FINANCE DEPARTMENT GOVERNMENT OF JAMMU & KASHMIR OF PROJECTS/WORKS COMPLETED DURING 2019-20 (UT SECTOR) PICTORIAL COMPENDIUM 2A
FINANCE DEPARTMENTGOVERNMENT OF JAMMU & KASHMIR
OF PROJECTS/WORKS COMPLETED DURING 2019-20 (UT SECTOR)
PICTORIAL COMPENDIUM
2A
PICTORIAL COMPENDIUM
2A
of Projects/Works Completed during 2019-20 (UT sector)
PICTORIAL COMPENDIUM
2A
FINANCE DEPARTMENTGOVERNMENT OF JAMMU & KASHMIR
Designed by Web Chasers, SrinagarPublished by Finance Department, Govt. of J&K
Publication Year: August 2020
III
The benefits of development percolate down to the masses primarily only after projects/works get complet-ed in a time bound manner with adherence to all requisite norms and maintenance of quality parameters. The UT of J&K is committed to change the perception and tradition where by projects were executed and
tenders invited without budgetary support besides frequently changing the specifications and project designs resulting in cost and time overruns.
Finance Department has laid sharp focus on completion of development projects, their physical verification and concurrent evaluation so that remedial measures are taken even during the course of execution of the projects/works. These measures clubbed with making Administrative Approvals, Technical Sanctions, implementation of Pulse application, making photographic evidence before and after execution of projects mandatory etc. will ulti-mately lead to efficiency in planning, management and monitoring of the developmental activities.
A picture is worth a thousand words. Proper documentation of development projects completed with photo-graphic evidences is an effort towards our endeavour for brining transparency and accountability in execution of works. The pictorial compendium of projects/works completed during 2019-20 (UT sector) has been prepared by the Expenditure Division-II of the Finance Department. The compendium is in two volumes and contains dis-trict-wise/source-wise details of development projects/works of 33 Administrative Departments. I hope that the compendium will imbibe sense of accountability among the executing agencies as it is open to masses to see developmental works that have been executed in their respective areas. I felicitate my team of officers/officials in Expenditure Division-II for putting in hard efforts for completion of the compendium in a record time.
(Dr. Arun Kumar Mehta)
DR ARUN KUMAR MEHTAIAS
FINANCE COMMISSIONERFINANCE, J&K
2
Const. of road from main road to Peer Dardun at Beegam.Constt. of lane with tiles at Waltengo
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Date of start: 18-08-2019
Date of completion: 20-10-2019.
Approved Cost: 150 Lakh
Completion cost: 1.50 lakh
No. of souls benefitted: 260
Comments of stakeholders: Facilitates all weather connectivity.
Date of start: 05-05-2019
Date of completion: 18-08-2019
Approved Cost: 1.00 lakh
Completion cost : 1.00 lakh
No. of souls benefitted: 320
Comments of stakeholders: Facilitates the connectivity for agricultural purpose.
3
Drain from M/School Trahpoo to main Road to Shop of Farooq Tailor Trahpoo
Crossing Near Land Mohd Ishaq Mir at Tancha Khah Damhall
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Date of commencement: 04.11.2019
Date of completion: 03.12.2019
Approve Cost: 3.06
Completion cost : 3.06
No. of people benefited: 380
Cmments of stakeholders: Important nature of work/quality work/public utility
Date of commencement: 06.08.2019
Date of completion: 19.12.2019
Approve Cost: 3.00
Completion cost : 3.00
No. of people benefited: 260
Comments of stakeholders: Important nature of work/quality work/public utility
4
Date of Commencement: 01.11.2019
Date of completion: 23.12.2019
Approve Cost: 4.00
Completion cost : 4.00
No. of people benefited: 170
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 9.08.2019
Date of completion: 22.12.2019
Approve Cost: 4.00
Completion cost : 4.00
No. of people benefited: 320
Comments of stakeholders: Important nature of work/quality work/public utility
F.P Bund NLO Nisar Ahmad Mir and others at Tailwani Tile path at Naikpora Tailwani
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
5
Fencing Graveyard at GopalporaCulvert at Thajiwara
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Date of Commencement: 11.11.2019
Date of completion: 22.12.2019
Approve Cost: 1.50
Completion cost : 1.50
No. of people benefited: 150
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 11.09.2019
Date of completion: 30.12.2019
Approve Cost: 3.00
Completion cost : 3.00
No. of people benefited: 320
Comments of stakeholders: Important nature of work/quality work/public utility
6
Date of Commencement: 02.0.10.2019
Date of completion: 12.12.2019
Approve Cost: 5.00
Completion cost : 5.00
No. of people benefited: 180
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 02.07.2019
Date of completion: 12.12.2019
Approve Cost: 5.00
Completion cost : 5.00
No. of people benefited: 140
Comments of stakeholders: Important nature of work/quality work/public utility
Irrigation Ladh Sheikh Mohalla at Hanji Danter Link Road with E/Wall Malpora Anzullah
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
7
Date of Commencement: 15.10.2019
Date of completion: 29.12.2019
Approve Cost: 3.00
Completion cost : 3.00
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 14.08.2020
Date of completion: 23.12.2019
Approve Cost: 5.12
Completion cost: 5.12
No. of people benefited: 430
Comments of stakeholders: Important nature of work/quality work/public utility
Graveyard at Ruhoo Earth filling Graveyard with Drain at Ganie Check Anzwalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
8
Date of Commencement: 11.06.2019
Date of completion: 26.12.2019
Approve Cost: 3.00
Completion cost : 3.00
No. of people benefited: 110
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 30.09.2019
Date of completion: 28.12.2019
Approve Cos: 3.15
Completion cost: 3.15
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
irrgation Ladh from Mohd Maqbool Dar to Mongcal, Monghall Irrigation Ladh from Makahal to Rakh at Aung
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
9
Date of Commencement: 18.08.2019
Date of completion: 23.12.2019
Approve Cost: 3.50
Completion cost : 3.50
No. of people benefited: 135
Comments of sakeholders: Important nature of work/quality work/public utility
Date of Commencement: 02.06.2019
Date of completion: 23.12.2019
Approve Cost: 5.00
Completion cost : 5.00
No. of people benefited: 140
Comments of stakeholders: Important nature of work/quality work/public utility
Lane/Drain from S/O Shabir Ahmad to H/O Ab Rashid at Donipawa Xing to Nandi Nallah at T.Tachloo Shamsipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
10
Date of Commencement: 19.10.2019
Date of completion: 28.12.2019
Approve Cost: 10.00
Completion cost : 10.00
No. of people benefited: 1500
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 02.05.2019
Date of completion: 25.12.2019
Approve Cost: 5.98
Completion cost : 5.98
No. of people benefited: 370
Comments of stakeholders:
Important nature of work/quality work/public utility
Development of Play Field at Sursoona link Road Pushwariteng to kanjzigund to gund onwards soiling with edge wall
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
11
Date of Commencement: 28.09.2019
Date of completion: 20.12.2019
Approve Cost: 3.40
Completion cost : 3.40
No. of people benefited: 1200
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 09.08.2019
Date of completion: 28.12.2019
Approve Cost: 3.40
Completion cost : 3.40
No. of people benefited: 1200
Comments of stakeholders: Important nature of work/quality work/public utility
Irr Ladh Nlo M Maqbool Bhat And Others At Nard Bal At Laribal Krindigam
Link Road With E/Wall From PMGSY Road To Sangman Dadoo Panchpora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
12
Date of Commencement: 09.07.2019
Date of completion: 25.12.2019
Approve Cost: 5.00
Completion cost : 5.00
No. of people benefited: 800
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 02.10.2019
Date of completion: 19.12.2019
Approve Cost: 3.40
Completion cost : 3.40
No. of people benefited: 1500
Comments of stakeholders: Important nature of work/quality work/public utility
Link Road from Main Road Panjpora Herpora via Rather Mohalla
R/Wall Grave Yard Ziyarat Sharif At Astanpora Guree
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
13
Date of Commencement: 09.09.2019
Date of completion: 05.12.2019
Approve Cost: 4.00
Completion cost : 4.00
No. of people benefited: 2500
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 05.6.2019
Date of completion: 31.12.2019
Estimated Cost: 1.00
Completion cost: 1.00
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
link Roaf from Snagam Bridge to irrigation Gaguge at Sangam G.B Khalil Crossing at Lonepora chittergul B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
14
Date of Commencement: 07.10.2019
Date of completion: 22.12.2019
Approve Cost: 2.80
Completion cost : 2.80
No. of people benefited: 1300
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 02.10.2019
Date of completion: 22.12.2019
Approve Cost: 3.20
Completion cost : 3.20
No. of people benefited: 1500
Comments of stakeholders: Important nature of work/quality work/public utility
Road from Pyt. Ghar to L/O Gul Mohd Dar to Bilal Ahmad & others
Link Road From M/R To H/O Reyaz Malik And Others At Jablipora A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
15
Date of Commencement: 14.08.2019
Date of completion: 25.12.2019
Approve Cost: 3.20
Completion cost : 3.20
No. of people benefited: 1425
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 11.06.2019
Date of completion: 25.12.2019
Approve Cost: 3.40
Completion cost : 3.40
No. of people benefited: 1000
Comments of stakeholders: Important nature of work/quality work/public utility
Irr Ladh Near L/O Subhan Pandith To L/O Bashir Malik And Others Crossing near Jamia Masjid Sangam Sundbari A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
16
Date of Commencement: 05.05.2019
Date of completion: 26.12.2019
Approve Cost: 3.40
Completion cost : 3.40
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 02.04.2019
Date of completion: 10.12.2019
Approve Cost: 3.40
Completion cost : 3.40
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
protection work near AWC at Potonpora Hallpora Adhall Breng Irrigation Ladh at Chopan Mohallah Aoh
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
17
Date of Commencement: 19.08.2019
Date of Completion: 31.12.2019
Approved Cost: 3.20
Completion cost : 3.20
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 12.09.2019
Date of completion: 25.12.2019
Approved Cost: 3.00
Completion cost : 3.00
No. of people benefited: 350
Comments of stakeholders: Important nature of work/quality work/public utility
Public park near Shamshahn Ghar Ranipora P/Bund Near orchard of Javid Ahmad Bhat & others at village Chingund bewoora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
18
Date of Commencement: 09.07.2019
Date of completion: 28.12.2019
Approved Cost: 2.99
Completion cost : 2.99
No. of people benefited: 450
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 09.06.2019
Date of completion: 25.12.2019
Approved Cost: 2.40
Completion cost : 2.40
No. of people benefited: 450
Comments of stakeholders: Important nature of work/quality work/public utility
R/Wall NHO Showkat Ah.Ganie and others at Chinigund
Passenger Shed at Saller near Sumo Stand
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
19
Date of Commencement: .05.2019
Date of completion: 31.12.2019
Approved Cost: 2.00
Completion cost : 2.00
No. of people benefited: 300
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 01.08.2019
Date of completion: 27.12.2019
Approved Cost: 2.99
Completion cost : 2.99
No. of people benefited: 250
Comments of stakeholders: Important nature of work/quality work/public utility
drain with edge wall NLO Mohd Maqbool and Others at Nowpora
Drain with edge wall NLO Gh Nabi and Others at Nowpor
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
20
Date of Commencement 10.09.2019
Date of completion: 25.02.2020
Approved Cost: 3.70
Completion cost : 3.70
No. of people benefited: 150
Comments of stakeholders: Important nature of work/quality work/public utility
Date of Commencement: 08.06.2019
Date of completion: 25.02.2020
Approved Cost: 2.20
Completion cost : 2.20
No. of people benefited: 100
Comments of stakeholders: Important nature of work/quality work/public utility
Tile Path at Dangerpora Nanil Drain /Earth Filling Govt. Primary School ground at Akad
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
21
Date of Commencement 3.08.2019
Date of completion 30.12.2019
Approved Cost: 2.75
Completion cost : 2.75
No. of people benefited: 190
Comments of stakeholders: Important nature of work/quality work/public utility
Date of commencement: 19.09.2019
Date of completion: 15.02.2020
Approved Cost: 3.60
Completion cost : 3.60
No. o people benefited: 260 PPL
Comments of stakeholders: Important nature of work/quality work/public utility
Drain Bonkah Bradus at Shamispora Construction of crossing at Markibalard charigam yanner A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
22
Date of commencement: 21.06.2019
Date of completion: 31.2.2020
Approved Cost: 3.52
Completion cost : 3.52
No. of people benefited: 490 People
Comments of stakeholders. Much needed/community benefit/quality work
Date of commencement: 05.08.2019
Date of completion: 30.12.2019
Approve Cost: 6.00
Completion cost : 6.00
No. of people benefited: 370
Comments of stakeholders: Important nature of work/quality work/public utility
Construction Of Ghat Near Jamia Masjid Sharief Awoora Crossing near Masjid Sharief Kutbal Shelipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
23
Date of commencement: 19.11.2019
Date of completion: 31.12.2019
Approved Cost: 1.50
Completion cost : 1.50
Physical Status Completed Physically
No. o people benefited: 380 PPL
Comments of stakeholders
Much needed/community benefit/quality work
Date of commencement: 01.11.2019
Date of completion: 15.02.2020
Approved Cost: 3.13
Completion cost : 3.13
Physical Status Completed Physically
No. of people benefited: 180 persons
Comments of stakeholders
Much needed/community benefit/quality work
Construction Of Bund Near H/O Javaid Iqbal Shah Iram Colony Ainoo(Pyt) Aishmuqam.
C/O P/wall at Damjan Ladh on Nalla Sandarn at Sangarn
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
24
Date of Commencement: 13-03-2019
Date of Completion: 24-03-2020
Approved Cost: 1.66 lacs
Completion Cost: 1.66 lacs
Funds Released (CD&Pyts) = Nil
Expenditure incurred= Nil
Physical Status= Completed
No of People Benefitted: 250 Approx
Comments of Stakeholders: Enhanced rural connectivity & Provide access to agricultural fields
Much Needed/quality work:
Scheme:- CD panchayats
Date of Commencement: 10-12-2019
Date of Completion: 24-03-2020
Estimated Cost: 4.85 lacs
Completion Cost: 4.85 lacs
Funds Released (CD&Pyts) = Nil
Expenditure incurred= Nil
Physical Status= Completed
No of People Benefitted: 450 (Approx)
Comments of Stakeholders: Infrastructure development
Much Needed/quality work: Maintained Quality Standard
Scheme: C&D Panchayat + MGNREGA
C/o Culver at Eidgah Tilgam-B . C/o Fencing grave yard at Pethpora Wanigam Bala.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
25
Date of commencement: 2019-20
Date of Completion : March 20Estt
Cost: 2.72
Completion Cost:
No.of Population to be Benefited: 300
Comments on Stake Holder:-
Date of Commencement: 29-01-2020
Date of Completion:
Estimated Cost: = 4.80 Lacs
Completion cost =: 4.80 Lacs
Number of People Benefitted: 350
Much Needed and Quality Work.
Const of Culvert on Habligam to Hardbani road NLO mohd Sultan Mir Devbugh C/o Chopan Mohalla Drain at Mundji (Noorabad)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
26
Date of Start :- 28/01/2020
Date of Completion:- 15/03/2020
Approved Cost:- 2.13
Completion cost:- 2.13
No. of Souls Benefited:- 1200
Comments of Stakeholders:- There were a great need of this culvert having public demand as well as community based benefit .This Culvert is providing connectivity to vast land of Horticulture & Agriculture.
Date of start :- 25/02/2020
Date of Completion:- 23/03/2020
Approved Cost:- 2.29 lakh
Completion cost:- 2.29
No. of Souls Benefited:- 500
Comments of Stakeholders:- There were a great need of this culvert hav-ing public demand as well as community based benefit . This Culvert is providing connectivity to vast land of Horticulture & Agriculture.
C/o Culvert on Gundbal Road in Reban B C/o Culvert at sheikh Mohalla Panzalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
27
Date of Start - 25/02/2020
Date of Completion:- 30/05/2020
Approved Cost:- 1.85
Completion cost:- 1.85
No. of People Benefited:- 700Comments of Stakeholders:- There were a great need of this culvert having public de-mand as well as community based benefit . This Culvert is providing connectivity to two Hamlets of panchayat & it also connected vast land of Horticulture & Agriculture.
Date of Start- 01/03/2020
Date of Completion:- 3/2020
Approved Cost:- 2.17 Lakh
Completion cost:- 2.17
No. of People Benefited:- 600Comments of Stakeholders:- There were a great need of this culvert having public demand as well as community based benefit . This Culvert is providing connectivity to Pilgrims coming from different areas to pay Visit to Ziyarat Sharief & it also connected vast land of Horticulture & Agriculture.
C/o Culvert at Dar Mohalla & Ganie Mohalla Panzalla C/o Culvert near Ziyarat shareef Bibiya Khahmoh
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
28
Date of commencement:- 2018-19
Date of Completion :- march 2020
Estt Cost:- 3.29
Completion Cost:- 3.29
No.of Population to be Benefited:- 80
Comments on Stake Holder:-
Date of Completion:-
Approved Cost:- Rs3.90lacs
Completion cost:- 3.90 lack
Physical Status:- Under Process
No of Souls benefited:-
Comments of Stakeholder:-
Const of Culvert at Gam khul sonlipora bitehpora tangmarg
Constt. Of R/wall and Drain at New Chopan Mohalla Near land of Mohd. Yousf Chopan at Hudpora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
29
Date of commencement:- 2019-20
Date of Completion :- 20/03/2020
Estt Cost:- 3.00
Completion Cost:- 3.00
No.of Population to be Benefited:- 145
Comments on Stake Holder:-
Date of Commencement: 15-02.2020
Date of Completion: 3/20
Approved Cost: 4.69lacs
Completion Cost: 4.69 lacs
Expenditure incurred Nil
Const of Culvert on Tilgam Khul at Kralpora C/o R Wall Near pna Pyt Ghar Sangrama
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
30
Date of Commencement: 30/12/2019
Date of Completion: 18/03/2020
Estimated Cost: 2.65 lacs
Completion Cost: 2.57 lacs
No. of People benefitted: 80 Households
Comments of Stakeholders: Much needed / quality Work: Very Good
Date of Commencement: 01-03-2020
Date of Completion: 31-03-2020
Approved Cost: 3.99 lacs
Completion Cost: 3.99 lacs
Expenditure incurred; Nil
C/o Fencing of Graveyard Tang at Logripora tujjer C/o Culvert NHO Haji Ab Rehman Mir on Main Nallah Gantamulla Bala
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
31
Date of Commencement: 01-03-2020
Date of Completion: 31-3-2020
Estimated Cost: 4.41 lacs
Completion Cost: 4.41 lacs
Expenditure incurred= Nil
Date of Commencement: 0212-2019
Approved Cost: 4.00 lacs
Completion Cost: 4.00 lacs
Expenditure incurred= 1.5 Lacs + 0.40LacsNil
No of People Benefitted: 211 Approx
Comments of Stakeholders:Enhanced rural connectivity & Provide access to agricultural fields Much Needed/quality work:
C/o Culvert at Kesari Nallah Fatehgarh Laying of Grade 3rd from Bye Pass ( Petrol Pump) to H/O Farooq Ahmad at Nowpora A
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
32
Date of Commencement:- 08.01.2019
Date of Completion:- 31.01.2020
Estimated cost:- 3.00 Lakh
Completion cost :- 3.00 lakh
Expenditure CD & Pyt :- 0.87 Lkh
No. of people benefited:- 60 House Holds
Comments of stakeholders:- The work is of community benefit Much needed/quality work is satisfactory
Date of Commencement:- 20.03.2019
Date of Completion:- 19.06.2019
Estimated cost:- 2.00 Lakh
Completion cost :- 2.00 lakh
Expenditure CD & Pyt :- 0.50 Lkh
No. of people benefited:- 2300
Comments of stakeholders:- The work is of community benefit Much needed/quality work is satisfactory
Imp. of foot path with R. wall at Khojpora Const. of road Panchayat Ghar to Nagbal Halmathpora A
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
33
Date of Commencement:- 08.01.2019
Date of Completion:- 24.02.2020
Estimated cost:- 3.00 Lakh
Completion cost :- 3.00 lakh
Expenditure CD & Pyt :- 1.14 Lkh
No. of people benefited:-will facilitate to School going children as well as Gen. Public
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Date of Commencement:- 26.02.2020
Date of Completion:- 25.03.2020
Estimated cost:- 2.00 Lakh
Completion cost :- 2.00 lakh
Expenditure CD & Pyt :- 0.00 Lkh
No. of people benefited:- 280
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Imp. of road from Boys Middle School to Wani Mohallah Development of Park at Marazi Mohalla Halmathpora C
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
34
Date of Commencement:- 25.11.2019
Date of Completion:- 22.03.2020
Estimated cost:- 3.00 Lakh
Completion cost :- 3.00 lakh
Expenditure CD & Pyt :- 1.61 Lkh
No. of people benefited:- Whole village
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Date of Commencement:- 17.02.2020
Date of Completion:- 23.03.2020
Estimated cost:- 2.00 Lakh
Completion cost :- 2.00 lakh
Expenditure CD & Pyt :- 0.00
No. of people benefited:- 130
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Play field at LachiporaPublic Park at Sheikh Mohalla Halmathpora A near Masjid Abu Baker
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
35
Date of Commencement:- 18.12.2019
Date of Completion:- 20.03.2020
Estimated cost:- 2.50 Lakh
Completion cost :- 2.50 lakh
Expenditure CD & Pyt :- 0.00 Lkh
No. of people benefited:- 100
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Date of Commencement:- 21.11.2019
Date of Completion:- 20.03.2020
Estimated cost:- 1.93 Lakh
Completion cost :- 1.93 lakh
Expenditure CD & Pyt :- 0.70 Lkh
No. of people benefited:- 5 HHs
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
const. of Culvert near Irrigation Khul Tulwari Khan Bagh at Lassipora
Const. of 2 No Bathroom with Flush at Bhat Mohalla near G M Bhat and others at Wavoora “B”
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
36
Date of Commencement:- 04.02.2020
Date of Completion:- 22.03.2020
Estimated cost:- 2.00 Lakh
Completion cost :- 2.00 lakh
Expenditure CD & Pyt :- 0.00 Lakh
No. of people benefited:- 200
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Date of Commencement:- 14.02.2020
Date of Completion:- 15.03.2020
Estimated cost:- 2.08 Lakh
Completion cost :- 2.08 lakh
Expenditure CD & Pyt :- 0.00 Lakh
No. of people benefited:- 150
Comments of stakeholders:- The work is of community benefit
Much needed/quality work is satisfactory
Const. of Culvert on Nalla Dardpora Const. of Flush point near Jamia Masjid Dogerpora A
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
37
Date of Commencement:- 19.11.2019
Date of Completion:- March-20
Estimated cost:- 2.90 Lakh
Completion cost :- 2.90 lakh
Expenditure CD & Pyt:- 1.00 Lakh
No. of people benefited:- 35
Comments of stakeholders:- The work is of community benefit
Much needed/quality work
Date of Commencement:- 06.03.2020
Date of Completion:- 25.03.2020
Estimated cost:- 2.59 Lakh
Completion cost :- 2.59 lakh
Expenditure CD & Pyt:- 2.00 Lakh
No. of people benefited:- 800
Comments of stakeholders:- The work is of community benefit
Much needed/quality work
Const. of Tile Path and drain with R. wall NHO Fareeda Bagum and others at Gund Mancher
Const. of well with drain NLO Gh Hassan Bhat and others at Punzwa A
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
38
Date of Commencement:- 20.03.2020
Date of Completion:- 30.03.2020
Estimated cost:- 4.00 Lakh
Completion cost :- 4.00 lakh
Expenditure CD & Pyt:- 1.50 Lakh
No. of people benefited:- 1700
Comments of stakeholders:- The work is of community benefit
Much needed/quality work
Date of Commencement: 09-02-2020
Date of Completion: 14-03-2020
Estimated Cost : 2.15 lacs
Completion Cost : 2.15 lacs
No of people benefitted: 258
Comments of the Stake Holder: Good Quality Of Work
Const. of Public Park at Waisa Const. of drain near H/o Aijaz ah and others at Kalidar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
39
Date of Commencement: 14-03-2020
Date of Completion : 31-03-2020
Estimated Cost 2.37 lacs
Completion Cost : 2.37 lacs
No of people benefitted: 600
Comments of the Stake Holder: Good Quality Of Work
Date of Commencement: 11-03-2020
Date of Completion: 31-3-2020
Estimated Cost: 2.00 lacs
Completion Cost: 2.00 lacs
No of people benefitted: 150
Comments of the Stake Holder: Good Quality Of Work
Dev. Of graveyard by way of earth filling phase-ii at Gangipora
Upgradation Of Road With Drain From Link Road To H/O Gh Hassan Sofi At C.p.kalan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
40
Date of Commencement: 12-02-2020
Date of Completion 14-03-2020
Estimated Cost: 3.25 lacs
Completion Cost: 3.25 lacs
No of people benefitted: 600
Comments of the Stake Holder: Good Quality Of Work
Date of Commencement: 15-02-2020
Date of Completion: 15-03-2020
Estimated Cost: 1.60 lacs
Completion Cost: 1.60 lacs
No of people benefitted: 700
Comments of the Stake Holder: Good Quality Of Work
Devlopment Of Link Road From Bridge To Doon Basti With R/Wall At Behrampora Brarigund
Constt Of Link Road From Main Road To H/O M. Yaqoob , Bashir Ahmad & M. Ashraf & Others At Yarikalan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
41
Date of Commencement: 2019-20
Date of Completion : 15-03-2020
Estimated Cost: 0.42 lacs
Completion Cost: 0.42 lacs
No of people benefitted: 100
Comments of the Stake Holder: Good Quality Of Work
Date of Commencement: 01-03-2020
Date of Completion: 31-03-2020
Estimated Cost: 2.00 lacs
Completion Cost: 2.00 lacs
No of people benefitted: 1800
Comments of the Stake Holder: Good Quality Of Work
Construction of P/Bund From Main road to Syed Hassan Shah to Ghulam Mohmmad Mallah Wani Mohallah Paller
Improvement of Road From PMGSY-G to Doba B/W/O earth cutting soling malting at ladin
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
42
Date of Commencement: 15.03.2020
Date of Completion: 25.03.2020
Est. Cost: 2.99 Lacs
Completion cost: 2.99 Lacs
No. Of people benefited: 185
Comments of stakeholders:
Much needed /Quality Work:
Date of Commencement: 20.03.2020
Date of Completion: 27.03.2020
Est. Cost: 2.99 Lacs
Completion cost: 2.99 Lacs
No. Of people benefited: 110
Comments of stakeholders: Essential
Demand/ Quality Work
Construction Of Road From Main Road To Bridge At Sofipora C/O Tile Lane To Masjid Sharief At Sofipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
43
Date of Commencement: 18.03.2020
Date of Completion: 20.03.2020
Est. Cost: 2.99 Lacs
Completion cost: 2.99 Lacs
No. Of people benefited: 165
Comments of stakeholders:
Much needed /Quality Work:
Date of Start : 19-02-2020
Date of Completion: 18-03-2020
Approved Cost:- 2.00 Lacs
Completion cost : 2.00 lacs
No. of souls benefitted:- 60
Comments of Stakeholders:-
Connecting inhabitants.
C/O Tile Lane From Eidgah To H/O Parvaiz Ahmad Bhat At Sofipora
Improvement of road from H/o Gh Hassan Khan to Faqir Gujree at Nagbal Dara A.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
44
Date of Start:- 27-01-2020
Date of Completion:- 15-03-2020
Approved Cost:- 2.00 lacs
Completion cost: 2.00 lacs
No. of souls benefitted:- 120
Comments of Stakeholders:- Safeguarding graveyeard
Date of Start:- 21-01-2020
Date of Completion:- 09-03-2020
Approved Cost:- 2.00 lacs
Completion cost: 2.00 lacs
No. of souls benefitted:- 70
Comments of Stakeholders:- Enhancing Rural Connectivity
Development of Graveyard by way of R/Wall at sheikh Mohalla Dara B
Construction of road from H/o Gh Mohuidin Ganaie to H/o Gh Mohd Ganaie at Bilal colony Theed A.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
45
Date of Start:- 17-03-2020
Date of Completion:- 31-03-2020
Approved Cost:- 1.80 lacs
Completion cost : 1.80 lacs
Expenditure (CD&Pyt): Nil
No. of souls benefitted:- 110
Comments of Stakeholders:- Connecting People
Date of Start:- 07-03-2020
Date of Completion:- 23-03-2020
Approved Cost:- 2.50 lacs
Completion cost: 2.50
Expenditure (CD&Pyt): Nil
No. of souls benefitted:- 80
Comments of Stakeholders:- Safeguarding Graveyard
Construction of culvert near Gairbagh Barji at Gandtha Construction of R/Wall and Fencing of Graveyard at Balhama A.
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
46
Date of Start :- 17-02-2020
Date of Completion:- 09-03-2020
Approved Cost:- 1.50 Lacs
Completion cost: 1.50 lac
No. of souls benefitted:- 80
Comments of Stakeholders:- Combating Soil Erosion
Date of Start:- 24-02-2020
Date of Completion:- 19-03-2020
Approved cost:- 2.00 Lacs
Completion cost : 2.00 lacs
No. of souls benefitted:- 60
Comments of Stakeholders:- Enhancing Rural Connectivity
Date of Start:- 27-01-2020
Date of Completion:- 24-02-2020
Approved Cost:- 1.50 Lacs
Completion cost : 1.50 lacs
No. of souls benefitted:- 2000
Comments of Stakeholders:-Facilitating com-muters and general Public
Construction of protection bund near Darul-Aloom sirhindi sahib at Khonmoh C.
Construction of lane from H/o Zakir Hussain Bhat to H/o Gh Hassan Dar at Firdous Colony Balhama A.
Construction of Passenger Shed near Gramin Bank at Panzinara A.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
47
Date of Commencement 28/12/2018
Date of Completion March 2020
Estt. Cost 2.00 Lacs
Completion cost 2.00 Lacs
No. of Souls benefitted 65
Comments of Stakeholder Provide shelter to passenger
Date of Commencement 04/01/2018
Date of Completion March 2020
Estt. Cost 2.00 Lacs
Expenditure 2.00 Lacs
No. of Souls benefitted 65
Comments of Stakeholder Provided shelter to passenger
Const of Passenger Shed at Khoo Gharat(60)Const of Passenger Shed at Zero Morh Pyt Sersundwan(59)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
48
Date of Commencement 17/12/2018
Date of Completion 25/03/2020
Estt. Cost 1.00 Lacs
Completion cost 1.00 Lacs
No. of Souls benefitted 139
Comments of Stakeholder Much needed work
Date of Commencement 20/12/2018
Date of Completion March 2020
Estt. Cost 3.00 Lacs
Completion cost 2.99 Lacs
No. of Souls benefitted 45
Comments of Stakeholder Quality work
Const of Pond at Buttan near Akhara Ward No 2 Akhali Buttan(61)Renovation of Panchayat Ghar Building and C/wall at Pyt Jeri(58)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
49
Date of Commencement 2018-19
Date of Completion 2019-20
Estt. Cost 8.785
Completion cost 8.785
No. of Souls benefitted GP
Comments of Stakeholder Quality work
Estimated Cost:- 5.00 Lacs
Completion Cost:- 5.00 lacs
Date of Start:- 09/03/2020
Date of Completion:- 25/03/2020
Total no. of People Benefitted:- 200
Comment s of the State Holder:- Much Needed/ Quality Work
Construction of lane/drain at Madina Colony near H/o Riaz & others(26), Satwari
Work done liability for Const of earth work of Tractor Road from GMS Chubbi to Moda Khad KM 2nd falling under Salalkote Block Arnas(57)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
50
Estimated Cost:- 1.50 Lacs
Completion Cost:- 0.75
Date of Start:- 09/03/2020
Date of Completion:- 25/03/2020
Total no. of People Benefitted:- 90
Comment s of the State Holder:- Much Needed/ Quality Work
Estimated Cost:- 1.50 Lacs
Completion Cost:- 1.50 Lacs
Date of Start:- 09/03/2020
Date of Completion:- 26/03/2020
Total no. of People Benefitted:- 100
Comment s of the State Holder:- Much Needed/ Quality Work
Construction drain at Vidhata Nagar Bathindi near H/o Farooq(27)Constt. of lane/drain at Charak Mohalla Sunjwan(23)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
51
Estimated Cost:- 2.50 Lacs
Completion Cost:- 1.25 Lacs
Date of Start:- 09/03/2020
Date of Completion:- 26/03/2020
Total no. of People Benefitted:- 90
Comment s of the State Holder:- Much Needed/ Quality Work
Estimated Cost:- 2.00 Lacs
Completion Cost:- 2.00 Lacs
Date of Start:- 09/03/2020
Date of Completion:- 27/03/2020
Total no. of People Benefitted:- 100
Comment s of the State Holder:- Much Needed/ Quality Work
Construction of covered drain at Fariada Enclave Sunjwan(24)Constt. Lane/drain at Bathindi near H/o Dr. Mantu(25)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
52
Estimated Cost:- 1.50 Lacs
Completion Cost:- 0.65
Date of Start:- 09/03/2020
Date of Completion:- 27/03/2020
Total no. of People Benefitted:- 90
Comment s of the State Holder:- Much Needed/ Quality Work
Estimated Cost:- 2.50 Lacs
Completion Cost:- 1.00 Lacs
Date of Start:- 09/03/2020
Date of Completion:- 28/03/2020
Total no. of People Benefitted:- 100
Comment s of the State Holder:- Much Needed/ Quality Work
Construction of lane/drain near H/o Wasim & others(28)Constt. of Nallah on main road NHO Farooq Ahmed at Gulmarg Colony Bathindi(30)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
53
Estimated Cost:- 2.00 Lacs
Completion Cost:- 0.88
Date of Start:- 09/03/2020
Date of Completion:- 28/03/2020
Total no. of People Benefitted:- 90
Comment s of the State Holder:- Much Needed/ Quality Work
Date of Commencement: 09.03.2019
Date of Completion: 25.03.2020
Estimated Cost: Rs. 3.20 Lacs
Completion Cost: Rs.3.20 Lacs
No of people benefitted: 145
Comments of the Stake Holder: Better Rural Connectivity.
Constt. of L/D from H/o Dr. Nirmal Singh to H/o Joginder Singh to Tilak Raj and allied links village Pachail. (31)Laying of Slab near H/o Hussain Malik, Mukhtar & others.(29)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
54
ESTIMATED COST : 3.50 LACS
EXPENDITURE: 0.45 LACS
DATE OF START : 17-01-2019
DATE OF COMPLETION : 24-03-2020
TOTAL BENEFICIARIES BENEFITTED : 60
COMMETS OF THE STAKE HOLDERS : MUCH NEEDED / QUALITY WORK
ESTIMATED COST : 4.50 LACS
COMPLETION COST : 4.00 LACS
DATE OF START : 12-01-2019
DATE OF COMPLETION : 14-03-2020
TOTAL BENEFICIARIES BENEFITTED : 55
COMMETS OF THE STAKE HOLDERS : MUCH NEEDED / QUALITY WORK
NAME OF THE WORK : COSTT OF T ROAD FROM MAIN ROAD TO MOHALLAH BADOLA(01)
NAME OF THE WORK : COSTT OF T/ ROAD FROM MAIN ROAD TO SHAMSHAN GHAT MUNDH
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
55
Date of Commencement: 22-10-2018
Date of Completion: 30-12-2019
Estimated Cost: 4.00 lacs
Completion Cost: 4.00 lacs (CD&Pyt) cum.
No. of People benefitted: 55
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Date of Commencement: 22-10-2018
Date of Completion: 04-09-2019
Estimated Cost: 2.50 lacs
Completion Cost: 2.50 lacs (CD&Pyt) cum.
No. of People benefitted: 35
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Name of the work(S No.13): Const. of T. Road from PWD Road to Gaward
Name of the work(S No.12): Const. of T- Road from PWD Road Bashat to Dhangal Road W.No.1
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
56
Date of Commencement: 08-03-2019
Date of Completion: 17-03-2020
Estimated Cost: 2.50 lacs
Completion Cost: 2.50 lacs (CD&Pyt) cum.
No. of People benefitted: 85
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Date of Commencement: 20-03-2019
Date of Completion: 31-03-2020
Estimated Cost: 5.00 lacs
Completion Cost: 4.00 lacs (CD&Pyt) cum.
Soul to be benefitted:- 100
Comments of Stockholder:- Work done is great and community getting the full benefit of it for which it has been constructed.
Name of the work(S No.15): Special Repair of thor to Paddar T/Road pyt Kanah block GhordiName of the work(S No.14): Const. of T. Road from Graveyard to
SC Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
57
Date of Commencement 17-09-2019
Date of completion 02-11-2019
Funds received 1.00 lacs
Final Expenditure 0.50 lacs (CD&Pyt) cum.
No. of Souls benefitted 50
Comments of Stockholder Saves a lot of time
Much needed/quality work Quality work
Date of Commencement 17-09-2019
Date of completion 02-11-2019
Funds received 0.50 lacs
Final Expenditure 0.25 lacs (CD&Pyt) cum.
No. of Souls benefitted 100
Comments of Stockholder Beneficial for school children
Much needed/quality work Quality work
Const of T/road from Barta School to DudarProvision of T/road Jakheni Kaldi road to Bathuni
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
58
Date of commencement 15-09-2018
Date of Completion 31-12-2019
Estt. Cost 2.50 Lacs
Completion Cost 0.50 Lacs (CD&Pyt) cum.
No. of People benefitted 300
Comments of Stakeholders Satisfactory
Much Need/ Quality Work Quality Work
Date of commencement 18-09-2018
Date of Completion 31-12-2019
Estt. Cost 2.50 lacs
Completion Cost 0.50 lacs (CD&Pyt) cum.
No. of People benefitted 500
Comments of Stakeholders Satisfactory
Much Need/ Quality Work Quality Work
Provision of Tractor Road from Pasku to SalaraProvision of Tractor Road from Ossu Kaira road to Mlkeyiann
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
59
Date of commencement 02/11/2019
Date of Completion 31/12/2019
Estt. Cost 0.50 lacs
Completion Cost 0.25 lacs (CD&Pyt) cum.
No. of People benefitted 30
Comments of Stakeholders Satisfactory
Much Need/ Quality Work Quality Work
Date of commencement 02/11/2019
Date of Completion 31/12/2019
Estt. Cost 0.50 lacs
Completion Cost 0.25 lacs (CD&Pyt) cum.
No. of People benefitted 30
Comments of Stakeholders Satisfactory
Much Need/ Quality Work Quality Work
Provision of T/Road from NHW to Nallah via Peer Danga_ Pyt Mand East
Const. of T/Road from Seen Tharkan Road to Badaga Mohalla Pyt Mand West
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
60
Date of Commencement: 22-10-2018
Date of Completion: 30-08-2019
Estimated Cost: 2.50 lacs
Completion Cost: 2.50 lacs (CD&Pyt) cum.
No. of People benefitted: 40
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Date of Commencement: 08-03-2019
Date of Completion: 30-08-2019
Estimated Cost: 3.00 lacs
Completion Cost: 3.00 lacs (CD&Pyt) cum.
No. of People benefitted: 35
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Name of the work(S No.51): Const. of Compound Wall/ Fencing near CFC building BDO Office Chenani Part -1
Name of the work(S No.50): Const. of approach and Parking in the premises Block Office Chenani.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
61
Date of Commencement: 08-03-2019
Date of Completion: 17-03-2020
Estimated Cost: 3.50 lacs
Completion Cost: 3.50 lacs (CD&Pyt) cum.
No. of People benefitted: 350
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Date of Commencement: 01-12-2018
Date of Completion: 31-03-2020
Estimated Cost: 4.00 lacs
Completion Cost: 4.00 lacs (CD&Pyt) cum.
No. of People benefitted: 400
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Name of the work(S No.53): Constt of Passenger Shed at Bus Stand Katwalt.
Name of the work(S No.52): Const. of Lane/drain Eid Gah Sudhmahadev
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
62
Date of commencement 12-12-2018
Date of Completion 09-12-2019
Estt. Cost 4.00 lacs
Completion Cost 3.50 lacs (CD&Pyt) cum.
No. of People benefitted 100
Comments of Stakeholders Satisfactory
Much Need/ Quality Work Quality Work
Date of commencement 12-12-2018
Date of Completion 09-12-2019
Estt. Cost 1.50 lacs
Completion Cost 1.23 lacs (CD&Pyt) cum.
No. of People benefitted 500
Comments of Stakeholders Satisfactory
Much Need/ Quality Work Quality Work
Const. of water tanki Near Yug devsthanConst. of Steps from Canal to Lower Thartyal W.No.1
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
63
Date of Commencement: 04-01-2019.
Date of Completion: 16-12-2019.
Estimated Cost: 4.50 lacs
Completion Cost: 4.50 lacs (CD&Pyt) cum.
No. Of Souls Benefitted: 180.
