/wall at Ekdaba Dowaran parenpeela (343) C/O Fencing of orchards at Wagoora-A (344)

Date of Commencement 16-02-2020

Date of Completion 07-03-2020

Estimated Cost 3.31 lacs

Completion Cost 3.31 lacs

No. of people benefitted 2260

Comments of stakeholders Work will safeguard the Panchayat property

Date of Commencement 2018-2019

Date of Completion 25-08-2019

Estimated Cost 2.8 lac

Completion Cost 2.8

No. of Population to be Benefited

Comments on Stake Holder

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 473: PICTORIAL COMPENDIUM

468

C/O path with drain near H/o Nazir ah baba and others at kakovthal b (332)

C/O p bund at different spots rather mohalla lone mohalla waripora (328)

Date of Commencement 19.02.2019

Date of Completion 21.03.2019

Estimated Cost 3.60 lacs

Completion Cost 3.60

No. of people benefitted 985

Comments of stakeholders Work is of community benefit

Date of Commencement 23.02.2019

Date of Completion 21.03.2019

Estimated Cost 2.70 lacs

Completion Cost 2.70

No. of people benefitted 1280

Comments of stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 474: PICTORIAL COMPENDIUM

469

Fencing of Graveyard at waripora bala (333) Constt. of R/wall on nallah from land of Hyder khan to Nasarullah Uranbowa (341).

Date of Commencement 10.03.2019

Date of Completion 25.03.2019

Estimated Cost 3.20lacs

Completion Cost 3.20 lacs

No of people Benefitted 400

Comments of Stakeholders work executed to the satisfaction of local community

Date of Commencement 08.03.2019

Date of Completion 25.03.2019

Estimated Cost 2.80 lacs

Completion Cost 2.80

No. of people benefitted 1685

Comments of stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 475: PICTORIAL COMPENDIUM

470

Constt. of drain R/wall near H.o wali Mohd. Mir and others at Burnate (342) Fencing panchayat Ghar Land at Tarzoo B (331)

Date of Commencement 2018-19

Date of Completion 03.2020

Estimated Cost 2.40lacs

Completion Cost 2.04

No. of people benefitted 1100

Comments of stakeholders Work is of community benefit

Date of Commencement 2018-19

Date of Completion 25.03.2020

Estimated Cost 2.70lacs

Completion Cost 2.28 lacs

No of people Benefitted 300

Comments of Stakeholders work executed to the satisfaction of local community

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 476: PICTORIAL COMPENDIUM

471

Fencing of Park Near Graveyard at Charlepora Ganie Mohalla Edipora B (334) Const of Drain/Field Channel at pethgam wagoora B (329)

Date of Commencement 01.03.2019

Date of Completion 20.03.2020

Estimated Cost 2.70lacs

Completion Cost 2.70

No. of people benefitted 100

Comments of stakeholders Work is of community benefit

Date of Commencement 09.03.2019

Date of Completion 27.03.2020

Estimated Cost 2.40lacs

Completion Cost 2.37 lacs

No. of people benefitted 80

Comments of stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 477: PICTORIAL COMPENDIUM

472

Constt. of oriental fencing of Graveyard at Pathanpora Sherabad (326) Dev. of park at Waza Mohalla Fresthar Waripora (330)

Date of Commencement 27.02.2019

Date of Completion 24.03.2020

Estimated Cost 3.00 lacs

Completion Cost 3.00

No. of people benefitted 120

Comments of stakeholders Work is of community benefit

Date of Commencement 18.02.2019

Date of Completion 23.03.2020

Estimated Cost 2.58 lacs

Completion Cost 2.47

No. of people benefitted 250

Comments of stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 478: PICTORIAL COMPENDIUM

473

Constt. of tile path main to Masjid Sharief Khati Jul Kubra Kushipora (339) Development of Children Park at Rebbon (340)

Date of commencement 2018-19

Date of Completion march 2020

Estt Cost 5.00

Completion Cost 4.90

No.of Population to be Benefited 110

Comments of stakeholders Work is of community benefit

Date of commencement 2018-19

Date of Completion march 2020

Estt Cost 2.80

Completion Cost 1.97

No.of Population to be Benefited 60

Comments of stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 479: PICTORIAL COMPENDIUM

474

Improvement of path at Sheikh Mohalla Tarihama (327) Construction of culvert on Gurat Road at Mangloora Takiya batpora (348)

Date of Commencement 26-12-2019

Date of Completion 16-03-2020

Estimated Cost 2.52 lacs

Completion Cost 2.51 lacs

No.of People Benefitted 700

Comments of Stakeholders Work is of community benefit

Date of commencement 2018-19

Date of Completion march 2020

Estt Cost 2.40

Completion Cost 2.40

No.of Population to be Benefited 700

Comments of stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 480: PICTORIAL COMPENDIUM

475

Construction of Drain from Main Road To onwards at Gutiyar (352).

Imp. Of Khul B/W/O R/Wall From H/o Zafrullah Mir To H/O Mohd Isak Hajam at Chairoo (483)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,65 lacs

Completion Cost 0,60 lacs

No of people benefitted 60

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 20-02-2020

Date of Completion 22-03-2020

Estimated Cost 3.10lacs

Completion Cost 3.10 lacs

No of people Benefitted 700

Comments of Stakeholders Work is of community benefit

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 481: PICTORIAL COMPENDIUM

476

Improvement of road from Perr Mohallah thakri Road at Aripanthan A (477) Constt. Of Fecing of Jinazgah at Kandhama A (476)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2,00 lacs

Completion Cost 2,00 lacs

No of people benefitted 400

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,27 lacs

Completion Cost 1,27 lacs

No of people benefitted 367

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 482: PICTORIAL COMPENDIUM

477

Construction of Drain Along with R/Wall NearNagrad land at Bunhama (443)

Development of Park near Astan Sherif Syed Allav Din Bukhari at Iskandepora (444)

Date of Commencement 2018-19

Date of Completion 2018-19

Estimated Cost 1,79 lacs

Completion Cost 1,79 lacs

No of people benefitted 150

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0.80 lacs

Completion Cost 0,80 lacs

No of people benefitted 200

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 483: PICTORIAL COMPENDIUM

478

Construction of drain from shop of Gh Mohammad Ganie to Astanat Kanigund 479

Construction chain link fencing around Shamshan Ghat at sikh Atina (481)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,00 lacs

Completion Cost 1,00 lacs

No of people benefitted 450

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,50 lacs

Completion Cost 0,50 lacs

No of people benefitted 60

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 484: PICTORIAL COMPENDIUM

479

Construction of R/Wall at Hayatpora fromH/o Mohd Jabbar Magray upto H/O Gh Hassan Mir at hayatpora gundipora (441)

Construction of Road along with R/Wall from Gani Pora Narwara Road to Agriculture Land at Gandipora (482)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2.00 lacs

Completion Cost 2.00 lacs

No of people benefitted 200

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2018-19

Date of Completion 2019-20

Estimated Cost 1,30 lacs

Completion Cost 1,30 lacs

No of people benefitted 40

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 485: PICTORIAL COMPENDIUM

480

Construction of titled Path from Main gate to HolyShrine of Astan Allaiya Syed Shamasdin (452)

Construction of Fencing Around Graveyard Sheikh Ab Rahim at Malpora (445)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,92 lacs

Completion Cost 0,92 lacs

No of people benefitted 550

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 3,99 lacs

Completion Cost 3,99

lacsNo of people benefitted 550

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 486: PICTORIAL COMPENDIUM

481

Construction of road from H/O Gh Mohd To Panchayat Ghar at parisabad (475)

Construction of R/ Wall Shamar Khul near H/O Ali Mohd ganie and others at parisabad (473)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,15 lacs

Completion Cost 1,15 lacs

No of people benefitted 480

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,99 lacs

Completion Cost 1,99 lacs

No of people benefitted 480

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 487: PICTORIAL COMPENDIUM

482

Construction of R/Wall From Masjid Shrif to Ayoub Waza at Aripanthan (478)

Construction of R/ Wall nera H/O younis wani , Nazir Sheikh at Check ora nanajan (480)

Date of Commencemen 2019-20

Date of Completion 2019-20

Estimated Cost 0,50 lacs

Completion Cost 0,50 lacs

No of people benefitted 60

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,50 lacs

Completion Cost 0,50 lacs

No of people benefitted 500

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 488: PICTORIAL COMPENDIUM

483

Construction of P/Bund lane Culvert near Masjid Sherif at Budina (467)

Development of road from Lone Mohallahto tali Mohallah at surasyar (456)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,00 lacs

Completion Cost 1,00 lacs

No of people benefitted 2000

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,50 lacs

Completion Cost 0,50 lacs

No of people benefitted 60

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 489: PICTORIAL COMPENDIUM

484

Connstruction of P/Bund nera Darazgah at kachwari B (486) Earth filling and fencing around Graveyardat Kachwari A (484)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2,00 lacs

Completion Cost 2,00 lacs

No of people benefitted 200

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,50 lacs

Completion Cost 1,50 lacs

No of people benefitted 200

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 490: PICTORIAL COMPENDIUM

485

Development of Park near opanchayat gharat Mehdipora (461) Constriction of culvert near H/O Muzafar Ahmad rather and others at Ganjibagh (453)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 3,00 lacs

Completion Cost 3,00 lacs

No of people benefitted 500

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,61 lacs

Completion Cost 0,61 lacs

No of people benefitted 450

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 491: PICTORIAL COMPENDIUM

486

Constriction of 3 no. Culverts at Different Spots at dadmaribagh (451)

Constriction of p/bund near Land of Mhd Yousuf bhat , farooq Ahmad bhat and others (455)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2,50 lacs

Completion Cost 2,50 lacs

No of people benefitted 100

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 4,00 lacs

Completion Cost 4,00 lacs

No of people benefitted 750

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 492: PICTORIAL COMPENDIUM

487

Development of Maqbara at Sheikhpora Narbal (Part I & II) B/W/O of Chain Link Fencing Over Exixting RCC for a 300ft at(446)( Narbal (446)

Improvement of road B/W/O nallah Moakh P/bund and RCC Spun pipes from Branjan road to Bujgoo (462)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2,50 lacs

Completion Cost 2,50 lacs

No of people benefitted 1500

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2,50 lacs

Completion Cost 2,50 lacs

No of people benefitted 100

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 493: PICTORIAL COMPENDIUM

488

Construction of lane form rasool haja, to H/O mohd akram at Dalwan (460) Construction of Drain to H/o Gulla Salam at Dalwan (459)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,65 lacs

Completion Cost 0,65 lacs

No of people benefitted 250

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0,75 lacs

Completion Cost 0,75 lacs

No of people benefitted 300

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 494: PICTORIAL COMPENDIUM

489

Femcing and earth filling of paray Graveyard at Bunmakhama (447)

Construction of Culvert / r/Wall near Shop of Ab Rashid hajam and Others at Hakermullah (472)

Date of Commencement 2018-19

Date of Completion 2019-20

Estimated Cost 3,24 lacs

Completion Cost 3,24 lacs

No of people benefitted 400

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2018-19

Date of Completion 2019-20

Estimated Cost 2,50 lacs

Completion Cost 2,50 lacs

No of people benefitted 400

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 495: PICTORIAL COMPENDIUM

490

Construction of Park Nera Baity Mukaram at Peth Mukram (448)Construction of Drain Near Land of Fayaz Mir, Aziz Mir,

Mushtaq, Nazir and others at Lalgund Gudsatoo A (463)

Date of Commencement 019-20

Date of Completion 2019-20

Estimated Cost 0.48 lacs

Completion Cost 0.48 lacs

No of people benefitted 150

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2018-19

Date of Completion 2019-20

Estimated Cost 2,50 lacs

Completion Cost 2,50 lacs

No of people benefitted 1000

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 496: PICTORIAL COMPENDIUM

491

Construction of P/Bund & Drain near H/o Mohd Abdulla Rather , Ali Mohd rather and others (469)

Const. of Drain Near Maqbool Ganie at Gariend (470)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1,00 lacs

Completion Cost 1,00 lacs

No of people benefitted 250

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2,37 lacs

Completion Cost 2,37 lacs

No of people benefitted 200

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 497: PICTORIAL COMPENDIUM

492

Construction of Road from MR to H/o Nazir Ahmad Khan at Galwanppra (471)

Earth filling and fencing around Graveyardat Kachwari A (484)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0.53 lacs

Completion Cost 0.53 lacs

No of people benefitted 300

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2.50 lacs

Completion Cost 2.50 lacs

No of people benefitted 250

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 498: PICTORIAL COMPENDIUM

493

Construction of Drain with P/Bund From h/o Showkat to H/o Mahi-I-Din waza at Razwan (468)

Construction of Drain from H/o Mohd Abdullag rather

S/o Hussain Rather to L/o Master ghulam Rasool Mir (464)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1.00 lacs

Completion Cost 1.00 lacs

No of people benefitted 50

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1.36 lacs

Completion Cost 1.36 lacs

No of people benefitted 50

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 499: PICTORIAL COMPENDIUM

494

C/O LANE AT BATAPORA BALL PHASE-II (458) CONSTT. OF TRACTOR ROAD FROM M/R TO H/O GH NABI DAR AT CHRAWANI (457)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1.165 lacs

Completion Cost 1.165 lacs

No of people benefitted 300

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1.33 lacs

Completion Cost 1.33 lacs

No of people benefitted 210

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 500: PICTORIAL COMPENDIUM

495

Construction of Drain with cover from behind BDO Office to onwards at Ghousia Colony B.K Pora – A (449)

C/o drain from main road to h/o Ab Samad Teli and others at Astan mohalla at Pyt Pahroo B (450)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2.50 lacs

Completion Cost 2.50 lacs

No of people benefitted 500

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2.32 lacs

Completion Cost 2.32 lacs

No of people benefitted 400

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 501: PICTORIAL COMPENDIUM

496

Constr. of Link road from Beerwa Budgam road to H/O Gh Qadir Dar at N.S.Pora A (465)

Construction of Road from Yarisatroo to Astan Sherif Gojra with earth cutting (485)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2.00 lacs

Completion Cost 2.00 lacs

No of people benefitted 500

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 2.50 lacs

Completion Cost 2.50 lacs

No of people benefitted 500

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 502: PICTORIAL COMPENDIUM

497

Construction of Imambara Lane at juhama (440) Construction of P/Bund nera the Land of Maqsood ahmad bandroo , Bashier bandroo and others at bandrepora (487)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1.35 lacs

Completion Cost 1.35 lacs

No of people benefitted 250

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0.60 lacs

Completion Cost 0.60 lacs

No of people benefitted 150

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 503: PICTORIAL COMPENDIUM

498

Construction of lane form Masjid Sherif Manz Gam at Shulipora A (474)

Construction of Fencing Around Graveyard Syed Jamu Din Bukhari at Gambora (442)

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 0.80 lacs

Completion Cost 0.80 lacs

No of people benefitted 200

Comments of the Stake Holder Good Quality Of Work

Date of Commencement 2019-20

Date of Completion 2019-20

Estimated Cost 1.35 lacs

Completion Cost 1.35 lacs

No of people benefitted 250

Comments of the Stake Holder Good Quality Of Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 504: PICTORIAL COMPENDIUM

499

R /WALL Pyt.Ghar Shibote malwana west (Block Gundana) Constt.of P/Work Eidgah at Jangalwar (Block Thathri)

Date of Commencement 13-03-2020

Date of Completion March 2020

Estimated Cost 0.80 Lakhs

Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)

No of People benefitted 250

Comments of Stakeholders Much Needed/Quality

Date of Commencement 23-02-2020

Date of Completion March 2020

Estimated cost 1.60 lakhs

Completion cost 1.00 lakhs. (Expdt under CD&Pyt)

No of people Benefited 330

Commence of stake holders Much needed/quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 505: PICTORIAL COMPENDIUM

500

Repair/Renovation of Govt M S Phagsoo (Block Thathri)

Date of Commencement 12-03-2020

Date of Completion March 2020 (Expdt under CD&Pyt)

Estimated Cost 0.80 Lakhs

Completion Cost 0.50 Lakhs

No of People benefitted 150

Comments of Stakeholders Much Needed/Quality

Date of Commencement 13-02-2020

Date of Completion March 2020

Estimated Cost 0.80 Lakhs

Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)

No of People benefitted 200

Comments of Stakeholders Much Needed/Quality work

Development of Eidgah at Dadiyan (Block Thathri)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 506: PICTORIAL COMPENDIUM

501

Constt. Of B/Wall near Additional Block of Girls High School kanhal (Block Bhagwah) Constt. Of Tile Work NHO Akbar Malik (Block Daliudhyanpur)

Date of Commencement 06-02-2020

Date of Completion March 2020

Estimated Cost 3.04 Lakhs

Completion Cost 1.90 Lakhs (Expdt under CD&Pyt)

No. Of People Benefited 40

Comments of Stakeholders Much needed

Date of Commencement 10-02-2020

Date of Completion March 2020

Estimated Cost 0.80 Lakhs

Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)

No. Of People Benefited 150

Comments of Stakeholders Much Needed/Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 507: PICTORIAL COMPENDIUM

502

Constt. Of P/Work NHO Daminder Singh (Block Bhagwah)

Date of Commencement 02-03-2020

Date of Completion March 2020

Estimated Cost 1.44 Lakhs

Completion Cost 0.45 Lakhs (Expdt under CD&Pyt)

No. Of People Benefited 4

Comments of Stakeholders Much Needed/Quality Work

Date of Commencemen 10-02-2020

Date of Completion March 2020

Estimated Cost 2.40 Lakhs

Completion Cost 1.50 Lakhs (Expdt under CD&Pyt)

No. Of People Benefited 10

Comments of Stakeholders Much Needed/Quality Work

Constt. Of P/Work at Siserwar NLO Ajeet Singh (Block Bhagwah)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 508: PICTORIAL COMPENDIUM

503

Constt of Community Path at Chulass (Block Bhagwah) Pacca Steps at Gugwah Pyt.Kastigarh-A (Block Kastigarh)

Date of start 23/11/2019

Date of Completion March 2020

ESTT. COST 1.44 Lakhs

Completion Cost 0.90 Lakhs (Expdt under CD&Pyt)

No of People Benefited 150

Comments of Stakeholders Much needed/ Quality work

Date of Commencement 10-02-2020

Date of Completion March 2020

Estimated Cost 0.80 Lakhs

Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)

No. of People Benefited 27

Comments of Stakeholders Much Needed/Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 509: PICTORIAL COMPENDIUM

504

Constt.of P/Work at Graveyard Badanoo Butt Mohalla (Block Thathri)

Dated of Commencement 10/01/2020

Date of Completion March 2020

Estt Cost 1.44

Completion Cost 0.90 (Expdt under CD&Pyt)

