SINGLE LINE DESCRIPTION DOUBLE LINE D D SPLIT BRANCH TAKE-OFF WITH SQUARE ELBOW & SPLITTER DAMPER SPLIT BRANCH TAKE-OFF WITH RADIUS ELBOW & SPLITTER DAMPER POSITIVE PRESSURE RISER, TYPICALLY SUPPLY NEGATIVE PRESSURE RISER, TYPICALLY RETURN, EXHAUST OR OUTSIDE AIR F/S COMBINATION FIRE & SMOKE DAMPER F/S FIRE DAMPER MOTOR OPERATED DAMPER (MOD) MANUAL VOLUME DAMPER, SINGLE BLADE DAMPER (SBD) FOR ROUND OR <10" TALL, OPPOSED BLADE DAMPER (OBD) >10" TALL BACKDRAFT DAMPER BDD BDD SMOKE DAMPER SMOKE DETECTOR DUCT SIZE: FIRST NUMBER IS PLAN WIDTH, SECOND NUMBER IS DEPTH. 24x36 24x36 DUCTWORK LEGEND SD SD PRESSURE REDUCING VALVE SHOCK ABSORBER STRAINER W/ BLOW-OFF VALVE SAFETY RELIEF VALVE VACUUM BREAKER PRESSURE GAUGE W/ PIG TAIL & COCK THERMOMETER PRESSURE - TEMP. TAP AIR VENT PIPE ANCHOR FLEXIBLE CONNECTOR PIPE EXPANSION JOINT PIPE UNION DOUBLE CHECK BACKFLOW PREVENTER PUMP & EQUIPMENT CONNECTOR TEMPERATURE CONTROL VALVE (2-WAY) DRAIN VALVE W/ HOSE END PLUG VALVE IN RISER FLOW BALANCING VALVE GATE OR GLOBE VALVE IN RISER FLOW CONTROL VALVE BALL VALVE PLUG OR BALANCING VALVE CHECK VALVE GLOBE VALVE BUTTERFLY VALVE VENTURI/FLOW INDICATOR TEMPERATURE CONTROL VALVE (3-WAY) SOLENOID VALVE 90° ELBOW UP TEE UP TEE DOWN SHUT OFF (BALL, GATE, BUTTERFLY) PIPING SYMBOLS 90° ELBOW DN S FLOW SWITCH HOSE BIBB WALL HYDRANT TEMPERATURE CONTROLLER OR SENSOR STEAM TRAP TEST CHAMBER STEAM TRAP: FT-FLOAT & THERMOSTATIC TD-THERMODYNAMIC IB-INVERTED BUCKET TS-THERMOSTATIC BP-BALANCED PRESSURE EQUIPMENT ABBREVIATIONS AIR HANDLING UNIT AHU AIR SEPARATOR AS BOILER (HOT WATER) B BASE BOARD BB BUFFER TANK BT CONSTANT VOLUME BOX CV DISHWASHER EXHAUST FAN DEF ELECTRIC BASEBOARD HEATER EBH FURNACE F FAN COIL FC FAN POWERED BOX FP GLYCOL FEEDER GF HUMIDIFIER HC HEATING COIL HP HEAT PUMP HX HEAT EXCHANGER KITCHEN EXHAUST FAN KEF MAKE-UP AIR UNIT MAU MOTOR CONTROL CENTER MCC MIXING VALVE MV PUMP P RETURN (OR RELIEF) AIR FAN RF RADIANT ZONE RZ SNOWMELT AREA SA SUMP BASIN SB SUPPLY FAN SF STORAGE TANK ST THERMOSTATIC MIXING VALVE TMV UNIT HEATER UH VARIABLE VOLUME BOX VV WATER HEATER WH H CHILLER CH COOLING COIL CC CIRC PUMP CP CABINET UNIT HEATER CUH COOLING TOWER CT DUCT COIL DC ELECTRIC WATER HEATER EWH EVAPORATIVE COOLING UNIT ECU ENERGY RECOVERY UNIT ERU EXHAUST FAN EF EXPANSION TANK ET VARIABLE VOLUME BOX W/ REHEAT VR TYPE OF AIR DEVICE RE: GRD SCHEDULE. AIR DEVICE DESIGNATION KEY # CA EXH OSA RA XFR SIZE (INCHES) OR MINIMUM FREE AREA REQUIRED IN SQUARE FEET. NOTE: FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN IS NECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE. INDICATES AIR INLET DEVICE. = = = = = = AIR QUANTITY (CFM) COMBUSTION AIR EXHAUST OUTSIDE AIR RETURN TRANSFER B XFR 12x6 A 150 12x6 PLAN ABBREVIATIONS ABOVE FINISHED FLOOR AIR ADMITTANCE VALVE ABOVE FINISHED GRADE AUTOMATIC BUILDING CONTROL SYSTEM BACK DRAFT DAMPER BUILDING AAV AFF AFG AUTO BCS BDD BLDG BETWEEN COMMON (OR CLOSED) COMBUSTION AIR CONTROLS CONTRACTOR CONTINUATION DESIGN BUILD B/N C CA CC CDBBC CUBIC FEET PER MINUTE (AIR FLOW RATE) CAST IN PLACE CEILING (OR COOLING) CONCRETE CONDENSATE CONNECT (OR CONNECTION) CONTRACTOR CFM CIP CLG CONC COND CONN CONTR'R CLEANOUT TO GRADE COTG DOMESTIC HOT WATER RECIRC EXISTING DWR (E) EXHAUST AIR EA ENTERING AIR TEMPERATURE ELECTRICAL CONTRACTOR ENTERING WATER TEMPERATURE EAT EC EXH EXHAUST EWT GENERAL CONTRACTOR GROUND HEAT EXCHANGER GC GHX GALLONS PER MINUTE (WATER FLOW RATE) GPM HORSEPOWER HOT WATER IN LIEU OF HP HW ILO KILOWATTS KW LEAVING AIR TEMPERATURE LINEAR FOOT LEAVING WATER TEMPERATURE LAT LF LWT MECHANICAL CONTRACTOR MC MANUFACTURER MOTOR OPERATED DAMPER NEW MFG MOD (N) NORMALLY CLOSED NC NATIONAL ELECTRIC CODE NOT IN CONTRACT NORMALLY OPEN NEC NIC NO OUTSIDE AIR OA OPPOSED BLADE VOLUME DAMPER ON CENTER OBD OC OUTSIDE AIR OSA RETURN AIR REQUIRED RA REQ'D REQUIREMENTS REQ'MTS SUPPLY AIR SQUARE FOOT (FEET) SA SF STATIC PRESSURE SP STAINLESS STEEL THROW-AWAY (TRANSFER AIR) TYPICAL SS TA TYP UNLESS NOTED OTHERWISE UNO WALL CLEANOUT WCO WITH REGARD TO WATER COOLED TRANSFER WRT W/C XFR DIAMETER Ø BY CONTRACTOR COLD WATER CW HOT WATER RECIRC HWC ABOVE ABV BELOW FINISHED GRADE BFG DOMESTIC WATER DOMESTIC HOT WATER DW DHW DOWN DN DOMESTIC HOT WATER RECIRC DHR COMBINATION FIRE/SMOKE DAMPER FURNISHED BY OWNER FSD FBO FLOOR CLEANOUT FCO FOR CONTINUATION FCT FD FIRE DAMPER REFER TO: RE: WITH W/ CLEANOUT CO FUTURE (F) FREE AREA FA FFI FOR FURTHER INFORMATION WITHOUT W/O VENT THRU ROOF VTR NOTES 1. ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS ON LEGEND SHEET ARE NOT NECESSARILY USED ON THIS PROJECT. 2. THIS DRAWING SET CONSISTS OF DATA GENERATED, IN PART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES AND NOTATION CONVENTIONS OCCURRING IN THIS DRAWING SET ARE NECESSARILY DEFINED ON THESE LEGENDS. CONSULT THE ENGINEER IN THE EVENT SYMBOLOGY OR NOTATION INTERPRETATION IS REQUIRED. PLAN SYMBOLS CONTROL PANEL/RADIANT MANIFOLD CARBON DIOXIDE SENSOR CARBON MONOXIDE SENSOR DIAGRAM CONTINUATION REFERENCE PLUMBING/HVAC RISER POINT OF NEW CONNECTION DUCT STATIC PRESSURE SENSOR ROOM PRESSURE SENSOR EMERGENCY POWER OFF SWITCH ACCESS PANEL SNOWMELT MANIFOLD SECTION CUT LETTER/SHEET SHOWN ON POINT OF DISCONNECTION - SP CO2 EPO P CO - - - P THERMOSTAT HUMIDISTAT REMOTE TEMPERATURE SENSOR T S H H B W H TC FS ROOF DRAIN FLOOR DRAIN FLOOR SINK HORIZONTAL CLEANOUT VERTICAL CLEANOUT DECK/ROOF DRAIN ABOVE PIPING DESIGNATIONS SNOWMELT SUPPLY SNOWMELT RETURN HEATING WATER SUPPLY (HIGH TEMP) HEATING WATER RETURN (HIGH TEMP) CHILLED WATER SUPPLY CHILLED WATER RETURN CONDENSER RETURN HIGH PRESSURE STEAM HIGH PRESSURE CONDENSATE RETURN LOW PRESSURE STEAM LOW PRESSURE CONDENSATE RETURN REFRIGERANT SUCTION REFRIGERANT LIQUID FLOOR COOLING SUPPLY FLOOR COOLING RETURN HEATING WATER SUPPLY (LOW TEMP) HEATING WATER RETURN (LOW TEMP) SOLAR HEATING WATER SUPPLY SOLAR HEATING WATER RETURN GROUND LOOP SUPPLY GROUND LOOP RETURN HEATING WATER SUPPLY HEATING WATER RETURN GLYCOL FEED MEDIUM PRESSURE STEAM MEDIUM PRESSURE CONDENSATE RETURN PUMPED CONDENSATE GEOTHERMAL (OR GROUND) LOOP SUPPLY GEOTHERMAL (OR GROUND) LOOP RETURN CLOSED CONDENSER SUPPLY CLOSED CONDENSER RETURN CONDENSER SUPPLY PLUMBING PIPING CR CS CCR CCS GLR GLS CHR CHS GLR GLS GF HWR HWS HWR(LT) HWS(LT) HWR(HT) HWS(HT) FCR FCS SHWR SHWS SMS SMR PC MPR MPS LPS LPR HPR HPS RS RL STEAM & CONDENSATE PIPING HYDRONIC PIPING 90° ELBOW DOWN (ROUND DUCT ONLY) ROUND 90° ELBOW UP (ROUND DUCT ONLY) OFFSET TO CHANGE ELEVATION (AT 30° WHEN POSSIBLE) D = DROP R = RISE ROUND RADIUS ELBOW 90° STRAIGHT TEE 90° CONICAL TEE 45° BRANCH 45° CONICAL TEE SIZE OR SHAPE TRANSITION ROUND FLEXIBLE DUCT 90° ELBOW DN (NEGATIVE PRESSURE) 90° ELBOW DN (POSITIVE PRESSURE) 90° ELBOW UP (NEGATIVE PRESSURE) 90° ELBOW UP (POSITIVE PRESSURE) 90° RADIUS ELBOW 90° RADIUS ELBOW W/TURNING VANES SQUARE DUCT SPLIT ROUND DUCT SPLIT SUMP PUMP SP MECHANICAL SYSTEMS LEGEND ABOVE SEA LEVEL PROJECT ALTITUDE 5,292' ' ' ISSUE LOG KEY: # DATE ISSUE LOG MECHANICAL SHEET INDEX TITLE MECHANICAL COVER SHEET M0-01 100% DD 02.22.2018 ISSUED AS PART OF A SET ' ' NOT PART OF SET ' ' ISSUED FOR INFORMATION ONLY * √ √ √ √ √ MECHANICAL DEMOLITION PLAN M-1-01 MECHANICAL DETAILS M-5-01 MECHANICAL SCHEDULES M-6-01 MECHANICAL PLAN M-1-02 √ √ MECHANICAL ROOM ENLARGED PLAN M-1-03 95% CD's 04.30.2018 √ √ √ √ √ √ √ MECHANICAL CONTROLS M-7-01 √ 100% CD's √ √ √ √ √ √ √ 05.25.2018 SAN JUAN REGIONAL MEDICAL CENTER Emergency Department Renovation Mail: Phone: 48 C.R. 25O/ STE. 3/ DURANGO Physical: 1235 THOROUGHBRED RD./ DURANGO, CO./ 81303 (970) 385-6774 RMKM ARCHITECTURE, P.C. ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www˛bgbuildingworks˛com Project No. 9659.00 Copyright 2016 MECHANICAL COVER SHEET M0-01
23
Embed
Physical: 48 C.R. 25O/ STE. 3/ DURANGO · pressure - temp. tap air vent pipe anchor flexible connector pipe expansion joint pipe union double check backflow preventer ... cc cdbbc
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
SINGLE LINE DESCRIPTION DOUBLE LINE
D D
SPLIT BRANCH TAKE-OFF WITH SQUAREELBOW & SPLITTER DAMPER
SPLIT BRANCH TAKE-OFF WITH RADIUSELBOW & SPLITTER DAMPER
POSITIVE PRESSURE RISER,TYPICALLY SUPPLY
NEGATIVE PRESSURE RISER, TYPICALLYRETURN, EXHAUST OR OUTSIDE AIR
F/S COMBINATION FIRE & SMOKE DAMPER F/S
FIRE DAMPER
MOTOR OPERATED DAMPER (MOD)
MANUAL VOLUME DAMPER, SINGLE BLADEDAMPER (SBD) FOR ROUND OR <10" TALL,OPPOSED BLADE DAMPER (OBD) >10" TALL
BACKDRAFT DAMPERBDD BDD
SMOKE DAMPER
SMOKE DETECTOR
DUCT SIZE: FIRST NUMBER IS PLAN WIDTH,SECOND NUMBER IS DEPTH.
SIZE (INCHES) OR MINIMUMFREE AREA REQUIRED INSQUARE FEET.
NOTE:FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN ISNECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE.
INDICATES AIRINLET DEVICE.
======
AIR QUANTITY (CFM)COMBUSTION AIREXHAUSTOUTSIDE AIRRETURNTRANSFER
BXFR12x6
A15012x6
PLAN ABBREVIATIONS
ABOVE FINISHED FLOOR
AIR ADMITTANCE VALVE
ABOVE FINISHED GRADE
AUTOMATIC
BUILDING CONTROL SYSTEM
BACK DRAFT DAMPER
BUILDING
AAV
AFF
AFG
AUTO
BCS
BDD
BLDG
BETWEEN
COMMON (OR CLOSED)
COMBUSTION AIR
CONTROLS CONTRACTOR
CONTINUATION DESIGN BUILD
B/N
C
CA
CC
CDBBC
CUBIC FEET PER MINUTE (AIR FLOW RATE)
CAST IN PLACE
CEILING (OR COOLING)
CONCRETE
CONDENSATE
CONNECT (OR CONNECTION)
CONTRACTOR
CFM
CIP
CLG
CONC
COND
CONN
CONTR'R
CLEANOUT TO GRADECOTG
DOMESTIC HOT WATER RECIRC
EXISTING
DWR
(E)
EXHAUST AIREA
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
ENTERING WATER TEMPERATURE
EAT
EC
EXH EXHAUST
EWT
GENERAL CONTRACTOR
GROUND HEAT EXCHANGER
GC
GHX
GALLONS PER MINUTE (WATER FLOW RATE)GPM
HORSEPOWER
HOT WATER
IN LIEU OF
HP
HW
ILO
KILOWATTSKW
LEAVING AIR TEMPERATURE
LINEAR FOOT
LEAVING WATER TEMPERATURE
LAT
LF
LWT
MECHANICAL CONTRACTORMC
MANUFACTURER
MOTOR OPERATED DAMPER
NEW
MFG
MOD
(N)
NORMALLY CLOSEDNC
NATIONAL ELECTRIC CODE
NOT IN CONTRACT
NORMALLY OPEN
NEC
NIC
NO
OUTSIDE AIROA
OPPOSED BLADE VOLUME DAMPER
ON CENTER
OBD
OC
OUTSIDE AIROSA
RETURN AIR
REQUIRED
RA
REQ'D
REQUIREMENTSREQ'MTS
SUPPLY AIR
SQUARE FOOT (FEET)
SA
SF
STATIC PRESSURESP
STAINLESS STEEL
THROW-AWAY (TRANSFER AIR)
TYPICAL
SS
TA
TYP
UNLESS NOTED OTHERWISEUNO
WALL CLEANOUTWCO
WITH REGARD TO
WATER COOLED
TRANSFER
WRT
W/C
XFR
DIAMETERØ
BY CONTRACTOR
COLD WATERCW
HOT WATER RECIRCHWC
ABOVEABV
BELOW FINISHED GRADEBFG
DOMESTIC WATER
DOMESTIC HOT WATER
DW
DHW
DOWNDN
DOMESTIC HOT WATER RECIRCDHR
COMBINATION FIRE/SMOKE DAMPER
FURNISHED BY OWNER
FSD
FBO
FLOOR CLEANOUTFCO
FOR CONTINUATIONFCT
FD FIRE DAMPER
REFER TO:RE:
WITHW/
CLEANOUTCO
FUTURE(F)
FREE AREAFA
FFI FOR FURTHER INFORMATION
WITHOUTW/O
VENT THRU ROOFVTR
NOTES1. ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS
ON LEGEND SHEET ARE NOT NECESSARILY USED ONTHIS PROJECT.
2. THIS DRAWING SET CONSISTS OF DATA GENERATED, INPART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES ANDNOTATION CONVENTIONS OCCURRING IN THISDRAWING SET ARE NECESSARILY DEFINED ON THESELEGENDS. CONSULT THE ENGINEER IN THE EVENTSYMBOLOGY OR NOTATION INTERPRETATION ISREQUIRED.
PLAN SYMBOLSCONTROL PANEL/RADIANT MANIFOLD
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
DIAGRAM CONTINUATION REFERENCE
PLUMBING/HVAC RISER
POINT OF NEW CONNECTION
DUCT STATIC PRESSURE SENSOR
ROOM PRESSURE SENSOR
EMERGENCY POWER OFF SWITCH
ACCESS PANEL
SNOWMELT MANIFOLD
SECTION CUT LETTER/SHEET SHOWN ON
POINT OF DISCONNECTION
-
SP
CO2
EPO
P
CO
--
-P
THERMOSTAT
HUMIDISTAT
REMOTE TEMPERATURE SENSOR
T
S
H
H B
W H
TC
FS
ROOF DRAIN
FLOOR DRAIN
FLOOR SINK
HORIZONTAL CLEANOUT
VERTICAL CLEANOUT
DECK/ROOF DRAIN ABOVE
PIPING DESIGNATIONS
SNOWMELT SUPPLY
SNOWMELT RETURN
HEATING WATER SUPPLY (HIGH TEMP)
HEATING WATER RETURN (HIGH TEMP)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSER RETURN
HIGH PRESSURE STEAM
HIGH PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM
LOW PRESSURE CONDENSATE RETURN
REFRIGERANT SUCTION
REFRIGERANT LIQUID
FLOOR COOLING SUPPLY
FLOOR COOLING RETURN
HEATING WATER SUPPLY (LOW TEMP)
HEATING WATER RETURN (LOW TEMP)
SOLAR HEATING WATER SUPPLY
SOLAR HEATING WATER RETURN
GROUND LOOP SUPPLY
GROUND LOOP RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
GLYCOL FEED
MEDIUM PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE RETURN
PUMPED CONDENSATE
GEOTHERMAL (OR GROUND) LOOP SUPPLY
GEOTHERMAL (OR GROUND) LOOP RETURN
CLOSED CONDENSER SUPPLY
CLOSED CONDENSER RETURN
CONDENSER SUPPLY
PLUMBING PIPING
CR
CS
CCR
CCS
GLR
GLS
CHR
CHS
GLR
GLS
GF
HWR
HWS
HWR(LT)
HWS(LT)
HWR(HT)
HWS(HT)
FCR
FCS
SHWR
SHWS
SMS
SMR
PC
MPR
MPS
LPS
LPR
HPR
HPS
RS
RL
STEAM & CONDENSATE PIPING
HYDRONIC PIPING90° ELBOW DOWN (ROUND DUCT ONLY)
ROUND 90° ELBOW UP (ROUND DUCT ONLY)
OFFSET TO CHANGE ELEVATION(AT 30° WHEN POSSIBLE)
D = DROP R = RISE
ROUND RADIUS ELBOW
90° STRAIGHT TEE
90° CONICAL TEE
45° BRANCH
45° CONICAL TEE
SIZE OR SHAPE TRANSITION
ROUND FLEXIBLE DUCT
90° ELBOW DN (NEGATIVE PRESSURE)
90° ELBOW DN (POSITIVE PRESSURE)
90° ELBOW UP (NEGATIVE PRESSURE)
90° ELBOW UP (POSITIVE PRESSURE)
90° RADIUS ELBOW
90° RADIUS ELBOW W/TURNING VANES
SQUARE DUCT SPLIT
ROUND DUCT SPLIT
SUMP PUMPSP
MECHANICAL SYSTEMS LEGEND
ABOVE SEA LEVEL
PROJECT ALTITUDE5,292'
' 'ISSUE LOG KEY:
#
DA
TE
ISSUE LOG
MECHANICAL SHEET INDEX
TITLE
MECHANICAL COVER SHEETM0-01
100%
DD
02.2
2.20
18ISSUED AS PART OF A SET' ' NOT PART OF SET' ' ISSUED FOR INFORMATION ONLY*
1. EXISTING TERMINAL UNIT TO REMAIN. REMOVECONTROLS INCLUDING ACTUATORS, WIRING, TUBING,AND THE ASSOCIATED THERMOSTAT.
2. REMOVE GRILLES IN THE ROOM AS SHOWN. REMOVEASSOCIATED FLEX. NOTE NECK SIZE OF EXISTINGGRILLE FOR REPLACEMENT.
3. REMOVE LOW PRESSURE DUCT BACK TO REHEATCOIL.
4. CAREFULLY REMOVE THERMOSTAT FROM WALL ANDRETAIN FOR RE-USE OR SALVAGE TO OWNER.REMOVE ANY AND ALL PNEUMATIC TUBING BACK TOMAIN LINE AND CAP. REMOVE ANY WIRINGASSOCIATED WITH THE THERMOSTAT.