Comments of stakeholders: Good work
Much needed/quality work: Much needed
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 5.00 lacs
Expd.:- 2.88 lacs
No of people benefited:- 250
Comments of stakeholders
Much needed/quality work:- Good Quality
Name of Work:-Constt. Of L/D under Model Village Jakhwar(41)Name of the work(S No.56): Tiled Pathway at Morah Alsoo pyt Kail block Khoon.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
64
Date of commencement:- 2018-19
Date of Completion 22-12-2019
Estimated Cost:- 2.50 lacs
Completion Cost :- 1.52 lacs
No of people benefited:- 250
Comments of stakeholders
Much needed/quality work:- Good work
Date of commencement:-. 1-12-2018
Date of Completion:- 31.12.2019
Estimated Cost:- 3.00
Expd. :- 1.73
No of people benefited:- 250
Comments of stakeholders
Much needed/quality work:- Good Quality
Name of Work:- Constt. Of T/R from Dharalta Road to the h/o Kripal Singh and others(07)Name of Work:- Development of Ground at Bajohie.(37)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
65
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 5.00 lacs
Expd. :- 2.87 lacs
No of people benefited:- 240
Comments of stakeholders
Much needed/quality work:- Good Quality
Date of commencement:- 01.12.2019
Date of Completion:- 31.12.2019
Estimated Cost:- 6.00 lacs
Completion Cost :- 1.00 lacs
No of people benefited:- 200
Comments of stakeholders
Much needed/quality work:- Good Quality
Constt. Of T/R by way of RBM filling with protection work from SC mohalla to Rajpur moh Pyt Satura Kathua(22)
Name of Work:- Constt. Of T/R from Surara road to h/o Thakur Singh via patti Mohalla Pyt. Dewal Block Barnoti(08)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
66
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 2.50 lacs
Expd.:- 2.50 lacs
No of people benefited:- 150
Comments of stakeholders
Much needed/quality work:- Good Quality
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 4.32 lacs
Completion Cost :- 2.49 lacs
No of people benefited:- 100
Comments of stakeholders
Much needed/quality work:- Good Quality
Name of Work:- Constt. Of D/Channel at Moh. Panthal, pyt Pallan(38)
Name of Work:- Constt. Of Lane with protection at Thain Mohalla Khajur Singh and others at Dinga Amb B(42)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
67
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 7.00 lacs
Expd:- 3.52 lacs
No of people benefited:- 200
Comments of stakeholders
Much needed/quality work:- Good Quality
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 5.00 lacs
Expd.:- 2.88 lacs
No of people benefited:- 250
Comments of stakeholders
Much needed/quality work:- Good Quality
Name of Work:-Up gradation of T/R from Ghar Malti Road to mohalla Kartar Up to Jasmotra Moh.(09)
Name of Work:- Constt. Of Lane and Drain with culvert Moh. Panthal near Masjid Panthal(39)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
68
Date of commencement:- 06-03-2019
Date of Completion 22-12-2019
Estimated Cost:- 3.00 lacs
Completion Cost :- 1.65
No of people benefited:- 190
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Good Quality
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 2.00 lacs
Completion Cost.:- 1.38 lacs
No of people benefited:- 250
Comments of stakeholders
Much needed/quality work:- Good Quality
Name of Work:-Constt. Of L/D with culvert from link road to h/o Tirth at village Haripur Paddel(43)Name of Work:- Development of Ground at Macchedi.(36)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
69
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 3.00 lacs
Completion Cost :- 2.25 lacs
No of people benefited:- 300
Comments of stakeholders
Much needed/quality work:- Good Quality
Date of commencement:- 05.11.2019
Date of Completion:- 31.03.2020
Estimated Cost:- 4.00 lacs
Completion Cost :- 0.50 lacs
No of people benefited:- 50
Comments of stakeholders:- Demand of Public
Much needed/quality work:- Good Work
Name of Work:-Constt. Of Plate form with lying of tiles near Baba Birfanath at sohal pyt Kootah Block Hiranagar(62)
Name of Work:-Constt. Of road from tridwan to choie with filling and wire crates(10)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
70
Date of commencement:- 01.12.2018
Date of Completion:- 31.12.2019
Estimated Cost:- 16.00 lacs
Completion Cost :- 12.80 lacs
No of people benefited:- 250
Comments of stakeholders
Much needed/quality work:- Good Quality
Estt. Cost :- 1.00 Lacs
Completion Cost (Cum. Expdt):- 0.93 Lacs
Date of Start:- 23-10-2018
Date of Completed:- 20-12-2019
Number of people benefited: 110
Comments of the Stake Holder: Much needed work
Name of work:- R/wall Nr.Lal Hussain Uchhad Pyt.Uchhad(34)Name of Work:-Constt. Of culvert of Gharati Kasori Road(40)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
71
Estt. Cost:- 1.00 Lacs
Completion Cost(Cum.Expdt): 0.75Lacs
Date of Start:- 04-12-2018
Date of Completed:- 02-12-2019
Number of people benefited: 120
Comments of the Stake Holder: Much needed work
Estt.Cost :- 1.00 Lacs
Completion Cost (Cum. Expdt):- 0.93 acs
Date of Start:- 22-01-2019
Date of Completed:- 10-12-2019
Number of people benefited: 150
Comments of the Stake Holder: Much needed work
Name of work:- Tr. Road Uchhad Kameer(5)Name of work:- Tr. Road from main road to Bandian Balnoi(3)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
72
Estt. Cost :- 1.00 Lacs
Completion Cost (Cum.Expdt): 0.75Lacs
Date of Start:- 04-12-2018
Date of Completed:- 01-12-2019
Number of people benefited: 200
Comments of the Stake Holder: Much needed work
E. Cost :- 1.00 Lacs
Completion Cost (Cum. Expdt):- 0.75 Lacs
Date of Start:- 04-12-2018
Date of Completed:- 05-12-2019
Number of people benefited: 110
Comments of the Stake Holder: Much needed work
Name of work C/Wall at Moh.Cheyan Ziara Dhara Topa Pyt.Topa(32)Name of work:- Tr. Road from M/R to Bakarwallan Ghani Lower.(4)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
73
Estimated Cost. : 7.00 lacs
Completion Cost (Cum. Expdt):- 5.25 lacs
DOS:- 18-03-2019
DOC:- 31-12-2019
Number of people benefitted: 200
Comments of the Stake Holder: Much needed work
Date of Commencement: 20-03-2019
Date of Completion: 31-03-2020
Estimated Cost: 1.75
Completion Cost (Cum. Expdt): 1.44
No of people benefitted: 50
Comments of the Stake Holder: The Work is executed for Community Development
Name of Work with Location: Constt. of C/Path from Main Road to Naka Nr. KM 2nd to Moh. Khori Ping Nr. Waseem Raja & Other Pyt. Naka Majhari(35)
Work Name: Const. of Road at Lower Bhatidhar Nr Shamim Ahmed.(6)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
74
Date of commencement:- 15-11-2018
date of completion:- 31-12-2019
Estimated Cost:- 1.50 Lacs
Completion Cost:- 1.50 Lacs
No. of people benefited:- 50
Comments of stakeholders:- After completion of works people are thankful to RDD.
Date of commencement:- 08-09-2018
date of completion:- 24-12-2019
Estimated Cost:- 3.00 Lacs
Completion Cost:- 3.00 Lacs
No. of people benefited:- 300
Comments of stakeholders:-After renovation of BHQ Building accommodation of office of Block Development officer Padder has been strengthen.
Dev. Of Ground/ Allied Work and Repair of Compound Wall at BHQ Padder Pyt. Gulabgarh Block Palmar District Kishtwar.(45)
Const. of Sanitary Complex Near Ziarat Zain Ud Din Dhah (RA) Saheb at Bhanderkoot Pyt. Lower Palmar-C Block Palmar District Kishtwar.(44)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
75
Date of commencement:- 01-09-2018
Date of completion:- 30-12-2019
Estimated Cost:- 1.00 Lacs
Completion Cost:- 1.00 Lacs
No. of people benefited:- 40
Comments of stakeholders:- Public of the area has appreciated the work.
Date of commencement:- 10-10-2018
date of completion:- 30-12-2019
Estimated Cost:- 2.50 Lacs
Completion Cost:- 2.50 Lacs
No. of people benefited:- 450
Comments of stakeholders:- Pyt. Ghar protected by protection work .
Fencing of Pyt. Ghar Bhagna-C Pyt. Bhagna-C Block Nagseni District Kishtwar.(47)
Constt of Protection work near land of Gh. Hussain Sheikh Pyt. Inshan Block Warwan District Kishtwar.(46)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Phtograph not available
76
Date of commencement:- 14-02-2018
Date of completion:- 30-12-2019
Estimated Cost:- 2.50 Lacs
Completion Cost:- 2.50 Lacs
No. of people benefited:- 250
Comments of stakeholders:- After completion of works people are thankful to RDD.
Date of commencement:- 12-02-2019
date of completion:- 31-12-2019
Estimated Cost:- 2.00 Lacs
Completion Cost:- 2.00 Lacs
No. of people benefited:- Public of the area is quite satisfied with the work.
Const. of Community Sanitary Complex at Agral Near Ashtadashbhuja Matta Temple Pyt. Agral Block Trigam District Kishtwar.(49)
P/Path From Chandi Mata Mandir Wasser to Shiv Mandir Bunkuleed Pyt. Lachkhazana Block Kishtwar District Kishtwar.(48)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
77
Date of commencement: 15/12/2019
Date of completion: 20/03/2020
Estt. Cost: 2.00 lacs
Completion Cost: 1.57 lacs
No. of people benefitted : 100
Comments of stakeholders: Improve connectivity
Date of commencement : 25/12/2019
Date of completion : 20 /03/2020
Estt. Cost : 2.00 lacs
Completion Cost : 1.51 lacs
No. of people benefitted : 50
Comments of stakeholders : Improve connectivity
Constt. Of lane/drain alongwith protection wall at kupri near the h/o sardari lal.(66)Constt. Of L/d at Amli w.no.1 moh. Naresh Kumar.(65)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
78
Date of commencement : 23/12/2019
Date of completion : 25 /02/2020
Estt. Cost : 3.00 lacs
Completion Cost : 2.47 lacs
No. of people benefitted : 20
Comments of stakeholders : Protection to land of locals
and houses
Date of commencement : 25/12/2019
Date of completion : 20 /03/2020
Estt. Cost : 3.50 lacs
Completion Cost : 2.82 lacs
No. of people benefitted : 100
Comments of stakeholders : Proper drainage of water.
Constt. Of pacca nallah from kali dass cattelshed to onwards.(69)Constt. Of protection work at patyari w.no.2 near the h/o Avtar Singh.(67)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
79
Date of commencement: 30/12/2019
Date of completion: 19/03/2020
Estt. Cost: 1.50 lacs
Completion Cost: 1.17 lacs
No. of people benefitted : 300
Comments of stakeholders: Public work
E.Cost: 6.50 lacs
Expenditure : 1.05 lacs
Date of Start : 10-02-2020
Date of Completion: 15-03-2020
No Of Souls Benefitted : 275
Comments of Stakeholders:- Satisfactory
Much Need/Quality Work:- Good
E.Cost: 1.20 lacs
Expenditure : 1.20 lacs
Date of Start : 01-03-2020
Date of Completion: 30-03-2020
No Of Souls Benefitted : 275
Comments of Stakeholders:- Satisfactory
Much Need/Quality Work:- Good
Name of Work: Repair & Renovation of BHQ Banihal(63)
Name of Work: Construction of C/Path Mugal Mohalla to Railway Road , Lower Dalwah(64)
Leveling of Shamshan Ghat at Samthyal(68)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
80
C/o CSC Laterine near Masjid shareef Ahlihadees Bhatpora Block Larnoo(01)
3 No Sanitary Complex (Lava tory Blocks at Shri Ramkrishna) Block Achabal(02)
Date of Commencement : 12-06-2019
Date of Completion : 03-08-2019
Estimated Cost : 2.00
Completion Cost : 1.89
No of people benefitted : 120
Date of Commencement : 16/05/2019
Date of Completion : 17/09/2019
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 65
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
81
03. No Sanitary Complex (Lava tory Blocks at Shri Ramkrishna) part II Block Achabal(03)
Date of commencement : 17-06-2019
Date of Completion : 07-08-2019
Estt. Cost : 2.00 (SBM Share 1.80+B,S=0.20)
Completion cost (Exp) : 1.79
No. of People benefitted : 110
comments of stakeholder : Much needed /quality work :-
Date of commencement : 12-06-2019
Date of Completion : 02-09-2019
Estt. Cost : 2.00(SBM Share 1.80+B,S=0.20)
Completion cost(Exp) : 1.79
No. of People benefitted : 12
comments of stakeholder : Much needed /quality work
03. No Sanitary Complex (Lava tory Blocks at Shri Ramkrishna) (04)Part III Block Achabal
CALENDAR-ALT
CALENDAR-CHECK
`
`USER
CALENDAR-ALT
CALENDAR-CHECK
`
`USER
82
C/O COMMUNITY SANITARY COMPLEX AT BHQ CHITTERGULL(05)
C/O COMMUNITY SANITARY COMPLEX NEAR HIGH SCHOOL CHOWGAM BLOCK CHITTERGULL(06)
Date of Commencement : 08/04/2019
Date of Completion : 30/04/2019
Estimated Cost : 2.00
Completion Cost : 2.00
No of people benefitted : 125 HH
Date of Commencement : 01/07/2019 Date of Completion : 30/07/2019Estimated Cost : 2.00Completion Cost : 2.00No of people benefitted : 300
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
``USER
83
C/O COMMUNITY SANITARY COMPLEX NEAR JAMIA MASJID DEETHU (07)
Date of Commencement : 01/04/2019
Date of Completion : 02/05/2019
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 150
Date of Commencement : 15/05/2019
Date of Completion : 31/05/2019
Estimated Cost : 2.00
Completion Cost : 2.00
No of people benefitted : 142
C/O COMMUNITY SANITARY COMPLEX AT HIGH SCHOOL NANIL BLOCK K-PORA(08)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
84
C/O COMMUNITY SANITARY COMPLEX AT HANGALPAWA BLOCK K-PORA(09)
C/O COMMUNITY SANITARY COMPLEX AT RANBIRPORA BLOCK K-PORA(10)
Date of Commencement : 01/04/2019
Date of Completion : 01/08/2019
Estimated Cost : 2.00
Completion Cost : 1.80
No of people benefitted : 30
Date of Commencement : 08/03/2019
Date of Completion : 15/04/2019
Estimated Cost : 2.00
Completion Cost : 1.80
No of people benefitted : 127
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
85
C/O COMMUNITY SANITARY COMPLEX NEAR MASJID SHARIEF FOHAR BLOCK K-PORA(11)
Date of Commencement : 01-04-2019
Date of Completion : 25-04-2019
Estimated Cost : 1.80 Lakhs
Completion Cost : 1.80 Lakhs
No. of people benefitted : 230
Date of Commencement : 03/04/2019
Date of Completion : 05/05/2019
Estimated Cost : 2.00
Completion Cost : 1.80
No of people benefitted : 55
CSC at Kabamarg BLOCK SHAHABAD(12)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
86
Sanitary Scomplex at Govt. Higher Secondary School Kabamarg BLOCK SHAHABAD(13) Sanitary Complex Kreeri Masjid Shareef BLOCK SHAHABAD(14)
Date of Commencement : 22-07-2019
Date of Completion : 25-10-2019
Estimated Cost : 1.80 Lakhs
Completion Cost : 1.80 Lakhs
No . Of persons benefitted : 159
Date of Commencement : 02-04-2019
Date of Completion : April 2019
Estimated Cost : 1.80 Lakhs
Completion Cost : 1.80 Lakhs
No. of people benefitted : 230
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
87
CSC Constructed at Jamia Masjid Shareef Mantpora BLOCK SHAHABAD (15)
Date of Commencement : 08-05-2019
Date of Completion : 11-09-2019
Estimated Cost : 1.80 Lakhs
Completion Cost : 1.80 Lakhs
No. of persons benefitted : 118
Date of Commencement : 10-07-2019
Date of Completion : 30-10- 2019
Estimated Cost : 1.80 Lakhs
Completion Cost : 1.80 Lakhs
No. of people benefitted : 113
Community Sanitary Complex near Masjid Shareef Mukdampora Shankerpora BLOCK SHAHABAD (16)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
88
Community Sanitary Complex near Masjid Shareef Reshipora Zaldoora BLOCK SHAHABAD(17)
SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikha C/o Sanitary Complex at Nadikhai(18)
Date of Commencement : 11/06/2019
Date of Completion : 29/12/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No . Of persons benefitted : 290
Date of Commencement : 15-06-2019
Date of Completion : 15-08-2019
Estimated Cost : 1.80 Lakhs
Completon Cost : 1.80 Lakhs
No. of persons benefitted : 111
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
89
SWACHH BHARAT MISSION ( Grameen) CSC in Block Aloosa C/o Sanitary Complex Near Majid –A pyt Kehnusa(19)
Date of Commencement : 01/08/2019
Date of Completion : 30/11/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No. of persons benefitted : 300
Date of Commencement : 27/07/2019
Date of Completion : 28/09/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No. of people benefitted : 300
SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikhaie C/o Sanitary Complex GundiJahangir – A(20)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
90
SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikhai C/o Sanitary Complex CFC at Markundal (21)
SWACHH BHARAT MISSION ( Grameen) CSC in Block Nadikhai C/o Sanitary Complex Block Headquater Nadikhai(22)
Date of Commencement : 17/05/2019
Date of Completion : 29/09/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No . Of persons benefitted : 350
Date of Commencement : 20/04/2019
Date of Completion : 29/08/2019
Estimated Cost : 2.00 lacs
Completon Cost : 1.80 Lakhs
No. of persons benefitted : 393
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
91
SWACHH BHARAT MISSION ( Grameen) CSC in Block Sumbal(23) C/o Sanitary Complex at BHQ Sumbal
Date of Commencement : 21/03/2019
Date of Completion : 25/06/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No. of persons benefitted : 350
Date of Commencement : 26/05/2019
Date of Completion : 30/11/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No. of people benefitted : 393
SWACHH BHARAT MISSION ( Grameen) CSC in Block Gurez(24) C/o Sanitary Complex at Chorwan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
92
SWACHH BHARAT MISSION ( Grameen) CSC in Block Tulail C/o Sanitary Complex at Neeru(25)
SWACHH BHARAT MISSION ( Grameen) CSC in Block Hajin C/o Sanitary Complex at sadunara- B(26)
Date of Commencement : 17/05/2019
Date of Completion : 25/08/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No . Of persons benefitted : 350
Date of Commencement : 15/04/2019
Date of Completion : 20/08/2019
Estimated Cost : 2.00 lacs
Completon Cost : 1.80 Lakhs
No. of persons benefitted : 393
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
93
SWACHH BHARAT MISSION ( Grameen) CSC in Block Hajin C/o Sanitary Complex at Sadunara-B Near Masjid Sharief(27)
Date of Commencement : 20-03-2019
Date of Completion : 03-06-2019
Estimated Cost : 2.00lacs
Completion Cost : 1.80 lacs
No. of People Benefitted :
Comments of Stakeholders : Work executed to the satisfaction of local community as per guidelines of desired quality.
Date of Commencement : 17/05/2019
Date of Completion : 25/08/2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 Lacs
No. of people benefitted : 393
C/ o CSC at Tehsil office Karhama (28)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
94
C/o CSC near Ziyarat Sharief Dalri Pyt. Zethan (29) C/o CSC at Binner A (30)
Date of Commencement : 03-03-2019
Date of Completion : 05-04-2019
Estimated Cost : 2.00lacs
Completion Cost : 1.80 lacs
No. of People Benefitted : 200
Comments of Stakeholders : Much needed / Quality work very good
Date of Commencement : 25-10-2018
Date of Completion : 10-11-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.8 lacs
No. of People Benefitted : 270
Comments of Stakeholders : Much needed / Quality work very good
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
95
Construction of Sanitary complex at Dargam (31)
Date of Commencement : 12-10-2018
Date of Completion : 08-06-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.68 lacs
No. of People Benefitted : 200 (approx)
Comments of Stakeholders : Improved Sanitation in Village
Date of Commencement : 01-09-2018
Date of Completion : 16-07-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.65 lacs
No. of People Benefitted : 250 (approx)
Comments of Stakeholders : Improved Sanitation in Village
C/o CSC Machanpora fidarpora (32)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
96
C/o CSC at Jamia Masjid Chandilora (33) C/O CSC at Masjid Sharief Hardmadam (34)
Date of Commencement : 01-02-2019
Date of Completion : 01-12-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.43 lacs
No. of People Benefitted : 670
Comments of Stakeholders : Much needed / Quality work very good
Date of Commencement : 08-10-2018
Date of Completion : 05-02-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.39 lacs
No. of People Benefitted : 200 households
Comments of Stakeholders : Much needed / Quality work very good
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
97
C/O CSC at Masjid Sharief Mohyien (35)
Date of Commencement : 01-02-2019
Date of Completion : 03-04-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.8 lacs
No. of People Benefitted : 200.
Comments of Stakeholders : Improved Sanitation in Village
Date of Commencement : 01-06-2018
Date of Completion : 01-04-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.76 lacs
No. of People Benefitted : 500.
Comments of Stakeholders : Improved Sanitation in Village
C/o CSC near Jamia Masjid Nowpora (36)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
98
C/o CSC near little heart School Garkot B (37) C/o CSC near Darul Uloom Wailoo (38)
Date of Commencement : 03-03-2019
Date of Completion : 27-04-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.8 lacs
No. of People Benefitted : 200.
Comments of Stakeholders : Improved Sanitation in Village
Date of Commencement : 02-03-2019
Date of Completion : 19-10-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.537 lacs
No. of People Benefitted : 170.
Comments of Stakeholders : Improved Sanitation in Village
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
99
C/O CSC near Masjid Sharief Beigh Pati Sultanpora (39)
Date of Commencement : 02.04.2019
Date of Completion : 25.05.2019
Estimated Cost : 2.00
Completion Cost : 2.00
No of people benefitted : 300
Comments of the Stake Holder : Satisfactory
Date of Commencement : 11-09-2018
Date of Completion : 10-05-2019
Estimated Cost : 2.00 lacs
Completion Cost : 1.8 lacs
No. of People Benefitted : 230
Comments of Stakeholders : Much needed / Quality work very good
C/o CSC near Masjid sherif at Aripathan 2019-20(40)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
100
Block Beerwah Sanitary Complex at Village Abadpora Panchayat Parisabad Block Waterhail(41)
Sanitary Complex at Village Paris Panchayat Parisabad
Block Waterhail(42)
Date of Commencement : 10/4/201
Date of Completion : 23/7/2019
Estimated Cost : 2.00 lacs
Completion Cost : 2.00 lacs
No. of People Benefitted : 800
Date of Commencement : 10/5/2019
Date of Completion : 23/7/2019
Estimated Cost : 2.00 lacs
Completion Cost : 2.00 lacs
No. of People Benefitted : 800
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
101
CSC At HARMALI CHAKKA B(174)
Date of Commencement : 2706/2019
Date of Completion : 22/10/2019
Estimated Cost : 1.80 Lacs
Completion Cost : 1.80 Lacs
No of people benefitted : 178
Comments of the Stake Holder : Benefited work for public.
Date of Commencement : 1-4-2019
Date of Completion : 17-4-2019
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : Around 100
Comments of the Stake Holder : Much Needed for cleanliness
Constt of CSC at Thune-A(43)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
102
Constt of CSC at Thune-B(44) Const of CSC at Sonamarg-B(45)
Date of Commencement : 26/05/2019
Date of Completion : 29/12/2019
Estimated Cost : 1.80 Lacs
Completion Cost : 1.74 Lacs
No. of People Benefitted : 210
Comments of Stakeholder : Benefited work for public.
Date of Commencement : 22/04/2019
Date of Completion : 28/06/2019
Estimated Cost : 1.80 Lacs
Completion Cost : 1.79 Lacs
No. of People Benefitted : 194
Comments of Stakeholder : Benefited work for public.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
103
Constt of CSC at Kullan-B(46)
Date of Commencement : 25-06-2019
Date of Completion : 31-11-2019
Estimated cost : 200000
Completion cost : 180000
No. of people benefitted : 590
Comments of the Stake Holder : Better Sanitization & hygiene practices.
Date of Commencement : 22/04/2019
Date of Completion : 08/06/2019
Estimated Cost : 1.80 Lacs
Completion Cost : 1.72 Lacs
No of people benefitted : 154
Comments of the Stake Holder : Benefited work for public.
Construction of CSC at Pyt. Seri Panditan(83)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
104
Construction of CSC at Raipur Lower near Talab Panchayat Ghar at Pyt. Raipur lower Domana(84) CSC AT JHAJJAR KOTLI(85)
Date of Commencement : APR-19
Date of Completion : JULY-19
Estimated Cost : 1.80 Lacs
Completion Cost : 1.80 LAC
No. of People Benefitted : 100
Comments of Stakeholder : GOOD
Date of Commencement : 06-11-2019
Date of Completion : 23-12-2019
Estimated Cost : 2.00 Lacs
Completion Cost : 1.80 Lacs
No of people benefitted : 350
Comments of the Stake Holder : As per the need of the inhabitats
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
105
CSC AT BADSOO MOH TUFARI NEAR MASJID W NO 3(86)
Date of Commencement : 13.01 2019
Date of Completion : 20-05-2019
Estimated Cost : 1.80 Lacs
Completion Cost : 1.80 Lacs
No of people benefitted : 90
Comments of the Stake Holder : As per the need of the inhabitants
Date of Commencement : 22-06-2019
Date of Completion : NOV-19
Estimated Cost : 1.80 Lacs
Completion Cost : 1.80 Lacs
No of people benefitted : 80
Comments of the Stake Holder : GOOD
Const of CSC at Patniyal, Panchayat Sangrampur(88)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
106
Const of CSC near Maszid at Gujjar Basti village Kalyanpur, Panchayat Kalyanpur(87) Construction of CSC unit at Mandla Panchayat- Basohli Rural(89)
Date of Commencement : 15-06-2019
Date of Completion : 10-12-2020
Estimated Cost : 2.00 lacs
Completion Cost : 1.80 lacs
No. of people benefitted : 250 families
Comments of the Stake Holder : They are satisfied and getting proper benefits of the CSC
Date of Commencement : 13.01 2019
Date of Completion : 20-05-2019
Estimated Cost : 1.80
LacsCompletion Cost : 1.80 Lacs
No of people benefitted : 98
Comments of the Stake Holder : As per the need of the inhabitants
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
107
Construction of CSC unit at Ward no 5 Hatli more Chowk Gov. B(90)
Date of Commencement : 17-2-2019
Date of Completion : August 2019
Estimated Cost : 3.00 lacs
Completion Cost : 1.80 lacs
No. of people benefitted : 20 families
Comments of the Stake Holder : They are satisfied and getting proper benefits of the CSC
Date of Commencement : 17-2-2019
Date of Completion : August 2019
Estimated Cost : 3.00 lacs
Completion Cost : 1.80 lacs
No. of people benefitted : 250 families
Comments of the Stake Holder : They are satisfied and getting proper benefits of the CSC
Construction of CSC unit at JAKFED, ward no.8 Govindsar A(91)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
108
Date of Commencement 08.05.2019
Date of Completion 30.06.2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Date of Commencement 09.03.2019
Date of Completion 30.08.2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Name of Work with Location:- CSC Kralpora Dool(219)
Block:- Nagseni
Name of Work with Location:- CSC at Galhar(218)
Block:- Nagseni
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
109
Date of Commencement 11/2019
Date of Completion 12/2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.
Date of Commencement 10/2019
Date of Completion 12/2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.
Name of Work with Location:- CSC Shah Mohalla ward no 4 Mulchiter(221)
Block:- Mughal Maidan
Name of Work with Location:- CSC Panchayat Ghar Rahalthal(220)
Block:- Mughal Maidan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
110
Date of Commencement 07/2019
Date of Completion 09/2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.
Date of Commencement 06/2019
Date of Completion 08/2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Comments of the Stake Holder:- Unit is functional and is used by General Public.
Name of Work with Location:- CSC Aapath Nag Mandir Trigam .(226)
Block:- Trigam
Name of Work with Location:- CSC at Pyt. Ghar Heur(225)
Block:- Trigam
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
111
Date of Commencement 08-2019
Date of Completion 13-10-2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 50
Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.
Date of Commencement 06-2019
Date of Completion 09-2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 45
Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.
Name of Work with Location:- CSC at Panchayat Ghar Ranie-B(228)
Block:- MARWAH
Name of Work with Location:- CSC at Panchayat Ghar Nowpachi-B(227)
Block:- MARWAH
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
112
Date of Commencement 07-2019
Date of Completion 11-2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 55
Comments of the Stake Holder:- Unit is functional and is used by devotedies
Date of Commencement 09-2019
Date of Completion 11-2019
Estimated Cost 1.80
Completion Cost 1.80
No of people benefitted 50
Comments of the Stake Holder:- Unit is functional and is used by general public & beneficial to the public.
Name of Work with Location:- CSC at Shahi Mohala Changer(230)
Block:- MARWAH
Name of Work with Location:- CSC Panchayat Ghar Qaderna –A(229)
Block:- MARWAH
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
113
Date of Commencement 1-11-2019
Date of Completion 30-11-2019
Estimated Cost 2.00
Completion Cost 1.80
No of people benefitted 60
Name of Work with Location:- CSC AT BEGANA PANCHAYAT MATTA-B(222)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
114
Date of Commencement 10-06-2019
Date of Completion 28-08-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 210
Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public
Date of Commencement 10-05-2019
Date of Completion 15-10-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.000
No of people benefitted 250
Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change
Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
115
Date of Commencement 10-06-2019
Date of Completion 28-08-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 210
Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public
Date of Commencement 10-05-2019
Date of Completion 15-10-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.000
No of people benefitted 250
SoulsComments of the Stake Holder: increases Sanitation Practices & encourages behavioural change
Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
116
Date of Commencement 10-06-2019
Date of Completion 28-08-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 210
Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public
Date of Commencement 10-05-2019
Date of Completion 15-10-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.000
No of people benefitted 250
Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change
Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
117
Date of Commencement 10-06-2019
Date of Completion 28-08-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 210
Comments of the Stake Holder: increases Sanitation Practices & encourages behavioural change, and facilitates to general Public
Date of Commencement 10-05-2019
Date of Completion 15-10-2019
Estimated Cost 2.00 Lacs
Completion Cost 2.000
No of people benefitted 250
SoulsComments of the Stake Holder: increases Sanitation Practices & encourages behavioural change
Name of Work with Location: C/O CSC Near Shah Mohallah Masjid Shareef Lirrow(47)Name of Work with Location: C/O CSC at PHC Tarigam(50)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
118
Date of Commencement 10/11/2019
Date of Completion 20/12/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 lacs
No of people benefitted 25 Families
Comments of the Stake Holder: Benefited for community .
Date of Commencement 28/10/2019
Date of Completion 20/12/2019
Estimated Cost 2.00 Lacs
Completion Cost 1.992 Lacs
No of people benefitted 15 Families4
Comments of the Stake Holder: Benefited for community .
Name of Work with :Location: CSC Nr. Gurdwara Sahib Qazi Mohra(147)
Name of Work with Location: CSC Nr. Eidgah Masjid Jhulass (146)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
119
Date of Commencement 06/08/2019
Date of Completion 09/09/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 lacs
No of people benefitted 25 Families
Comments of the Stake Holder: Benefited for community .
Date of Commencement 02-08-2019
Date of Completion 09/09/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 15 Families
Comments of the Stake Holder: Benefited for community .
Name of Work with :Location : CSC Nr. Hill Pari Masjid (149)Name of Work with Location: CSC Nr. Masjid Usma Masjid hill (148)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
120
Date of Commencement 30/08/19
Date of Completion 31/12/19
Estimated Cost 1.80 lakh
Completion Cost 1.80 lakh
No of people benefitted 350
Date of Commencement 30/08/19
Date of Completion 31/12/19
Estimated Cost 1.80 lakh
Completion Cost 1.80 lakh
No of people benefitted 1800
Name of Work with Location:CSC Nr .Pyt Ghar Bedar (151)Name of Work with Location:CSC Nr. Gali Azamabad (150)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
121
Date of Commencement 30/08/19
Date of Completion 31/12/19
Estimated Cost 1.80 lakh.
Completion Cost 1.80 lakh
No of people benefitted 1500
Date of Commencement 30/08/19
Date of Completion 31/12/19
Estimated Cost 1.80 lakh
Completion Cost 1.80 lakh
No of people benefitted 850
Name of Work with Location: CSC Nr. Masjid Sundri (153)Date of Commencement:- 30/08/19Name of Work with Location: CSC Nr. Madarsa Gagrian (152)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
122
Date of Commencement 15-12-2018
Date of Completion 30-04-2019
Estimated Cost 1.80 lakh.
Completion Cost 1.80 lakh
No of people benefitted 200
Date of Commencement 15/9//2019
Date of Completion 22/10/2019
Estimated Cost 2.00
Completion Cost 179910
No of people benefitted 105
Comments of the Stake Holder: providing relief while prayer ing in Mosque.
Name of Work with Location: CSC Nr Masjid (161)Name of Work with LocationC:- CSC Nr. Mardasa Haveli (154)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
123
Date of Commencement 15-04-2019
Date of Completion:- 22-05-2019
Estimated Cost 2.00 Lacs
Completion Cost:- 1.79 Lasc
No of people benefitted:- 55
Date of Commencement 01-10-2019
Date of Completion 30-10-2019
Estimated Cost 2.00 Lacs
Completion Cost 1.78 Lacs
No of people benefitted 45
Name of Work with Location:- CSC Near Madarsa Moin ul Islam (156)
Name of Work with Location:- CSC Near Jamia Masjid Hattian (155)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
124
Date of Commencement 20-10-2019
Date of Completion 20-11-2019
Estimated Cost 2.00 Lacs
Completion Cost 1.79600 Lacs
No of people benefitted 55
Date of Commencement 15-09-2019
Date of Completion 17-10-2019
Estimated Cost 2.00 Lacs
Completion Cost:- 1.799 Lacs
No of people benefitted:- 60
Name of Work with Location:- CSC Near Masjid Ahele Hadees Tohid Nagar (158)
Name of Work with Location:- CSC Near Jamia Masjid Moh. Bajjaran (157)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
125
Date of Commencement 15-06-2019
Date of Completion 16-08-2019
Estimated Cost 2.00 Lacs
Completion Cost 1.784 LacsN
o of people benefitted 56
Date of Commencement 15-11-2019
Date of Completion 16-12-2019
Estimated Cost 2.00
LacsCompletion Cost 1.78500 Lacs
No of people benefitted 44
Name of Work with Location:- CSC Near Sumo Stand Kalasi (160)Name of Work with Location:- CSC Near Jamia Masjid (159)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
126
Date of Commencement 15/10/2019
Date of Completion 31/12/2019
Estimated Cost 2.00
Completion Cost 179450
No of people benefitted 100
Date of Commencement 20/9/2019
Date of Completion 20/12/2019
Estimated Cost 2.00
Completion Cost Nil
No of people benefitted 65
Name of Work with Location: CSC Nr Zariat Kallar Katta(163)Name of Work with Location: CSC Nr Masjid Rajdhan (162)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
127
Date of Commencement 02/09/2019
Date of Completion 16/11/2019
Estimated Cost 2.00lacs
Completion Cost 2.00lacs
No. Of people Benefitted 35 Families
Comment of Stake holders: Much Need /Community Benefited Work
Date of Commencement 07/09/2019
Date of Completion 02/10/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00Lacs
No of People benefited 35Familiy
Comment of Stake Holders Much Needed work
CSC Ward no. 04 (169)
Pyt:-Mastandara
Name of Work:-CSC Moh Azad (164)
Panchayat :- Fazalabad Lower B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
128
Date of Commencement 15/10/2019
Date of Complition 16/11/2019
Estimated Cost 2.00lacs
Completion Cost 2.00Lacs
No Of People benefited 35
Comments of Stake Holder Good Quality works
Date of Commencement 15/10/2019
Date of Completion 16/10/2019
Estimates Cost 2.00 lacs
Completion Cost 2.00 lacs
No of People Benefitted 50 pop
Comments of Stakeholders Good Quality works
Name of work :-CSC Near Pyt. Ghar (167)Name :-CSC Near Masjid (165)
Panchayat : Mahra A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
129
Date of Commencement 28/08/2019
Date of Completion 20/10/2019
Estimated Cost 2.00Lacs
Completion Cost 2.00Lacs
No of People benefited 50 pop
Comment of Stake Holders Much Needed work
Date of Commencement 10/01/2019
Date of Completion 29/05/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00Lacs
No of People benefited 50 Families
Comment of Stake Holders Much Needed work
Constt CSC near Behramgall Market (168)Work Name :- CSC Nr Pyt Ghar Buffliaz B (166)
Panchayat:-Buffliaz B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
130
Date of Commencement 07/09/2019
Date of Completion 02/10/2019
Estimated Cost 2.00Lacs
Completion Cost 2.00Lacs
No of People benefited 35 Families
Comment of Stake Holders Much Needed work
Date of Commencement 07/09/2019
Date of Completion 3/11/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00Lacs
No of People benefited 35pop
Comment of Stake Holders Much Needed work
Constt of CSC ward no. 08 Mastandara (171)
Pyt:-Murrah upperCSC Near Eid Gah Murrah Lower Khulai (170)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
131
Commencement 10-09-2019
Date of Completion 25-12-2019
Estimated Cost 2.00 LAC
Completion Cost 2.00 LAC
No of people benefitted 57
Commencement 27-08-2019
Date of Completion 26-10-2019
Estimated Cost 2.00 LAC
Completion Cost 2.00 LAC
No of people benefitted 49
CSC NR MASJID BALNOI (173)CSC NR KHIDMAT CENTRE MANKOTE (172)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
132
Date of Commencement 01/05/2019
Date of Completion 16/08/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 250
Comments of the Stake Holder: The CSC unit has ensured the community level sanitation and the general population are satisfied with the construction of said CSC unit under SBM-(G)
Date of Commencement 30/05/2019
Date of Completion 20/08/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted: 450
Comments of the Stake Holder :The CSC unit has ensured the community level sanitation and the general population are satisfied with the construction of said CSC unit under SBM-(G)
: CSC near Play field at Satoora(52)CSC near Masjid-i-Ahlihadees Panzoo(51)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
133
Date of Commencement 29/04/2019
Date of Completion 10/08/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted 650
Comments of the Stake Holder: The CSC unit has ensured the community level sanitation and the general population are satisfied with the construction of said CSC unit under SBM-(G)
Date of Commencement 03/06/2019
Date of Completion 03/09/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted: 450
Comments of the Stake Holder :The CSC unit has ensured the community level sanitation and the general population especially Sikh community are satisfied with the construction of said CSC unit under SBM-(G)
CSC near Deeri Sahab Gulshanpora(54)CSC near Jamia Masjid Panzoo(53)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
134
Date of commencement 04/07/2019.
Date of completion 28/09/2019.
Estimated cost 2.00 lacs.
Completion cost 2.00 lacs
No of people benefited 389 no.
commencements of the stake holder:- people of the village happy with the Rural dev. Department .
Moreover the people of the villagers are satisfied
Date of commencement 05/07/2019.
Date of completion 12/10/2019.
Estimated cost 2.00 lacs.
Completion cost 2.00 lacs
No of people benefited: 289 no.
commencements of the stake holder:- people of the village happy with the Rural dev. Department .
Moreover the people of the villagers are satisfied
Name Of Work With Location :- C/O Of Csc Near Masjid Ahalihadees At Shahabad.(56)
C/O Of Csc Near Jamia Masjid Sharief Danapora At Noorpora B.(55)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
135
Date of commencement 20/07/2019.
Date of completion 18/10/2029.
Estimated cost 2.00 lacs.