No of People Benefited 150

Commence of Stakeholders Much Needed/Quality Work

Date of Commencement 13-03-2020

Date of Completion March 2020

Estimated Cost 1.44 Lakhs

Completion Cost 0.90 Lakhs (Expdt under CD&Pyt)

No of People benefitted 150

Comments of Stakeholders Much Needed/Quality work

Repair of Khul NLO Abdul Salam. (Block Doda (Ghat)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 510: PICTORIAL COMPENDIUM

505

Const of P/work Near masjid Sharief Lower Padrana. (Block Doda (Ghat) Fencing of Graveyard Wani Pura Pyt Behota Lower (Block Marmat)

Dated of Commencement 25/10/2019

Date of Completion March 2020

Estt. Cost 1.60Lakhs

Completion Cost 1.00 lakhs (Expdt under CD&Pyt)

No of People Benefited 250

Commence of Stakeholders Much needed/ Quality work:

Dated of Commencement 15/01/2020

Date of Completion March 2020

Estt Cost 4.00 lakh

Completion Cost 2.50 lakh (Expdt under CD&Pyt)

No of People Benefited 40

Commence of Stakeholders Much Needed/Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 511: PICTORIAL COMPENDIUM

506

P/work NLO Atta Mohd Pyt Roat A Near Eid Gah Roat. (Block Marmat)

Dated of Commencement 04/12/2019

Date of Completion March 2020

Estt. Cost 1.60 Lakhs

Completion Cost 1.60 lakhs (Expdt under CD&Pyt)

No of People Benifited 150

Comments of Stakeholders Much needed/ Quality work

Dated of Commencement 01/11/2019

Date of Completion March 2020

Estt. Cost 04.00 lakhs

Completion Cost 2.50 lakhs (Expdt under CD&Pyt)

No of People Benefited 300

Comments of Stakeholders Much needed/ Quality work:

WCD ILO Sumandar Khan Pyt Mangota –B (Block Marmat)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 512: PICTORIAL COMPENDIUM

507

Constt of Irrigation Khul at Berreru (Block Bhalla) const of P/PATH FROM SCHOOL TO MASJID Pyt:- Dashnan

Dated of Commencement 10/01/2020

Date of Completion March 2020

Estt Cost 1.60 lakhs

Completion Cost 1.00 lakhs (Expdt under CD&Pyt)

No of People Benefited 30

Commence of Stakeholders Much Needed/Quality Work:-

Date of Commencement 03/01/2020

Date of Completion March 2020

Estimated Cost 1.60 lakhs

Completion Cost 1.00 lakhs (Expdt under CD&Pyt)

No of people benefited 265

Comments of stakeholders The Const of the section of irrigation khul has helped the local farmers in irrigation.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 513: PICTORIAL COMPENDIUM

508

Const of P/work NLO RIAZ AHMED BASTI

Date of Commencement 19/11/2020

Date of Completion March 2020

Estt. Cost 0.80 lakhs

Complection Cost 0.50 lakhs (Expdt under CD&Pyt)

No. of People benefitted 250

Comments of Stakeholders Much Needed

Dated of Commencement 12/01/2020

Date of Completion March 2020

Estt Cost 1.20 lakhs

Completion Cost 0.75 lakhs (Expdt under CD&Pyt)

No of People Benefite 5

Comments of Stakeholders Much Needed/Quality Work

P/Work Panchayat Ghar Hambal-A (Block Khellani)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 514: PICTORIAL COMPENDIUM

509

Constt. Of Tile Work H.S.S. Khellani. (Block Khellani) Constt. Of Flood P/Work on left side of chil guard Nallah. (Block Chiralla)

Date of Commencement 04/02/2020

Date of completion March 2020

Estt cost 4.88 lakhs

Completion cost 3.05 lakhs (Expdt under CD&Pyt)

No of people Benefitted 60

Commence of Stakeholders Much Needed/ Quality Work

Date of Commencement 19/11/2019

Date of Completion March 2020

Estt. Cost 0.80 lakhs

Complection Cost 0.50 lakhs (Expdt under CD&Pyt)

No. of People benefitted 200

Comments of Stakeholders Much Needed

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 515: PICTORIAL COMPENDIUM

510

Renovations of Community Hall Paryote-A (Block Khellani)

Date of Commencement 19/11/2019

Date of Completion March 2020

Estt. Cost 0.80 lakhs

Complection Cost 0.50 lakhs (Expdt under CD&Pyt)

No. of People benefitted 250

Comments of Stakeholders Much Needed

Date of Commencement 19/11/2019

Date of Completion March 2020

Estt. Cost 1.20 lakhs

Complection Cost 0.65 lakhs (Expdt under CD&Pyt)

No. of People benefitted 200

Comments of Stakeholders Much Needed

Constt. Of B/Wall Near Durga Mandir Shree (Block Khellani)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 516: PICTORIAL COMPENDIUM

511

Fencing /Repairing H.S Sarsi (Block Khellani) Constt.of C/Wall Gravyard Butt Mohalla in Ward No 2 (Block Jakyas)

Date of Commencement 13-02-2020

Date of Completion March 2020

Estimated Cost 1.60 Lakhs

Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)

No of People benefitted : 200

Comments of Stakeholders Much Needed/Quality work

Date of Commencement 14-11-2019

Date of Completion March 2020

Estt. Cost 0.80 lakhs

Complection Cost 0.50 lakhs (Expdt under CD&Pyt)

No. of People benefitted 250

Comments of Stakeholders Much Needed

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 517: PICTORIAL COMPENDIUM

512

Development of Spring Near Hill Nallah (Block Jakyas)

Date of Commencement 12-03-2020

Date of Completion March 2020

Estimated Cost 1.60 Lakhs

Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)

No of People benefitted 150

Comments of Stakeholders Much Needed/Quality

Date of Commencement 15-01-2020

Date of Completion March 2020(Expdt under CD&Pyt)

Estt. Cost 1.60 lakhs

Completion Cost 1.00 lakhs

No. of People benefitted 75

Comments of Stakeholders Much Needed

Repair/Renovation HS Chhaller (Block Jakyas)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 518: PICTORIAL COMPENDIUM

513

Constt.of C/Wall Gravyard in Ward No 4 Champal (Block Jakyas) Constt.of P/Path at Wani Pura Tilogra (Block Jakyas)

Date of Commencement 13-03-2020

Date of Completion March 2020

Estimated Cost 3.20 Lakhs

Completion Cost 2.00 Lakhs (Expdt under CD&Pyt)

No of People benefitted 250

Comments of Stakeholders Much Needed/Quality

Date of Commencement 13-03-2020

Date of Completion March 2020

Estimated Cost 1.60 Lakhs

Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)

No of People benefitted 150

Comments of Stakeholders Much Needed/Quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 519: PICTORIAL COMPENDIUM

514

Constt. of P/Bund Suranga Nallah (Block Kahara)

Date of Commencement 21/11/2019.

Date of Completion March 2020

Estt. Cost 4.80 Lakhs

Completion Cost 3.00

No of People Benifited 50

Commence of Stakeholders Much needed/ Quality work

Date of Commencement 19/10/2019

Date of Completion March 2020

Estimated Cost 8.00 lakhs

Completion cost 5.00 lakhs (Expdt under CD&Pyt)

No. of People Benefitted 245

Comments of Stake Holders Much Needed/Quality

P/work NHO Hari Gopal Rathore at Sarol Bagh Panchayat Udrana- A. (Block Bhaderwah)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 520: PICTORIAL COMPENDIUM

515

Development of Graveyard at Ward No.5 Panchayat Udrana B (Block Bhaderwah)

Z-khul with allied activities from LO Mohd Ishaq to Thajbal Panchayat Dhareja. (Block Bhaderwah)

Date of Commencement 21/11/2019.

Date of Completion March 2020 (Expdt under CD&Pyt)

Estt. Cost 3.20Lakhs

Completion Cost 2.00 lakhs

No of People Benifited 35

Commence of Stakeholders : Much needed/ Quality work:

Date of Commencement 21/11/2019

Date of Completion March 2020

Estt. Cost 6.40 Lakhs

Completion Cost 4.00 lakhs(Expdt under CD&Pyt)

No of People Benifited 100

Commence of Stakeholders Much needed/ Quality work:

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 521: PICTORIAL COMPENDIUM

516

R/wall Graveyard Khan Mohalla Hanga Panchayat Hanga. (Block Bhaderwah)

Date of Commencement 21-11-2019

Date of completion March 2020

Estt cost 4.80 Lakhs

Completion cost 3.00 lakhs (Expdt under CD&Pyt)

No of people Benefitted 200

Comments of Stakeholders Much Needed/ Quality Work

Date of Commencement 21/11/2019.

Date of Completion March 2020

Estt. Cost 2.40Lakhs

Completion Cost 1.50 lakhs (Expdt under CD&Pyt)

No of People Benifited 100

Comments of Stakeholders Much needed/ Quality work

Construciton of abulution centre (Wazu Khana) at MS Lower Chakka (Block Bhaderwah)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 522: PICTORIAL COMPENDIUM

517

Construction of Public Park Near Janazgah at Kotli Ward No 1 (Block Bhaderwah)

Development of Graveyard at Kach Panchayat Nalthi. (Block Bhaderwah)

Date of Commencement 21/11/2019

Date of Completion March 2020

Estt. Cost 4.80 Lakhs’s

Completion Cost 3.00 lakhs (Expdt under CD&Pyt)

No of People Benefitted 220

Commence of Stakeholders Much needed / Quality work:

Date of Commencement 21-11-2019

Date of Completion March 2020

Estimated Cost 0.80 Lakhs

Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)

No. of People Benefited 70

Comments of Stakeholders Much Needed/Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 523: PICTORIAL COMPENDIUM

518

Constt.of P/path from Main Road to the House of Raghubir Singh Panchayat Udrana- A. (Block Bhaderwah)

Date of Commencement 10/01/2020

Date of Completion March 2020

Estimated Cost 1.60 LAKHS

Completion Cost 1.00 LAKHS (Expdt under CD&Pyt)

No of people benefited 365

Comments of stakeholders The Local People of seri are satisfied for const of this ram leela ground. Much needed/Quality work: - The locals had demanded for const of this work for organizing local functions.

Date of Commencement 21/11/2019.

Date of Completion March 2020

Estt. Cost 0.96 Lakhs

Completion Cost 0.60 lakhs (Expdt under CD&Pyt)

No of People Benifited 20

Comments of Stakeholders Much needed/ Quality work:

CONSTT OF FENCING AT RAM LELE GROUND (Block Bhalla)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 524: PICTORIAL COMPENDIUM

519

Constt of R/Wall Near HO Jasbir Singh Pyt.Kastigarh-A (Block Kastigarh)

Constt of B/Wall & L/Levelling of Ground Near CFC Kastigarh Pyt.Kastigarh-A (Block Kastigarh)

Date of start 27/11/2019

Date of Completion March 2020

ESTT. COST 3.20 Lakhs

Completion Cost 2.00 Lakhs (Expdt under CD&Pyt)

No of People Benefited 200

Comments of Stakeholders Much needed/ Quality work

Date of start 23/11/2019

Date of Completion March 2020

ESTT. COST 6.40 Lakhs

Completion Cost 4.00 Lakhs (Expdt under CD&Pyt)

No of People Benefited 50

Comments of Stakeholders Much needed/ Quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 525: PICTORIAL COMPENDIUM

520

Estd. Of Meeting Hall at BHQ Assar. (Block Assar)

Dateof Commencement 14/02/2020

Date of Completion March 2020

Estimated Cost 4.80 Lakhs

Completion Cost 1.50 lakhs(Expdt under CD&Pyt)

No. Of People Benefited 300

Comments of Stakeholders Much Needed/Quality Work

Date of Commencement 03/01/2020

Date of Completion March 2020

Estimated Cost 6.40 Lakhs

Completion Cost 4.00 Lakhs (Expdt under CD&Pyt)

No. Of People Benefited:

Comments of Stakeholders Much Needed/Quality Work

Const of Public Passanger Shed at Ramgarh (Block Assar)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 526: PICTORIAL COMPENDIUM

521

Const of P/Work at Jathi NLO Shakuntla Devi (Block Assar) Constt of R/Wall NHO Noor Pyt Mundhar Lower-A (Block Kastigarh)

Date of start 23/11/2019

Date of Completion March 2020

ESTT. COST 1.60 Lakhs

Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)

No of People Benefited 50

Comments of Stakeholders Much needed/ Quality work

Date of Commencement 31/01/2020

Date of Completion March 2020

Estimated Cost 1.60 Lakhs

Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)

No. Of People Benefited 95

Comments of Stakeholders Much Needed/Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 527: PICTORIAL COMPENDIUM

522

Constt of Drain at Panchayat Halqa Dhandal- Pyt Dhandal-B (Block Kastigarh) Constt of Drain at Kudhar Pyt Dhandal-A (Block Kastigarh)

Date of start 22/01/2020

Date of Completion March 2020

ESTT. COST 2.00 Lakhs

Completion Cost 1.50 Lakhs (Expdt under CD&Pyt)

No of People Benefited 250

Comments of Stakeholders Much needed/ Quality work

Date of start 22/01/2020

Date of Completion March 2020

ESTT. COST 3.50 Lakhs

Completion Cost 3.00 Lakhs (Expdt under CD&Pyt)

No of People Benefited 200

Comments of Stakeholders Much needed/ Quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 528: PICTORIAL COMPENDIUM

523

Constt. of Protection work/development of Graveyard at Gatha Panchayat Gatha. (Block Bhaderwah)

Constt. Of B/Path Chancer to Kanaierew Panchayat Chansar (Block Changa)

Dated of Commencement 22/02/2020

Date of Completion March 2020

Estt. Cost 3.00 Lakhs

Completion Cost 2.00 lakhs (Expdt under CD&Pyt)

No of People Benefited 170

Comments of Stakeholders Much needed/ Quality work :

Dated of Commencement 10/01/2020.

Date of Completion March 2020

Estt. Cost 4.90 Lakhs

Completion Cost 04.00 lakhs (Expdt under CD&Pyt)

No of People Benefitted 400

Comments of Stakeholders Much needed/ Quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 529: PICTORIAL COMPENDIUM

524

B/Path Chansar to Chanchlu Panchayat Chancer (Block Changa) Constt. Of Flood P/Work on left side of chil guard Nallah. (Block Chiralla)

Date of Commencement 04/02/2020

Date of completion March 2020

Estt cost 5.00 lakhs

Completion cost 4.00 lakhs (Expdt under CD&Pyt)

No of people Benefitted 60

Comments of Stakeholders Much Needed/ Quality Work

Dated of Commencement 22/02/2020

Date of Completion March 2020

Estt. Cost 3.00 lakhs

Completion Cost 2.00 lakhs (Expdt under CD&Pyt)

No of People Benefited 170

Comments of Stakeholders Much needed/ Quality work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 530: PICTORIAL COMPENDIUM

525

Constt. Constt. Of Flood Protection works on left side of the Chillgad spot Hudki. (Block Chiralla)

Date of Commencement 04/02/2020

Date of completion March 2020

Estt cost 5.00 lakhs

Completion cost 4.00 lakhs (Expdt under CD&Pyt)

No of people Benefitted 150

Commence of Stakeholders Much Needed/ Quality Work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 531: PICTORIAL COMPENDIUM

526

Date of Start:- 21-12-2019

Date of Completion:- 11-03-2020

Estimated Cost:- Rs. 3.50 lacs

Completion cost of the project:- Rs.2.45 (Expd.CD Pyt)

Total No. people benefitted:- 50

Comments of the Stake holders:- Much needed

Date of Start:- 30-12-2019

Date of Completion:- 11-03-2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs.3.50 (Expd.CD Pyt)

Total No. people benefitted:- 150

Comments of the Stake holders:- Much needed &Quality Work

CONSTRUCTION OF LANE DRAIN FROM SHAM LAL HOUSE MOHALLA JATTAN TO PRABH DAYAL HOUSE AT LAHORI CHAK in Convergence with MGNREGA. .

CONSTRUCTION OF P/WORK NEAR THE HOUSE OF MUSHTAQ AHMED in Convergence with MGNREGA.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 532: PICTORIAL COMPENDIUM

527

Date of Start:- 15-01-2020

Date of Completion:- March 2020

Estimated Cost:- Rs. 2.00 lacs

Completion cost of the project:- Rs.0.75 lac

Total No. people benefitted:- 35

Comments of the Stake holders:- Much needed

Date of Start:- 16-01-2020

Date of Completion:- March 2020

Estimated Cost:- Rs. 3.00 lacs

Completion cost of the project:- Rs.2.10

Total No. people benefitted:- 70

Comments of the Stake holders:- Much needed

& quality work

Balance Work of Cowshed at Gurha Brahmana

Panchayat:- Gurha Brahmana

Constt. of L/d from main road to H/of Sanjay Sharma at Daskal Mandir near Mahindra Finance Company

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 533: PICTORIAL COMPENDIUM

528

Date of Start:- 21.01.2020

Date of Completion:- March 2020

Estimated Cost:- Rs. 3.50 lacs

Completion cost of the project:- Rs.1.23

Total No. people benefitted:- 75

Comments of the Stake holders:- Much needed

Date of Start:- 07.02.2020

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs.1.75

Total No. people benefitted:- 120

Comments of the Stake holders:- Much needed

Constt. of L/D Mandir Chowk to house of Saran Singh in convergence with MGNREGA

Construction of Culvert near Tube well in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 534: PICTORIAL COMPENDIUM

529

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 4.50 lacs

Completion cost of the project:- Rs.3.00

Total No. people benefitted:- 475

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 4.00 lacs

Completion cost of the project:- Rs.2.80

Total No. people benefitted:- 562

Comments of the Stake holders:- Much needed

Construction of Lane/Drain from H/o Ram Lal to H/o Kulbushan Kumar Mohalla Bhagtan in convergence with MGNREGA

Construction of Lane from Link road Batera to House Sardar Gurdyal Singh & Others in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 535: PICTORIAL COMPENDIUM

530

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 3.00 lacs

Completion cost of the project:- Rs.2.00

Total No. people benefitted:- 580

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 7.00 lacs

Completion cost of the project:- Rs.5.00

Total No. people benefitted:- 580

Comments of the Stake holders:- Much needed

Construction of T/Road at W No. 1 Mohalla Gurudev and others in convergence with MGNREGA

Construction of Plateform at Graint in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 536: PICTORIAL COMPENDIUM

531

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 14.00 lacs

Completion cost of the project:- Rs.9.00

Total No. people benefitted:- 590

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 6.50 lacs

Completion cost of the project:- Rs.4.50

Total No. people benefitted:- 675

Comments of the Stake holders:- Much needed

Constt. of Link Road from Moh. Salyaran to Moh. Tarkhan in convergence with MGNREGA

Construction of Approach Road from Link Road Batyara to Moh. Bhagtan in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 537: PICTORIAL COMPENDIUM

