PHOTO. NO. DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-26-1 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS WEST SIDE DOOR LOCATIONS (DOOR A & DOOR B) DOOR LOCATION PLAN (BASEMENT FLOOR PLAN) MAJOR MAINTENANCE FY 15 A B ADD#3: 3/18/14
8

PHOTO. NO.

Jan 03, 2016

Download

Documents

beverly-nunez

WEST SIDE DOOR LOCATIONS (DOOR A & DOOR B). A. B. DOOR LOCATION PLAN (BASEMENT FLOOR PLAN). 252 CHURCH STREET OLIN LIBRARY - WEST DOOR REPLACEMENT SECTION 00020 - EXISTING CONDITION PHOTOS. DATE: 01/20/14. PHOTO. NO. MAJOR MAINTENANCE FY 15. REVISIONS. WESLEYAN U N I V E R S I T Y. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y P-26-1

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

WEST SIDE DOOR LOCATIONS

(DOOR A & DOOR B)

DOOR LOCATION PLAN(BASEMENT FLOOR PLAN)

MAJOR MAINTENANCE FY 15

AB

ADD#3: 3/18/14

Page 2: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

WEST ELEVATION

WEST SIDE DOORS TO BE REPLACED WITH

NEW FRP DOORS. ALSO PROVIDE NEW HARDWARE

AS NOTED.

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

Draft Only

P-26-2

DOOR ‘A’ DOOR ‘B’

ADD#3: 3/18/14

Page 3: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

P-26-3

DOOR ‘A’ – EXISTING CONDITIONS

ADD#3: 03/1814

Page 4: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

P-26-4

DOOR ‘B’ – EXISTING CONDITIONS

ADD#3: 03/1814

Page 5: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

Scope of Work (Reference MMFY15 Project Manual for all general project requirements)

(See photo sheets for scope location clarifications)

DOOR ‘A’

• Contractor shall remove and discard door leaf, hinges, closer and threshold. Salvage “Deliveries Only” sign for reinstallation.

• Contractor shall salvage lockset and core – return to Owner.

• Contractor shall repair lower section of rusted HM frames (both sides). Grind out all rusted and deteriorated frame areas. Refasten and anchor base pf strike side jamb to prevent future movement. Repair base of frame with Bondo or equivalent repair material.

• Contractor shall install a new FRP door, threshold and associated hardware as identified. Prep existing frame to install new FRP door to replace the existing HM door. Prior to ordering door, contractor shall field measure frame opening and all hardware prep requirements. Submit shop drawings for final review and approval. Note: Hardware shall be fastened with thru-bolts as specified.

• Contractor shall field measure the existing frame opening and hold the tightest dimension at the base of the frame. New door shall be sized based on using this dimension and adequate clearance shall be provided to account for the continuous hinge and operating clearance at the strike side of the jamb.

• Contractor shall prep and level concrete floor to accept new threshold. Repair / replace exist interior VCT floor at threshold. Match existing VCT as required.

• Prep, prime and paint interior and exterior of new FRP door. Prep, prime & paint HM frames, including exterior dividing panel between both doors. Paint shall match existing colors.

• Contractor shall schedule door installation with Owner. Delivery access must be maintained at all times.

• Door removal and installation of new door must occur within the same day.

• Upon completion of the new door installation, ensure proper function and clearance space between new door and existing frame..

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

P-26-5ADD#3: 03/1814

Page 6: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

Scope of Work (Reference MMFY15 Project Manual for all general project requirements)

(See photo sheets for scope location clarifications)

DOOR ‘B’

• Contractor shall remove and discard door leaf, hinges and threshold. Salvage “Fire Panel” sign for reinstallation.

• Contractor shall maintain and protect existing automatic door closer, electric latch and card reader system.

• Contractor shall re-install activated electric latch, latch sensor and wiring. Coordinate with ISG (Integrated Security Group), Mike Veronese, 888-474-3672, and new hardware to ensure compatibility and proper installation.

• Contractor shall salvage lockset and core – return to Owner.

