PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED RESETTLEMENT ACTION PLAN Lupon IS, Region I I Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized
14

PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

Apr 25, 2018

Download

Documents

doannhan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

PHILIPPINES Participatory Irrigation Development Project (PO88926)

ABBREVIATED RESETTLEMENT ACTION PLAN

Lupon IS, Region I I

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED
Page 3: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

Lupon IS, Region I I

The Social Assessment conducted for PlDP in November 2006 found about 20 households on canal embankment and on the protection structures of the Tagugpo Intake of Lupon IS. During field validation, however, it was found that there are 67 households informal settlers on those locations and that some of these are IP - households especially on the protection structl-lres of the Tagugpo Intake.

Series of dialogues were conducted with .the informal settlers together with the IP scattered - households who are economic migrants in the site. Consulta,tion meetings were held with the LGUs (Barangays and Municipalities) and NCIP and requested for their assistance to resolve the problem. With their assistance, the informal settlers, including the IP - hol~seholds agreed on the cash value of unsalvageable construction materials as NIA assistance and that NIA will provide transport to haul the dismantled dwellings to their individually identified settlement area. The agreement was formalized thr1-l a Memorandum of Agreement which was executed between NIA and the informal settlers. The agreed cost is estimated at P405,770.00.

Although not required because the system does not overlap with an Ancestral Domain, thru the assistance also of the NCIP, a Certification of Precondition (a certificate of compliance to the FPlC Process and certification that the community has given its consent) to the proposed rehabilitation of Lupon IS was issued.

Page 4: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

PAMBANSANG PANGASXWAAN NG PATUBIG (National krigation Adminisiration)

Lupon Irrigaticm Syshm Lupon, Davao 0rhnta1

C Q N S ~ ~ ~ V E ACTIVITIES WITH TNDIGENO-CIPe)

Lnst December, 2006 NIA-Lupon Irrigation System coordinated with the National Commission on rzdigmus Pooplo Provincial OfFice at Mati City, D m Oriental for the conduct of conaultativo assembly meetings with Indigenous People at the mbnicipalitiea of Lupon and Bannybanay.

On Janwy, 2006 bath NIA and NCIP ofllcials conducted coneultatian meetingn with the locd government offiobh of both Lupon and Bannybanay . Then, consultation meetinge with ths leaders of the Indigenous Peaple of Upon and Banaybanay wae conducted to yet far the poseible date1 and venues for tho coneultativo aewmbly meeting with all the indigenous people within tho rndcipaliti6s of Lupon and Bansybanay.

Theu, the NCIP oflicials conducted interviewe with the Irrigsbra AssocUona' leaders, several Xndigemus People in the watrtrahed aroa d suverd individual farmers witlrin the system h m the fourth week of January up to tho manth of February, 2007 to d ~ l 6 i n e thc cffectd of the proposed project of NIA under th4 Participatory Irrigation Development Project.

On Maroh,2007 two separate muitativo assembly meetings were conducted between NLA of8cials, NCll? &ciala, LOU officials, aad the Indigenous People of the municipalities ofLupon and Banaybaoay.

Fortunately, the Indigenou~ People had no demands excopt that the affected squatrars dong the upstream podan of the dam site of Lupan Irrigation System which are ako members of the h d i p o u a People shall be givan ausisitance tither in the form of cash or conehicticm matd& and ahall be provided with a dump truck for thc hauling of their demolished materials to their new settlement area.

After MA committed to provide the necessary assistance, NCIP afi ials oornrnilted to provide relevant data regarding tho consulfativrt aesembly meeting wc had conducred and the pmposod project of NIA under PlDP to the pmuincial govcament oftices concerned at Mati City, Davao Oriontal for their hfonnation rmd poeeible actions. Furtho~nore, t h y uuormnitted to subrnit their report to their regional md cmtd droes for the approval of thc C ~ c a t a of Pre-Condition for L u p Irrigation System.

Prepared by:

Engineer A

Page 5: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

PAMaQNSANG PANGAS1 WAAN NG P A W I G (National Irrigation Administrativn]

L u ~ o n Irrigation System Lupon, Dmno Oriantal

RESETTLEMENT PLAN FOR S O U A m R S AT W O N IS Lupon, Davao Orlental

Intmduction:

Ltiponlrrigation Syatom war constructed last December 3, 1971 and it experience a colony of squatten that mushroom along ths badu of Sumlag river upsbeam of the dam she and dong the b a s of isrigation ~ana18 o~cupyhg the t l p a within the bo~darynhi t of right af wily acquired by NU.