532

Date of Start:- 2019-20

Date of Completion:- 24-03-2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs.4.00

Total No. people benefitted:- 100-150

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.50 lacs

Completion cost of the project:- Rs.3.85

Total No. people benefitted:- 150-200

Comments of the Stake holders:- Much needed

Const of C-path from NH to Hanuman Mandir Suketar W No.06 in convergence with MGNREGA

Const of Tr road and other allied works from PWD Road to moh Baroon with different links at W No.08 in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 538: PICTORIAL COMPENDIUM

533

Date of Start:- 13-12-2019

Date of Completion:- 24-03-2020

Estimated Cost:- Rs. 2.98 lacs

Completion cost of the project:- Rs.2.09

Total No. people benefitted:- 50-75

Comments of the Stake holders:- Much needed

Date of Start:- 13-12-2019

Date of Completion:- 21-03-2020

Estimated Cost:- Rs. 9.50 lacs

Completion cost of the project:- Rs.5.78

Total No. people benefitted:- 250-300

Comments of the Stake holders:- Much needed

Improvement of Tr road from main road to mohalla Bhagat Balarn Phase II in convergence with MGNREGA

Const of lane from tara singh house through Banto devi to house of kaka ram at Zero Morh village Panyal in convergence with MGNREGA Panchayat:- Jajjar Kotli,Block Dansal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 539: PICTORIAL COMPENDIUM

534

Date of Start:- 2019-20

Date of Completion:- 24-03-2020

Estimated Cost:- Rs. 10.00 lacs

Completion cost of the project:- Rs.7.00

Total No. people benefitted:- 400-500

Comments of the Stake holders:- Much needed

Date of Start:- 13-12-2019

Date of Completion:- 21-03-2020

Estimated Cost:- Rs. 4.20 lacs

Completion cost of the project:- Rs.2.94

Total No. people benefitted:- 75-100

Comments of the Stake holders:- Much needed

Const of lane drain from house of Som to Land of Smt. Banti Devi at Zero Morh in convergence with MGNREGA

Const of Tr road and other allied works from mohalla saral and onwards with different links in w no.7 in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 540: PICTORIAL COMPENDIUM

535

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 2.00 lacs

Completion cost of the project:- Rs.0.70

Total No. people benefitted:- 30

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 2.00 lacs

Completion cost of the project:- Rs.0.70

Total No. people benefitted:- 60

Comments of the Stake holders:- Much needed

Const of Culvert in W No.4 in convergence with MGNREGAConst of Culvert in W No.7 in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 541: PICTORIAL COMPENDIUM

536

Date of Start:- 12-01-2020

Date of Completion:- 14-03-2020

Estimated Cost:- Rs. 4.50 lacs

Completion cost of the project:- Rs.4.00

Total No. people benefitted:- 45

Comments of the Stake holders:- Much needed

Date of Start:- 12-01-2020

Date of Completion:- 14-03-2020

Estimated Cost:- Rs. 7.50 lacs

Completion cost of the project:- Rs.5.25

Total No. people benefitted:- 77

Comments of the Stake holders:- Much needed

Const of Approach Road with Drain at Nandni Lower Pyt Kirpalpur in convergence with MGNREGA

CONSTT OF T/ ROAD FROM SATHAR TO NARDI in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 542: PICTORIAL COMPENDIUM

537

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 15.00 lacs

Completion cost of the project:- Rs.10.50

Total No. people benefitted:- 250

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 4.50 lacs

Completion cost of the project:- Rs.3.15

Total No. people benefitted:- 30

Comments of the Stake holders:- Much needed

Constt of Lane at Mawa in convergence with MGNREGA

Panchayat:- Mathwar, Block Mathwar

Constt. Of Approach Road and Allied works from Gorda to Kalkani Lassu Part 1 in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 543: PICTORIAL COMPENDIUM

538

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs. 4.00 lacs

Total No. people benefitted:- 100

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 4.00 lacs

Completion cost of the project:- Rs.3.00

Total No. people benefitted:- 30

Comments of the Stake holders:- Much needed

Constt. Of Lane and P/Work Moh. Chunka wala & others Rabta & Others in convergence with MGNREGA

Constt. Of T/Road at Kherri Moh. Rabta in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 544: PICTORIAL COMPENDIUM

539

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs. 4.00 lacs

Total No. people benefitted:- 50

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 9.80 lacs

Completion cost of the project:- Rs. 6.00 lacs

Total No. people benefitted:- 50

Comments of the Stake holders:- Much needed

Constt. Of T/Road and P/Work Moh Bisho Mohd & Others at Dhano in convergence with MGNREGA

Constt. Of P/Work Moh. Chunka wala & Others Rabta Bhagani in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 545: PICTORIAL COMPENDIUM

540

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.50 lacs

Completion cost of the project:- Rs. 3.85 lacs

Total No. people benefitted:- 1000

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.50 lacs

Completion cost of the project:- Rs. 3.85 lacs

Total No. people benefitted:- 350

Comments of the Stake holders:- Much needed

Constt. Of Sara Nallah near Sarah Bridge in convergence with MGNREGA APPROACH ROAD AT BAN PANJGRIAN PANCHAYAT NADORE

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 546: PICTORIAL COMPENDIUM

541

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 8.00 lacs

Completion cost of the project:- Rs. 5.60 lacs

Total No. people benefitted:- 690

Comments of the Stake holders:- Duarble asset

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 3.00 lacs

Completion cost of the project:- Rs. 2.10 lacs

Total No. people benefitted:- 330

Comments of the Stake holders:- Durable asset created

Constt. Of lane drain Mohalla Mara in convergence with MGNREGAConstt of culvert at Pargalta in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 547: PICTORIAL COMPENDIUM

542

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs. 4.00 lacs

Total No. people benefitted:- 350

Comments of the Stake holders:- Durable asset created.

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs. 4.00 lacs

Total No. people benefitted:- 550

Comments of the Stake holders:- Durable asset created

Const. of link road /allied work main road to Dumi to Moh ST W No 9 in convergence with MGNREGA

Upgradtion of road /allied work from Nuba to Primary School Kwara W No 3 in convergence with MGNREGA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 548: PICTORIAL COMPENDIUM

543

Date of Start:- 13-12-2019

Date of Completion:- 25-2-2020

Estimated Cost:- Rs. 4.69 lacs

Completion cost of the project:- Rs. 3.28 lacs

Total No. people benefitted:- 150

Comments of the Stake holders: Much needed by the people

Date of Start:- 1-12-2019

Date of Completion:- 25-03-2020

Estimated Cost:- Rs. 4.60 lacs

Completion cost of the project:- Rs. 2.84 lacs

Total No. people benefitted:- 200

Comments of the Stake holders:- Much needed

Constt. of Lane filling edge wall of road near Peer babaBlock :- Satwari

Constt. of L/D from Govt. Primary School Camp Rathana to onwards. Pyt. Rathana Block R S Pura

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 549: PICTORIAL COMPENDIUM

544

Date of Start:- 1-12-2019

Date of Completion:- 25-03-2020

Estimated Cost:- Rs. 7.50 lacs

Completion cost of the project:- Rs. 4.54 lacs

Total No. people benefitted:- 350

Comments of the Stake holders:- Much needed

Date of Start:- 1-12-20019

Date of Completion:- 25-03-2020

Estimated Cost:- Rs. 9.50 lacs

Completion cost of the project:- Rs. 6.65 lacs

Total No. people benefitted:- 300

Comments of the Stake holders:- Much needed

Constt.of approach road to Nowabad, Pyt. Malik MarketBlock :- Satwari

Constt. of P/wall at Nakki Nallah near land of Naseem and others of road near Peer baba

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 550: PICTORIAL COMPENDIUM

545

Date of Start:- 1-12-2019

Date of Completion:- March 2020

Estimated Cost:- Rs. 3.00 lacs

Completion cost of the project:- Rs. 0.78 lacs

Total No. people benefitted:- 300

Comments of the Stake holders:- Much needed

Date of Start:- 20-12-2019

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Total No. people benefitted:- 300

Comments of the Stake holders:- Much needed

Constt.of lane drain at Sunjwan near H/o Imran & others, Pyt. Malik Market

Constt.of lane drain at Vidhata Nagar lane No. 3 Bathindi from link road to house of Ab. Rasheed and others

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 551: PICTORIAL COMPENDIUM

546

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs. 1.50 lacs

Total No. people benefitted:- 300

Comments of the Stake holders:- Much needed

Date of Start:- 2019-20

Date of Completion:- March 2020

Estimated Cost:- Rs. 5.00 lacs

Completion cost of the project:- Rs. 3.50 lacs

Total No. people benefitted:- 300

Comments of the Stake holders:- Much needed

Constt.of lane drain near DevSthan Mula ChakPanchayat:-Mula Chak Block SuchetgarhConstt.of lane drain at New DewangarhBlock :- Suchetgarh

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 552: PICTORIAL COMPENDIUM

547

Date of commencement:- 01.12.2019

Date of Completion:- 31.03.2020

Estimated Cost:- 2.00 lacs

Completion Cost (Expd.):- 0.98 lacs

No of people benefited:- 20

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed Work

Date of commencement:- 01.12.2019

Date of Completion:- 31.03.2020

Estimated Cost:- 2.00 lacs

Completion Cost (Expd.):- 1.00 lacs

No of people benefited:- 20

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed Work

Name of Work:-Constt. Of protection work at w.no.2 from the land of Om Parkash, Hans Raj near the culvert at Devo Chak

Name of Work:-Constt. Of protection work at Gara near the land of Baijnatg

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 553: PICTORIAL COMPENDIUM

548

Date of commencement:- 01.12.2019

Date of Completion 31.03.2020

Estimated Cost:- 4.00 lacs

Completion Cost:

No of people benefited:- 150

Comments of stakeholders:- Demand of Public

Much needed/quality work:-

Date of commencement:- 01-01-2020

Date of Completion:- 31-03-2020

Estimated Cost:- 3.00 lacs

Completion Cost:-

No. of people benifitted:-

Comments of stakeholders:- Demand of General Public/Farmers

Much needed/quality work:- Much needed work

Constt. Of L/D Tharkalwal w.no.1 main road to h/o Satish Kumar and other

Constt. Of Lane from link road to Nag Devta Sathan at Chaknathal w.no.1

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 554: PICTORIAL COMPENDIUM

549

Date of commencement:- 11.12.2019

Date of Completion:- 22.03.2020

Estimated Cost:- 2.00 lacs

Completion Cost :- 1.01 Lacs

No of people benefited:- 40

Comments of stakeholders:- Demand of General Public

Much needed/quality work:- Good Work

Date of commencement:- 01.12.2019

Date of Completion:- 31.03.2020

Estimated Cost:- 8.00 lacs

Completion Cost:-

No of people benefited:- 200

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed Work

Constt. Of T/R from GMS Dhaloti to Jasrota TempleConstt. Of well at Mohalla Anjala near the land of Dev Raj Sharma, Naresh Kumar and others, Block Dingaamb.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 555: PICTORIAL COMPENDIUM

550

Date of commencement:- 01-10-2019

Date of Completion 31-03-2020

Estimated Cost:- 5.00 lacs

Completion Cost :- 3.00 Lacs

No of people benefited:- 125

Comments of stakeholders:- Demand of General Public/ Farmers

Much needed/quality work:- Much needed work

Date of commencement:- 01-10-2019

Date of Completion:- 31-03-2020

Estimated Cost:- 3.00 lacs

Completion Cost :- 1.09 lacs

No of people benefited:- 50

Comments of stakeholders:- Demand of General Public/ Farmers

Much needed/quality work:- Much needed work

Constt. Of Toe wall near Bua di Bai at Changrah to the land of Paras Ram, Bali Ram and others

Lane with protection from middle school Lakhnote to the h/o Ramesh Chand at village Lakhnote

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 556: PICTORIAL COMPENDIUM

551

Date of commencement:- 01-10-2019

Date of Completion 31-03-2020

Estimated Cost:- 19.00 lacs

Completion Cost:- 5.03 lacs

No of people benefited:- 500

Comments of stakeholders:- Demand of General Public/ Farmers

Much needed/quality work:- Much needed work

Date of commencement:- 31.12.2018

Date of Completion 31.03.2020

Estimated Cost:- 8.00 lacs

Completion Cost:-

No of people benefited:- 500

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed work

Constt. Of Road by way cutting, filling,culvert and side wall from link road Gaiterwan to KharoteConstt. Of Vented causeway culvert on Dhambra at lower Jakhbar

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 557: PICTORIAL COMPENDIUM

552

Date of commencement: - 25.10.2019

Date of Completion:- 31.03.2020

Estimated Cost:- 8.00 lacs

Completion Cost:-

No of people benefited:- 25

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Good work

Date of commencement:- 01.01.2020

Date of Completion:- 31.03.2020

Estimated Cost:- 6.00 lacs

Comp;etion Cost:-

No of people benefited:- 100

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed Work

Constt. Of Lane from road side at village Ram Nagar to Keerian near electric station upto Durga Mandhir and from the h/o Dukara Nath upto the h/o retired SI Satpaul Sharma Block Keerain Gandiyal

Constt. Of p/work near eidgah in the land of mubharkh ali pyt. Prehta Block Basohli

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 558: PICTORIAL COMPENDIUM

553

Date of commencement:- 25.10.2019

Date of Completion:- 31.03.2020

Estimated Cost:- 5.00 lacs

Completion Cost:- 1.50 lacs

No of people benefited:- 100

Comments of stakeholders:- Demand of Public

Much needed/quality work:- Good Quality

Date of commencement:- 01.01.2020

Date of Completion:- 31.03.2020

Estimated Cost:- 5.00 lacs

Completion Cost:-

No of people benefited:- 400

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed work

Constt. Of T/R from Bakhta to Guraha Suraj Forelain West-A Block Barnoti

Constt. Of T/R from Kathan to Dhadu via Moh SC Pyt Dhar Mahanpur Block Dhar Mahanpur

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 559: PICTORIAL COMPENDIUM

554

Date of commencement:- 31.12.2018

Date of Completion 31.03.2019

Estimated Cost:- 16.50 lacs

Completion Cost :- 9.00 lacs

No of people benefited:- 500

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Good Quality

Date of commencement:- 01.12.2018

Date of Completion:- 31.03.2019

Estimated Cost:- 0.70 lacs

Completion Cost:-

No of people benefited:- 30

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed Work

Constt. Of Culvert nera the h/o Tarsem Lal and others at village Gadyal Block MarheenBalance Work of Play Field at Chadwa

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 560: PICTORIAL COMPENDIUM

555

Date of commencement:- 01.01.2018

Date of Completion:- 31.03.2019

Estimated Cost:- 2.98 lacs

Completion Cost:-

No of people benefited:- 400

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed work

Date of commencement:- 01.12.2018

Date of Completion:- 31.03.2019

Estimated Cost:- 0.83 lacs

Completion Cost:-

No of people benefited:- 200

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Much needed Work

Constt. Of lane from the h/o Parveen Kumar to the h/o Gain Chand at Mukhandpur Camp block MarheenPlay Ground at Seswan Block Marheen

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 561: PICTORIAL COMPENDIUM

556

Date of commencement:- 31.12.2018

Date of Completion 31.03.2019

Estimated Cost:- 5.95 lacs

Completion Cost :- 2.98 lacs

No of people benefited:- 210

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Good Quality

Date of commencement:- 01-10-2019

Date of Completion 31-03-2020

Estimated Cost:- 8.00 lacs

Completion Cost:-

No of people benefited:- 50

Comments of stakeholders:- Demand of General Public/ Farmers

Much needed/quality work:- Good Qaulity

Constt. Of prott. Wall of kool at Baba Pachera near land of Nazir Ahmed and others pyt. Najote Block Duggain CDPyt+MGNREGAConstt. Of Foot Bridge at Sharad

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 562: PICTORIAL COMPENDIUM

557

Date of commencement:- 25-10-2019

Date of Completion:- 31-03-2020

Estimated Cost:- 3.00 lacs

No of people benefited:- 60

Completion Cost:-

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Good Quality

Date of commencement:- 01-12-2019

Date of Completion:- 31-03-2020

Estimated Cost:- 6.00 lacs

Completion Cost:-

No of people benefited:- 50

Comments of stakeholders:- Demand of general public

Much needed/quality work:- Good Quality

Date of commencement:- 03-03-2019

Date of Completion: 22-03-2019

Estimated Cost:- 4.00 lacs

Completion Cost :- 1.40 lacs

No of people benefited:- 230

Comments of stakeholders:- Demand of Public

Much needed/quality work:- Good Work

Lane from greed to fathi and Lalhal Pyt Dhagger Block Duggan

Lane/drain from Bowli to Mohra Lower Howal. W.No.9, Block Lohai Malhar

Constt. Of lane from Shunker Din h/o Bowali Badhyal.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 563: PICTORIAL COMPENDIUM

558

Date of commencement:- 08-02-2020

Date of completion:- 31-03-2020

Estimated Cost:- 2.40 Lacs

Completion Cost : 0.96lacs

No. of people benefited:- 427

Comments of stakeholders:- After completion of works people are thankful to RDD.

Date of commencement:- 02-01-2020

Date of completion:- 31-03-2020

Estimated Cost:- 2.50 Lacs

Completion Cost : 1.00 lacs

No. of people benefited:- 189

Comments of stakeholders:- Public of the area are using the ground as Eidgah besides children also use the ground for playing.

Dev. Of Eid Gah at Daller Pyt. Upper Chatroo Block Inderwal District Kishtwar.

Dev of ground Eid gah at Patimhala W.No.5 Pyt. Palmar Upper Block Palmar District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 564: PICTORIAL COMPENDIUM

559

Date of commencement:- 01-03-2020

Date of completion:- 24-03-2020

Estimated Cost:- 2.50 Lacs

Completion Cost: 1.00 lacs

No. of people benefited:- 200

Comments of stakeholders:- People of the area are very thankful to RDD.

Date of commencement:- 02-01-2020

Date of completion:- 30-03-2020

Estimated Cost:- 2.25 Lacs

Completion Cost: 0.90 lacs

No. of people benefited:- 100

Comments of stakeholders:- After completion of work public also demands for tile path to connecting the ground.

Development of ground in Passerkot Pyt. Inderwal-A Block Inderwal District Kishtwar

Dev. Constt of B/room near Masjid Sharief Kalamosie Pyt. Inderwal-B Block Inderwal District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 565: PICTORIAL COMPENDIUM

560

Date of commencement:- 02-01-2020

Date of completion:- 31-03-2020

Estimated Cost:- 7.20 Lacs

Completion Cost:

No. of people benefited:- 150

Comments of stakeholders:- Building is being used for Pyt Ghar & other Community functions.