• Contractor shall repair lower section of rusted HM frames (both sides). Grind out all rusted and deteriorated frame areas. Refasten and anchor base pf strike side jamb to prevent future movement. Repair base of frame with Bondo or equivalent repair material.

• Contractor shall install a new FRP door, threshold and associated hardware as identified. Prep existing frame to install new FRP door to replace the existing HM door. Prior to ordering door, contractor shall field measure frame opening and all hardware prep requirements. Note: Hardware shall be fastened with thru-bolts as specified.

• Contractor shall field measure the existing frame opening and hold the tightest dimension at the base of the frame. New door shall be sized based on using this dimension and adequate clearance shall be provided to account for the continuous hinge and operating clearance at the strike side of the jamb. Submit shop drawings for review & approval.

• Contractor shall prep and level concrete floor to accept new threshold. Repair / replace exist interior VCT floor at threshold. Match existing VCT as required.

• Prep, prime and paint interior and exterior of new FRP door. Prep, prime & paint HM frames, including exterior dividing panel between both doors. Paint shall match existing colors.

• Contractor shall schedule door installation with Owner. Egress must be maintained at all times.

• Door removal and installation of new door must occur within the same day.

• Upon completion of the new door installation, ensure proper function and clearance space between new door and existing frame..

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

P-26-6ADD#3: 03/1814

Page 7: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

Products (Reference MMFY15 Project Manual for all general project requirements)

Contractor shall field measure, coordinate, furnish and install the following. Verify all field dimensions for proper ordering.

DOOR ‘A’

1. DOORS: 1 ¾” thick FRP door with insulated core (field verify existing door thickness):

• Corrim - Special Lite

• Commercial Door Systems; or

• Approved Equal

2. HINGES: Heavy Duty Continuous MCK 25HD –

3. EXIT DEVICE: Sarg 16-8804-J-ETL704-US4-LHRB-less cylinders - TB

4. CLOSER: NOR CLP7500R – TB – 696

NOTE: Due to existing mounting holes on header stop. A steel plate (approx.) 2 ½”(w) x 8” (L) x 1/8” (d) – may be needed to cover existing holes and mount new parallel door closer.

5. THRESHOLD: PEM 2286A (or as is needed)

6. DOOR BOTTOM:PEM 345AV

7. PERIMETER WEATHERSTRIPPING: PEM Set 2892GV x 2893GV

8. CORES: (2 ea.) CorbRus 1080-114-A02-606--N25 o-bit –

9. Provide Frame Hinge Fillers

10. Provide Strike Frame Filler

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

P-26-7ADD#3: 03/1814

Page 8: PHOTO. NO.

PHOTO. NO.DATE: 01/20/14REVISIONSConstruction Services

170 Long LaneMiddletown, CT 06457

WESLEYAN U N I V E R S I T Y

Products (Reference MMFY15 Project Manual for all general project requirements)

Contractor shall field measure, coordinate, furnish and install the following. Verify all field dimensions for proper ordering.

DOOR ‘B’

1. DOORS: 1 ¾” thick FRP door with insulated core (field verify existing door thickness):

• Corrim - Special Lite

• Commercial Door Systems; or

• Approved Equal

2. HINGES: Heavy Duty Continuous MCK 25HD - G

3. EXIT DEVICE: Sarg 16-8904-J-ETL704-US4-RHRB-less cylinders – TB (Field measure and prep new door to align with existing strike).

4. CLOSER: Re-install existing – provide ¼ - 20 thru bolts

5. THRESHOLD:PEM 2286A (or as is needed)

6. DOOR BOTTOM:PEM 345AV

7. PERIMETER WEATHERSTRIPPING:PEM Set 2892GV x 2893GV

8. CORES: (2 ea.) CorbRus 1080-114-A02-606--N25 o-bit-

9. Provide Hinge Frame Fillers

252 CHURCH STREETOLIN LIBRARY - WEST DOOR REPLACEMENT

SECTION 00020 - EXISTING CONDITION PHOTOS

P-26-8ADD#3: 03/1814