Completion cost 2.00 lacs
No of people benefited 230 no.
commencements of the stake holder:- people of the village happy with the Rural dev. Department
Moreover the people of the villagers are satisfied
Date of Commencement 03/06/2019
Date of Completion 03/09/2019
Estimated Cost 2.00 Lacs
Completion Cost 2.00 Lacs
No of people benefitted: 450
Comments of the Stake Holder :The CSC unit has ensured the community level sanitation and the general population especially Sikh community are satisfied with the construction of said CSC unit under SBM-(G)
CSC near Deeri Sahab Gulshanpora(54)Name Of Work With Location :- C/O Of Csc At Peernar Noorpora Ii .(57)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
136
Date of commencement 19.09.2019
Date of Completion 22.11.2019
Estimated Cost 1.80 + 0.20 (Beneficiary share)
Completion cost 1.795
No. of people benefitted:- Almost 380Comments from Stakeholders:-The CSC is very beneficial as the people at large scale offer congregation prayers in the said Masjid Shareef
Date of commencement 14.08.2019
Date of Completion 22.10.2019
Estimated Cost 1.80 + 0.20 (Beneficiary share)
Completion cost 1.795
No. of people benefitted Almost 500
Comments from Stakeholders:-The CSC at play ground would be beneficial especially for the sports persons as may sports persons from different villages of the district are playing cricket in the near by play ground
Community Sanitary Complex near Play ground Achgooze .(60)
Community Sanitary Complex at Masjid Shareef Khaidora Achgooze.(59)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
137
Date of Commencement 04-05-2019
Date of Completion 16-07-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 25
Comments of the Stake Holder:- Urgent Requirement of People
Date of Commencement 04-05-2019
Date of Completion 29-06-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted:- 30Comments of the Stake Holder:- Much Needed Work
CSC Near Panchayat Ghar Potha(115)CSC Near Jamia Masjid ward No.05 Ladyote(114)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
138
Date of Commencement 07-07-2019
Date of Completion 09-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80Lakh
No. of people benefitted:- 30Comments of the Stake Holder:- Much Needed Work
Date of Commencement 21-09-2019
Date of Completion 03-11-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
CSC at Ward No.02 Jamia Masjid Saranoo Dalogra(117)Csc near Panchayat Ghar Sagote(116)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
139
Date of Commencement 06-06-2019
Date of Completion 01-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
Date of Commencement 09-07-2019
Date of Completion 23-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted:- 30Comments of the Stake Holder:- Much Needed Work
CSC Near Panchayat Ghar Dodasan(119) RemoteSC Near Jamia masjid chakli Dodasan lower(118)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
140
Date of Commencement 08-08-2019]
Date of Completion 27-10-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Commencement 06-10-2019
Date of Completion August-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People
CSC at the land of Pyt. Ghar, Gurdan bala(145)CSC near Panchayat Ghar Mehrajpura((120)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
141
Date of Commencement 01-09-2019
Date of Completion 29-11-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Commencement 15-06-2019
Date of Completion 29-11-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
CSC Near Masjid Bijji Kewal Upper(122)CSC Near Meera Masjid W.No.03 Nerojal(121)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
142
Date of Commencement 15-06-2019
Date of Completion: 13-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 25
Comments of the Stake Holder:- Urgent Requirement of People
Date of Commencement 15-06-2019
Date of Completion 21-08-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
CSC near Malik Mohalla W.No.01 Rajnagar Lower(124)CSC Near jamia Masjid Phalni. W.No.04 Phalni(123)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
143
Date of Commencement 15-06-2019
Date of Completion 19-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Commencement 15-06-2019
Date of Completion 11-11-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
CSC Near Jamia Masjid Upper Bathan W.No.03Rajnagar Upper(126)CSC Near najar Mohalla W. No.01 Rajnagar Lower(125)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
144
Date of Completion 24-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Commencement 15-06-2019
Date of Completion 10-11-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
CSC Near Masjid Targain Lower(128):- CSCnear Jamia Masjid Shahpur(127)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
145
Date of Commencement 15-06-2019
Date of Completion 26-08-2019
Estimated Cost Rs. 1.80
Lakh Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Completion 11-11-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
CSC at Panchayat Ghar Dhara Sanwla(130)CSC Near Jamia Masjid Targain Upper(129)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
146
Date of Commencement 15-06-2019
Date of Completion 24-09-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People
Date of Commencement 06-10-2019
Date of Completion Nov. 2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
CSC Near Land of Panchayat Ghar Badhal-A(132)CSC Near Panchayat Ghar Kallar(131)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
147
Date of Commencement 06-10-2019
Date of Completion Nov. 2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Commencement 6-10-2019
Date of Completion Nov.2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
:- CSC at the land of Pyt. Ghar, Bhella(134)CSC at the land of Panchcyat Ghar Bahi nambal (133)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
148
Date of Completion Nov.2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
Date of Commencement 06-10-2019
Date of Completion Nov.2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
CSC at the land of Pyt. Ghar, Gadyog Dhelari(136)CSC at the land of Pyt. Ghar , Gadyog(135)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
149
Date of Completion August 2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Completion Nov.2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 35
Comments of the Stake Holder:- General Demand of the People
CSC at the land of Pyt. Ghar , Khawas(138)CSC at the land of Pyt. Ghar, Gundha(137)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
150
Date of Completion Nov.2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 25
Comments of the Stake Holder:- Urgent Requirement of People
Date of Commencement 6-10-2019
Date of Completion Dec-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
CSC at the land of Pyt. Ghar, Atti(140) CSC at the land of Pyt. Ghar, Narla(139)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
151
Date of Commencement 06-10-2019
Date of Completion Dec 2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
Date of Commencement 06-10-2019
Date of Completion Dec-2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People
CSC at the land of Pyt. Ghar, Chawa(142) CSC at the land of Pyt. Ghar, Charran(141)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
152
Date of Commencement 06-10-2019
Date of Completion June 2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted:- 35Comments of the Stake Holder:- General Demand of the People
Date of Commencement 06-15-2019
Date of Completion August 2019
Estimated Cost Rs. 1.80 Lakh
Completion Cost Rs. 1.80 Lakh
No. of people benefitted 30
Comments of the Stake Holder:- Much Needed Work
:- CSC at the land of Pyt. Ghar, Fatehhpur Khass(144)CSC near Pyt Ghar Dhanore Dhindian(143)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
153
Date of Commencement: 01-11-2019
Date of Completion:- 30-11-2019 Estimated Cost: 2.00
Completion Cost:- 1.80
No of people benefitted:- 100
Comments of the Stake Holder:- Satisfactory
Date of Commencement: 01/02/2019
Date of Completion: 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacsNo of people benefitted: 350-400
Comments of the Stake Holder:_ Nil
Date of Commencement: 01/112019
Date of Completion: 31/11/2019
Estimated Cost: 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 650-700
Comments of the Stake Holder:_ Nil
Constt of CSC at Raja Manzil W No2 Pyt Bhordhar-B ( 178)
Constt of CSC at Mahakshal Mahaveshar Mandir Batroo (179)
Construction of CSC at Mominabad , Pyt:- Gool – B Block:- Gool (177)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
154
Date of Commencement: 01/112019
Date of Completion : 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 450-500
Comments of the Stake Holder:_ Nil
Date of Commencement: 01/112019
Date of Completion: 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 400-500
Comments of the Stake Holder:_ Nil
Date of Commencement: 01/112019
Date of Completion: 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 250-300
Comments of the Stake Holder:_ Nil
Constt of CSC near AWC Chakka (181) Constt of CSC at Upper Daingpora Khowra (182) Constt of CSC at Kralna(180)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
155
Date of Commencement: 01/112019
Date of Completion 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 450-500
Comments of the Stake Holder: Nil
Date of Commencement: 01/112019
Date of Completion: 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 450-550
Comments of the Stake Holder: Nil
Date of Commencement : 01.07.2019
Date of Completion : 15.12.2020
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 234-230
Comments of the Stake Holder : NIL
Constt of CSC at Chanjloo (184) CSC NEAR JAMIA MASJID SHARIF DANGANRI Pyt : DHARAM B (185)
Constt of CSC near Masjid Sharif Kote (183)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
156
Date of Commencement : 07.07.2019
Date of Completion : 05.12.2020
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 120-180
Comments of the Stake Holder : NIL
Date of Commencement : 07.07.2019
Date of Completion : 25.12.2020
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 180-250
Comments of the Stake Holder : NIL
CSC NEAR MASJID SHARIF CHROON Pyt : GUNDI (187) CSC NEAR Masjid Papshalana Pyt : Dharam A (186)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
157
Date of Commencement : 07.07.2019
Date of Completion : 25.12.2020
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 230-280
Comments of the Stake Holder : NIL
Date of Commencement : 01.09.2019
Date of Completion : 30.09.2019
Estimated Cost : 2.00
Completion Cost : 2.00
No of people benefitted : 80
Comments of the Stake Holder : Satisfactory
CSC at Barnal PYT : Gandhri (189) CSC NEAR MASJID SHARIF BHIMDASSA Pyt : BHIMDASSA (188)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
158
Date of Commencement : 01.09.2019
Date of Completion : 30.09.2019
Estimated Cost : 2.00
Completion Cost : NIL
No of people benefitted : 80
Comments of the Stake Holder : Satisfactory
Date of Commencement : 01.09.2019
Date of Completion : 30.09.2019
Estimated Cost : 2.00
Completion Cost : 2.00
No of people benefitted : 80
Comments of the Stake Holder : Satisfactory
CSC Near Nag Devta Tanger PYT : Tanger (191)CSC at Bhattan Near Hospital PYT : Bhattan (190)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
159
Date of Commencement : 01.09.2019
Date of Completion : 30.09.2019
Estimated Cost : 2.00
Completion Cost : 2.00
No of people benefitted : 90
Comments of the Stake Holder : Satisfactory
Date of Commencement : 01.09.2019
Date of Completion : 30.09.2019
Estimated Cost : 2.00
Completion Cost : Nil
No of people benefitted : 75
Comments of the Stake Holder : Satisfactory
CSC Achansulari W.No 02 PYT : KABBI (193) CSC Bhutyal Mohalla Lower Dharamkund PYT : Kanga (192)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
160
Date of Commencement: 15/10/2019
Date of Completion: 15/12/2019
Estimated Cost:- 1.80 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 450-500
Comments of the Stake Holder: Satisfactory Much needed or quality work Much needed
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 1.80 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at Ablar W. No.07 Allinbass B (195) Constt of CSC unit at Masjid sharief Hemen Karma. ((194)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
161
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 1.80 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at Lamberdar Mohallah W.No. 06 HOCHAK (197)
Construction of CSC at Jamia Masjid Sharief upper Chamahal BINGARA (196)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
162
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost 1.80 lakh
Completion Cost: 1.80 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at Masjid Sharief Shalgad W.No 06 Maligam B (199)
Construction of CSC at Masjid Sharief Bass W.No.02 Maligam A (198)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
163
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80
Completion Cost: 1.80
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 1.80 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at Masjid Sharief Adhal W.No 03 Pogal Lower (201)
Construction of CSC at Batroo Gujar Bast W.No 07 Panchal A (200)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
164
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 1.80 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at Upper Gujrara W.No. 03 Senabathi B (203)
Constt of CSC at bus stand senabathi W.No.01 Senabathi A (202)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
165
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at walldar Panla Panla (205) Construction of CSC at Bhatpora Shaman Nag. Pingloga (204)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
166
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 1.80 lakh
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement: 01/112019
Date of Completion: 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 650-700
Comments of the Stake Holder:_ Nil
Constt of CSC at Batroo near Shiv
Temple (207) Construction of CSC at Khill W.No.04 Balihote B (206)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
167
Date of Commencement: 01/112019
Date of Completion: 31/11/2019
Estimated Cost:- 2.00 lacs
Completion Cost: 1.80 lacs
No of people benefitted: 450-500
Comments of the Stake Holder:_ Nil
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Constt of CSC at Magerkote
Amarnath Morh (208)
Construction of CSC at Jawala Mandir near PWD Road to Hochak (209
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
168
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80 lakh
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Construction of CSC at Masjid Sharief Chevly W.No.07 Senabathi B (211)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Construction of CSC at Eidgah Mohallah Panchal B (210)
169
Date of Commencement: 24-08-2019
Date of Completion: 25-09-2019
Estimated Cost: 1.80
Completion Cost: 0.00
No of people benefitted: 120
Comments of the Stake Holder:
Date of Commencement : 08.08.2019
Date of Completion : 29.12.2019
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 200-250
Comments of the Stake Holder : NIL
Construction of CSC at Masjid Sharief Chanka W.No. 04 (212) CSC Near Mangaloge Masjid Sharief Pyt : Dalwah Upper(213)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
170
Date of Commencement : 08.08.2019
Date of Completion : 29.12.2019
Estimated Cost : 1.80
Completion Cost : 0.00
No of people benefitted : 230-280
Comments of the Stake Holder : NIL
Date of Commencement : 08.08.2019
Date of Completion : 19.03.2020
Estimated Cost : 1.80
Completion Cost : 1.80
No of people benefitted : 180-250
Comments of the Stake Holder : NIL
CSC Near Najar Mohalla Ward No.04 Pyt : Dalwah Lower(214) CSC near panjgana masjid sharief sumber upper a(215) Pyt : Sumber Upper-a
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
171
Date of Commencement : 08.08.2019
Date of Completion : 29.12.2019
Estimated Cost : 1.80
Completion Cost : 0.00
No of people benefitted : 250-280
Comments of the Stake Holder : NIL
Date of Commencement : 08.08.2019
Date of Completion : 14.12.2019
Estimated Cost : 1.80
Completion Cost : 0.00
No of people benefitted : 250-280
Comments of the Stake Holder : NIL
CSC NEAR Pangana Masjid Sharief PYT : Chachawah B(216) Csc Near Ram Mandir Narla W No 02(217) Pyt : Chachawah A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
172
Date of Commencement: 05-04-2019
Date of Completion: 30-04-2019
Estimated Cost: 1.80
Completion Cost: 1.80
No of people benefitted: General Public
Comments of the Stake Holder: Good Much needed / Quality work: Much needed
Date of Commencement: 13-08-2019
Date of Completion: 25-12-2019
Estimated Cost: 1.80
Completion Cost: 1.80
No of people benefitted: General Public
Comments of the Stake Holder: Good Much needed / Quality work: Much needed
Construction of CSC Jama Masjid, Pyt. Bandhar, Block Thakrakote(176)
Construction of CSC at Pyt. Ghar Kansoli, Pyt. Mahore C, Block Mahore(175)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
173
Date of Commencement: 15-11-2019
Date of completion 31-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 150
Date of Commencement: 24-11-2019
Date of completion 29-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 250
Construction of Sanitary Complex at Village Chann Malagrain Panchayat Sangwali Block Ghagwal (92)
Construction of Sanitary Complex at Govt. Middle School Duree Panchayat Duree Block Nud (93)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
174
Date of Commencement: 23-10-2019
Date of completion 20-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 150
Date of Commencement: 19-10-2019
Date of completion 20-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Construction of Sanitary Complex at Kaloha Moh. SC Panchayat Dhora Block Nud (94)
Construction of Sanitary Complex at Government Middle School Bardan Panchayat Moutlian Kalan Block Nud (95)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
175
Date of Commencement: 03-07-2019
Date of completion 17-08-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 150
Date of Commencement: 03-07-2019
Date of completion 17-08-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Construction of Sanitary Complex at Mohargarh Fort Panchayat Mohargarh Block Nud (96)
Construction of Sanitary Complex at Pyt Ghar Moutlian Kalan Panchayat Moutlian Kalan Block Nud (97)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
176
Date of Commencement: 03-07-2019
Date of completion 18-08-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 200
Date of Commencement: 02-11-2019
Date of completion 15-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 300
Construction of Sanitary Complex at Govt. High School Sarna Panchayat Sarna Block Nud (98)
Construction of Sanitary Complex at GDC Samba Panchayat Druee Block Nud (99)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
177
Date of Commencement: 02-11-2019
Date of completion 15-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 300
Date of Commencement: 24-11-2019
Date of completion 22-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 90
Construction of Sanitary Complex at GDC Samba Panchayat Druee Block Nud (100)
Construction of Sanitary Complex at Palth near Eidhgah Panchayat Mananu Block Nud (101)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
178
Date of Commencement: 02-11-2019
Date of completion 25-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Date of Commencement: 24-10-2019
Date of completion 27-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 60
Construction of Sanitary Complex at PHC Dhora Panchayat Dhora Block Nud (102)
Construction of Sanitary Complex at Kaloha Panchayat Dhora Block Nud (103)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
179
Date of Commencement: 03-05-2019
Date of completion 28-05-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Date of Commencement: 03-05-2019
Date of completion 22-06-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Construction of Sanitary Complex at Abtal Panchayat Abtal Block Ramgarh (104)
Construction of Sanitary Complex at Kesso Manhasan Panchayat Kesso Manhasan Block Ramgarh (105)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
180
Date of Commencement: 03-05-2019
Date of completion 16-06-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Date of Commencement: 03-11-2019
Date of completion 30-12-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 70
Construction of Sanitary Complex at PHC Dhora Panchayat Dhora Block Nud (102)
Construction of Sanitary Complex at Kartholi Lower Panchayat Kartholi Lower Block Bari Brahmana (107)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
181
Date of Commencement: 15-06-2019
Date of completion 15-09-2019
Estimated Cost Rs. 1.80 lakhs
Completion Cost Rs. 1.80 lakhs
No. of people benefited 100
Construction of Sanitary Complex at Palli Panchayat Palli Block Bari Brahmana (108)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
182
Date of commencement: 06.01.2019
Date of completion: 01.05.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 350
Comments by Stake holder: Satisfied with the work execution
Date of commencement: 29.05.2019
Date of completion: 25.06.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.90 lacs
Population benefitted: 350
Comments by Stake holder: Great work by RDD
C/O CSC near Ziyarat Sharief Dachoo, Chitragam(61) C/O CSC near Masjid Sharief at Nadigam(63)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
183
Date of commencement: 29.05.2019
Date of completion: 25.07.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 251
Comments by Stake holder: Satisfied with the work execution
Date of commencement: 3.04.2019
Date of completion: 20.06.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.74 lacs
Population benefitted: 365
Comments by Stake holder: Long pending demand was fulfilled
C/O CSC for ladies Qaymut Ul Banat at Chitragam(64) C/O CSC near Hanfia Institue High School Losdenew (66)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
184
Date of commencement: 3.05.2019
Date of completion: 2.06.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 365
Comments by Stake holder: Long pending demand was fulfilled
Date of commencement: 26.09.2019
Date of completion: 26.10.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 160
Comments by Stakeholder: Long pending demand fulfilled
C/O CSC Govt.Higher Secondary Shool Nadigam(65) C/O CSC near Muqdam Mohalla Keller(62)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
185
Date of commencement: 26.09.2019
Date of completion: 26.10.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.99 lacs
Population benefitted: 203
Comments by Stakeholder: Public Demand
Date of commencement: 26.09.2019
Date of completion: 7.11.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 385
Comments by Stake holder: Community benefit
C/O CSC near Khanday Mohalla Keller(67) C/O CSC near Ziyarat Sharief Pehlipora(68)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
186
Date of commencement: 26.09.2019
Date of completion: 0 7.11.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 385
Comments by Stake holder: Community benefit
Date of commencement: 09.03.2019
Date of completion: 26.04.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.99 lacs
Population benefitted: 125
Comments by Stake holder: Long pending demand fulfilled
C/O CSC Govt.Higher Secondary Shool Nadigam(65) C/O CSC near Darul uloom Alamgung , Hermain(70)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
187
Date of commencement: 30.04.2019
Date of completion: 26.05.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 203
Comments by Stake holder: Community benefit
Date of commencement: 30.04.2019
Date of completion: 26.05.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 165
Comments by Stake holder: Long pending demand fulfilled
C/O CSC near Jamia Masjid Bonpora Landoora, Hermain(71) C/O CSC near Jamia Masjid Reshipora, Hermain(72)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
188
Date of commencement: 23.06.2019
Date of completion: 25.07.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted:: 214
Comments by Stake holder: Community benefit
Date of commencement: 23.04.2019
Date of completion: 25.05.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.70 lacs
Population benefitted: 195
Comments by Stake holder: Community benefit
C/O CSC point at Jinaz ghah at Feeripora(74)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
C/O CSC point at Feeripora(73)
189
Date of commencement: 3.04.2019
Date of completion: 2.05.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 355
Comments by Stake holder: community benefit
Date of commencement: 30.04.2019
Date of completion: 2.06.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 1.80 lacs
Population benefitted: 355
Comments by Stake holder: Public demand was fulfilled.
Csc near at Narapora keller(76)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Csc near wani mohalla masjid sharief at keller(75)
190
Date of commencement: 3.04.2019
Date of completion: 03.07.2019
Date of commencement: 30.04.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 2.00 lacs
Population benefitted: 355
Comments by Stake holder: Satisfied with the work execution
Date of commencement: 2.04.2019
Date of completion: 2.06.2019
Estimated cost: Rs 2.00 lacs
Bill cost: Rs 2.00 lacs
Population benefitted: 355
Comments by Stake holder: Satisfied with the work execution
Csc near Masjid Sharief Hamdania Tukroo Shopian(78)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Csc near Masjid Sharief Keegam Shopian(77)
191
Date of Commencement: 06.04.2019
Date of Completion: 20.07.2019
Estimated Cost: 2:00
Completion Cost: 1.80
No of people benefitted: 140Comments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.
Date of Commencement: 08.03.2019
Date of Completion: 09.12.2019
Estimated Cost: 2.00
Completion Cost: 1.387
No of people benefitted: 123Comments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.
Construction of CSC Latrine near Govt. High School New Theed B(80)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Construction of CSC Latrine at Jamia Masjid Awal New Theed A(79)
192
Date of Commencement: 28/09/2019
Date of Completion: 16/10/2019
Estimated Cost: 2.00
Completion Cost: 184292/-
No of people benefitted: 96 Students/TeachersComments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.
Date of Commencement: 05/11/2019
Date of Completion: 30/11/2019
Estimated Cost: 2.00
Completion Cost: 180000/-
No of people benefitted: 325Comments of the Stake Holder: The motive of the scheme should endeavour to have at least one CSC in every village that may cater to the sanitation needs of floating population. The department had identified suitable locations in the villages of District Srinagar, where construction of CSC’s are easily accessible to all, having adequate water availability and where long-term O&M is ensured. The CSC’s have been executed in order to ensure open defecation free areas in District Srinagar.
Constt of Community Latrine near H/o. Ali Mohd Dar at Khazir Mohalla Balhama-B(82)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Constt of Community Latrine at Govt Girls Sec School Sikhnard Khonmoh-C(81)
193
Date of Commencement: 04/2019
Date of Completion: 12/2019
Estimated Cost: 1.80
Completion Cost: 1.80
Comments of Stakeholders:-
Much needed / Quality work :- Good
Date of Commencement :- 11/2019
Date of Completion: 12/2019 (Phy. Completed)
Estimated Cost: 1.80 lacs
Completion Cost: 1.80 lacs
No of people benefitted 100
Comments of the Stake Holder: Work done is great and community
getting the full benefit of it for which it has been constructed
Const of CSC Unit near Mukri Mata Ghordi(110)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CSC unit at Moungri Panchayat Basnote (109)
194
Date of Commencement :- 11/2019
Date of Completion: 12/2019 (Phy. Completed)
Estimated Cost: 1.80 lacs
Completion Cost:_ 1.80 lacs
No of people benefitted 100
Comments of the Stake Holder: Work done is great and community getting the full benefit of it for which it has been constructed
Date of Commencement :- 06/2019
Date of Completion: 12/2019
Estimated Cost: 1.80 lacs
Completion Cost: 1.80 lacs
No of people benefitted: General Public
Comments of the Stake Holder:Much needed / Quality work :-Good
CSC Unit of Nagorian Mohalla Pachound no 1((112)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Const of CSC Unit at HS Larh Ghordi(111)
195
Date of Commencement : 10/2019
Date of Completion: 12/2019
Estimated Cost 1.80 lac
Completion Cost : 1.80 lac
No of people benefitted : 25-30
Comments of the Stake Holder: Much needed / Quality work :- Good
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CSC unit at Basantgarh(113)
196
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.92 Lakhs
Completion Cost: Rs.0.80Lakhs
No. of people benefitted: 18
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs. 1.47 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
S.No.02:Retaining Wall at Shankerpora NLO Gh Qadir Ganie at Nallah SandranS.No.01: Renovation of Spring near Masjid Shasrief Zamalgam
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
197
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.85Lakhs
Completion Cost: Rs.0.85Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work.
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.084 Lakhs
Completion Cost: Rs. 1.062Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work.
S.No.04:Development of Spring at Khandar Pora DoodwaganS.No.03: Dev. Of Spring at Botishah Sahab (R.A) Naag at Nowgam near Masjid Sharief
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
198
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs.1.4850 Lakhs
No. of people benefitted: 32
Comments of stakeholders: Much needed/Quality work.
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.65 Lakhs
Completion Cost: Rs. 0.6362Lakhs
No. of people benefitted: 24
Comments of stakeholders: Much needed/Quality work.
S.No.06:Water Harvesting Tank at Lonepora Heeward NLO Ab Razak Lone S.No.05: Lining Wall at Bon Kul Qammer NLO Syed Abdullah
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
199
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.49Lakhs
Completion Cost: Rs.1.49Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work.
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.30Lakhs
Completion Cost: Rs. 0.24082Lakhs
No. of people benefitted: 14
Comments of stakeholders: Much needed/Quality work.
S.No.08: Farm Pond at Loout Qammer NLO Ab Rehman GanieS.No.07: Crate Bund at Gooriwan Deing NLO Ab Aziz Malik at Doodwagan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
200
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.42Lakhs
Completion Cost: Rs. 0.28285 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.42 Lakhs
Completion Cost: Rs. 0.287 Lakhs
No. of people benefitted: 17
Comments of stakeholders: Much needed/Quality work
S.No.10 Farm Pond at Lawal Qammer NLO Ab Rehman WaniS.No.09: Farm Pond at Khushipora Qammer NLO Fayaz Ah Wani
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
201
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs. 1.50 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.44 Lakhs
Completion Cost: Rs. 0.313 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
S.No.12. Water Harvesting Tank at Hergam Koot NLO Mohd Akbar WagayS.No.11: Create Bund at Nallah Sandran Koot NLO Imtiyaz Ah Lone
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
202
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs. 1.50 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion:December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs. 1.50 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
S.No.14. Create Bund at Trumbdoo Nallah Sandran at different spots
S.No.13: Create Bund at Nallah Heeward from Wahiward on roads to main Road
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
203
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs. 1.50 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.50 Lakhs
Completion Cost: Rs. 1.50 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
S.No.14. Create Bund at Trumbdoo Nallah Sandran at different spots
S.No.13: Create Bund at Nallah Heeward from Wahiward on roads to main Road
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
204
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 0.497 Lakhs
Completion Cost: Rs. 0.497 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.44 Lakhs
Completion Cost: Rs. 0.44 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.16. Water Harvesting Tank at Darbar Heeward NLO Gh Hassan
S.No.15: water Harvesting Tank at Lathnard Heeward NLO Gh Qadir Lone
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
205
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 0.965Lakhs
Completion Cost: Rs. 0.7708Lakhs
No. of people benefitted: 35
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.30 Lakhs
Completion Cost: Rs. 0.238 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
S.No.18. Farm Pond at Wadich Thaman NLO Gh Rasool MalikS.No.17: Land Levelling at Gogaldar Heeward NLO Mohd Ramzan Lone
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
206
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 0.447Lakhs
Completion Cost: Rs. 0.327Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.30 Lakhs
Completion Cost: Rs. 0.238 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.20. Farm Pond at Kadimargh Thaman NLO Mohd Maqbool Rather
S.No.19: Water Harvesting Tank at Wanigamh Thaman NLO GH Hassan Guroo
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
207
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 1.42 Lakhs
Completion Cost: Rs. 1.42 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.48 Lakhs
Completion Cost: Rs. 1.19 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
S.No.22. Development of spring at Magam A NLO Syed Aziz-U-dinS.No.21: Water Harvesting Tank at Choinard Gujjer Basti Rein NLO Farooq Ah Bhat
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
208
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 1.3311 Lakhs
Completion Cost: Rs. 1.3311akhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.00 Lakhs
Completion Cost: Rs. 0.925 Lakhs
No. of people benefitted: 32
Comments of stakeholders: Much needed/Quality work
S.No.24. Water Storage Tank at Hakura NLO Tahir Ahmad MalikS.No.23: Crate bund at Thaman
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
209
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 1.00 Lakhs
Completion Cost: Rs. 0.6401akhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.42Lakhs
Completion Cost: Rs. 0.37197Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
S.No.26. Conservation of Water Via Dev. Of spring near Awrin at Pethbugh
S.No.25: Water Storage Tank at Doibal Khushipora NLO Maqsood Ahmad Itoo & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
210
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.. 2.957Lakhs
Completion Cost: Rs. 1.814akhs
No. of people benefitted: 38
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.9566 Lakhs
Completion Cost: Rs. 0.951 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.28 Water Storage Tank at Voi NLO Nisar Ah Wagay & OthersS.No.27: Conservation of Water via Dev. Of Spring Naidnag NLO Abdul Majeed Khanday & Others at babdar phase I
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
211
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.00 Lakhs
Completion Cost: Rs. 0.986l akhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.1.22 Lakhs
Completion Cost: Rs. 0.97 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.30. Water Harvesting Tank at Bindroo NLO Najeeb Ah Khan & Others
S.No.29: Water Storage Tank at Voi NLO Mohd Jabar Wani & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
212
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 2.978 Lakhs
Completion Cost: Rs. 2.97 Lakhs
No. of people benefitted: 34
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.2.694Lakhs
Completion Cost: Rs. 2.67 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
S.No.34 Protection Bund cum fireld channel at Herpora Khandipora Hakura NLO Aijaz Ahmad
S.No.33: Lining Wall to Irrigation Ladh from both sides at Herpora Hakura NLO Mohd Yousuf parray Phase II
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
213
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 2.971 Lakhs
Completion Cost: Rs. 2.96 Lakhs
No. of people benefitted: 34
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.2.97Lakhs
Completion Cost: Rs. 2.97 Lakhs
No. of people benefitted: 39
Comments of stakeholders: Much needed/Quality work
S.No.36. Development of Field Channel to Check Soil Erosion at Danpath Shichen
S.No.35: Lining Wall cum field channel to check soil Erosion at dehwatoo Anipora Sichen Nlo Gh Mohammad.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
214
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.485 Lakhs
Completion Cost: Rs. 1.47 Lakhs
No. of people benefitted: 25
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.3.00 Lakhs
Completion Cost: Rs. 2.95 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
S.No.38. Conservation of water by development of reserviour at babdar NLO Ab Majeed Khanday and others Phase III
S.No.37: Conservation of Water via Dev. Of Spring at Pethbugh (Kahwotnag) NLO Arif ahmad Mir
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
215
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 3.00 Lakhs
Completion Cost: Rs. 2.84 Lakhs
No. of people benefitted: 32
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.69Lakhs
Completion Cost: Rs.0.674Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.40. Water Harvesting Tank at Kapsidar Shangramn NLO Mohd Maqbool Wani & Others
S.No.39: Conservation of water by development of reserviour at babdar NLO Ab Majeed Khanday and others Phase IV
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
216
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 2.00 Lakhs
Completion Cost: Rs. 1.99 Lakhs
No. of people benefitted: 34
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.853 Lakhs
Completion Cost: Rs.0.67 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
S.No.42 Development of Spring at Gilpora TrajanS.No.41: Check Dam at Sednard Nallah Halsidar
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
217
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.00 Lakhs
Completion Cost: Rs. 1.00 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.72 Lakhs
Completion Cost: Rs.0.58Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.44. Rain Water Harvestin Tank at Shangran AlchiwardS.No.43: Rain Water Harvesting tank at Sariean Hall
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
218
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.50Lakhs
Completion Cost: Rs. 1.49 Lakhs
No. of people benefitted: 37
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs.0.79 Lakhs
Completion Cost: Rs.0.59 Lakhs
No. of people benefitted: 17
Comments of stakeholders: Much needed/Quality work
S.No.46. Development od Spring at Joibal ShangranS.No.45: Nallah Bund at Bunpora Shangran near Primary School
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
219
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.50Lakhs
Completion Cost: Rs. 1.08 Lakhs
No. of people benefitted: 18
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.00 Lakhs
Completion Cost: Rs. 1.00 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work.
S.No.48. Development of Spring NLO Shah Wali & Gh Hassan Bumla at SaskhodanS.No.47: Nallah Bund at Joibal Shangran
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
220
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.386 Lakhs
Completion Cost: Rs. 0.386 Lakhs
No. of people benefitted: 14
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.943Lakhs
Completion Cost: Rs. 0.836 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
S.No.50. Development of Kokernag Spring at Jabba Peerpora Hingipora
S.No.49: Water Storage Tank NLO Manzoor Mir at Peth Halan Hingipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
221
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .2.17 Lakhs
Completion Cost: Rs. 1.06 Lakhs
No. of people benefitted: 24
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.54 Lakhs
Completion Cost: Rs. 0.54 Lakhs
No. of people benefitted: 16
Comments of stakeholders: Much needed/Quality work
S.No.52. Development of Spring NLO Gh Rasool Sheroo at NowgamnaadS.No.51: Check Dams at Gah Naad Nallah Khadar Kapran
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
222
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.37 Lakhs
Completion Cost: Rs. 0.265 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.73 Lakhs
Completion Cost: Rs. 0.73 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
S.No.54. Farm Pond NLO Gul Wani & Others at Reshipora Yakerbaru
S.No.53: Water Storage of Spring at Gamdoor Nallah NLO Nazir Pahadi , Boba Pahadi
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
223
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.70 Lakhs
Completion Cost: Rs. 0.67 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion December 2019
Estimated Cost: Rs. 1.09 Lakhs
Completion Cost: Rs. 0.873 Lakhs
No. of people benefitted: 25
Comments of stakeholders: Much needed/Quality work
S.No.56. Development of Spring at Moshikadal Gujer Basti HallanS.No.55: Rain Water Harvesting Tank at Laward Hallan.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
224
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.384 Lakhs
Completion Cost: Rs. 0.336 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of ommencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.99 Lakhs
Completion Cost: Rs. 1.036Lakhs
No. of people benefitted: 25
Comments of stakeholders: Much needed/Quality work
S.No.54. Farm Pond NLO Gul Wani & Others at Reshipora YakerbaruS.No.57: Rain Water Harvesting Tank at Naagi nard Chohan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
225
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.723 Lakhs
Completion Cost: Rs. 0.69 Lakhs
No. of people benefitted: 24
Comments of stakeholders:Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.92 Lakhs
Completion Cost: Rs. 0.77 Lakhs
No. of people benefitted: 18
Comments of stakeholders: Much needed/Quality work
S.No.60. Fisheries Pond NLO syed Mohd Amin at KapranS.No.59: Rain Water Harvesting Tank at Khanpora Kapran NLO Muzaffer Khan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
226
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .2.50 Lakhs
Completion Cost: Rs. 0.93 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.73 Lakhs
Completion Cost: Rs. 0.694 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
S.No.62. Water Harvesting Tank NLO Gulam Rasool Rather at ChohanS.No.61: Check Dams on Nowgam Nad Kapran (Phase II)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
227
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.979 Lakhs
Completion Cost: Rs. 1.552 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.60 Lakhs
Completion Cost: Rs. 0.546 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
S.No.66. Conseravtion of Water Via Development of Spring at Nageh Howed at Peerpora manz Dehruna
S.No.65: Water Storage Tank & Cattle Trough for Spring near Masjid Shareef Naaginad Hingipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
228
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.957 Lakhs
Completion Cost: Rs. 0.514 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.52 Lakhs
Completion Cost: Rs. 0.52 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.68. Water Harvesting Tank at Khalhar in Orchard of Gul Mohd BhatS.No.67: Check Dam at Shalguf Nard Kungamnag
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
229
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.97 Lakhs
Completion Cost: Rs. 0.4546 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.92 Lakhs
Completion Cost: Rs. 0.336 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
S.No.70. Check Dam NLO Firdous Ah Wani at Cherdokh Soaf BS.No.69: Chech Dam at Hapatnard soaf A NLO Gh Nabi Ahanger & Others g .