Date of commencement:- 02-01-2020

Date of completion:- 31-03-2020

Estimated Cost:- 5.80 Lacs

Completion Cost:-

No. of people benefited:- 250

Comments of stakeholders:- Ground is used by the public & demand of tile work has also been raised.

Dev. Of ground at Varun Devta Mandir Pyt. Filler-A Block thakraie District Kishtwar.

Repair/Renovation of Community building at Pochhal-A2, Pyt. Pochhal-A2 Block Kishtwar District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 566: PICTORIAL COMPENDIUM

561

Date of commencement:- 25-02-2020

Date of completion:- 23-03-2020

Estimated Cost:- 4.69 Lacs

Completion Cost:-

No. of people benefited:- 190

Comments of stakeholders:- Public has appreciated the work of RDD.

Date of commencement:- 02-01-2020

Date of completion:- 31-03-2020

Estimated Cost:- 1.83 Lacs

Completion Cost:-

No. of people benefited:- 231

Comments of stakeholders:- Public of the are is thankful to Rural Dev. Deptt. For the sustainable work.

Const. Shed at Galigad Near Nallaha Pyt. Trigam-C Block Trigam District Kishtwar.

Const. of P/Wall Shah Mohalla Graveyard NHO Azad Hussian Rather Pyt. Filler-A Block thakraie District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 567: PICTORIAL COMPENDIUM

562

Date of commencement:- 17-01-2020

Date of completion:- 31-03-2020

Estimated Cost:- 2.00 Lacs

Completion Cost:-

No. of people benefited:- 1200

Comments of stakeholders:- The work is appreciated by all quarters of the public.

Date of commencement:- 11-03-2020

Date of completion:- 31-03-2020

Estimated Cost:- 4.00 Lacs

Completion Cost:-

No. of people benefited:- 350

Comments of stakeholders:- Public of this area are very happy and appreciates for the good quality work.

Const. of Foot Path From the h/o Haroon Zargar to Paninaab in village Bugrana Pyt. Bugrana Block Drabshalla District Kishtwar.

Const. of Passenger Shed at Bakura Pyt. Shandri Block Drabshalla District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 568: PICTORIAL COMPENDIUM

563

Date of commencement:- 11-12-2019

Date of completion:- 31-03-2020

Estimated Cost:- 2.00 Lacs

Completion Cost:-

No. of people benefited:- 150

Comments of stakeholders:- sanitary complex is proving beneficial for the public/madrasa residents.

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 2.00 Lacs

Completion Cost:-

No. of people benefited:- 135

Comments of stakeholders:- Public of the area is quite satisfied with the work.

Const. of Sanitary Complex at Kutal Pyt. Hiloor Block Drabshalla District Kishtwar.

Const. of Sanitary Complex Near Madarssa at Bhagran Pyt. Karool-C Block Drabshalla District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 569: PICTORIAL COMPENDIUM

564

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 1.25 Lacs

Completion Cost:-

No. of people benefited:- 135

Comments of stakeholders:- Public of the area is quite satisfied with the work.

Date of commencement:- 02-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 1.00 Lacs

Completion Cost:-

No. of people benefited:- 35

Comments of stakeholders:- people of the area demands for its plaster.

Const. of Inlet Tank at Chamdal WSS Balgran Pyt. Balgran Block Drabshalla District Kishtwar.

Const. of Sanitary Complex at Khori Pyt. Khori Block Drabshalla District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 570: PICTORIAL COMPENDIUM

565

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 2.00 Lacs

Completion Cost:-

No. of people benefited:- 104

Comments of stakeholders:- Public of the area is quite satisfied with the work.

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 2.50 Lacs

Completion Cost:-

No. of people benefited:- 85

Comments of stakeholders:- people of the area has appreciated the work.

Const. Dev. Of Ground in Pyt. Bhata Block Mughalmaidan District Kishtwar.

Const. of Sanitary Complex at Karool-B Pyt. Karool-B Block Drabshalla District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 571: PICTORIAL COMPENDIUM

566

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 2.50 Lacs

No. of people benefited:- 70

Comments of stakeholders:- Works has been appreciated by the public of area.

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 3.75 Lacs

No. of people benefited:- 75

Comments of stakeholders:- Student and elderly population have appreciated the construction of playground.

Const. Dev. Of Ground at Mehjar Kuchhal-B Block Mughalmaidan District Kishtwar.

Const. of P/Work & Sanitary Complex Near Masjid Abrar Kuchhal-A Block Mughalmaidan District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 572: PICTORIAL COMPENDIUM

567

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 3.50 Lacs

Completion Cost:-

No. of people benefited:- 75

Comments of stakeholders:- Path is proving beneficial for the public during rainy season.

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 0.75 Lacs

Completion Cost:-

No. of people benefited:- 12

Comments of stakeholders:- Bowli/Pond will be used for agriculture and drinking water for livestock.

Dev. Of Bowli at Chakroon Pyt. Binoon Block Bunjwah District Kishtwar.

Const. Pacca Path Banjora Pyt.Moori Block Bunjwah District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 573: PICTORIAL COMPENDIUM

568

Date of commencement:- 13-03-2020

Date of completion:- 28-03-2020

Estimated Cost:- 0.75 Lacs

Completion Cost

No. of people benefited:- 05

Comments of stakeholders:- rainwater is used as an alternative supply during drought which help to maintain greenery.

Date of commencement:- 01-03-2020

Date of completion:- 24-03-2020

Estimated Cost:- 2.60 Lacs

Completion Cost : 1.04 lacs

No. of people benefited:- 174

Comments of stakeholders:- During the period of Yatra, Shed will be beneficial for devotees & public of area.

Const. of Yatri Shed at Chitto at Guri Phat Pyt Tiyari Block Padder District Kishtwar.

Const. of Inlet Tank at Lalli Pyt. Nali Block Bunjwah District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 574: PICTORIAL COMPENDIUM

569

Date of commencement:- 01-03-2020

Date of completion:- 24-03-2020

Estimated Cost:- 2.60 Lacs

Completion Cost : 1.04 lacs

No. of people benefited:- 208

Comments of stakeholders:- During the period of Yatra, Shed will be beneficial for devotees & public of area.

Date of commencement:- 01-03-2020

Date of completion:- 24-03-2020

Estimated Cost:- 2.50 Lacs

Completion Cost:-

No. of people benefited:- Official Staff

Comments of stakeholders:- After renovation of CIC Building accommodation of office of Block Development officer Drabshalla has been strengthen.

Repair/Renovation of CIC Building in Pyt. Badhat Block Drabshalla District Kishtwar.

Const. of Yatri Shed Near School mata mandir Pyt Atholi Block Padder District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 575: PICTORIAL COMPENDIUM

570

Date of start: 2019-20

Date of completion: March 2020

Approved Cost: ₹ 5.40 lakh

Funds released (CD&Pyt) : ₹ 3.70 lakh

Expenditure (CD&pyt) : ₹ 3.70lakh

No. of souls benefitted: 960

Comments of stakeholders: The bridge was persistent demand

of the habitation

Date of start: 28-11-2019

Date of completion: 15.03.2020

Approved Cost: ₹ 3.00 lakh

Funds released (CD&Pyt ) : ₹ 2.50 lakh

Final Expenditure (CD&Pyt) : ₹ 2.50 lakh

No. of souls benefitted: 210

Comments of stakeholders: Saves the land from soil erosion and floods.

Const. of P/Bund Nandkhull at Shangus (412)Const. of Xing Bawooder road at Shirpora (386)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 576: PICTORIAL COMPENDIUM

571

Date of start: 25-11-2019

Date of completion: 18-03-2020

Approved Cost: ₹ 4.50 lakh

Funds released (CD&Pyt) : ₹ 3.00 lakh

Expenditure (CD&pyt) : ₹ 3.00lakh

No. of souls benefitted: 850

Comments of stakeholders: The Xing helps the people for agricultural activities .

Date of start: 02-01-2020

Date of completion: 29-01-2020

Approved Cost: ₹ 2.99 lakh

Funds released (CD&Pyt) :₹ 2.00 Lakh

Expenditure (CD&pyt) : ₹ 2.00 Lakh

No. of souls benefitted: 340

Comments of stakeholders: The road facilitates the farmers for agriculture purpose.

Const. of Link raod from Tangoa to Banjar area land of Mohd MaqsoodTantry & others (394)Const. of Xing Dantrin at Tengbal Halqa Kakran. (391)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 577: PICTORIAL COMPENDIUM

572

Date of start: 20-04-2019

Date of completion: 26-06-2019

Approved Cost: ₹ 1.00 lakh

Funds released (CD&Pyt) :₹ 0.70 Lakh

Expenditure (CD&pyt) : ₹ 0.70 Lakh

No. of souls benefitted: 205

Comments of stakeholders: Facilitates the rural connectivity all weather.

Date of start: 20-12-2019

Date of completion: 06-02-2020

Approved Cost: ₹ 2.92 lakh

Funds released (CD&Pyt) :₹ 2.00 Lakh

Expenditure (CD&pyt) : ₹ 2.00 Lakh

No. of souls benefitted: 510

Comments of stakeholders: Safeguards the road form the follow of water .

Const of L.wall on Gam Khul road at Chelan (405). Const of tile lane from Jamia Masjid to Ab Majeed Chopan, Ab Hamid Nengroo and others at Hanger (380)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 578: PICTORIAL COMPENDIUM

573

Date of start: 18-12-2019

Date of completion: 05-01-2020

Approved Cost: ₹ 3.00 lakh

Funds released (CD&Pyt) :₹ 2.50 Lakh

Expenditure (CD&pyt) : ₹ 2.50 Lakh

No. of souls benefitted: 430

Comments of stakeholders: Helps for soil erosion and follow of water.

Date of start: 15-02-2020

Date of completion: 10-03-2020

Approved Cost: ₹ 3.00 lakh

Funds released (CD&Pyt) :₹ 2.50 Lakh

Expenditure (CD&pyt) : ₹ 2.50 Lakh

No. of souls benefitted: 730

Comments of stakeholders: Prevents the erosion and floods of the agriculture land.

Const. of P/Bund NLO Ab Hamid Shiekh at New Bye-Pass Laroo (414)Const of P/Bund Gamood at Kharvate (411).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 579: PICTORIAL COMPENDIUM

574

Date of start: 15-02-2020

Date of completion: 18-03-2020

Approved Cost: ₹ 3.50 lakh

Funds released (CD&Pyt) :₹ 2.50 Lakh

Expenditure (CD&pyt) : ₹ 2.50 Lakh

No. of souls benefitted: 720

Comments of stakeholders: Facilitates all weather connectivity in the habitation.

Date of start: 15-12-2019

Date of completion: 31-12-2019

Approved Cost: ₹ 3.00 lakh

Funds released (CD&Pyt) :₹ 1.72 Lakh

Expenditure (CD&pyt) : ₹ 1.72 Lakh

No. of souls benefitted: 1230

Comments of stakeholders: Facilitates the irrigation facility in the vast agriculture land.

Const. of Irrigation Channel NHO Mohd Ramzan Bhat & others at Dharshan. Srandoo (389).Const. tile lane at K.Check at Manigam (399)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 580: PICTORIAL COMPENDIUM

575

Date of start: 15-02-2020

Date of completion: 05-03-2020

Approved Cost: ₹ 6.00 lakh

Funds released (CD&Pyt) :₹ 4.00 Lakh

Expenditure (CD&pyt) : ₹ 4.00 Lakh

No. of souls benefitted: 1108

Comments of stakeholders: Helps the people in crossing the Nallah.

Date of start: 18-11-2019

Date of completion: 05-12-2019

Approved Cost: ₹ 2.99 lakh

Funds released (CD&Pyt) :₹ 2.50 Lakh

Expenditure (CD&pyt) : ₹ 2.50 Lakh

No. of souls benefitted: 630

Comments of stakeholders: Increased the irrigation facility for vast land.

Const of Irrigation NLO Ab Aziz Dar and others at Fatilangan (409)Const. of Xing Nallah Paphadi with R/wall at Banghall (400)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 581: PICTORIAL COMPENDIUM

576

Date of start: 15-02-2020

Date of completion: 10-03-2020

Approved Cost: ₹ 2.80 lakh

Funds released (CD&Pyt) :₹ 2.30 Lakh

Expenditure (CD&pyt) : ₹ 2.30 Lakh

No. of souls benefitted: 520

Comments of stakeholders: Facilitates all whether connectivity in the habitation.

Date of start: 15-11-2019

Date of completion: 20-12-2019

Approved Cost: ₹ 2.80 lakh

Funds released (CD&Pyt) :₹ 1.80 Lakh

Expenditure (CD&pyt) : ₹ 1.80 Lakh

No. of souls benefitted: 670

Comments of stakeholders: Facilitates the connectivity and drainage in the village .

Const. of Link road with drain from main road to Marg Sarbuji at Wanigund Redwani side (388).

Const of Lane / drain near house of Ghulam Mohideen Ganie S/o. Ab Wahab Ganie R/o. Banghall (407)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 582: PICTORIAL COMPENDIUM

577

Date of start: 10-11-2019

Date of completion: 16-12-2019

Approved Cost: ₹ 6.00 lakh

Funds released (CD&Pyt) :₹ 2.00 Lakh

Expenditure (CD&pyt) : ₹ 4.00 Lakh

No. of souls benefitted: 1130

Comments of stakeholders: Facilitates the connectivity between Villages Khrewan and Mah

Date of start: 12-11-2019

Date of completion: 05-12-2019

Approved Cost: ₹ 2.99 lakh

Funds released (CD&Pyt) :₹ 2.50 Lakh

Expenditure (CD&pyt) : ₹ 2.50 Lakh

No. of souls benefitted: 330

Comments of stakeholders: Protects the land from soil erosion and floods.

Const. of P/bund NLO Gulzar Ahmad Rather & others at Arndal Halqa Srandoo (408).Const. of Link road with Xing Khrewan to Mahth (387)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 583: PICTORIAL COMPENDIUM

578

Date of start: 15-11-2019

Date of completion: 30-12-2019

Approved Cost: ₹ 3.50 lakh

Funds released (CD&Pyt) :₹ 2.50Lakh

Expenditure (CD&pyt) : ₹ 2.50 Lakh

No. of souls benefitted: 430

Comments of stakeholders: Facilitates all wether connectivity in the habitation.

Date of start: 05-05-2019

Date of completion: 18-03-2020

Approved Cost: ₹ 2.50 lakh

Funds released (CD&Pyt) :₹ 1.85 Lakh

Expenditure (CD&pyt) : ₹ 1.85 Lakh

No. of souls benefitted: 230

Comments of stakeholders: Protects erosion and floods.

Const. R/wall Bund Shali Warida Nallah at Lammer (385).Const of tile lane at Graveyard at K Check Manigam (402)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 584: PICTORIAL COMPENDIUM

579

Date of start: 05-05-2019

Date of completion: 18-03-2020

Approved Cost: ₹ 5.20 lakh

Funds released (CD&Pyt) :₹ 3.50 Lakh

Expenditure (CD&pyt) : ₹ 3.50 Lakh

No. of souls benefitted: 1060

Comments of stakeholders: Facilitates the safe crossing of the Nallah.

Date of start: 05-05-2019

Date of completion: 18-03-2020

Approved Cost: ₹ 5.40 lakh

Funds released (CD&Pyt) :₹ 2.00 Lakh

Expenditure (CD&pyt) : ₹ 2.00 Lakh

No. of souls benefitted: 840

Comments of stakeholders: Facilitates the connectivity for agricultural activities.

Const. of road from Kanipora towards Mahnoor Dal at Kanipora (398).

Const. Tractor Xing NLO Mushtaq Ahmad Bhat at Herdal Adijan Card Ladgoo (390).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 585: PICTORIAL COMPENDIUM

580

Date of start: 29-11-2019

Date of completion: 13-01-2020

Approved Cost: ₹ 2.99 lakh

Funds released (CD&Pyt) :₹ 2.00 Lakh

Expenditure (CD&pyt) : ₹ 2.00 Lakh

No. of souls benefitted: 720

Comments of stakeholders: Facilitates the irrigation facilities for vast land.

Date of start: 13-12-2019

Date of completion: 30-03-2020

Approved Cost: ₹ 7.00 lakh

Funds released (CD&Pyt) :₹ 4.00 Lakh

Expenditure (CD&pyt) : ₹ 4.00 Lakh

No. of souls benefitted: 1030

Comments of stakeholders: Facilitates the connectivity between Villages Kanipora and Nanibugh.

Const. of Link road from Kanipora to Nanibugh Halqa Laroo (393)Const. of drian / Irrigation channel NLO Bashir Ahmad Wani and others at Chelan (397).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 586: PICTORIAL COMPENDIUM

581

Date of start: 06-02-2020

Date of completion: 07-03-2020

Approved Cost: ₹ 2.50 lakh

Funds released (CD&Pyt) :₹ 1.70 Lakh

Expenditure (CD&pyt) : ₹ 1.70 Lakh

No. of souls benefitted: 610

Comments of stakeholders: Facilitates the connectivity in the habitation.

Date of start: 08-11-2019

Date of completion: 05-12-2020

Approved Cost: ₹ 1.50 lakh

Funds released (CD&Pyt) :₹ 1.00 Lakh

Expenditure (CD&pyt) : ₹ 1.00 Lakh

No. of souls benefitted: 450

Comments of stakeholders: Facilitates irrigation facilities for vast land

Const. of Irrigation channel at Checki Hanjan (381)Const. of road with R/wall from Holy faith Public school to HO Shabir Ahmad Bhat at Laroo (395).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 587: PICTORIAL COMPENDIUM

582

Date of start: 10-12-2019

Date of completion: 05-03-2020

Approved Cost: ₹ 3.90 lakh

Funds released (CD&Pyt) :₹ 2.00 Lakh

Expenditure (CD&pyt) : ₹ 2.00 Lakh

No. of souls benefitted: 210

Comments of stakeholders: Facilitates flood protection for the land.

Date of start: 01-02-2020

Date of completion: 20-03-2020

Approved Cost: ₹ 2.99 lakh

Funds released (CD&Pyt ) : ₹ 2.50 lakh

Final Expenditure (CD&Pyt) : ₹ 2.50 lakh

No. of souls benefitted: 605

Comments of stakeholders: Improves the Irrigation facility.

Const. of Irrigation Channel NLO Reyaz Ahmad Dar & others at Dendlethen (410).Const. of P/bund Nallah Gagni Yethyaroo Berigam (401).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 588: PICTORIAL COMPENDIUM

583

Date of start: 11-10-2019

Date of completion: 18-11-2019

Approved Cost: ₹ 2.00 lakh

Funds released (CD&Pyt ) : ₹ 1.50 lakh

Final Expdt. (CD&Pyt) : ₹ 1.50 lakh

No. of souls benefitted: 605

Comments of stakeholders: Improves the Irrigation facility. Protects the soil from erosion

Date of start: 08-02-2020

Date of completion: 30-03-2020

Approved Cost: ₹ 6.50 Lakh

Funds released (CD&Pyt) :₹ 4.50 Lakh

Expenditure (CD&pyt) : ₹ 4.50 Lakh

No. of souls benefitted: 1570

Comments of stakeholders: The road facilitates the connectivity for the people of the area.

