Top Banner
picking up from last week…
33

Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Dec 14, 2015

Download

Documents

Justina Summers
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

picking up from last week…

Page 2: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

•Fire stair layout•Due October 18th

Assignment #1

Page 3: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Requirements

Use your studio project building dimensions Floor to floor heights Thickness of exterior walls and interior

partitions (they’re different) Use your design to calculate the

occupant load

Page 4: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Step 1: calculate occupant load

Page 5: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Step 2:Calculate dimension of egress components

Page 6: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

•Plans, sections (2), and hidden elevation of center guard rail/hand rail•To scale•Fully dimensioned•Printed in black and white on 24x36” paper

Step 3: Design fire stair

Page 7: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

other things to include

General project data: Use Group, Construction Type, codes in effect

Rize/run calculation Enlarged detail of the stair nosing Drawing indicating handrail mounting

and clearance

Page 8: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Overa

ll st

air

dim

ensi

ons

Page 9: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Sta

ir d

imensi

ons

Page 10: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Are

as

of

Refu

ge

Page 11: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Guard

rails

Page 12: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

For next week

Create Occupancy Plan Calculate total occupancy Calculate egress components Calculate toilets

Page 13: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Chapter 5

ID 234 Building Codes

Fire Resistant Materials and Assemblies

Page 14: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire / Smoke Protection Systems

Passive systems: prevent fires Fire and smoke barriers Finishes and furniture

Active systems: once a fire has started Detection Extinguishing / Suppression Emergency lighting

Exiting systems: architectural elements Means of egress

Page 15: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Com

part

menta

tion

“Compartmentation”

Passive fire protection means

The separation of areas in a building to control fire and smoke

Use Wall, Floor, and Ceiling Assemblies

“Fire resistance” (of assemblies) vs. “fire protection” (of penetrations in those assemblies)

“Fire barriers” (for compartmentation) vs. “fire and smoke partitions” (not specific to egress; residential, tenant spaces)

Page 16: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

•All use standard materials•Sometimes in standard configurations

Fire Barriers and Fire Partitions

Page 17: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire

Separa

tion w

alls

Page 18: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire Barriers

Page 19: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire

an

d s

moke

part

itio

ns

Page 20: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire

Barr

iers

and

Fir

e P

art

itio

ns

Page 21: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire

Barr

iers

Page 22: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Use

Fir

e B

arr

iers

for

Sep.

of

Occ

upancy

Page 23: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire

Barr

iers

Page 24: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

•Passive fire protection•Also create compartments•Differentiate between horizontal and vertical

Smoke Barriers

Page 25: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire Rated Materials and Assemblies

Underwriters Laboratories (UL) Fire resistance Directory Volume 1 & 2

Gypsum Association (GA) Fire Resistance Design Manual

Factory Mutual (FM) Specification Tested Products Guide

Page 27: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

•For doors and windows•For mechanical, structural, HVAC penetrations

Openings

Page 28: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Opening Protection Rated Door Assemblies Door and Frame Door Hardware Fire Window Assemblies Rated Glazing and Frames Specially Tempered Glass Wire Glass Glass Block Clear Ceramics Insulated and Multilayered Glass Transparent Wall Units Frames

Page 29: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Opening Protectives

Page 30: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Fire

Resi

stant

Mate

rials

an

d

Ass

em

blie

s

Page 31: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Key Terms

Page 32: Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.

Ch

eck

list