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
230
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.60 Lakhs
Completion Cost: Rs. 0.60 Lakhs
No. of people benefitted: 25
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.475 Lakhs
Completion Cost: Rs. 0.475Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.72. WHT NLO Shamis U din Rather at KhalharS.No.71: Water Harvesting Tank in the Land of Gh Qadir Bhat S/O Rama Bhat at Soaf B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
231
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.00 Lakhs
Completion Cost: Rs. 0.747 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.00 Lakhs
Completion Cost: Rs. 0.96 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
S.No.74: Farm Pond NLO Abdul Salam& Others at KandiwaraS.No.73: Water Harvesting Tank at Kongamnag NLO Mohd Ashraf, Abdul Salam & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
232
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.42Lakhs
Completion Cost: Rs. 0.408 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.46 Lakhs
Completion Cost: Rs. 0.397Lakhs
No. of people benefitted: 18
Comments of stakeholders: Much needed/Quality work
S.No.76. Water Harvesting Tank at ArhamaS.No.75: Farm pond at Bon Arhama
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
233
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.39Lakhs
Completion Cost: Rs. 0.39 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.50 Lakhs
Completion Cost: Rs. 0.49Lakhs
No. of people benefitted: 17
Comments of stakeholders: Much needed/Quality work
S.No.78. Water Harvesting Tank at Check Bagh NLO Reyaz Ahmad & OthersS.No.77: Perculation Tank at Wooder TChawalgam
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
234
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.926 Lakhs
Completion Cost: Rs. 0.369Lakhs
No. of people benefitted: 16
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.855 Lakhs
Completion Cost: Rs. 1.831Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
S.No.80. Check Dam With Nallah Baund in crates at Rukhan Nallah Hallwan Nlo Fayaz Ali & Others
S.No.79: Check Dams NLO Lass Mohd shree at MatakNad Soaf B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
235
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.46 Lakhs
Completion Cost: Rs. 1.455Lakhs
No. of people benefitted: 13
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.85Lakhs
Completion Cost: Rs. 1.60 Lakhs
No. of people benefitted: 24
Comments of stakeholders: Much needed/Quality work
S.No.78. Water Harvesting Tank at Check Bagh NLO Reyaz Ahmad & Others
S.No.81: Stone Bund at Khoda Dar Brad Nlo Gh Mohd Shah & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
236
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs . 1.00 Lakhs
Completion Cost: Rs. 0.99 Lakhs
No. of people benefitted: 13
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.50Lakhs
Completion Cost: Rs. 1.485 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.84. stone Bund at Kacha Pacca Yall NLO Mohd Shaban & Others S.No.83: Water Harvesting Pala Pather, Nagbal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
237
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.50 Lakhs
Completion Cost: Rs. 1.488Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.50Lakhs
Completion Cost: Rs. 1.472 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
S.No.86. Stone Bund at Kit Kul (RRM) chandrigam NLO Gh Nabi & Others
S.No.85: Nallah Bund at Banjer Hassan Noor NLO) Mohd Shaban & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
238
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.50 Lakhs
Completion Cost: Rs. 1.453Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.50Lakhs
Completion Cost: Rs. 1.488Lakhs
No. of people benefitted: 25
Comments of stakeholders: Much needed/Quality work
S.No.88. Loose Boulder Bund at Herdar Nallah KhayarS.No.87. Stone Bund at Khayar NLO Gh Hassan Najar
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
239
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.50 Lakhs
Completion Cost: Rs. 0.321Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.486Lakhs
Completion Cost: Rs. 1.423 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
S.No.90. Lining Wall Field Channel with recharge pits at Dairoo from the Land of Ab Rehman Khanday to Ab Majeeed Rather
S.No.89. Development of spring at Different Spots at Hallan Panzmullah
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
240
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.46 Lakhs
Completion Cost: Rs. 1.435 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.88 Lakhs
Completion Cost: Rs. 0.818 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality wor
S.No.92. Control Bund to check the soil Erosion at Ainoo NLO Mohd Amin Zarger & others
S.No.91. Lining Wall for Field chan nel with Recharge Pits at Wajura from The Land of Gh Qadoir Kumar to Ab Gani Lone Phase I
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
241
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.48 Lakhs
Completion Cost: Rs. 1.468 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 2.66 Lakhs
Completion Cost: Rs. 2.406 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
S.No.94. Check Dam at Various Spots at Ainoo Nlo Mohd Amin Zarger & Others
S.No.93. Lining Wall for field Channel with Recharge pits at Dayroo from the land of Zahoor Ahmad Nad to Qadir Rather
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
242
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.496 Lakhs
Completion Cost: Rs. 1.012 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.529Lakhs
Completion Cost: Rs. 0.402 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
S.No.96. Development of Spring at Mughal Mohalla Brai NLO Nazir Ah Paswal
S.No.95. Lining Wall for Field Channel withy Recharge pits at Ainoo from the Land of Ghulam Nabi Magray to the Land of Ab Razak Magray
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
243
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.50 Lakhs
Completion Cost: Rs. 1.223 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 1.50Lakhs
Completion Cost: Rs. 1.125 Lakhs
No. of people benefitted: 24
Comments of stakeholders: Much needed/Quality work
S.No.98. Lining Wall for Field Channel with Recharge pits at Gowas from the Land of Gh Nabi Khadin to Abdullah Bakod
S.No.97. Lining Wall for field channel with Recharge Pits at Gowas from the Land of Ali Mohd Ganie to Gh Hassan Sheikh
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
244
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.335 Lakhs
Completion Cost: Rs. 0.24 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.335 Lakhs
Completion Cost: Rs. 0.242 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
S.No.100. Farm Pond at Brai NLO Nazir Ahmad Paswal near Middle School
S.No.99. Farm Pond at Brai in the Land of Munshi Chohan naad Chohan Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
245
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .0.335 Lakhs
Completion Cost: Rs. 0.227 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.335 Lakhs
Completion Cost: Rs. 0.2535 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
S.No.102. Farm Pond at Brai Chohan Mohalla in the land of Ab Rashid Chohan NHO Mohd Yousuf Khan
S.No.101. Farm Pond at Brai Paswal Mohalla NLO Bashir Ah Chohan near Masjid Sharief
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
246
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.49Lakhs
Completion Cost: Rs. 1.485 Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs. 0.70 Lakhs
Completion Cost: Rs. 0.569 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
S.No.104. Conservation of Water Via Dev. Of Spring at Loveli Mohalla Brai
S.No.103. Lining Wall for Field Channel with recharge Pits at ainoo from the land of Habba Magray to the Land of Mohd
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
247
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.00 Lakhs
Completion Cost: Rs. 0.993 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.75 Lakhs
Completion Cost: Rs. 0.288 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
S.No.106. Check Dam at Poshmaiden Nagbal S.No.105. Development of Farm Pond at Gujjir Basti Nagbal NLO Mohd Dawlat Khan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
248
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.48 Lakhs
Completion Cost: Rs. 1.47 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.50Lakhs
Completion Cost: Rs. 1.49 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
S.No.108. Lining Wall for Field Channel at dumakha Nagbal NLO Abdul Gaffar Dar
S.No.107. Development of Spring approched with Drain at Seero Mohallah Gujjir Basti Nagbal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
249
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs .1.50 Lakhs
Completion Cost: Rs. 1.144 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.49Lakhs
Completion Cost: Rs. 1.472 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
S.No.110. Lining Wall for Field Channel Manzewatter Ladh Chatti Paibugh NLO Ab Ahad Bhat & Others S.No.109. Development of Spring approched with Drain at Nagbal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
250
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 2.00 Lakhs
Completion Cost: Rs. 1.958 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.50 Lakhs
Completion Cost: Rs. 1.488Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.112. Lining Wall for field Channel at Yadi Kha NLO Gh Rasool Mir & Others
S.No.111. Lining Wall for Field Channel at Moush ladh NLO Ab Ahad & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
251
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 2.81 Lakhs
Completion Cost: Rs. 2.81 Lakhs
No. of people benefitted: 36
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.50 Lakhs
Completion Cost: Rs. 1.498Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.114. Retaining Wall at Peer Mohalla NLO Peer Qamar u din & OthersS.No.113. Dev. Of Spring CUM Waterr Storage Tank at Mir Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
252
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.00 Lakhs
Completion Cost: Rs. 0.88 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.50 Lakhs
Completion Cost: Rs. 1.49 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
S.No.116. Dev. Of Lassi Dewan Spring of Vail Nagbal near Gravyard
S.No.115 Farm Pond at Kamni Vani Nlo Mohd Ibrahim Shah & `others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
253
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.489 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs1.00 Lakhs
Completion Cost: Rs. 0.892 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.118. Farm Pond at Hutmurah NLO Peer Sajad Ahmad & Others
S.No.117. Nallah Bund at checkdar Nagbal NLO Ab Gaffer Bhat & others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
254
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.00 Lakhs
Completion Cost: Rs. 0.89 Lakhs
No. of people benefitted: 18
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.80 Lakhs
Completion Cost: Rs. 0.80 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
Earthen Bund at Kamnivani, NagbalS.No.119. Farm Pond at Hutmurah NLO Assadullah & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
255
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 2.50 Lakhs
Completion Cost: Rs. 2.457Lakhs
No. of people benefitted: 28
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.48 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
S.No.122. Nallah Bund (RRM) at Mir Mohallah Nagbal NLO Gh Mohi ud din & OthersS.No.121. Lining Wall for Field channel at Paibugh near Grave Yard
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
256
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.495 Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.68283 Lakhs
Completion Cost: Rs. 0.68283 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.124. Crate Bund S.No.123. Crate bund at Goordar Nagbal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
257
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.49 Lakhs
No. of people benefitted: 17
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.50 Lakhs
Completion Cost: Rs. 0.465 Lakhs
No. of people benefitted: 17
Comments of stakeholders: Much needed/Quality work
S.No.126. Dev. Of Spring at Gujiran BatakootS.No.125. Linning Wall for Field Channel From The land Gh Hassan Deedar & Mohd Akber Deedar at Gujjir Batkoot
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
258
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.50Lakhs
No. of people benefitted: 23
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.459 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
S.No.128 . Lining Wall for Field Channel from the Land of Ab Khari to Mohd Yousuf Pushward batkoot
S.No.127. Lining Wall for Field Channel from Masjid Sharief to Gh Hassan Khari Pushward
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
259
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.00 Lakhs
Completion Cost: Rs. 0.98 Lakhs
No. of people benefitted: 34
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 2.36 Lakhs
Completion Cost: Rs. 0.968 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.126. Dev. Of Spring at Gujiran BatakootS.No.129. Check Dam at Various parts across Nallah at waibal puherpjan Phase-II
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
260
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 2.36 Lakhs
Completion Cost: Rs. 0.954 Lakhs
No. of people benefitted: 26
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.283 Lakhs
No. of people benefitted: 21
Comments of stakeholders: Much needed/Quality work
S.No.132. Lining Wall for Field Channel at Pushward Batakoot from the Land of Mohd Yousuf & Others
S.No.131. Check Dam at nagmargi Pushward Gujran NLO Mohd Ashraf shah
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
261
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.46 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.421 Lakhs
No. of people benefitted: 27
Comments of stakeholders Much needed/Quality work
S.No.134. Lining Wall for Field Channel at from the Land of Bashir Choora To Abdul Deedar
S.No.133. Lining Wall for Field Channel at Pushward Batakoot from the Land of Abdullah Deedar to Gull mohd Khan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
262
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.74 Lakhs
Completion Cost: Rs. 0.527 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.43Lakhs
Completion Cost: Rs. 1.43 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
S.No.136. Lining Wall of Field Channel with Recharge Pits at Charakpora from the Land of Javaid Ah Khan to the Land of Gh Nabi Tota
S.No.135. Conservation of Water Via Dev of Spring at Googledar NLO Irshad Ahmad Lone
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
263
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.55 Lakhs
Completion Cost: Rs. 1.53 Lakhs
No. of people benefitted: 33
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.69 Lakhs
Completion Cost: Rs. 0.562 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.138. Conservation Of Water Via Dev.of Spring NLO Ashiq Hussain Bhat
S.No.137. Check Dams at Various Spots across Nallah Changazi gagadawan Hapatnard
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
264
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.60 Lakhs
Completion Cost: Rs. 1.023 Lakhs
No. of people benefitted: 31
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.949 Lakhs
Completion Cost: Rs. 1.91 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
S.No.140. Check Dams At Various Spots at Aithnard Gujjer Basti NLO GH Qadir Dar & Others
S.No.139. Check Dam at spots across Nallah from Palpathri to NLO Mubarak Khan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
265
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.465 Lakhs
Completion Cost: Rs. 1.454 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.773 Lakhs
Completion Cost: Rs. 0.625 Lakhs
No. of people benefitted: 22
Comments of stakeholders: Much needed/Quality work
S.No.142. Development of spring at Nambal A NHO Gh Nabi BhatS.No.141. Protection Bund at Ranzpal NLO Farooq Ah & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
266
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.925 Lakhs
Completion Cost: Rs. 0.496 Lakhs
No. of people benefitted: 27
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 0.935Lakhs
Completion Cost: Rs. 0.63 Lakhs
No. of people benefitted: 19
Comments of stakeholders: Much needed/Quality work
S.No.144. Dev.of Spring at Gaschari Kardi KichlooS.No.143. Dev. Of Spring at Molvi Mohalla Hardi Kichloo Grandwand
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
267
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.50 Lakhs
Completion Cost: Rs. 1.49 Lakhs
No. of people benefitted: 34
Comments of stakeholders: Much needed/Quality work
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.997 Lakhs
Completion Cost: Rs. 1.922 Lakhs
No. of people benefitted: 39
Comments of stakeholders: Much needed/Quality work
S.No.146. Check Wall cum Field Channel at Budbar Subhan Pora NLO Ab Rehman Bhat & Others
S.No.145. Field Channel with Recharge Pits at Khaltal HP Bagh NLO Mohd Yaseen & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
268
Date of Commencement: November 2019
Date of Completion: December 2019
Estimated Cost: Rs 1.499 Lakhs
Completion Cost: Rs. 1.478 Lakhs
No. of people benefitted: 29
Comments of stakeholders: Much needed/Quality work
S.No.147. Check Wall cum fueld Channel at Glender Shamsipora NLO Gh Mohd Ganie & Others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
269
DOS: May, 2019
DOC: July,2019
EST COST: 2.94
IWMP COST: 2.94
FAMLIES BENEFITTED: 20
DOS:- May, 2019
DOC:- July,2019
EST COST: 2.34
IWMP COST: 2.34
FAMLIES BENEFITTED: 23
Figure 46 C/O Flume /Channel At Bon Rather Mohallah Nearl/O Ab Rasheed Malik
Figure 45 C/O Crate Wire Protection Bund On Nallah Panaar Near L/O Wali Malik And Others.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
270
DOS: May,2019
DOC:- July,2019
EST COST: 2.55
IWMP COST: 2.55
FAMLIES BENEFITTED: 15
DOS: May,2019
DOC: July,2019
EST COST: 1.90
IWMP COST: 1.90
FAMLIES BENEFITTED: 13
Figure 48C/O Wht Near L/O Gulzar Malik Bod Mohallah Mohalla Figure 47 C/O Wht Near L/O Abdullah Gashee,Shah Fatha Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
271
DOS: MAY 2019
DOC:- JULY 2019
EST COST: 2.89
IWMP COST: 2.89
FAMLIES BENEFITTED: 35
DOS: MAY 2019
DOC: JULY 2019
EST COST: 4.27
IWMP COST: 4.27
FAMLIES BENEFITTED: 22
Figure 2050 C/O Crate Wire P Bund Near Main Road Suresh Khul Near L/O Satar Sheikh,Mustaq Khatana 19 Figure 49 C/Oirrigation Channel Near L/O Nabi Lone To
Suresh Khul Onwards At Lone Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
272
DOS : May, 2019
DOC: JULY 2019
EST COST: 4.64
IWMP COST: 4.64
FAMLIES BENEFITTED: 37
DOS: MAY 2019
DOC: JULY 2019
EST COST: 3.88
IWMP COST: 3.88
FAMLIES BENEFITTED: 27
Figure 52 C/O Crate Wire P Bund Near L/O Bashir Ah Mongral Onwards At Watalpora Mohalla
Figure 51 C/O Crate Wire P Bund Near L/O Karim Ganji Malik Onwards In Karim Ganjji Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
273
DOS: MAY 2019
DOC: JULY 2019
EST COST: 1.87
IWMP COST: 1.87
FAMLIES BENEFITTED: 15
DOS: MAY 2019
DOC: JULY 2019
EST COST: 3.24
IWMP COST: 3.24
FAMLIES BENEFITTED: 16
Figure 54 C/O CRATE P BUND PMGSY ROAD TO GH MOHIDIN BHAT HABIB NALLAH
Figure 53 C/O Irrigation Channel Nallah Sheikh Naar Near L/O Rasheed Lone Onwards Near Primary School Masjid Daranpora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
274
DOS: MAY 2019
DOC: JULY 2019
EST COST: 2.17
IWMP COST: 2.17
FAMLIES BENEFITTED: 18
DOS: MAY 2019
DOC: JULY 2019
EST COST: 1.75
IWMP COST: 1.75
FAMLIES BENEFITTED: 25
Figure 56 C/O Spring Ibarahim Lone At Mongral Check Lone Mohalla. Mohalla
Figure 55 C/O Wht Near Ali Mohd Lone Near Daranpora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
275
DOS : May, 2019
DOC: JULY 2019
EST COST: 2.72
IWMP COST: 2.72
FAMLIES BENEFITTED: 19
DOS: MAY 2019
DOC: JULY 2019
EST COST: 4.91
IWMP COST: 4.91
FAMLIES BENEFITTED: 38
Figure 58 C/O Irrigation Channel From Main Road Near H/O Gh Qadir Wani Onwards Hajam Mohalla
Figure 57 C/O Irrigation Channel Near L/O Rasheed Najar Onwards At Chowdikar Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
276
DOS: MAY 2019
DOC: JULY 2019
EST COST: 4.02
IWMP COST: 4.02
FAMLIES BENEFITTED: 32
DOS: MAY 2019
DOC: JULY 2019
EST COST: 2.17
IWMP COST: 2.17
FAMLIES BENEFITTED: 13
Figure 60 C/O Wht Near L/O Mehboob Khan At Bhat Mohalla Mohalla
Figure 59 C/O Irrigation Channel From Main Road Near L/O Mohideen Bhat Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
277
DOS : May, 2019
DOC: JULY 2019
EST COST: 3.68
IWMP COST: 3.68
FAMLIES BENEFITTED: 33
DOS : May, 2019
DOC: JULY 2019
EST COST: 2.13
IWMP COST: 2.13
FAMLIES BENEFITTED: 14
Figure 62 C/O WHT NEAR L/O JAMAL KHATANA AT KHATNA MOHALLAFigure 61 C/O IRRIGATION CHANNEL NEAR L/O ABDULAH BHAT IN BHAT MOHALLA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
278
DOS: MAY 2019
DOC: JULY 2019
EST COST: 2.40
IWMP COST: 2.40
FAMLIES BENEFITTED: 17
DOS: MAY 2019
DOC: JULY 2019
EST COST: 3.24
WMP COST: 3.24
FAMLIES BENEFITTED: 23
Figure 64 C/O WHT NEAR L/O GH NABI SHEIKH AND KAWTHOR PEER MOHALLA Figure 63 C/O WHT NEAR L/O MOHIDIN ZARGER IN KHATNA
MOHALLA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
279
DOS : May, 2019
DOC JULY 2019
EST COST : 3.10
IWMP SHARE : 3.10
FAMILIES BENIFFITTED: 27
DOS : May, 2019
DOC : July,2019
EST COST : 2.38
IWMP SHARE : 2.38
FAMILIES BENIFFITTED: 22
Figure 66 C/O Irrigation Channel Near Gh Mohd Bhat To Ibrahim Malik At Check Tulipora Figure 65 C/O Irrigation Channel Near L/O Yousuf Khan ,Bashir
Sheikh Onwards Bonsheikhpora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
280
DOS : May, 2019
DOC : July,2019
EST COST : 1.80
IWMP SHARE : 1.80
FAMILIES BENIFFITED : 17
DOS: MAY 2019
DOC : JULY 2019
EST: 1.80
IWMP SHARE: BILL PENDING
FAMILIES BENIFITTED: 18
Figure 68 C/O Irrigation Channel Wover Mohalla Near L/O Reshi Khan H/O Sanullah Sheeikh
Figure 67 C/O Irrigation Channel Near L/O Bashir Ah Wani S/O Gh Ahmed Wani
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
281
DOS : MAY 2019
DOC: JULY 2019
EST COST: 2.50
IWMP COST: 20
FAMLIES BENEFITTED: 23
DOS: MAY 2019
DOC: JULY 2019
EST COST: 3.78
IWMP COST: 3.78
FAMLIES BENEFITTED: 32
Figure 70 C/O Irrigation Channel Near L/O Ali Mohd Bhat At Bhat Mohallah
Figure 69 C/O Irrigation Channel Vaternary Khul Near L/O Aziz Wani Onwards At Batgund
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
282
DOS: MAY 2019
DOC:- JULY 2019
EST COST: 1.98
IWMP COST: 1.98
FAMLIES BENEFITTED: 12
DOS: MAY 2019
DOC: JULY 2019
EST COST: 3.59
IWMP COST: 3.59
FAMLIES BENEFITTED: 25
Figure 72 C/O Wht Near L/O Mohd Yousaf Lone And Other At Rather Mohallah
Figure 71 C/O Crate Wire P Bund Near H/O Rafi Malik And Others Near Huch Khul
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
283
DOS: MAY 2019
DOC: JULY 2019
EST COST: 2.49
IWMP COST: 2.49
FAMLIES BENEFITTED: 17
DOS: MAY 2019
DOC: JULY 201
EST COST: 2.49
IWMP COST: 2.49
FAMLIES BENEFITTED: 18
Figure 74 C/O Irrigation Channel From Farooq Sheikh Fishries Hut Onwards In Sheikh Mohalla
Figure 73 C/O Irrigation Channel From L/O Ali Mohd Sheikh Onwards In Beigh Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
284
DOS: MAY 2019
DOC: JULY 2019
EST COST: 3.63
IWMP COST: 3.63
FAMLIES BENEFITTED: 29
DOS: MAY 2019
DOC: JULY 2019
EST COST: 2.63
IWMP COST: 2.63
FAMLIES BENEFITTED: 16
Figure 76 C/O Wht Near L/O Yaqoob Peer At Beigh Mohalla Figure 75 C/O Irrgation Channel Near L/O Ab Rasheed Rather At Rather Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
285
DOS: MAY 2019
DOC: JULY 2019
EST COST: 2.00
WMP COST: 2.00
FAMLIES BENEFITTED: 15
Figure 77 C/O Crate P Bund Near L/O Mohideen Dar And Others At Nawrooz Baba Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
286
D.O.S: 12-06-2019,
D.O.C: 26-07-2019,
Estimated Cost: 2.60lac,
Billed cost: 2.57 lacs,
No.of beneficiaries: 140
Much needed
D.O.S: 16-06-2019,
D.O.C: 25-07-2019
Est. Cost: 3.985 lacs
BilledCost: 2.20 lacs,
Beneficiaries: 200
Provided relief to the farmers.
C/o Water Harvesting Tank at Tanghat Bonkoot,C/o P/Bund using C/wire at Kehnusa.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
287
D.O.S: 26-06-2019,
D.O.C: 15-07-2019,
Estt.Cost: 2.90 lac,
Billed cost: 2.48 lacs,
No. of Beneficiaries- 190
Much needed
D.O.S:06-06-2019,
D.O.C:05-07-2019,
Estt.Cost:1.24 lacs
Billed cost:1.237 lacs,
No.of Beneficiaries-150
Much needed
C/o Irr. Field channel at Potushay C/o Field Channel at Quil Muqam,
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
288
D.O.S: 10-06-2019,
D.O.C: 28-07-2019,
Estimated Cost: 1.52 lac,
Billed cost: 1.50 lacs,
No.of beneficiaries: 160
Much needed
D.O.S: 20-06-2019,
D.O.C: 14-07-2019,
Estt.Cost: 1.70 lac,
Billed cost: 1.56 lacs,
No.of Beneficiaries- 110
Much needed
C/o Recharge pits at Malangam-CC/o Farm ponds at Aloosa-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
289
D.O.S: 16-06-2019,
D.O.C: 14-07-2019,
Estt.Cost: 2.12lac,
Billed cost: 1.50 lacs,
No.of Beneficiaries- 120
Provide relief to the farmers.
D.O.S: 09-06-2019,
D.O.C: 21-07-2019,
Estt.Cost: 2.12 lac,
Billed cost: 2.12 lacs,
No.of Beneficiaries- 80
Much Needed
C/o Protection Bund using C/wire at Binlipora-A, C/o 06 N0. Farm ponds at Bonkoot-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
290
D.O.S: 01-06-2019
D.O.C: 30-07-2019,
Estt.Cost: 1.64 ac,
Billed cost: 1.20 lacs,
No. of Beneficiaries- 118
Much needed
D.O.S: 18-06-2019,
D.O.C: 22-07-2019,
Estt.Cost: 2.53 lac,
Billed cost: 1.57 lacs,
No.of Beneficiaries- 145
Much needed
C/o Field Channel at kunusa Guzerbal, C/o Field Channel at Malangam-A,
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
291
D.O.S: 13-06-2019,
D.O.C: 05-07-2019,
Estt.Cost: 2.546 lac,
Billed cost: 2.37 lacs,
No.of Beneficiaries- 160
Useful/Quality work
D.O.S: 29-06-2019,
D.O.C: 25-17-2019
Est.Cost: 1.71 lacs,
Billed cost: 1.687 lacs,
No.of Benefaciries- 120
Useful/Quality work
C/O:- Field Channel at GuzerbalC/o Field Channel at Mantrigam,
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
292
D.O.S: 14-06-2019,
D.O.C: 16-07-2019,
Estimated Cost: 1.53lac,
Billed cost: 1.527 lacs,
No. of beneficiaries: 90
Provided water facilities to the farmers
D.O.S: 14-06-2019,
D.O.C: 16-07-2019,
Estt.Cost: 1.53 lac,
Billed cost: 1.527 lacs,
No. of Beneficiaries- 90
Much needed
C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
293
D.O.S: 22-06-2019,
D.O.C: 18-07-2019
Est.Cost: 1.30 lacs,
Billed cost: 1.04 lacs,
No.of Benefaciries- 130
Useful/Quality work
C/O:- Field Channel at Magnipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
294
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.36
Completion Cost:- 0.34
No. of People Benefited :- 5 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 036.
Completion Cost:- 0.34
No. of People Benefited :- 5 persons
Comments of Stock holder:- Much Needed/ quality work
Farm Pond BalgaranFarm Pond Balgara.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
295
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.45
Completion Cost:- 0.42700
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.45
Completion Cost:- 0.42700
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Storage Tank GwariStorage Tank Balgaran
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
296
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4700
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4700
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Farm Pond GwariP/w Chamoti
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
297
D.O.S: Nov-2019
D.OC: Dec-2019
Estimated Cost: 0.50
Completion Cost: 0.46800
No. of People Benefited : 15 persons
Comments of Stock holder: Much Needed/ quality work
D.O.S: Nov-2019
D.OC: Dec-2019
Estimated Cost: 0.60
Completion Cost: 0.54
No. of People Benefited: 15 persons
Comments of Stock holder: Much Needed/ quality work
Farm Pond ChamotiP/w Chamoti
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
298
D.O.S: 01-06-2019
D.O.C: 30-07-2019,
Estt.Cost: 1.64 ac,
Billed cost: 1.20 lacs,
No. of Beneficiaries- 118
Much needed
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.60
Completion Cost:- 0.54
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Farm Pond Chamoti Farm Pond Chamoti
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
299
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 2.06600
Completion Cost:- 1.90
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.95
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
WHT HornaR/wall Bhatta
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
300
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.935
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.935
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
WHT HornaWHT Horna
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
301
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.919
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
WHT Horna
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost: 1.00
Completion Cost:- 0.914
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
WHT Drubeel
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
302
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.95
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.841
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
C/O-5 No.of Farm ponds at Aloosa-A(Paribal)C/O-5 No.of Farm ponds at Aloosa-A(Malik Mohlla)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
WHT Drubeel WHT Drubeel
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
303
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.88
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
C/O:- Field Channel at Magnipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.811
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
C/O:- Field Channel at Magnipora
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
C/O:- Field Channel at Magnipora C/O:- Field Channel at MagniporaC/O:- Field Channel at Magnipora C/O:- Field Channel at MagniporaC/O:- Field Channel at Magnipora C/O:- Field Channel at MagniporaWHT Drubeel Field Channel Magnipora
304
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.935
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.644
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
WHT Drubeel WHT Drubeel
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
305
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.91600
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Diversion Drain Drubeel
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.90
Completion Cost:- 0.85500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Diversion Drain Drubeel
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
306
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.66
Completion Cost:- 0.60
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.285
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
P/w Keshwan-A
Diversion Drain Drubeel
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
307
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
P/w Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
P/w Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
308
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
P/w Keshwan-AP/w Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
309
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
P/w Keshwan-A
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
L/L Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
310
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
L/L Keshwan-A
L/L Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
311
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.45600
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Farm Pond Keshwan-AL/L Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
312
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.45600
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.45600
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Farm Pond Keshwan-A Farm Pond Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
313
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.50
Completion Cost:- 1.32
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.50
Completion Cost:- 1.425
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Nalla-Bund Keshwan-ANalla-Bund Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
314
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4750
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4750
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
G-P Keshwan-AG-P Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
315
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4750
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.47500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Check Dam Keshwan-AG-P Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
316
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4750
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.47500
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
Check DamKeshwan-ACheck Dam Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
317
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.95000
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.95000
No. of People Benefited :- 15 farmers
(Completion Cost:-0.47500)
Comments of Stock holder:- Much Needed/ quality work
P/W Keshwan-AP/W Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
318
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.434
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.448
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
CP/W Keshwan-BP/W Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
319
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.418
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.434
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P/W Keshwan-BP/W Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
320
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.418
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.434
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P/W Keshwan-BP/W Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
321
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.43
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.428
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P/W Keshwan-BP/W Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
322
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.448
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.34
No. of People Benefited :- 15 persons
Comments of Stock holder:- Much Needed/ quality work
L-L Keshwan-BCheck Dam Keshwan-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
323
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.322
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost: 0.37
Completion Cost:- 0.325
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L Keshwan-BP/W Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
324
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.325
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.3400
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L Keshwan-BL-L Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
325
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.3500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.92
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
WHT Keshwan-BL-L Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
326
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.469
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4600
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Form Pond Keshwan-BForm Pond Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
327
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.50
Completion Cost:- 1.295
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.50
Completion Cost:- 1.295
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
N-Bund Keshwan-BN-Bund Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
328
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.428
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.428
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Keshwan-BG-Pluging Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
329
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.285
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.397
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Keshwan-BG-Pluging Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
330
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.397
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.397
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Keshwan-BG-Pluging Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
331
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.433
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.387
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Keshwan-BG-Pluging Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
332
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.3800
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.433
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Keshwan-BG-Pluging Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
333
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.397
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.46
Completion Cost:- 0.415
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Keshwan-BG-Pluging Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
334
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.458
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.425
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Check Dam Keshwan-BCheck Dam Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
335
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.436
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.425
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Check Dam Keshwan-BCheck Dam Keshwan-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
336
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.93
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.422
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging AnjoleG-Pluging Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
337
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.458
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.937
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
N-Bund AnjoleG-Pluging Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
338
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.94
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.43
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Check Dam AnjoleN-Bund Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
339
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.195
Completion Cost:- 0.185
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.195
Completion Cost:- 0.185
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
V-Pit AnjoleV-Pit Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
340
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.195
Completion Cost:- 0.185
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.195
Completion Cost:- 0.185
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
V-Pit AnjoleV-Pit Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
341
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.195
Completion Cost:- 0.185
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.195
Completion Cost:- 0.185
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
V-Pit AnjoleV-Pit Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
342
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4750
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4750
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P/W AnjoleP/W Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
343
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.285
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L AnjoleP/W Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
344
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L AnjoleL-LAnjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
345
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.347
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.47
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L AnjoleL-L Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
346
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.33
Completion Cost:- 0.313
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P-W SarawanL-L Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
347
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.35
Completion Cost:- 0.335
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.35
Completion Cost:- 0.335
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P-W Sara wanP-W Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
348
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.35
Completion Cost:- 0.335
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.35
Completion Cost:- 0.322
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P-W Sara wanP-W Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
349
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.35
Completion Cost:- 0.322
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.92700
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Nalla-Bund Sara wanP-W Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
350
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.92700
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.95
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Nalla-Bund Sara wanNalla-Bund Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
351
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.928
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.475
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Sara wanWHT Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
352
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.475
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.95
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-Pluging Sara wanG-Pluging Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
353
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.475
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.436
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Check Dam Sara wanCheck Dam Sara wan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
354
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.88
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.471
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
G-pluging AnjoleWHT Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
355
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.422
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.469
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Form Pond AnjoleG-pluging Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
356
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.437
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.475
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P/w AnjoleCheck Dam Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
357
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28300
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28400
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P/w AnjoleP/w Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
358
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.30
Completion Cost:- 0.28500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Land Levelling AnjoleP/w Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
359
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.32700
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.35100
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Land Levelling AnjoleLand LevellingAnjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
360
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.349
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.37
Completion Cost:- 0.349
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Land Levelling AnjoleLand Levelling Anjole
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
361
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.89000
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.47500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L Patnazi _BWHT Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
362
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.47500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.314
Completion Cost:- 0.288
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L Patnazi _BL-L Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
363
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.59
Completion Cost:- 0.54
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.59
Completion Cost:- 0.47500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P-Work Patnazi _BP-Work Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
364
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.59
Completion Cost:- 0.47500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.59
Completion Cost:- 0.54
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P-Work Patnazi _BP-Work Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
365
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.4990
Completion Cost:- 0.47
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.4990
Completion Cost:- 0.365
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Check Dam Patnazi _BCheck Dam Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
366
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.4990
Completion Cost:- 0.47000
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.4990
Completion Cost:- 0.45500
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
P-Work Patnazi _BNalla-Bund Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
367
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.60
Completion Cost:- 0.47500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.60
Completion Cost:- 0.54600
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Gully Plugging Patnazi _BGully Plugging Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
368
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.60
Completion Cost:- 0.51
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.12
Completion Cost:- 1.06
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Diversion Drain Patnazi _BG-PlugingPatnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
369
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.59
Completion Cost:- 0.40500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.31400
Completion Cost:- 0.29800
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L Patnazi _BGully Plugging Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
370
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.49900
Completion Cost:- 0.39900
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.9500
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
WHT Kither Nalla-Bund Patnazi _B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
371
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 1.00
Completion Cost:- 0.93500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.4590
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Form Pond Kither WHT Kither
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
372
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.47500
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.50
Completion Cost:- 0.475
No. of People Benefited : 15 farmers
Comments of Stock holder:- Much Needed/ quality work
L-L Kither Form Pond Kither
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
373
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.499
Completion Cost:- 0.34400
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
D.O.S:- Nov-2019
D.OC:- Dec-2019
Estimated Cost:- 0.49900
Completion Cost:- 0.47400
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Check Dam KitherCheck Dam Kither
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
374
D.O.S:- Nov-2019
D.O.C:- Dec-2019
Estimated Cost:- 0.49900
Completion Cost:- 0.47400
No. of People Benefited :- 15 farmers
Comments of Stock holder:- Much Needed/ quality work
Nallah Bund Kither
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
375
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.62 Lakhs
Completion cost: Rs. 1.62 Lakhs
No. of people benefited: 20
Comments of stakeholders: It saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: RS. 1.27 Lakhs
Completion cost: Rs. 1.27 lakhs
No. of people benefited: 25
Comments of stakeholders: prevention of soil loss from erosion.Much Needed/ Quality Work.
Protection wall at w. no. 3 Mohalla Soba Kassi PYT Dandi Dara (S. no. 2)Check Dam at w. no. 2 Mohalla Kerian PYT Dandi Dara(S. no. 1)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
376
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.17 lakhs
Completion cost: Rs. 1.17 lakhs
No. of people benefited: 25
Comments of stakeholders: Needed for water Storage
Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 lakhs
Completion cost: Rs.1.27 lakhs
No. of people benefited: 20
Comments of stakeholders: It saves the soil through harsh weather and stops erosion.
Protection wall at w. no. 6 Mohalla Paswallan Pyt Dandi Dara (S.no. 4)Water Tank at Moh. Soba Kassi w-3 PYT Dandidara (S. no.3
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
377
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: - Rs. 1.17 lakhs
Completion cost: Rs. 1.17 lakhs
No. of people benefited: 35
Comments of stakeholders: Good for water Storage.Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 lakhs
Completion cost: Rs. 1.27 lakhs
No. of people benefited: 22
Comments of stakeholders: It saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work
Protection wall at W. no. 1 Moh. Dakhan Pyt Dandi Dara (S. no. 6)Water Tank at Moh. Paswallan w-6 PYT Dandidara (S. no.5)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
378
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.62lakhs
Completion cost: Rs. 1.62 lakhs
No. of people benefited: 18
Comments of stakeholders: Good for ground water recharge and water Conservation. Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 lakhs
Completion cost: Rs. 1.22 lakhs
No. of people benefited: 16
Comments of stakeholders: prevention of soil loss from erosion. Much Needed/Quality Work.
Protection Wall at W. no. 1at W.no. 7 Moh. Saydian PYT Dandi Dara (S. no. 8)Check Dam at W. no. 1 Moh. Dhakan PYT Dandi Dara (S. no. 7)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
379
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29 lakhs
Completion cost: Rs. 1.29 lakhs
No. of people benefited: 22
Comments of stakeholders: t saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work.
Date of Start:- Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.17 lakhs
Completion cost: Rs. 1.17 lakhs
No. of people benefited: 25
Comments of stakeholders: Needed for water Storage
Much Needed/ Quality Work.
Water Tank at W.no. 5 Moh. Loohratarrie PYT Dandidara (S. no. 10Protection wall at W.no. 7 PYT Dandi Dara (W. no. 9)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
380
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 2.05 lakhs
Completion cost: Rs. 2.00 lakhs
No. of people benefited: 35
Comments of stakeholders: To prevent soil erosion.
Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: RS. 1.29 lakhs
Completion cost: RS. 1.22 lakhs
No. of people benefited: 15
Comments of stakeholders: To prevent soil erosion.
Much Needed/ Quality Work
Protection Wall W. No 8 Moh. Barwalla PYT Dandi Dara (S. no. 12)Protection wall at W.no. 5 Moh. Loohratarrie PYT Dandidara (S. no. 11)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
381
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.62 lakhs
Completion cost: - Rs. 1.45 lakhs
No. of people benefited: 30
Comments of stakeholders: It saves the soil through harsh weather and stops erosion. Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 l;akhs
Completion cost: Rs. 1.27 lakhs
No. of people benefited: 20
Comments of stakeholders: Needed for prevention of soil from erosion. Much Needed/ Quality Work.
P/Wall W. No 4 Moh. Jabbran PYT Dandi Dara (S. no. 14)Check Dam at W.no.8 Moh. Barwalla PYT Dandi Dara (S. no. 13)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
382
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 lakhs
Completion cost: Rs. 1.27 lakhs
No. of people benefited: 18
Comments of stakeholders: To prevent soil erosion.
Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29 Lakhs
Completion cost: RS. 1.29 lakhs
No. of people benefited: 25
Comments of stakeholders: Needed for prevention of soil from erosion. Much Needed/ Quality Work.
Protection wall at W.no. 2 near Jama Masjid PYT Lathong (S. no. 16)P/Wall W. No 4 Moh. Jabbran PYT Dandi Dara (S. no. 15)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
383
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.17 lakhs
Completion cost: RS. 1.17 lakhs
No. of people benefited: 26
Comments of stakeholders: Needed for Water Storage. Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 lakhs
Completion cost: RS. 1.22 Lakhs
No. of people benefited: 10
Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work.
P/Wall W No 4 near Panchayat Ghar PYT Lathong
(S. no. 18)
Water Tank W. No 8. Moh Bukhair Saydian PYT Lathong (S. no. 17)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
384
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29 lakhs
Completion cost: Rs. 1.29 lakhs
No. of people benefited: 12
Comments of stakeholders: Good for soil conservation Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: RS. 1.17 lakhs
Completion cost: Rs. 1.17 lakhs
No. of people benefited: 19
Comments of stakeholders: Good for water storage. Much Needed/ Quality Work.
Water Tank at W No 1 Moh. Shekehian PYT Lathong (S. no. 20)P/ Wall W.no 2 Moh. Saydian PYT Lathong (S. no. 19)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
385
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.28 lkahs
Completion cost: Rs.1.28
No. of people benefited: 12
Comments of stakeholders: prevention of soil loss from erosionMuch Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29 lakhs
Completion cost: Rs. 1.29Lakhs
No. of people benefited: 40
Comments of stakeholders: Good for water storage. MuchNeeded/ Quality Work.
Water Tank at W No 08 Moh. Kumrian PYT Sangla (S. no. 22)P/Wall W No 6 Moh. Saran PYT Sangla (S. no. 21)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
386
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.0.67 lakhs
Completion cost: Rs. 0.45 Lakhs
No. of people benefited: 30
Comments of stakeholders: Good for drinking purpose Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 0.67lakhs
Completion cost: Rs. 0.50 lakhs
No. of people benefited: 20
Comments of stakeholders: Good for drinking purpose
Much Needed/ Quality Work
Spring Renovation at W No 2 Moh. Galli Jabbar PYT Sangla (S. no. 24)
Spring Renovation/Bawli at W No 08 Moh. Kumrian PYT Sangla (S. no. 23)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
387
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost:Rs. 1.27 lakhs
Completion cost: Rs. 1.27 lakhs
No. of people benefited: 50
Comments of stakeholders: prevention of soil loss from erosion.Much Needed/Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.98 lakhs
Completion cost: Rs. 1.98 lakhs
No. of people benefited: 25
Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work.
Protection wall at W No 01 Moh. Upper Saydian PYT Pamrote (S. no. 26)
Protection wall at W No 03 Moh. Khalifan PYT Sangla (S. no. 25)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
388
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.2.05lakhs
Completion cost: Rs. 2.02 lakhs
No. of people benefited: 30
Comments of stakeholders: prevention of soil loss from erosion. Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29 lakhs
Completion cost: Rs. 1.29 lakhs
No. of people benefited: 35
Comments of stakeholders: Good for water storage.Much Needed/ Quality Work.
Water Tank at W No. 02 Moh. Lower Pamrote PYT Pamrote (S. no. 28
Protection wall at W No 02 Moh. Lower Saydian PYT Pamrote(S. no. 27)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
389
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.24 lakhs
Completion cost: Rs. 1.17 lakhs
No. of people benefited: 40
Comments of stakeholders: Good for water storage
Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.23 lakhs
Completion cost: Rs.1.23 lakhs
No. of people benefited: 20
Comments of stakeholders: Good for water Storage
Much Needed/ Quality Work
Water Tank at W No 04 PYT Gounthal (S. no. 30)
Water Tank W No 3 PYT Gounthal(S. no. 29)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
390
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.28 lakhs
Completion cost: Rs.1.25lakhs
No. of people benefited: 25
Comments of stakeholders: prevention of soil loss from erosion.Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 0.67 lakhs
Completion cost: Rs 0.45 lakhs
No. of people benefited: 35
Comments of stakeholders: Good for drinking purpose
Much Needed/ Quality Work.
Bawli at W-7 PYT Gounthal (S. no. 32)Protection wall at W No 05 PYT Gounthal (S. no. 31)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
391
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 0.67 lakhs
Completion cost: Rs 0.45 lakhs
No. of people benefited: 35
Comments of stakeholders: Good for drinking purpose
Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.27 lakhs
Completion cost: Rs 1.27 lakhs
No. of people benefited: 16
Comments of stakeholders: The more we conserve soil the more crops grow.Much Needed/ Quality Work
Protection Wall Moh. Dhakan w-6 PYT Gounthal (S. no. 34)Bawli at W-7 PYT Gounthal (S. no. 33)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
392
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost:Rs. 1.27 lakhs
Completion cost: Rs 1.27 lakhs
No. of people benefited: 15
Comments of stakeholders: To prevent soil erosion.Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29lakhs
Completion cost: Rs 1.29 lakhs
No. of people benefited: 38
Comments of stakeholders: Good for water storage.Much Needed/ Quality Work
Water Tank at w-3 Moh. Khatana PYT Phagla (S. no. 36)P/wall at W-8 Moh. Danna PYT Gounthal (S. no. 35)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
393
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.23 lakhs
Completion cost: Rs 1.23 lakhs
No. of people benefited: 40
Comments of stakeholders: Good for water storage. Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.29 lakhs
Completion cost: Rs 1.29 lakhs
No. of people benefited: 20
Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work
Protection wall at w-3 Moh. Booriwala PYT Mohra Bechai(S. no. 38)
Water Tank at w-3 Moh. Pajjan Saydian PYT Phagla (S. no. 37)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
394
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.25 lakhs
Completion cost: Rs 1.25 lakhs
No. of people benefited: 15
Comments of stakeholders: The more we conserve soil the more crops grow. Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.27 lakhs
Completion cost: Rs.1.21 lakhs
No. of people benefited: 26 Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work.
Water Harvesting Tank at Moh. Luddran PYT Mohra Bechai Lower(S. no. 40)
Protection wall at Moh.Kohlian PYT Mohra Bechai(S. no. 39)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
395
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.27 lakhs
Completion cost: Rs1.21 lakhs
No. of people benefited: 24
Comments of stakeholders: Good for ground water recharge and water conservation. Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.17 lakhs
Completion cost: Rs 1.17 lakhs
No. of people benefited: 38
Comments of stakeholders: Good for water storage Much Needed/ Quality Work
Water Tank at Moh. Bajjran w-7 PYT Mohra Bechai (S. no. 42)Water Harvesting Tank at Moh. Daniwala PYT Mohra Bechai Lower (S. no. 41)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
396
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.25 lakhs
Completion cost: Rs 1.25 lakhs
No. of people benefited: 18
Comments of stakeholders: The more we conserve soil the more crops grow Much Needed/ Quality Work
Date of Start: 17/10/2019
Date of Completion: 16/12/2019
E. cost: Rs. 1.62 lakhs
Completion cost: Rs 1.18 lakhs
No. of people benefited: 38
Comments of stakeholders: Facilitate the removal of water held in the upper horizons of the soil. Much Needed/ Quality Work
Earthen Bund at Moh. Zargran w-2 PYT Sangla Lower (S. no. 44)Protection wall at Moh. Luddran w-1 PYT Mohra Bechai (S. no. 43)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
397
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 1.29 lakhs
Completion cost: Rs 1.29 lakhs
No. of people benefited: 20
Comments of stakeholders: Prevent of soil loss from erosion. Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.17 lakhs
Completion cost: Rs.1.17 lakhs
No. of people benefited: 45
Comments of stakeholders: Good for water Storage Much Needed/ Quality Work
Water Tank at W. no. 04 PYT Sangla (S.No. 46)Protection wall at Moh. Margan w-1 PYT Sangla (S. no. 45)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
398
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.17 lakhs
Completion cost: Rs.1.17 lakhs
No. of people benefited: 45
Comments of stakeholders: Good for Water Storage
Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.98 lakhs
Completion cost: Rs 1.98 lakhs
No. of people benefited: 35
Comments of stakeholders: Prevent of soil loss from erosion.Much Needed/ Quality Work
Protection Wall at W. no. 01 Moh. Kholian PYT Kallar Katal (S. no. 48)Water Tank at W. no. 04 Moh. Tand PYT Sangla (S.No. 47)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
399
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.54 lakhs
Completion cost: Rs 1.54 lakhs
No. of people benefited: 38
Comments of stakeholders: Prevent of soil loss from erosion. Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.98 lakhs
Completion cost: Rs 1.98 lakhs
No. of people benefited: 38
Comments of stakeholders: Prevent of soil loss from erosion.
Much Needed/ Quality Work
Protection Wall at Moh.Kholian W-1 PYT Kallar Katal(S. no. 50)
Water Tank Moh. Awana W. no. 03 (S. no. 49)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
400
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.85 lakhs
Completion cost: Rs 1.85 lakhs
No. of people benefited: 38
Comments of stakeholders: Good for ground water recharge and water conservation. Much Needed Quality Work
Date of Start: 08/08/2019
Date of Completion: 15/11/2019
E. cost: Rs. 2.40 lakhs
Completion cost: Rs 2.30 lakhs
No. of people benefited: 36
Comments of stakeholders: To prevent soil erosion Much Needed/ Quality Work
P/wall at Moh. Chairan Jabri PYT Nehrian (S. no. 52)Water Harvesting Tank at Moh. Mahiwala w-3 PYT Nehrian(S. no. 51
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
401
Date of Start: 07/11/2019
Date of Completion: 30/12/2019
E. cost: Rs.2.40 lakhs
Completion cost: Rs 2.40 lakhs
No. of people benefited: 15
Comments of stakeholders: Prevent of soil loss from erosion. Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.27 lakhs
Completion cost: Rs 1.27 lakhs
No. of people benefited: 38
Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work
Water Harvesting Tank at Moh. Noona w-4 PYT Hari Budha (S. no. 54)Protection wall at Moh. Chairan w-6 PYT Nehrian (S. no. 53)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
402
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.3.00 lakhs
Completion cost: Rs 2.50 lakhs
No. of people benefited: 35
Comments of stakeholders: Prevent of soil loss from erosion.
Much Needed/ Quality Work
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs.1.36 lakhs
Completion cost: Rs 1.36 lakhs
No. of people benefited: 38
Comments of stakeholders: to reduce water logging
Much Needed/ Quality Work
Drain at Moh. Deri w-4 PYT Hari Budha (S. no. 56)Protection wall at Moh. Moori Katha w-5 PYT Hari Budha (S. no. 55)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
403
Date of Start: 07/11/2019
Date of Completion: 30/12/2019
E. cost: Rs.1.85 lakhs
Completion cost: Rs 1.85 lakhs
No. of people benefited: 20
Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work.
Date of Start: Nov 2019
Date of Completion: Dec 2019
E. cost: Rs. 2.05 lakhs
Completion cost: Rs 2.05 lakhs
No. of people benefited: 20
Comments of stakeholders: Needed for prevention of soil loss from erosion.Much Needed/ Quality Work.
P/wall at Moh. Loohran PYT Hari Budha Upper (S. no. 58)Water Harvesting Tank at Moh. Chaiyanwali PYT Hari Budha (S. no. 57)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
404
Date of Start: 07/11/2019
Date of Completion: 30/12/2019
E. cost: Rs.1.85 lakhs
Completion cost: Rs 1.85 lakhs
No. of people benefited: 32
Comments of stakeholders: Good for ground water recharge and water conservation Much Needed/ Quality Work.