Const. of road from Pratap pora Gujjar Basti to Vobber raod Gundipora Chowgam (403).

Const. of P/bund near HO Gh Mohd to HO Mohd Yousuf & Wali Mohd Bhat & others Kund (379)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 589: PICTORIAL COMPENDIUM

584

Date of start: 10-10-2019

Date of completion: 31-10-2019.

Approved Cost: ₹ 1.20 Lakh

Funds released (CD&Pyt ) : ₹ 0.90 lakh

Final Expdt. (CD&Pyt) : ₹ 0.90 lakh

No. of souls benefitted: 450

Comments of stakeholders: Helps the inhabitants for crossing Nallah.

Date of start: 20-09-2019

Date of completion: 05-10-2019.

Approved Cost: ₹ 1.20 Lakh

Funds released (CD&Pyt ) : ₹ 0.90 lakh

Final Expdt. (CD&Pyt) : ₹ 0.90 lakh

No. of souls benefitted: 450

Comments of stakeholders: Helps the inhabitants for crossing Nallah.

C/o Foot bridge on Nallah Tengkhah at Jaibal Halqa Gandwani (377) C/o Crossin near kharnard at Jaibal Halqa Gandwani (378).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 590: PICTORIAL COMPENDIUM

585

Date of start: 10-11-2019

Date of completion: 15-12-2019.

Approved Cost: ₹ 2.99 Lakh

Funds released (CD&Pyt ) : ₹ 2.00 lakh

Final Expdt. (CD&Pyt) : ₹ 2.00 lakh

No. of souls benefitted: 450

Comments of stakeholders: Protects the land from soil erosion and floods

Date of start: 08-09-2019

Date of completion: 20-10-2019.

Approved Cost: ₹ 1.00 Lakh

Funds released (CD&Pyt ) : ₹ 0.70 lakh

Final Expdt. (CD&Pyt) : ₹ 0.70 lakh

No. of souls benefitted: 620

Comments of stakeholders:

C/o Washing Plates at Jamia Masjid Beagam (382). C/o FP Bund on GadMarg at Ashthal (392).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 591: PICTORIAL COMPENDIUM

586

Date of start: 10-11-2019

Date of completion: 05-12-2019.

Approved Cost: ₹ 2.00 Lakh

Funds released (CD&Pyt ) : ₹ 1.30 lakh

Final Expdt. (CD&Pyt) : ₹ 1.30 lakh

No. of souls benefitted: 310

Comments of stakeholders: Increases irrigation facilities in the area.

Date of start: 05-10-2019

Date of completion: 20-10-2019.

Approved Cost: ₹ 1.00 Lakh

Funds released (CD&Pyt ) : ₹ 0.70 lakh

Final Expdt. (CD&Pyt) : ₹ 0.70 lakh

No. of souls benefitted: 450

Comments of stakeholders: Increases irrigation facilities in the area.

C/o Irrigation channel near LO Gh Ahmad Bhat & others at Pariwan (383).

C/o Irrigation Channel R/wall near LO Gulzar Ahmad Parry & others at Checkpora (396).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 592: PICTORIAL COMPENDIUM

587

Date of start: 2018-2019

Date of completion: 30-06.2019

Approved Cost: ₹ 1.00 lakh

Funds released (CD&Pyt ) : ₹ 0.70 Lakh

Final Expenditure (CD&Pyt) : ₹ 0.70 Lakh

No. of souls benefitted: 710

Comments of stakeholders:

Date of start: 20-11-2019

Date of completion: 12-02-2020

Approved Cost: ₹ 2.00 lakh

Funds released (CD&Pyt ) : ₹ 1.25 lakh

Final Expdt. (CD&Pyt) : ₹ 1.25 lakh

No. of souls benefitted:

Comments of stakeholders:

Const. of Xing with filling R/wall near Temple NHO Badrinath at Kharwat (404)

Const. of fencing of Graveyard at Ganie Mohalla Kharvat Block Kulgam (384)

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 593: PICTORIAL COMPENDIUM

588

Date of start: 18-11-2019

Date of completion: 10-02-2020

Approved Cost: ₹ 3.00 lakh

Funds released (CD&Pyt ) : ₹ 2.50 lakh

Final Expdt. (CD&Pyt) : 2.50 lakh

No. of souls benefitted: 710

Comments of stakeholders: Protects from flood and soil erosion.

Date of start: 12-11-2019

Date of completion: 30-12-2019

Approved Cost: ₹ 2.00 lakh

Funds released (CD&Pyt ) : ₹ 1.25 lakh

Final Expdt. (CD&Pyt) : ₹ 1.25 lakh

No. of souls benefitted: 240

Comments of stakeholders: Improves the Irrigation facilities for vast land.

Const. of L/wall /Irrigation channel Gam Khull Kharvat (406).Const. of P/bund Nandkhul at Laroo (413).

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

`

USER

Page 594: PICTORIAL COMPENDIUM

589

Date of Commencement: 09.11.2019

Date of Completion: March.2020

Estimated Cost: 3.00 Lacs

Completion Cost:-

No of people benefitted: 25 Families

Comments of the Stake Holder: Benefitted for community

Date of Commencement: 10.11.2019

Date of Completion: 20.12.2019

Estimated Cost: 1.00 Lacs (0.50 Lacs CD&Pyt+0.50 Lacs MGNREGA)

No of people benefitted: 25 Families

Comments of the Stake Holder: Benefitted for community.

Constt. Of B/Path by way of passing through H/o Mohd Ishaq Moh. Dhaki(232)Constt. Of protection work at Gara near the land of Baijnatg

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 595: PICTORIAL COMPENDIUM

590

Date of Commencement: 01.01.2020

Date of Completion: 20.03.2020

Estimated Cost: 0.50 Lacs

Completion Cost:-

No of people benefitted: 15 Families

Comments of the Stake Holder: Benefitted for community

Date of Commencement: 10/01/2020

Date of Completion: March/2020

Estimated Cost: 1.00 Lacs

Completion Cost:-

No of people benefitted: 15 Families

Comments of the Stake Holder: Benefited for community .

Constt. Of P/work at Graveyard in W.No. 05(230)Constt. Of B/wall Nr. Masjid Moh. Dedran nr. Old Gurudwara(231)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 596: PICTORIAL COMPENDIUM

591

Date of Commencement: 05-12-2019

Date of Completion: March/2020

Estimated Cost: 1.00 Lacs

Completion Cost:-

No of people benefitted: 15 Families

Comments of the Stake Holder: Benefited for community

Date of Commencement:- 09-1-2020

Date of Completion:- 31/03/2020

Estimated Cost : 0.70 Lakhs

Completion Cost:- 0.6950

No Of People Benefitted: 15

R/Wall nr. Khalid Mehmood Moh Shiekhan Samote(246) Constt. Of B/Path Nr. H/O Mohd Ashraf (242)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 597: PICTORIAL COMPENDIUM

592

Date of Commencement:- 25-1-2020

Date of Completion:- 30/03/2020

Estimated Cost : 2.00Lakhs

Completion Cost:- 2.00

No Of People Benefitted: 19

Date of Commencement:- 06-1-2019

Date of Completion:- 28/02/2020

Estimated Cost : 2.00 Lakhs

Completion Cost:- 0.96380

No Of People Benefitted: 30

Constt of Lane/Drain Nr. Garve Yard Ward No 04 (247)B/Path Pacca Danga Moh Soban Kasi ward No 03 Nr. Barket Hussain Kholi(243)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 598: PICTORIAL COMPENDIUM

593

Date of Commencement:- 06-1-2019

Date of Completion:- 02/03/2020

Estimated Cost : 1.00 Lakhs

Completion Cost:- 0.65585

No Of People Benefitted: 15

Date of Commencement:- 06-1-2019

Date of Completion:- 02/03/2020

Estimated Cost : 1.50 Lakhs

Completion Cost:- 1.00

No Of People Benefitted: 15

Constt of P/Work R/Wall Nr. Grave Yard Moh Khawaja(248)P/Work Nr. Land of Jamal Din(245)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 599: PICTORIAL COMPENDIUM

594

Date of Commencement:- 16-1-2019

Date of Completion:- 30/3/2020

Estimated Cost : 3.00Lakhs

Completion Cost:- 2.00

No Of People Benefitted: 15

Date of Start:- 17/12/2019

Date of Completion:- 31/03/2020

E. Cost :- 1.00 Lac

Expenditure :- 0.50 Lacs

No of Souls benefited:- 30

Observation Recommendations of Stake Holders:-

P/Work at GMS Shiendhara (250)B/Path Moh Saydian Panyali Nathu wala(244)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 600: PICTORIAL COMPENDIUM

595

Date of Start:- 25/11/2019

Date of Completion:- March 2020

E. Cost :- 4.00 Lacs

Expenditure :- 2.00 Lacs

No of Souls benefited:- 25

Observation Recommendations of Stake Holders:-

Date of Commencement: 05-01-2020

Completion: 15-03-2020

Estimate Cost: 3.00CD &Pyt: 1.00MGNREGA: 2.00

Complition Cost:-

Number of people benefited: 120

Scheme: CD Pyt. Convergence MGNREGA

Pacca /R/wall Moh. Chowana Ward No 8 Nr. Yaqeen.(252)Construction of Conference Hall / Meeting Hall adjoining Pyt Ghar Lassana Upper(249)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 601: PICTORIAL COMPENDIUM

596

Date of commencement: 25-1-2020

Competion:- 28-03-2020

Estimate Cost: 3.00lacCD& Pyt: 1.00MGNREGA: 2.00

Complition Cost:-

Scheme: CD & Pyt and Convergence MGNREGAYear: 2019-20

Date of commencement: 12-01-2020

Competion: 12-03-2020

Estimate Cost: 3.00lacCD& Pyt: 1.00MGNREGA: 2.00

Complition Cost:-

Scheme: CD & Pyt convergence MGNREGA Year: 2019-20

Tr. Road Main Road to Jhandhidhar(251)R/wall at Moh. Nakka W.No 1(254)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 602: PICTORIAL COMPENDIUM

597

Date of commencement: 03-01-2020

Competion: 07-03-2020

Estimate Cost: 2.00lacCD& Pyt. 1.00MGNREGA: 1.00

Completion Cost:-

Scheme: CD & Pyt Number of Soul Benefited: 270 Year: 2019-20

Date of Commencement:- 20-1-2020

Date of Completion:- 31-3-20

Estimated Cost:- 1.50

Completion Cost:- 0.50

No of people benefitted:- 189

Comments of the Stake Holder:- Further Need to Improvement.

Constt. Of P/Work / Fancing Nr Graveyard at Sib Dani (239)Kul Pangaali Nallah to Dhakari(253)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 603: PICTORIAL COMPENDIUM

598

Date of Commencement:- 5-1-2020

Date of Completion:- 20-3-2020

Estimated Cost:- 1.00

Completion Cost:- 0.50

No of people benefitted:- 130

Comments of the Stake Holder:- Further Need to Extention

Date of Commencement:- 27-1-2019

Date of Completion:- 18-03-2020

Estimated Cost:- 1.00

Completion Cost:- 0.50

No of people benefitted:- 221

Comments of the Stake Holder:- Good Intative taken by RDD

Constt. Of Park W No 07 Bella Sethi(241) Constt. Of B/Path Nr H/O Ashraf(238)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 604: PICTORIAL COMPENDIUM

599

Date of Commencement:- 02-1-2020

Date of Completion:- 28-2-2020

Estimated Cost:- 1.50

Completion Cost:- 0.50

No of people benefitted:- 256

Comments of the Stake Holder:- its Very Necessary to Protect the Jamia Masjid.

Date of Commencement:- 23-1-2020

Date of Completion:- 30-03-2020

Estimated Cost:- 3.00

Completion Cost:- 0.85

No of people benefitted:- 40

Comments of the Stake Holder:- its Very Necessary to Protect the Jamia Masjid

Constt. Of R/Wall Nr. Masjid Thakran & H/O Imtiaz Ahmed (236)Constt. Of P/Work Nr Jamia Masjid Tantraygam(240)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 605: PICTORIAL COMPENDIUM

600

Date of Commencement:- 2-1-2020

Date of Completion:- 31-03-2020

Estimated Cost:- 3.00

Completion Cost:- 0.85

No of people benefitted:- 40

Comments of the Stake Holder:- its Very Necessary to Protect the Jamia Masjid & H/O Imtiaz Ahmed

Date of Commencement:- 8-1-2020

Date of Completion:- 25-3-2020

Estimated Cost:- 3.00

Completion Cost:- 0.75

No of people benefitted:- 296

Comments of the Stake

Constt. Of Boundary Wall Nr Graveyard (Balance Work)(237)Constt. Of Lane from link road to Nag Devta Sathan at Chaknathal w.no.1

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 606: PICTORIAL COMPENDIUM

601

Date of Commencement:- 25-01-2020

Date of Completion:- 18-03-2020

Estimated Cost:- 12.00

Completion Cost:- 2.15

No of people benefitted:- 800

Comments of the Stake

Date of Commencement:- 02-01-2020

Date of Completion:- 20-03-2020

Estimated Cost:- 2.00

Completion Cost:- 0.73

No of people benefitted:- 20

Comments of the Stake Holder:

Constt. Of R/Wall Mohd Bashir Ward No. 4 & others (233)Constt. Of tr road from bara thakran to via Moh Kheit Via Liayaqat Ahmed(319)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 607: PICTORIAL COMPENDIUM

602

Date of Commencement:- 11-1-2020

Date of Completion:- 20-03-2020

Estimated Cost:- 4.00

Completion Cost:- 2.00

No of people benefitted:- 80

Comments of the Stake Holder

Date of commencement: 12-01-2020

Competion: 21-03-2020

Estimate Cost: 2.00lacCD & PYT: 1.00MGNREGA: 1.00

Completion Cost:-

Scheme: CD & Pyt convergence MGNREGA Year: 2019-20

Tr. Road Para Wali GaliBlock: Mankote (255)Constt. Road B/Path Link road to Gali No. 6 (234)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 608: PICTORIAL COMPENDIUM

603

Date of Commencement: 15/02/2020

Date of Completion:- 21.03.2020

Estimated Cost: Rs. 4.90 lacs

Completion Cost: Rs. 3.47 lacs (Expdt under CD&Pyt)

No. of people benefitted: 15 households Comments of stakeholders Much needed/ Quality work

Date of Commencement: 13/08/2019

Date of Completion:- 02.03.2020

Estimated Cost.: Rs. 1.40 lacs

Completion Cost Rs.1.00 lac (Expdt under CD&Pyt)

No. of people benefitted: 158 Students

Comments of stakeholders Much needed/ Quality work

Date of Commencement: 11/08/2019

Date of Completion:- 02.03.2020

Estimated Cost.: Rs.1.40 lacs

Completion Cost Rs.1.00 lac (Expdt under CD&Pyt)

No. of people benefitted: 75 Househoulds

Comments of stakeholders Much needed/ Quality work

T/Road from Main Road to Mohalla kaliyan, Mehra. Name: Constt. Of T/Road mohalla Dedhran.Protection work/ Bund at rice Field block

Kotranka

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 609: PICTORIAL COMPENDIUM

604

Date of Commencement: 10/09/2019

Date of Completion:- 12.03.2020

Estimated Cost.: 2.10 lacs

Completion Cost 1.50 lacs

(Expdt under CD&Pyt)

No. of people benefitted: 95 Househoulds

Comments of stakeholders Much needed/urgent nature work

Date of Commencement: 15/02/2020

Date of Completion:- 18.02.2020

Estimated Cost: 2.80 lacs

Completion Cost: 2.00 lacs

(Expdt under CD&Pyt)

No. of peoples benefitted: 158 Students Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement: 16/01/2020

Date of Completion:- 11.02.2020

Estimated Cost: 6.67 lacs

Completion Cost: 4.00 lacs

(Expdt under CD&Pyt)

No. of peoples benefitted: 341 HH

Comments of stakeholdersMuch needed/Quality work urgent nature work

Constt of P/work ward no 07 nr school Constt of T/Road Marwadi School to Sasni

Name: Constt of Foot Path From Main Road to Lah Bowali

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 610: PICTORIAL COMPENDIUM

605

Date of Commencement: 02/01/2020

Date of Completion:- 16.02.2020

Estimated Cost: 6.57 lacs

Completion Cost: 4.00 lacs

(Expdt under CD&Pyt)

No. of peoples benefitted: 158 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement: 18/01/2020

Date of Completion: 13.02.2020

Estimated Cost: 6.67 lacs

Completion Cost: 3.18 lacs (Expdt under CD&Pyt)

No. of peoples benefitted:75 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement: 02/01/2020

Date of Completion:- 11.02.2020

Estimated Cost: 4.20 lacs

Completion Cost: 3.00 lacs

(Expdt under CD&Pyt)

No. of peoples benefitted: 96 HHComments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Repair of Cremation Ghat/Allied work at Siot Const. of T/road Chambal Gala Talli Mohalla Repair of T/Road Jaba to Panori

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 611: PICTORIAL COMPENDIUM

606

Date of Commencement: 02/01/2020

Date of Completion:- 11.02.2020

Estimated Cost: 5.60 lacs

Completion Cost: 4.00 lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 24 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement: 04/01/2020

Date of Completion:- 13.02.2020

Estimated Cost: 1.40lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 70 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Tractor Road Balima to Middle School Kotli Bagla T/road Kala kote to Molvi Mohalla Parran

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 612: PICTORIAL COMPENDIUM

607

Date of Commencement: 04/01/2020

Date of Completion:- 13.02.2020

Estimated Cost: 6.67 lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 85 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement: 03/01/2020

Date of Completion:- 11.02.2020

Estimated Cost: 20.00 lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 250 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

CONSTT. OF T/ROAD FROM M/ROAD TO Pyt. Halqa Kalsian Balance work of Culvert and approach Road at Bandrai near Shamshanghat

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 613: PICTORIAL COMPENDIUM

608

Date of Commencement: 29/01/2018

Date of Completion:- 10.02.2019

Estimated Cost: 1.00 lacs

Completion Cost: 0.75 lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 25 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement: 24/01/2018

Date of Completion:- 02.02.2019

Estimated Cost: 4.69 lacs

Completion Cost: 3.69 lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 45 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

PROTECTION WALL OF GRAVE YARD AT KHO MOHALLA P/WORK,R/WALL NHO SAJAD HUSSAIN MOHARA

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 614: PICTORIAL COMPENDIUM

609

Date of Commencement: 24/10/2019

Date of Completion:- 11.02.2020

Estimated Cost: 1.40lacs

Completion Cost: 1.00 lacs (Expdt under CD&Pyt)

No. of peoples benefitted: 15 HH

Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.

