Photon Power
Slide 3
A Power-Hungry World
Slide 4
Why Invest In Failing Centrally-Controlled Infrastructure?
Ageing Grid, Exceeding Life Expectancy: $17 Trillion (2013) Needed
Globally
Slide 5
Energy Delivery of The Future
Slide 6
Drivers Of Change Falling cost Rate hikes 28% by 2018 in B.C.
Grid parity 75% in 18 months. B.C is already there ! Incentives
Fossil fuels Climate Change
Slide 7
Slide 8
How do Solar PV Modules Work?
Slide 9
Large Scale Commercial
Slide 10
TSouke First Nation: Population 250. Plan to reduce energy
consumption by 75% and then net zero. 75 kW of solar
Slide 11
Small Scale Residential
Slide 12
3 kW (12 Panel) Grid Tie System
Slide 13
10 kW (40 panel) Grid Tie System
Slide 14
Process Yearly Consumption Budget Replacement decision Physical
site analysis sun exposure, obstructions, space, roof vs ground,
stresses re wind, structural issues, visual impacts, neighbours,
bylaws, security and other considerations Determine system size,
number of panels, wiring requirements, location. Coordinate the
install, permits and inspections necessary to complete.
Slide 15
Traditional Systems
Slide 16
Microinverter System
Slide 17
Slide 18
Advantages Of Grid Tie Microinverters 240 volt AC, not 600 volt
DC Lower installation cost Partial shading not a problem
Redundancyno system failure vs string inverters Cost for system
units on par with string inverters
Slide 19
Racking System With Microinverters
Slide 20
Panel Mount over Microinverter
Slide 21
Before installing PV, reduce consumption
Slide 22
Slide 23
Do we have enough Sunshine?
Slide 24
Look at Germany
Slide 25
Solar power works on cloudy days! The small demonstration
inverter, rated at 1100 Watts is putting out close to 50% capacity.
On a full-sized system (10 kW), this would be 4745 Watts. Thats
enough to run 47 100 Watt light bulbs at the same time.
Slide 26
To Battery or not to Battery
Slide 27
Costly, high maintenance, and cannot transfer power for more
than a few days. Not enviro friendly. Use the Grid as a battery.
Accounting shifts summer surplus to winter deficit.
Slide 28
Slide 29
Three Meter Options Analog: No credit for surplus RF off:
Reading fee RF on: Automatic credit for surplus
Slide 30
The Fortis /B.C Hydro Tariff To qualify for net metering, a
Grid Tie System must have an approved bi-directional (smart) meter
installed. From The Fortis Net Metering Guidelines
http://www.fortisbc.com/Electricity/CustomerS
ervice/NetMeteringProgram/Docum
http://www.fortisbc.com/Electricity/CustomerS
ervice/NetMeteringProgram/Docum Section 3.1.5 "It is required that
the customer's facility be equipped with a bi- directional meter
(or a meter approved by a Fortis designer)
Slide 31
Photon Power
Slide 32
- GabEnergy - A Non Profit Society The purposes of the Society
are to: promote and facilitate the development of sustainable
alternative energy sources for Gabriola; conduct educational
outreach for alternative energy projects; build skills and
expertise on Gabriola for alternative energy development; and
facilitate the provision of low cost infrastructure for alternative
energy systems throughout British Columbia.
Slide 33
How Portal connecting buyers to the wholesaler not resellers
Provide advice, coordinate ordering, shipment and delivery of
system components. To cover fixed costs, a five percent donation
for above services is requested.
Slide 34
*Prices do not include shipping, GST, installation &
donation.
Slide 35
Slide 36
The Economic Case - Austin Texas
Slide 37
Levelized Cost (LCOE) for Solar LCOE is the industry standard
for analyzing delivered energy costs. Cost divided by power
produced 10 kW.h system on Gabe $26,000.00 / 275,000 kW.h $0.09 per
kW.h
Slide 38
Levelized Cost (LCOE) for Solar LCOE for this installation is
just Nine cents Per kW.h Guaranteed for 25 Years into the future! *
No other Energy Source can match that; not even close!
Slide 39
Slide 40
Slide 41
LCOE of $0.09 per kW.h Installed cost no more than $2.60 / watt
In fact we just did an install where the LCOE was $0.07 per kW.h
and the installed cost was just $2.04 per watt! The Numbers.. What
To Look For
Slide 42
Other Approaches IPP Over 1 MW Municipal / Private
Kimberley
Slide 43
1 MW 4,200 Panels Azimuth tracking
Slide 44
Slide 45
Slide 46
Net Metering Up to 100 kW Existing service to property Physical
size 400 panels - twice the size of a basketball court
Slide 47
Slide 48
Net Meter
Slide 49
Earth Heartbeat
Slide 50
Investor Co-op
Slide 51
Many Models: Europe, Ontario Shares, usually a module multiple
Regular stock options Member owned and controlled
Slide 52
Slide 53
Community Project
Slide 54
One time initiative Salt Spring School On going small
administration
Slide 55
Slide 56
Community Co-op
Slide 57
Donations Membership owned & controlled Expands over time
Directs benefits to a mix of community programs Volunteer Board
& Admin Eventually will need paid staff
Slide 58
Slide 59
Site Selection
Slide 60
Slide 61
Physical parameters Private, Crown or other Legal, lease,
covenants, rate of return Eventual replacement of
infrastructure