Water Harvesting Tank at Moh. Talla Moori PYT Hari Budha (S. no. 59)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
405
D.o.s/ D.o.c: 14-05-2019 / 26-06-2019
Estimated Cost: 3.45300
Iwmp Share: 2.89000
Mg-Nrega Share: 0.55233
Dimensions: 255 Rft
D.O.S/ D.O.C: 05-05-2019 / 20-06-2019
Estimated Cost: 3.22000
IWMP Share: 1.79331
MG-NREGA Share: 0.63882
Dimensions: 185 rft
Const of Kuhl from l/o Gh Mohiddin onwards at Agricultural land Padgampora
Treatment Of Land By Way Of Protection Bund From L/O Mohd Ismail Khan Onwards At Nagbal Barsoo Pul-1-4
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
406
D.O.S/ D.O.C: 27-05-2019 / 07-06-2019
Estimated Cost: 2.40000
IWMP Share: 1.66100
MG-NREGA Share: 0.49290
Dimensions: 314rft
D.O.S/ D.O.C: 10-05-2019 / 20-06-2019
Estimated Cost: 1.45000
IWMP Share: 1.07800
MG-NREGA Share: 0.29000
Dimensions: 20*20
C/o WHT cum Storage tank in l/o Ghulam Rasool at LadhooConst of field channel from l/o Abdullah Shiekh to onwards at Ladhoo
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
407
D.O.S/ D.O.C: 29-05-19 / 05-06-2019
Estimated Cost: 1.37000
IWMP Share: 0.96700
MG-NREGA Share: 0.26970
Dimensions: 20*20
D.O.S/ D.O.C: 20-05-2019 / 18-06-2019
Estimated Cost: 1.37000
IWMP Share: 0.83988
MG-NREGA Share: 0.30618
Dimensions: 20*20
Construction of Water Harvesting Tank cum Storage tank near l/o Jallaluddin, at Ladhoo B
Construction of Water Harvesting Tank cum Storage tank near l/o Chunni Lal, at Ladhoo A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
408
D.O.S/ D.O.C: 05-05-2019 / 25-06-2019
Estimated Cost: 3.46000
IWMP Share: 2.65524
MG-NREGA Share: 0.69378
Dimensions: 515 rft
D.O.S/ D.O.C: 29-05-2019 / 18-06-2019
Estimated Cost: 2.79350
IWMP Share: 1.93693
MG-NREGA Share: 0.57288
Dimensions: 310 rft
Concreting of Field Channel from l/o Abdul Razaq Dar to onwards at Banjar Khah Lethpora A Pul-1-2
Construction of Field Channel from irrigation canal to Agriculture field at Lethapora phase I
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
409
D.O.S/ D.O.C: 25-05-2019/14-06-2019
Estimated Cost: 2.75800
IWMP Share: 2.05786
MG-NREGA Share: 0.55056
Dimensions: 220 rft
Treatment of land by way of p- bund near l/o Shabir Ahmad Dar at Lethapora A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Comment-dots
410
Date of Commencement 4 July 2019
Date of Completion 5 Sep 2019
Estimated Cost 1.00
Completion Cost 1.00
No. of People benefited 40
Comments of stakeholders Much needed/quality works
Date of Commencement 1 July 2019
Date of Completion 29 sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No. of People benefited 55
Comments of stakeholders Much needed/quality works
Harvesting Tank Nlo Green Mohalla Pyt. Khablan-A Water Harvesting Tank Nlo Shakoor Din At Saaj-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
411
Date of Commencement 4 July 2019
Date of Completion 27 Sep 2019
Estimated Cost 1.00
Completion Cost 1.00
No. of People benefited 45
Comments of stakeholders Much needed/quality works:_
Date of Commencement 3 July 2019
Date of Completion 26 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No. of People benefited 55
Comments of stakeholders Much needed/quality works
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Harvesting Tank NLO Bowli Station Pyt. Saaj-A Harvesting Tank NLO Ab. Salam Pyt. Khablan-A
412
Date of Commencement 1 July 2019
Date of Completion 29 Sep 2019
Estimated Cost 2.00
Completion Cost 1.80
No. of People benefited 66
Comments of stakeholders Much needed/quality works
Date of Commencement 03 July 219
Date of Completion 23 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No.of People benefited 45
Comments of stakeholders Much needed/quality works
Harvesting Tank NLO Mohd Akram Pyt. Lah Harvesting Tank NLO Akram Pyt. Lah
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
413
Date of Commencement 01 July 2019
Date of Completion 29 Sep 2019
Estimated Cost 2.30
Completion Cost 2.00
No. of People benefited 56
Comments of stakeholders Much needed/quality works
Date of Commencement 01 July 2019
Date of Completion 29 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No. Of People benefited 55
Comments of stakeholders Much needed/quality works
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Harvesting Tank NLO Sushil Kumar Pyt. Kallar Harvesting Tank NLO Mohd Hafeez Pyt.Chingus
414
Date of Commencement 1 July 2019
Date of Completion 30 Sep 2019
Estimated Cost 2.50
Completion Cost 2.00
No. of People benefited 65
Comments of stakeholders Much needed/quality works
Date of Commencement 1 July 2019
Date of Completion 22 Sep 2019
Estimated Cost 2.50
Completion Cost 2.00
No.of People benefited 65
Comments of stakeholders Much needed/quality works
Harvesting Tank NLO Satvinder Singh Pyt. Bathuni Drain NLO Adnan Ali Pyt. Behrote
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
415
Date of Commencement 4 July 2019
Date of Completion 15 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No. of People benefited 35
Comments of stakeholders Much needed/quality works
Date of Commencement 4 July 2019
Date of Completion 29 Sep 2019
Estimated Cost 2.00
Completion Cost 1.50
No. Of People benefited 55
Comments of stakeholders Much needed/quality works
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Water Harvesting Tank at Mulla Da Pani Pyt.Totamohara Water Harvesting Tank NLO Mohd Qayoom Pyt. Khablan-A
416
Date of Commencement 4 July 2019
Date of Completion 12 Sep 2019
Estimated Cost 2.00
Completion Cost 1.50
No. of People benefited 45
Comments of stakeholders Much needed/quality works
Date of Commencement 04 July 2019
Date of Completion 27 Sep 2019
Estimated Cost 1.50
Completion Cost 1.50
No.of People benefited 43
Comments of stakeholders Much needed/quality works
Protection Wall NLO Maroof Abdullaha Danna Pyt. Khablan-A Protection Wall NLO Mohd Bashir Pyt.Tamohara
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
417
Date of Commencement 4 July 2019
Date of Completion: 09 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No. of People benefited 34
Comments of stakeholders Much needed/quality works
Date of Commencement 4 July 2019
Date of Completion 12 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No.of People benefited 55
Comments of stakeholders Much needed/quality works
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Water Harvesting Tank NLO Mohd Qasim Pyt. DOC: -Totamohara Water Harvesting Tank NLO Shafat Ahmed Pyt. Rajdhani-A
418
Date of Commencement 02- July 2019
Date of Completion 27 Sep 2019
Estimated Cost 1.50
Completion Cost 1.00
No. of People benefited 34
Comments of stakeholders Much needed/quality works
Date of Commencement 02 July 2019
Date of Completion 25 Sep 2019
Estimated Cost 2.00
Completion Cost 1.50
No.of People benefited 45
Comments of stakeholders Much needed/quality works
Harvesting Tank NLO Mohd Anwar Pyt. Plangarh Harvesting Tank NLO Mohd Zaman Pyt. Bhattian
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
419
C/O drain with path near Nazir Ahmad Bhat and Alshams School Qalamabad (374)
C/O well with drain near land of Gh. Hassan Bhat & others at Punzwa A (366)
Date of Commencement : 06.03.2020
Date of Completion : 25.03.2020
Est. Cost : 2.59 Lacs
Completion Cost : 2.00 lacs
No of people benefitted : 800
Stake holder comment : The work is of community benefit.
Date of Commencement : 02.02.2020
Date of Completion : 22.03.2020
Est. Cost : 2.00 Lacs
Completion cost : 2.00 Lacs
No. of People benefitted : for playing gams of Youth of whole Panchayat Stake holder comment : The work is of community benefit.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
420
Fencing (Chain link) around Panchayat Ghar Magam B
Date of commencement : 2018-19
Date of Completion : 03-2020
Estt. Cost : 3.40
Completion cost (Exp) : 2.545
No. of People benefitted : for playing gams of Youth of whole Panchayat Stake holder comment : The work is of community benefit.
Date of commencement : 27.12.2019
Date of Completion : 19.3.2020
Estt. Cost : 2.80
Completion cost(Exp) : 2.00
No. of People benefitted : for playing gams of Youth of whole Panchayat Stake holder comment : The work is of community benefit.
Development play field at Kulangam bag (361)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
421
Const of P bund NLO Ab Gafar Bhat at karihama (359)Name of Work with Location:- C/O COMMUNITY SANITARY COMPLEX NEAR HIGH SCHOOL CHOWGAM BLOCK CHITTERGULL(06)
Date of Commencement : 21.12.2019
Date of Completion : 10.03.2020
Estimated Cost : 2.500
Completion Cost : 1.750
No of people benefitted : Provides Connectivity facility of village Rawathpora Stake holder comment : The work is of community benefit.
Date of Commencement : 14.3.2019Date of Completion : 25.3.2020Estimated Cost : 2.00Completion Cost : 1.00No of people benefitted : protection of residential houses of village Kariham
Stake holder comment : The work is of community benefit.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
``USER
COMMENT-DOTS
422
Const. of R Wall with drain near Panchayat Ghar Kundian ( Keran) (362)
Date of Commencement : 25.2.2020
Date of Completion : 25.3.2020
Estimated Cost : 2.40
Completion Cost : 1.62
No of people benefitted : 40
Stake holder comment : The work is of community benefit.
Date of Commencement : 26.3.2019
Date of Completion : 30-3-2020
Estimated Cost : 3.5
Completion Cost : 2.7
No of people benefitted : 254
Stake holder comment : The work is of community benefit.
Const. of foot path with R, wall NHO Gh Hassan Dar at Annanwan (375)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
423
Const. of foot path with 2 No. culverts at Khan Mohalla NHO Ab Majid Wani and others at Bumhama (372) Dev. Of Public Park at Poshpora “B” Trehgam
Date of Commencement : 01/04/2019
Date of Completion : 01/08/2019
Estimated Cost : 2.67
Completion Cost : 1.75
No of people benefitted : 1250 Stake holder comment : The work is of community benefit.
Date of Commencement : 1.2.2020
Date of Completion : 9.3.2020
Estimated Cost : 2.99
Completion Cost : 2.00
No of people benefitted : 45 house holds
Stake holder comment : The work is of community benefit.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
424
Const. of 2 No. Culverts at Jumgund (363)
Date of Commencement : 15.3.2020
Date of Completion : 30.3.2020
Estimated Cost : 2.000
Completion Cost : 1.350
No. of people benefitted : for safeguard of Panchayat building Stake holder comment : The work is of community benefit.
Date of Commencement : 10.1.2019
Date of Completion : 03/2020
Estimated Cost : 6.64
Completion Cost : 3.943
No of people benefitted : provides connectivity facility of village Jumgund Stake holder comment : The work is of community benefit.
Fencing of Panchayat Ghar Meelyal with leveling (370)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
425
const. of foot path from Sari to Mansha Lone at Hajinard Ward No. 1 (367)
Const. of foot path with drain near H/O GhMohi-ud-din Baba and others at Nowpora (368)
Date of Commencement : 15.02.2020
Date of Completion : 17.03.2020
Estimated Cost : 2.340
Completion Cost : 1.636
No . Of persons benefitted : 200
Stake holder comment : The work is of community benefit.
Date of Commencement : 18.02.2020
Date of Completion : 19.03.2020
Estimated Cost : 2.930
Completion Cost : 1.880
No. of people benefitted : 180
Stake holder comment : The work is of community benefit.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
426
Const. of bathroom near Jamia Masjid Darpora (360)
Date of Commencement : 14.02.2020
Date of Completion : 15.03.2020
Estimated Cost : 2.080
Completion Cost : 1.55
No. of persons benefitted : 150
Stake holder comment : The work is of community benefit.
Date of Commencement : 26.2.2018
Date of Completion : 10-03-2020
Estimated Cost : 2.00
Completion Cost : 2.00
No. of people benefitted : 200
Stake holder comment : The work is of community benefit.
Constt. of flash point near Jamia Masjid Dogerpora A (373)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
427
Const. of fencing around MS Jumgund (364) Const. of protection wall at Naikoo Mohalla Gund Chabutera (376)
Date of Commencement : 25.2.2020
Date of Completion : 25.3.2020
Estimated Cost : 2.95
Completion Cost : 1.87
No . Of persons benefitted : 16 House holds
Stake holder comment : The work is of community benefit.
Date of Commencement : 2018 - 2019
Date of Completion : 01.01.2020
Estimated Cost : 3.40
Completon Cost : 2.68
No. of persons benefitted : The work provides the safety of the students of the village for wild animals
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
428
Const./Imp. of road from Lone Mohalla to Khanpora Muqam Awoora A (527)
Date of Commencement : 2019-20
Date of Completion : 2019-20
Estimated Cost : 1.60 lacs
Completion Cost : 1.60 lacs
No. of persons benefitted : whole village
Stake holder comment : The work is of community benefit.
Date of Commencement : 8/3/2019
Date of Completion : 29/03/2020
Estimated Cost : 7.00
Completion Cost : 6.00
No. of people benefitted : 400
Stake holder comment : The work is of community benefit.
Imp. Of p wall from Gulgaz Ahmad to Gh. Rasool at Kustooripora hatbara (435)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
429
Cosntt. Of road with R.wall at Gundimomin (436) Construction of Field channel from l/o Ab. Ahad Matoo to l/o ab. Rashid jan at safapora (437)
Date of Commencement : 09.03.2019
Date of Completion : 25.03.2020
Estimated Cost : 3.62 lacs
Completion Cost : 3.62 lacs
No . Of persons benefitted : whole village
Stake holder comment : The work is of community benefit.
Date of Commencement : 2019-20
Date of Completion : 2019-20
Estimated Cost : 2.99 lacs
Completon Cost : 2.99 lacs
No. of persons benefitted : whole village
Stake holder comment : The work is of community benefit.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
430
Construction of footpath from main road to qabrestain (438)
Date of Commencement : 01.02.2020
Date of Completion : 01.03.2020
Estimated Cost : 2.08 lacs
Completion Cost : 2.08 lacs
No. of persons benefitted : whole village
Stake holder comment : The work is of community benefit.
Date of Commencement : 2019-20
Date of Completion : 10.03.2020
Estimated Cost : 3.08 lacs
Completion Cost : 3.08 lacs
No. of people benefitted : whole village
Stake holder comment : The work is of community benefit.
Development of road with r/wall from l/o ab. Qayoom sofi at bagwanpora mohalla (439)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
431
Construction of road from National Highway to L/o Mohd Hanief Ganaie via TK School at Panzinara B (434) Irrigation Ladh / Kull Ci Dass to Rambipora Ranipora Road (500)
Date of commencement : 16.01.2018
Date of completion : 28.3.2020
Estimated Cost : 11.96
Completion cost : 11.96
No. of people benefited : 4 villages
Comments of stakeholders : Important nature of work/ quality work/ public utility
Date of Commencement : 02-02-2020
Date of Completion : 27-02-2020
Estimated Cost : 1.50 lacs
Completon Cost : 1.49 lacs
No. of persons benefitted : whole village
Stake holder comment : The work is of community benefit.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
432
C/O Steps /Drain at Tengpora Shah Mohalla at Magraypora (501)
Date of commencement : 20.03.2018
Date of completion : 28.3.2020
Estimated Cost : 2.99
Completion cost : 2.99
No. of people benefited : 910
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of commencement : 16.01.2018
Date of completion : 28.3.2020
Estimated Cost : 2.99
Completion cost : 2.99
No. of people benefited : 160
Comments of stakeholders : Important nature of work/ quality work/public utility
C/o Entry Gate at Jamiya Park Tailwan Part II (502)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
433
C/O Drain NHO Ab Rashid Padder and others at Nopngam Nunwani Kadapora (503) C/O Crossing at Bon Tooru near lift irrigation Station (504)
Date of commencement : 16.01.2018
Date of completion : 28.3.2020
Estimated Cost : 2.99
Completion cost : 2.99
No. of people benefited : 190
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of commencement : 10.01.2018
Date of completion : 26.3.2020
Estimated Cost : 1.00
Completion cost : 1.00
No. of people benefited : 401
Comments of stakeholders : Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
434
C/O Crossing at Bon Tooru Gamund (505)
Date of commencement : 15.02.2018
Date of completion : 27.3.2020
Estimated Cost : 2.00
Completion cost : 2.00
No. of people benefited : 910
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of commencement : 12.01.2018
Date of completion : 23.3.2020
Estimated Cost : 2.50
Completion cost : 2.50
No. of people benefited : 190
Comments of stakeholders : Important nature of work/ quality work/public utility
C/O Graveyard Park BWO Fencing at Kanganhall (506)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
435
C/O Xing at Baisoo Guridraman (507) C/O Xing at Bahwatoo Pindobal (508)
Date of commencement : 15.02.2018
Date of completion : 11.03.2020
Estimated Cost : 1.60
Completion cost : 1.60
No. of people benefited : 320
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of commencement : 15.06.2018
Date of completion : 15.12.2019
Estimated Cost : 1.49
Completion cost : 1.49
No. of people benefited : 356
Comments of stakeholders : Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
436
C/O Foot bridge at Kandiwara and Nagam (509)
Date of commencement : 1.03.2019
Date of completion : 25.03.2020
Estimated Cost : 2.40
Completion cost : 2.40
No. of people benefited : 320
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of commencement : 10.03.2019
Date of completion : 26.03.2020
Estimated Cost : 2.00
Completion cost : 2.00
No. of people benefited : 320
Comments of stakeholders : Important nature of work/ quality work/public utility
C/o lining wall on Nallah Danji At Voy part A (510)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
437
Irrigation Ladh at Goriwan NLO Manzoor Ahmad Sheikh and Others at Sheilpora (511)
C/O Protection bund near house of Mohd Shafi Mochi & others at Sheikh Mohalla C.S.Pora (512)
Date of Commencement : 2.12.2019
Date of completion : 30.12.2019
Estimated Cost : 5.00
Completion cost : 5.00
No. of people benefited : 650
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of commencement : 05.12.2019
Date of completion : 03.02.2020
Estimated Cost : 1.50
Completion cost : 1.50
No. of people benefited : 430
Comments of stakeholders : Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
438
Construction of Irrgation Canal/Khul from CI Dass to Ranbirpora Road from RD 0 to RD 400 onwards RD 400 TO RD 1100 (513)
Date of Commencement: 28.12.2019
Date of completion 10.02.2020
Estimated Cost 3.00
Copletion cost 3.00
No. of people benefited 650
Comments of stakeholders Important nature of work/quality work/public utility
Date of Commencement : 30.11.2019
Date of completion : 16.12.2019
Estimated Cost : 4.80
Completion cost : 4.80
No. of people benefited : 650
Comments of stakeholders : Important nature of work/ quality work/public utility
C/O Drain from L/O Afhad Dar to L/O Gh Nabi at Darpora Chee (514)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
439
C/O X-ing near Masjid Sharief at Peth Dailgam (515) C/O Drain lane NHO Gh Nabi Bhat from M/R to M/Sharief Veeri (516)
Date of Commencement : 15.01.2020
Date of completion : 08.02.2020
Estimated Cost : 2.00
Completion cost : 2.00
No. of people benefited : 1100
Comments of stakeholders : Important nature of work/ quality work/public utility
Date of Commencement : 19.12.2020
Date of completion : 19.01.2020
Estimated Cost : 2.20
Completion cost : 2.20
No. of people benefited : 500
Comments of stakeholders : Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
440
C/O Drain near L/O Tariq Ahmad Khanday to bashir ah. Malik & others (517)
Date of Commencement 18.03.2020
Date of completion 26.03.2020
Estimated Cost 1.00
Completion cost 1.00
No. of people benefited 250
Comments of stakeholders Important nature of work/ quality work/public utility
Date of Commencement 21.01.2020
Date of completion 04.02.2020
Estimated Cost 2.00
Completion cost 2.00
No. of people benefited 250
Comments of stakeholders Important nature of work/ quality work/public utility
Fencing around graveyard at Kenelwon (518)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
441
Link road from Bongam Masjid to steel Grider Bridge at Sirhama Payeen (519
C/O Dev. of link road at Manzoo Nambal near Eidgah Nambal-B (520)
Date of Commencement 15.12.2019
Date of completion 10.03.2020
Estimated Cost 1.40
Completion cost 1.40
No. of people benefited 150
Comments of stakeholders Important nature of work/ quality work/public utility
Date of Commencement 24.12.2019
Date of completion 06.01.2020
Estimated Cost 1.00
Completion cost 1.00
No. of people benefited 650
Comments of stakeholders Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
442
Development of Public Park At Akoora (521) C/O Link Road from H/O Mohd Amin Tramboo to onwards at herpora Nanil (522)
Date of Commencement 25.12.2019
Date of completion 25.02.2020
Estimated Cost 1.00
Completion cost 1.00
No. of people benefited 250
Comments of stakeholders Important nature of work/ quality work/public utility
Date of Commencement 15.12.2019
Date of completion March 2020
Estimated Cost 2.00
Completion cost 2.00
No. of people benefited 150
Comments of stakeholders Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
443
CONSTRUCTION OF R/WALL NEAR LAND OF GH HASSAN PARRAY & OTHERS AT WAJOORADAL (523)
C/O Construction of Edge Wall/Lane near L/O Bashir Ahmad Padder & others at Schichen (524)
Date of commencement 10.02.2020
Date of completion 04.03.2020
Estimated Cost 2.80
Completion Cost 2.80
No. of people benefited 1000
Comments of stakeholders Much needed/community benefit/quality work
Date of commencement 19.12.2020
Date of completion 28.02.2020
Estimated Cost 2.20
Completion cost 2.20
No. o people benefited 320
Comments of stakeholders Much needed /community benefit/quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
444
C/O irrgation ladh NLO Manzoor Ahmad Ganie & others Harwanz (525
C/O Road with R/Wall from M/R to 4 way Watterut at Watchi A (431)
Date of commencement 02.03.2020
Date of completion 15.03.2020
Est. Cost 2.99 lacs
Completion cost 2.99 lacs
No. Of people benefited 400
Comments of stakeholders essential demand/ satisfactory work
Date of commencement 22.11.2019
Date of completion 12.12.2019
Estimated Cost 1.40
Completion cost 1.40
No. of people benefited 390
Comments of stakeholders Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
445
C/O Ghat steps near Fuki Mohalla Mohalla at Watchi (425) C/O Concrete Kull from irrigation canal to L/o M. Yousuf, M. Shafi & others at Kalidooch (424)
Date of Commencement 18.03.2020
Date of Completion 25.03.2020
Est. Cost 7.21 Lacs
Completion cost 7.21 Lacs
No. Of people benefited 231
Comments of stakeholders Essential Demand/ Quality work
Date of Commencement 10.03.2020
Date of Completion 22.03.2020
Est. Cost 3.05 Lacs
Completion cost 3.05 Lacs
No. Of people benefited 85
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
446
C/O culvert near Land of Aijaz Ahmad Rather at Kralcheck at Awneera (422)
CONSTRUCTION OF ROAD FROM L/O GH MOHD BHAT TO CH HAJI AND METALLING AT KEEGAM (429)
Date of Commencement 01/12/2019
Date of Completion 20.03.2020
Est. Cost 4.00 lacs
Completion cost 4.00 Lacs
No. Of people benefited 460
Comments of stakeholders Essential Demand/ Quality Work
Date of Commencement 15.03.2020
Date of Completion 30.03.2020
Est. Cost 2.99 Lacs
Completion cost 2.99 Lacs
No. Of people benefited 65
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
447
CONSTRUCTION OF ROAD WITH R/WALL AT DIFFERENT SPOTS FROM IRRIGATION CANAL FROM WATCHI TO HERLAMINI (430)
CONST. OF 3.NO TILE LANES AT KUMAR MOHALLA & RESHI MOHALLA AT WATCHI (427)
Date of Commencement 18.03.2020
Date of Completion 20.03.2020
Est. Cost 6.70 Lacs
Completion cost 6.70 Lacs
No. Of people benefited 441
Comments of stakeholders Essential Demand/ Quality work
Date of Commencement 15/02/2020
Date of Completion 20.03.2020
Est. Cost 2.99 lacs
Completion cost 2.99 Lacs
No. Of people benefited 235
Comments of stakeholders Essential Demand/ Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
448
CONSTT. OF TILE LANE FROM MAIN ROAD TO MIR MOHALLAH AT KASHOO (432)
CONSTRUCTION OF ROAD FROM WACHI TO MELHURA INCLUDING OF LINKS OF DABLIPRA GANIEPORA WITH R/WALL (526)
Date of Commencement 04/03/2019
Date of Completion 30.03.2020
Est. Cost 20.75 Lacs
Completion cost 20.75 Lacs
No. Of people benefited 550
Comments of stakeholders Much needed /Quality Work:
Date of Commencement 15/02/2020
Date of Completion 30.03.2020
Est. Cost 2.00 Lacs
Completion cost 2.00 Lacs
No. Of people benefited 65
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
449
CONSTRUCTION OF CAUSEWAY ON NALLAH LAR AT BERTHIPORA WATHOO ROAD (416)
CONSTRUCTION OF ROAD FROM MAIN ROAD TO BUND AT HEERPORA MELHURA (WORK DONE CLAIM ) (421)
Date of Commencement 05/12/2019
Date of Completion 30.03.2020
Est. Cost 1.35 Lacs
Completion cost 1.11 Lacs
No. Of people benefited 150
Comments of stakeholders Much needed /Quality Work:
Date of Commencement 23/02/2019
Date of Completion 30.03.2020
Est. Cost 1.80 Lacs
Completion cost 1.80 Lacs
No. Of people benefited 150
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
450
DEVELOPMENT OF LAND WITH BREST WALL & DRAIN AT TULIMAN AT WATCHI (423) FENCING AROUND BLOCK BUILDING AT ZAINPORA (426)
Date of Commencement 05/12/2019
Date of Completion 30.03.2020
Est. Cost 3.50 Lacs
Completion cost 3.50 Lacs
No. Of people benefited 50
Comments of stakeholders Much needed /Quality Work:
Date of Commencement 05/12/2019
Date of Completion 30.03.2020
Est. Cost 3.50 Lacs
Completion cost 3.50 Lacs
No. Of people benefited 50
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
451
CONSTRUCTION OF ROAD AT ZIYRAT SHARIEF SYED SHAB TO GOJAR BASTI AT BUTMURAN (419)
CONSTRUCTION OF ROAD FROM MAIN ROAD TO MUSHTAQ AHMAD MIR AT WATHOO (420)
Date of Commencement 15/12/2019
Date of Completion 30.03.2020
Est. Cost 1.00 Lacs
Completion cost 1.00 Lacs
No. Of people benefited 50
Comments of stakeholders Much needed /Quality Work:
Date of Commencement 26/07/2019
Date of Completion 30.03.2020
Est. Cost 1.80 Lacs
Completion cost 1.80 Lacs
No. Of people benefited 235
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
452
CONSTRUCTION OF RETAING WALL NEAR L/O GH QADIR SHERGOGRI AT BERTHIPORA (417) CONSTRUCTION OF INTERIOR LANES AT POJO (418)
Date of Commencement 02/08/2019
Date of Completion 30.03.2020
Est. Cost 1.00 Lacs
Completion cost 1.00 Lacs
No. Of people benefited 50
Comments of stakeholders Much needed /Quality Work:
Date of Commencement 05/09/2019
Date of Completion 30.03.2020
Est. Cost 1.00 Lacs
Completion cost 1.00 Lacs
No. Of people benefited 50
Comments of stakeholders Much needed /Quality Work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
453
Name of work: Culvert near the house of Gh Mohidin Khan and others at Chowdribagh (415)
C/o R-wall near baba Naseeb din Gazi at Hakabara –A Block Hajin (490)
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 1.70
Complection Cost 1.29
Comments of stakeholders Important nature of work/ quality work/ public utility.
Date of Commencement 2018-19
Date of completion 2019-20
Estimated Cost 2.90
Completion Cost 2.90
No of people benefitted whole Panchayat
Comments of stakeholders Much needed/Quality work: Satisfactory
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
454
C/o field channel from l/o Mohd Subhan Wani upto Gh. Mohd at T.A. Shah (489) C/o Fencing of grave yard at Zurimanz at Kenusa (496)
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 1.00
Completion Cost 1.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 2.10
Completion Cost 1.58
Comments of stakeholders Important nature of work/ quality work/ public utility.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
455
C/o road from Aloosa to sheikh muqum Ph-1st Aloosa (488) Up-gradation/Renovation of PCC Path with tile path from main Road to GH Qadir Malla Gund Dachina (494)
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 1.00
Completion Cost 1.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 2.10
Completion Cost 1.78
Comments of stakeholders Important nature of work/ quality work/ public utility.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
456
Constt. Of road with drain from steel bridge to Pavar Mohalla Kenusa road at Guzarbal (495) C/o link road baghi rehman sahib at Nesbal Block Sumbal (491)
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 2.00
Completion Cost 2.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 2.00
Completion Cost 2.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
457
C/o culvert near orchard of Gh. Rasool and others Block Sumbal 492 Fencing of Eidgah at Qazipora Phase III (493)
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 2.45
Completion Cost 2.45
Comments of stakeholders Important nature of work/ quality work/ public utility.
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 1.70
Completion Cost 1.60
Comments of stakeholders Important nature of work/ quality work/ public utility.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
458
C/o P-bund at Jorijoyee (499) Constt. Of P-bund near Masjid Shreef Bosgay (498)
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 1.00
Completion Cost 1.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 1.00
Completion Cost 1.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
459
C/o Fencing of Hut at Sheikpora Jurniyal-A (497) Name of Work :-Const of tile path at Kreeri B BLOCK Wagoora (345)
Date of commencement Aug 2019
Date of Completion march 2020
Estt Cost 3.30
Completion Cost 2.50
No.of Population to be Benefited 110
Comments on Stake Holder
Date of commencement 2018-19
Date of completion March-20
Estimated Cost 4.00
Completion Cost 4.00
Comments of stakeholders Important nature of work/ quality work/ public utility.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
460
Name of Work:- Const of R Wall at Tilwanpora Merchimer Block Singhpora (351) Name of Work:-Fencing of Pyt Ghar Fresthar (354)
Date of commencement 2019-20
Date of Completion march 2020
Estt Cost 2.57
Completion Cost 2.57
No.of Population to be Benefited 345
Comments on Stake Holder
Date of commencement 22-02-2020
Date of Completion march 2020
Estt Cost 2.39
Completion Cost 2.39
No.of Population to be Benefited 145
Comments on Stake Holder
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
461
Name of Work: C/o Culvert at near Eid khai Hakapethri zaloora tujjer (358)
Name of Work:Const of Tiles Path from link Road to H/o Imran Khan at H.No 03 Bonyar (347)
Date of commencement 04/02/2020
Date of Completion 08/03/ 2020
Estt Cost 3.16
Completion Cost 3.16
No. of Population to be Benefited 345
Comments on Stake Holder
Date of commencement 2019-20
Date of Completion march 2020
Estt Cost 3.30
Completion Cost 3.30
No.of Population to be Benefited 245
Comments on Stake Holder
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
462
C/o Drain from H/o Irshad Ahmad Tantray to Onwards at Gund Brath (357)
Fencing of Grave Yard Near l/o Mohd Akbar Khan at Pathan pora Nowlari (350)
Date of commencement 2019-20
Date of Completion march 20
Estt Cost 1.96
Completion Cost 1.61
No.of Population to be Benefited 200
Comments on Stake Holder
Date of Commencement 09-12-2019
Date of Completion 16-03-2020
Estimated Cost 2.50 + 1.16= 3.66 Lacs
Completion Cost 2.44 + 1.06 = 3.50 Lacs
Number of People Benefitted 1250
Comments of the Stakeholders The work has been completed as per the sanctioned estimate and people are satisfied with the work.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
463
Const of Oriental Fencing phase II Eidgah at Kungamdara Khore (325)
Fencing around Eidgah Near Baitul markazi jammia masjid akeek at Kungamdara Khore (349)
Date of commencement 31.12.2019
Date of Completion 10.03.2020
Estt Cost 1.48
Completion Cost 1.45
No.of Population to be Benefited 2000
Comments on Stake Holder
Date of commencement 21.02.2019
Date of Completion 07.03.2019
Estt Cost 2.45
Completion Cost 2.45
No.of Population to be Benefited 800
Comments on Stake Holder
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
464
Const of Drain pethpora,bala near H/o Gh hassan kumar,Ab Rehman,lone to seed bhat mohalla at wanigam bala (337)
Const of Road From Habibullah wani to onwards at wussan pattan (335)
Date of commencement 02.03.2019
Date of Completion 23.03.2019
Estt Cost 2.39
Completion Cost 2.39
No.of Population to be Benefited 1000
Comments on Stake Holder
Date of commencement 31.12.2018
Date of Completion 03.2020
Estt Cost 1.90
Completion Cost 1.83
No.of Population to be Benefited 600
Comments on Stake Holder
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
465
Const of R Wall near Primary School at Check jamal mir Palhalan H (338)
Const of Drain from Grave yard to Panchayat Ghar phase 2nd palhalan F (336)
Date of commencement 07.03.2019
Date of Completion 03.03.2020
Estt Cost 2.35
Completion Cost 2.14
No.of Population to be Benefited 2000
Comments on Stake Holder
Date of commencement 09.03.2019
Date of Completion 22.03.2019
Estt Cost 2.38
Completion Cost 2.33
No.of Population to be Benefited 1500
Comments on Stake Holder
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
466
Constt. C/o Drain at Chandoosa A (355) Constt. C/o P/bund near GMS at Drangbal (356)
Date of Commencement 15-02-2020
Date of Completion 18-03-2020
Estimated Cost Rs3.39 lacs
Completion Cost Rs3.26 lacs
No. of Population Benefitted 200
Comments of stakeholders work executed to the satisfaction of local community
Date of Commencement 04-02-2020
Date of Completion 18-03-2020
Estimated Cost Rs3.72 lacs
Completion Cost Rs3.72 lacs
No. of Population Benefitted 700
Comments of stakeholders work executed to the satisfaction of local community
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
467
Constt. of foot path with R/wall at Ekdaba Dowaran parenpeela (343) C/O Fencing of orchards at Wagoora-A (344)
Date of Commencement 16-02-2020
Date of Completion 07-03-2020
Estimated Cost 3.31 lacs
Completion Cost 3.31 lacs
No. of people benefitted 2260
Comments of stakeholders Work will safeguard the Panchayat property
Date of Commencement 2018-2019
Date of Completion 25-08-2019
Estimated Cost 2.8 lac
Completion Cost 2.8
No. of Population to be Benefited
Comments on Stake Holder
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
468
C/O path with drain near H/o Nazir ah baba and others at kakovthal b (332)
C/O p bund at different spots rather mohalla lone mohalla waripora (328)
Date of Commencement 19.02.2019
Date of Completion 21.03.2019
Estimated Cost 3.60 lacs
Completion Cost 3.60
No. of people benefitted 985
Comments of stakeholders Work is of community benefit
Date of Commencement 23.02.2019
Date of Completion 21.03.2019
Estimated Cost 2.70 lacs
Completion Cost 2.70
No. of people benefitted 1280
Comments of stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
469
Fencing of Graveyard at waripora bala (333) Constt. of R/wall on nallah from land of Hyder khan to Nasarullah Uranbowa (341).
Date of Commencement 10.03.2019
Date of Completion 25.03.2019
Estimated Cost 3.20lacs
Completion Cost 3.20 lacs
No of people Benefitted 400
Comments of Stakeholders work executed to the satisfaction of local community
Date of Commencement 08.03.2019
Date of Completion 25.03.2019
Estimated Cost 2.80 lacs
Completion Cost 2.80
No. of people benefitted 1685
Comments of stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
470
Constt. of drain R/wall near H.o wali Mohd. Mir and others at Burnate (342) Fencing panchayat Ghar Land at Tarzoo B (331)
Date of Commencement 2018-19
Date of Completion 03.2020
Estimated Cost 2.40lacs
Completion Cost 2.04
No. of people benefitted 1100
Comments of stakeholders Work is of community benefit
Date of Commencement 2018-19
Date of Completion 25.03.2020
Estimated Cost 2.70lacs
Completion Cost 2.28 lacs
No of people Benefitted 300
Comments of Stakeholders work executed to the satisfaction of local community
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
471
Fencing of Park Near Graveyard at Charlepora Ganie Mohalla Edipora B (334) Const of Drain/Field Channel at pethgam wagoora B (329)
Date of Commencement 01.03.2019
Date of Completion 20.03.2020
Estimated Cost 2.70lacs
Completion Cost 2.70
No. of people benefitted 100
Comments of stakeholders Work is of community benefit
Date of Commencement 09.03.2019
Date of Completion 27.03.2020
Estimated Cost 2.40lacs
Completion Cost 2.37 lacs
No. of people benefitted 80
Comments of stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
472
Constt. of oriental fencing of Graveyard at Pathanpora Sherabad (326) Dev. of park at Waza Mohalla Fresthar Waripora (330)
Date of Commencement 27.02.2019
Date of Completion 24.03.2020
Estimated Cost 3.00 lacs
Completion Cost 3.00
No. of people benefitted 120
Comments of stakeholders Work is of community benefit
Date of Commencement 18.02.2019
Date of Completion 23.03.2020
Estimated Cost 2.58 lacs
Completion Cost 2.47
No. of people benefitted 250
Comments of stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
473
Constt. of tile path main to Masjid Sharief Khati Jul Kubra Kushipora (339) Development of Children Park at Rebbon (340)
Date of commencement 2018-19
Date of Completion march 2020
Estt Cost 5.00
Completion Cost 4.90
No.of Population to be Benefited 110
Comments of stakeholders Work is of community benefit
Date of commencement 2018-19
Date of Completion march 2020
Estt Cost 2.80
Completion Cost 1.97
No.of Population to be Benefited 60
Comments of stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
474
Improvement of path at Sheikh Mohalla Tarihama (327) Construction of culvert on Gurat Road at Mangloora Takiya batpora (348)
Date of Commencement 26-12-2019
Date of Completion 16-03-2020
Estimated Cost 2.52 lacs
Completion Cost 2.51 lacs
No.of People Benefitted 700
Comments of Stakeholders Work is of community benefit
Date of commencement 2018-19
Date of Completion march 2020
Estt Cost 2.40
Completion Cost 2.40
No.of Population to be Benefited 700
Comments of stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
475
Construction of Drain from Main Road To onwards at Gutiyar (352).