Date of Commencement :- 02-02-2020

Date of Completion :- 20-03-2020

E.Cost 1.40Lacs

Completion Cost :- 1.00 Lacs (Expdt under CD&Pyt)

No. of People benefited :- 170

Comments of stakeholders Much needed /Quality work

Link road Eid Gah to Khatanna Mohalla Gurrian (Rajouri)PROTECTION WALL NHO Mohd Aslam Gali Upper Shahdra

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 615: PICTORIAL COMPENDIUM

610

Date of Commencement :- 08-01-2020

Date of Completion :- 10-03-2020

E.Cost :- 1.40 Lacs

Completion Cost :- 1.00 Lacs (Expdt under CD&Pyt)

No. of People benefited :- 115

Comments of stakeholders Much needed /Quality work

Date of Commencement :- 02-02-2020

Date of Completion :- 20-03-2020

E.Cost :- 5.60 Lacs

Completion Cost :- 4.00 Lacs (Expdt under CD&Pyt)

No. of People benefited :- 170

Comments of stakeholders Much needed /Quality work

P/WALL T/ROAD W.NO 02 MOH ZABIR CH. NARLINK ROAD FORM MAIN ROAD TO HAJI GHULAM KHATANA GURRIAN

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 616: PICTORIAL COMPENDIUM

611

Date of Commencement :- 02-02-2020

Date of Completion :- 20-03-2020

E.Cost :- 8.00 Lacs

Completion Cost :- 5.00 Lacs (Expdt under CD&Pyt)

No. of People benefited :- 170

Comments of stakeholders Much needed /Quality work

Date of Commencement :- 21.11.2019

Date of Completion :- 19.03.2020

E.Cost :- 2.80 Lacs

Completion Cost :- 2.00 Lacs (Expdt under CD&Pyt)

No. of People benefited :- 60 HH

Comments of stakeholders Much needed /Quality work

Constt. Of P/Wall at Kothra NLO Arif Lone Panchayat Kothra Constt of r/wall/p/wall near grave yard at Nakka alongwith the land of haji Ghulam Hussaan

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 617: PICTORIAL COMPENDIUM

612

Date of Commencement :- 21.11.2019

Date of Completion :- 09.02-2020

E.Cost :- 2.10 Lacs (Expdt under CD&Pyt

No. of People benefited :- 70 HH

Comments of stakeholders

Date of Commencement :- 21.11.2019

Date of Completion :- 19-03-2020

E.Cost 4.90 Lacs

Completion Cost :- 3.50 Lacs (Expdt under CD&Pyt

No. of People benefited :- 45 HH

Comments of stakeholders Much needed /Quality work

Constt. Of C/Wall G/Yard Nr Forest Land Chowkian-C Name: Const. of Tractor Road from main road to Manda

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 618: PICTORIAL COMPENDIUM

613

Date of Commencement :- 21.11.2019

Date of Completion :- 19-02-2020

E.Cost 6.00 Lacs

Completion Cost :- 4.50 Lacs (Expdt under CD&Pyt

No. of People benefited :- 50 HH

Comments of stakeholders Much needed /Quality work

Date of Commencement :- 21.11.2019

Date of Completion :- 22.03.2020

E.Cost :- 5.00 Lacs

Completion Cost :- 4.00 Lacs (Expdt under CD&Pyt

No. of People benefited :- 30 HH

Comments of stakeholders Much needed /Quality work

Constt. Of B/Path P/Work Photanwali NLO Sadiq Panchayat Constt. Of Langer Khana With Toilet Faclity Nr Darga Harote Shrif

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 619: PICTORIAL COMPENDIUM

614

Date of Commencement :- 21.11.2019

Date of Completion :- 17-02-2020

E.Cost 3.30 Lacs

Completion Cost :- 2.00 Lacs (Expdt under CD&Pyt

No. of People benefited :- 30 HH

Comments of stakeholders Much needed /Quality work

Date of Commencement :- 21.11.2019

Date of Completion :- 19-02-2020

E.Cost :- 4.90 Lacs

Completion Cost :- 3.50 Lacs (Expdt under CD&Pyt

No. of People benefited :- 85 Students/200 HH

Comments of stakeholders Much needed /Quality work

Constt. Of Culvert at Bethiyla Kadriyala Nr GMS Topa Constt. Of B/Path NHO Mushtaq & Ots Panchyat Kothra

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 620: PICTORIAL COMPENDIUM

615

Date of Commencement :- 21.11.2019

Date of Completion :- 11-02-2020

E.Cost :- 1.40 Lacs

Completion Cost :- 1.00 Lacs (Expdt under CD&Pyt

No. of People benefited :- 30 HH

Comments of stakeholders Much needed /Quality work

Date of Commencement :- 21.11.2019

Date of Completion :- 08-02-2020

E.Cost :- 4.20Lacs

Completion Cost 3.00 Lacs (Expdt under CD&Pyt

No. of People benefited :- 30 HH

Comments of stakeholders Much needed /Quality work

Constt. Of P/work NHO fazal HussainConstt. Of P/work NHO Mohd rafiq Chadroong Thannamsndi

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 621: PICTORIAL COMPENDIUM

616

Date of Commencement :- 21.11.2019

Date of Completion :- 02-01-2020

E.Cost :- 4.90 Lacs

Completion Cost :- 3.90 Lacs (Expdt under CD&Pyt

No. of People benefited :- 42 HH

Comments of stakeholders

Much needed /Quality work

Date of Commencement :- 21.11.2019

Date of Completion :- 16.01-2020

E.Cost :- 4.20 Lacs

Completion Cost :- 3.00 Lacs (Expdt under CD&Pyt

No. of People benefited :- 75 HH

Comments of stakeholders Much needed /Quality work

Constt. Of T/Road Bhatyari main road to Mughal MohallaConstt. Of P/Work NHO Mohd Sadiq Chowkian-C

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 622: PICTORIAL COMPENDIUM

617

Date of Commencement :- 21.11.2019

Date of Completion :- 13.02-2020

E.Cost :- 5.00 Lacs

Completion Cost :- 3.50 Lacs (Expdt under CD&Pyt

No. of People benefited :- 35 HH

Comments of stakeholders

Date of Commencement :- 21.11.2019

Date of Completion :- 02.01-2020

E.Cost :- 1.40 Lacs

(Expdt under CD&Pyt

No. of People benefited :- 15 HH

Comments of stakeholders

Constt. Of P/Work at Moh. Mattan Nr Faqar Hussain Part I Panchayat Nadian-A Constt. Of R/Work Near House of Abdul Hameed Nagrota

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 623: PICTORIAL COMPENDIUM

618

Date of Commencement :- 21.11.2019

Date of Completion :- 16.02-2020

E.Cost :- 10.00 Lacs

Completion Cost :- 7.00 Lacs (Expdt under CD&Pyt

No. of People benefited :- 70 HH

Comments of stakeholders

Date of Commencement :- 21.11.2019

Date of Completion :- 19.03.2020

E.Cost :- 0.90 Lacs

Completion Cost :- 0.82 Lacs (Expt. Under CD&Pyt.)

No. of People benefited :- 150 HH

Comments of stakeholders Much needed /Quality work Urgent Nature work

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Constt. Of P/work and Land levelling NHO Mohd Amin Balance work of Protection wall of grave yard at Khoo Mohalla

Page 624: PICTORIAL COMPENDIUM

619

Date of Commencement :- 12.01.2020

Date of Completion :- 14.03.2020

E.Cost :- 5.60 Lacs

Completion Cost :- 4.00 Lacs (Expt. Under CD&Pyt.)

No. of People benefited :- 56 HH

Comments of stakeholders Much needed /Quality work Community Benefit work

Constt. Of T/Road Agrati Haji Aslam Mohalla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 625: PICTORIAL COMPENDIUM

620

Date of Commencement : - 06-12-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs. 4.50 Lacs

Completion Cost : Rs.3.00 Lacs (Expdt. under CD& Pyt )

No. of people benefited : - 250

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 10-11-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs 3.50 Lacs

Completion Cost : Rs. 2.30 Lacs (Expdt. under CD& Pyt )

No. of people benefited : - 200

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

CONSTT OF L/DRAIN FROM House of MOHD RAFIQ NAYAK TO RAILWAY STATION Banihal

P/path near the land of Gulzar house to an Rashid Bali and others Ukhral

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 626: PICTORIAL COMPENDIUM

621

Date of Commencement : - 01-12-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs 1.00 Lacs

Completion Cost : - Rs. 0.65 Lacs (Expdt. under CD& Pyt )

No. of people benefited : - 100

Comments of Stake holders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 11-11-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs 1.00 Lacs

Completion Cost : - Rs. 0.65 Lacs(Expdt. under CD& Pyt )

No. of people benefited : - 120

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

P/Bund Near Land of Najam Din Gamsool Alinbass-A Constt. Of L/drain Masjid Mohalla Imnari Pogall Upper

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

Page 627: PICTORIAL COMPENDIUM

622

Date of Commencement : - 10-12-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs. 1.00 Lacs

Completion Cost : - Rs. 0.70 Lacs (Expdt. under CD&Pyt)

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 12/10/2019

Date of Completion : - 20/03/2020

Estt. Cost : - Rs. 4.50 Lacs

Completion Cost : - Rs 3.15 Lacs (Expdt. under CD&Pyt)

No. of people benefited : - 200

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt of P/ Work NHO Ab Latief W No 5 Maligam-B Repair/Renovation of BHQ Ramsoo

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 628: PICTORIAL COMPENDIUM

623

Date of Commencement : - 12/10/2019

Date of Completion : - 28/03/2020

Estt. Cost : - Rs. 2.50 Lacs

Completion Cost : - Rs.1.75Lacs (Expdt under CD&Pyt)

No. of people benefited : - 312

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 16-01-2020

Date of Completion : - 31-03.2020

Estt. Cost : - Rs. 1.00 lacs

Completion Cost : - Rs. 0.70 lacs (Expdt under CD&Pyt)

No. of people benefited : - 120

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Const. Of Pacca Path from PWD Road to HSS Neel P/WORK AT MANHAS MOHALLAH / Hirnihall Khari Lower-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 629: PICTORIAL COMPENDIUM

624

Date of Commencement : - 05-11-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs. 1.00 lacs

Completion Cost : - Rs. 0.70 lacs (Expdt under CD&Pyt)

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 01-11-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs. 1.00 lacs

Completion Cost : - Rs. 0.70 lacs (Expdt under CD&Pyt)

No. of people benefited : - 124

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

P/WORK AT GUDORA Trigam Upper P/WORK AT KAWNA TRIGAM LOWER-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 630: PICTORIAL COMPENDIUM

625

Date of Commencement : - 06-10-20219

Date of Completion : - 01-02-2020

Estt. Cost : - Rs. 1.00 lacs

Completion Cost : - Rs. 0.440 lacs(Expdt under CD&Pyt)

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 01/02/2020

Date of Completion : - 20/03/2020

Estt. Cost : - Rs. 1.00 lacs

Completion Cost : - Rs. 0.50 lacs (Expdt under CD&Pyt)

No. of people benefited : - 250

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

P/BUND MANDAKBASS KHARI Upper-A Constt of P/Bund Mohu Ball Mangith

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 631: PICTORIAL COMPENDIUM

626

Date of Commencement : - 01.02.2020

Date of Completion : - 14.03.2020

Estt. Cost : - Rs. 1.80 lacs

Completion Cost : - Rs.1.20 lacs (Expdt under CD&Pyt)

No. of people benefited : - 135

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 28.01.2020

Date of Completion : - 14.03.2020

Estt. Cost : - Rs.1.50 lacs

Completion Cost : - Rs.1.050 lacs (Expdt under CD&Pyt )

No. of people benefited : - 145

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt of C/path Parthwali to Thaku Mohalla Kalimasta Pacca Path Yuba Mohalla to Famda Mohalla Kalimasta

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 632: PICTORIAL COMPENDIUM

627

Date of Commencement : - 03.02.2020

Date of Completion : - 14.03.2020

Estt. Cost : - Rs.1.80 lacs

Completion Cost : - Rs.1.20 lacs (Expdt under CD&Pyt)

No. of people benefited : - 150

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 28.01.2020

Date of Completion : - 14.03.2020

Estt. Cost : - Rs.1.80 lacs

Completion Cost : - Rs. 1.20 lacs (Expdtt under CD&Pyt )

No. of people benefited : - 135

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt of Pacca Path Main road to Tragwal Mohalla Gool-A Constt of C/Path Killersoo to Wani Mohalla Ind

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 633: PICTORIAL COMPENDIUM

628

Date of Commencement : - 12/10/2019

Date of Completion : - 28/03/2020Estt.

Cost : - Rs. 1.00 lacs

Completion Cost : - Rs. 0.40 lacs (Expdt under CD&Pyt)

No. of people benefited : - 312

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 12-11-2019

Date of Completion : - 28-03-2020

Estt. Cost : Rs. 1.00 lacs

Completion Cost : - Rs. 0.400 lacs (Expdt under CD&Pyt)

No. of people benefited : - 316

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt of Drain at Panchayat Ghar Dharam_A Constt of Drain at Panchayat Ghar Dharam-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 634: PICTORIAL COMPENDIUM

629

Date of Commencement : - 12/10/2019

Date of Completion : - 20/03/2020

Estt. Cost : - Rs.1.00 lacs

Completion Cost : - Rs. 0.400 lacs (Expdt under CD&Pyt)

No. of people benefited : - 200

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 12/10/2019

Date of Completion : - 28/03/2020

Estt. Cost : - Rs.1.00 lacs

Completion Cost : - Rs. 0.400 lacs (Expdt under CD&Pyt)

No. of people benefited : - 150

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt of P/Path Pry.School to Graveyard Gundi Gugarsulla Constt of Drain at Panchayat Ghar Bhimdassa

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 635: PICTORIAL COMPENDIUM

630

Date of Commencement : - 10.02.2020

Date of Completion : - 15.03.2020

Estt. Cost : - Rs. 2.00 lacs

Completion Cost : - Rs. 1.40 lacs (Expdt under CD&Pyt)

No. of people benefited : - 255

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 05/12/2019

Date of Completion : - 25/03/2020

Estt. Cost : - Rs.1.80 lacs

Completion Cost : - Rs.1.20 lacs (Expdt under CD&Pyt)

No. of people benefited : - 300

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt of Drain at Panchayat Ghar Dharam_A Constt of Drain at Panchayat Ghar Dharam-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Constt of P/Path Main Road to Tower, Sangaldan-B Constt of C/Path Sarunda Chakki to Margay Mohalla Thatharka-A

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 636: PICTORIAL COMPENDIUM

631

Date of Commencement : - 12/10/2019

Date of Completion : - 20/03/2020

Estt. Cost : - Rs. 1.00 lacs

Completion Cost : - Rs.0.76 lacs (Expdtt under CD&Pyt)

No. of people benefited : - 200

Comments of Stakeholders : -SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 01-11-2019

Date of Completion : - 20/03/2020

Estt. Cost : - Rs.1.20 lacs

Completion Cost : - Rs. 0.47 lacs (Expdt under CD&Pyt)

No. of people benefited : - 150

Comments of Stakeholders : - Satisfactory Much needed / Quality Work Good

Constt of Drain at Panchayat Ghar Dharam_A Constt of Drain at Panchayat Ghar Dharam-B

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Constt of C/Path Dumki Masjid Drour, Sumber Lower Dev. Of Spring at W.No. 01 Bagna

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 637: PICTORIAL COMPENDIUM

632

Date of Commencement : - 12-10-2019

Date of Completion : - 15-03-2020

Estt. Cost : -Rs.1.80 lacs

Completion Cost : - Rs.1.00 lacs (Expdtt under CD&Pyt)

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 07-12-2019

Date of Completion : - 1 7-03-2020

Estt. Cost : - Rs.1.70 lacs

Completion Cost : - Rs.1.19 lacs (Expdtt under CD&Pyt)

No. of people benefited : - 140

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt. Of P/Work at Graveyard Naibasti balihote-B Constt. Of P/Work at Graveyard ST Mohalla Chandrog W.No. 7 Maitra-A.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 638: PICTORIAL COMPENDIUM

633

Date of Commencement : - 12-11-2019

Date of Completion : - 14-03-2020

Estt. Cost : - Rs.2.00 lacs

Completion Cost : - Rs.1.31 lacs (Expdt under CD&Pyt)

No. of people benefited : - 145

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 14-11-2019

Date of Completion : - 25-03-2020

Estt. Cost : - Rs. 1.20 lacs

Completion Cost : Rs. 0.65 lacs (Expdtt under CD&Pyt)

No. of people benefited : - 210

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Fencing graveyard near Qasim Mohar W.No. 02 Maitra-A. Dev. Of Spring at Mayan Raju Mohalla W.No. 04 Seri-A.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 639: PICTORIAL COMPENDIUM

634

Date of Commencement : 12-11-2019

Date of Completion : - 22-03-2020

Estt. Cost : - Rs.1.50 lacs

Completion Cost : - Rs.1.00 lac (Expdt under CD&Pyt)

No. of people benefited : - 140

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 01-12-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs.3.50 lacs

Completion Cost : - Rs.2.50 lacs (Expdt under CD&Pyt)

No. of people benefited : - 20

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt. Of P/Work at Batsool Seri-B. P/Work at at Ludhwal SC Mohalla Panchayat Ludhwal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 640: PICTORIAL COMPENDIUM

635

Date of Commencement : - 01-12-2019

Date of Completion : - 31-03-2020

Estt. Cost : - Rs.1.40 lacs

Completion Cost : - Rs.1.00 lacs (Expdt under CD&Pyt)

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Date of Commencement : - 01.12.2019

Date of Completion : - 30.03.2020

Estt. Cost : - Rs.2.750 lacs

Completion Cost : - Rs.0.88 lacs (Expdt under CD&Pyt)

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt. Of Launching of culver at Magunallah NHO Charan Dass Panchayat :- B.Batote Constt of Protection Work Batli Near Masjid Shareef Gandhri

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 641: PICTORIAL COMPENDIUM

636

Date of Commencement : - 01-10-2019

Date of Completion : - 15-03-2020

Estt. Cost : - Rs.1.40 lacs

Completion Cost : - Rs.1.00 lac (Expdt under CD&Pyt)

No. of people benefited : - 120

Comments of Stakeholders : - Satisfactory Much needed / Quality Work Good

Date of Commencement : - 01-10-2019

Date of Completion : - 31/03/2020

Estt. Cost : - Rs. 1.85 lacs

Completion Cost : - Rs.1.25 lacs (Expdt under CD&Pyt)

