Top Banner
Phoenix Convention Center • Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider Electric [August 11, 2015] Almeric Christian Federal Building, St Croix, U.S. Virgin Islands 100% Net Zero Energy Use and Energy Savings Performance Contracting (ESPC)
14

Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Dec 30, 2015

Download

Documents

Baldwin Higgins
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Phoenix Convention Center • Phoenix, Arizona

Solution Showcase

GSA’s NDER Program: Doubling the Energy Savings from Financed Projects

Kevin VaughnSchneider Electric[August 11, 2015]

Almeric Christian Federal Building, St Croix, U.S. Virgin Islands100% Net Zero Energy Use

andEnergy Savings Performance Contracting (ESPC)

Page 2: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade2

Topics To Be Discussed

• GSA Support for ESPC

• Case Study

• Lessons Learned

Page 3: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade3

Benefits of ESPC

• Increased quality and value through: • Private-sector expertise in energy efficiency, renewable energy, water conservation, and

reduced greenhouse gas (GHG) emissions • Built-in incentives for ESCOs to provide high-quality equipment, timely services, and thorough

project commissioning • Infrastructure improvements that pay for themselves over time

• Flexible, practical contract and procurement processes from FEMP that ensure each agency achieves its energy-related goals with:

• Best practices developed over nearly 15 years and hundreds of projects • Templates, schedules, contract review tools, and other resources • Life-of-contract (LOC) support.

• Smart program management that: • Guarantees energy and related operation and maintenance cost savings • Enhances the ability to plan and budget energy, operation, and maintenance accounts • Minimizes vulnerability to budget impacts due to volatile energy prices, weather, and

equipment failure.

Page 4: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade4

GSA’s Recent Use of ESPCs

National Deep Energy Retrofit Program (NDER)- 2012

• Program Management Office (PMO) stood up to standardize and centralize ESPC award process.

• PMO established a timeline for award process and provided guidance to regional offices

• Ten ESPC TOs awarded with total value of $172 million investment and $10.8 million guaranteed annual savings

• 38% average annual energy reduction•

• PMO achieved significant reduction in project cycle time from 20.9 months to 15.9 months (from ESCO selection to TO award)

National Deep Energy Retrofit Program (NDER)- 2012

• Program Management Office (PMO) to standardize and centralize ESPC award process.

• PMO established a timeline for award process and provided guidance to regional offices

• Ten ESPC TOs awarded with total value of $172 million investment and $10.8 million guaranteed annual savings

• 38% average annual energy reduction• • PMO achieved significant reduction in project cycle time from 20.9 months

to 15.9 months (from ESCO selection to TO award)

Page 5: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade5

GSA’s Recent Use of ESPCs

National Deep Energy Retrofit Program (NDER)- 2012

Almeric Christian Federal Building

Page 6: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade6

Almeric Christian Federal Building

• GSA Region 2

• Schneider Electric selected in 2012, through NDER, to implement ESPC

• TO awarded September, 2013

• Construction completed September, 2014

• Project parameters• $6.4 million investment• $0.5 million/year guaranteed

savings• 19 year finance term

Page 7: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade7

Key Facts

Building Characteristics:• Location: St. Croix, Virgin Islands• Floor Area: 57,872 ft2

• Original Construction: 1989• Tenant: Federal Courts• Baseline EUI: 57 kBtu/ft2

• Local Utility Rate: $0.52/kWh

Project Details:• Project Duration: Approx 24 months, 12

each for development & construction • Investment Value: $6.4 million• Projected Energy Reduction: 100%• Projected Savings: $500,000/year• Contract Term: 19 years

Page 8: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade8

Technical Specifications

• Key ECMs– Building Automation System– Lighting upgrades– Chiller and AHU upgrades

• Renewables– 462 kW ground-mounted solar PV

• M&V – Option B: PV system– Option C: all other ECMs

Chiller Improvements; $675,877

BAS Improve-ments; $502,902

HVAC - replace AHUs 2, 4 & 6;

$517,771

Interior Lighting Improvements;

$802,949

Window Film Installation;

$39,635

VFDs - Variable volume CHW Dis-

tribution; $81,885

Ground Mounted Solar;

$3,322,147

Building Transformer Replacement; $291,464

Retro Commissioning; $18,621

Investment Value, by Detailed ECM Category

Page 9: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade9

Scope

• 670kW PV system• New Chillers• New substation• New air handling units• New building

automation system (BAS)

• Lighting upgrade• Window film

Old SubstationOld Chillers New Chiller

Page 10: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade10

Benefits of the ESPC

• 100% reduction in grid supplied electricity

• Stable utility rates• Improved lighting and

comfort conditions for the tenants

• New equipment reduces O&M expense

• Risk of substation failure is eliminated

New Chillers New Substation

Page 11: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade11

• <insert savings>• Note use of GSA meters to validate utility

meters

Performance to Date

Page 12: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade12

Lessons Learned

• Start security clearance process as early as possible

• Integrate GSA construction inspector as early as possible

• Tenant engagement is critical

• Successful ESPCs are a partnership

• Communication, communication, communication

Page 13: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade13

Keys to Success

• Well-structured communication plan

• Building tenant buy-in• Proactively addressed tenant concerns

• Consideration of unique project characteristics• Utility rates• Security requirements

• Information collection and dissemination processes could be improved• More existing asset data needed• Standardized central location for all

project information

Page 14: Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.

Energy Exchange: Federal Sustainability for the Next Decade14

Questions