Imp. Of Khul B/W/O R/Wall From H/o Zafrullah Mir To H/O Mohd Isak Hajam at Chairoo (483)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,65 lacs
Completion Cost 0,60 lacs
No of people benefitted 60
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 20-02-2020
Date of Completion 22-03-2020
Estimated Cost 3.10lacs
Completion Cost 3.10 lacs
No of people Benefitted 700
Comments of Stakeholders Work is of community benefit
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
476
Improvement of road from Perr Mohallah thakri Road at Aripanthan A (477) Constt. Of Fecing of Jinazgah at Kandhama A (476)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2,00 lacs
Completion Cost 2,00 lacs
No of people benefitted 400
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,27 lacs
Completion Cost 1,27 lacs
No of people benefitted 367
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
477
Construction of Drain Along with R/Wall NearNagrad land at Bunhama (443)
Development of Park near Astan Sherif Syed Allav Din Bukhari at Iskandepora (444)
Date of Commencement 2018-19
Date of Completion 2018-19
Estimated Cost 1,79 lacs
Completion Cost 1,79 lacs
No of people benefitted 150
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0.80 lacs
Completion Cost 0,80 lacs
No of people benefitted 200
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
478
Construction of drain from shop of Gh Mohammad Ganie to Astanat Kanigund 479
Construction chain link fencing around Shamshan Ghat at sikh Atina (481)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,00 lacs
Completion Cost 1,00 lacs
No of people benefitted 450
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,50 lacs
Completion Cost 0,50 lacs
No of people benefitted 60
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
479
Construction of R/Wall at Hayatpora fromH/o Mohd Jabbar Magray upto H/O Gh Hassan Mir at hayatpora gundipora (441)
Construction of Road along with R/Wall from Gani Pora Narwara Road to Agriculture Land at Gandipora (482)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2.00 lacs
Completion Cost 2.00 lacs
No of people benefitted 200
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2018-19
Date of Completion 2019-20
Estimated Cost 1,30 lacs
Completion Cost 1,30 lacs
No of people benefitted 40
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
480
Construction of titled Path from Main gate to HolyShrine of Astan Allaiya Syed Shamasdin (452)
Construction of Fencing Around Graveyard Sheikh Ab Rahim at Malpora (445)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,92 lacs
Completion Cost 0,92 lacs
No of people benefitted 550
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 3,99 lacs
Completion Cost 3,99
lacsNo of people benefitted 550
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
481
Construction of road from H/O Gh Mohd To Panchayat Ghar at parisabad (475)
Construction of R/ Wall Shamar Khul near H/O Ali Mohd ganie and others at parisabad (473)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,15 lacs
Completion Cost 1,15 lacs
No of people benefitted 480
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,99 lacs
Completion Cost 1,99 lacs
No of people benefitted 480
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
482
Construction of R/Wall From Masjid Shrif to Ayoub Waza at Aripanthan (478)
Construction of R/ Wall nera H/O younis wani , Nazir Sheikh at Check ora nanajan (480)
Date of Commencemen 2019-20
Date of Completion 2019-20
Estimated Cost 0,50 lacs
Completion Cost 0,50 lacs
No of people benefitted 60
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,50 lacs
Completion Cost 0,50 lacs
No of people benefitted 500
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
483
Construction of P/Bund lane Culvert near Masjid Sherif at Budina (467)
Development of road from Lone Mohallahto tali Mohallah at surasyar (456)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,00 lacs
Completion Cost 1,00 lacs
No of people benefitted 2000
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,50 lacs
Completion Cost 0,50 lacs
No of people benefitted 60
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
484
Connstruction of P/Bund nera Darazgah at kachwari B (486) Earth filling and fencing around Graveyardat Kachwari A (484)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2,00 lacs
Completion Cost 2,00 lacs
No of people benefitted 200
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,50 lacs
Completion Cost 1,50 lacs
No of people benefitted 200
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
485
Development of Park near opanchayat gharat Mehdipora (461) Constriction of culvert near H/O Muzafar Ahmad rather and others at Ganjibagh (453)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 3,00 lacs
Completion Cost 3,00 lacs
No of people benefitted 500
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,61 lacs
Completion Cost 0,61 lacs
No of people benefitted 450
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
486
Constriction of 3 no. Culverts at Different Spots at dadmaribagh (451)
Constriction of p/bund near Land of Mhd Yousuf bhat , farooq Ahmad bhat and others (455)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2,50 lacs
Completion Cost 2,50 lacs
No of people benefitted 100
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 4,00 lacs
Completion Cost 4,00 lacs
No of people benefitted 750
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
487
Development of Maqbara at Sheikhpora Narbal (Part I & II) B/W/O of Chain Link Fencing Over Exixting RCC for a 300ft at(446)( Narbal (446)
Improvement of road B/W/O nallah Moakh P/bund and RCC Spun pipes from Branjan road to Bujgoo (462)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2,50 lacs
Completion Cost 2,50 lacs
No of people benefitted 1500
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2,50 lacs
Completion Cost 2,50 lacs
No of people benefitted 100
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
488
Construction of lane form rasool haja, to H/O mohd akram at Dalwan (460) Construction of Drain to H/o Gulla Salam at Dalwan (459)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,65 lacs
Completion Cost 0,65 lacs
No of people benefitted 250
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0,75 lacs
Completion Cost 0,75 lacs
No of people benefitted 300
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
489
Femcing and earth filling of paray Graveyard at Bunmakhama (447)
Construction of Culvert / r/Wall near Shop of Ab Rashid hajam and Others at Hakermullah (472)
Date of Commencement 2018-19
Date of Completion 2019-20
Estimated Cost 3,24 lacs
Completion Cost 3,24 lacs
No of people benefitted 400
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2018-19
Date of Completion 2019-20
Estimated Cost 2,50 lacs
Completion Cost 2,50 lacs
No of people benefitted 400
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
490
Construction of Park Nera Baity Mukaram at Peth Mukram (448)Construction of Drain Near Land of Fayaz Mir, Aziz Mir,
Mushtaq, Nazir and others at Lalgund Gudsatoo A (463)
Date of Commencement 019-20
Date of Completion 2019-20
Estimated Cost 0.48 lacs
Completion Cost 0.48 lacs
No of people benefitted 150
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2018-19
Date of Completion 2019-20
Estimated Cost 2,50 lacs
Completion Cost 2,50 lacs
No of people benefitted 1000
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
491
Construction of P/Bund & Drain near H/o Mohd Abdulla Rather , Ali Mohd rather and others (469)
Const. of Drain Near Maqbool Ganie at Gariend (470)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1,00 lacs
Completion Cost 1,00 lacs
No of people benefitted 250
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2,37 lacs
Completion Cost 2,37 lacs
No of people benefitted 200
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
492
Construction of Road from MR to H/o Nazir Ahmad Khan at Galwanppra (471)
Earth filling and fencing around Graveyardat Kachwari A (484)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0.53 lacs
Completion Cost 0.53 lacs
No of people benefitted 300
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2.50 lacs
Completion Cost 2.50 lacs
No of people benefitted 250
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
493
Construction of Drain with P/Bund From h/o Showkat to H/o Mahi-I-Din waza at Razwan (468)
Construction of Drain from H/o Mohd Abdullag rather
S/o Hussain Rather to L/o Master ghulam Rasool Mir (464)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1.00 lacs
Completion Cost 1.00 lacs
No of people benefitted 50
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1.36 lacs
Completion Cost 1.36 lacs
No of people benefitted 50
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
494
C/O LANE AT BATAPORA BALL PHASE-II (458) CONSTT. OF TRACTOR ROAD FROM M/R TO H/O GH NABI DAR AT CHRAWANI (457)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1.165 lacs
Completion Cost 1.165 lacs
No of people benefitted 300
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1.33 lacs
Completion Cost 1.33 lacs
No of people benefitted 210
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
495
Construction of Drain with cover from behind BDO Office to onwards at Ghousia Colony B.K Pora – A (449)
C/o drain from main road to h/o Ab Samad Teli and others at Astan mohalla at Pyt Pahroo B (450)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2.50 lacs
Completion Cost 2.50 lacs
No of people benefitted 500
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2.32 lacs
Completion Cost 2.32 lacs
No of people benefitted 400
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
496
Constr. of Link road from Beerwa Budgam road to H/O Gh Qadir Dar at N.S.Pora A (465)
Construction of Road from Yarisatroo to Astan Sherif Gojra with earth cutting (485)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2.00 lacs
Completion Cost 2.00 lacs
No of people benefitted 500
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 2.50 lacs
Completion Cost 2.50 lacs
No of people benefitted 500
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
497
Construction of Imambara Lane at juhama (440) Construction of P/Bund nera the Land of Maqsood ahmad bandroo , Bashier bandroo and others at bandrepora (487)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1.35 lacs
Completion Cost 1.35 lacs
No of people benefitted 250
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0.60 lacs
Completion Cost 0.60 lacs
No of people benefitted 150
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
498
Construction of lane form Masjid Sherif Manz Gam at Shulipora A (474)
Construction of Fencing Around Graveyard Syed Jamu Din Bukhari at Gambora (442)
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 0.80 lacs
Completion Cost 0.80 lacs
No of people benefitted 200
Comments of the Stake Holder Good Quality Of Work
Date of Commencement 2019-20
Date of Completion 2019-20
Estimated Cost 1.35 lacs
Completion Cost 1.35 lacs
No of people benefitted 250
Comments of the Stake Holder Good Quality Of Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
499
R /WALL Pyt.Ghar Shibote malwana west (Block Gundana) Constt.of P/Work Eidgah at Jangalwar (Block Thathri)
Date of Commencement 13-03-2020
Date of Completion March 2020
Estimated Cost 0.80 Lakhs
Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)
No of People benefitted 250
Comments of Stakeholders Much Needed/Quality
Date of Commencement 23-02-2020
Date of Completion March 2020
Estimated cost 1.60 lakhs
Completion cost 1.00 lakhs. (Expdt under CD&Pyt)
No of people Benefited 330
Commence of stake holders Much needed/quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
500
Repair/Renovation of Govt M S Phagsoo (Block Thathri)
Date of Commencement 12-03-2020
Date of Completion March 2020 (Expdt under CD&Pyt)
Estimated Cost 0.80 Lakhs
Completion Cost 0.50 Lakhs
No of People benefitted 150
Comments of Stakeholders Much Needed/Quality
Date of Commencement 13-02-2020
Date of Completion March 2020
Estimated Cost 0.80 Lakhs
Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)
No of People benefitted 200
Comments of Stakeholders Much Needed/Quality work
Development of Eidgah at Dadiyan (Block Thathri)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
501
Constt. Of B/Wall near Additional Block of Girls High School kanhal (Block Bhagwah) Constt. Of Tile Work NHO Akbar Malik (Block Daliudhyanpur)
Date of Commencement 06-02-2020
Date of Completion March 2020
Estimated Cost 3.04 Lakhs
Completion Cost 1.90 Lakhs (Expdt under CD&Pyt)
No. Of People Benefited 40
Comments of Stakeholders Much needed
Date of Commencement 10-02-2020
Date of Completion March 2020
Estimated Cost 0.80 Lakhs
Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)
No. Of People Benefited 150
Comments of Stakeholders Much Needed/Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
502
Constt. Of P/Work NHO Daminder Singh (Block Bhagwah)
Date of Commencement 02-03-2020
Date of Completion March 2020
Estimated Cost 1.44 Lakhs
Completion Cost 0.45 Lakhs (Expdt under CD&Pyt)
No. Of People Benefited 4
Comments of Stakeholders Much Needed/Quality Work
Date of Commencemen 10-02-2020
Date of Completion March 2020
Estimated Cost 2.40 Lakhs
Completion Cost 1.50 Lakhs (Expdt under CD&Pyt)
No. Of People Benefited 10
Comments of Stakeholders Much Needed/Quality Work
Constt. Of P/Work at Siserwar NLO Ajeet Singh (Block Bhagwah)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
503
Constt of Community Path at Chulass (Block Bhagwah) Pacca Steps at Gugwah Pyt.Kastigarh-A (Block Kastigarh)
Date of start 23/11/2019
Date of Completion March 2020
ESTT. COST 1.44 Lakhs
Completion Cost 0.90 Lakhs (Expdt under CD&Pyt)
No of People Benefited 150
Comments of Stakeholders Much needed/ Quality work
Date of Commencement 10-02-2020
Date of Completion March 2020
Estimated Cost 0.80 Lakhs
Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)
No. of People Benefited 27
Comments of Stakeholders Much Needed/Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
504
Constt.of P/Work at Graveyard Badanoo Butt Mohalla (Block Thathri)
Dated of Commencement 10/01/2020
Date of Completion March 2020
Estt Cost 1.44
Completion Cost 0.90 (Expdt under CD&Pyt)
No of People Benefited 150
Commence of Stakeholders Much Needed/Quality Work
Date of Commencement 13-03-2020
Date of Completion March 2020
Estimated Cost 1.44 Lakhs
Completion Cost 0.90 Lakhs (Expdt under CD&Pyt)
No of People benefitted 150
Comments of Stakeholders Much Needed/Quality work
Repair of Khul NLO Abdul Salam. (Block Doda (Ghat)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
505
Const of P/work Near masjid Sharief Lower Padrana. (Block Doda (Ghat) Fencing of Graveyard Wani Pura Pyt Behota Lower (Block Marmat)
Dated of Commencement 25/10/2019
Date of Completion March 2020
Estt. Cost 1.60Lakhs
Completion Cost 1.00 lakhs (Expdt under CD&Pyt)
No of People Benefited 250
Commence of Stakeholders Much needed/ Quality work:
Dated of Commencement 15/01/2020
Date of Completion March 2020
Estt Cost 4.00 lakh
Completion Cost 2.50 lakh (Expdt under CD&Pyt)
No of People Benefited 40
Commence of Stakeholders Much Needed/Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
506
P/work NLO Atta Mohd Pyt Roat A Near Eid Gah Roat. (Block Marmat)
Dated of Commencement 04/12/2019
Date of Completion March 2020
Estt. Cost 1.60 Lakhs
Completion Cost 1.60 lakhs (Expdt under CD&Pyt)
No of People Benifited 150
Comments of Stakeholders Much needed/ Quality work
Dated of Commencement 01/11/2019
Date of Completion March 2020
Estt. Cost 04.00 lakhs
Completion Cost 2.50 lakhs (Expdt under CD&Pyt)
No of People Benefited 300
Comments of Stakeholders Much needed/ Quality work:
WCD ILO Sumandar Khan Pyt Mangota –B (Block Marmat)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
507
Constt of Irrigation Khul at Berreru (Block Bhalla) const of P/PATH FROM SCHOOL TO MASJID Pyt:- Dashnan
Dated of Commencement 10/01/2020
Date of Completion March 2020
Estt Cost 1.60 lakhs
Completion Cost 1.00 lakhs (Expdt under CD&Pyt)
No of People Benefited 30
Commence of Stakeholders Much Needed/Quality Work:-
Date of Commencement 03/01/2020
Date of Completion March 2020
Estimated Cost 1.60 lakhs
Completion Cost 1.00 lakhs (Expdt under CD&Pyt)
No of people benefited 265
Comments of stakeholders The Const of the section of irrigation khul has helped the local farmers in irrigation.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
508
Const of P/work NLO RIAZ AHMED BASTI
Date of Commencement 19/11/2020
Date of Completion March 2020
Estt. Cost 0.80 lakhs
Complection Cost 0.50 lakhs (Expdt under CD&Pyt)
No. of People benefitted 250
Comments of Stakeholders Much Needed
Dated of Commencement 12/01/2020
Date of Completion March 2020
Estt Cost 1.20 lakhs
Completion Cost 0.75 lakhs (Expdt under CD&Pyt)
No of People Benefite 5
Comments of Stakeholders Much Needed/Quality Work
P/Work Panchayat Ghar Hambal-A (Block Khellani)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
509
Constt. Of Tile Work H.S.S. Khellani. (Block Khellani) Constt. Of Flood P/Work on left side of chil guard Nallah. (Block Chiralla)
Date of Commencement 04/02/2020
Date of completion March 2020
Estt cost 4.88 lakhs
Completion cost 3.05 lakhs (Expdt under CD&Pyt)
No of people Benefitted 60
Commence of Stakeholders Much Needed/ Quality Work
Date of Commencement 19/11/2019
Date of Completion March 2020
Estt. Cost 0.80 lakhs
Complection Cost 0.50 lakhs (Expdt under CD&Pyt)
No. of People benefitted 200
Comments of Stakeholders Much Needed
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
510
Renovations of Community Hall Paryote-A (Block Khellani)
Date of Commencement 19/11/2019
Date of Completion March 2020
Estt. Cost 0.80 lakhs
Complection Cost 0.50 lakhs (Expdt under CD&Pyt)
No. of People benefitted 250
Comments of Stakeholders Much Needed
Date of Commencement 19/11/2019
Date of Completion March 2020
Estt. Cost 1.20 lakhs
Complection Cost 0.65 lakhs (Expdt under CD&Pyt)
No. of People benefitted 200
Comments of Stakeholders Much Needed
Constt. Of B/Wall Near Durga Mandir Shree (Block Khellani)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
511
Fencing /Repairing H.S Sarsi (Block Khellani) Constt.of C/Wall Gravyard Butt Mohalla in Ward No 2 (Block Jakyas)
Date of Commencement 13-02-2020
Date of Completion March 2020
Estimated Cost 1.60 Lakhs
Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)
No of People benefitted : 200
Comments of Stakeholders Much Needed/Quality work
Date of Commencement 14-11-2019
Date of Completion March 2020
Estt. Cost 0.80 lakhs
Complection Cost 0.50 lakhs (Expdt under CD&Pyt)
No. of People benefitted 250
Comments of Stakeholders Much Needed
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
512
Development of Spring Near Hill Nallah (Block Jakyas)
Date of Commencement 12-03-2020
Date of Completion March 2020
Estimated Cost 1.60 Lakhs
Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)
No of People benefitted 150
Comments of Stakeholders Much Needed/Quality
Date of Commencement 15-01-2020
Date of Completion March 2020(Expdt under CD&Pyt)
Estt. Cost 1.60 lakhs
Completion Cost 1.00 lakhs
No. of People benefitted 75
Comments of Stakeholders Much Needed
Repair/Renovation HS Chhaller (Block Jakyas)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
513
Constt.of C/Wall Gravyard in Ward No 4 Champal (Block Jakyas) Constt.of P/Path at Wani Pura Tilogra (Block Jakyas)
Date of Commencement 13-03-2020
Date of Completion March 2020
Estimated Cost 3.20 Lakhs
Completion Cost 2.00 Lakhs (Expdt under CD&Pyt)
No of People benefitted 250
Comments of Stakeholders Much Needed/Quality
Date of Commencement 13-03-2020
Date of Completion March 2020
Estimated Cost 1.60 Lakhs
Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)
No of People benefitted 150
Comments of Stakeholders Much Needed/Quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
514
Constt. of P/Bund Suranga Nallah (Block Kahara)
Date of Commencement 21/11/2019.
Date of Completion March 2020
Estt. Cost 4.80 Lakhs
Completion Cost 3.00
No of People Benifited 50
Commence of Stakeholders Much needed/ Quality work
Date of Commencement 19/10/2019
Date of Completion March 2020
Estimated Cost 8.00 lakhs
Completion cost 5.00 lakhs (Expdt under CD&Pyt)
No. of People Benefitted 245
Comments of Stake Holders Much Needed/Quality
P/work NHO Hari Gopal Rathore at Sarol Bagh Panchayat Udrana- A. (Block Bhaderwah)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
515
Development of Graveyard at Ward No.5 Panchayat Udrana B (Block Bhaderwah)
Z-khul with allied activities from LO Mohd Ishaq to Thajbal Panchayat Dhareja. (Block Bhaderwah)
Date of Commencement 21/11/2019.
Date of Completion March 2020 (Expdt under CD&Pyt)
Estt. Cost 3.20Lakhs
Completion Cost 2.00 lakhs
No of People Benifited 35
Commence of Stakeholders : Much needed/ Quality work:
Date of Commencement 21/11/2019
Date of Completion March 2020
Estt. Cost 6.40 Lakhs
Completion Cost 4.00 lakhs(Expdt under CD&Pyt)
No of People Benifited 100
Commence of Stakeholders Much needed/ Quality work:
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
516
R/wall Graveyard Khan Mohalla Hanga Panchayat Hanga. (Block Bhaderwah)
Date of Commencement 21-11-2019
Date of completion March 2020
Estt cost 4.80 Lakhs
Completion cost 3.00 lakhs (Expdt under CD&Pyt)
No of people Benefitted 200
Comments of Stakeholders Much Needed/ Quality Work
Date of Commencement 21/11/2019.
Date of Completion March 2020
Estt. Cost 2.40Lakhs
Completion Cost 1.50 lakhs (Expdt under CD&Pyt)
No of People Benifited 100
Comments of Stakeholders Much needed/ Quality work
Construciton of abulution centre (Wazu Khana) at MS Lower Chakka (Block Bhaderwah)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
517
Construction of Public Park Near Janazgah at Kotli Ward No 1 (Block Bhaderwah)
Development of Graveyard at Kach Panchayat Nalthi. (Block Bhaderwah)
Date of Commencement 21/11/2019
Date of Completion March 2020
Estt. Cost 4.80 Lakhs’s
Completion Cost 3.00 lakhs (Expdt under CD&Pyt)
No of People Benefitted 220
Commence of Stakeholders Much needed / Quality work:
Date of Commencement 21-11-2019
Date of Completion March 2020
Estimated Cost 0.80 Lakhs
Completion Cost 0.50 Lakhs (Expdt under CD&Pyt)
No. of People Benefited 70
Comments of Stakeholders Much Needed/Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
518
Constt.of P/path from Main Road to the House of Raghubir Singh Panchayat Udrana- A. (Block Bhaderwah)
Date of Commencement 10/01/2020
Date of Completion March 2020
Estimated Cost 1.60 LAKHS
Completion Cost 1.00 LAKHS (Expdt under CD&Pyt)
No of people benefited 365
Comments of stakeholders The Local People of seri are satisfied for const of this ram leela ground. Much needed/Quality work: - The locals had demanded for const of this work for organizing local functions.
Date of Commencement 21/11/2019.
Date of Completion March 2020
Estt. Cost 0.96 Lakhs
Completion Cost 0.60 lakhs (Expdt under CD&Pyt)
No of People Benifited 20
Comments of Stakeholders Much needed/ Quality work:
CONSTT OF FENCING AT RAM LELE GROUND (Block Bhalla)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
519
Constt of R/Wall Near HO Jasbir Singh Pyt.Kastigarh-A (Block Kastigarh)
Constt of B/Wall & L/Levelling of Ground Near CFC Kastigarh Pyt.Kastigarh-A (Block Kastigarh)
Date of start 27/11/2019
Date of Completion March 2020
ESTT. COST 3.20 Lakhs
Completion Cost 2.00 Lakhs (Expdt under CD&Pyt)
No of People Benefited 200
Comments of Stakeholders Much needed/ Quality work
Date of start 23/11/2019
Date of Completion March 2020
ESTT. COST 6.40 Lakhs
Completion Cost 4.00 Lakhs (Expdt under CD&Pyt)
No of People Benefited 50
Comments of Stakeholders Much needed/ Quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
520
Estd. Of Meeting Hall at BHQ Assar. (Block Assar)
Dateof Commencement 14/02/2020
Date of Completion March 2020
Estimated Cost 4.80 Lakhs
Completion Cost 1.50 lakhs(Expdt under CD&Pyt)
No. Of People Benefited 300
Comments of Stakeholders Much Needed/Quality Work
Date of Commencement 03/01/2020
Date of Completion March 2020
Estimated Cost 6.40 Lakhs
Completion Cost 4.00 Lakhs (Expdt under CD&Pyt)
No. Of People Benefited:
Comments of Stakeholders Much Needed/Quality Work
Const of Public Passanger Shed at Ramgarh (Block Assar)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
521
Const of P/Work at Jathi NLO Shakuntla Devi (Block Assar) Constt of R/Wall NHO Noor Pyt Mundhar Lower-A (Block Kastigarh)
Date of start 23/11/2019
Date of Completion March 2020
ESTT. COST 1.60 Lakhs
Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)
No of People Benefited 50
Comments of Stakeholders Much needed/ Quality work
Date of Commencement 31/01/2020
Date of Completion March 2020
Estimated Cost 1.60 Lakhs
Completion Cost 1.00 Lakhs (Expdt under CD&Pyt)
No. Of People Benefited 95
Comments of Stakeholders Much Needed/Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
522
Constt of Drain at Panchayat Halqa Dhandal- Pyt Dhandal-B (Block Kastigarh) Constt of Drain at Kudhar Pyt Dhandal-A (Block Kastigarh)
Date of start 22/01/2020
Date of Completion March 2020
ESTT. COST 2.00 Lakhs
Completion Cost 1.50 Lakhs (Expdt under CD&Pyt)
No of People Benefited 250
Comments of Stakeholders Much needed/ Quality work
Date of start 22/01/2020
Date of Completion March 2020
ESTT. COST 3.50 Lakhs
Completion Cost 3.00 Lakhs (Expdt under CD&Pyt)
No of People Benefited 200
Comments of Stakeholders Much needed/ Quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
523
Constt. of Protection work/development of Graveyard at Gatha Panchayat Gatha. (Block Bhaderwah)
Constt. Of B/Path Chancer to Kanaierew Panchayat Chansar (Block Changa)
Dated of Commencement 22/02/2020
Date of Completion March 2020
Estt. Cost 3.00 Lakhs
Completion Cost 2.00 lakhs (Expdt under CD&Pyt)
No of People Benefited 170
Comments of Stakeholders Much needed/ Quality work :
Dated of Commencement 10/01/2020.
Date of Completion March 2020
Estt. Cost 4.90 Lakhs
Completion Cost 04.00 lakhs (Expdt under CD&Pyt)
No of People Benefitted 400
Comments of Stakeholders Much needed/ Quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
524
B/Path Chansar to Chanchlu Panchayat Chancer (Block Changa) Constt. Of Flood P/Work on left side of chil guard Nallah. (Block Chiralla)
Date of Commencement 04/02/2020
Date of completion March 2020
Estt cost 5.00 lakhs
Completion cost 4.00 lakhs (Expdt under CD&Pyt)
No of people Benefitted 60
Comments of Stakeholders Much Needed/ Quality Work
Dated of Commencement 22/02/2020
Date of Completion March 2020
Estt. Cost 3.00 lakhs
Completion Cost 2.00 lakhs (Expdt under CD&Pyt)
No of People Benefited 170
Comments of Stakeholders Much needed/ Quality work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
525
Constt. Constt. Of Flood Protection works on left side of the Chillgad spot Hudki. (Block Chiralla)
Date of Commencement 04/02/2020
Date of completion March 2020
Estt cost 5.00 lakhs
Completion cost 4.00 lakhs (Expdt under CD&Pyt)
No of people Benefitted 150
Commence of Stakeholders Much Needed/ Quality Work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
526
Date of Start:- 21-12-2019
Date of Completion:- 11-03-2020
Estimated Cost:- Rs. 3.50 lacs
Completion cost of the project:- Rs.2.45 (Expd.CD Pyt)
Total No. people benefitted:- 50
Comments of the Stake holders:- Much needed
Date of Start:- 30-12-2019
Date of Completion:- 11-03-2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs.3.50 (Expd.CD Pyt)
Total No. people benefitted:- 150
Comments of the Stake holders:- Much needed &Quality Work
CONSTRUCTION OF LANE DRAIN FROM SHAM LAL HOUSE MOHALLA JATTAN TO PRABH DAYAL HOUSE AT LAHORI CHAK in Convergence with MGNREGA. .
CONSTRUCTION OF P/WORK NEAR THE HOUSE OF MUSHTAQ AHMED in Convergence with MGNREGA.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
527
Date of Start:- 15-01-2020
Date of Completion:- March 2020
Estimated Cost:- Rs. 2.00 lacs
Completion cost of the project:- Rs.0.75 lac
Total No. people benefitted:- 35
Comments of the Stake holders:- Much needed
Date of Start:- 16-01-2020
Date of Completion:- March 2020
Estimated Cost:- Rs. 3.00 lacs
Completion cost of the project:- Rs.2.10
Total No. people benefitted:- 70
Comments of the Stake holders:- Much needed
& quality work
Balance Work of Cowshed at Gurha Brahmana
Panchayat:- Gurha Brahmana
Constt. of L/d from main road to H/of Sanjay Sharma at Daskal Mandir near Mahindra Finance Company
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
528
Date of Start:- 21.01.2020
Date of Completion:- March 2020
Estimated Cost:- Rs. 3.50 lacs
Completion cost of the project:- Rs.1.23
Total No. people benefitted:- 75
Comments of the Stake holders:- Much needed
Date of Start:- 07.02.2020
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs.1.75
Total No. people benefitted:- 120
Comments of the Stake holders:- Much needed
Constt. of L/D Mandir Chowk to house of Saran Singh in convergence with MGNREGA
Construction of Culvert near Tube well in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
529
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 4.50 lacs
Completion cost of the project:- Rs.3.00
Total No. people benefitted:- 475
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 4.00 lacs
Completion cost of the project:- Rs.2.80
Total No. people benefitted:- 562
Comments of the Stake holders:- Much needed
Construction of Lane/Drain from H/o Ram Lal to H/o Kulbushan Kumar Mohalla Bhagtan in convergence with MGNREGA
Construction of Lane from Link road Batera to House Sardar Gurdyal Singh & Others in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
530
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 3.00 lacs
Completion cost of the project:- Rs.2.00
Total No. people benefitted:- 580
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 7.00 lacs
Completion cost of the project:- Rs.5.00
Total No. people benefitted:- 580
Comments of the Stake holders:- Much needed
Construction of T/Road at W No. 1 Mohalla Gurudev and others in convergence with MGNREGA
Construction of Plateform at Graint in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
531
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 14.00 lacs
Completion cost of the project:- Rs.9.00
Total No. people benefitted:- 590
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 6.50 lacs
Completion cost of the project:- Rs.4.50
Total No. people benefitted:- 675
Comments of the Stake holders:- Much needed
Constt. of Link Road from Moh. Salyaran to Moh. Tarkhan in convergence with MGNREGA
Construction of Approach Road from Link Road Batyara to Moh. Bhagtan in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
532
Date of Start:- 2019-20
Date of Completion:- 24-03-2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs.4.00
Total No. people benefitted:- 100-150
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.50 lacs
Completion cost of the project:- Rs.3.85
Total No. people benefitted:- 150-200
Comments of the Stake holders:- Much needed
Const of C-path from NH to Hanuman Mandir Suketar W No.06 in convergence with MGNREGA
Const of Tr road and other allied works from PWD Road to moh Baroon with different links at W No.08 in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
533
Date of Start:- 13-12-2019
Date of Completion:- 24-03-2020
Estimated Cost:- Rs. 2.98 lacs
Completion cost of the project:- Rs.2.09
Total No. people benefitted:- 50-75
Comments of the Stake holders:- Much needed
Date of Start:- 13-12-2019
Date of Completion:- 21-03-2020
Estimated Cost:- Rs. 9.50 lacs
Completion cost of the project:- Rs.5.78
Total No. people benefitted:- 250-300
Comments of the Stake holders:- Much needed
Improvement of Tr road from main road to mohalla Bhagat Balarn Phase II in convergence with MGNREGA
Const of lane from tara singh house through Banto devi to house of kaka ram at Zero Morh village Panyal in convergence with MGNREGA Panchayat:- Jajjar Kotli,Block Dansal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
534
Date of Start:- 2019-20
Date of Completion:- 24-03-2020
Estimated Cost:- Rs. 10.00 lacs
Completion cost of the project:- Rs.7.00
Total No. people benefitted:- 400-500
Comments of the Stake holders:- Much needed
Date of Start:- 13-12-2019
Date of Completion:- 21-03-2020
Estimated Cost:- Rs. 4.20 lacs
Completion cost of the project:- Rs.2.94
Total No. people benefitted:- 75-100
Comments of the Stake holders:- Much needed
Const of lane drain from house of Som to Land of Smt. Banti Devi at Zero Morh in convergence with MGNREGA
Const of Tr road and other allied works from mohalla saral and onwards with different links in w no.7 in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
535
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 2.00 lacs
Completion cost of the project:- Rs.0.70
Total No. people benefitted:- 30
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 2.00 lacs
Completion cost of the project:- Rs.0.70
Total No. people benefitted:- 60
Comments of the Stake holders:- Much needed
Const of Culvert in W No.4 in convergence with MGNREGAConst of Culvert in W No.7 in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
536
Date of Start:- 12-01-2020
Date of Completion:- 14-03-2020
Estimated Cost:- Rs. 4.50 lacs
Completion cost of the project:- Rs.4.00
Total No. people benefitted:- 45
Comments of the Stake holders:- Much needed
Date of Start:- 12-01-2020
Date of Completion:- 14-03-2020
Estimated Cost:- Rs. 7.50 lacs
Completion cost of the project:- Rs.5.25
Total No. people benefitted:- 77
Comments of the Stake holders:- Much needed
Const of Approach Road with Drain at Nandni Lower Pyt Kirpalpur in convergence with MGNREGA
CONSTT OF T/ ROAD FROM SATHAR TO NARDI in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
537
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 15.00 lacs
Completion cost of the project:- Rs.10.50
Total No. people benefitted:- 250
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 4.50 lacs
Completion cost of the project:- Rs.3.15
Total No. people benefitted:- 30
Comments of the Stake holders:- Much needed
Constt of Lane at Mawa in convergence with MGNREGA
Panchayat:- Mathwar, Block Mathwar
Constt. Of Approach Road and Allied works from Gorda to Kalkani Lassu Part 1 in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
538
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs. 4.00 lacs
Total No. people benefitted:- 100
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 4.00 lacs
Completion cost of the project:- Rs.3.00
Total No. people benefitted:- 30
Comments of the Stake holders:- Much needed
Constt. Of Lane and P/Work Moh. Chunka wala & others Rabta & Others in convergence with MGNREGA
Constt. Of T/Road at Kherri Moh. Rabta in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
539
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs. 4.00 lacs
Total No. people benefitted:- 50
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 9.80 lacs
Completion cost of the project:- Rs. 6.00 lacs
Total No. people benefitted:- 50
Comments of the Stake holders:- Much needed
Constt. Of T/Road and P/Work Moh Bisho Mohd & Others at Dhano in convergence with MGNREGA
Constt. Of P/Work Moh. Chunka wala & Others Rabta Bhagani in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
540
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.50 lacs
Completion cost of the project:- Rs. 3.85 lacs
Total No. people benefitted:- 1000
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.50 lacs
Completion cost of the project:- Rs. 3.85 lacs
Total No. people benefitted:- 350
Comments of the Stake holders:- Much needed
Constt. Of Sara Nallah near Sarah Bridge in convergence with MGNREGA APPROACH ROAD AT BAN PANJGRIAN PANCHAYAT NADORE
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
541
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 8.00 lacs
Completion cost of the project:- Rs. 5.60 lacs
Total No. people benefitted:- 690
Comments of the Stake holders:- Duarble asset
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 3.00 lacs
Completion cost of the project:- Rs. 2.10 lacs
Total No. people benefitted:- 330
Comments of the Stake holders:- Durable asset created
Constt. Of lane drain Mohalla Mara in convergence with MGNREGAConstt of culvert at Pargalta in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
542
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs. 4.00 lacs
Total No. people benefitted:- 350
Comments of the Stake holders:- Durable asset created.
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs. 4.00 lacs
Total No. people benefitted:- 550
Comments of the Stake holders:- Durable asset created
Const. of link road /allied work main road to Dumi to Moh ST W No 9 in convergence with MGNREGA
Upgradtion of road /allied work from Nuba to Primary School Kwara W No 3 in convergence with MGNREGA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
543
Date of Start:- 13-12-2019
Date of Completion:- 25-2-2020
Estimated Cost:- Rs. 4.69 lacs
Completion cost of the project:- Rs. 3.28 lacs
Total No. people benefitted:- 150
Comments of the Stake holders: Much needed by the people
Date of Start:- 1-12-2019
Date of Completion:- 25-03-2020
Estimated Cost:- Rs. 4.60 lacs
Completion cost of the project:- Rs. 2.84 lacs
Total No. people benefitted:- 200
Comments of the Stake holders:- Much needed
Constt. of Lane filling edge wall of road near Peer babaBlock :- Satwari
Constt. of L/D from Govt. Primary School Camp Rathana to onwards. Pyt. Rathana Block R S Pura
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
544
Date of Start:- 1-12-2019
Date of Completion:- 25-03-2020
Estimated Cost:- Rs. 7.50 lacs
Completion cost of the project:- Rs. 4.54 lacs
Total No. people benefitted:- 350
Comments of the Stake holders:- Much needed
Date of Start:- 1-12-20019
Date of Completion:- 25-03-2020
Estimated Cost:- Rs. 9.50 lacs
Completion cost of the project:- Rs. 6.65 lacs
Total No. people benefitted:- 300
Comments of the Stake holders:- Much needed
Constt.of approach road to Nowabad, Pyt. Malik MarketBlock :- Satwari
Constt. of P/wall at Nakki Nallah near land of Naseem and others of road near Peer baba
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
545
Date of Start:- 1-12-2019
Date of Completion:- March 2020
Estimated Cost:- Rs. 3.00 lacs
Completion cost of the project:- Rs. 0.78 lacs
Total No. people benefitted:- 300
Comments of the Stake holders:- Much needed
Date of Start:- 20-12-2019
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Total No. people benefitted:- 300
Comments of the Stake holders:- Much needed
Constt.of lane drain at Sunjwan near H/o Imran & others, Pyt. Malik Market
Constt.of lane drain at Vidhata Nagar lane No. 3 Bathindi from link road to house of Ab. Rasheed and others
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
546
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs. 1.50 lacs
Total No. people benefitted:- 300
Comments of the Stake holders:- Much needed
Date of Start:- 2019-20
Date of Completion:- March 2020
Estimated Cost:- Rs. 5.00 lacs
Completion cost of the project:- Rs. 3.50 lacs
Total No. people benefitted:- 300
Comments of the Stake holders:- Much needed
Constt.of lane drain near DevSthan Mula ChakPanchayat:-Mula Chak Block SuchetgarhConstt.of lane drain at New DewangarhBlock :- Suchetgarh
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
547
Date of commencement:- 01.12.2019
Date of Completion:- 31.03.2020
Estimated Cost:- 2.00 lacs
Completion Cost (Expd.):- 0.98 lacs
No of people benefited:- 20
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed Work
Date of commencement:- 01.12.2019
Date of Completion:- 31.03.2020
Estimated Cost:- 2.00 lacs
Completion Cost (Expd.):- 1.00 lacs
No of people benefited:- 20
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed Work
Name of Work:-Constt. Of protection work at w.no.2 from the land of Om Parkash, Hans Raj near the culvert at Devo Chak
Name of Work:-Constt. Of protection work at Gara near the land of Baijnatg
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
548
Date of commencement:- 01.12.2019
Date of Completion 31.03.2020
Estimated Cost:- 4.00 lacs
Completion Cost:
No of people benefited:- 150
Comments of stakeholders:- Demand of Public
Much needed/quality work:-
Date of commencement:- 01-01-2020
Date of Completion:- 31-03-2020
Estimated Cost:- 3.00 lacs
Completion Cost:-
No. of people benifitted:-
Comments of stakeholders:- Demand of General Public/Farmers
Much needed/quality work:- Much needed work
Constt. Of L/D Tharkalwal w.no.1 main road to h/o Satish Kumar and other
Constt. Of Lane from link road to Nag Devta Sathan at Chaknathal w.no.1
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
549
Date of commencement:- 11.12.2019
Date of Completion:- 22.03.2020
Estimated Cost:- 2.00 lacs
Completion Cost :- 1.01 Lacs
No of people benefited:- 40
Comments of stakeholders:- Demand of General Public
Much needed/quality work:- Good Work
Date of commencement:- 01.12.2019
Date of Completion:- 31.03.2020
Estimated Cost:- 8.00 lacs
Completion Cost:-
No of people benefited:- 200
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed Work
Constt. Of T/R from GMS Dhaloti to Jasrota TempleConstt. Of well at Mohalla Anjala near the land of Dev Raj Sharma, Naresh Kumar and others, Block Dingaamb.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
550
Date of commencement:- 01-10-2019
Date of Completion 31-03-2020
Estimated Cost:- 5.00 lacs
Completion Cost :- 3.00 Lacs
No of people benefited:- 125
Comments of stakeholders:- Demand of General Public/ Farmers
Much needed/quality work:- Much needed work
Date of commencement:- 01-10-2019
Date of Completion:- 31-03-2020
Estimated Cost:- 3.00 lacs
Completion Cost :- 1.09 lacs
No of people benefited:- 50
Comments of stakeholders:- Demand of General Public/ Farmers
Much needed/quality work:- Much needed work
Constt. Of Toe wall near Bua di Bai at Changrah to the land of Paras Ram, Bali Ram and others
Lane with protection from middle school Lakhnote to the h/o Ramesh Chand at village Lakhnote
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
551
Date of commencement:- 01-10-2019
Date of Completion 31-03-2020
Estimated Cost:- 19.00 lacs
Completion Cost:- 5.03 lacs
No of people benefited:- 500
Comments of stakeholders:- Demand of General Public/ Farmers
Much needed/quality work:- Much needed work
Date of commencement:- 31.12.2018
Date of Completion 31.03.2020
Estimated Cost:- 8.00 lacs
Completion Cost:-
No of people benefited:- 500
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed work
Constt. Of Road by way cutting, filling,culvert and side wall from link road Gaiterwan to KharoteConstt. Of Vented causeway culvert on Dhambra at lower Jakhbar
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
552
Date of commencement: - 25.10.2019
Date of Completion:- 31.03.2020
Estimated Cost:- 8.00 lacs
Completion Cost:-
No of people benefited:- 25
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Good work
Date of commencement:- 01.01.2020
Date of Completion:- 31.03.2020
Estimated Cost:- 6.00 lacs
Comp;etion Cost:-
No of people benefited:- 100
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed Work
Constt. Of Lane from road side at village Ram Nagar to Keerian near electric station upto Durga Mandhir and from the h/o Dukara Nath upto the h/o retired SI Satpaul Sharma Block Keerain Gandiyal
Constt. Of p/work near eidgah in the land of mubharkh ali pyt. Prehta Block Basohli
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
553
Date of commencement:- 25.10.2019
Date of Completion:- 31.03.2020
Estimated Cost:- 5.00 lacs
Completion Cost:- 1.50 lacs
No of people benefited:- 100
Comments of stakeholders:- Demand of Public
Much needed/quality work:- Good Quality
Date of commencement:- 01.01.2020
Date of Completion:- 31.03.2020
Estimated Cost:- 5.00 lacs
Completion Cost:-
No of people benefited:- 400
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed work
Constt. Of T/R from Bakhta to Guraha Suraj Forelain West-A Block Barnoti
Constt. Of T/R from Kathan to Dhadu via Moh SC Pyt Dhar Mahanpur Block Dhar Mahanpur
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
554
Date of commencement:- 31.12.2018
Date of Completion 31.03.2019
Estimated Cost:- 16.50 lacs
Completion Cost :- 9.00 lacs
No of people benefited:- 500
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Good Quality
Date of commencement:- 01.12.2018
Date of Completion:- 31.03.2019
Estimated Cost:- 0.70 lacs
Completion Cost:-
No of people benefited:- 30
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed Work
Constt. Of Culvert nera the h/o Tarsem Lal and others at village Gadyal Block MarheenBalance Work of Play Field at Chadwa
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
555
Date of commencement:- 01.01.2018
Date of Completion:- 31.03.2019
Estimated Cost:- 2.98 lacs
Completion Cost:-
No of people benefited:- 400
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed work
Date of commencement:- 01.12.2018
Date of Completion:- 31.03.2019
Estimated Cost:- 0.83 lacs
Completion Cost:-
No of people benefited:- 200
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Much needed Work
Constt. Of lane from the h/o Parveen Kumar to the h/o Gain Chand at Mukhandpur Camp block MarheenPlay Ground at Seswan Block Marheen
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
556
Date of commencement:- 31.12.2018
Date of Completion 31.03.2019
Estimated Cost:- 5.95 lacs
Completion Cost :- 2.98 lacs
No of people benefited:- 210
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Good Quality
Date of commencement:- 01-10-2019
Date of Completion 31-03-2020
Estimated Cost:- 8.00 lacs
Completion Cost:-
No of people benefited:- 50
Comments of stakeholders:- Demand of General Public/ Farmers
Much needed/quality work:- Good Qaulity
Constt. Of prott. Wall of kool at Baba Pachera near land of Nazir Ahmed and others pyt. Najote Block Duggain CDPyt+MGNREGAConstt. Of Foot Bridge at Sharad
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
557
Date of commencement:- 25-10-2019
Date of Completion:- 31-03-2020
Estimated Cost:- 3.00 lacs
No of people benefited:- 60
Completion Cost:-
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Good Quality
Date of commencement:- 01-12-2019
Date of Completion:- 31-03-2020
Estimated Cost:- 6.00 lacs
Completion Cost:-
No of people benefited:- 50
Comments of stakeholders:- Demand of general public
Much needed/quality work:- Good Quality
Date of commencement:- 03-03-2019
Date of Completion: 22-03-2019
Estimated Cost:- 4.00 lacs
Completion Cost :- 1.40 lacs
No of people benefited:- 230
Comments of stakeholders:- Demand of Public
Much needed/quality work:- Good Work
Lane from greed to fathi and Lalhal Pyt Dhagger Block Duggan
Lane/drain from Bowli to Mohra Lower Howal. W.No.9, Block Lohai Malhar
Constt. Of lane from Shunker Din h/o Bowali Badhyal.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
558
Date of commencement:- 08-02-2020
Date of completion:- 31-03-2020
Estimated Cost:- 2.40 Lacs
Completion Cost : 0.96lacs
No. of people benefited:- 427
Comments of stakeholders:- After completion of works people are thankful to RDD.
Date of commencement:- 02-01-2020
Date of completion:- 31-03-2020
Estimated Cost:- 2.50 Lacs
Completion Cost : 1.00 lacs
No. of people benefited:- 189
Comments of stakeholders:- Public of the area are using the ground as Eidgah besides children also use the ground for playing.
Dev. Of Eid Gah at Daller Pyt. Upper Chatroo Block Inderwal District Kishtwar.
Dev of ground Eid gah at Patimhala W.No.5 Pyt. Palmar Upper Block Palmar District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
559
Date of commencement:- 01-03-2020
Date of completion:- 24-03-2020
Estimated Cost:- 2.50 Lacs
Completion Cost: 1.00 lacs
No. of people benefited:- 200
Comments of stakeholders:- People of the area are very thankful to RDD.
Date of commencement:- 02-01-2020
Date of completion:- 30-03-2020
Estimated Cost:- 2.25 Lacs
Completion Cost: 0.90 lacs
No. of people benefited:- 100
Comments of stakeholders:- After completion of work public also demands for tile path to connecting the ground.
Development of ground in Passerkot Pyt. Inderwal-A Block Inderwal District Kishtwar
Dev. Constt of B/room near Masjid Sharief Kalamosie Pyt. Inderwal-B Block Inderwal District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
560
Date of commencement:- 02-01-2020
Date of completion:- 31-03-2020
Estimated Cost:- 7.20 Lacs
Completion Cost:
No. of people benefited:- 150
Comments of stakeholders:- Building is being used for Pyt Ghar & other Community functions.
Date of commencement:- 02-01-2020
Date of completion:- 31-03-2020
Estimated Cost:- 5.80 Lacs
Completion Cost:-
No. of people benefited:- 250
Comments of stakeholders:- Ground is used by the public & demand of tile work has also been raised.
Dev. Of ground at Varun Devta Mandir Pyt. Filler-A Block thakraie District Kishtwar.
Repair/Renovation of Community building at Pochhal-A2, Pyt. Pochhal-A2 Block Kishtwar District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
561
Date of commencement:- 25-02-2020
Date of completion:- 23-03-2020
Estimated Cost:- 4.69 Lacs
Completion Cost:-
No. of people benefited:- 190
Comments of stakeholders:- Public has appreciated the work of RDD.
Date of commencement:- 02-01-2020
Date of completion:- 31-03-2020
Estimated Cost:- 1.83 Lacs
Completion Cost:-
No. of people benefited:- 231
Comments of stakeholders:- Public of the are is thankful to Rural Dev. Deptt. For the sustainable work.
Const. Shed at Galigad Near Nallaha Pyt. Trigam-C Block Trigam District Kishtwar.
Const. of P/Wall Shah Mohalla Graveyard NHO Azad Hussian Rather Pyt. Filler-A Block thakraie District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
562
Date of commencement:- 17-01-2020
Date of completion:- 31-03-2020
Estimated Cost:- 2.00 Lacs
Completion Cost:-
No. of people benefited:- 1200
Comments of stakeholders:- The work is appreciated by all quarters of the public.
Date of commencement:- 11-03-2020
Date of completion:- 31-03-2020
Estimated Cost:- 4.00 Lacs
Completion Cost:-
No. of people benefited:- 350
Comments of stakeholders:- Public of this area are very happy and appreciates for the good quality work.
Const. of Foot Path From the h/o Haroon Zargar to Paninaab in village Bugrana Pyt. Bugrana Block Drabshalla District Kishtwar.