No. of people benefited : - 250

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Constt. of P/work at Mildan W.No 06 Rajgarh P/WORK AT W.No 07 NEAR MANDIR Panchayat Draman

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 642: PICTORIAL COMPENDIUM

637

Date of Commencement : - 01-12-2019

Date of Completion : - 31-03-2020

Estt. Cost : - 1.40

Completion Cost : - 0.26

No. of people benefited : - 100

Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good

Development of spring NLO Kali Dass w. no 6

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 643: PICTORIAL COMPENDIUM

638

Date of Commencement 28/11/2019

Date of Completion March 2020

Estt. Cost 6.00 Lacs

Completion cost Rs.3.00 Lacs (Expdt. under CD& Pyt )

No. of People benefitted 55

Comments of Stakeholder Much needed work

Date of Commencement 5/8/2018

Date of Completion March 2020

Estt. Cost 3.00 Lacs under CD Pyt

Completion cost Rs.1.50 Lacs (Expdt. under CD& Pyt )

No. of People benefitted 85

Comments of Stakeholder Helped residents in crossing during floods

Const of Link road main road Sermegha to Taka Moh via Som Raj House Const of Foot Bridge at Samad Nallah Pyt Thakrakote

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 644: PICTORIAL COMPENDIUM

639

Date of Commencement 11/01/2019

Date of Completion March 2020

Estt. Cost 1.00 Lacs under CD Pyt

Completion cost Rs.0.50 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 123

Comments of Stakeholder Helped residents in crossing during floods

Date of Commencement 2019-20

Date of Completion 2019-20

Estt. Cost 5.00 Lacs

Completion cost Rs.2.65 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 68

Comments of Stakeholder Water harvesting

Const of Foot Bridge at Mankote Block Chassana Renovation of Pacca Path from Kahna road to Block HQ near CIC Building Pouni

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 645: PICTORIAL COMPENDIUM

640

Date of Commencement 13/02/2020

Date of Completion 17/03/2020

Estt. Cost 2.50 Lacs

Completion cost Rs.1.70 Lacs (Expdt. under CD& Pyt )

No. of People benefitted 40

Comments of Stakeholder Water harvesting

Date of Commencement 13/02/2020

Date of Completion 17/03/2020

Estt. Cost 2.50 Lacs

Completion cost Rs.1.75 Lacs (Expdt. under CD& Pyt )

No. of People benefitted 25

Comments of Stakeholder Water harvesting

Const of Pond at Lancha Const of Pond at Hajam Nagar

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 646: PICTORIAL COMPENDIUM

641

Date of Commencement 11/01/2020

Date of Completion March 2020

Estt. Cost 4.00 Lacs

Completion cost Rs.3.00 Lacs (Expdt. under CD& Pyt )

No. of People benefitted 35

Comments of Stakeholder Protected land sliding

Date of Commencement 11/01/2020

Date of Completion March 2020

Estt. Cost 8.00 Lacs

Completion cost Rs.5.60 Lacs (Expdt. under CD& Pyt )

No. of People benefitted 45

Comments of Stakeholder Much needed work

Const of R/wall at Jamlan near water tank Const of Lane Drain Dar Moh. W. No 4

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 647: PICTORIAL COMPENDIUM

642

Date of Commencement 11/01/2020

Date of Completion March 2020

Estt. Cost 12.00 Lacs

Completion cost Rs.2.75 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 750

Comments of Stakeholder Satisfactory

Date of Commencement Nov. 2019

Date of Completion March 2020

Estt. Cost 5.00 Lacs

Completion cost Rs.3.50 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 152

Comments of Stakeholder Satisfactory

Const of T/Road at Tajhar to Sugga Const of B/path from Dounga to Laadh

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 648: PICTORIAL COMPENDIUM

643

Date of Commencement 11/01/2020

Date of Completion March 2020

Estt. Cost 1.20 Lacs

Completion cost Rs.0.42 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 10

Comments of Stakeholder Satisfactory

Date of Commencement 11/01/2020

Date of Completion March 2020

Estt. Cost 4.00 Lacs

Completion cost Rs.3.00 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 10

Comments of Stakeholder Satisfactory

Const of Tanki Bathroom NHO Barket Ali Const of Drain at Changri

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 649: PICTORIAL COMPENDIUM

644

Date of Commencement 13/02/2020

Date of Completion 17/03/2020

Estt. Cost 2.50 Lacs

Completion cost Rs.1.75 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 20

Comments of Stakeholder Water harvesting

Date of Commencement 2019-20

Date of Completion March 2020

Estt. Cost 8.00 Lacs

Completion cost Rs.3.60 Lacs (Expdt. under CD& Pyt )

No. of Souls benefitted 35

Comments of Stakeholder Water harvesting

Const of water harvesting tank at Budhan B Const of Pond at W. No 4

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 650: PICTORIAL COMPENDIUM

645

Date of Commencement 11/01/2020

Date of Completion March 2020

Estt. Cost 8.00 Lacs

Completion cost 8.00 Lacs

No. of people benefitted 230

Comments of Stakeholder Much needed work

Const of T/road from PMGSY Road to Sarni (7 Km)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 651: PICTORIAL COMPENDIUM

646

Date of commencement 03/03/2020

Date of completion 20/03/2020

Estt. Cost Rs.1.35 lacs

Completion Cost Rs.0.85 lacs (Expenditure under CD&Pyt)

No. of people benefitted 200

Comments of stakeholders Improved connectivity

Date of commencement 2019-20

Date of completion 12/03/2020

Estt. Cost Rs. 5.86 lacs

Completion Cost Rs.2.80lacs (Expenditure under CD&Pyt)

No. of people benefitted 350

Comments of stakeholders Much needed work.

Constt. Of L/D in vill. Meen Sarkar (Tabela) Constt of Flooring at ShamShan Ghat (Birpur Lower)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 652: PICTORIAL COMPENDIUM

647

Date of commencement 15/12/2019

Date of completion Phy Comp

Estt. Cost 3.00 lacs

Completion Cost 1.05 lacs (Expenditure under CD&Pyt)No. of people benefitted 50

Comments of stakeholders Improved Rural Connectivity

Date of commencement 03.03.2020

Date of completion 27.03.2020

Estt. Cost 2.80 lacs

Completion Cost 2.55 lacs (Expenditure under CD&Pyt)

No. of people benefitted 30

Comments of stakeholders Proper drainage of water and protection to agriculture land

Constt. Of L/D from link road to h/o Mohd Sharif Part-B Protection of Agriculture Land of Late Sh. Punjab Singh to Avtar Singh at Gho Rakhwala

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 653: PICTORIAL COMPENDIUM

648

Date of commencement 09/12/2019

Date of completion Mar-2020

Estt. Cost Rs.0.70 lacs

Completion Cost Rs. 0.50 lacs (Expenditure under CD&Pyt)

No. of people benefitted 25

Comments of stakeholders Protection work

Date of commencement 09/12/2019

Date of completion 20/03/2020

Estt. Cost Rs.0.75 lacs

Completion Cost Rs.0.50 lacs

No. of people benefitted 30

Comments of stakeholders Facility for drinking water

Constt. Of P/Work NHO Rammo Devi at Pacholi Constt. OF Water Tanki at Megh Nallah Moh. W.No.5

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 654: PICTORIAL COMPENDIUM

649

Date of commencement 09.12.2019

Date of completion 12.01.2020

Estt. Cost Rs. 0.70 lacs

Completion Cost Rs. 0.50 lacs (Expenditure under CD&Pyt)

No. of people benefitted 50

Comments of stakeholders Improve connectivity

Date of commencement 03/03/2020

Date of completion 20/03/2020

Estt. Cost 5.00 lacs (Expenditure under CD&Pyt)

No. of people benefitted 200

Comments of stakeholders Improved Connectivity

Constt. Lane from link road to H/O Ajay kumar at Nagrota Construction of T/road from Khanwal to Shamshan Ghat part-C

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 655: PICTORIAL COMPENDIUM

650

Date of commencement 18/12/2019

Date of completion Mar-20

Estt. Cost Rs.2.90 lacs

Completion Cost Rs.2.00 lacs (Expenditure under CD&Pyt)

No. of people benefitted 100

Comments of stakeholders Improved Connectivity

Date of commencement 18/12/2019

Date of completion Mar-20

Estt. Cost Rs.2.60 lacs

Completion Cost Rs.1.82 lacs (Expenditure under CD&Pyt)

No. of people benefitted 100

Comments of stakeholders Improved Connectivity

Constt. Of L/D from the H/O Dildar singh to the H/O Mukhtyar Singh at Bandral

Constt. Of L/D from main road to the H/O Capt. Ajit singh at W.No.7

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 656: PICTORIAL COMPENDIUM

651

Date of commencement 15/11/2019

Date of completion 07/03/2020

Estt. Cost 9.00 lacs

Completion Cost 3.15 lacs (Expenditure under CD&Pyt)

No. of people benefitted 100

Comments of stakeholders Improved Connectivity

Date of commencement 19/02/2020

Date of completion 04/03/2020

Estt. Cost Rs.2.91 lacs

Completion Cost Rs.1.20 lacs (Expenditure under CD&Pyt)

No. of people benefitted : 60

Comments of stakeholders Improved Connectivity

Constt. Of road from link road to BHQ Nud Constt. Of B/Path Bada Khad to Talai Village Bagar

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 657: PICTORIAL COMPENDIUM

652

Date of commencement 19/02/2020

Date of completion 04/03/2020

Estt. Cost Rs.2.04 lacs

Completion Cost Rs.1.30 lacs (Expenditure under CD&Pyt)

No. of people benefitted : 50

Comments of stakeholders Improved Connectivity

Date of commencement 31/12/2019

Date of completion 26/03/2020

Estt. Cost Rs.1.50 lacs

Completion Cost Rs.0.49 lacs (Expenditure under CD&Pyt)

No. of people benefitted 50

Comments of stakeholders Improved Connectivity

Constt. Of B/Path Bada Khad to Teda Village Bagar Constt of L/Drain Moh Jogian at village Barla

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 658: PICTORIAL COMPENDIUM

653

Date of commencement 19/02/2020

Date of completion 04/03/2020

Estt. Cost Rs.1.50 lacs

Completion Cost Rs.0.90 lacs (Expenditure under CD&Pyt)

No. of people benefitted 50

Comments of stakeholders Improved Connectivity

Date of commencement 11/12/2019

Date of completion 22/03/2020

Estt. Cost Rs.1.50 lacs

Completion Cost Rs.0.90 lacs (Expenditure under CD&Pyt)

No. of people benefitted 90

Comments of stakeholders Improved Connectivity

Constt of C/Path Moh ST at Chann Kana Constt of L/D from H/o Karan Singh to Jagdish at Chann Matloni W.no 8

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 659: PICTORIAL COMPENDIUM

654

Date of commencement 05/12/2019

Date of completion 20/03/2020

Estt. Cost Rs.1.50 lacs

Completion Cost Rs.0.90 lacs (Expenditure under CD&Pyt)

No. of people benefitted 50

Comments of stakeholders Improved Connectivity

Date of commencement 18/02/2020

Date of completion In progress

Estt. Cost Rs.3.50 lacs

Completion Cost Rs.1.29 lacs (Expenditure under CD&Pyt)

No. of people benefitted : 60

Comments of stakeholders Improved Connectivity

Constt of L/D from Culvert to H/o Jagdish Raj at Nonath Constt. of Pacca path/ Dunga at Devi sthan near shamshan ghat.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 660: PICTORIAL COMPENDIUM

655

Date of commencement 20/01/2020

Date of completion 30/03/2020

Estt. Cost Rs.1.50 lacs

Completion Cost Rs. 0.45 lacs (Expenditure under CD&Pyt)

No. of people benefitted 50

Comments of stakeholders Improved Connectivity

Date of commencement 25/12/2019

Date of completion 20/03/2020

Estt. Cost Rs.1.30 lacs

Completion Cost Rs. 0.91 lacs (Expenditure under CD&Pyt)

No. of people benefitted 300

Comments of stakeholders Improving sanitation facility

Constt of Culvert near Land of Roop Lal pyt Naran Constt of wall & repair of bathroom W.No 2 Ghagwal

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 661: PICTORIAL COMPENDIUM

656

Date of Commencement 2019-20

Date of completion March 2020

Estd Cost 9.50 lacs

Completion Cost 9.50 lacs

No. of Peoples benefitted 150

Comments of Stakeholders Much needed / Quality Work

Good Work

Date of Commencement 2019-20

Date of completion March 2020

Estd Cost 1.75 lacs

Completion Cost 1.75 lacs

No. of Peoples benefitted 80

Comments of Stakeholders Much needed / Quality Work

Good Work

Const. of approach road from PWD road to CFC building at BHQ Chenani(200)

Const. of T. Road from PMGSY road to CFC Tandar Block Chenani*(201)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 662: PICTORIAL COMPENDIUM

657

Date of Commencement 2019-20

Date of completion March 2020

Estd Cost 1.75 lacs

Completion Cost 1.75 lacs

No. of Peoples benefitted 70

Comments of Stakeholders Much needed / Quality Work

Good Work

Date of Commencement 24-12-2019

Date of completion March 2020

Estd Cost 1.90 lac

Completion Cost 1.90 lac

No. of Peoples benefitted 275

Comments of Stakeholders Much needed / Quality Work

Const. of Khul Morha Mittal W.No.6 Pyt. Bupp(202) Const of Kuchha Pucca Path by way of stone soling Bodi to SC Moh.(203)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 663: PICTORIAL COMPENDIUM

658

Date of Commencement 24-12-2019

Date of completion March 2020

Estd Cost 3.00 lacs

Completion Cost 3.00 lacs

No. of Souls benefitted 250

Comments of Stakeholders Much needed / Quality Work

For SC

Date of Commencement 13-10-2019

Date of completion 10-3-2020

Estd Cost 3.00

Completion Cost 3.00

No. of Peoples benefitted 45

Comments of Stakeholders Much needed / Quality Work

Const of T/road from Main road to SC Moh. W.No. 3(204 Const of P/Work with Crate at Pyt

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 664: PICTORIAL COMPENDIUM

659

Date of Commencement 13-10-2019

Date of completion 10-3-2020

Estd Cost 3.00

Completion Cost 3.00

No. of Peoples benefitted 50

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 2019-20

Date of completion 09-03-2019

Estd Cost 3.00 Lacs

Completion Cost 3.00 Lacs

No. of Peoples benefitted 150

Comments of Stakeholders Much needed / Quality Work

Good Work

Const of Protection Work /fencing near CFC building Latti-A (206) Const of Tractor Road WNo-1(207)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 665: PICTORIAL COMPENDIUM

660

Date of Commencement 16-08- 2019

Date of completion March-2020

Estd Cost 2.75 lacs

Completion Cost 2.75 lacs

No. of Peoples benefitted 75

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 16-08-2019

Date of completion March-2020

Estd Cost 2.75 lacs

Completion Cost 2.75 lacs

No. of Peoples benefitted 70

Comments of Stakeholders Much needed / Quality Work

Const of C/Path Ujh to Kattian W.No 05 (208) Const of Extension of B/Path from Sia to Maryal Dhar(209)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 666: PICTORIAL COMPENDIUM

661

Date of Commencement 18/12/2019

Date of completion 15/03/2020

Estd Cost 1.80

Completion Cost 1.80

No. of Peoples benefitted 150

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 20-02-2020

Date of completion 25-3-2020

Estd Cost 2.75

Completion Cost 2.75

No. of Peoples benefitted 100

Comments of Stakeholders Much needed / Quality Work

Constt. Of T-road Bani to Upper Durdi w.no 09(210) Constt. Of T.Road from Main Road to Badra(211)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 667: PICTORIAL COMPENDIUM

662

Date of Commencement 19/12/2019

Date of completion 20-3-2020

Estd Cost 2.70

Completion Cost 2.70

No. of Peoples benefitted 400

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 19/12/2019

Date of completion 20-3-2020

Estd Cost 2.75

Completion Cost 2.75

No. of Peoples benefitted 350

Comments of Stakeholders Much needed / Quality Work

Ren. of Hutt at BHQ Mansar(212) Ren. of CIC Building at BHQ Mansar(213)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 668: PICTORIAL COMPENDIUM

663

Date of Commencement 2019

Date of completion 15-3-2020

Estd Cost 1.34

Completion Cost 1.34

No. of Peoples benefitted 20

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 17/12/2019

Date of completion 15-3-2020

Estd Cost 2.75

Completion Cost 2.75

No. of Peoples benefitted 125

Comments of Stakeholders Much needed / Quality Work

Repair and Renovation of CFC Building at BHQ Ghordi(214 Ext. of T/Road Neeli to Dhat (215)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 669: PICTORIAL COMPENDIUM

664

Date of Commencement 15-12-2019

Date of completion March-2020

Estd Cost 2.50

Completion Cost 2.50

No. of Peoples benefitted 250

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 05-11-2019

Date of completion March. 2020

Estd. Cost 0.70 lac

Completion Cost 0.70 lacs

No. of Peoples benefitted 200

Comments of Stakeholders Much needed / Quality Work

Const of C/Path Pata Lad soo to Foot Bridge Toter Nallah W.No 9 Basnote(216) Const of T/road Kukar Morh to Kah (217)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 670: PICTORIAL COMPENDIUM

665

Date of Commencement Dec. 2019

Date of completion March 2020

Estd Cost 0.70 lacs

Completion Cost 0.70 lacs

No. of Peoples benefitted 150

Comments of Stakeholders Much needed / Quality Work

Date of Commencement 01-01-2020

Date of completion March-2020

Estd Cost 0.70 lacs

Completion Cost 0.70 lacs

No. of Peoples benefitted 150

Comments of Stakeholders Much needed / Quality Work

Const of T/road from road to H/o Shanker Singh Batota(218) Repair of T/road Sokan Moh. (219)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 671: PICTORIAL COMPENDIUM

666

DATE OF COMMENCEMENT 21-12-2019

DATE OF COMPLETION March-2020

ESTD. COST 2.00

COMPLETION COST 2.00

NO. OF SOULS BENEFITED 30

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QUALITY WORK

DATE OF COMMENCEMENT 05/03/2020

DATE OF COMPLETION 25/03/2020

ESTD. COST 1.00

COMPLETION COST 1.00

NO. OF SOULS BENEFITED 30

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QUALITY WORK

Drainage channel with P/wall to Bowli at Battal near matador stand(220) Const of L/D salmari near CFC building(221)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 672: PICTORIAL COMPENDIUM

667

DATE OF COMMENCEMENT 15-02-2020

DATE OF COMPLETION 20-03-2020

ESTD. COST 0.90

COMPLETION COST 0.90

NO. OF PEOPLES BENEFITED 30

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK

DATE OF COMMENCEMENT 01/03/2020

DATE OF COMPLETION 23/03/2020

ESTD COST 2.50

COMPLETION COST 2.50

NO. OF PEOPLE BENIFITED 100

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK

LANE DRAIN WITH CULVERT AT KASHIRAH NHO SANDOKU RAM(222) Const of culvert nearMS Lower Gandala(223)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 673: PICTORIAL COMPENDIUM

668

DATE OF COMMENCEMENT 01-01-2020

DATE OF COMPLETION 15-03-2020

ESTD. COST 0.49

COMPLETION COST 0.49

NO. OF PEOPLES BENEFITED 10

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK

DATE OF COMMENCEMENT 24-01-2020

DATE OF COMPLETION 18-03-2020

ESDT COST 1.30

COMPLETION COST 1.30

NO. OF SOULS BENEFITED 18

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK

CONST. OF LANE DRAIN NHO GIRDHARI LAL & OTHERS(224) BALANCE WORK FOR THE CONSTRUCTION OF DRAIN AT THE H/O DR. KUDYAAR(225)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 674: PICTORIAL COMPENDIUM

669

DATE OF COMMENCEMENT 1-1-2020

DATE OF COMPLETION March-2020

ESTD COST 2.00

COMPLETION COST 2.00

NO. OF SOULS BENEFITED 80

COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK

Date of Commencement 10.02.2020

Date of completion March 2020

Estd Cost 10.00 lacs

Completion Cost 10.00 lacs

No. of Peoples benefitted 400

Comments of Stakeholders Much needed / Quality Work

Const of lane and central drain near H/o Nasib(226) Const of T/road from Ambi towards Middle School Dhandal(227)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 675: PICTORIAL COMPENDIUM

670

Date of Commencement 15/12/2019

Date of completion 25-03-2020

Estd Cost 8.00

Completion Cost 8.00

No. of Peoples benefitted 56

Comments of Stakeholders Much needed / Quality Work

good

Date of Commencement 2019-20

Date of completion March 2020

Estd Cost 10.00

Completion Cost 10.00

No. of Peoples benefitted 70

Comments of Stakeholders Good Work Much needed / Quality Work Much Needed

Const of T road PMGSY road to joury(320) Const. of T. Road ST Mohalla W.No.4 Pyt Challyar (321)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 676: PICTORIAL COMPENDIUM

671

Date of commencement 04-11-2019

Date of completion 03-03-2020

Estimated Cost 6.00 Lacs

Completion Cost (Expdt underRGSA) 4.00 lacs

No. of People Benefited: 545

Comments of Stakeholders After repairing all Gram Sabhas duirng rain/snow are conducting in the premises of the Pyt. Ghar.

Date of commencement 08-02--2020

Date of completion 29-02-2020

Estimated Cost 6.00 Lacs

Completion Cost (Expdt under RGSA) 4.00 lacs

No. of People Benefited 2663 Nos.

Comments of Stakeholders After repairing all Gram Sabhas duirng rain/snow are conducting in the premises of the Pyt. Ghar.

S.No. 1264 Repair / Renovation of Panchayat Ghar Bhagna-C Block Nagseni District Kishtwar.

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

S.No. 1265 Repair / Renovation of Panchayat Ghar Sigdi-B1 Block Mughalmaidan District Kishtwar.

Page 677: PICTORIAL COMPENDIUM

672

Date of Commencement 20.12.2019

Date of Completion 15.03.2020

Estimated Cost 5 Lacs (4.00RGSA+1.00LacsMGNREGA)

Completion Cost 3.898 lacs (RGSA)

No of People Benefitted 400

Comments of the Stakeholders The work is satisfactory.

Date of Start 04/03/2020

Date of Completion Mar - 2020

E. Cost 8.00 Lacs

Expenditure 4.00 Lacs

No of Souls benefited 70

Comments of the Stakeholders -

Repair and Renovation of Panchayat Ghar Hari Buddha Lower (1238)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and Renovation ot Panchayat Ghar Khanater (1242)

Page 678: PICTORIAL COMPENDIUM

673

Date of Commencement 11-2019

Date of Completion Mar, 2020

Estimated Cost 8.00 Lakhs

Completion Cost 4.07 Lakhs

No. of People Benefitted 1500

Comments of Stakeholders Much needed /Quality of Work

Date of commencement 17-11-2019

Date of completion 28-03-2020

Estimated Cost 7.58 Lacs

Completion Cost 4.00 lacs

No. of People Benefited 400 Nos.

Comments of Stakeholders -

Repair / Renovation of Panchayat Ghar Loran Lower A (1239)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and renovation of Pyt. Ghar Surankote (1241)

Page 679: PICTORIAL COMPENDIUM

674

Date of Commencemen 12 / 2019

Date of Completion 03 / 2020Estimated

Cost 4.00 Lacs

Completion Cost 4.00

No of People Benefitted Whole Vilalge

Comments of the Stakeholders -

Date of Commencemen 2019 - 20

Date of Completion Mar - 2020

E. Cost 5.00 Lacs

Expenditure 4.00 Lacs (Expdt under RGSA)

No of Souls Benefited 203

Comments of the Stakeholders Much needed / Quality Work

Repair and Renovation of Panchayat Ghar Hari Buddha Lower (1238)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair / Renovation of Panchayat Ghar Nangali Sahib Sain Baba (NSSB) (1240

Page 680: PICTORIAL COMPENDIUM

675

Date of Commencemen 2019 - 20

Date of Completion Mar - 2020

E. Cost 5.00 Lacs

Expenditure 4.00 Lacs (Expdt under RGSA)

No of Souls Benefited 203

Comments of the Stakeholders Much needed / Quality Work

Date of commencement 11-06-2019

Date of completion 20-03-2020

Estimated Cost 4.00 Lacs

Completion Cost 4.00 lacs

No. of People Benefited 150 - 200

Comments of Stakeholders Satisfactory

Repair / Renovation of Panchayat Ghar Jaganoo Block Jaganoo Udhampur (1256)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair / Renovation of Pyt Ghar Seela (1257)

Page 681: PICTORIAL COMPENDIUM

676

Date of Commencement 19.05.2019

Date of Completion 18.02.2020

Estimated Cost 4.00 Lacs

Completion Cost 4.00 Lacs

No of People Benefitted 150 - 200

Comments of the Stakeholders The work is satisfactory

Date of Start 12.07.2019

Date of Completion 15.03.2020

E. Cost 4.00 Lacs

Expenditure 4.00 Lacs

No of Souls benefited 00 - 150

Comments of the Stakeholders The work is satisfactory

Repair / Renovation of Panchayat Ghar Panjgrain Block Chanunta (1254)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair / Renovation of Panchayat Ghar Basantgarh Block Dudu Basantgarh (1255)

Page 682: PICTORIAL COMPENDIUM

677

Date of Commencement 20.08.2019

Date of Completion 01.10.2019

Estimated Cost 4.00 Lacs

Completion Cost 4.00 Lacs

No of People Benefitted Whole Panchayat

Comments of the Stakeholders Important nature of work / quality work/public utility

Date of Start 05.09.2019

Date of Completion 28.12.2019

E. Cost 4.00 Lacs

Completion Cost 4.00 Lacs

No of People Benefitted Whole Panchayat

Comments of the Stakeholders Important nature of work / quality work/public utility

Repair / Renovation of Panchayat Ghar Chittergul B (1268)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Renovation / Repairs of Panchayat Ghar at Larkipora (RGSA)(1267)

Page 683: PICTORIAL COMPENDIUM

678

Date of commencement 03-12-2019

Date of completion 01-01-2020

Estimated Cost 3.22 Lacs

Completion Cost 3.22 lacs

No. of People Benefited: Whole Panchayat

Comments of Stakeholders Important nature of work / quality work/public utility.

Date of commencement 01-10-2019

Date of completion 02-02-2020

Estimated Cost 4.00 Lacs

Completion Cost 4.00 lacs

No. of People Benefited Whole Panchayat

Comments of Stakeholders Important nature of work / quality work/public utility.

Repair / Renovation of Panchayat Ghar Batkoot (Phalgam) under RGSA (1269)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair / Renovation of Panchayat Ghar Vessu (1270)

Page 684: PICTORIAL COMPENDIUM

679

Date of Commencement 15.01.2020

Date of Completion 28.02.2020

Estimated Cost 4.005 Lacs

Completion Cost 4.00Lacs

No of People Benefitted Whole Panchayat

Comments of the Stakeholders Important nature of work/ quality work/public utility

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair / Renovation of Panchayat Ghar Brakipora under RGSA (1266)

Page 685: PICTORIAL COMPENDIUM

680

Date of commencement 25-12-2019

Date of completion 03-03-2020

Estimated Cost 4.00Lacs(RGSA=3.10 MGNREGA=0.90)

Completion Cost (Expdt underRGSA) 1.55 Lacs

No. of People Benefited: 1230

Comments of Stakeholders Repair and renovation was needed for the said Panchayat Ghar.

Date of commencement 23-11-2019

Date of completion 08-02-2020

Estimated Cost 2.78 Lacs (RGSA = 2.78, MGNREGA =0.00)

Completion Cost (Expdt under RGSA) 2.78 Lacs

No. of People Benefited 1278

Comments of Stakeholders The Panchayat Ghar was in dilapidated condition.

Repair and Renovation of Panchayat Ghar at Berigam. (1274)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and Renovation of Panchayat Ghar at Kujar. (1272)

Page 686: PICTORIAL COMPENDIUM

681

Date of Commencement 07.02.2020

Date of Completion 19.03.2020

Estimated Cost 2.99Lacs(RGSA=2.78, MGNREGA=0.0)

Completion Cost 1.50 Lacs

No of People Benefitted 1610

Comments of the Stakeholders Repairment was needed for the said Panchayat Ghar .

Date of Start 06.02.2020

Date of Completion 08.03.2020

E. Cost 4.00Lacs (RGSA=3.0, MGNREGA=1.0)

Expenditure 1.50 Lacs

No of Souls benefited 1060

Comments of the Stakeholders Repairment of the said Panchayat was required

Repair and Renovation of Panchayat Ghar at Motibugh (1271)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and Renovation of Panchayat Ghar at Bogund. (1273)

Page 687: PICTORIAL COMPENDIUM

682

Date of commencement 25.09.2019

Date of completion March, 2020

Estimated Cost 3.50 Lacs

Completion Cost 1.75 Lacs

No. of People Benefited -

Comments of Stakeholders -

Repairment/ Renovation of PYT Ghar at Nazneenpora (1277)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Page 688: PICTORIAL COMPENDIUM

683

Date of Commencement 15.07.2019

Date of Completion March, 2020

Estimated Cost 3.75 Lacs

Completion Cost 1.75 Lacs

No of People Benefitted -

Comments of the Stakeholders -

Date of Start 28.12.2019

Date of Completion March, 2020

E. Cost 4.00 Lacs

Expenditure 2.00 Lacs

No of Souls benefited -

Comments of the Stakeholders -

Repairment / Renovation of PYT Ghar Dangam (1275)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repairment / Renovation of PYT Ghar K-Ullar (1276)

Page 689: PICTORIAL COMPENDIUM

684

Date of commencement 20-12-2019

Date of completion 26-03-2020

Estimated Cost 6.46 Lacs

Completion Cost (Expdt underRGSA) 3.50 Lacs

No. of People Benefited: 580

Comments of Stakeholders Satisfactory

Date of commencement 19-11-2019

Date of completion 27-03-2020

Estimated Cost 6.00 Lacs

Completion Cost (Expdt underRGSA) 4.00 Lacs

No. of People Benefited: 312

Comments of Stakeholders Satisfactory

- Repair and renovation of pyt ghar Sangaldan A. (1244)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and renovation of pyt ghar Dalwah Lower (1245)

Page 690: PICTORIAL COMPENDIUM

685

Date of Commencement 19-12-2019

Date of Completion 28-03-2020

Estimated Cost 5.00 Lacs

Completion Cost (Expdt underRGSA) 4.00 Lacs

No. of People Benefited: 580

Comments of Stakeholders Satisfactory

Date of Start 08.01.2020

Date of Completion 10.02.2020

E. Cost 4.00 Lacs

Completion Cost 4.00 Lacs

No. of People Benefited: Whole Panchayat

Comments of Stakeholders Much needed / Quality Work

Repair/Renovation of Panchayat Ghar at Dhok Jagir Block Akhnoor (1260)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and renovation of pyt ghar Mahu Upper (1243)

Page 691: PICTORIAL COMPENDIUM

686

Date of commencement 24-04-2019

Date of completion 01-03-2020

Estimated Cost 4.00 Lacs

Completion Cost (Expdt underRGSA) 2.50 Lacs

No. of People Benefited: 2500

Comments of Stakeholders Much needed quality work.

Date of commencement 25-11-2019

Date of completion 03-03-2020

Estimated Cost 4.00 Lacs

Completion Cost (Expdt under RGSA) 4.00 Lacs

No. of People Benefited 500

Comments of Stakeholders Much needed quality work.

Repair nad Renovation of Pyt. Ghar kootah Kathua (1247)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair/ renovation of panchayat ghar GANGAL BLOCK CHOWKI CHOURA (1259)

Page 692: PICTORIAL COMPENDIUM

687

Date of Commencement 25-11-2019

Date of Completion 31.03.2020

Estimated Cost 8.00Lacs

Completion Cost 4.6 Lacs(RGSA=4.00, GNREGA=0.60.)

No of People Benefitted 500

Comments of the Stakeholders Much needed quality work.

Date of Start 25-11-2019

Date of Completion 31.03.2020

E. Cost 8.00Lacs

Completion Cost 5.44 Lacs(RGSA=4.00, GNREGA=1.44)

No of People Benefitted 500

Comments of the Stakeholders Much needed quality work.

Repair nad Renovation of Pyt. Plahi (1248)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

:- Repair nad Renovation of Pyt. Ghar Rakh Lachipur (1246)

Page 693: PICTORIAL COMPENDIUM

688

Date of commencement 25-11-2019

Date of completion 31-03-2020

Estimated Cost 8.00Lacs

Completion Cost (Expdt underRGSA) 4.72 Lacs(RGSA=4.00, GNREGA=0.72

No. of People Benefited: 500

Comments of Stakeholders Much needed / quality work

Date of commencement 25-11-2019

Date of completion 31-03-2020

Estimated Cost 8.00Lacs

Completion Cost (Expdt underRGSA) 4.84 Lacs(RGSA=4.00, MGNREGA=0.84

No. of People Benefited: 500

Comments of Stakeholders Much needed / quality work

:- Repair and Renovation of Pyt. Ghar Chhan Lal Din ( 1250)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

:- Repair nad Renovation of Pyt. Ghar Tridwan (1249)

Page 694: PICTORIAL COMPENDIUM

689

Date of Commencement 03-01-2020

Date of Completion 25-03-2020

Estimated Cost 6.12 Lacs

Completion Cost 4.00 Lacs

No of People Benefitted 500 to 700

Comments of the Stakeholders Community Benefit work

Date of Start 13-11-2019

Date of Completion 25.03.2020

E. Cost 6.12 Lacs

Expenditure 6.12 Lacs

No of Souls Benefited 300 to 500

Comments of the Stakeholders Community Benefit work

REPAIR / RENOVATION OF PANCHAYAT GHAR – AGRATI NORTH Under RGSA (1252)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair / Renovation of Panchayat Ghar Panjgrain Under RGSA (1251)

Page 695: PICTORIAL COMPENDIUM

690

Date of commencement 13-11-2019

Date of completion 25-03-2020

Estimated Cost 6.12 Lacs

Completion Cost (Expdt underRGSA) 4.00 Lacs

No. of People Benefited: 350 - 400

Comments of Stakeholders Community Benefit work

Date of commencement 10-10-2019

Date of completion 25-03-2020

Estimated Cost 4.00 Lacs

Completion Cost 4.00 Lacs

No. of People Benefited Whole Panchayat

Comments of Stakeholders Upgradation of panchayat Infrastructure.

Repair and renovation of panchayat ghar Blater Block Sumb.Samba (1262)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

RENOVATION OF PANCHAYAT GHAR DOONGI BRAHMANA (1253)

Page 696: PICTORIAL COMPENDIUM

691

Date of Commencement 13-11-2019

Date of Completion March, 2020

Estimated Cost 6.50 Lacs

Completion Cost 5.38 Lacs

No of People Benefitted Whole Panchayat

Comments of Stakeholders Upgradation of panchayat Infrastructure.

Date of Start 11-11-2019

Date of Completion 25.03.2020

E. Cost 4.00 Lacs

Expenditure 4.00 Lacs

No of Souls benefited Whole Panchayat

Comments of Stakeholders Upgradation of panchayat Infrastructure.

Repair and renovation of panchayat ghar Sangwali Block Ghagwal (1263)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and renovation of panchayat Ghar Chak Nazir (1261)

Page 697: PICTORIAL COMPENDIUM

692

Date of commencement 25-12-2019

Date of completion 03-03-2020

Estimated Cost 4.00Lacs(RGSA=3.10 MGNREGA=0.90)

Completion Cost (Expdt underRGSA) 1.55 Lacs

No. of People Benefited: 1230

Comments of Stakeholders Repair and renovation was needed for the said Panchayat Ghar.

Date of commencement 23-11-2019

Date of completion 08-02-2020

Estimated Cost 2.78 Lacs (RGSA = 2.78, MGNREGA =0.00)

Completion Cost (Expdt under RGSA) 2.78 Lacs

No. of People Benefited 1278

Comments of Stakeholders The Panchayat Ghar was in dilapidated condition.

Repair and Renovation of Panchayat Ghar at Berigam. (1274)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and Renovation of Panchayat Ghar at Kujar. (1272)

Page 698: PICTORIAL COMPENDIUM

693

Date of Commencement 07.02.2020

Date of Completion 19.03.2020

Estimated Cost 2.99Lacs(RGSA=2.78, MGNREGA=0.0)

Completion Cost 1.50 Lacs

No of People Benefitted 1610

Comments of the Stakeholders Repairment was needed for the said Panchayat Ghar .

Date of Start 06.02.2020

Date of Completion 08.03.2020

E. Cost 4.00Lacs (RGSA=3.0, MGNREGA=1.0)

Expenditure 1.50 Lacs

No of Souls benefited 1060

Comments of the Stakeholders Repairment of the said Panchayat was required

Repair and Renovation of Panchayat Ghar at Motibugh (1271)

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

CALENDAR-ALT

CALENDAR-CHECK

`

`

USER

COMMENT-DOTS

Repair and Renovation of Panchayat Ghar at Bogund. (1273)

Page 699: PICTORIAL COMPENDIUM
Page 700: PICTORIAL COMPENDIUM

FINANCE DEPARTMENTGOVERNMENT OF JAMMU & KASHMIR

OF PROJECTS/WORKS COMPLETED DURING 2019-20 (UT SECTOR)

PICTORIAL COMPENDIUM

2B

PICTORIAL COMPENDIUM

2B