5. CAREFULLY REMOVE SUPPLY GRILLE FROM CEILINGAND KEEP FOR RE-INSTALLATION IN THE NEW CEILING.
1. ADDITIONAL STORM, HYDRONIC, DOMESTIC, WASTEAND VENT PIPING MAY BE ROUTED IN SPACE THAT ISNOT REPRESENTED, BUT IS TO REMAIN. OTHERSYSTEMS MAY EXIST WITHIN THE SPACE THAT ARENOT REPRESENTED ON THESE DRAWINGS;MODIFICATIONS TO THESE SYSTEMS ARE NOTANTICIPATED.
2. FIELD VERIFY ALL COMPONENTS PRIOR TODEMOLITION. THE INFORMATION ON THIS SHEET WASOBTAINED, IN PART, FROM HISTORIC DESIGNDRAWINGS. ONLY PORTIONS OF THE SYSTEMS WEREACCESSIBLE FOR VISUAL CONFIRMATION DURINGDESIGN PROCESS.
3. PROVIDE PRELIMINARY TESTING OF EXISTINGHYDRONIC SYSTEMS. MEASURE CURRENT FLUIDFLOW RATE THROUGH ALL EXISTING COILS, RADIANT,AND SNOWMELT ZONES FOR THE CURRENTLYINSTALLED SYSTEMS. SUBMIT REPORT OF MEASUREDVALUES TO ENGINEER FOR REVIEW ANDCONFIRMATION OF SYSTEM DESIGN ASSUMPTIONSPRIOR TO DEMOLITION.
4. PROVIDE PRELIMINARY TESTING OF EXISTING HVACDUCTWORK SYSTEMS. MEASURE CURRENT AIRFLOW RATES AT ALL EXISTING SUPPLY, RETURN, ANDEXHAUST REGISTERS. MEASURE TOTAL AIR FLOWSAT MAIN DUCT BRANCHES AND ALL FAN SYSTEMS.SUBMIT REPORT OF MEASURED VALUES TOENGINEER FOR REVIEW AND CONFIRMATION OFSYSTEM DESIGN ASSUMPTIONS PRIOR TODEMOLITION.
5. (E) WASTE SYSTEM SERVING SPACE IS LOCATED INTHE CEILING OF THE SPACE BELOW.
6. REMOVE ALL MECHANICAL ITEMS INDICATED.
7. TEMPORARILY SEAL OR CAP PIPING TO BE RE-USEDFOR LATER CONNECTION.
8. SEAL ALL OPEN DUCTS DURING CONSTRUCTION TOMITIGATE DUST AND DEBRIS FROM SYSTEM. CAPDUCTWORK IN LOCATIONS THAT ARE NOT BEINGRECONNECTED.
9. REMOVE ALL DEMOLISHED COLD WATER, HOT WATERAND HOT WATER RECIRCULATION PIPING BACK TOBRANCH FROM MAIN TO ELIMINATE ALL DEAD ENDS INDOMESTIC WATER PIPING.
10. NOTIFY ENGINEER IMMEDIATELY OF ANYDISCREPANCIES OF INFORMATION REPRESENTED INTHE DOCUMENTS VERSUS WHAT IS FOUND IN THEFIELD.
11. COORDINATE PATCHING AND REPAIRS OF WALLS,CEILINGS AND FLOORS WITH ARCHITECT.
12. PATCH STRUCTURAL OPENINGS IN FLOORS, WALLSAND ROOFS THAT WERE PREVIOUSLY OCCUPIED BYSYSTEMS AND EQUIPMENT DEMOLISHED UNDER THISCONTRACT IN ACCORDANCE WITH STRUCTURALENGINEER'S REQUIREMENTS.
13. ALL EXISTING COMBINATION FIRE/SMOKE DAMPERSDEPICTED ON THIS SHEET SHALL BE REMOVED.
1. ALL EXISTING PNEUMATIC CONTROLS SHALL BECAREFULLY REMOVED. THE HYDRONIC VALVES SHALLBE REPLACED. DAMPER ACTUATORS SHALL FIELDVERIFY THE LOCATION SIZE AND TYPE OF ALLHYDRONIC CONTROL VALVES AND ACTUATORS FORREPLACEMENT AS A PART OF THE DIRECT DIGITALCONTROLS UPGRADE. VERIFY EXISTING DAMPERACTUATORS AND REPLACE WITH NEW.
2. APPROXIMATE LOCATION FOR EXISTING OUTSIDE AIRFAN.
1. RE: _/M_ SERIES FOR MECHANICAL DIAGRAMS.
2. COORDINATE ROUTING OF CONDENSATE DRAINLINES WITH ARCHITECT PRIOR TO INSTALLATION.
3. CEILING COORDINATION OF ALL MEP SYSTEMS(LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL,FIRE PROTECTION, ETC.) MUST BE COMPLETED BYTHE CONTRACTOR PRIOR TO THE START OF ANYINSTALLATIONS.
4. DO NOT ROUTE DUCTWORK OVER ELECTRICALROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C.CLEARANCES. COORDINATE ROUTINGS WITH DIV. 16CONTRACTOR.
5. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHTIN GARAGE AND INFORM THE ENGINEER ANDARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6"PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEADHEIGHT MUST BE MAINTAINED IN ACCESSIBLE VANAREAS.
6. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TOALL MOTORIZED EQUIPMENT.
7. VERIFY ALL EQUIPMENT ACCESS PANELS WITHMANUFACTURER AND ARCHITECT.
8. ALL SOURCES OF IGNITION ON MECHANICALEQUIPMENT SHALL BE MOUNTED 18" AFF.
9. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS,ETC. FROM DAMAGE AS NECESSARY WITH CAGES.COORDINATE WITH ARCHITECT.
10. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATEFIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
11. THE SPACE ABOVE CEILING IS BEING UTILIZED AS ARETURN AIR PLENUM. ALL RETURN GRILLES SHALL BEPROVIDED WITH SOUND BOOTS AND A DIRECT PATHTO THE AIR HANDLING SYSTEM RETURN DUCT, OPENTO PLENUM. WHERE FULL HEIGHT WALLS AREINSTALLED AND THE RETURN AIR PATH ISCOMPROMISED, THE SOUND BOOT SHALL EXTENDTHROUGH THE WALL OR TRANSFER AIR DUCTSSHALL BE PROVIDED. OTHERWISE, PROVIDE Z- OR U-DUCT TRANSFER THROUGH WALL. TRANSFER DUCTSAND SOUND BOOTS SHALL BE LINED SHEET METAL.NON-METAL DUCT NOT PERMITTED.
12. T-STATS AND CO2 SENSORS SHALL BE LOCATEDNEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN.COORDINATE WITH ARCHITECT & ELECTRICALENGINEER TO MATCH HEIGHT AND LOCATION.
13. ALL DUCTWORK SHALL BE ROUTED AS HIGH ASPOSSIBLE IN THE CEILING SPACE. UTILIZE JOISTSPACE WHEN POSSIBLE, ESPECIALLY WHERECROSSING OTHER DUCTS, PIPES, AND ELECTRICAL.
14. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONSSHOWN ARE APPROXIMATE, EXACT LOCATIONSSHALL BE COORDINATED WITH THE ARCHITECTSDRAWINGS AND WITH THE LOCATIONS OF THEEQUIPMENT OR APPARATUS THAT THEY SERVE.
15. SEAL ALL DUCT PENETRATIONS OF ACOUSTICPARTITIONS.
HVAC NOTES:
EXTERIOR DUCTINSULATION.
INSULATED ACOUSTICFLEX DUCT. 5'-0"MAXIMUM LENGTH
INTERNALLY LINED SUPPLYDUCT, OR AS NOTED INSPECIFICATIONS.
CONICAL SPIN-IN FITTING WITHMANUAL VOLUME DAMPER.
SHEET METALSTRAP.
S.S. WORM DRIVECLAMP.
SQUARE TO ROUND ADAPTERAS REQUIRED.
SHEET METALSHIELD.
SUPPORT AS REQUIREDFOR MIN RADIUSSPECIFIED.
MINIMUM ℄ RADIUS > 1.5 xFLEX DUCT DIAMETER.
CEILING DIFFUSER
NO SCALE
TYPICAL DIFFUSER CONNECTION DIAGRAM OFF DIAGRAM45° DUCT TAKE-
45°
NO SCALE
DAMPER IF H<8"
TAKE-OFF.AROUND ENTIRESEAL AIRTIGHT
OPPOSED BLADEDAMPER IF H>=8"
SINGLE BLADE
6" MINIMUM.1/4 OF "W" OR
ENDBEARING
W
H
GRILLE CONNECTION DIAGRAMEXHAUST/DUCTED RETURN
NO SCALE
FLEX DUCT CONNECTION FORLAY-IN CEILING, SHEET METALCONNECTION OVER HARD CEILING
SHEET METAL PLENUM(NO INSULATION). MATCHGRILLE NECK. HEIGHT 4"HIGHER THANCONNECTION.
WORM DRIVE S.S.CLAMP.
CEILING DIFFUSER.
FIRE DAMPER AND FIRE/SMOKE
NO LINING REQ'D.
SOLID METAL STUDNO LINING WITH
FRAMING.
THE WALL.EQUAL TO THAT ONMATERIAL OF RATINGWITH FIRE RESISTIVEOPENING TO BE LINED
CONCRETE OR MASONRY
METAL STUD
NO SCALE
WOOD STUD
WALLSLEEVE.
MAX. DIMENSIONS ASSOCIATED WITH THE TESTCONNECTION. ALL U.L. LISTED DAMPERS ALSO HAVESLEEVE THICKNESS IS CONTINGENT ON TYPE OFTO TERMINATE AT SLEEVES OR DAMPER FRAMES.BY U.L. STANDARD 555 ALL DUCTS ARE REQUIRED
LINKAGE ASSEMBLY OUT OF
THIS DIAGRAM IS NOT INTENDED TO
AND FIRE/SMOKE DAMPER INSTALLATION.COVER ALL CASES OF FIRE DAMPER
HOWEVER SLEEVE THICKNESS MUST ALSO NOT BELESS THAN DUCT GAGE OR THAT SPECIFICALLYAUTHORIZED BY A RECOGNIZED AUTHORITY.
1. SIZES SHOWN ARE MINIMUM PIPE SIZES TO A SINGLE FIXTURE. LARGERSIZES MAY BE INDICATED ON PLANS WHERE REQUIRED.
2. MINIMUM DOMESTIC PIPE SIZE TO (2) OR MORE FIXTURES IS 3/4".
3. RE: MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR INDIRECT WASTESIZES.
4. WASTE AND VENT SIZES SHOWN ABOVE APPLY TO INDIVIDUAL VENTING ONLY.WHERE ALLOWED, INDIVIDUAL VENT CONNECTIONS MAY BE OMITTED ORSIZES MAY VARY WHEN CIRCUIT VENTS, COMMON VENTS, WASTE STACKVENTS, WET VENTS, OR COMBINATION DRAIN AND VENT SYSTEMS ARE USED.PRIOR APPROVAL FROM THE ENGINEER IS REQUIRED TO USE THESEALTERNATIVE VENTING METHODS.
5. PROVIDE TRAP GUARD FOR ALL FLOOR DRAINS AND FLOOR SINKS NOTLOCATED IN FOOD SERVICE AREAS.
6. MINIMUM SIZE FOR WASTE AND VENT PIPING BENEATH SLAB IS 2".
7. ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT.
8. REFER TO APPLIANCE SCHEDULES (BY OTHERS) FOR ADDITIONAL PLUMBINGFIXTURE CONNECTIONS SUCH AS INST-HOTS, COFFEE MAKERS, ANDGARBAGE DISPOSALS.
9. PROVIDE ICE MAKER BOX ROUGH IN W/ 1/2"CW CONNECTION FOR ALLREFRIGERATOR LOCATIONS.
ABBREV.
CS CLOTHES WASHER ROUGH-IN 1/2" 1/2" 2" 1-1/2"
DRINKING FOUNTAIN / E.W.C.DF - 1/2" 1-1/2" 1-1/2"
DISH MACHINE ROUGH-INDM 3/4" 3/4" 2" 1-1/2"
DW DISHWASHER ROUGH-IN -1/2" 2" 1-1/2"
FD FLOOR DRAIN - - 2" 1-1/2"
FS FLOOR SINK - - 3" 2"
HOSE BIBHB - - -3/4"
HAND SINKHS 1-1/2" 1-1/2"1/2" 1/2"
KITCHEN SINK W/ OR W/O DISPOSERKS 1/2" 1/2" 2" 1-1/2"
LAVATORYLAV 1/2" 1-1/2" 1-1/2"1/2"
MOP SERVICE BASINMSB 3/4" 3" 2"3/4"
SHOWER / BATHTUBSH 3/4" 3/4" 2" 1-1/2"
SERVICE SINKSS 3" 2"1/2" 1/2"
TROUGH DRAINTD - - 3" 2"
URINAL (BLOWOUT)UR 1" 2" 1-1/2"-
URINAL (WASHDOWN)UR
UR URINAL (WATERLESS)
3/4" 2" 1-1/2"
- 2" 1-1/2"
-
-
WATER CLOSET (FLUSH VALVE)WC
WATER CLOSET (FLUSH TANK)WCT
- 1" 4" 2"
- 1/2" 4" 2"
WS 3/4"3/4" 2" 1-1/2"WORK SINK
EQUIPMENT ABBREVIATIONSAIR HANDLING UNITAHU
AIR SEPARATORAS
BOILER (HOT WATER)B
BASE BOARDBB
BUFFER TANKBT
CONSTANT VOLUME BOXCV
DISHWASHER EXHAUST FANDEF
ELECTRIC BASEBOARD HEATEREBH
FURNACEF
FAN COILFC
FAN POWERED BOXFP
GLYCOL FEEDERGF
HUMIDIFIER
HC HEATING COIL
HP HEAT PUMP
HX HEAT EXCHANGER
KITCHEN EXHAUST FANKEF
MAKE-UP AIR UNITMAU
MOTOR CONTROL CENTERMCC
MIXING VALVEMV
PUMP P
RETURN (OR RELIEF) AIR FANRF
RADIANT ZONERZ
SNOWMELT AREASA
SUMP BASINSB
SUPPLY FANSF
STORAGE TANKST
THERMOSTATIC MIXING VALVETMV
UNIT HEATERUH
VARIABLE VOLUME BOXVV
WATER HEATERWH
H
CHILLERCH
COOLING COILCC
CIRC PUMPCP
CABINET UNIT HEATERCUH
COOLING TOWERCT
DUCT COILDC
ELECTRIC WATER HEATEREWH
EVAPORATIVE COOLING UNITECU
ENERGY RECOVERY UNITERU
EXHAUST FANEF
EXPANSION TANKET
VARIABLE VOLUME BOX W/ REHEATVR
TYPE OF AIR DEVICERE: GRD SCHEDULE.
AIR DEVICE DESIGNATION KEY
#CAEXHOSARAXFR
SIZE (INCHES) OR MINIMUMFREE AREA REQUIRED INSQUARE FEET.
NOTE:FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN ISNECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE.
INDICATES AIRINLET DEVICE.
======
AIR QUANTITY (CFM)COMBUSTION AIREXHAUSTOUTSIDE AIRRETURNTRANSFER
BXFR12x6
A15012x6
REFERENCE SAMPLE
FFI = FOR FURTHER INFORMATIONFCT = FOR CONTINUATION
RE: B/M400 FFI
REFER TO:
DRAWING NUMBER ORDIAGRAM LETTER
SHEET NUMBER
PLAN ABBREVIATIONS
ABOVE FINISHED FLOOR
AIR ADMITTANCE VALVE
ABOVE FINISHED GRADE
AUTOMATIC
BUILDING CONTROL SYSTEM
BACK DRAFT DAMPER
BUILDING
AAV
AFF
AFG
AUTO
BCS
BDD
BLDG
BETWEEN
COMMON (OR CLOSED)
COMBUSTION AIR
CONTROLS CONTRACTOR
CONTINUATION DESIGN BUILD
B/N
C
CA
CC
CDBBC
CUBIC FEET PER MINUTE (AIR FLOW RATE)
CAST IN PLACE
CEILING (OR COOLING)
CONCRETE
CONDENSATE
CONNECT (OR CONNECTION)
CONTRACTOR
CFM
CIP
CLG
CONC
COND
CONN
CONTR'R
CLEANOUT TO GRADECOTG
DOMESTIC HOT WATER RECIRC
EXISTING
DWR
(E)
EXHAUST AIREA
ENTERING AIR TEMPERATURE
ELECTRICAL CONTRACTOR
ENTERING WATER TEMPERATURE
EAT
EC
EXH EXHAUST
EWT
GENERAL CONTRACTOR
GROUND HEAT EXCHANGER
GC
GHX
GALLONS PER MINUTE (WATER FLOW RATE)GPM
HORSEPOWER
HOT WATER
IN LIEU OF
HP
HW
ILO
KILOWATTSKW
LEAVING AIR TEMPERATURE
LINEAR FOOT
LEAVING WATER TEMPERATURE
LAT
LF
LWT
MECHANICAL CONTRACTORMC
MANUFACTURER
MOTOR OPERATED DAMPER
NEW
MFG
MOD
(N)
NORMALLY CLOSEDNC
NATIONAL ELECTRIC CODE
NOT IN CONTRACT
NORMALLY OPEN
NEC
NIC
NO
OUTSIDE AIROA
OPPOSED BLADE VOLUME DAMPER
ON CENTER
OBD
OC
OUTSIDE AIROSA
RETURN AIR
REQUIRED
RA
REQ'D
REQUIREMENTSREQ'MTS
SUPPLY AIR
SQUARE FOOT (FEET)
SA
SF
STATIC PRESSURESP
STAINLESS STEEL
THROW-AWAY (TRANSFER AIR)
TYPICAL
SS
TA
TYP
UNLESS NOTED OTHERWISEUNO
WALL CLEANOUTWCO
WITH REGARD TO
WATER COOLED
TRANSFER
WRT
W/C
XFR
DIAMETERØ
BY CONTRACTOR
COLD WATERCW
HOT WATER RECIRCHWC
ABOVEABV
BELOW FINISHED GRADEBFG
DOMESTIC WATER
DOMESTIC HOT WATER
DW
DHW
DOWNDN
DOMESTIC HOT WATER RECIRCDHR
COMBINATION FIRE/SMOKE DAMPER
FURNISHED BY OWNER
FSD
FBO
FLOOR CLEANOUTFCO
FOR CONTINUATIONFCT
FD FIRE DAMPER
REFER TO:RE:
WITHW/
CLEANOUTCO
FUTURE(F)
FREE AREAFA
FFI FOR FURTHER INFORMATION
WITHOUTW/O
VENT THRU ROOFVTR
NOTES1. ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS
ON LEGEND SHEET ARE NOT NECESSARILY USED ONTHIS PROJECT.