In the advent of PIDP, all 9ffe~ted scctars within and orrtside of the project coverage area me required to ba known and could avail of fair treatateat m case of fiegal aquattms which b v a been there for quite 8 long time. Hence, a 8ettlemaU plan is hereby proposed far the attainment af aettling the irreue of squattm.

-

A. First Stage of Implementah

Last December, 2006 identification of squattere colony in the itma wtrt conducted to dewmine the number of houees, type and the degree of construction, lootaion, cost of atruciuree comtruoted, occupation of the occupants, and other relevant information.

Then we conducted s8vtral i n f d meetings andlor dJaIoguea with the squatters &om both the Municipalitiee of Banayhanay and Lupan to determine the length of lime they stay in the area and their individual &man&.

Nmt, wc conducted cmultatiw meeting8 with the barmgay officale md LGU aEiciple ooncarned d t h regards to their municipal settlement p h for these aquattcrs.After pseeentation of our program undur PDP aad aur settlement plan far the affected squatters we learned bat both the muni~ipalitiee ofLupon ad Banaybanay had no resettlement plan for the squatters and they did not havz any ~ommftmcnt for assistance for the &acted squatters.

B. Second Staga of Implementation

For the months of February to May, 2007 NIA info~mtd the affeoted squatters that their municipal and barangay offi~ials had no srcttlement plan for them. NIA informed them that NIA can pmvide them with assistance h the fonn of ash d o r in kind (Like ccment, reiru5orced steel bars, other cofl~truotion material8 and vehicles for the hauling of the demolished materials to their new resettlement ma

The legal &mands of the individual identified squatters were consolldatcd for the preparation of the program of works to be endorsed to the 1mdi.g institution for canfirmation. NIA and the i d o a W Rquattarn a p e d M the cash value af c0~1Iruction matarials as assistance and that NIA will prod& vehi~lce for the hauling of their clemalighed materiala b their new settlement area As a proof of the agreement, the affected squatter8 signed @Mavits of desistance.

,

Page 6: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

C. Third Stage of Zmplenlentation

In thc third stage, meeting shall be conducted batween N U and the afFeotad squatters. Offkials from N a y Barangays concerned snd LGUB of Lupon and Banaybattay ahall be hvitud t;r wiW& the presmtatiun dthe sp~x;Bc acticra B identified aquattas. Was, rwieiort ofthe action for resettlument ahall be koplmented.

D. Fourth S t . of Implementation

In the fourth atage, final meeting and/or dialogusr ahdl be cmchrcted by and between tllc affectad squatters and N U wheiu, if bob parties agree, signing of tha Memoranda of Agromants shalt take effect immediately. (See attached Action Plan for the Informal Settlers which COWS the third and fourth stages of this Raettlemmi Plan).

Prepared by:

~ C ~ O S , mrn Engineer A

Page 7: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

LUPON RIS LIST OF CANAL SQUATERS

No.

1 2 3 - 4 5

Name of Squatters i AfkdfxI

ROEL BASILAD ROGELlO PASTRENA DEL SANALASA 1 JOEL NALASA BASlLlO DIMPAS MERLYN DIMPAS

23

7 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

WN*L LOCATION

LAT A-2 LA1 A-2 LAT A-2 LAT A-2 I A T A-2

Station

1 +347 NO50 0+051 Oc052 0+053

DIOSDADO BULADACO FIDERICO FRANCISCO JESlE TEOTODA DANllA LUCOB FLORENDA FORMENTERA NICOLAS PAGAURA ( ANTHONY ADLAWAN JENNY LUCOB LEOPOLDO ADLAWAN LORNA BANQUIL RAYMUNDO LINGANAY I DOMIMADOR CUARISIMA ERNEST0 ALGABRE JOSE LUMABAS BENJIE CARAHAY DOMING0 CABER0 BERNARD0 SOLANO ADELlNA TOLENTINO

LAT A Main Canal, uls Main Canal, uls Main Canal, u/s Main Canal, u/s Main Canal, u / / Main Canal, u/s Main Canal, uls Main Canal, uls Main Canal, dls Matn Canal, dls Main Canal, dls Main Canal, dls Main Canal, d/s Main Canal, dls Main Canal, dls