Const. of Passenger Shed at Bakura Pyt. Shandri Block Drabshalla District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
563
Date of commencement:- 11-12-2019
Date of completion:- 31-03-2020
Estimated Cost:- 2.00 Lacs
Completion Cost:-
No. of people benefited:- 150
Comments of stakeholders:- sanitary complex is proving beneficial for the public/madrasa residents.
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 2.00 Lacs
Completion Cost:-
No. of people benefited:- 135
Comments of stakeholders:- Public of the area is quite satisfied with the work.
Const. of Sanitary Complex at Kutal Pyt. Hiloor Block Drabshalla District Kishtwar.
Const. of Sanitary Complex Near Madarssa at Bhagran Pyt. Karool-C Block Drabshalla District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
564
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 1.25 Lacs
Completion Cost:-
No. of people benefited:- 135
Comments of stakeholders:- Public of the area is quite satisfied with the work.
Date of commencement:- 02-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 1.00 Lacs
Completion Cost:-
No. of people benefited:- 35
Comments of stakeholders:- people of the area demands for its plaster.
Const. of Inlet Tank at Chamdal WSS Balgran Pyt. Balgran Block Drabshalla District Kishtwar.
Const. of Sanitary Complex at Khori Pyt. Khori Block Drabshalla District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
565
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 2.00 Lacs
Completion Cost:-
No. of people benefited:- 104
Comments of stakeholders:- Public of the area is quite satisfied with the work.
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 2.50 Lacs
Completion Cost:-
No. of people benefited:- 85
Comments of stakeholders:- people of the area has appreciated the work.
Const. Dev. Of Ground in Pyt. Bhata Block Mughalmaidan District Kishtwar.
Const. of Sanitary Complex at Karool-B Pyt. Karool-B Block Drabshalla District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
566
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 2.50 Lacs
No. of people benefited:- 70
Comments of stakeholders:- Works has been appreciated by the public of area.
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 3.75 Lacs
No. of people benefited:- 75
Comments of stakeholders:- Student and elderly population have appreciated the construction of playground.
Const. Dev. Of Ground at Mehjar Kuchhal-B Block Mughalmaidan District Kishtwar.
Const. of P/Work & Sanitary Complex Near Masjid Abrar Kuchhal-A Block Mughalmaidan District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
567
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 3.50 Lacs
Completion Cost:-
No. of people benefited:- 75
Comments of stakeholders:- Path is proving beneficial for the public during rainy season.
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 0.75 Lacs
Completion Cost:-
No. of people benefited:- 12
Comments of stakeholders:- Bowli/Pond will be used for agriculture and drinking water for livestock.
Dev. Of Bowli at Chakroon Pyt. Binoon Block Bunjwah District Kishtwar.
Const. Pacca Path Banjora Pyt.Moori Block Bunjwah District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
568
Date of commencement:- 13-03-2020
Date of completion:- 28-03-2020
Estimated Cost:- 0.75 Lacs
Completion Cost
No. of people benefited:- 05
Comments of stakeholders:- rainwater is used as an alternative supply during drought which help to maintain greenery.
Date of commencement:- 01-03-2020
Date of completion:- 24-03-2020
Estimated Cost:- 2.60 Lacs
Completion Cost : 1.04 lacs
No. of people benefited:- 174
Comments of stakeholders:- During the period of Yatra, Shed will be beneficial for devotees & public of area.
Const. of Yatri Shed at Chitto at Guri Phat Pyt Tiyari Block Padder District Kishtwar.
Const. of Inlet Tank at Lalli Pyt. Nali Block Bunjwah District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
569
Date of commencement:- 01-03-2020
Date of completion:- 24-03-2020
Estimated Cost:- 2.60 Lacs
Completion Cost : 1.04 lacs
No. of people benefited:- 208
Comments of stakeholders:- During the period of Yatra, Shed will be beneficial for devotees & public of area.
Date of commencement:- 01-03-2020
Date of completion:- 24-03-2020
Estimated Cost:- 2.50 Lacs
Completion Cost:-
No. of people benefited:- Official Staff
Comments of stakeholders:- After renovation of CIC Building accommodation of office of Block Development officer Drabshalla has been strengthen.
Repair/Renovation of CIC Building in Pyt. Badhat Block Drabshalla District Kishtwar.
Const. of Yatri Shed Near School mata mandir Pyt Atholi Block Padder District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
570
Date of start: 2019-20
Date of completion: March 2020
Approved Cost: ₹ 5.40 lakh
Funds released (CD&Pyt) : ₹ 3.70 lakh
Expenditure (CD&pyt) : ₹ 3.70lakh
No. of souls benefitted: 960
Comments of stakeholders: The bridge was persistent demand
of the habitation
Date of start: 28-11-2019
Date of completion: 15.03.2020
Approved Cost: ₹ 3.00 lakh
Funds released (CD&Pyt ) : ₹ 2.50 lakh
Final Expenditure (CD&Pyt) : ₹ 2.50 lakh
No. of souls benefitted: 210
Comments of stakeholders: Saves the land from soil erosion and floods.
Const. of P/Bund Nandkhull at Shangus (412)Const. of Xing Bawooder road at Shirpora (386)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
571
Date of start: 25-11-2019
Date of completion: 18-03-2020
Approved Cost: ₹ 4.50 lakh
Funds released (CD&Pyt) : ₹ 3.00 lakh
Expenditure (CD&pyt) : ₹ 3.00lakh
No. of souls benefitted: 850
Comments of stakeholders: The Xing helps the people for agricultural activities .
Date of start: 02-01-2020
Date of completion: 29-01-2020
Approved Cost: ₹ 2.99 lakh
Funds released (CD&Pyt) :₹ 2.00 Lakh
Expenditure (CD&pyt) : ₹ 2.00 Lakh
No. of souls benefitted: 340
Comments of stakeholders: The road facilitates the farmers for agriculture purpose.
Const. of Link raod from Tangoa to Banjar area land of Mohd MaqsoodTantry & others (394)Const. of Xing Dantrin at Tengbal Halqa Kakran. (391)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
572
Date of start: 20-04-2019
Date of completion: 26-06-2019
Approved Cost: ₹ 1.00 lakh
Funds released (CD&Pyt) :₹ 0.70 Lakh
Expenditure (CD&pyt) : ₹ 0.70 Lakh
No. of souls benefitted: 205
Comments of stakeholders: Facilitates the rural connectivity all weather.
Date of start: 20-12-2019
Date of completion: 06-02-2020
Approved Cost: ₹ 2.92 lakh
Funds released (CD&Pyt) :₹ 2.00 Lakh
Expenditure (CD&pyt) : ₹ 2.00 Lakh
No. of souls benefitted: 510
Comments of stakeholders: Safeguards the road form the follow of water .
Const of L.wall on Gam Khul road at Chelan (405). Const of tile lane from Jamia Masjid to Ab Majeed Chopan, Ab Hamid Nengroo and others at Hanger (380)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
573
Date of start: 18-12-2019
Date of completion: 05-01-2020
Approved Cost: ₹ 3.00 lakh
Funds released (CD&Pyt) :₹ 2.50 Lakh
Expenditure (CD&pyt) : ₹ 2.50 Lakh
No. of souls benefitted: 430
Comments of stakeholders: Helps for soil erosion and follow of water.
Date of start: 15-02-2020
Date of completion: 10-03-2020
Approved Cost: ₹ 3.00 lakh
Funds released (CD&Pyt) :₹ 2.50 Lakh
Expenditure (CD&pyt) : ₹ 2.50 Lakh
No. of souls benefitted: 730
Comments of stakeholders: Prevents the erosion and floods of the agriculture land.
Const. of P/Bund NLO Ab Hamid Shiekh at New Bye-Pass Laroo (414)Const of P/Bund Gamood at Kharvate (411).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
574
Date of start: 15-02-2020
Date of completion: 18-03-2020
Approved Cost: ₹ 3.50 lakh
Funds released (CD&Pyt) :₹ 2.50 Lakh
Expenditure (CD&pyt) : ₹ 2.50 Lakh
No. of souls benefitted: 720
Comments of stakeholders: Facilitates all weather connectivity in the habitation.
Date of start: 15-12-2019
Date of completion: 31-12-2019
Approved Cost: ₹ 3.00 lakh
Funds released (CD&Pyt) :₹ 1.72 Lakh
Expenditure (CD&pyt) : ₹ 1.72 Lakh
No. of souls benefitted: 1230
Comments of stakeholders: Facilitates the irrigation facility in the vast agriculture land.
Const. of Irrigation Channel NHO Mohd Ramzan Bhat & others at Dharshan. Srandoo (389).Const. tile lane at K.Check at Manigam (399)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
575
Date of start: 15-02-2020
Date of completion: 05-03-2020
Approved Cost: ₹ 6.00 lakh
Funds released (CD&Pyt) :₹ 4.00 Lakh
Expenditure (CD&pyt) : ₹ 4.00 Lakh
No. of souls benefitted: 1108
Comments of stakeholders: Helps the people in crossing the Nallah.
Date of start: 18-11-2019
Date of completion: 05-12-2019
Approved Cost: ₹ 2.99 lakh
Funds released (CD&Pyt) :₹ 2.50 Lakh
Expenditure (CD&pyt) : ₹ 2.50 Lakh
No. of souls benefitted: 630
Comments of stakeholders: Increased the irrigation facility for vast land.
Const of Irrigation NLO Ab Aziz Dar and others at Fatilangan (409)Const. of Xing Nallah Paphadi with R/wall at Banghall (400)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
576
Date of start: 15-02-2020
Date of completion: 10-03-2020
Approved Cost: ₹ 2.80 lakh
Funds released (CD&Pyt) :₹ 2.30 Lakh
Expenditure (CD&pyt) : ₹ 2.30 Lakh
No. of souls benefitted: 520
Comments of stakeholders: Facilitates all whether connectivity in the habitation.
Date of start: 15-11-2019
Date of completion: 20-12-2019
Approved Cost: ₹ 2.80 lakh
Funds released (CD&Pyt) :₹ 1.80 Lakh
Expenditure (CD&pyt) : ₹ 1.80 Lakh
No. of souls benefitted: 670
Comments of stakeholders: Facilitates the connectivity and drainage in the village .
Const. of Link road with drain from main road to Marg Sarbuji at Wanigund Redwani side (388).
Const of Lane / drain near house of Ghulam Mohideen Ganie S/o. Ab Wahab Ganie R/o. Banghall (407)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
577
Date of start: 10-11-2019
Date of completion: 16-12-2019
Approved Cost: ₹ 6.00 lakh
Funds released (CD&Pyt) :₹ 2.00 Lakh
Expenditure (CD&pyt) : ₹ 4.00 Lakh
No. of souls benefitted: 1130
Comments of stakeholders: Facilitates the connectivity between Villages Khrewan and Mah
Date of start: 12-11-2019
Date of completion: 05-12-2019
Approved Cost: ₹ 2.99 lakh
Funds released (CD&Pyt) :₹ 2.50 Lakh
Expenditure (CD&pyt) : ₹ 2.50 Lakh
No. of souls benefitted: 330
Comments of stakeholders: Protects the land from soil erosion and floods.
Const. of P/bund NLO Gulzar Ahmad Rather & others at Arndal Halqa Srandoo (408).Const. of Link road with Xing Khrewan to Mahth (387)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
578
Date of start: 15-11-2019
Date of completion: 30-12-2019
Approved Cost: ₹ 3.50 lakh
Funds released (CD&Pyt) :₹ 2.50Lakh
Expenditure (CD&pyt) : ₹ 2.50 Lakh
No. of souls benefitted: 430
Comments of stakeholders: Facilitates all wether connectivity in the habitation.
Date of start: 05-05-2019
Date of completion: 18-03-2020
Approved Cost: ₹ 2.50 lakh
Funds released (CD&Pyt) :₹ 1.85 Lakh
Expenditure (CD&pyt) : ₹ 1.85 Lakh
No. of souls benefitted: 230
Comments of stakeholders: Protects erosion and floods.
Const. R/wall Bund Shali Warida Nallah at Lammer (385).Const of tile lane at Graveyard at K Check Manigam (402)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
579
Date of start: 05-05-2019
Date of completion: 18-03-2020
Approved Cost: ₹ 5.20 lakh
Funds released (CD&Pyt) :₹ 3.50 Lakh
Expenditure (CD&pyt) : ₹ 3.50 Lakh
No. of souls benefitted: 1060
Comments of stakeholders: Facilitates the safe crossing of the Nallah.
Date of start: 05-05-2019
Date of completion: 18-03-2020
Approved Cost: ₹ 5.40 lakh
Funds released (CD&Pyt) :₹ 2.00 Lakh
Expenditure (CD&pyt) : ₹ 2.00 Lakh
No. of souls benefitted: 840
Comments of stakeholders: Facilitates the connectivity for agricultural activities.
Const. of road from Kanipora towards Mahnoor Dal at Kanipora (398).
Const. Tractor Xing NLO Mushtaq Ahmad Bhat at Herdal Adijan Card Ladgoo (390).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
580
Date of start: 29-11-2019
Date of completion: 13-01-2020
Approved Cost: ₹ 2.99 lakh
Funds released (CD&Pyt) :₹ 2.00 Lakh
Expenditure (CD&pyt) : ₹ 2.00 Lakh
No. of souls benefitted: 720
Comments of stakeholders: Facilitates the irrigation facilities for vast land.
Date of start: 13-12-2019
Date of completion: 30-03-2020
Approved Cost: ₹ 7.00 lakh
Funds released (CD&Pyt) :₹ 4.00 Lakh
Expenditure (CD&pyt) : ₹ 4.00 Lakh
No. of souls benefitted: 1030
Comments of stakeholders: Facilitates the connectivity between Villages Kanipora and Nanibugh.
Const. of Link road from Kanipora to Nanibugh Halqa Laroo (393)Const. of drian / Irrigation channel NLO Bashir Ahmad Wani and others at Chelan (397).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
581
Date of start: 06-02-2020
Date of completion: 07-03-2020
Approved Cost: ₹ 2.50 lakh
Funds released (CD&Pyt) :₹ 1.70 Lakh
Expenditure (CD&pyt) : ₹ 1.70 Lakh
No. of souls benefitted: 610
Comments of stakeholders: Facilitates the connectivity in the habitation.
Date of start: 08-11-2019
Date of completion: 05-12-2020
Approved Cost: ₹ 1.50 lakh
Funds released (CD&Pyt) :₹ 1.00 Lakh
Expenditure (CD&pyt) : ₹ 1.00 Lakh
No. of souls benefitted: 450
Comments of stakeholders: Facilitates irrigation facilities for vast land
Const. of Irrigation channel at Checki Hanjan (381)Const. of road with R/wall from Holy faith Public school to HO Shabir Ahmad Bhat at Laroo (395).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
582
Date of start: 10-12-2019
Date of completion: 05-03-2020
Approved Cost: ₹ 3.90 lakh
Funds released (CD&Pyt) :₹ 2.00 Lakh
Expenditure (CD&pyt) : ₹ 2.00 Lakh
No. of souls benefitted: 210
Comments of stakeholders: Facilitates flood protection for the land.
Date of start: 01-02-2020
Date of completion: 20-03-2020
Approved Cost: ₹ 2.99 lakh
Funds released (CD&Pyt ) : ₹ 2.50 lakh
Final Expenditure (CD&Pyt) : ₹ 2.50 lakh
No. of souls benefitted: 605
Comments of stakeholders: Improves the Irrigation facility.
Const. of Irrigation Channel NLO Reyaz Ahmad Dar & others at Dendlethen (410).Const. of P/bund Nallah Gagni Yethyaroo Berigam (401).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
583
Date of start: 11-10-2019
Date of completion: 18-11-2019
Approved Cost: ₹ 2.00 lakh
Funds released (CD&Pyt ) : ₹ 1.50 lakh
Final Expdt. (CD&Pyt) : ₹ 1.50 lakh
No. of souls benefitted: 605
Comments of stakeholders: Improves the Irrigation facility. Protects the soil from erosion
Date of start: 08-02-2020
Date of completion: 30-03-2020
Approved Cost: ₹ 6.50 Lakh
Funds released (CD&Pyt) :₹ 4.50 Lakh
Expenditure (CD&pyt) : ₹ 4.50 Lakh
No. of souls benefitted: 1570
Comments of stakeholders: The road facilitates the connectivity for the people of the area.
Const. of road from Pratap pora Gujjar Basti to Vobber raod Gundipora Chowgam (403).
Const. of P/bund near HO Gh Mohd to HO Mohd Yousuf & Wali Mohd Bhat & others Kund (379)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
584
Date of start: 10-10-2019
Date of completion: 31-10-2019.
Approved Cost: ₹ 1.20 Lakh
Funds released (CD&Pyt ) : ₹ 0.90 lakh
Final Expdt. (CD&Pyt) : ₹ 0.90 lakh
No. of souls benefitted: 450
Comments of stakeholders: Helps the inhabitants for crossing Nallah.
Date of start: 20-09-2019
Date of completion: 05-10-2019.
Approved Cost: ₹ 1.20 Lakh
Funds released (CD&Pyt ) : ₹ 0.90 lakh
Final Expdt. (CD&Pyt) : ₹ 0.90 lakh
No. of souls benefitted: 450
Comments of stakeholders: Helps the inhabitants for crossing Nallah.
C/o Foot bridge on Nallah Tengkhah at Jaibal Halqa Gandwani (377) C/o Crossin near kharnard at Jaibal Halqa Gandwani (378).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
585
Date of start: 10-11-2019
Date of completion: 15-12-2019.
Approved Cost: ₹ 2.99 Lakh
Funds released (CD&Pyt ) : ₹ 2.00 lakh
Final Expdt. (CD&Pyt) : ₹ 2.00 lakh
No. of souls benefitted: 450
Comments of stakeholders: Protects the land from soil erosion and floods
Date of start: 08-09-2019
Date of completion: 20-10-2019.
Approved Cost: ₹ 1.00 Lakh
Funds released (CD&Pyt ) : ₹ 0.70 lakh
Final Expdt. (CD&Pyt) : ₹ 0.70 lakh
No. of souls benefitted: 620
Comments of stakeholders:
C/o Washing Plates at Jamia Masjid Beagam (382). C/o FP Bund on GadMarg at Ashthal (392).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
586
Date of start: 10-11-2019
Date of completion: 05-12-2019.
Approved Cost: ₹ 2.00 Lakh
Funds released (CD&Pyt ) : ₹ 1.30 lakh
Final Expdt. (CD&Pyt) : ₹ 1.30 lakh
No. of souls benefitted: 310
Comments of stakeholders: Increases irrigation facilities in the area.
Date of start: 05-10-2019
Date of completion: 20-10-2019.
Approved Cost: ₹ 1.00 Lakh
Funds released (CD&Pyt ) : ₹ 0.70 lakh
Final Expdt. (CD&Pyt) : ₹ 0.70 lakh
No. of souls benefitted: 450
Comments of stakeholders: Increases irrigation facilities in the area.
C/o Irrigation channel near LO Gh Ahmad Bhat & others at Pariwan (383).
C/o Irrigation Channel R/wall near LO Gulzar Ahmad Parry & others at Checkpora (396).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
587
Date of start: 2018-2019
Date of completion: 30-06.2019
Approved Cost: ₹ 1.00 lakh
Funds released (CD&Pyt ) : ₹ 0.70 Lakh
Final Expenditure (CD&Pyt) : ₹ 0.70 Lakh
No. of souls benefitted: 710
Comments of stakeholders:
Date of start: 20-11-2019
Date of completion: 12-02-2020
Approved Cost: ₹ 2.00 lakh
Funds released (CD&Pyt ) : ₹ 1.25 lakh
Final Expdt. (CD&Pyt) : ₹ 1.25 lakh
No. of souls benefitted:
Comments of stakeholders:
Const. of Xing with filling R/wall near Temple NHO Badrinath at Kharwat (404)
Const. of fencing of Graveyard at Ganie Mohalla Kharvat Block Kulgam (384)
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
588
Date of start: 18-11-2019
Date of completion: 10-02-2020
Approved Cost: ₹ 3.00 lakh
Funds released (CD&Pyt ) : ₹ 2.50 lakh
Final Expdt. (CD&Pyt) : 2.50 lakh
No. of souls benefitted: 710
Comments of stakeholders: Protects from flood and soil erosion.
Date of start: 12-11-2019
Date of completion: 30-12-2019
Approved Cost: ₹ 2.00 lakh
Funds released (CD&Pyt ) : ₹ 1.25 lakh
Final Expdt. (CD&Pyt) : ₹ 1.25 lakh
No. of souls benefitted: 240
Comments of stakeholders: Improves the Irrigation facilities for vast land.
Const. of L/wall /Irrigation channel Gam Khull Kharvat (406).Const. of P/bund Nandkhul at Laroo (413).
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
`
USER
589
Date of Commencement: 09.11.2019
Date of Completion: March.2020
Estimated Cost: 3.00 Lacs
Completion Cost:-
No of people benefitted: 25 Families
Comments of the Stake Holder: Benefitted for community
Date of Commencement: 10.11.2019
Date of Completion: 20.12.2019
Estimated Cost: 1.00 Lacs (0.50 Lacs CD&Pyt+0.50 Lacs MGNREGA)
No of people benefitted: 25 Families
Comments of the Stake Holder: Benefitted for community.
Constt. Of B/Path by way of passing through H/o Mohd Ishaq Moh. Dhaki(232)Constt. Of protection work at Gara near the land of Baijnatg
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
590
Date of Commencement: 01.01.2020
Date of Completion: 20.03.2020
Estimated Cost: 0.50 Lacs
Completion Cost:-
No of people benefitted: 15 Families
Comments of the Stake Holder: Benefitted for community
Date of Commencement: 10/01/2020
Date of Completion: March/2020
Estimated Cost: 1.00 Lacs
Completion Cost:-
No of people benefitted: 15 Families
Comments of the Stake Holder: Benefited for community .
Constt. Of P/work at Graveyard in W.No. 05(230)Constt. Of B/wall Nr. Masjid Moh. Dedran nr. Old Gurudwara(231)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
591
Date of Commencement: 05-12-2019
Date of Completion: March/2020
Estimated Cost: 1.00 Lacs
Completion Cost:-
No of people benefitted: 15 Families
Comments of the Stake Holder: Benefited for community
Date of Commencement:- 09-1-2020
Date of Completion:- 31/03/2020
Estimated Cost : 0.70 Lakhs
Completion Cost:- 0.6950
No Of People Benefitted: 15
R/Wall nr. Khalid Mehmood Moh Shiekhan Samote(246) Constt. Of B/Path Nr. H/O Mohd Ashraf (242)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
592
Date of Commencement:- 25-1-2020
Date of Completion:- 30/03/2020
Estimated Cost : 2.00Lakhs
Completion Cost:- 2.00
No Of People Benefitted: 19
Date of Commencement:- 06-1-2019
Date of Completion:- 28/02/2020
Estimated Cost : 2.00 Lakhs
Completion Cost:- 0.96380
No Of People Benefitted: 30
Constt of Lane/Drain Nr. Garve Yard Ward No 04 (247)B/Path Pacca Danga Moh Soban Kasi ward No 03 Nr. Barket Hussain Kholi(243)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
593
Date of Commencement:- 06-1-2019
Date of Completion:- 02/03/2020
Estimated Cost : 1.00 Lakhs
Completion Cost:- 0.65585
No Of People Benefitted: 15
Date of Commencement:- 06-1-2019
Date of Completion:- 02/03/2020
Estimated Cost : 1.50 Lakhs
Completion Cost:- 1.00
No Of People Benefitted: 15
Constt of P/Work R/Wall Nr. Grave Yard Moh Khawaja(248)P/Work Nr. Land of Jamal Din(245)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
594
Date of Commencement:- 16-1-2019
Date of Completion:- 30/3/2020
Estimated Cost : 3.00Lakhs
Completion Cost:- 2.00
No Of People Benefitted: 15
Date of Start:- 17/12/2019
Date of Completion:- 31/03/2020
E. Cost :- 1.00 Lac
Expenditure :- 0.50 Lacs
No of Souls benefited:- 30
Observation Recommendations of Stake Holders:-
P/Work at GMS Shiendhara (250)B/Path Moh Saydian Panyali Nathu wala(244)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
595
Date of Start:- 25/11/2019
Date of Completion:- March 2020
E. Cost :- 4.00 Lacs
Expenditure :- 2.00 Lacs
No of Souls benefited:- 25
Observation Recommendations of Stake Holders:-
Date of Commencement: 05-01-2020
Completion: 15-03-2020
Estimate Cost: 3.00CD &Pyt: 1.00MGNREGA: 2.00
Complition Cost:-
Number of people benefited: 120
Scheme: CD Pyt. Convergence MGNREGA
Pacca /R/wall Moh. Chowana Ward No 8 Nr. Yaqeen.(252)Construction of Conference Hall / Meeting Hall adjoining Pyt Ghar Lassana Upper(249)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
596
Date of commencement: 25-1-2020
Competion:- 28-03-2020
Estimate Cost: 3.00lacCD& Pyt: 1.00MGNREGA: 2.00
Complition Cost:-
Scheme: CD & Pyt and Convergence MGNREGAYear: 2019-20
Date of commencement: 12-01-2020
Competion: 12-03-2020
Estimate Cost: 3.00lacCD& Pyt: 1.00MGNREGA: 2.00
Complition Cost:-
Scheme: CD & Pyt convergence MGNREGA Year: 2019-20
Tr. Road Main Road to Jhandhidhar(251)R/wall at Moh. Nakka W.No 1(254)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
597
Date of commencement: 03-01-2020
Competion: 07-03-2020
Estimate Cost: 2.00lacCD& Pyt. 1.00MGNREGA: 1.00
Completion Cost:-
Scheme: CD & Pyt Number of Soul Benefited: 270 Year: 2019-20
Date of Commencement:- 20-1-2020
Date of Completion:- 31-3-20
Estimated Cost:- 1.50
Completion Cost:- 0.50
No of people benefitted:- 189
Comments of the Stake Holder:- Further Need to Improvement.
Constt. Of P/Work / Fancing Nr Graveyard at Sib Dani (239)Kul Pangaali Nallah to Dhakari(253)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
598
Date of Commencement:- 5-1-2020
Date of Completion:- 20-3-2020
Estimated Cost:- 1.00
Completion Cost:- 0.50
No of people benefitted:- 130
Comments of the Stake Holder:- Further Need to Extention
Date of Commencement:- 27-1-2019
Date of Completion:- 18-03-2020
Estimated Cost:- 1.00
Completion Cost:- 0.50
No of people benefitted:- 221
Comments of the Stake Holder:- Good Intative taken by RDD
Constt. Of Park W No 07 Bella Sethi(241) Constt. Of B/Path Nr H/O Ashraf(238)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
599
Date of Commencement:- 02-1-2020
Date of Completion:- 28-2-2020
Estimated Cost:- 1.50
Completion Cost:- 0.50
No of people benefitted:- 256
Comments of the Stake Holder:- its Very Necessary to Protect the Jamia Masjid.
Date of Commencement:- 23-1-2020
Date of Completion:- 30-03-2020
Estimated Cost:- 3.00
Completion Cost:- 0.85
No of people benefitted:- 40
Comments of the Stake Holder:- its Very Necessary to Protect the Jamia Masjid
Constt. Of R/Wall Nr. Masjid Thakran & H/O Imtiaz Ahmed (236)Constt. Of P/Work Nr Jamia Masjid Tantraygam(240)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
600
Date of Commencement:- 2-1-2020
Date of Completion:- 31-03-2020
Estimated Cost:- 3.00
Completion Cost:- 0.85
No of people benefitted:- 40
Comments of the Stake Holder:- its Very Necessary to Protect the Jamia Masjid & H/O Imtiaz Ahmed
Date of Commencement:- 8-1-2020
Date of Completion:- 25-3-2020
Estimated Cost:- 3.00
Completion Cost:- 0.75
No of people benefitted:- 296
Comments of the Stake
Constt. Of Boundary Wall Nr Graveyard (Balance Work)(237)Constt. Of Lane from link road to Nag Devta Sathan at Chaknathal w.no.1
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
601
Date of Commencement:- 25-01-2020
Date of Completion:- 18-03-2020
Estimated Cost:- 12.00
Completion Cost:- 2.15
No of people benefitted:- 800
Comments of the Stake
Date of Commencement:- 02-01-2020
Date of Completion:- 20-03-2020
Estimated Cost:- 2.00
Completion Cost:- 0.73
No of people benefitted:- 20
Comments of the Stake Holder:
Constt. Of R/Wall Mohd Bashir Ward No. 4 & others (233)Constt. Of tr road from bara thakran to via Moh Kheit Via Liayaqat Ahmed(319)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
602
Date of Commencement:- 11-1-2020
Date of Completion:- 20-03-2020
Estimated Cost:- 4.00
Completion Cost:- 2.00
No of people benefitted:- 80
Comments of the Stake Holder
Date of commencement: 12-01-2020
Competion: 21-03-2020
Estimate Cost: 2.00lacCD & PYT: 1.00MGNREGA: 1.00
Completion Cost:-
Scheme: CD & Pyt convergence MGNREGA Year: 2019-20
Tr. Road Para Wali GaliBlock: Mankote (255)Constt. Road B/Path Link road to Gali No. 6 (234)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
603
Date of Commencement: 15/02/2020
Date of Completion:- 21.03.2020
Estimated Cost: Rs. 4.90 lacs
Completion Cost: Rs. 3.47 lacs (Expdt under CD&Pyt)
No. of people benefitted: 15 households Comments of stakeholders Much needed/ Quality work
Date of Commencement: 13/08/2019
Date of Completion:- 02.03.2020
Estimated Cost.: Rs. 1.40 lacs
Completion Cost Rs.1.00 lac (Expdt under CD&Pyt)
No. of people benefitted: 158 Students
Comments of stakeholders Much needed/ Quality work
Date of Commencement: 11/08/2019
Date of Completion:- 02.03.2020
Estimated Cost.: Rs.1.40 lacs
Completion Cost Rs.1.00 lac (Expdt under CD&Pyt)
No. of people benefitted: 75 Househoulds
Comments of stakeholders Much needed/ Quality work
T/Road from Main Road to Mohalla kaliyan, Mehra. Name: Constt. Of T/Road mohalla Dedhran.Protection work/ Bund at rice Field block
Kotranka
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
604
Date of Commencement: 10/09/2019
Date of Completion:- 12.03.2020
Estimated Cost.: 2.10 lacs
Completion Cost 1.50 lacs
(Expdt under CD&Pyt)
No. of people benefitted: 95 Househoulds
Comments of stakeholders Much needed/urgent nature work
Date of Commencement: 15/02/2020
Date of Completion:- 18.02.2020
Estimated Cost: 2.80 lacs
Completion Cost: 2.00 lacs
(Expdt under CD&Pyt)
No. of peoples benefitted: 158 Students Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement: 16/01/2020
Date of Completion:- 11.02.2020
Estimated Cost: 6.67 lacs
Completion Cost: 4.00 lacs
(Expdt under CD&Pyt)
No. of peoples benefitted: 341 HH
Comments of stakeholdersMuch needed/Quality work urgent nature work
Constt of P/work ward no 07 nr school Constt of T/Road Marwadi School to Sasni
Name: Constt of Foot Path From Main Road to Lah Bowali
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
605
Date of Commencement: 02/01/2020
Date of Completion:- 16.02.2020
Estimated Cost: 6.57 lacs
Completion Cost: 4.00 lacs
(Expdt under CD&Pyt)
No. of peoples benefitted: 158 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement: 18/01/2020
Date of Completion: 13.02.2020
Estimated Cost: 6.67 lacs
Completion Cost: 3.18 lacs (Expdt under CD&Pyt)
No. of peoples benefitted:75 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement: 02/01/2020
Date of Completion:- 11.02.2020
Estimated Cost: 4.20 lacs
Completion Cost: 3.00 lacs
(Expdt under CD&Pyt)
No. of peoples benefitted: 96 HHComments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Repair of Cremation Ghat/Allied work at Siot Const. of T/road Chambal Gala Talli Mohalla Repair of T/Road Jaba to Panori
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
606
Date of Commencement: 02/01/2020
Date of Completion:- 11.02.2020
Estimated Cost: 5.60 lacs
Completion Cost: 4.00 lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 24 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement: 04/01/2020
Date of Completion:- 13.02.2020
Estimated Cost: 1.40lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 70 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Tractor Road Balima to Middle School Kotli Bagla T/road Kala kote to Molvi Mohalla Parran
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
607
Date of Commencement: 04/01/2020
Date of Completion:- 13.02.2020
Estimated Cost: 6.67 lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 85 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement: 03/01/2020
Date of Completion:- 11.02.2020
Estimated Cost: 20.00 lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 250 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
CONSTT. OF T/ROAD FROM M/ROAD TO Pyt. Halqa Kalsian Balance work of Culvert and approach Road at Bandrai near Shamshanghat
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
608
Date of Commencement: 29/01/2018
Date of Completion:- 10.02.2019
Estimated Cost: 1.00 lacs
Completion Cost: 0.75 lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 25 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement: 24/01/2018
Date of Completion:- 02.02.2019
Estimated Cost: 4.69 lacs
Completion Cost: 3.69 lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 45 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
PROTECTION WALL OF GRAVE YARD AT KHO MOHALLA P/WORK,R/WALL NHO SAJAD HUSSAIN MOHARA
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
609
Date of Commencement: 24/10/2019
Date of Completion:- 11.02.2020
Estimated Cost: 1.40lacs
Completion Cost: 1.00 lacs (Expdt under CD&Pyt)
No. of peoples benefitted: 15 HH
Comments of stakeholdersMuch needed/Quality work: Urgent Nature work.
Date of Commencement :- 02-02-2020
Date of Completion :- 20-03-2020
E.Cost 1.40Lacs
Completion Cost :- 1.00 Lacs (Expdt under CD&Pyt)
No. of People benefited :- 170
Comments of stakeholders Much needed /Quality work
Link road Eid Gah to Khatanna Mohalla Gurrian (Rajouri)PROTECTION WALL NHO Mohd Aslam Gali Upper Shahdra
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
610
Date of Commencement :- 08-01-2020
Date of Completion :- 10-03-2020
E.Cost :- 1.40 Lacs
Completion Cost :- 1.00 Lacs (Expdt under CD&Pyt)
No. of People benefited :- 115
Comments of stakeholders Much needed /Quality work
Date of Commencement :- 02-02-2020
Date of Completion :- 20-03-2020
E.Cost :- 5.60 Lacs
Completion Cost :- 4.00 Lacs (Expdt under CD&Pyt)
No. of People benefited :- 170
Comments of stakeholders Much needed /Quality work
P/WALL T/ROAD W.NO 02 MOH ZABIR CH. NARLINK ROAD FORM MAIN ROAD TO HAJI GHULAM KHATANA GURRIAN
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
611
Date of Commencement :- 02-02-2020
Date of Completion :- 20-03-2020
E.Cost :- 8.00 Lacs
Completion Cost :- 5.00 Lacs (Expdt under CD&Pyt)
No. of People benefited :- 170
Comments of stakeholders Much needed /Quality work
Date of Commencement :- 21.11.2019
Date of Completion :- 19.03.2020
E.Cost :- 2.80 Lacs
Completion Cost :- 2.00 Lacs (Expdt under CD&Pyt)
No. of People benefited :- 60 HH
Comments of stakeholders Much needed /Quality work
Constt. Of P/Wall at Kothra NLO Arif Lone Panchayat Kothra Constt of r/wall/p/wall near grave yard at Nakka alongwith the land of haji Ghulam Hussaan
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
612
Date of Commencement :- 21.11.2019
Date of Completion :- 09.02-2020
E.Cost :- 2.10 Lacs (Expdt under CD&Pyt
No. of People benefited :- 70 HH
Comments of stakeholders
Date of Commencement :- 21.11.2019
Date of Completion :- 19-03-2020
E.Cost 4.90 Lacs
Completion Cost :- 3.50 Lacs (Expdt under CD&Pyt
No. of People benefited :- 45 HH
Comments of stakeholders Much needed /Quality work
Constt. Of C/Wall G/Yard Nr Forest Land Chowkian-C Name: Const. of Tractor Road from main road to Manda
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
613
Date of Commencement :- 21.11.2019
Date of Completion :- 19-02-2020
E.Cost 6.00 Lacs
Completion Cost :- 4.50 Lacs (Expdt under CD&Pyt
No. of People benefited :- 50 HH
Comments of stakeholders Much needed /Quality work
Date of Commencement :- 21.11.2019
Date of Completion :- 22.03.2020
E.Cost :- 5.00 Lacs
Completion Cost :- 4.00 Lacs (Expdt under CD&Pyt
No. of People benefited :- 30 HH
Comments of stakeholders Much needed /Quality work
Constt. Of B/Path P/Work Photanwali NLO Sadiq Panchayat Constt. Of Langer Khana With Toilet Faclity Nr Darga Harote Shrif
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
614
Date of Commencement :- 21.11.2019
Date of Completion :- 17-02-2020
E.Cost 3.30 Lacs
Completion Cost :- 2.00 Lacs (Expdt under CD&Pyt
No. of People benefited :- 30 HH
Comments of stakeholders Much needed /Quality work
Date of Commencement :- 21.11.2019
Date of Completion :- 19-02-2020
E.Cost :- 4.90 Lacs
Completion Cost :- 3.50 Lacs (Expdt under CD&Pyt
No. of People benefited :- 85 Students/200 HH
Comments of stakeholders Much needed /Quality work
Constt. Of Culvert at Bethiyla Kadriyala Nr GMS Topa Constt. Of B/Path NHO Mushtaq & Ots Panchyat Kothra
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
615
Date of Commencement :- 21.11.2019
Date of Completion :- 11-02-2020
E.Cost :- 1.40 Lacs
Completion Cost :- 1.00 Lacs (Expdt under CD&Pyt
No. of People benefited :- 30 HH
Comments of stakeholders Much needed /Quality work
Date of Commencement :- 21.11.2019
Date of Completion :- 08-02-2020
E.Cost :- 4.20Lacs
Completion Cost 3.00 Lacs (Expdt under CD&Pyt
No. of People benefited :- 30 HH
Comments of stakeholders Much needed /Quality work
Constt. Of P/work NHO fazal HussainConstt. Of P/work NHO Mohd rafiq Chadroong Thannamsndi
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
616
Date of Commencement :- 21.11.2019
Date of Completion :- 02-01-2020
E.Cost :- 4.90 Lacs
Completion Cost :- 3.90 Lacs (Expdt under CD&Pyt
No. of People benefited :- 42 HH
Comments of stakeholders
Much needed /Quality work
Date of Commencement :- 21.11.2019
Date of Completion :- 16.01-2020
E.Cost :- 4.20 Lacs
Completion Cost :- 3.00 Lacs (Expdt under CD&Pyt
No. of People benefited :- 75 HH
Comments of stakeholders Much needed /Quality work
Constt. Of T/Road Bhatyari main road to Mughal MohallaConstt. Of P/Work NHO Mohd Sadiq Chowkian-C
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
617
Date of Commencement :- 21.11.2019
Date of Completion :- 13.02-2020
E.Cost :- 5.00 Lacs
Completion Cost :- 3.50 Lacs (Expdt under CD&Pyt
No. of People benefited :- 35 HH
Comments of stakeholders
Date of Commencement :- 21.11.2019
Date of Completion :- 02.01-2020
E.Cost :- 1.40 Lacs
(Expdt under CD&Pyt
No. of People benefited :- 15 HH
Comments of stakeholders
Constt. Of P/Work at Moh. Mattan Nr Faqar Hussain Part I Panchayat Nadian-A Constt. Of R/Work Near House of Abdul Hameed Nagrota
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
618
Date of Commencement :- 21.11.2019
Date of Completion :- 16.02-2020
E.Cost :- 10.00 Lacs
Completion Cost :- 7.00 Lacs (Expdt under CD&Pyt
No. of People benefited :- 70 HH
Comments of stakeholders
Date of Commencement :- 21.11.2019
Date of Completion :- 19.03.2020
E.Cost :- 0.90 Lacs
Completion Cost :- 0.82 Lacs (Expt. Under CD&Pyt.)
No. of People benefited :- 150 HH
Comments of stakeholders Much needed /Quality work Urgent Nature work
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
Constt. Of P/work and Land levelling NHO Mohd Amin Balance work of Protection wall of grave yard at Khoo Mohalla
619
Date of Commencement :- 12.01.2020
Date of Completion :- 14.03.2020
E.Cost :- 5.60 Lacs
Completion Cost :- 4.00 Lacs (Expt. Under CD&Pyt.)