2. THIS DRAWING SET CONSISTS OF DATA GENERATED, INPART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES ANDNOTATION CONVENTIONS OCCURRING IN THISDRAWING SET ARE NECESSARILY DEFINED ON THESELEGENDS. CONSULT THE ENGINEER IN THE EVENTSYMBOLOGY OR NOTATION INTERPRETATION ISREQUIRED.
18ISSUED AS PART OF A SET' ' NOT PART OF SET' ' ISSUED FOR INFORMATION ONLY*
√√
√
√
√
√
PLUMBING SPECIFICATION NOTES SHEETP0-02
PLUMBING DEMOLITION PLANPD1-01
PLUMBING PLANP1-01
PLUMBING DIAGRAMS SHEETP5-01
√PLUMBING MEDICAL GAS DEMOLITION PLANPD1-02
√PLUMBING SCHEDULESP6-01
√PLUMBING MEDICAL GAS PLANP1-02
1. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE,VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELDINSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER.
2. COORDINATE ROUTING OF CONDENSATE DRAIN LINES WITH ARCHITECT PRIOR TO INSTALLATION.
3. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDEOF INSULATION.
4. INSTALL THERMOSTATIC MIXING VALVES, ASSE 1070 LISTED, AT EACH PUBLIC HANDWASHING LAVATORY/SINK.SIZE TO MATCH HW PIPE SIZE.
5. TERMINATE PLUMBING VENTS NOT LESS THAN 12" ABOVE ROOF.
6. DO NOT ROUTE PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES.COORDINATE ROUTINGS WITH DIV. 16 CONTRACTOR.
7. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OFANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BEMAINTAINED IN ACCESSIBLE VEHICLE AREAS.
8. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT.
9. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 10 FEET OF ALL HOT WATER FIXTURES. CONNECT WITHIN 3FEET OF 0.5 GPM AND LOWER FAUCETS.
10. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT.
11. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES.COORDINATE WITH ARCHITECT.
12. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED.
13. ALL VALVES SHALL BE INSTALLED ABOVE DROP-IN CEILINGS IN ACCESSIBLE LOCATIONS, OR WITH ACCESSPANELS IN HARD-LID CEILINGS.
14. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHENPOSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL.
15. ACCESS PANELS SHALL BE 24x24, U.N.O. LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BECOORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUSTHAT THEY SERVE.
16. SEAL ALL PIPING PENETRATIONS THROUGH ACOUSTIC PARTITIONS.
17. EXPOSED SOIL OR WASTE PIPING SHALL NOT BE INSTALLED ABOVE ANY WORKING, STORAGE, OR EATINGSURFACES IN FOOD SERVICE ESTABLISHMENTS.
1. CONTROLS SYSTEM COMPONENTS SHALL BE COMPATIBLE WITH EXISTING BUILDING AUTOMATION SYSTEM (AUTOMATED LOGIC). CONTROLS SHALL BEFIELD INSTALLED. CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR WIRING AND INSTALLING ALL DEVICES REQUIRED FOR A FULLY FUNCTIONALCONTROL SYSTEM FOR THIS PROJECT, REGARDLESS OF VOLTAGE. IF THE CONTRACTOR CANNOT SELF PERFORM WORK REQUIRING LINE VOLTAGE THENTHE CONTRACTOR SHALL COORDINATE WITH AND COMPENSATE THE ELECTRICAL CONTRACTOR AS REQUIRED. CONTROLS CONTRACTOR SHALLCOORDINATE WITH EQUIPMENT SUPPLIERS TO ENSURE THAT ALL DEVICES ARE COMPATIBLE WITH THE EXISTING CONTROLS SYSTEM AND EXISTINGMECHANICAL EQUIPMENT. CONTROLS CONTRACTOR SHALL PROVIDE READ-ONLY ACCESS TO THE BAS VIA THE INTERNET FOR A PERIOD OF ONE YEAR TOASSIST WITH TROUBLESHOOTING ANY ISSUES RELATED TO THE HVAC SYSTEM IN THE AREA OF THIS PROJECT.
2. CONTROLS CONTRACTOR SHALL ALSO HAVE IN HIS BID AS A LINE ITEM FOR THE POTENTIAL NEED FOR THE TIME AND RESOURCES REQUIRED TO ASSISTTHE COMMISSIONING AGENT IN THE COMMISSIONING OF THE MECHANICAL AND ELECTRICAL SYSTEMS ASSOCIATED WITH THE TENANT FINISH WORKUTILIZING A WEB BASED COMMISSIONING PROCESS. WORK SHALL INCLUDE BUT NOT LIMITED TO: ATTENDING COMMISSIONING SCOPE MEETING,PERFORMING AND DOCUMENTING PRE-FUNCTIONAL CHECK LISTS, PROVIDING ASSISTANCE IN THE FUNCTIONAL TESTING OF EQUIPMENT AND PROVIDINGTOOLS REQUIRED TO PERFORM FUNCTIONAL TESTING.
3. ALL CONTROL WIRING TO BE INSTALLED IN PLENUM RATED CONDUIT.
4. NO NETWORKED CONTROL POINTS ARE ALLOWED. ALL SENSORS TO BE HARDWIRED DIRECTLY TO CONTROLLING MODULE.
CONTROLS SYSTEM NOTES
1. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS IN FIELD PRIOR TO COMMENCEMENT OF WORK. REFER TO ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS.
2. ALL SUBCONTRACTORS SHALL BE LICENSED, EXPERIENCED, AND THOROUGHLY KNOWLEDGEABLE IN THEIR RESPECTIVE AREAS OF THE CONSTRUCTION INDUSTRYAND SHALL PERFORM IN A RESPONSIBLE MANNER WITH ESTABLISHED CONSTRUCTION SEQUENCE, SHALL RECOGNIZE THE PRIORITY OF THE CONSTRUCTIONDOCUMENTS, AND SHALL INFORM THE PRIME CONTRACTOR OF POTENTIAL PROBLEMS WHEN THE CONSTRUCTION DOCUMENTS ARE UNCLEAR OR INCONSISTENT.
3. SUBCONTRACTORS SHALL BE RESPONSIBLE TO NOTIFY THE PRIME CONTRACTOR OF DISCREPANCIES OR CONFLICTS IN THE CONSTRUCTION DOCUMENTS FOUNDDURING BIDDING AND/OR PRIOR TO PERFORMING THE WORK.
4. EXAMINATION OF BIDDING DOCUMENTS.
A. EACH BIDDER SHALL EXAMINE THE BIDDING DOCUMENTS CAREFULLY, AND NOT LATER THAN SEVEN (7) DAYS PRIOR TO THE DATE OF RECEIPT OF BIDS, SHALLMAKE WRITTEN REQUEST TO THE ARCHITECT FOR INTERPRETATION OR CORRECTION OF ANY DISCREPANCIES, AMBIGUITIES, INCONSISTENCIES, OR ERRORSTHEREIN WHICH HE MAY DISCOVER (REFER TO ARCHITECTURAL REQUIREMENTS). THE ARCHITECT WILL ISSUE ANY INTERPRETATION OR CORRECTION AS ANADDENDUM. ONLY A WRITTEN INTERPRETATION OR CORRECTION BY ADDENDUM SHALL BE BINDING. NO BIDDER SHALL RELY UPON INTERPRETATIONS ORCORRECTIONS GIVEN BY ANY OTHER METHOD. IF DISCREPANCIES, AMBIGUITIES, INCONSISTENCIES, OR ERRORS ARE NOT COVERED BY ADDENDUM ORWRITTEN DIRECTIVE, CONTRACTOR SHALL INCLUDE IN THEIR BID, LABOR MATERIALS AND METHODS OF CONSTRUCTION RESULTING IN HIGHER COST. AFTERAWARD OF CONTRACT, NO ALLOWANCE OR EXTRA COMPENSATION WILL BE MADE ON BEHALF OF THE CONTRACTOR DUE TO THEIR FAILURE TO MAKE THEWRITTEN REQUESTS AS DESCRIBED ABOVE.
B. FAILURE TO REQUEST CLARIFICATION DURING THE BID PERIOD OF ANY INADEQUACY, OMISSION, OR CONFLICT WILL NOT RELIEVE THE CONTRACTOR OF THEIRRESPONSIBILITIES. THE SIGNING OF THE CONTRACT WILL BE CONSIDERED AS IMPLICITLY DENOTING THAT THE CONTRACTOR HAS A THOROUGHCOMPREHENSION OF THE FULL INTENT AND SCOPE OF THE CONSTRUCTION CONTRACT DRAWINGS AND SPECIFICATIONS.
5. PROVIDE A BASE BID WHICH SHALL INCLUDE ONLY SPECIFIED EQUIPMENT OR EQUIPMENT LISTED AS EQUIVALENT. NO SUBSTITUTIONS FOR THE LISTEDEQUIPMENT SHALL BE ALLOWED IN THE BASE BID.
A. THE MANUFACTURER OF EQUIPMENT OR MATERIALS FIRST NAMED ON THE DRAWINGS IS THE BASIS OF DESIGN. OTHER MANUFACTURERS LISTED ARECONSIDERED GENERAL EQUIVALENTS ONLY.
B. COORDINATION OF GENERAL EQUIVALENTS AND SUBSTITUTIONS: WHERE CONTRACT DOCUMENTS PERMIT SELECTION FROM SEVERAL GENERALEQUIVALENTS, OR WHERE SUBSTITUTIONS ARE AUTHORIZED, COORDINATE CLEARANCE AND OTHER INTERFACE REQUIREMENTS WITH MECHANICAL ANDOTHER WORK.
1) PROVIDE NECESSARY ADDITIONAL ITEMS SO THAT SELECTED OR SUBSTITUTED ITEM OPERATES EQUIVALENT TO THE BASIS OF DESIGN AND PROPERLYFITS IN THE AVAILABLE SPACE ALLOCATED FOR THE BASIS OF DESIGN.
2) PROVIDE ALL FEATURES WHICH ARE STANDARD ON THE BASIS OF DESIGN PLUS ANY SPECIFIED OPTIONS.
3) BE RESPONSIBLE FOR ASSURING THAT PIPING, CONDUIT, DUCT, FLUE, AND OTHER SERVICE LOCATIONS FOR GENERAL EQUIVALENTS OR SUBSTITUTIONSDO NOT CAUSE ACCESS, SERVICE, OR OPERATIONAL DIFFICULTIES ANY GREATER THAT WOULD BE ENCOUNTERED WITH THE BASE DESIGN.
6. INASMUCH AS DESIGN FOR REMODEL AND/OR REHABILITATION REQUIRES THAT CERTAIN ASSUMPTIONS BE MADE REGARDING EXISTING CONDITIONS, ANDBECAUSE SOME OF THESE ASSUMPTIONS CANNOT BE VERIFIED WITHOUT DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE BUILDING, THEENGINEER CANNOT ASSURE THE OWNER OR THE CONTRACTOR THAT THE PROFESSIONAL CONSULTING SERVICES HEREIN ENCOMPASS ALL CONTINGENCIES.FIELD COORDINATION DURING CONSTRUCTION IS IMPERATIVE. MAKE REASONABLE ALLOWANCES FOR UNSEEN CONDITIONS.
7. THE EXISTING BUILDING WILL BE OCCUPIED BY THE OWNER DURING CONSTRUCTION. CONTINUED OPERATION OF THE FACILITY SHALL NOT BE HINDERED BY THISWORK. ACCOUNT FOR ALL ADDITIONAL COSTS WHICH MAY BE INCURRED DUE TO THE DIFFICULTY OF WORKING OVER AND AROUND EMPLOYEES, FURNITURE,EQUIPMENT, ETC.; AND DUE TO THE HOURS OF THE DAY IN WHICH AN AREA MAY BE ACCESSIBLE WHEN COMPILING HIS BID.
8. BE RESPONSIBLE TO FIELD VERIFY EXISTING EQUIPMENT OR DUCTWORK REMAINING TO BE CONNECTED TO NEW OR EXISTING SYSTEMS. PROVIDE DUCTWORK,PIPING, CONTROLS, DIFFUSERS, ETC., AS REQUIRED TO RESTORE CONTINUITY OF SYSTEMS, OR TO MAKE NEW WORK MEET EXISTING CONDITIONS, WHETHERINDICATED OR NOT.
9. SUBCONTRACTOR SHALL VERIFY EXISTENCE AND LOCATION OF ALL UTILITY SERVICES AND COORDINATE AS REQUIRED BY THEIR RESPECTIVE AREA OF THECONSTRUCTION, NOTIFYING THE PRIME CONTRACTOR OF VARIATIONS OR CONFLICTS.
10. IF NOT SPECIFICALLY DEFINED IN THESE CONSTRUCTION DOCUMENTS, MATERIALS AND/OR EQUIPMENT SHALL BE IDENTIFIED BY THE SUBCONTRACTOR WITHSUFFICIENT TIME TO ALLOW SELECTION, PURCHASE, AND DELIVERY TO MAINTAIN CONSTRUCTION SCHEDULE.
11. PROVIDE MECHANICAL DEMOLITION AS REQUIRED. REFER TO ARCHITECTURAL DEMOLITION DRAWINGS FOR LOCATION AND EXTENT OF DEMOLITION REQUIRED.VISIT SITE PRIOR TO BID TO DETERMINE EXTENT OF WORK INVOLVED. EXISTING FIXTURES, MECHANICAL EQUIPMENT, ETC., BEING REMOVED SHALL BE RETURNEDTO THE OWNER. DISPOSE OF ALL REMOVED PIPING, DUCTWORK, ETC. UNLESS NOTED OTHERWISE. PIPES, DUCTWORK, EQUIPMENT, ETC. TO BE REMOVED, ARESHOWN HATCHED, UNLESS OTHERWISE NOTED.
12. VERIFY EXACT LOCATIONS OF EXISTING AND NEW UNDERGROUND UTILITIES, PIPING, AND RACEWAY SYSTEMS IN CEILING SPACES ABOVE AND BELOW SPACE.
13. ALL DUCTWORK, DIFFUSERS, PIPING, FIXTURES, AND EQUIPMENT SHOWN IN LIGHT DASHED LINE WEIGHT IS EXISTING, NEW INDICATED BY HEAVIER LINE WEIGHT,EXCEPT WHERE NOTED. PIPES, DUCTWORK, EQUIPMENT, ETC. TO BE REMOVED, ARE SHOWN HATCHED.
14. OFFSET PIPING, DUCTWORK, ETC. AS NECESSARY TO ACCOMMODATE STRUCTURE, BEAMS, AND COLUMNS, AND EXISTING EQUIPMENT.
15. ALL EXISTING SUPPORT RODS AND STRAPS NOW SUPPORTING DUCTS, PIPES, AIR TUBING, ELECTRICAL CONDUIT, ETC. THAT ARE REMOVED TO ALLOW ROOM FORINSTALLATION OF NEW EQUIPMENT SHALL BE RELOCATED AND REINSTALLED, OR REPLACED IF DAMAGED.
16. ALL “CAPPED” SANITARY AND VENT LINES SHALL BE RECONNECTED OR RE-ROUTED AS NECESSARY TO PREVENT “DEAD-ENDS” IN THE PIPING. ALL PIPING SHALLDRAIN TO ACTIVE SANITARY WASTE LINES AND ALL BRANCHES WITH TRAPS SHALL BE ADEQUATELY VENTED.
17. CAP ALL DEMOLISHED AND ABANDONED DUCT TAKE-OFFS AT TRUNK DUCT.
18. WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THE SATISFACTION OF THE ARCHITECT, OWNER, AND ENGINEER.
19. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM HIS/HER WORK IN CONFORMANCE WITH ALL APPLICABLE CODES, ORDINANCES AND LIFE SAFETY FEATURESAS REQUIRED BY LOCAL, STATE, OR NATIONAL AUTHORITIES. THE CONTRACTOR SHALL VERIFY WITH THE ARCHITECT IF MODIFICATION OF HIS/HER WORK ISREQUIRED FOR COMPLIANCE.
20. ALL WORK OF ALL TRADES MUST BE IN STRICT COMPLIANCE, OR EXCEED THE MINIMUM MATERIAL AND METHOD REQUIREMENTS OF THE ADOPTED NEW MEXICOSTATE CODES INCLUDING THE INTERNATIONAL BUILDING CODE, UNIFORM MECHANICAL AND PLUMBING CODES, FIRE AND ELECTRICAL CODES, MOST CURRENTNFPA, THE 2010 GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTH CARE FACILITIES, ALL LOCAL ORDINANCES AND AMENDMENTS AND MANUFACTURER'SINSTALLATION RECOMMENDATIONS. IF A CONFLICT BETWEEN THOSE PUBLICATIONS EXISTS, THE MOST STRINGENT REQUIREMENT SHALL APPLY.
21. PAY FOR AND SECURE ALL REQUIRED PERMITS AND INSPECTIONS. PRIOR TO FINAL PAYMENT, TURN OVER TO ARCHITECT ALL CERTIFICATES OF COMPLETION.
22. WARRANTY THE INSTALLATION AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP. THE WARRANTY SHALL BE FOR A PERIOD OF ONE YEAR AFTER OWNER'SACCEPTANCE. DEFECTS SHALL BE PROMPTLY REMEDIED WITHOUT COST TO THE OWNER.
23. SUBMIT RECORD DOCUMENTS TO ARCHITECT. DOCUMENTS SHALL INCLUDE ALL ADDENDUM ITEMS, CHANGE ORDERS, ALTERATIONS, REROUTINGS, ETC.
24. SYSTEMS SHALL BE COMPLETE, OPERABLE, AND READY FOR CONTINUOUS OPERATION PRIOR TO ACCEPTANCE BY THE OWNER.
25. SYSTEMS SHALL BE TESTED FOR PROPER OPERATION. PERFORM AT A MINIMUM ALL CODE REQUIRED TESTS OR SYSTEMS. IF TESTS OF WORK ARE DEFECTIVE,CONTRACTOR SHALL MAKE CORRECTIONS NECESSARY AT NO ADDITIONAL COST TO OWNER.
26. ALL MATERIALS AND/OR EQUIPMENT SHALL BE HANDLED AND INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS.
27. SUBMIT ALL MECHANICAL DIVISION SHOP DRAWING AND PRODUCT DATA AT ONE TIME. SUBMITTAL SHALL BE BOUND AND INDEXED IN A NEAT AND ORDERLYMANNER. PARTIAL SUBMITTALS WILL BE REJECTED. SUBMITTALS SHALL INCLUDE, BUT NOT BE LIMITED TO: EQUIPMENT, FIXTURES, INSULATION, DIFFUSERS,PUMPS, PIPING, VALVES, CONTROLS, AND FIRE PROTECTION.
28. FAILURE TO ORDER, OR RELEASE ORDER FOR MATERIALS AND/OR EQUIPMENT WILL NOT BE ACCEPTED AS A REASON TO SUBSTITUTE ALTERNATE MATERIALS,EQUIPMENT, OR INSTALLATION METHODS.
29. PROVIDE NECESSARY TRENCHING, BACKFILL, EXCAVATION, SUPPORTS, SAWCUTTING AND PATCHING, CONCRETE/PAVING, ETC., AS REQUIRED. PATCH TO MATCHEXISTING FLOOR LEVEL.
30. REPAIR ALL ACCIDENTAL OR INTENTIONAL DAMAGE TO MATCH EXISTING CONSTRUCTION WITH NO NOTICEABLE DIFFERENCE IN CONTINUITY, APPEARANCE ORFUNCTION.
31. TEMPORARY HEAT SHALL BE FURNISHED BY THE GENERAL CONTRACTOR. USE OF THE PERMANENT HEATING SYSTEM WILL NOT BE ALLOWED.
32. COORDINATE ALL PENETRATIONS OF THE FLOOR SLAB PRIOR TO COMMENCING WORK. UTILIZE X-RAY AND VISUAL INVESTIGATION OF EXISTING CONDITIONS ASREQUIRED PRIOR TO DRILLING OR CUTTING. COORDINATE ALL NEW PENETRATIONS WITH OTHER DIVISIONS OF THE WORK. ALL CONTRACTORS ARE INDIVIDUALLYRESPONSIBLE FOR ALL PENETRATIONS REQUIRED BY THEIR DIVISIONS.