Lateral D A-

Lateral D

T Y \ ~ . " , ~ , " ~ ~ e

Shade pp

Shade I Poultry Residential I Pigge ty

Residential Residential

6+500 6+500 6+649 6+649

8,000.00 7,500.00

-- 7,000.00 5,500.00 5,500.00 7,200.00 7,000.00 6,800.00 6,500.00 4,000.00

- 3,000.00 3,500.00 1,500.00 1,500.00 1,000.00

- 1,200.00 700.00

- 1, 3~0.00

Description (Concrete, Woodsn,

Banboo)

Wooden Wooden RC Conc. Wooden Wooden

Residential Residential Residential Residential

' 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3,000.00 3.000.00 2,000.00 1,300.00 1,500.00 600.00 500.00 400.00 500.00 350.00 800.00 -. -

- WoodedBamboo

Wodden Wodden Wodden

Estimated Cost of Structure Constmcted

7,000.00 4,000.00 3,500.00 7,000.00 18 000.00

Wodden 1 Wodden Wodden Wodden Wodden Wodden

R.C. Fence Wodden Wodden Wodderi Wodden Wodden

Wodden

6+649 6+649 6+649 6+649 6+649 7+800 9+540 9+540 -

9+918 9+918 9+918 9-640

1 2+135 2+135

~s t i n r~d Cast as NIA hswame InGIudlw

~au!lng cost

3,OOO.OO 2,000.00 1,200.00 5,000.00 5 500.00

Residential Residential Residential Residential Residential

Store Wall Fence

.. Residential Shade Fence

Piggery Dirty Kitchen

Shade - Shade

Page 8: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

LUPON RIS LIST OF CANAL SQUATERS Description Estiwted Cost Wmtd cast as NB

NO. p&~me of Tyy::C= (concrete. Wooden, of structure ~nc~udb Banboa) Conrtracted HauRne Cest

&-.- LAT A-2 58,320.00 9 LATERAL A 69,000.00 - 15 MAIN CANAL 30,800.00 NOT€: Estimated Cost of NLA Assistance to affected familii includes hauling assistance

3 LATERAL D -l,95cm'l of d e m o l i housing materials to the new resettlement site If any.

26 DAMSITE 245,700.00 -

, 67 T O T A L : 405,770.00 Submitted by: - Prepared by. d w

Page 9: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

PAKIGSAAD SA MALINAWONG PAGHAWA

Ako si Ginuong/ Ginang m g panuigon ( ) walay kab balay ( ) payag ( ) nga gitukod sa kilid sa kana1 C ) protection dike ( ) sa NIA - Lupon Irrigation System, Lupon, Davao Oriental. H u m a n mapasabot sa ruga katungod, katuyuan ug tumong sa NIA - Lupon lrrigation System ug sa among mga Icatungod, kami kinasing kasing nga miuyon ug nanaad sa mga musunod:

1. N g a ako mitukod sa among balay ( ) payag ( ) diha sa kilid sa kanal( ) prokction dike ( ) nga walay pagtugot sa opisina sa NIA - Lupon Irrigation System;

2. Nga ako nakasabot nga ang luna nga akong gitukoran sa among bday ( ) payag ( ) gipanag-iyahan sa NIA - Lupn Imgatjon System;

3. Nga ako miuyon ug walay pagsupak o pagduha-duha sa pagguba sa akong gjtukod nga balay ( ) pay% ( ) ug pagpahawa gikan sa maong luna nga akong gitukoran sa panahon nga kami pahawaon na sa N IA - Lupon Irrigation System;

4. Nga ako nanaad nga mohawa sa maong luna sa panahon nga @ t a g nga lugway sa amoa sa NIA - Lupon Irrigation System;

5. Nga kami kinasingkasing nga mihangyo sa NIA - Lupon Inigation System ug sa local government units nga hatagan ug hinabang sa bisan unsang yamaagi sa takna sa among pagpahawa gikan sa maong luna;

Amn sa pagmatuod nga kining p w s a a d sa h a w nga pagpahawa tinuod sum& sa akong kabubut - on ug hapsay nga panghunahuna akomnga~~irmad~saubosningpctsa P) bulansa?&. tuig lZf2E.C- st3 -- -- -, Lupon, Davao Oriental, Phihppines.