No. of People benefited :- 56 HH
Comments of stakeholders Much needed /Quality work Community Benefit work
Constt. Of T/Road Agrati Haji Aslam Mohalla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
620
Date of Commencement : - 06-12-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs. 4.50 Lacs
Completion Cost : Rs.3.00 Lacs (Expdt. under CD& Pyt )
No. of people benefited : - 250
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 10-11-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs 3.50 Lacs
Completion Cost : Rs. 2.30 Lacs (Expdt. under CD& Pyt )
No. of people benefited : - 200
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
CONSTT OF L/DRAIN FROM House of MOHD RAFIQ NAYAK TO RAILWAY STATION Banihal
P/path near the land of Gulzar house to an Rashid Bali and others Ukhral
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
621
Date of Commencement : - 01-12-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs 1.00 Lacs
Completion Cost : - Rs. 0.65 Lacs (Expdt. under CD& Pyt )
No. of people benefited : - 100
Comments of Stake holders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 11-11-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs 1.00 Lacs
Completion Cost : - Rs. 0.65 Lacs(Expdt. under CD& Pyt )
No. of people benefited : - 120
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
P/Bund Near Land of Najam Din Gamsool Alinbass-A Constt. Of L/drain Masjid Mohalla Imnari Pogall Upper
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
622
Date of Commencement : - 10-12-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs. 1.00 Lacs
Completion Cost : - Rs. 0.70 Lacs (Expdt. under CD&Pyt)
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 12/10/2019
Date of Completion : - 20/03/2020
Estt. Cost : - Rs. 4.50 Lacs
Completion Cost : - Rs 3.15 Lacs (Expdt. under CD&Pyt)
No. of people benefited : - 200
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt of P/ Work NHO Ab Latief W No 5 Maligam-B Repair/Renovation of BHQ Ramsoo
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
623
Date of Commencement : - 12/10/2019
Date of Completion : - 28/03/2020
Estt. Cost : - Rs. 2.50 Lacs
Completion Cost : - Rs.1.75Lacs (Expdt under CD&Pyt)
No. of people benefited : - 312
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 16-01-2020
Date of Completion : - 31-03.2020
Estt. Cost : - Rs. 1.00 lacs
Completion Cost : - Rs. 0.70 lacs (Expdt under CD&Pyt)
No. of people benefited : - 120
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Const. Of Pacca Path from PWD Road to HSS Neel P/WORK AT MANHAS MOHALLAH / Hirnihall Khari Lower-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
624
Date of Commencement : - 05-11-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs. 1.00 lacs
Completion Cost : - Rs. 0.70 lacs (Expdt under CD&Pyt)
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 01-11-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs. 1.00 lacs
Completion Cost : - Rs. 0.70 lacs (Expdt under CD&Pyt)
No. of people benefited : - 124
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
P/WORK AT GUDORA Trigam Upper P/WORK AT KAWNA TRIGAM LOWER-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
625
Date of Commencement : - 06-10-20219
Date of Completion : - 01-02-2020
Estt. Cost : - Rs. 1.00 lacs
Completion Cost : - Rs. 0.440 lacs(Expdt under CD&Pyt)
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 01/02/2020
Date of Completion : - 20/03/2020
Estt. Cost : - Rs. 1.00 lacs
Completion Cost : - Rs. 0.50 lacs (Expdt under CD&Pyt)
No. of people benefited : - 250
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
P/BUND MANDAKBASS KHARI Upper-A Constt of P/Bund Mohu Ball Mangith
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
626
Date of Commencement : - 01.02.2020
Date of Completion : - 14.03.2020
Estt. Cost : - Rs. 1.80 lacs
Completion Cost : - Rs.1.20 lacs (Expdt under CD&Pyt)
No. of people benefited : - 135
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 28.01.2020
Date of Completion : - 14.03.2020
Estt. Cost : - Rs.1.50 lacs
Completion Cost : - Rs.1.050 lacs (Expdt under CD&Pyt )
No. of people benefited : - 145
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt of C/path Parthwali to Thaku Mohalla Kalimasta Pacca Path Yuba Mohalla to Famda Mohalla Kalimasta
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
627
Date of Commencement : - 03.02.2020
Date of Completion : - 14.03.2020
Estt. Cost : - Rs.1.80 lacs
Completion Cost : - Rs.1.20 lacs (Expdt under CD&Pyt)
No. of people benefited : - 150
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 28.01.2020
Date of Completion : - 14.03.2020
Estt. Cost : - Rs.1.80 lacs
Completion Cost : - Rs. 1.20 lacs (Expdtt under CD&Pyt )
No. of people benefited : - 135
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt of Pacca Path Main road to Tragwal Mohalla Gool-A Constt of C/Path Killersoo to Wani Mohalla Ind
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
628
Date of Commencement : - 12/10/2019
Date of Completion : - 28/03/2020Estt.
Cost : - Rs. 1.00 lacs
Completion Cost : - Rs. 0.40 lacs (Expdt under CD&Pyt)
No. of people benefited : - 312
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 12-11-2019
Date of Completion : - 28-03-2020
Estt. Cost : Rs. 1.00 lacs
Completion Cost : - Rs. 0.400 lacs (Expdt under CD&Pyt)
No. of people benefited : - 316
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt of Drain at Panchayat Ghar Dharam_A Constt of Drain at Panchayat Ghar Dharam-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
629
Date of Commencement : - 12/10/2019
Date of Completion : - 20/03/2020
Estt. Cost : - Rs.1.00 lacs
Completion Cost : - Rs. 0.400 lacs (Expdt under CD&Pyt)
No. of people benefited : - 200
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 12/10/2019
Date of Completion : - 28/03/2020
Estt. Cost : - Rs.1.00 lacs
Completion Cost : - Rs. 0.400 lacs (Expdt under CD&Pyt)
No. of people benefited : - 150
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt of P/Path Pry.School to Graveyard Gundi Gugarsulla Constt of Drain at Panchayat Ghar Bhimdassa
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
630
Date of Commencement : - 10.02.2020
Date of Completion : - 15.03.2020
Estt. Cost : - Rs. 2.00 lacs
Completion Cost : - Rs. 1.40 lacs (Expdt under CD&Pyt)
No. of people benefited : - 255
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 05/12/2019
Date of Completion : - 25/03/2020
Estt. Cost : - Rs.1.80 lacs
Completion Cost : - Rs.1.20 lacs (Expdt under CD&Pyt)
No. of people benefited : - 300
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt of Drain at Panchayat Ghar Dharam_A Constt of Drain at Panchayat Ghar Dharam-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Constt of P/Path Main Road to Tower, Sangaldan-B Constt of C/Path Sarunda Chakki to Margay Mohalla Thatharka-A
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
631
Date of Commencement : - 12/10/2019
Date of Completion : - 20/03/2020
Estt. Cost : - Rs. 1.00 lacs
Completion Cost : - Rs.0.76 lacs (Expdtt under CD&Pyt)
No. of people benefited : - 200
Comments of Stakeholders : -SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 01-11-2019
Date of Completion : - 20/03/2020
Estt. Cost : - Rs.1.20 lacs
Completion Cost : - Rs. 0.47 lacs (Expdt under CD&Pyt)
No. of people benefited : - 150
Comments of Stakeholders : - Satisfactory Much needed / Quality Work Good
Constt of Drain at Panchayat Ghar Dharam_A Constt of Drain at Panchayat Ghar Dharam-B
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Constt of C/Path Dumki Masjid Drour, Sumber Lower Dev. Of Spring at W.No. 01 Bagna
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
632
Date of Commencement : - 12-10-2019
Date of Completion : - 15-03-2020
Estt. Cost : -Rs.1.80 lacs
Completion Cost : - Rs.1.00 lacs (Expdtt under CD&Pyt)
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 07-12-2019
Date of Completion : - 1 7-03-2020
Estt. Cost : - Rs.1.70 lacs
Completion Cost : - Rs.1.19 lacs (Expdtt under CD&Pyt)
No. of people benefited : - 140
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt. Of P/Work at Graveyard Naibasti balihote-B Constt. Of P/Work at Graveyard ST Mohalla Chandrog W.No. 7 Maitra-A.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
633
Date of Commencement : - 12-11-2019
Date of Completion : - 14-03-2020
Estt. Cost : - Rs.2.00 lacs
Completion Cost : - Rs.1.31 lacs (Expdt under CD&Pyt)
No. of people benefited : - 145
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 14-11-2019
Date of Completion : - 25-03-2020
Estt. Cost : - Rs. 1.20 lacs
Completion Cost : Rs. 0.65 lacs (Expdtt under CD&Pyt)
No. of people benefited : - 210
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Fencing graveyard near Qasim Mohar W.No. 02 Maitra-A. Dev. Of Spring at Mayan Raju Mohalla W.No. 04 Seri-A.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
634
Date of Commencement : 12-11-2019
Date of Completion : - 22-03-2020
Estt. Cost : - Rs.1.50 lacs
Completion Cost : - Rs.1.00 lac (Expdt under CD&Pyt)
No. of people benefited : - 140
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 01-12-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs.3.50 lacs
Completion Cost : - Rs.2.50 lacs (Expdt under CD&Pyt)
No. of people benefited : - 20
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt. Of P/Work at Batsool Seri-B. P/Work at at Ludhwal SC Mohalla Panchayat Ludhwal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
635
Date of Commencement : - 01-12-2019
Date of Completion : - 31-03-2020
Estt. Cost : - Rs.1.40 lacs
Completion Cost : - Rs.1.00 lacs (Expdt under CD&Pyt)
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Date of Commencement : - 01.12.2019
Date of Completion : - 30.03.2020
Estt. Cost : - Rs.2.750 lacs
Completion Cost : - Rs.0.88 lacs (Expdt under CD&Pyt)
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt. Of Launching of culver at Magunallah NHO Charan Dass Panchayat :- B.Batote Constt of Protection Work Batli Near Masjid Shareef Gandhri
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
636
Date of Commencement : - 01-10-2019
Date of Completion : - 15-03-2020
Estt. Cost : - Rs.1.40 lacs
Completion Cost : - Rs.1.00 lac (Expdt under CD&Pyt)
No. of people benefited : - 120
Comments of Stakeholders : - Satisfactory Much needed / Quality Work Good
Date of Commencement : - 01-10-2019
Date of Completion : - 31/03/2020
Estt. Cost : - Rs. 1.85 lacs
Completion Cost : - Rs.1.25 lacs (Expdt under CD&Pyt)
No. of people benefited : - 250
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Constt. of P/work at Mildan W.No 06 Rajgarh P/WORK AT W.No 07 NEAR MANDIR Panchayat Draman
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
637
Date of Commencement : - 01-12-2019
Date of Completion : - 31-03-2020
Estt. Cost : - 1.40
Completion Cost : - 0.26
No. of people benefited : - 100
Comments of Stakeholders : - SatisfactoryMuch needed / Quality Work Good
Development of spring NLO Kali Dass w. no 6
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
638
Date of Commencement 28/11/2019
Date of Completion March 2020
Estt. Cost 6.00 Lacs
Completion cost Rs.3.00 Lacs (Expdt. under CD& Pyt )
No. of People benefitted 55
Comments of Stakeholder Much needed work
Date of Commencement 5/8/2018
Date of Completion March 2020
Estt. Cost 3.00 Lacs under CD Pyt
Completion cost Rs.1.50 Lacs (Expdt. under CD& Pyt )
No. of People benefitted 85
Comments of Stakeholder Helped residents in crossing during floods
Const of Link road main road Sermegha to Taka Moh via Som Raj House Const of Foot Bridge at Samad Nallah Pyt Thakrakote
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
639
Date of Commencement 11/01/2019
Date of Completion March 2020
Estt. Cost 1.00 Lacs under CD Pyt
Completion cost Rs.0.50 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 123
Comments of Stakeholder Helped residents in crossing during floods
Date of Commencement 2019-20
Date of Completion 2019-20
Estt. Cost 5.00 Lacs
Completion cost Rs.2.65 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 68
Comments of Stakeholder Water harvesting
Const of Foot Bridge at Mankote Block Chassana Renovation of Pacca Path from Kahna road to Block HQ near CIC Building Pouni
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
640
Date of Commencement 13/02/2020
Date of Completion 17/03/2020
Estt. Cost 2.50 Lacs
Completion cost Rs.1.70 Lacs (Expdt. under CD& Pyt )
No. of People benefitted 40
Comments of Stakeholder Water harvesting
Date of Commencement 13/02/2020
Date of Completion 17/03/2020
Estt. Cost 2.50 Lacs
Completion cost Rs.1.75 Lacs (Expdt. under CD& Pyt )
No. of People benefitted 25
Comments of Stakeholder Water harvesting
Const of Pond at Lancha Const of Pond at Hajam Nagar
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
641
Date of Commencement 11/01/2020
Date of Completion March 2020
Estt. Cost 4.00 Lacs
Completion cost Rs.3.00 Lacs (Expdt. under CD& Pyt )
No. of People benefitted 35
Comments of Stakeholder Protected land sliding
Date of Commencement 11/01/2020
Date of Completion March 2020
Estt. Cost 8.00 Lacs
Completion cost Rs.5.60 Lacs (Expdt. under CD& Pyt )
No. of People benefitted 45
Comments of Stakeholder Much needed work
Const of R/wall at Jamlan near water tank Const of Lane Drain Dar Moh. W. No 4
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
642
Date of Commencement 11/01/2020
Date of Completion March 2020
Estt. Cost 12.00 Lacs
Completion cost Rs.2.75 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 750
Comments of Stakeholder Satisfactory
Date of Commencement Nov. 2019
Date of Completion March 2020
Estt. Cost 5.00 Lacs
Completion cost Rs.3.50 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 152
Comments of Stakeholder Satisfactory
Const of T/Road at Tajhar to Sugga Const of B/path from Dounga to Laadh
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
643
Date of Commencement 11/01/2020
Date of Completion March 2020
Estt. Cost 1.20 Lacs
Completion cost Rs.0.42 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 10
Comments of Stakeholder Satisfactory
Date of Commencement 11/01/2020
Date of Completion March 2020
Estt. Cost 4.00 Lacs
Completion cost Rs.3.00 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 10
Comments of Stakeholder Satisfactory
Const of Tanki Bathroom NHO Barket Ali Const of Drain at Changri
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
644
Date of Commencement 13/02/2020
Date of Completion 17/03/2020
Estt. Cost 2.50 Lacs
Completion cost Rs.1.75 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 20
Comments of Stakeholder Water harvesting
Date of Commencement 2019-20
Date of Completion March 2020
Estt. Cost 8.00 Lacs
Completion cost Rs.3.60 Lacs (Expdt. under CD& Pyt )
No. of Souls benefitted 35
Comments of Stakeholder Water harvesting
Const of water harvesting tank at Budhan B Const of Pond at W. No 4
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
645
Date of Commencement 11/01/2020
Date of Completion March 2020
Estt. Cost 8.00 Lacs
Completion cost 8.00 Lacs
No. of people benefitted 230
Comments of Stakeholder Much needed work
Const of T/road from PMGSY Road to Sarni (7 Km)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
646
Date of commencement 03/03/2020
Date of completion 20/03/2020
Estt. Cost Rs.1.35 lacs
Completion Cost Rs.0.85 lacs (Expenditure under CD&Pyt)
No. of people benefitted 200
Comments of stakeholders Improved connectivity
Date of commencement 2019-20
Date of completion 12/03/2020
Estt. Cost Rs. 5.86 lacs
Completion Cost Rs.2.80lacs (Expenditure under CD&Pyt)
No. of people benefitted 350
Comments of stakeholders Much needed work.
Constt. Of L/D in vill. Meen Sarkar (Tabela) Constt of Flooring at ShamShan Ghat (Birpur Lower)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
647
Date of commencement 15/12/2019
Date of completion Phy Comp
Estt. Cost 3.00 lacs
Completion Cost 1.05 lacs (Expenditure under CD&Pyt)No. of people benefitted 50
Comments of stakeholders Improved Rural Connectivity
Date of commencement 03.03.2020
Date of completion 27.03.2020
Estt. Cost 2.80 lacs
Completion Cost 2.55 lacs (Expenditure under CD&Pyt)
No. of people benefitted 30
Comments of stakeholders Proper drainage of water and protection to agriculture land
Constt. Of L/D from link road to h/o Mohd Sharif Part-B Protection of Agriculture Land of Late Sh. Punjab Singh to Avtar Singh at Gho Rakhwala
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
648
Date of commencement 09/12/2019
Date of completion Mar-2020
Estt. Cost Rs.0.70 lacs
Completion Cost Rs. 0.50 lacs (Expenditure under CD&Pyt)
No. of people benefitted 25
Comments of stakeholders Protection work
Date of commencement 09/12/2019
Date of completion 20/03/2020
Estt. Cost Rs.0.75 lacs
Completion Cost Rs.0.50 lacs
No. of people benefitted 30
Comments of stakeholders Facility for drinking water
Constt. Of P/Work NHO Rammo Devi at Pacholi Constt. OF Water Tanki at Megh Nallah Moh. W.No.5
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
649
Date of commencement 09.12.2019
Date of completion 12.01.2020
Estt. Cost Rs. 0.70 lacs
Completion Cost Rs. 0.50 lacs (Expenditure under CD&Pyt)
No. of people benefitted 50
Comments of stakeholders Improve connectivity
Date of commencement 03/03/2020
Date of completion 20/03/2020
Estt. Cost 5.00 lacs (Expenditure under CD&Pyt)
No. of people benefitted 200
Comments of stakeholders Improved Connectivity
Constt. Lane from link road to H/O Ajay kumar at Nagrota Construction of T/road from Khanwal to Shamshan Ghat part-C
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
650
Date of commencement 18/12/2019
Date of completion Mar-20
Estt. Cost Rs.2.90 lacs
Completion Cost Rs.2.00 lacs (Expenditure under CD&Pyt)
No. of people benefitted 100
Comments of stakeholders Improved Connectivity
Date of commencement 18/12/2019
Date of completion Mar-20
Estt. Cost Rs.2.60 lacs
Completion Cost Rs.1.82 lacs (Expenditure under CD&Pyt)
No. of people benefitted 100
Comments of stakeholders Improved Connectivity
Constt. Of L/D from the H/O Dildar singh to the H/O Mukhtyar Singh at Bandral
Constt. Of L/D from main road to the H/O Capt. Ajit singh at W.No.7
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
651
Date of commencement 15/11/2019
Date of completion 07/03/2020
Estt. Cost 9.00 lacs
Completion Cost 3.15 lacs (Expenditure under CD&Pyt)
No. of people benefitted 100
Comments of stakeholders Improved Connectivity
Date of commencement 19/02/2020
Date of completion 04/03/2020
Estt. Cost Rs.2.91 lacs
Completion Cost Rs.1.20 lacs (Expenditure under CD&Pyt)
No. of people benefitted : 60
Comments of stakeholders Improved Connectivity
Constt. Of road from link road to BHQ Nud Constt. Of B/Path Bada Khad to Talai Village Bagar
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
652
Date of commencement 19/02/2020
Date of completion 04/03/2020
Estt. Cost Rs.2.04 lacs
Completion Cost Rs.1.30 lacs (Expenditure under CD&Pyt)
No. of people benefitted : 50
Comments of stakeholders Improved Connectivity
Date of commencement 31/12/2019
Date of completion 26/03/2020
Estt. Cost Rs.1.50 lacs
Completion Cost Rs.0.49 lacs (Expenditure under CD&Pyt)
No. of people benefitted 50
Comments of stakeholders Improved Connectivity
Constt. Of B/Path Bada Khad to Teda Village Bagar Constt of L/Drain Moh Jogian at village Barla
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
653
Date of commencement 19/02/2020
Date of completion 04/03/2020
Estt. Cost Rs.1.50 lacs
Completion Cost Rs.0.90 lacs (Expenditure under CD&Pyt)
No. of people benefitted 50
Comments of stakeholders Improved Connectivity
Date of commencement 11/12/2019
Date of completion 22/03/2020
Estt. Cost Rs.1.50 lacs
Completion Cost Rs.0.90 lacs (Expenditure under CD&Pyt)
No. of people benefitted 90
Comments of stakeholders Improved Connectivity
Constt of C/Path Moh ST at Chann Kana Constt of L/D from H/o Karan Singh to Jagdish at Chann Matloni W.no 8
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
654
Date of commencement 05/12/2019
Date of completion 20/03/2020
Estt. Cost Rs.1.50 lacs
Completion Cost Rs.0.90 lacs (Expenditure under CD&Pyt)
No. of people benefitted 50
Comments of stakeholders Improved Connectivity
Date of commencement 18/02/2020
Date of completion In progress
Estt. Cost Rs.3.50 lacs
Completion Cost Rs.1.29 lacs (Expenditure under CD&Pyt)
No. of people benefitted : 60
Comments of stakeholders Improved Connectivity
Constt of L/D from Culvert to H/o Jagdish Raj at Nonath Constt. of Pacca path/ Dunga at Devi sthan near shamshan ghat.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
655
Date of commencement 20/01/2020
Date of completion 30/03/2020
Estt. Cost Rs.1.50 lacs
Completion Cost Rs. 0.45 lacs (Expenditure under CD&Pyt)
No. of people benefitted 50
Comments of stakeholders Improved Connectivity
Date of commencement 25/12/2019
Date of completion 20/03/2020
Estt. Cost Rs.1.30 lacs
Completion Cost Rs. 0.91 lacs (Expenditure under CD&Pyt)
No. of people benefitted 300
Comments of stakeholders Improving sanitation facility
Constt of Culvert near Land of Roop Lal pyt Naran Constt of wall & repair of bathroom W.No 2 Ghagwal
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
656
Date of Commencement 2019-20
Date of completion March 2020
Estd Cost 9.50 lacs
Completion Cost 9.50 lacs
No. of Peoples benefitted 150
Comments of Stakeholders Much needed / Quality Work
Good Work
Date of Commencement 2019-20
Date of completion March 2020
Estd Cost 1.75 lacs
Completion Cost 1.75 lacs
No. of Peoples benefitted 80
Comments of Stakeholders Much needed / Quality Work
Good Work
Const. of approach road from PWD road to CFC building at BHQ Chenani(200)
Const. of T. Road from PMGSY road to CFC Tandar Block Chenani*(201)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
657
Date of Commencement 2019-20
Date of completion March 2020
Estd Cost 1.75 lacs
Completion Cost 1.75 lacs
No. of Peoples benefitted 70
Comments of Stakeholders Much needed / Quality Work
Good Work
Date of Commencement 24-12-2019
Date of completion March 2020
Estd Cost 1.90 lac
Completion Cost 1.90 lac
No. of Peoples benefitted 275
Comments of Stakeholders Much needed / Quality Work
Const. of Khul Morha Mittal W.No.6 Pyt. Bupp(202) Const of Kuchha Pucca Path by way of stone soling Bodi to SC Moh.(203)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
658
Date of Commencement 24-12-2019
Date of completion March 2020
Estd Cost 3.00 lacs
Completion Cost 3.00 lacs
No. of Souls benefitted 250
Comments of Stakeholders Much needed / Quality Work
For SC
Date of Commencement 13-10-2019
Date of completion 10-3-2020
Estd Cost 3.00
Completion Cost 3.00
No. of Peoples benefitted 45
Comments of Stakeholders Much needed / Quality Work
Const of T/road from Main road to SC Moh. W.No. 3(204 Const of P/Work with Crate at Pyt
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
659
Date of Commencement 13-10-2019
Date of completion 10-3-2020
Estd Cost 3.00
Completion Cost 3.00
No. of Peoples benefitted 50
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 2019-20
Date of completion 09-03-2019
Estd Cost 3.00 Lacs
Completion Cost 3.00 Lacs
No. of Peoples benefitted 150
Comments of Stakeholders Much needed / Quality Work
Good Work
Const of Protection Work /fencing near CFC building Latti-A (206) Const of Tractor Road WNo-1(207)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
660
Date of Commencement 16-08- 2019
Date of completion March-2020
Estd Cost 2.75 lacs
Completion Cost 2.75 lacs
No. of Peoples benefitted 75
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 16-08-2019
Date of completion March-2020
Estd Cost 2.75 lacs
Completion Cost 2.75 lacs
No. of Peoples benefitted 70
Comments of Stakeholders Much needed / Quality Work
Const of C/Path Ujh to Kattian W.No 05 (208) Const of Extension of B/Path from Sia to Maryal Dhar(209)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
661
Date of Commencement 18/12/2019
Date of completion 15/03/2020
Estd Cost 1.80
Completion Cost 1.80
No. of Peoples benefitted 150
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 20-02-2020
Date of completion 25-3-2020
Estd Cost 2.75
Completion Cost 2.75
No. of Peoples benefitted 100
Comments of Stakeholders Much needed / Quality Work
Constt. Of T-road Bani to Upper Durdi w.no 09(210) Constt. Of T.Road from Main Road to Badra(211)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
662
Date of Commencement 19/12/2019
Date of completion 20-3-2020
Estd Cost 2.70
Completion Cost 2.70
No. of Peoples benefitted 400
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 19/12/2019
Date of completion 20-3-2020
Estd Cost 2.75
Completion Cost 2.75
No. of Peoples benefitted 350
Comments of Stakeholders Much needed / Quality Work
Ren. of Hutt at BHQ Mansar(212) Ren. of CIC Building at BHQ Mansar(213)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
663
Date of Commencement 2019
Date of completion 15-3-2020
Estd Cost 1.34
Completion Cost 1.34
No. of Peoples benefitted 20
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 17/12/2019
Date of completion 15-3-2020
Estd Cost 2.75
Completion Cost 2.75
No. of Peoples benefitted 125
Comments of Stakeholders Much needed / Quality Work
Repair and Renovation of CFC Building at BHQ Ghordi(214 Ext. of T/Road Neeli to Dhat (215)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
664
Date of Commencement 15-12-2019
Date of completion March-2020
Estd Cost 2.50
Completion Cost 2.50
No. of Peoples benefitted 250
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 05-11-2019
Date of completion March. 2020
Estd. Cost 0.70 lac
Completion Cost 0.70 lacs
No. of Peoples benefitted 200
Comments of Stakeholders Much needed / Quality Work
Const of C/Path Pata Lad soo to Foot Bridge Toter Nallah W.No 9 Basnote(216) Const of T/road Kukar Morh to Kah (217)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
665
Date of Commencement Dec. 2019
Date of completion March 2020
Estd Cost 0.70 lacs
Completion Cost 0.70 lacs
No. of Peoples benefitted 150
Comments of Stakeholders Much needed / Quality Work
Date of Commencement 01-01-2020
Date of completion March-2020
Estd Cost 0.70 lacs
Completion Cost 0.70 lacs
No. of Peoples benefitted 150
Comments of Stakeholders Much needed / Quality Work
Const of T/road from road to H/o Shanker Singh Batota(218) Repair of T/road Sokan Moh. (219)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
666
DATE OF COMMENCEMENT 21-12-2019
DATE OF COMPLETION March-2020
ESTD. COST 2.00
COMPLETION COST 2.00
NO. OF SOULS BENEFITED 30
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QUALITY WORK
DATE OF COMMENCEMENT 05/03/2020
DATE OF COMPLETION 25/03/2020
ESTD. COST 1.00
COMPLETION COST 1.00
NO. OF SOULS BENEFITED 30
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QUALITY WORK
Drainage channel with P/wall to Bowli at Battal near matador stand(220) Const of L/D salmari near CFC building(221)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
667
DATE OF COMMENCEMENT 15-02-2020
DATE OF COMPLETION 20-03-2020
ESTD. COST 0.90
COMPLETION COST 0.90
NO. OF PEOPLES BENEFITED 30
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK
DATE OF COMMENCEMENT 01/03/2020
DATE OF COMPLETION 23/03/2020
ESTD COST 2.50
COMPLETION COST 2.50
NO. OF PEOPLE BENIFITED 100
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK
LANE DRAIN WITH CULVERT AT KASHIRAH NHO SANDOKU RAM(222) Const of culvert nearMS Lower Gandala(223)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
668
DATE OF COMMENCEMENT 01-01-2020
DATE OF COMPLETION 15-03-2020
ESTD. COST 0.49
COMPLETION COST 0.49
NO. OF PEOPLES BENEFITED 10
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK
DATE OF COMMENCEMENT 24-01-2020
DATE OF COMPLETION 18-03-2020
ESDT COST 1.30
COMPLETION COST 1.30
NO. OF SOULS BENEFITED 18
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK
CONST. OF LANE DRAIN NHO GIRDHARI LAL & OTHERS(224) BALANCE WORK FOR THE CONSTRUCTION OF DRAIN AT THE H/O DR. KUDYAAR(225)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
669
DATE OF COMMENCEMENT 1-1-2020
DATE OF COMPLETION March-2020
ESTD COST 2.00
COMPLETION COST 2.00
NO. OF SOULS BENEFITED 80
COMMENTS OF STAKEHOLDERS MUCH NEEDED / QULAITY WORK
Date of Commencement 10.02.2020
Date of completion March 2020
Estd Cost 10.00 lacs
Completion Cost 10.00 lacs
No. of Peoples benefitted 400
Comments of Stakeholders Much needed / Quality Work
Const of lane and central drain near H/o Nasib(226) Const of T/road from Ambi towards Middle School Dhandal(227)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
670
Date of Commencement 15/12/2019
Date of completion 25-03-2020
Estd Cost 8.00
Completion Cost 8.00
No. of Peoples benefitted 56
Comments of Stakeholders Much needed / Quality Work
good
Date of Commencement 2019-20
Date of completion March 2020
Estd Cost 10.00
Completion Cost 10.00
No. of Peoples benefitted 70
Comments of Stakeholders Good Work Much needed / Quality Work Much Needed
Const of T road PMGSY road to joury(320) Const. of T. Road ST Mohalla W.No.4 Pyt Challyar (321)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
671
Date of commencement 04-11-2019
Date of completion 03-03-2020
Estimated Cost 6.00 Lacs
Completion Cost (Expdt underRGSA) 4.00 lacs
No. of People Benefited: 545
Comments of Stakeholders After repairing all Gram Sabhas duirng rain/snow are conducting in the premises of the Pyt. Ghar.
Date of commencement 08-02--2020
Date of completion 29-02-2020
Estimated Cost 6.00 Lacs
Completion Cost (Expdt under RGSA) 4.00 lacs
No. of People Benefited 2663 Nos.
Comments of Stakeholders After repairing all Gram Sabhas duirng rain/snow are conducting in the premises of the Pyt. Ghar.
S.No. 1264 Repair / Renovation of Panchayat Ghar Bhagna-C Block Nagseni District Kishtwar.
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
S.No. 1265 Repair / Renovation of Panchayat Ghar Sigdi-B1 Block Mughalmaidan District Kishtwar.
672
Date of Commencement 20.12.2019
Date of Completion 15.03.2020
Estimated Cost 5 Lacs (4.00RGSA+1.00LacsMGNREGA)
Completion Cost 3.898 lacs (RGSA)
No of People Benefitted 400
Comments of the Stakeholders The work is satisfactory.
Date of Start 04/03/2020
Date of Completion Mar - 2020
E. Cost 8.00 Lacs
Expenditure 4.00 Lacs
No of Souls benefited 70
Comments of the Stakeholders -
Repair and Renovation of Panchayat Ghar Hari Buddha Lower (1238)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and Renovation ot Panchayat Ghar Khanater (1242)
673
Date of Commencement 11-2019
Date of Completion Mar, 2020
Estimated Cost 8.00 Lakhs
Completion Cost 4.07 Lakhs
No. of People Benefitted 1500
Comments of Stakeholders Much needed /Quality of Work
Date of commencement 17-11-2019
Date of completion 28-03-2020
Estimated Cost 7.58 Lacs
Completion Cost 4.00 lacs
No. of People Benefited 400 Nos.
Comments of Stakeholders -
Repair / Renovation of Panchayat Ghar Loran Lower A (1239)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and renovation of Pyt. Ghar Surankote (1241)
674
Date of Commencemen 12 / 2019
Date of Completion 03 / 2020Estimated
Cost 4.00 Lacs
Completion Cost 4.00
No of People Benefitted Whole Vilalge
Comments of the Stakeholders -
Date of Commencemen 2019 - 20
Date of Completion Mar - 2020
E. Cost 5.00 Lacs
Expenditure 4.00 Lacs (Expdt under RGSA)
No of Souls Benefited 203
Comments of the Stakeholders Much needed / Quality Work
Repair and Renovation of Panchayat Ghar Hari Buddha Lower (1238)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair / Renovation of Panchayat Ghar Nangali Sahib Sain Baba (NSSB) (1240
675
Date of Commencemen 2019 - 20
Date of Completion Mar - 2020
E. Cost 5.00 Lacs
Expenditure 4.00 Lacs (Expdt under RGSA)
No of Souls Benefited 203
Comments of the Stakeholders Much needed / Quality Work
Date of commencement 11-06-2019
Date of completion 20-03-2020
Estimated Cost 4.00 Lacs
Completion Cost 4.00 lacs
No. of People Benefited 150 - 200
Comments of Stakeholders Satisfactory
Repair / Renovation of Panchayat Ghar Jaganoo Block Jaganoo Udhampur (1256)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair / Renovation of Pyt Ghar Seela (1257)
676
Date of Commencement 19.05.2019
Date of Completion 18.02.2020
Estimated Cost 4.00 Lacs
Completion Cost 4.00 Lacs
No of People Benefitted 150 - 200
Comments of the Stakeholders The work is satisfactory
Date of Start 12.07.2019
Date of Completion 15.03.2020
E. Cost 4.00 Lacs
Expenditure 4.00 Lacs
No of Souls benefited 00 - 150
Comments of the Stakeholders The work is satisfactory
Repair / Renovation of Panchayat Ghar Panjgrain Block Chanunta (1254)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair / Renovation of Panchayat Ghar Basantgarh Block Dudu Basantgarh (1255)
677
Date of Commencement 20.08.2019
Date of Completion 01.10.2019
Estimated Cost 4.00 Lacs
Completion Cost 4.00 Lacs
No of People Benefitted Whole Panchayat
Comments of the Stakeholders Important nature of work / quality work/public utility
Date of Start 05.09.2019
Date of Completion 28.12.2019
E. Cost 4.00 Lacs
Completion Cost 4.00 Lacs
No of People Benefitted Whole Panchayat
Comments of the Stakeholders Important nature of work / quality work/public utility
Repair / Renovation of Panchayat Ghar Chittergul B (1268)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Renovation / Repairs of Panchayat Ghar at Larkipora (RGSA)(1267)
678
Date of commencement 03-12-2019
Date of completion 01-01-2020
Estimated Cost 3.22 Lacs
Completion Cost 3.22 lacs
No. of People Benefited: Whole Panchayat
Comments of Stakeholders Important nature of work / quality work/public utility.
Date of commencement 01-10-2019
Date of completion 02-02-2020
Estimated Cost 4.00 Lacs
Completion Cost 4.00 lacs
No. of People Benefited Whole Panchayat
Comments of Stakeholders Important nature of work / quality work/public utility.
Repair / Renovation of Panchayat Ghar Batkoot (Phalgam) under RGSA (1269)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair / Renovation of Panchayat Ghar Vessu (1270)
679
Date of Commencement 15.01.2020
Date of Completion 28.02.2020
Estimated Cost 4.005 Lacs
Completion Cost 4.00Lacs
No of People Benefitted Whole Panchayat
Comments of the Stakeholders Important nature of work/ quality work/public utility
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair / Renovation of Panchayat Ghar Brakipora under RGSA (1266)
680
Date of commencement 25-12-2019
Date of completion 03-03-2020
Estimated Cost 4.00Lacs(RGSA=3.10 MGNREGA=0.90)
Completion Cost (Expdt underRGSA) 1.55 Lacs
No. of People Benefited: 1230
Comments of Stakeholders Repair and renovation was needed for the said Panchayat Ghar.
Date of commencement 23-11-2019
Date of completion 08-02-2020
Estimated Cost 2.78 Lacs (RGSA = 2.78, MGNREGA =0.00)
Completion Cost (Expdt under RGSA) 2.78 Lacs
No. of People Benefited 1278
Comments of Stakeholders The Panchayat Ghar was in dilapidated condition.
Repair and Renovation of Panchayat Ghar at Berigam. (1274)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and Renovation of Panchayat Ghar at Kujar. (1272)
681
Date of Commencement 07.02.2020
Date of Completion 19.03.2020
Estimated Cost 2.99Lacs(RGSA=2.78, MGNREGA=0.0)
Completion Cost 1.50 Lacs
No of People Benefitted 1610
Comments of the Stakeholders Repairment was needed for the said Panchayat Ghar .
Date of Start 06.02.2020
Date of Completion 08.03.2020
E. Cost 4.00Lacs (RGSA=3.0, MGNREGA=1.0)
Expenditure 1.50 Lacs
No of Souls benefited 1060
Comments of the Stakeholders Repairment of the said Panchayat was required
Repair and Renovation of Panchayat Ghar at Motibugh (1271)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and Renovation of Panchayat Ghar at Bogund. (1273)
682
Date of commencement 25.09.2019
Date of completion March, 2020
Estimated Cost 3.50 Lacs
Completion Cost 1.75 Lacs
No. of People Benefited -
Comments of Stakeholders -
Repairment/ Renovation of PYT Ghar at Nazneenpora (1277)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
683
Date of Commencement 15.07.2019
Date of Completion March, 2020
Estimated Cost 3.75 Lacs
Completion Cost 1.75 Lacs
No of People Benefitted -
Comments of the Stakeholders -
Date of Start 28.12.2019
Date of Completion March, 2020
E. Cost 4.00 Lacs
Expenditure 2.00 Lacs
No of Souls benefited -
Comments of the Stakeholders -
Repairment / Renovation of PYT Ghar Dangam (1275)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repairment / Renovation of PYT Ghar K-Ullar (1276)
684
Date of commencement 20-12-2019
Date of completion 26-03-2020
Estimated Cost 6.46 Lacs
Completion Cost (Expdt underRGSA) 3.50 Lacs
No. of People Benefited: 580
Comments of Stakeholders Satisfactory
Date of commencement 19-11-2019
Date of completion 27-03-2020
Estimated Cost 6.00 Lacs
Completion Cost (Expdt underRGSA) 4.00 Lacs
No. of People Benefited: 312
Comments of Stakeholders Satisfactory
- Repair and renovation of pyt ghar Sangaldan A. (1244)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and renovation of pyt ghar Dalwah Lower (1245)
685
Date of Commencement 19-12-2019
Date of Completion 28-03-2020
Estimated Cost 5.00 Lacs
Completion Cost (Expdt underRGSA) 4.00 Lacs
No. of People Benefited: 580
Comments of Stakeholders Satisfactory
Date of Start 08.01.2020
Date of Completion 10.02.2020
E. Cost 4.00 Lacs
Completion Cost 4.00 Lacs
No. of People Benefited: Whole Panchayat
Comments of Stakeholders Much needed / Quality Work
Repair/Renovation of Panchayat Ghar at Dhok Jagir Block Akhnoor (1260)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and renovation of pyt ghar Mahu Upper (1243)
686
Date of commencement 24-04-2019
Date of completion 01-03-2020
Estimated Cost 4.00 Lacs
Completion Cost (Expdt underRGSA) 2.50 Lacs
No. of People Benefited: 2500
Comments of Stakeholders Much needed quality work.
Date of commencement 25-11-2019
Date of completion 03-03-2020
Estimated Cost 4.00 Lacs
Completion Cost (Expdt under RGSA) 4.00 Lacs
No. of People Benefited 500
Comments of Stakeholders Much needed quality work.
Repair nad Renovation of Pyt. Ghar kootah Kathua (1247)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair/ renovation of panchayat ghar GANGAL BLOCK CHOWKI CHOURA (1259)
687
Date of Commencement 25-11-2019
Date of Completion 31.03.2020
Estimated Cost 8.00Lacs
Completion Cost 4.6 Lacs(RGSA=4.00, GNREGA=0.60.)
No of People Benefitted 500
Comments of the Stakeholders Much needed quality work.
Date of Start 25-11-2019
Date of Completion 31.03.2020
E. Cost 8.00Lacs
Completion Cost 5.44 Lacs(RGSA=4.00, GNREGA=1.44)
No of People Benefitted 500
Comments of the Stakeholders Much needed quality work.
Repair nad Renovation of Pyt. Plahi (1248)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
:- Repair nad Renovation of Pyt. Ghar Rakh Lachipur (1246)
688
Date of commencement 25-11-2019
Date of completion 31-03-2020
Estimated Cost 8.00Lacs
Completion Cost (Expdt underRGSA) 4.72 Lacs(RGSA=4.00, GNREGA=0.72
No. of People Benefited: 500
Comments of Stakeholders Much needed / quality work
Date of commencement 25-11-2019
Date of completion 31-03-2020
Estimated Cost 8.00Lacs
Completion Cost (Expdt underRGSA) 4.84 Lacs(RGSA=4.00, MGNREGA=0.84
No. of People Benefited: 500
Comments of Stakeholders Much needed / quality work
:- Repair and Renovation of Pyt. Ghar Chhan Lal Din ( 1250)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
:- Repair nad Renovation of Pyt. Ghar Tridwan (1249)
689
Date of Commencement 03-01-2020
Date of Completion 25-03-2020
Estimated Cost 6.12 Lacs
Completion Cost 4.00 Lacs
No of People Benefitted 500 to 700
Comments of the Stakeholders Community Benefit work
Date of Start 13-11-2019
Date of Completion 25.03.2020
E. Cost 6.12 Lacs
Expenditure 6.12 Lacs
No of Souls Benefited 300 to 500
Comments of the Stakeholders Community Benefit work
REPAIR / RENOVATION OF PANCHAYAT GHAR – AGRATI NORTH Under RGSA (1252)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair / Renovation of Panchayat Ghar Panjgrain Under RGSA (1251)
690
Date of commencement 13-11-2019
Date of completion 25-03-2020
Estimated Cost 6.12 Lacs
Completion Cost (Expdt underRGSA) 4.00 Lacs
No. of People Benefited: 350 - 400
Comments of Stakeholders Community Benefit work
Date of commencement 10-10-2019
Date of completion 25-03-2020
Estimated Cost 4.00 Lacs
Completion Cost 4.00 Lacs
No. of People Benefited Whole Panchayat
Comments of Stakeholders Upgradation of panchayat Infrastructure.
Repair and renovation of panchayat ghar Blater Block Sumb.Samba (1262)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
RENOVATION OF PANCHAYAT GHAR DOONGI BRAHMANA (1253)
691
Date of Commencement 13-11-2019
Date of Completion March, 2020
Estimated Cost 6.50 Lacs
Completion Cost 5.38 Lacs
No of People Benefitted Whole Panchayat
Comments of Stakeholders Upgradation of panchayat Infrastructure.
Date of Start 11-11-2019
Date of Completion 25.03.2020
E. Cost 4.00 Lacs
Expenditure 4.00 Lacs
No of Souls benefited Whole Panchayat
Comments of Stakeholders Upgradation of panchayat Infrastructure.
Repair and renovation of panchayat ghar Sangwali Block Ghagwal (1263)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and renovation of panchayat Ghar Chak Nazir (1261)
692
Date of commencement 25-12-2019
Date of completion 03-03-2020
Estimated Cost 4.00Lacs(RGSA=3.10 MGNREGA=0.90)
Completion Cost (Expdt underRGSA) 1.55 Lacs
No. of People Benefited: 1230
Comments of Stakeholders Repair and renovation was needed for the said Panchayat Ghar.
Date of commencement 23-11-2019
Date of completion 08-02-2020
Estimated Cost 2.78 Lacs (RGSA = 2.78, MGNREGA =0.00)
Completion Cost (Expdt under RGSA) 2.78 Lacs
No. of People Benefited 1278
Comments of Stakeholders The Panchayat Ghar was in dilapidated condition.
Repair and Renovation of Panchayat Ghar at Berigam. (1274)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and Renovation of Panchayat Ghar at Kujar. (1272)
693
Date of Commencement 07.02.2020
Date of Completion 19.03.2020
Estimated Cost 2.99Lacs(RGSA=2.78, MGNREGA=0.0)
Completion Cost 1.50 Lacs
No of People Benefitted 1610
Comments of the Stakeholders Repairment was needed for the said Panchayat Ghar .
Date of Start 06.02.2020
Date of Completion 08.03.2020
E. Cost 4.00Lacs (RGSA=3.0, MGNREGA=1.0)
Expenditure 1.50 Lacs
No of Souls benefited 1060
Comments of the Stakeholders Repairment of the said Panchayat was required
Repair and Renovation of Panchayat Ghar at Motibugh (1271)
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
CALENDAR-ALT
CALENDAR-CHECK
`
`
USER
COMMENT-DOTS
Repair and Renovation of Panchayat Ghar at Bogund. (1273)