33. FIRE STOPPING REQUIREMENT. PENETRATIONS THROUGH RATED WALLS AND FLOORS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THEPASSAGE OF FLAMES AND HOT GASSES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC FOR FIRE STOPS ASTM-E-814. ACCEPTABLEMATERIALS INCLUDE: DOW CORNING RTV FIRE STOP FOAM FOR BARE PIPE, METAL CONDUIT, AND ELECTRICAL CABLE; 3M FIRE DAM 150 CAULK FOR BARE PIPE,METAL CONDUIT, AND BUILDING CONSTRUCTION GAPS; 3M CP-25 CAULK AND FS-195 INTUMESCENT STRIPS FOR INSULATED PIPES, PLASTIC PIPE OR CONDUIT, ANDELECTRICAL CABLE. SUBMIT UL LISTED APPLICATION DATA FOR EACH TYPE OF PENETRATION ENCOUNTERED.
34. DUCTS, PIPING, AND CONDUITS PENETRATING THROUGH ROOF SHALL HAVE ROOF FLASHING COMPATIBLE WITH THE ROOFING SYSTEM. SEE ARCHITECTURALDRAWINGS. IN THE ABSENCE OF ANY OTHER REQUIREMENTS, PROVIDE SHEET LEAD TYPE FLASHING FOR PLUMBING VENTS IN BUILT-UP ROOFS, TALL CONE WITHEPDM BOOT FOR PIPE AND CONDUIT IN SINGLE PLY MEMBRANE ROOFS, AND CURBED ROOF PENETRATIONS IN ALL TYPES OF ROOF. INSTALLATION SHALL BEWATERTIGHT.
35. ALL FLOOR DRAINS CONNECTED TO THE SEWER SYSTEM SHALL BE EQUIPPED WITH TRAP PRIMERS OR TRAP GUARDS. PROVIDE TRAP PRIMERS WITH BACKFLOWPREVENTERS AND CONNECT TO THE NEAREST COLD WATER PIPING ADJACENT TO A FLUSHING FIXTURE. PROVIDE ELECTRONIC TRAP PRIMERS FOR ANY AREASWHERE THE NEAREST ADJACENT FLUSHING FIXTURES ARE NOT WITHIN A REASONABLE DISTANCE OR STRUCTURAL OBSTRUCTIONS PREVENT GRAVITY SLOPING OFTRAP PRIMER LINES. ADDED COST OF ELECTRIC POWER FOR ELECTRONIC TRAP PRIMERS SHALL BE BORNE BY PLUMBING CONTRACTOR. INSTALL ALL TRAPPRIMER VALVES AND ASSOCIATED SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
36. SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR ALL CEILING PENETRATIONS AND AIR DEVICE LOCATIONS.
37. COORDINATE ARCHITECTURAL, STRUCTURAL, MECHANICAL, FIRE PROTECTION, ELECTRICAL, LANDSCAPING, AND INTERIOR DESIGN DRAWINGS PRIOR TOINSTALLATION.
38. CAREFULLY VERIFY ELECTRICAL SERVICE VOLTAGE AND PHASE AVAILABLE.
39. MOUNT ALL STATS AT 48” A.F.F. IN “ACCESSIBLE” AREAS, 4'6” A.F.F. IN OTHER AREAS, UNLESS NOTED OTHERWISE (REFER TO ARCHITECTURAL). COORDINATELOCATION WITH WALL FINISH, AND TO AVOID CASEWORK, FURNITURE, DOOR SWINGS, HEAT SOURCES, AND EXTERIOR WALLS (COORDINATE WITH ARCHITECH ANDOWNER). NOTIFY ENGINEER OF ANY CONFLICTS PRIOR TO BEGINNING THERMOSTAT INSTALLATION.
40. SUBMIT A WRITTEN BALANCE REPORT BY A NEBB OR AABC CERTIFIED BALANCING CONTRACTOR. BALANCING PROCEDURES SHALL BE IN ACCORDANCE WITH NEBBOR AABC GUIDELINES FOR PROPORTIONAL BALANCE. SUBMIT REPORT ON STANDARD NEBB FORMS OR SUBMIT FORMS FOR REVIEW PRIOR TO BALANCING.MEASUREMENTS SHALL INCLUDE ALL MOTOR AMPERAGE AND VOLTAGE READINGS; MOTOR AND FAN RPMS; STATIC PRESSURE AT INLET AND OUTLET OF ALLPACKAGED EQUIPMENT, FANS, COILS, AND FILTERS; PITOT TUBE MEASUREMENT OF SUPPLY, EXHAUST, RETURN, AND OUTSIDE AIR MAIN DUCTS, AT MINIMUM
OUTSIDE AIR, AND 100% (ECONOMIZER) OUTSIDE AIR; VELOCITY DISTRIBUTION ACROSS THE FACE OF FILTERS; AIR INLET AND OUTLETS; WATER FLOW AT ALL FLOWMEASUREMENT STATIONS; INLET AND OUTLET PRESSURE AT PUMPS WITH FLOW CALCULATED FROM THE PUMP CURVE; WATER FLOW, TEMPERATURE DROP, ANDPRESSURE DROP AT ALL COILS.
A. PROVIDE BELTS AND SHEAVES AS REQUIRED FOR DRIVE CHANGES TO ADJUST FAN SPEED.
B. ADJUST FLOWS TO WITHIN 10% OF REQUIRED QUANTITY. WHERE ROOM AIR PRESSURE RELATIONSHIP ARE REQUIRED TO BE MAINTAINED AS SHOWN BY ADIFFERENTIAL OF SUPPLY AND EXHAUST/RETURN OR BY NOTE, ADJUST SUPPLY TO WITHIN 10% AND THEN ADJUST EXHAUST/RETURN TO PROVIDE THEINDICATED ROOM PRESSURE. IF ACTUAL QUANTITY IS LESS THAN 90%, INVESTIGATE CAUSE, ATTEMPT TO RECTIFY AND NOTIFY ENGINEER. SUBMITTAL OFBALANCE REPORT WITH LESS THAN REQUIRED FLOWS WITHOUT EXPLANATION IS CAUSE FOR REJECTION OF REPORT.
C. SUBMIT THREE (3) COPIES OF ALL SUBMITTALS IN ADDITION TO ANY REQUIRED BY THE CONTRACTOR AND HIS SUPPLIERS. THESE COPIES SHALL BE RETAINEDBY THE OWNER, ARCHITECT, AND ENGINEER.
41. DUCTWORK:
A. FLEXIBLE DUCTWORK SHALL HAVE AN OUTER JACKET OF FIRE RETARDANT POLYETHYLENE VAPOR BARRIER MATERIAL, UNIFORM LAYER OF FIBERGLASSINSULATION, HIGH-STRENGTH GALVANIZED STEEL HELIX ENCAPSULATED IN REINFORCED “RIP STOP” ALUMINUM LAMINATE INTERIOR CORE, UL LISTED ANDLABELED, CLASS 1 AIR DUCT. WORKING PRESSURE RATING: POS. 6”, NEC. 4”. FLEXMASTER TYPE 5 OR EQUIVALENT. SUBMIT SAMPLES TO DETERMINEEQUIVALENCE.
B. FLEXIBLE CONNECTION: EQUIVALENT TO VENTFAB, FIREPROOF GLASS CLOTH, 10” W.C. RATED.
C. ROUND DUCT: SPIRAL SEAM, GALVANIZED STEEL. DIE STAMPED OR 5 GORE ELBOWS. “SNAP-LOCK”, LONGITUDINAL SEAM DUCT, OR ADJUSTABLE FITTINGS AREACCEPTABLE ON INDIVIDUAL GRILLE/DIFFUSER RUNOUTS ONLY.
D. INSULATION:
1) EXTERNALLY WRAP ALL RECTANGULAR AND ROUND SUPPLY AIR DUCTS WITH FLEXIBLE GLASS FIBER, ANSI/ASTM C612; 0.002 INCH FOIL SCRIM FACING.
E. DUCTWORK: G60 GALVANIZED SHEET STEEL; LOCK FORMING QUALITY; CONSTRUCTED TO THE LATEST EDITION OF SMACNA “HVAC DUCT CONSTRUCTIONSTANDARDS”; +/- 1” W.C. PRESSURE CLASSIFICATION, SEAL CLASS “C”; WITH GALVANIZED STEEL FASTENERS, ANCHORS, ANGLES, STRAPS, ETC.
F. SEAL ALL SEAMS (LONGITUDINAL AND TRANSVERSE) AIRTIGHT WITH UNITED MCGILL “UNI-GRIP” UL LISTED, WATER BASED, NON-HARDENING, ELASTIC SEALANTOR EQUIVALENT. TAPE NOT ALLOWED.
42. PROVIDE ¼” GALVANIZED MESH SCREEN ON ALL COMBUSTION AIR DUCTS OR OPENINGS, AND ALL OPEN END RETURN AND EXHAUST DUCTS.
43. ALL DUCTWORK DIMENSIONS ARE FREE AREA DIMENSIONS.
44. DUCTWORK NOTES:
A. DIFFUSER NECK SIZE IS SAME AS FLEXIBLE DUCT SIZE.
B. UNLESS OTHERWISE NOTED, ALL CHANGES IN DIRECTION SHALL BE MADE WITH RADIUS ELBOWS WITH RADIUS TO CENTERLINE EQUAL TO 1.5 DUCT WIDTH.
1) WHERE REQUIRED FOR SPACE CONSTRAINTS, PROVIDE SQUARE THROAT ELBOWS WITH SINGLE WIDTH (NON-AIRFOIL) TURNING VANES.
2) FOR DUCT DEPTHS OF 36” OR LESS, PROVIDE MANUFACTURED SINGLE WIDTH (NON-AIRFOIL) TURNING VANES, WITH SPACING IN ACCORDANCE WITHSMACNA DUCT CONSTRUCTION STANDARDS FOR “STANDARD SPACING”. USE DOUBLE THICKNESS BLADES FOR DUCT DEPTHS GREATER THAN 36”. USE NOTRAILING EDGES.
C. ALL FLEXIBLE DUCTS SHALL NOT EXCEED SIX FEET IN LENGTH.
D. RETURN AIR PLENUM: OTHER HVAC SYSTEMS IN THE PROJECT AREA USE THE SPACE ABOVE THE CEILING ON EACH FLOOR AS A RETURN AIR PLENUM.CONFORM TO THE REQUIREMENTS OF NFPA AND LOCAL CODE REQUIREMENTS FOR ALL MATERIAL INSTALLED IN THE RETURN AIR PLENUM.
E. PROVIDE A COMPLETE DUCTED RETURN AIR PATH BETWEEN ALL NEW AND MODIFIED RETURN AIR DEVICES (GRILLES ETC.) AND THEIR RESPECTIVE HVAC UNIT.
F. ALL BRANCH DUCTS TO DIFFUSERS/GRILLES TO BE PROVIDED WITH A BALANCING DAMPER.
45. SUPPORT PIPE WITH ROD AND CLEVIS, RING HANGERS, TRAPEZE, OR CLAMPS. NO PIPE TAPE OR STRAPPING ALLOWED. ALL HANGERS SHALL BE SIZED FOR OD OFINSULATION, IF ANY. PROTECT INSULATED LINES WITH 20 GA SHEET METAL SHIELDS FOR PIPING 1-1/2” AND LESS. PROVIDE CALCIUM SILICATE INSULATION INSERTSFOR ALL INSULATED PIPING 2” AND LARGER. MAINTAIN VAPOR BARRIER ON ALL COLD LINES. ISOLATE BARE COPPER LINES FROM HANGERS WITH VIBRASORB OREQUIVALENT, COPPER COATED HANGERS ARE NOT SUFFICIENT, WRAPPING PIPE WITH TAPE NOT ACCEPTABLE.
46. NEW HOT AND COLD WATER BRANCHES TO BE ROUTED FROM NEAREST HOT WATER AND COLD WATER OF LINE SIZE EQUAL TO OR GREATER THAN NEWBRANCH--TYPICAL. EXISTING HOT AND COLD WATER BRANCHES TO BE REMOVED MUST BE CAPPED BACK AT MAINS, NO DEAD LEGS ALLOWED
47. PROVIDE LINE SIZE ISOLATION VALVES ON ALL BRANCH PIPING TO INDIVIDUAL ROOMS.
48. REFER TO PLUMBING FIXTURE CONNECTIONS SCHEDULE FOR PIPE SIZES TO INDIVIDUAL PLUMBING FIXTURES, UNLESS NOTED OTHERWISE.
49. PROVIDE SHOCK ARRESTERS AT ALL DOMESTIC HOT AND COLD WATER BRANCHES SERVING FIXTURES AND EQUIPMENT WITH QUICK CLOSING VALVES. SUCHFIXTURES AND EQUIPMENT INCLUDES FLUSH VALVE WATER CLOSETS, DISHWASHERS, ICE MACHINES, AND CLOTHES WASHERS. SHOCK ARRESTERS SHALL BECONSTRUCTED WITH A PISTON IN A SEALED COPPER TUBE CHAMBER, AND APPROVED FOR INSTALLATION WITHIN WALLS WITHOUT ACCESS PANELS. SIOUX CHIEFOR EQUIVALENT. BELLOWS TYPE NOT ACCEPTABLE.
50. DOMESTIC HOT AND COLD PIPING INSIDE BUILDING--BURIED LINES, TYPE “K” SOFT ANNEALED COPPER WATER TUBE, SINGLE LENGTH TO AVOIDFITTINGS, (WROUGHT COPPER FITTINGS WHERE UNAVOIDABLE) AND 1100°F SOLDER. NON-BURIED LINES, TYPE “L” HARD COPPER WATER TUBE, WROUGHT COPPERFITTINGS AND NO LEAD 95-5 SOLDER.
51. COPPER PIPE VALVES AND SPECIALTIES
A. GATE VALVES - BRONZE, CLASS 125, 200 LB. W.O.G.B. BALL VALVES - BRONZE, CLASS 125, 600 LB. W.O.G.C. CHECK VALVES - BRONZE, CLASS 125, 200 LB. W.O.G.D. BALANCING VALVES - 125 PSI W.P. FOR 250 DEGREE FARENHEIGHT SERVICE TIGHT SHUTOFF, TOUR AND ANDERSON STA, ARMSTRONG CBV, GERAND, OR
FLOWSET, BELL AND GOSSETT CIRCUIT SETTER.E. DIRECT UNIONS: FURNISH AND INSTALL A DIELECTRIC UNION AT EACH CONNECTION BETWEEN DISSIMILAR METALS.
52. MATERIALS; SOIL, WASTE, AND VENT PIPING (INSIDE BUILDING)
A. LINES ABOVE/BELOW GROUND--STANDARD WEIGHT, C.I. EPOXY COATED SOIL PIPE, AND FITTINGS. HUB AND SPIGOT WITH NEOPRENE GASKETS, OR NO HUBWITH 4-BAND HEAVY DUTY CLAMPS. UP THROUGH 2-1/2” MAY BE STANDARD WEIGHT, GALVANIZED STEEL PIPE WITH BLACK, W.I. DRAIN FITTINGS, OR DWVCOPPER TUBE WITH DWV FITTINGS AND 95-5 NO LEAD SOLDER.
53. PROVIDE EXPANSION JOINTS OR LOOPS ON ALL CHILLED WATER PIPING RUNS IN EXCESS OF 50 FEET AND IN ACCORDANCE WITH THE MANUFACTURER'SRECOMMENDATIONS.
54. GRADE AND VALVE ALL CHILLED WATER PIPING WITH 3/4” HOSE END VALVES TO PERMIT COMPLETE DRAINAGE OF THE SYSTEM. VENT ALL HIGH POINTS INEQUIPMENT ROOMS AS NECESSARY WITH AUTOMATIC AIR VENTS PIPED TO CONVENIENT DRAIN. ALL HIGH POINTS IN SYSTEM OUTSIDE OF EQUIPMENT ROOMSWITH COMBINATION AUTOMATIC/MANUAL AIR VENTS AS REQUIRED TO RELIEVE AIR IN THE SYSTEM.
55. GAS PIPING: SCHEDULE 40 BLACK STEEL PIPE, 150 LB. MALLEABLE IRON SCREWED FITTINGS ON ABOVE GROUND PIPE, WELDED FITTINGS WITH ALL PIPING COATEDAND WRAPPED ON BURIED PIPE.
56. GAS VALVES: NON-LUBRICATED BALL STYLE VALVE WITH RESILIENT SEATS, AND ADJUSTABLE GLAND PACKING NUT, AGA AND UL LISTED FOR NATURAL GASSERVICE.
57. PROVIDE PLASTIC GROMMETS ON ALL HEATING WATER PIPING PASSING THROUGH WOOD JOISTS AND STUDS.
58. MATERIALS; HYDRONIC PIPING
A. ABOVE GRADE, UP THROUGH 2-1/2”: SCHEDULE 40 STEEL PIPE WITH MALLEABLE IRON THREADED FITTINGS, OR TYPE “L” COPPER TUBE WITH WROUGHTCOPPER FITTINGS AND 95-5 NO LEAD SOLDER.
B. ABOVE GRADE, 3” AND LARGER: SCHEDULE 40 STEEL PIPE WITH CAST IRON OR STEEL WELDING FITTINGS.
C. BELOW GRADE, UP THROUGH 1-1/4”: TYPE “K” SOFT ANNEALED COPPER TUBE, SINGLE LENGTH TO AVOID FITTINGS, (WROUGHT COPPER FITTINGS WHEREUNAVOIDABLE) AND 1100 DEGREE FARENHEIGHT SOLDER INSULATE WITH 1” THICK CLOSED CELL ELASTOMERIC INSULATION. ALL BURIED PIPE SHALL BESURROUNDED WITH 4” OF CLEAN SAND.
D. BELOW GRADE, 1-1/2” AND LARGER: JACKETED, PRE-INSULATED PIPING, WITH FLUID CARRIER PIPE EQUAL TO ABOVESPECIFICATION. ROVANCO, RICWELL/PERMA-PIPE OR EQUIVALENT.
59. DRAIN PAN PIPING--NOT BURIED--TYPE “M” COPPER, WROUGHT COPPER FITTINGS, AND 95-5 SOLDER; BURIED--TYPE L” COPPER WROUGHT COPPERFITTINGS, AND 95-5 SOLDER. ALL BURIED PIPE SHALL BE SURROUNDED WITH 4” OF CLEAN SAND.
60. INSULATE ALL CONDENSATE PIPING, CHILLED WATER, DOMESTIC WATER, DOMESTIC HOT WATER, DOMESTIC HOT WATER RECIRCULATION, AND STORM ANDOVERFLOW PIPING WITH U.L. APPROVED, WHITE, ALL SERVICE, GLASS FIBER, SNAP-ON, PIPE INSULATION. INSULATE FITTINGS WITH GLASS FIBER BLANKETINSULATION AND PREMOLDED P.V.C. COVERS. ALL MATERIALS SHALL HAVE A SMOKE DEVELOPED RATING OF 50 OR LESS AND A FLAME SPREAD RATING OF 25 ORLESS. INSULATION SHALL PASS UNINTERRUPTED THROUGH HANGERS. VAPOR BARRIERS SHALL BE CONTINUOUS, AND SEALED WITH “NON-BREATHING” MASTIC ONCOLD PIPING. ALL RAW EDGES OF INSULATION SHALL BE NEATLY TRIMMED AND SEALED WITH MASTIC.
A. INSULATION THICKNESS BELOW BASED ON INSULATION CONDUCTIVITY VALUE NOT EXCEEDING 0.27 BTU*IN/(HR*FT^2*°F):
1) CHILLED WATER, HEATING WATER - ALL PIPE SIZES, 1.” THICK. - . RUNOUTS WITHIN 4 FEET OF TERMINAL AND 1” PIPE DIAMETER OR LESS - 1/2” THICK.
2) DOMESTIC HOT WATER (DHW) AND DOMESTIC HOT WATER RECIRCULATION: ALL PIPE SIZES - 1” THICK; NON-RECIRCULATED DHW RUNOUTS WITHIN 8 FEETOF FIXTURES - 1/2” THICK.
3) DOMESTIC COLD WATER AND CONDENSATE: ALL PIPE SIZES - 1/2” THICK.
4) HORIZONTAL STORM AND OVERFLOW PIPING: ALL SIZES - 1” THICK.
61. EQUIPMENT LABELS: LABEL ALL PIPING AND EQUIPMENT. PROVIDE FULL BAND OR STRIP TYPE MARKERS AND FLOW ARROWS ON PIPING. PROVIDE TAPE BANDINGON EACH END OF LABEL/FLOW ARROW. PROVIDE ENGRAVED PLASTIC VALVE TAGS WITH VALVE NUMBER AND ATTACH WITH STANDARD CHAIN OR S-HOOKS.PROVIDE ENGRAVED PLASTIC SIGN ON OR NEAR SPECIFIED EQUIPMENT.
62. MEDICAL GAS SYSTEMS
A. REGULATORY REQUIREMENTS:
1) CONFORM TO NFPA 99.
B. SUBMITTALS:
1) PRIOR TO START OF WORK, THE CONTRACTOR'S MEDICAL GAS CERTIFIER SHALL REVIEW AND PROVIDE COMMENT TO ENGINEERS DESIGN TO INSUREFINAL COMPLIANCE.
2) SUBMIT MANUFACTURER'S PRODUCT DATA ON THE FOLLOWING:
a. MEDICAL GAS TUBING.b. STATION OUTLETS.c. MEDICAL GAS RAIL SYSTEMS.d. BRAZER CERTIFICATIONS.
C. PIPING MATERIALS
1) PIPING: COPPER, TYPE “L” OR MEDICAL QUALITY TYPE ACR, HARD TEMPER, CLEANED, CAPPED AND LABELED FOR OXYGEN SERVICE.
2) FITTINGS: WROUGHT COPPER, SOLDER JOINT, LONG RADIUS, CLEANED, CAPPED AND LABELED FOR OXYGEN SERVICE.
D. STATION OUTLETS:
1) OUTLETS TO BE GAS SPECIFIC AND ACCEPT ONLY SPECIFIC CONNECTIONS COMPATIBLE SPECIFIED. OUTLETS SHALL BE UL LISTED, CSA APPROVED AND MEET NFPA 99 STANDARD.
E. WASHING:
1) ON-SITE WASHING OF PIPE AND FITTINGS SHALL BE LIMITED TO RE-CLEANING SURFACES IN THE IMMEDIATE VICINITY OF JOINTS WHICH HAVE BECOME CONTAMINATED PRIOR TO JOINING.
F. JOINING:
1) ALL WORK SHALL BE PERFORMED BY BRAZERS CERTIFIED IN ACCORDANCE WITH AWS B2.2.
2) USE SILVER BRAZING ALLOY ANSI/AWS A5.8.
3) USE NO FLUX.
4) MAINTAIN A FLOW OF DRY OIL-FREE NITROGEN IN TUBING WHILE BRAZING TO PREVENT INTERNAL CORROSION.
5) JOINTS SHALL BE BRAZED WITHIN ONE HOUR OF BEING CLEANED. USE ONLY PLASTIC CAPS ON OD OF PIPE WHEN STOPPING WORK. DO NOT USE TAPE.
G. TESTS BY CONTRACTOR:
1) PERFORM THE INITIAL LEAK TEST, BLOWDOWN TEST, PRESSURE TEST, PIPING PURGE, AND CROSS CONNECTION TEST AS SPECIFIED IN NFPA 99. ISOLATEANY EQUIPMENT NOT RATED FOR THE TEST PRESSURE.
H. CERTIFICATION:
1) THE MEDICAL GAS SYSTEM SHALL BE TESTED BY A FACTORY TRAINED SERVICE REPRESENTATIVE OF THE MEDICAL GAS EQUIPMENT MANUFACTURERAFTER INSTALLATION OF THE SYSTEM HAS BEEN COMPLETED. THE REPRESENTATIVE SHALL PERFORM THE FOLLOWING SYSTEM VERIFICATION TESTS INACCORDANCE WITH NFPA 99: CROSS CONNECTION TEST, FLOW TEST, PIPING PURGE TEST, PIPING, PURITY TEST, AND CONCENTRATION TEST. APPROVEDMEDICAL GAS CERTIFICATION CONTRACTORS ARE SOUTHWEST MEDICAL GAS OR HEALTH CHOICE ENTERPRISES.
2) AT THE CONCLUSION OF TESTING, THE CERTIFIER SHALL PRESENT A TEMPORARY CERTIFICATE TO THE OWNER OR THE APPROPRIATE RESPONSIBLEPARTY, ANY ABNORMALITIES SHALL BE NOTED. IN ADDITION, IF REPAIR TO ANY PIECE OF MEDICAL GAS EQUIPMENT IS NECESSARY, PERFORM THIS REPAIRIN A REASONABLE TIME PERIOD. THE W
63. FIRE PROTECTION DESIGN/BUILD REQUIREMENTS:
A. PROVIDE MODIFICATIONS AND EXPANSION TO THE EXISTING AUTOMATIC SPRINKLER SYSTEM SERVING EXISTING BUILDING. COMPLETE DRAWINGS,SPECIFICATIONS, AND DETAILS SHALL BE SUBMITTED BY THE FIRE SPRINKLER DESIGN-BUILD CONTRACTOR.
B. THE FIRE SPRINKLER CONTRACTOR SHALL SERVE AS THE ENGINEER OF RECORD FOR ALL WORK PERFORMED UNDER THIS DIVISION. IF REQUIRED BY THEAUTHORITY HAVING JURISDICTION, (A.H.J.) SUBMIT COMPLETE FIRE SPRINKLER SYSTEM SHOP DRAWINGS AND HYDRAULIC CALCULATIONS, GENERATED BYCONTRACTOR. SHOP DRAWINGS SHALL BE A MINIMUM 1/8” SCALE, AND SHALL SHOW DEVICE AND APPLIANCE LOCATIONS, BUILDING BACKGROUNDINFORMATION, ROOM OCCUPANCY DESCRIPTIONS, DOOR SWINGS, FIRE RATINGS AND FIRE PROTECTION SYSTEM LAYOUT AND DETAILS. SHOP DRAWINGS ANDHYDRAULIC CALCULATIONS SHALL BE SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF NEW MEXICO. SUBMIT SHOP DRAWINGS ANDHYDRAULIC CALCULATIONS TO THE BUILDING AND FIRE DEPARTMENTS AND OBTAIN THEIR APPROVAL BEFORE SUBMISSION TO THE ARCHITECT.
C. WHERE REQUIRED BY THE A.H.J., ALL NEW SPRINKLER HEADS SHOULD HAVE THE CONNECTING MAIN AND BRANCH PIPE SIZES SHOWN.
1) SHOW THE CONNECTING MAIN AND BRANCH PIPE SIZES FOR ALL NEW, RELOCATED AND EXISTING SPRINKLER HEADS.
2) CONFORM TO LIGHT HAZARD OCCUPANCY REQUIREMENTS OF NFPA 13.
3) PROVIDE FLOW TEST INDICATING STATIC AND RESIDUAL PRESSURED DEVELOPED UNDER FIRE FLOW CONDITIONS AS REQUIRED BY A.H.J.
D. EXTEND THE EXISTING SPRINKLER SYSTEM, RELOCATE EXISTING AND ADD NEW SPRINKLER HEADS IN ACCORDANCE WITH NFPA 13, ALL APPLICABLE CODESAND ORDINANCES AND PROJECT REQUIREMENTS TO COMPLETE THE WORK.
E. SYSTEM SHALL BE INSTALLED COMPLETE AND OPERATIONAL, INCLUDING WATER FLOW INDICATOR, CONNECTIONS TO EXISTING ALARM, DRAIN PIPING,IDENTIFICATION SIGNS, ETC.
F. WORK SHALL BE PERFORMED BY A QUALIFIED FIRE SPRINKLER INSTALLER WITH A MINIMUM OF FIVE (5) YEARS EXPERIENCE IN SIMILAR INSTALLATIONS.
G. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO AND DURING INSTALLATION.
H. PROVIDE AN EXTRA STOCK OF SIX (6) SPRINKLER HEADS, THREE (3) OF EACH TYPE, AND A SPRINKLER WRENCH. SPRINKLER HEADS SHALL MATCH EXISTING INADJACENT AREAS.
64. COMBINATION FIRE AND SMOKE DAMPERS:
A. UNITS SHALL BE LABELED ACCORDING TO UL 555S. COMBINATION FIRE AND SMOKE DAMPERS SHALL BE LABELED ACCORDING TO UL 555 FOR 1-1/2HOUR RATING.
B. FUSIBLE LINKS SHALL BE REPLACEABLE AND 212 DEG F RATED.
C. FRAME AND BLADES SHALL BE AT LEAST 0.064-INCH THICK GALVANIZED SHEET STEEL, MOUNTING SLEEVE SHALL BE AT LEAST 0.052-INCH THICKGALVANIZED SHEET STEEL.
D. ELECTRICAL CONNECTION: 115V, SINGLE PHASE, 60 HZ.
A. BOOKS OF OPERATING AND MAINTENANCE INSTRUCTIONS SHALL BE PERSONALLY DELIVERED TO THE OWNER'S AUTHORIZED REPRESENTATIVE AND THEOWNER INSTRUCTED AS TO THEIR USE AND THE EQUIPMENT INVOLVED. (PROVIDE TWO BOOKS FOR EACH BUILDING). ALSO, INSTRUCT THE OWNER'SPERSONNEL ON EACH VALVE.
B. THE BOOK SHALL CONTAIN, BUT NOT BE LIMITED TO, THE FOLLOWING GENERAL ITEMS:1. SPARE PARTS LISTS FOR EACH PIECE OF EQUIPMENT.2. OPERATING MANUALS FOR EACH PIECE OF EQUIPMENT AND CONTROL.3. LUBRICATION CHARTS SHOWING TYPE OF LUBRICANT AND APPLICATION METHODS AND FREQUENCIES.4. FILTER CLEANING OR REPLACEMENT SCHEDULE. (ON CONTRACTOR'S LETTERHEAD STATIONARY).5. PREVENTIVE MAINTENANCE SCHEDULE FOR CHECKING ALL ITEMS SUCH AS BELT DRIVE, SAFETY CONTROLS AND OIL AND REFRIGERANT CHARGES.
CLEANING SCHEDULE OF ALL STRAINERS, TRAPS, COILS, TUBES, TOWER PANS, SPRAYS, ETC. (ON CONTRACTOR'S LETTERHEAD STATIONARY).6. NORMAL OPERATING INSTRUCTIONS INCLUDING A SEQUENCE OF OPERATION FOR EACH SYSTEM. (ON CONTRACTOR'S LETTERHEAD STATIONARY).7. INSTRUCTIONS AS TO PROCEDURE TO BE FOLLOWED FOR ANY EMERGENCY SITUATION, SUCH AS ALARMS OR SAFETY ITEMS BEING TRIPPED. (ON
CONTRACTOR'S LETTERHEAD STATIONARY).8. INSTRUCTIONS ON WHO TO CALL FOR SERVICE DURING GUARANTEE PERIOD. (ON CONTRACTOR'S LETTERHEAD STATIONARY).9. RECORD OF EQUIPMENT INSTALLED (COPY OF EACH SHOP DRAWING AS SET FORTH UNDER "SHOP DRAWING" PARAGRAPH).10. ALL WARRANTIES PROVIDED BY MANUFACTURERS ON THEIR EQUIPMENT THAT RUN LONGER THAN THE ONE YEAR GUARANTEE BY THE CONTRACTOR.
C. BOOKS SHALL BE ARRANGED IN SEQUENCE TO MATCH THE EQUIPMENT SCHEDULES INCLUDED IN THE SPECIFICATIONS.
D. PROVIDE RECORD DRAWINGS
E. APPROVAL WILL NOT BE GIVEN FOR FINAL PAYMENT UNTIL THE TESTS, BALANCING AND OPERATING INSTRUCTION PORTIONS HAVE BEEN COMPLETED.
OPERATION AND MAINTENANCE INSTRUCTIONS
1. ALL REFRIGERATION, BOILERS, AND PACKAGED EQUIPMENT SHALL BE STARTED BY THE MANUFACTURER OR UNDERTHE MANUFACTURER'S SUPERVISION. START-UP DATA SHALL BE RECORDED IN LOGS. COPIES OF START-UP LOGSSHALL BE FORWARDED TO MECHANICAL ENGINEER AND INCLUDED IN OPERATION AND MAINTENANCE
1. ADDITIONAL STORM, HYDRONIC, DOMESTIC, WASTE,VENT AND MEDICAL GAS PIPING MAY BE ROUTED INSPACE THAT IS NOT REPRESENTED, BUT IS TOREMAIN. OTHER SYSTEMS MAY EXIST WITHIN THESPACE THAT ARE NOT REPRESENTED ON THESEDRAWINGS; MODIFICATIONS TO THESE SYSTEMS ARENOT ANTICIPATED.
2. FIELD VERIFY ALL COMPONENTS PRIOR TODEMOLITION. THE INFORMATION ON THIS SHEET WASOBTAINED, IN PART, FROM HISTORIC DESIGNDRAWINGS. ONLY PORTIONS OF THE SYSTEMS WEREACCESSIBLE FOR VISUAL CONFIRMATION DURINGDESIGN PROCESS.
3. (E) WASTE SYSTEM SERVING SPACE IS LOCATED INBELOW GRADE. THERE IS CURRENTLY AN EXISTINGROOF DRAIN SYSTEM LOCATED IN THE CEILINGSPACE ABOVE.
4. REMOVE ALL PLUMBING IFIXTURES INDICATED.
5. TEMPORARILY SEAL OR CAP PIPING TO BE RE-USEDFOR LATER CONNECTION.
6. REMOVE ALL DEMOLISHED COLD WATER, HOT WATERAND HOT WATER RECIRCULATION PIPING BACK TOBRANCH FROM MAIN TO ELIMINATE ALL DEAD ENDS INDOMESTIC WATER PIPING.
7. NOTIFY ENGINEER IMMEDIATELY OF ANYDISCREPANCIES OF INFORMATION REPRESENTED INTHE DOCUMENTS VERSUS WHAT IS FOUND IN THEFIELD.
8. COORDINATE PATCHING AND REPAIRS OF WALLS,CEILINGS AND FLOORS WITH ARCHITECT.
9. PATCH STRUCTURAL OPENINGS IN FLOORS, WALLSAND ROOFS THAT WERE PREVIOUSLY OCCUPIED BYSYSTEMS AND EQUIPMENT DEMOLISHED UNDER THISCONTRACT IN ACCORDANCE WITH STRUCTURALENGINEER'S REQUIREMENTS.
10. COORDINATE WITH OWNER FOR DISPOSAL ORRE-USE REQUIREMENTS OF PLUMBING FIXTURES TOBE REMOVED.
1. REMOVE EXISTING SINK COMPLETE. REMOVEEXISTING WASTE PIPING DOWN TO BELOW GRADEAND SEAL AND CAP. REMOVE EXISTING HW/CW ANDVENT LINES BACK TO NEAREST ACTIVE MAIN. FIELDVERIFY EXISTING CONDITIONS AND EXACT LOCATIONOF ALL PIPING.
2. REMOVE EXISTING WALL HUNG DRINKING FOUNTAINCOMPLETE. REMOVE EXISTING WASTE PIPING DOWNTO BELOW GRADE AND SEAL AND CAP. REMOVEEXISTING CW AND VENT LINES BACK TO NEARESTACTIVE MAIN AND CAP. REMOVE EXISTING SUPPORTSYSTEM. FIELD VERIFY EXISTING CONDITIONS ANDEXACT LOCATION OF ALL PIPING.
3. REMOVE EXISTING FLOOR DRAIN COMPLETE.REMOVE EXISTING WASTE PIPING DOWN TO BELOWGRADE AND SEAL AND CAP. REMOVE EXISTING VENTCOMPLETE BACK TO EXISTING ACTIVE MAIN AND CAP.REMOVE ASSOCIATED TRAP PRIMER DEVICE ANDASSOCIATED SUPPLY PIPING. REMOVE CW FROMTRAP PRIMER BACK TO ACTIVE AMIN AND CAP. FIELDVERIFY EXISTING CONDITIONS AND EXACT LOCATIONOF ALL PIPING.
4. REMOVE EXISTING WATER CLOSET COMPLETE.REMOVE EXISTING WASTE PIPING DOWN TO BELOWGRADE AND SEAL AND CAP. REMOVE EXISTING VENTCOMPLETE BACK TO EXISTING ACTIVE MAIN AND CAP.REMOVE EXISTING CW SUPPLY COMPLETE BACK TONEAREST ACTIVE MAIN. FIELD VERIFY EXISTINGCONDITIONS AND EXACT LOCATION OF ALL PIPING.
5. REMOVE EXISTING URINAL COMPLETE. REMOVEEXISTING WASTE PIPING DOWN TO BELOW GRADEAND SEAL AND CAP. REMOVE EXISTING VENTCOMPLETE BACK TO EXISTING ACTIVE MAIN AND CAP.REMOVE EXISTING CW SUPPLY COMPLETE BACK TONEAREST ACTIVE MAIN. FIELD VERIFY EXISTINGCONDITIONS AND EXACT LOCATION OF ALL PIPING.
6. EXISTING STORM PIPING FROM ROOF ABOVE TOREMAIN. STORM PIPING TO REMAIN ACTIVE DURINGCONSTRUCTION. PROTECT PIPING DURINGCONSTRUCTION AND COORDINATE EXISTINGLOCATION WITH OTHER DISCIPLINES.
7. EXISTING PLUMBING FIXTURES TO REMAIN. PROTECTPLUMBING FIXTURE DURING CONSTRUCTION.
8. REMOVE EXISTING MEDICAL GAS STATIONCOMPLETE. REMOVE ALL ASSOCIATED A,V,O2 PIPINGCOMPLETE BACK TO NEAREST ACTIVE MAIN INCEILING SPACE AND CAP. FIELD VERIFY EXISTINGCONDITIONS AND EXACT LOCATION.
9. EXISTING MEDICAL GAS VALVE BOX TO REMAIN.FIELD VERIFY EXISTING CONDITIONS AND EXACTLOCATION.
10. REMOVE EXISTING HOSE BIBB HYDRANT ANDASSOCIATED CW SUPPLY LINE COMPLETE. FIELDVERIFY EXISTING CONDITIONS AND EXACT LOCATION.
11. EXISTING STORM DRAINAGE FROM CEILING SPACEDOWN TO BELOW GRADE IS TO REMAIN. EXISTINGSTORM DRAINAGE PIPING BELOW GRADE TOEXTERIOR IS REMAIN, BUT IS NOT SHOWN. TAKEPRECAUTION TO AVOID DAMAGING DURINGCONSTRUCTION. FIELD VERIFY EXISTING CONDITIONSAND EXACT LOCATION.
1. ADDITIONAL STORM, HYDRONIC, DOMESTIC, WASTE,VENT AND MEDICAL GAS PIPING MAY BE ROUTED INSPACE THAT IS NOT REPRESENTED, BUT IS TOREMAIN. OTHER SYSTEMS MAY EXIST WITHIN THESPACE THAT ARE NOT REPRESENTED ON THESEDRAWINGS; MODIFICATIONS TO THESE SYSTEMS ARENOT ANTICIPATED.
2. FIELD VERIFY ALL COMPONENTS PRIOR TODEMOLITION. THE INFORMATION ON THIS SHEET WASOBTAINED, IN PART, FROM HISTORIC DESIGNDRAWINGS. ONLY PORTIONS OF THE SYSTEMS WEREACCESSIBLE FOR VISUAL CONFIRMATION DURINGDESIGN PROCESS.
3. (E) WASTE SYSTEM SERVING SPACE IS LOCATED INBELOW GRADE. THERE IS CURRENTLY AN EXISTINGROOF DRAIN SYSTEM LOCATED IN THE CEILINGSPACE ABOVE.
4. REMOVE ALL PLUMBING IFIXTURES INDICATED.
5. TEMPORARILY SEAL OR CAP PIPING TO BE RE-USEDFOR LATER CONNECTION.
6. REMOVE ALL DEMOLISHED COLD WATER, HOT WATERAND HOT WATER RECIRCULATION PIPING BACK TOBRANCH FROM MAIN TO ELIMINATE ALL DEAD ENDS INDOMESTIC WATER PIPING.
7. NOTIFY ENGINEER IMMEDIATELY OF ANYDISCREPANCIES OF INFORMATION REPRESENTED INTHE DOCUMENTS VERSUS WHAT IS FOUND IN THEFIELD.
8. COORDINATE PATCHING AND REPAIRS OF WALLS,CEILINGS AND FLOORS WITH ARCHITECT.
9. PATCH STRUCTURAL OPENINGS IN FLOORS, WALLSAND ROOFS THAT WERE PREVIOUSLY OCCUPIED BYSYSTEMS AND EQUIPMENT DEMOLISHED UNDER THISCONTRACT IN ACCORDANCE WITH STRUCTURALENGINEER'S REQUIREMENTS.
10. COORDINATE WITH OWNER FOR DISPOSAL ORRE-USE REQUIREMENTS OF PLUMBING FIXTURES TOBE REMOVED.
1. REMOVE MEDICAL GAS STATION COMPLETE.FIELD VERIFY EXACT LOCATION.
2. REMOVE MEDICAL VALVE BOX COMPLETE. FIELDVERIFY EXACT LOCATION.
3. REMOVE AND CAP O2 TO VALVE. FIELD VERIFYEXACT LOCATION AND CONDITIONS.
4. REMOVE AND CAP A TO VALVE. FIELD VERIFYEXACT LOCATION AND CONDITIONS.
5. REMOVE AND CAP VAC BACK TO NEARESTACTIVE MAIN. FIELD VERIFY EXACT LOCATIONAND CONDITIONS.
1. CONNECT NEW CW TO EXISTING CW OF SAME SIZEOR LARGER IN CEILING SPACE. FIELD VERIFYEXISTING CONDITIONS AND EXACT LOCATION. SIZEPER PLAN.
2. CONNECT NEW CW/HW TO EXISTING CW/HW OFSAME SIZE OR LARGER. FIELD VERIFY EXISTINGCONDITIONS EXACT LOCATION. SIZE PER PLAN.
3. CONNECT NEW HWC TO EXISTING HWC OF SAMESIZE OR LARGER IN CEILING SPACE. FIELD VERIFYEXISTING CONDITIONS EXACT LOCATION. SIZE PERPLAN.
4. CIRCUIT SETTER BALANCING VALVE. SET TO (1.5GPM) ADJUSTABLE. PROVIDE WITH ISOLATION BALLVALVE BEFORE AND AFTER CIRCUIT SETTER VALVE.
5. CONNECT NEW WASTE LINE TO EXISTING WASTEOF SAME SIZE OR LARGER. FIELD VERIFY EXISTINGCONDITIONS, EXISTING INVERT AND EXACTLOCATION. SIZE PER PLAN.
6. ROUTE 1/2" HW/CW DOWN IN WALL AND CAP FORFUTURE CONNECTION. PROVIDE STUB-OUT FORFUTURE LAVATORY.
7. ROUGH-IN 2" WASTE AND 1-1/2" VENT IN WALL FORFUTURE SINK CONNECTION.
8. CONNECT NEW VENT TO EXISTING VENT OF SAMESIZE OR LARGER IN CEILING SPACE. FIELD VERIFYEXISTING CONDITIONS EXACT LOCATION. SIZE PERPLAN.
9. EXISTING STORM DRAIN LEADER DOWN TO BELOWGRADE TO REMAIN. FIELD VERIFY EXACT LOCATION.FURR-OUT AROUND EXISTING PIPING AS REQUIRED.PROVIDE ACCESS FOR STORM CLEAN-OUT.PROTECT EXISTING PIPING DURING DEMOLITIONAND CONSTRUCTION.
10. CONNECT NEW HW TO EXISTING HW OF SAME SIZEOR LARGER IN CEILING SPACE. FIELD VERIFYEXISTING CONDITIONS EXACT LOCATION. SIZE PERPLAN.
11. CONNECT NEW CW TO EXISTING CW OF SAME SIZEOR LARGER IN CEILING SPACE. FIELD VERIFYEXISTING CONDITIONS EXACT LOCATION. SIZE PERPLAN.
12. CONNECT NEW VENT TO EXISTING 4" VTR. FIELDVERIFY EXISTING CONDITIONS AND EXACTLOCATION.
13. 3/4" HW/CW DOWN IN WALL. ROUTE 1/2" HW/CW TOCOUNTER SINK. EXTEND 1/2" HW/CW TO WATERDISPENSERS BY OTHERS AND CONNECT PERMANUFACTURERS REQUIREMENTS WITH QUARTERTURN ANGLE STOPS. EXTEND 1/2" CW TO ICEMAKER BOX. ROUTE DRAIN FROM ICE MACHINE TOCOUNTER SINK TAIL PIECE AND TERMINATEINDIRECTLY ABOVE TRAP.
14. INSTALL FLOOR DRAIN FLUSH WITH FLOORDEPRESSION FOR WHEEL CHAIR SCALE.COORDINATE EXACT LOCATION WITH WHEEL CHAIRSCALE MANUFACTURERS INSTALLATIONREQUIREMENTS.
FLAG NOTES:#
1. REFER TO P0-01 FOR PLUMBING GENERAL NOTES.
2. REFER TO P5-01 FOR PLUMBING DIAGRAMS.
3. REFER TO P0-01 FOR THE PLUMBING FIXTURECONNECTION SCHEDULE FOR PIPE SIZES TOINDIVIDUAL FIXTURES.
4. THE RENOVATION IS TO BE EXECUTED IN PHASES.REFER TO ARCHITECTURAL PLANS FOR PROJECTPHASING.
Scale:
2 RADIOLOGY CORRIDOR FLOOR PLAN1/8"=1'-0"
1. EXISTING WET AND DRY FIRE PROTECTION SYSTEMIN AREA INDICATED SHALL BE MODIFIED TOPROVIDE COVERAGE FOR THE REDESIGNEDEXISTING SPACE. MODIFY AS REQUIRED ORPROVIDE NEW SPRINKLER HEAD LAYOUT FORCOMPLETE COVERAGE OF THE RENOVATED AREA.MODIFY PIPING OR REPOSITION EXISTING FIRESPRINKLER HEADS AS REQUIRED.
1. CONNECT O2, A, AND VAC TO EXISTING. FIELDVERIFY EXACT LOCATIONS AND EXISTINGCONDITIONS.
2. 1/2" O2, 1/2" A AND 1" VAC TO MBV-2 FROMEXISTING. FIELD VERIFY EXACT LOCATIONS ANDEXISTING CONDITIONS.
3. CONNECT 1/2" A, 1/2" O2 AND 1" VAC TO MGS-1.FIELD VERIFY EXACT LOCATIONS.
FLAG NOTES:#
1. REFER TO P0-01 FOR PLUMBING GENERAL NOTES.
2. REFER TO P5-01 FOR PLUMBING DIAGRAMS.
3. REFER TO SHEET P6-01 FOR MEDICAL GASSCHEDULES.
4. THE RENOVATION IS TO BE EXECUTED IN PHASES.REFER TO ARCHITECTURAL PLANS FOR PROJECTPHASING.
A. PIPING LAYOUT IS DIAGRAMMATIC ONLY. SIZESSHOWN ARE NOMINAL INSIDE DIAMETER. ALLRECESSED PIPING SHALL BE SEAMLESS COOPERTUBING TYPE K SOFT TAMPER ASTM DESIGNATIONNO. B-88 FOR ASSEMBLY WITH L COPPER TUBINGSHALL BE USED. EXPOSED PIPING TO BE SAMEEXCEPT HARD TAMPER. THE USE OF FITTINGS ISMANDATORY. TUBING BENDERS AND MACHINESWHICH DRAW FITTINGS FROM THE TUBING NOTACCEPTABLE.
B. ENSURE THAT THE MEDICAL GAS AND VACUUMLINES ARE ELECTRICALLY GROUNDED AT SEVERALPOINTS.
C. ISOLATE PIPING FROM STUDS, HANGERS, ETC.,WHERE THERE ARE ABERRATIONS OR WHEREDISSIMILAR MATAL'S COME IN CONTACT WITH EACHOTHER.
D. COORDINATE ALL OTHER TRADES TO INSTALLMEDICAL GAS PIPING WITHOUT CONFLICT.
E. P.C. SHALL HAVE MEDICAL GASES AND ALLASSOCIATED EQUIPMENT CERTIFIED BY ANORGANIZATION AUTHORIZED TO CERTIFY MEDICALGASES.
F. PROVIDE AND INSTALL ALL MEDICAL GASES TOCOMPLY WITH THE REQUIREMENTS OF NFPA 99,NFPA 50 AND LOCAL BUILDING CODES.
G. MARK ALL MEDICAL GAS LINES WITH COLOR CODEMARKERS THAT COMPLY WITH NFPAREQUIREMENTS.
H. CONTRACTOR SHALL PROVIDE A MOCK-UP OF O2,VAC, AIR & SLIDE LAYOUT PRIOR TO INSTALLATIONOF ALL MEDICAL GAS STATION FOR APPROVAL.LOCATE SLIDE NEXT TO VAC.
I. ALL PRESSURE SENSORS SHALL BE WIRED TOLOCAL AREA ALARM PANEL.
J. ALL NEW MEDICAL GAS EQUIPMENT (VALVE BOXES,OUTLETS, AND ALARMS SHALL MATCH CURRENTSJRMC FACILITY GUIDELINES STANDARDS ANDCURRENT EXISTING SYSTEM REQUIREMENTS.
ENLARGED PLUMBINGWASTEA VENT AND WATER ENLARGEMENT PLANS
P4-01Scale:
1 ENLARGED PLUMBING WATER PLAN1/4"=1'-0"
NOTES:
1. CONNECT NEW HW TO EXISTING HW OF SAME SIZEOR LARGER IN CEILING SPACE. FIELD VERIFYEXISTING CONDITIONS AND EXACT POINT OFCONNECTION.
2. WATER HAMMER ARRESTOR. PROVIDE IN ACCESSPANEL. COORDINATE LOCATION WITH WALLFINISHES AND ACCESSORIES.
3. CONNECT NEW WASTE LINE TO EXISTING WASTEOF SAME SIZE OR LARGER. FIELD VERIFY EXISTINGCONDITIONS, EXISTING INVERT AND EXACTLOCATION.
FLAG NOTES:#
1. REFER TO P0-01 FOR PLUMBING GENERAL NOTES.
2. REFER TO P5-01 FOR PLUMBING DIAGRAMS.
3. REFER TO P0-01 FOR THE PLUMBING FIXTURECONNECTION SCHEDULE FOR PIPE SIZES TOINDIVIDUAL FIXTURES.
4. REFER TO ARCHITECTURAL DRAWINGS FOR PHASINGREQUIREMENTS.
Scale:
2 ENLARGED WASTE AND VENT PLAN1/4"=1'-0"
P1aP1P1
P3 P3
P3 P3
P4P1a
P1
P2
P9
WCO
P1aP1P1
P3 P3
P3 P3
P4P1a
P1
P2
P9
P11
P11
PIPE THRU ROOF DIAGRAMNO SCALE
6" M
IN.
24 GA. GALV. ROOF JACK W/6" FLANGE BY M.C., SET INPLASTIC CEMENT BY G.C.
PIPE BY M.C.
24 GA. GALV. STORM COLLARBY M.C., CLAMP IN PLACE &CAULK WEATHERTIGHT.
PIPE SLEEVE & CAULKING BYM.C.
SOLDERED LAP SEAM
2 LAYERS OF FELT BY G.C.
FINISHED ROOF FELTS BYG.C.
2" MIN.
NOTE:COOR'D ROOF PENETRATIONAND SEALING WITH ROOFMANUFACTURER ANDINSTALLING CONTRACTOR.
CLEANOUT DIAGRAMS
FLOOR CLEANOUT (FCO)
NO SCALE
SLOPE DN @ 1/4"/L.F.
CLEANOUT TO GRADE (COTG)
WASTE LINE
FINISHED GRADE
6"
ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSURE WITH ANCHOR FLANGE,HEAVY DUTY TOP, AND VANDAL PROOF FASTENERS, ZURN, Z-1400-HD-KBRASSCLEANOUT PLUG W/COUNTER SUNK HEAD.
ADJUSTABLE CLEANOUTAND ACCESS COVER ZURNZB-1400. TOP OF COVER TOBE FLUSH W/ TOP OF FLOOR.
16" CONC. PAD TROWELSMOOTH & EDGE.
1/8 C.I. BEND
BALANCE OF PIPING SAMEAS CLEANOUT TO GRADE.
FLOOR LINE
1/8 C.I. BEND
C.I. WASTE LINE.LGTH TO SUIT.
1/8 BEND IF CLEANOUTOCCURS AT END OF LINE.
PROVIDE FOLLOWING OPTIONS AS APPROPRIATECARPET MARKER - FOR CARPETED AREAS.SQUARE TOP - FOR CERAMIC TILE ORSIMILAR SQUARE PATTERN FLOOR.FLASHING CLAMP - FOR ABOVE GRADEWATER PROOFED AREAS.
DESIGNER NOTE:1. COORDINATE C.O.T.G.
WITH CIVIL ENGINEER.
WALL CLEANOUTDIAGRAMNO SCALE
1'-0
"
MAY EXTEND AS AWASTE OR VENT.
CHROME WALLCOVERAND SCREW.
PLUGGED TEE WITHCLEANOUT.
WALL.
FLOOR LINE.
1/8 C.I. BEND.
BALANCE OF PIPINGSAME AS CLEANOUTTO GRADE.
WASTE LINE
SLOPE DN @ 1/4"/L.F.
TWO-WAY CLEANOUT TO GRADE DIAGRAMSNO SCALE
6"
FINISHED GRADE
ADJUSTABLE GRADE CLEANOUT AND ACCESS ENCLOSUREWITH ANCHOR FLANGE, HEAVY DUTY TOP, AND VANDALPROOF FASTENERS, ZURN, Z-1400-HD-KBRASS CLEANOUTPLUG W/COUNTER SUNK HEAD.
PROVIDE WITH 0.5 GPM AERATOR.PROVIDE WITH WALL CLEANOUT.
PROVIDE WITH ASSE 1070TEMPERATURE LIMITING DEVICE
FOR HOW WATER SUPPLY. PROVIDEWCO.
NO
MANUFACTURERS:FIXTURE: AMERICAN STANDARD, KHOLER
FAUCET: DELTA, AMERICAN STANDARD, T&S, CHICAGO
DRAIN: ZURN, J.R. SMITH, WATTS
GENERAL NOTES:A: REFER TO FLOOR PLANS FOR FIXTURE LOCATIONS.B: ALL FIXTURES SHALL BE APPROVED BY OWNER.
P1
P1a
P2
P3
P3a
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P16
P17
P18
P19
MEDICAL GAS OUTLETALL EQUIPMENT USED IN THIS SCHEDULE SHALL BE AS MANUFACTURED BY " BEACONMEDAEZ MEDICAL" AND SHALL MATCH EXISTING SJRMC FACILITY REQUIREMENTS.
GAS SERVICE STOCK NUMBER (WALL) REMARKS
SERVICE OUTLET:THE ROUGH-IN ASSEMBLY SHALL BE OF MODULAR DESIGN AND INCLUDE GAS-SPECIFIC 16-GAUGE STEELMOUNTING PLATE DESIGNED TO PERMIT ON-SITE GANGING OF MULTIPLE OUTLETS, IN ANY ORDER, ON 5"CENTERLINE SPACING. A MACHINED BRASS OUTLET BLOCK SHALL BE PERMANENTLY ATTACHED TO THEMOUNTING BRACKET TO PERMIT THE 1/2" OD (3/8" NOMINAL) TYPE-K COPPER INLET TUBE SWIVEL 360° FORATTACHMENT TO THE PIPING SYSTEM. THE LATCH-VALVE ASSEMBLY SHALL INCLUDE A SINGLE COMPRESSIONSEAL PRIMARY VALVE, BE GAS SPECIFIC FOR THE LABELED SERVICE, AND ACCEPT ONLY CORRESPONDINGGEOMETRICALLY SHAPED HOSE AND APPARATUS ADAPTERS. A DIE CAST, LIGHT GRAY, EPOXY POWDER COATEDTRIM PLATE SHALL BE PROVIDED TO TRIM EACH WALL OUTLET AND TO FILL THE SPACE BETWEEN ADJACENTOUTLETS. THE TRIM PLATE SHALL ALLOW LATCH VALVES TO BE INDIVIDUALLY REMOVED FOR SERVICING.
*MANUFACTURED ACCORDING TO ALL APPLICABLE NFPA AND CGA STANDARDS.*REMOVABLE COVER PLATES PROVIDE EASY ACCESS FOR PERIODIC INSPECTION OR MAINTENANCE.*LISTED BY UNDERWRITERS LABORATORIES, INC.
*NOTE: OUTLET CONNECTION TYPE SHALL BE VERIFIED AND COORDINATED WITH OWNER FOR REQUIREDCONNECTION TYPE REQUIEMENTS PRIOR TO SUBMITTAL AND ORDERING.
ALL EQUIPMENT USED IN THIS SCHEDULE SHALL BE AS MANUFACTURED BY" BEACON MEDAEZ MEDICAL"
STOCKNUMBER
SHUT-OFF VALVES*BE FULL-PORT, BALL VALVES*BE THREE-PIECE CONSTRUCTION FOR EASY INSTALLATION AND MAINTENANCE*HAVE TEFLON SEALS FOR LONG-LASTING, SMOOTH, EASY OPERATION*BE DESIGNED FOR WORKING PRESSURES OF 400 PSI OR 29" VACUUM*HAVE BLOW-OUT PROOF STEM*BE CLEANED FOR OXYGEN SERVICE*BE AVAILABLE IN 1/2" THROUGH 4" DIAMETER SIZES WITH TYPE K COPPER TUBING EXTENSIONS BRAZED TO FLANGES*HAVE A CORROSION-RESISTANT BRONZE BODY*REQUIRE ONLY ONE QUARTER OF A TURN TO COMPLETELY OPEN OR CLOSE
VALVES BOXESVALVE BOXES WILL:*INCLUDE A 1-1/2" LINE PRESSURE MONITORING GAUGE*BE AVAILABLE TO ACCOMMODATE ONE TO FOUR VALVES OF VARIOUS SIZES*BE LABELED FOR GAS IDENTIFICATION*BE ENCLOSED WITH A TRANSPARENT WINDOW DISPLAYING THE FOLLOWING CAUTION PERNFPA 99 (1990) AND CSA Z-305.1-M1984, "CAUTION: MEDICAL GAS SHUT-OFF VALVES. DO NOTCLOSE EXCEPT IN EMERGENCY."
REFERTO MFG. 1/2" 1"
A
1/2"
A 6-121022 BEACON MADAEZ QUICK CONNECT WALL OUTLETS
MEDICAL GAS STATION SCHEDULEMANUFACTURED BY "BEACON MEDAEZ MEDICAL"
STATIONGAS SERVICES & NO. OF OUTLETS REMARKS
O2
MGS-1
N20 VAC N2 EVAC SLIDE
WALL MOUNTED
NOTE: ALL GAS OUTLETS SHALL MATCH EXISTING MANUFACTURER TYPE. GAS OUTLET SHALL BEAS MANUFACTURED BY "BEACON MEDAEZ MEDICAL" UNLESS OUTLET TYPE IS NOT AVAILABLE.
MEDICAL GAS ABBREVIATIONS SCHEDULEMANUFACTURED BY "BEACON MEDAEZ MEDICAL"
MGO MEDICAL GAS OUTLET
MGS MEDICAL GAS STATION
MVB MEDICAL VALVE BOX
LPA LINE PRESSURE ALARM
O2 OXYGEN
N2O NITROUS OXIDE
V VACUUM
EV EVAC
A MEDICAL AIR
N NITROGEN
MAS MASTER ALARM STATION
1 1 11
A
EXISTING OUTLET CONNECTION TYPE AND MANUFACTURER SHALL BE VERIFIED ANDCOORDINATED WITH SJRMC FOR REQUIRED CONNECTION TYPE REQUIREMENTSPRIOR TO SUBMITTAL AND ORDERING.
MEDICAL GAS LINE PRESSURE ALARM PANEL
MARKTYPE OF GAS SERVICE
REMARKSO2
LPA-1
N20 VAC N2O EVAC N
ALL EQUIPMENT USED IN THIS SCHEDULE SHALL BE AS MANUFACTURED BY" BEACON MEDAEZ MEDICAL"
STOCKNUMBER
THE AREA PANEL SHALL CONSIST OF A POWER MODULE, DIGITAL MODULE, AND SENSORMODULE. THE POWER MODULE SHALL BE CAPABLE OF SUPPORTING UP TO EIGHT DIGITALMODULES AND CONVERTING 115/120 VAC TO LOW VOLTAGE DC. THIS MODULE SHALL CONTAINA FUSE TO PROTECT THE SYSTEM FROM VOLTAGE AND AMPERAGE SURGES AND A YELLOWPOWER ON INDICATOR THAT ILLUMINATES WHEN ELECTRICAL POWER IS AVAILABLE. DIGITALSHALL BE USED AS EITHER A MASTER ALARM OR AREA ALARM AND INCORPORATE A DIGITALLIQUID CRYSTAL DISPLAY (LCD) THAT CONTINUOUSLY INDICATES THE PRESSURE OR VACUUMIN THE SEGMENT OF THE PIPING SYSTEM BEING MONITORED. SENSOR MODULE SHALLCONTAIN A TRANSDUCER CAPABLE OF PROVIDING CALIBRATED SIGNALS TO THE DIGITALMODULE. SENSOR MODULES SHALL BE GAS SPECIFIC AND CAPABLE OF MOUNTING DIRECTLYIN THE MEDICAL GAS PIPELINE OR IN STANDARD WALL CONSTRUCTION.
*INCLUDES DRY CONTACT RELAYS (NO/MC) FOR CONNECTION OF REMOTE ALARMS.*COMPLETELY FACTORY ASSEMBLED AND PREWIRED.*LED INDICATOR LIGHTS PROVIDE FULL VISIBILITY WITH EXTENDED SERVICE LIFE.
REFERTO MFG. X X
A
X
LPA-2 REFERTO MFG. X X X
NEAR RECEPTION 1018
MVB-2 REFERTO MFG. 1/2" 1" 1/2"
CORRIDOR 1020 NEARTRIAGE 1019CORRIDOR 1071 NEARNURSE STATION 1073
PROJECTION SCREEN, TELEVISION, OR OTHER DISPLAY EQPT
SPK LOUDSPEAKER OUTLET
M
INTERACTIVE (ELECTRONIC) WHITEBOARD
S
S
TV
TV
M
LOW TEMPERATURE SENSORLT
GENERAL NOTES:1. THESE DRAWINGS ACCOMPANY THE CONSTRUCTION DOCUMENT
SPECIFICATIONS..
2. DO NOT SCALE DRAWINGS. VERIFY DIMENSIONS ON ARCHITECTURALDRAWINGS AND IN FIELD PRIOR TO COMMENCEMENT OF WORK.
3. VISIT SITE PRIOR TO BID AND VERIFY THAT CONDITIONS ARE ASINDICATED. CONTRACTOR SHALL INCLUDE IN HIS BID COSTSREQUIRED TO MAKE HIS WORK MEET EXISTING CONDITIONS.
4. SYSTEM OUTAGES SHALL BE PERMITTED ONLY AT TIMES APPROVEDBY OWNER - IN WRITING. WORK WHICH COULD RESULT IN ANACCIDENTAL OUTAGE (BEYOND BRANCH CIRCUITS) SHALL BEPERFORMED WITH THE OWNER'S MAINTENANCE PERSONNELADVISED OF SUCH WORK.
5. SERVICE SHALL BE MAINTAINED TO EXISTING AREAS DURINGCONSTRUCTION. CONTRACTOR SHALL PROVIDE PORTABLEGENERATORS, CABLES, OUTLETS, ETC. AS REQUIRED TO MAINTAINCONTINUITY OF SERVICE. PLACEMENT OF SUCH PORTABLEEQUIPMENT SHALL BE SUBJECT TO OWNER APPROVAL.
6. REVIEW ARCHITECTURAL, MECHANICAL AND OTHER DRAWINGSPRIOR TO BID.
7. WORK SHALL BE PERFORMED IN A WORKMANLIKE MANNER TO THESATISFACTION OF THE ARCHITECT.
8. WORK, MATERIALS, AND EQUIPMENT SHALL CONFORM TO THELATEST EDITIONS OF LOCAL, STATE OF NEW MEXICO, AND NATIONALCODES AND ORDINANCES.
9. PROVIDE PERMITS AND INSPECTIONS REQUIRED.
10. PROVIDE WITH SHOP DRAWING SUBMITTAL, ¼” SCALE LAYOUTDRAWINGS OF ROOMS WITH ELECTRICAL SWITCHBOARDS ANDTRANSFORMERS. LAYOUTS SHALL SHOW LOCATIONS OF, AND SHALLBE COORDINATED WITH MECHANICAL EQUIPMENT. ALL EQUIPMENTSHALL BE DRAWN TO SCALE.
11. CONTRACTOR'S FAILURE TO ORDER OR RELEASE ORDER FORMATERIALS AND/OR EQUIPMENT WILL NOT BE ACCEPTED AS AREASON TO SUBSTITUTE ALTERNATE MATERIALS, EQUIPMENT, ORINSTALLATION METHODS.
12. FIELD VERIFY EXISTING EQUIPMENT OR CIRCUITS THAT AREREMAINING TO BE RECONNECTED TO NEW OR EXISTINGSWITHBOARDS/PANELBOARDS. PROVIDE SWITCHES, RECEPTACLES,CONDUIT, WIRE, ETC. AS REQUIRED, TO RESTORE CONTINUITY OFCIRCUIT(S).
13. EXISTING SYSTEMS AND CONDITIONS SHOWN ON DRAWINGS FOREXISTING BUILDINGS ARE TO BE NOTED “FOR GUIDANCE ONLY”. THEELECTRICAL CONTRACTOR TO FIELD CHECK ALL EXISTINGCONDITIONS PRIOR TO BIDDING AND TO INCLUDE IN HIS BID ANALLOWANCE FOR REMOVAL AND/OR RELOCATION OF EXISTINGCONDUITS, WIRES, DEVICES, FIXTURES, OR OTHER EQUIPMENT ASINDICATED ON THE PLANS OR AS REQUIRED TO COORDINATE ANDADAPT NEW AND EXISTING ELECTRICAL SYSTEM TO ALL OTHERWORK AS REQUIRED.
14. PROVIDE ELECTRICAL DEMOLITION REQUIRED. REFER TOMECHANICAL AND ELECTRICAL DEMOLITION DRAWINGS FORLOCATION AND EXTENT OF DEMOLITION REQUIRED. CONTRACTORSHALL VISIT SITE PRIOR TO BID TO DETERMINE EXTENT OF WORKINVOLVED. PROVIDE LABOR AND MATERIALS REQUIRED TO MAINTAINAND/OR RESTORE CONTINUITY OF SERVICE TO EXISTING CIRCUITS.
15. PROVIDE ALL NECESSARY DEMOLITION TO REMOVE EXISTINGUNUSED CONDUIT, WIRE, CABLE, J-BOXES, RECEPTACLES, SWITCHES,LIGHTS, FIRE ALARMS DEVICES, ETC. COMPLETE WITH ASSOCIATEDCIRCUITING TO SOURCE. WHERE IT IS NOT FEASIBLE TO REMOVETHE ABOVE, OUTLET SHALL BE ABANDONED, WIRE REMOVED, ANDBLANK COVER PLATES PROVIDED.
16. ALL (E) EQUIPMENT BEING REMOVED SHALL BE DISCARDED INACCORDANCE WITH APPLICABLE EPA REQUIREMENTS.
17. EXISTING ELECTRICAL EQUIPMENT, ETC. BEING REMOVED SHALL BERETURNED TO THE OWNER, EXCEPT FOR THOSE ITEMS BEINGRELOCATED.
18. VERIFY EXACT LOCATION OF EQUIPMENT TO BE FURNISHED BYOTHERS PRIOR TO ROUGH-IN.
19. REVIEW MECHANICAL DRAWINGS AND PROVIDE LIGHTS, SWITCHES,RECEPTACLES, TELECOM OUTLETS, EQUIPMENT CONNECTIONS, ETC.AND ASSOCIATED CIRCUITING IN NEW AND REMODELED AREAS.
20. INSTALL ALL MATERIALS IN ACCORDANCE WITH THEMANUFACTURER'S RECOMMENDATIONS. ANY DEVIATIONS SHALL BEBROUGHT TO THE ARCHITECT/ENGINEER'S ATTENTION PRIOR TOINSTALLATION.
21. FINAL CONNECTIONS TO EQUIPMENT SHALL BE IN ACCORDANCE WITHMANUFACTURER'S APPROVED WIRING DIAGRAMS, DETAILS, ANDINSTRUCTIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TOPROVIDE MATERIALS AND EQUIPMENT COMPATIBLE WITH EQUIPMENTACTUALLY SUPPLIED.
22. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING EQUIPMENTWHICH IS DAMAGED DUE TO INCORRECT FIELD WIRING PROVIDEDUNDER THIS SECTION, OR FACTORY WIRING IN EQUIPMENT PROVIDEDUNDER THIS SECTION.
23. WHERE THE RE-USE OF EXISTING CONDUITS, WIRES, DEVICES, ETC, ISPERMISSIBLE, MAKE CERTAIN THAT THE WIRING FOR SAME ISCONTINUOUS FROM OUTLET TO OUTLET AND THAT SUCH CIRCUIT ORSYSTEMS SHALL PASS THROUGH NO OUTLET OR JUNCTION BOXESWHICH MAY BE RENDERED INACCESSIBLE BY THE STRUCTURALCHANGES TO BE MADE TO THE BUILDING. EXISTING CONDUITS, WIRE,DEVICES. WHICH ARE NOT INDICATED FOR REUSE SHALL BECOMETHE PROPERTY OF THIS CONTRACTOR HOWEVER LIGHTINGFIXTURES, PANEL FUSED SWITCHES, CIRCUIT BREAKERS, FIRE ALARMEQUIPMENT, WIRE, ETC. SHALL BECOME THE PROPERTY OF THEOWNER.
24. ALL ELECTRICAL SYSTEMS COMPONENTS SHALL BE LISTED ORLABELED BY U.L. OR OTHER RECOGNIZED TESTING FACILITY.
25. WIRING DEVICES SHALL BE SPECIFICATION GRADE AND RATED AT 20AMPERES FOR LIGHT SWITCHES, AND 20 AMPERES FOR DUPLEXRECEPTACLES. THE COLOR OF THE DEVICES AND COVER PLATESSHALL BE AS DIRECTED BY ARCHITECT.
26. ALL WIRING SHALL BE INSTALLED IN LISTED METALLICRACEWAYS. EMT FITTINGS SHALL BE MALLEABLE IRON ORSTEEL. CONNECTORS SHALL BE INSULATED THROAT TYPE. MINIMUMCONDUIT SIZE IS ¾”. FOLLOW NEC FOR MAXIMUM NUMBER OFCONDUCTORS PER CONDUIT. CONDUIT SHALL BE OF SUFFICIENTSIZE AND CONDUCTOR QUANTITY SHALL BE LIMITED TO ELIMINATETHE NEED TO DE-RATE CONDUCTORS. METAL CLAD CABLE IS NOTPERMITTED.
27. WIRE SHALL BE COPPER, 75 DEGREE CELSIUS RATED FOR GENERALUSE. WIRING WITHIN 3 INCHES OF FLUORESCENT BALLASTS WIRESHALL BE COPPER, MINIMUM 90 DEGREE CELSIUS RATED. SIZESINDICATED ARE FOR INSTALLATION IN A MAXIMUM 30 DEGREECELSIUS AMBIENT. CONDUCTOR AMPACITY SHALL BE DERATED FORHIGHER AMBIENT INSTALLATIONS.
28. PROVIDE NEW UPDATED PANELBOARD DIRECTORIES FOR EXISTINGAND NEW CIRCUITS BEING UTILIZED FOR COMPLETION OF PROJECT.
29. PANEL DIRECTORIES SHALL BE REMOVABLE. ROOM NAMES ANDNUMBERS SHALL BE AS DIRECTED BY OWNER. DIRECTORIES SHALLBE TYPED AND INSTALLED UNDER CLEAR PLASTIC COVERS.
30. FINAL CONNECTIONS TO MOTORS, TRANSFORMERS, AND OTHERVIBRATING EQUIPMENT SHALL BE SEAL TITE FLEX AND APPROVEDFITTINGS. DO NOT SECURE CONDUITS, DISCONNECTS, OR DEVICESTO DUCTWORK OR MECHANICAL EQUIPMENT.
31. FOR LOW VOLTAGE WIRING ROUTED IN CONDUIT , PROVIDE PULLBOXES WHERE THE ROUTE IS LONGER THAN 100 FEET, OR HAS MORETHAN TWO (2) 90 DEGREE BENDS.
32. SYSTEMS SHALL BE TESTED FOR PROPER OPERATION. IF TESTSSHOW THAT WORK IS DEFECTIVE, CONTRACTOR SHALL MAKECORRECTIONS NECESSARY AT NO COST TO OWNER.
33. GUARANTEE THE INSTALLATION AGAINST DEFECTS IN MATERIALSAND WORKMANSHIP WHICH MAY OCCUR UNDER NORMAL USAGE FORA PERIOD OF ONE YEAR AFTER OWNER'S ACCEPTANCE. DEFECTSSHALL BE PROMPTLY REMEDIED WITHOUT COST TO THE OWNER.
34. SYSTEMS SHALL BE COMPLETE, OPERABLE, AND READY FORCONTINUOUS OPERATION. LIGHTS, SWITCHES, RECEPTACLES,MOTORS, ETC. SHALL BE CONNECTED AND OPERABLE.
35. MAINTAIN A CURRENT SET OF AS-BUILT RECORD DRAWINGS WHICHSHALL BE AVAILABLE FOR REVIEW DURING ENGINEER'S SITEOBSERVATIONS. UPON COMPLETION, PROVIDE RECORD DRAWINGSTO ARCHITECT. DRAWINGS SHALL INCLUDE ALL ADDENDUM ITEMS,CHANGE ORDERS, ALTERATIONS, REROUTINGS, ETC.
36. FOR 120V BRANCH CIRCUITS THAT EXCEED 75' IN LENGTH AND 277VBRANCH CIRCUITS THAT EXCEED 175' IN LENGTH INCREASE TO NEXTWIRE SIZE. (12 AWG GOES TO 10 AWG).
37. THIS RENOVATION PROJECT IS TO BE EXECUTED IN MULTIPLEPHASES. SEE ARCHITECTURAL PLANS FOR PROJECT PHASING.
FIRE ALARM BELLB
NO SCALETYPICAL DEVICE ALIGNMENT
EQ EQ
6"MIN.
℄
℄
℄
DOOR WINDOW
EQ EQ
℄
LIGHTINGCONTROL ℄
℄
OFFSET COMMUNICATIONSDEVICES FROM POWERDEVICES TO EITHEROPPOSITE SIDE OF STUD BAY,OR ADJACENT STUD BAY.
NOTES:1. IF ALIGNMENT OF DEVICES INDICATED HERE IS IN CONFLICT
WITH ADA REQUIREMENTS DUE TO INSTALLATION DETAIL, ADADIMENSIONS SHALL GOVERN.
2. REFERENCE ARCHITECTURAL INTERIOR ELEVATIONS.LOCATIONS SHOWN ON INTERIOR ELEVATIONS SHALLSUPERCEDE LOCATIONS SHOWN HERE, UNLESS LOCATIONSSHOWN ON INTERIOR ELEVATIONS ARE NOT CODE COMPLIANT.
EQ
BACKSPLASH
ABOVECOUNTERDEVICE
RECEPTACLE
COUNTERTOP
EQ
FINISHED FLOOR
FINISHED CEILING
6"MIN.
20"MAX.
ALIGN DEVICES (OUTLETS,CONTROLS, ETC.)VERTICALLY. DO NOTVERTICALLY ALIGN POWERAND COMMUNICATIONSDEVICES SIMULTANEOUSLY.
NORMAL CALL DOME LIGHT - WALL MOUNT
NURSECALL SYMBOLS
Z
J
NC
NCTC
T
B
D
P
Z
2
1
NORMAL CALL DOME LIGHT - SINGLE LED - WALL MOUNT
NURSE CALL ZONE LIGHT - WALL MOUNT
NORMAL CALL DOME LIGHT - CEILING MOUNT
NORMAL CALL DOME LIGHT - SINGLE LED - CEILING MOUNT
NURSE CALL ZONE LIGHT - CEILING MOUNT
DOMELESS CONTROLLER - ABOVE MOUNT
NURSE CALL MASTER STATION
NURSE CALL TERMINAL CABINET
CODEBLUE EMERGENCY STATION
TOILET EMERGENCY STATION w/ PULL CORD
STAFF EMERGENCY STATION
SINGLE PATIENT STATION
DOUBLE PATIENT STATION
STAFF PRESENCE PAD
STAFF STATION
DUTY STATION
PATIENT BED HANDHELD CONTROL
SE
CB
SS
'*' ISSUED FOR INFORMATION ONLY' ' NOT PART OF SET' ' ISSUED AS PART OF A SETISSUE LOG KEY:
#
DA
TE
ISSUE LOG
ELECTRICAL SHEET INDEX
TITLE
ELECTRICAL COVER SHEETE0-01
02.2
2.20
1810
0% D
D
ELECTRONIC SAFETY & SECURITY SYMBOLS
L
CEILING MOUNTED CAMERA
WALL MOUNTED CAMERA
MAGNETIC DOOR CONTACT SWITCH
ADA ACCESS CONTROL MAIN PANELADA
CR CARD READER
S ELECTRIC LOCK - STRIKE
LM ELECTRIC LOCK - MAGNETIC
LR ELECTRIC LATCH / ROD RETRACTOR
SM MAGNETIC DOOR CONTACT SWITCH
PANIC BUTTONP
INTRUSION MOTION SENSOR
SECURITY KEYPAD
MON CCTV MONITOR
ACCESS CONTROL MAIN PANELACP
EXIT PANIC/CRASH BAR SENSORREX
SECURITY CENTRAL PROCESSING UNITCPU
SECURITY/ACCESS CONTROL WORKSTATIONWS
K
I
MULTI-OUTLET WIREWAY
VOICE/DATA SYMBOLS
COMBO VOICE/DATA OUTLET (1 DATA, 1 VOICE UNO)
(1) VOICE WALL OUTLET
(1) DATA WALL OUTLET
(1) VOICE FLOOR OUTLET
(1) DATA FLOOR OUTLET
COMBO VOICE/DATA FLOOR OUTLET
VOICE/DATA/FIBER OUTLETOF
POINT OF SALE (POS) OUTLETPOS
AUTOMATED TELLER MACHINE (ATM) STATIONATM
PUBLIC PAYPHONE OUTLETPP
ELEVATOR PHONE OUTLETE
POWER/TELECOM POLE
WIRELESS LAN (WI-FI) ACCESS POINT OUTLET (2 CABLES)
FAX/COPIER OUTLET
EMERGENCY SERVICES PHONE OUTLETEM
F
C
EC - ELECTRICAL CONTRACTOR
MC MECHANICAL CONTRACTOR-
PC PLUMBING CONTRACTOR-
ELECTRICAL LIGHTING PLANE1-01
ELECTRICAL POWER PLANE1-02
ELECTRICAL SPECIAL SYSTEMS PLANE1-03
ELECTRICAL DIAGRAMSE5-01
ELECTRICAL ONE-LINE DIAGRAM AND SCHEDULESE0-02
MECHANICAL EQUIPMENT WIRING AND CONNECTIONS
ITEM FURNISHEDUNDER
SET IN PLACE ORMTD. UNDER
WIRED /CONNECTED
UNDER
1. EQUIPMENT MOTORS AND THERMAL OVERLOADS, RESISTANCEHEATERS MD MD ED
2. VFDs, MOTOR CONTROLLERS; MAGNETIC STARTERS, REDUCEDVOLTAGE STARTERS AND OVERLOAD RELAYS MD ED(a) ED
3.DISCONNECT SWITCHES (FUSED OR NON-FUSED), HP RATEDSWITCHES, THERMAL OVERLOAD SWITCHES AND FUSES, ANDMANUAL OPERATING SWITCHES
ED(a) ED(a) ED
4.
PUSHBUTTON STATIONS, PILOT LIGHTS, MULTI-SPEEDSWITCHES, FLOAT SWITCHES, THERMOSTATS, CONTROLRELAYS, TIMECLOCKS, CONTROL TRANSFORMERS, CONTROLPANELS, MOTOR VALVES, DAMPER ACTUATORS, SOLENOIDVALVES, EP AND PE SWITCHES AND INTERLOCKS
MD MD MD(b)
5. 120 VOLT POWER FOR BAS PANELS, FIRE PROTECTION ANDBOILER CONTROLS ED ED ED
6. FIRE/SMOKE DAMPERS AND ELEVATOR VENT DAMPERS MD MD ED(c)
MD = MECHANICAL DIVISIONED = ELECTRICAL DIVISION
NOTES:
( a ) IF FURNISHED AS PART OF FACTORY-WIRED EQUIPMENT, THEN WIRING AND CONNECTIONS ONLY BY ED
( b ) IF ANY OF THESE DEVICES CARRY THE FULL LOAD CURRENT TO ANY MOTOR THEY SHALL BE CONNECTED BY ED. CONTROLDEVICES CARRYING FULL LOAD CURRENT FURNISHED BY MD AND WIRED BY ED SHALL BE LOCATED AT THE DEVICE BEINGCONTROLLED, UNLESS SHOWN ON DRAWINGS OR MUTUAL AGREEMENT IS MADE BETWEEN THE CONTRACTORS WITH NOCHANGE IN THE CONTRACT PRICE.
( c ) WIRING FROM ALARM CONTACTS TO ALARM SYSTEM BY ED; ALL CONTROL FUNCTION WIRING BY MD. DUCT DETECTORSFURNISHED BY ED, SET IN PLACE BY MD
GENERAL NOTE: THE ABOVE LIST DOES NOT ATTEMPT TO INCLUDE ALL COMPONENTS. ALL ITEMS NECESSARY FOR A COMPLETESYSTEM SHALL BE INCLUDED IN THE BASE CONTRACT.
1 1200 L EXAM LIGHTS 1 20 + 20 1 E TIME CLOCK 200 23 400 M ER DOOR ENTRY 1 20 + 20 1 L HELI DECK LIGHTS 1200 45 360 R RECEP SECURITY 1 20 + 20 1 L HELI DECK LIGHTS 1200 67 1440 R RECEP EXAM 14-15 1 20 + 20 1 R RECEP EXAM 8-9 1440 89 1440 R RECEP EXAM 12-13 1 20 + 20 1 R RECEP EXAM 6-7 1440 1011 1440 R RECEP EXAM 10-11 1 20 + 20 1 R RECEP EXAM 4-5 1440 1213 180 R RECEP NOURISHMENT 1 20 + 20 1 R RECEP MEDICATION 180 1415 540 R RECEP ALCOVE 1108 1 20 + 20 1 R RECEP MEDICATION 180 1617 720 R RECEP EXAM 1 1 20 + 20 1 R RECEP MEDICATION 180 1819 720 R RECEP EXAM 2 1 20 + 20 1 R RECEP N NURSE STA 540 2021 900 R RECEP OB EXAM 1 1 20 + 20 1 R RECEP N NURSE STA 360 2223 900 R RECEP OB EXAM 2 1 20 + 20 1 R RECEP N NURSE STA 1080 2425 400 E ISOLATION RM MONITOR 1 20 + 20 1 R RECEP RM 1048 ANTE 180 2627 1080 R WIRE MOLD NURSE STA 1 20 + 20 1 R RECEP EXAM 16-17 1440 2829 540 R RECEP S NURSE STA 1 20 + 20 1 R RECEP PHYSH RM 540 3031 360 R RECEP S NURSE STA 1 20 + 20 1 R RECEP TRAUMA 1 1080 3233 1080 R RECEP S NURSE STA 1 20 + 20 1 R RECEP TRAUMA 1 1080 3435 1080 R RECEP TRAUMA 2 1 20 + 20 1 M AUTO DOOR ENTRY 800 3637 1080 R RECEP TRAUMA 2 1 20 + 20 1 R RECEP RECEPTION 720 3839 360 R WP RECEP 1 20 + 20 1 R RECEP TRIAGE 720 4041 360 R RECEP PYXIS EQUIP 1 20 + 20 1 R RECEP TRIAGE 360 4243 360 R IT CLOSET SOUTH 1 20 + 20 1 R OUTSIDE ED #4 360 4445 360 R IT CLOSET SOUTH 1 20 + 20 1 R RECEP RECEPTION 720 4647 180 R HALLWAY EXIT 1 20 + 20 1 M DOOR AMB ENTRY 800 4849 720 R RECEP FAST TRACK 1 20 + 20 1 R RECEP FAST TRACK 720 5051 720 R RECEP FAST TRACK 1 20 + 20 1 E PNUMATIC TUBE NS 600 5253 180 R RECEP PATIENT MNTR 1 20 + 20 1 R RECEP ALCOVE 1062 180 5455 720 R RECEP MIDLAND/QA 1 20 + 20 1 R RECEP ALCOVE 1076 180 5657 360 R RECEP MULTI-PATIENT 1 20 + 20 1 R RECEP ASSESS 720 5859 360 R RECEP MULTI-PATIENT 1 20 + 20 1 R RECEP MULTI-PAT CP 360 6061 540 R RECEP RESULTS WAIT 1 20 + 20 1 R FAST TRACK 2 BED RM 1080 6263 560 R RECEP SUPPLY EQUIP 1 20 + 20 1 R RECEP TREATMENT 540 6465 540 R RECEP SUPPLY EQUIP 1 20 + 20 1 R RECEP TREATMENT 540 6667 1200 E
250V OUTLET X-RAY 2 15 + 20 1 R RECEP TREATMENT 540 6869 1200 E + 20 1 E DOOR POWER 1000 7071 540 R FAST TRK COMPS 1 20 + 20 1 E DOOR POWER 800 7273 900 R FAST TRK PRINTER 1 20 + SPACE 7475 SPACE + SPACE 7677 SPACE + SPACE 7879 SPACE + SPACE 8081 2400 E
FILM PROCESSOR 2 30 + SPACE 8283 2400 E + SPACE 84
LOAD TYPE PANEL TOTAL FEED THRUTOTAL
SUBFEEDTOTAL
FEEDERSUBTOTAL DEMAND FEEDER TOTAL
GENERAL NOTES:A. CRITICAL BRANCH POWER
(L) LIGHTING 3600 3600 125% 4500 B. SQUARE D NQOD
(R) RECEPTACLES 40520 40520 NEC 220 25260 C. NEW CIRCUITS SHOWN IN BOLD, USE EXISTING SPARE
(LM) LARGEST MOTOR 0 0 25% 0 OR CIRCUIT THAT IS NO LONGER IN USE.
(M) MOTORS (ALL) 2000 2000 100% 2000 D. EXISTING CIRCUITS NO LONGER USED RENAME 'SPARE'.
(E) EQUIPMENT 10200 10200 100% 10200 SPECIFIC NOTES:(A) APPLIANCES 0 0 0 0 (1) PROVIDE NEW 20A CB IN SPACE 72.
1 SPACE + SPACE 23 SPACE + SPACE 45 SPACE + SPACE 67 480 L X-RAY LIGHTS 1 20 + 20 1 X-RAY RECEP'S 720 89 SPACE + 20 1 X-RAY RECEP'S 720 1011 SPACE + SPACE 1213 SPACE + SPACE 1415 3300 M
AIR CURTAINAMB. ENTRY 3 40
+ SPACE 1617 3300 M + SPACE 1819 3300 M + 20 2 SPARE
2021 1000 E X-RAY (TIED TO 23) 1 20 + 2223 1000 E X-RAY 1 20 + 20 1 R CHART ROOM 900 2425 500 E ER DOORS 1 20 + 20 1 R CHART ROOM 900 2627 864 R GARDEN FOUNTAIN 1 20 + 20 1 R CHART ROOM 900 2829 800 L GARDEN LIGHTS 1 20 + 20 1 R CHART ROOM 900 3031 900 R RECEP CONSULT 1 20 + 20 1 R CHART ROOM 900 3233 720 R RECEP MULTI-PATIENT 1 20 + 20 1 R RECEP VERTICAL 1080 3435 540 R RECEP MULTI-PATIENT 1 20 + 20 1 R RECEP VERTICAL 1260 3637 720 R RECEP REC/SCL/DOOR 1 20 + 20 1 R RECEP VERTICAL 1080 3839 1176 M ER HALLWAY EXHAUST 1 20 + 20 1 R RECEP VERTICAL 1080 4041 360 R ED TV MONITOR 1 20 + 20 1 R RECEP OFFICE/VERT 1080 42
LOAD TYPE PANEL TOTAL FEED THRUTOTAL
SUBFEEDTOTAL
FEEDERSUBTOTAL DEMAND FEEDER TOTAL
GENERAL NOTES:A. NORMAL BRANCH POWER
(L) LIGHTING 1280 1280 125% 1600 B. SQUARE D NQOD
(R) RECEPTACLES 14184 14184 NEC 220 12092 C. NEW CIRCUITS SHOWN IN BOLD, USE EXISTING SPARE
(LM) LARGEST MOTOR 0 0 25% 0 OR CIRCUIT THAT IS NO LONGER IN USE.
(M) MOTORS (ALL) 11076 11076 100% 11076 D. EXISTING CIRCUITS NO LONGER USED RENAME 'SPARE'.
S224" UNDER CABINET LED FIXTURE, HIGH-IMPACT ACRYLICLENS, ANTI-MICROBIAL WHITE SURFACE 1220 3500 12 277 SPECTRA HUC523-MVOLT-LED35-S1
LX12-AM
X1 EXIT SIGN, SINGLE FACE, WHITE THERMOPLASTIC BODY,GREEN LETTERS SURFACE N/A LED GREEN 2 277 LITHONIA LQM S W 3 G 120/277 1
X2 EXIT SIGN, DOUBLE FACE, WHITE THERMOPLASTIC BODY,GREEN LETTERS SURFACE N/A LED GREEN 2 277 LITHONIA LQM S W 3 G 120/277 1
GENERAL NOTES:A. THE LUMINAIRE SCHEDULE CAN NOT BE USED INDEPENDENTLY OF THE DRAWINGS AND SPECIFICATIONS TO OBTAIN LUMINAIRE COSTS. THE INDIVIDUAL ESTABLISHING LUMINAIRE COSTS SHALL NOT
QUOTE PRICING WITHOUT FIRST SEEING APPLICABLE ELECTRICAL DRAWINGS AND ELECTRICAL DIVISION SPECIFICATIONS. THE CONTRACTOR IS REPONSIBLE FOR PROVIDING NECESSARY DRAWINGS ANDSPECIFICATIONS TO THE INDIVIDUAL QUOTING LUMINAIRE PRICING.
B. REFER TO DRAWINGS FOR FIXTURES CONNECTED TO BATTERY INVERTER SYSTEM (SHOWN BY HATCH IN/OVER SYMBOL).C. ALL LEDS ARE TO BE 3500° KELVIN COLOR TEMPERATURE
SPECIFIC NOTES:(1) INCLUDE EXIT DIRECTION ARROWS AS INDICATED ON PLAN.(2) INSTALL ABOVE MIRROR(S). COORDINATE MOUNTING HEIGHT WITH ARCHITECTURAL ELEVATIONS.(3) PROVIDE WITH MUD IN FLANGE.(4)
SCOPE OF WORKINCLUDES BRANCHCIRCUITS IN THESEPANELS ONLY.
TRANSFORMER75kVA 480/277V,208/120Y SEC
TRANSFORMER75kVA 480/277V,208/120Y SEC
DISCONNECTSWITCH 400A,225A FUSE
DISCONNECTSWITCH 200A,200A FUSE
SCOPE OF WORKINCLUDES BRANCHCIRCUITS IN THESEPANELS ONLY.
TRANSFORMER30kVA 480/277V,208/120Y SEC
PANEL: ME (EXISTING)VOLTAGE: 120/208V, 3PH, 4WMINIMUM BUS: 100
1 800 E FOAM RM HEATER EX 1 20 + 20 1 M N. BOILER FAN 696 23 800 E HEATER MECH RM 1 20 + 20 1 E BOILER CTL POWER 400 45 696 M EX-FAN NW MECH RM 1 20 + 20 1 M S. BOILER FAN 696 67 1200 E IT RACK UPS 1 20 + 20 1 M ELEV PIT PUMP 696 89 400 E WIND SOCK 1 20 + 20 1 M BOILER ROOM EX FAN 696 1011 400 E HVAC CONTROL PANEL 1 20 + 20 1 E TU WEST UNITS 950 1213 696 M CIRC PUMPS AHU 1 20 + 20 1 R RECEP FOPR AIR DRY 1080 1415 400 E C/P ON AHU 1 20 + 20 1 M EF6 696 1617 200 L ELEV CAB LIGHTS 1 20 + 20 1 ELEVATOR SHUNT TRIP 1819 400 E HVAC CONTROLS 1 20 + 20 1 M EF-3 696 2021 1200 E
CTL AIR COMP 3 15+ 20 1 E TU EAST UNITS 550 22
23 1200 E +30 3
MHANGER DOOR
2400 2425 1200 E + M 2400 2627
SPARE 2 40 + M 2400 2829 + SPACE 30
LOAD TYPE PANEL TOTAL FEED THRUTOTAL
SUBFEEDTOTAL
FEEDERSUBTOTAL DEMAND FEEDER TOTAL
GENERAL NOTES:A. EQUIPMENT BRANCH POWER
(L) LIGHTING 200 200 125% 250 B. SQUARE D NQOD
(R) RECEPTACLES 1080 1080 NEC 220 1080 C. NEW CIRCUITS SHOWN IN BOLD, USE EXISTING SPARE
(LM) LARGEST MOTOR 0 0 25% 0 OR CIRCUIT THAT IS NO LONGER IN USE.
(M) MOTORS (ALL) 12768 12768 100% 12768 D. EXISTING CIRCUITS NO LONGER USED RENAME 'SPARE'.
MARK DESCRIPTION VOLT /PHASE HP WATTS FLA MCA MOCP STARTER DISCONNECT/
FUSE SIZE FEEDER CIRCUIT SPECIFIC NOTES
EF-1 EXHAUST FAN 120/1 1/4 SNAP SWITCH 30A(2WG) NP-20 1
EF-2 EXHAUST FAN 120/1 1/4 SNAP SWITCH 20A(2WG) NP-22 1
TU TERMINAL UNIT (EXISTING) 120/1 50 SNAP SWITCH 20A(2WG) SEE SHEET E1-03 2
GENERAL NOTES:A. SEE SPECIFICATIONS FOR ELECTRICAL DIVISION AND MECHANICAL DIVISION MOTOR STARTER COORDINATION.B. PROVIDE PHASE PROTECTION FOR ALL THREE PHASE MOTORS ABOVE 7-1/2 HP.C. PROVIDE ALL EXTERIOR DISCONNECTS WITH NEMA 3R RATING.D. WHEN EQUIPMENT IS LISTED WITH ONLY A HORSEPOWER RATING THE DISCONNECT AND FEEDER ARE SIZED PER THE N.E.C.
SPECIFIC NOTES:(1) ON ROOF.(2) MULITPLE UNITS WITH SAME DESIGNATION. CONNECT CPT'S PROVIDED BY MC AT EXISTING UNIT.(3)(4)
A. THE ENGINEER HAS UNDERTAKEN NO FIELDVERIFICATION OF EXISTING DEVICES. ALL DEVICESSHOWN ARE FROM RECORD DRAWINGS. CONTRACTORSHALL FIELD VERIFY ALL EXISTING DEVICES THATPERTAIN TO THIS PROJECT.
B. FOR ALL ITEMS TO BE DEMOLISHED, REMOVE CIRCUITBACK TO POINT OF CONNECTION. MAKE BRANCHCIRCUIT WITH REMAINING DEVICES CONTINUOUS.
C. ELECTRICAL CONTRACTOR SHALL REMOVE ALLDEMOLISHED ITEMS FROM SITE UNLESS OWNERWISHES TO RETAIN. ITEMS REMOVED FROM SITESHALL BE DISPOSED OF IN A LEGAL MANNER.
D. THIS RENOVATION PROJECT IS TO BE EXECUTED INMULTIPLE PHASES. SEE ARCHITECTURAL PLANS FORPROJECT PHASING.
NOTES:
1. UNLESS NOTED OTHERWISE, REMOVE ALL EXISTINGELECTRICAL AND SPECIAL SYSTEM DEVICES IN AREAOF WORK AND REMOVE ALL EXISTING LIGHTINGFIXTURES AND LIGHTING CONTROLS IN AREA OFWORK. REMOVE ALL ASSOCIATED CONDUIT ANDCONDUCTORS SERVICING DEVICES, LIGHTING ANDMECHANICAL EQUIPMENT BEING REMOVED.
2. DISCONNECT DOOR MOTOR POWER FROM CRITICALBRANCH CIRCUIT.
3. MAINTAIN EXISTING CRITICAL BRANCH LIGHTINGHOMERUN FOR REUSE WITH NEW LIGHTING.
4. MAINTAIN EXISTING LIFE SAFETY BRANCH LIGHTINGHOMERUN FOR REUSE WITH NEW LIGHTING.
5. REROUTE EXISTING HOMERUN (CL-6 PER EXISTINGDRAWINGS) AFTER DEMOLITION OF UP-STREAMLIGHTING.
A. VERIFY EXACT LOCATION AND HEIGHT OF ALL DEVICESWITH ARCHITECT PRIOR TO ROUGH-IN.
B. ALL DEVICES, WIRING, ETC. IN PATIENT CARE AREASSHALL COMPLY WITH NEC ARTICLE 517.
C. VOICE/DATA, CATV, ACCESS CONTROL, AND CCTVDEVICES, CABLING, TERMINATIONS, ANDCONNECTIONS SHALL BE BY THE OWNER'S ON-CALLCONTRACTOR(S) AND SHALL CONFORM WITH LOCALSTANDARDS. ELECTRICAL CONTRACTOR SHALLPROVIDE AND INSTALL ALL OUTLET BOXES ANDPATHWAYS.
D. VOICE/DATA, CATV, SECURITY, AND CCTV SHALL BEROUTED VIA CONDUIT FROM OUTLET BOX TO ABOVEACCESSIBLE CEILING. CABLE SHALL BE ROUTED VIAJ-HOOKS, ARLINGTON LOOPS, OR SIMILAR CABLEMANAGEMENT SPACED NO GREATER THAN 5'-0"ABOVE ACCESSIBLE CEILINGS FROM OUTLET CONDUITTO TELECOM ROOM. E.C. SHALL PROVIDECOMMUNICATIONS PATHWAYS; COORDINATE ROUTINGWITH OWNER'S IT CONTRACTOR.
E. CONNECT NEW FIRE ALARM DEVICES TO EXISTINGSYSTEM.
F. CONNECT NEW SPEAKERS TO EXISTINGINTERCOM/PAGING SYSTEM.
G. NEW NURSE CALL SYSTEM DEVICES AND CABLINGSHALL BE BY THE OWNER'S ON-CALL CONTRACTOR(S).THE NEW DEVICES SHALL BE CONNECTED TO THEEXISTING NURSE CALL SYSTEM.
H. THIS RENOVATION PROJECT IS TO BE EXECUTED INMULTIPLE PHASES. SEE ARCHITECTURAL PLANS FORPROJECT PHASING.
NOTES:
1. PUSH BUTTON FOR REMOTE BUZZ-IN OF DOOR.
2. INSTALL ON MULLION.
3. REPLACE EXISTING CAMERAS WITH NEW.
4. MOTORIZED DOOR TO OPERATE UPON CARDREADER.
5. VERIFY LOCATION AT COMPUTER STATION WITHARCHITECTURAL ELEVATIONS PRIOR TO ROUGH-IN.
6. VOICE/DATA, CATV, AND CCTV CABLING RUN BACKTO THIS ROOM. OWNER'S ON-CALL CONTRACTORSHALL PROVIDE ADDITIONAL EQUIPMENT ASNECESSARY TO ACCOMMODATE NEW DEVICES.
7. EXISTING FIRE ALARM CABINET AND POWERSUPPLIES.
8. CONNECT MAGNETIC HOLD OPENS TO FIRE ALARMSYSTEM TO RELEASE UPON ALARM.
FLAG NOTES:#
Scale:
1 ELECTRICAL SPECIAL SYSTEMS PLAN1/8"=1'-0"
Scale:
2 ELECTRICAL SPECIAL SYSTEMS PLAN1/8"=1'-0"
18"
64"
78"
90"
48"
ELECTRICAL DEVICES
96"
WALL-MOUNTOC
DLVS
CBC
TSTC
120"MAX.
TOP OF DEVICE
9'-0"+ CEILING
8'-0" CEILING
TOP OF CABINET
TOP OF CABINET
TOP OF DEVICE
CL OF DEVICE
18"
TOP OF DEVICE
48"
MINIMUM, TOP OF DEVICE
BOTTOM OF DEVICE
TOP OF CABINET
TOP OF CABINET90"
6"MIN.
96"
NOTES:1. IF MOUNTING HEIGHT OF DEVICES INDICATED HERE IS IN
CONFLICT WITH ADA REQUIREMENTS DUE TO INSTALLATIONDETAIL, ADA DIMENSIONS SHALL GOVERN.