Page 10: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

PAKIGSAAI) SA MALI NAWONG PAOHAWA

Ako si G h n g / Ginang m ham tong ang panuigon ( ) walay kebilinggan ( ) min>o"y') bab. Tag-iya sa balay ( ) payag ( ) nga gitukod sa kilid sa kana1 ( ) pmtection dike ( ) aa NIA - Lupon Irrigation System, Lupon, Davao Oriental. Human mapasabot. sa mga katungod, katuyuan ug tumong sa NIA - Lupon Irrigation Sjrstem ug sa among mga katungd, kami kinasing kasing nga miuyon ug nanaad sa mga musund: I

1. Nga ako mitukad sa among balay (/j payag ( ) diha sa kiltl sa kanal( ) protection dike ( ) nga walay pagtugo t sa opisina sa NIA - Lupon Irrigation System;

asabot nga ang luna nga akohg gitukaran sa among ( ) gipanag-iyahan sa NIA - Lupon Irrigation

System; I

3. Nga ako miuyon ug walay pagsupak o pagduha-duha sa pagguba 3a akonl3 gitukd nga b&y ( 1 pay% ( 1 ug m- g i h maong luna nga akong gitukoran sa panahon nga kami pahawaon na aa NIA - Lupon lmgation System;

4. Nga ako nanaad nga mohawa sa maong luna sa panahon nga gihatag nga lugway sa axnoa sa NIA - Lupon Irrigation Systcm;

5. Nga kami kinaslngkasing nga mihangyo sa NIA - Lupon ln-igation System ug sa local government units nga hatagan ug hinabang sa bisan unsang patnaagi sa takna sa among p-awa @can sa maong luna;

Aron sa pagmatuod nga kining palugsaad sa h a w nga pagpahawa tinuod s d sa akong kabubut - on ug hapsay nga panghunahuna ako magapirma diri sa ubos ning petsa I I bulan sa ~ K E - W F & tuig & 0 7 dinhi sa -- , Lupon, Dave0 Oriental,

Page 11: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

Ako si Ginoongj Ginang k*i@@?m w m b e h a m t o n g ang pauuigon ( ) wday kabilinktk ( ) minp ( ) balu. Tag-iya sa b&y ( ) payag ( ) nga gitukod sa MlkI sa kanalt ) protection dike { ) sa NIA - L u p o n Irrigation System, Lupon, Davao Oriental. Humen mapasabot sa mga katuugod, katuyuan ug tumong sa NIA - Lupon Inigation System u g sa among mga katungod, kami kinasing h i n g nga miuyon ug n-d sa mga musunod:

1. Nga ako mitukod sa among balay ( ) payag ( ) diha sa kilid sa kanal( ) protection dike ( ) nga w h y pagtugot sa opisina sa NIA - Lupon Imgation System;

2. Nga ako nakasabot nga ang luna nga akong gitukoran sa among -

balay ( ) payag ( ) gipanag-iyahan sa NIA - Lupon Imigation System;

3. Nga ako miuyon ug walay pagsupak o pagduha-duha sa pagguba sa akong g i W o d nga balay ( ) paytag ( ) ug pgpdmwa gikan %a maong luna nga akong gitukoran sa panahon nga kami pahawaon na sa NIA - Lupoo Irrigation System;

4. Nga ako nanaad nga mohawa sa maong luna sa panahon nga gihatag nga lugway sa amoa sa NIA - Lupon Irrigation System;

5. Nga kami lrinasingkasing nga mihangyo m NIA - Lupon lnigat& System ug w local government units nga hatagan ug hinabang se bisan unsang pama& sa takna sa among pagpahawa gikan sa maong f u n -

$ , : I

Aron sa pagmatuod nga kining pakigsaad sa linaw nga pagpahawa tbuod sumah sa d o n g kabubut - on ug hapsay nga p a n & d u n a ako magapirma diri sa ubos nlug petsa I I . bulan sa Deb& tuig ZOof dinhi sa , Lupon, Davao Oriental, Philippines.

Page 12: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

A ~ O si ~imang/ ~inang ~t% hamtow ang panuigon ( ) walay kabiliaggrm ( ) miayo ( ) balo. Tag-iya sa bahy ( ) pya% ( 1 nga gitukod sa kilid sa kana1 ( ) p w d* ( ) aa NlA - Lupon Irrigation System, Lupon, