Photo Album for Pierce Job 34824-2 Douglas County, WA Custom Impel Pumper Wk 3 Production ending September 18, 2020 • The cab continues paint operations at the 41 plant. • The raw frame rails are in staging for assembly at the 41 plant. • The pump is in staging for paint operations at the IPP plant. • The body is in staging to begin paint operations at the 41 plant.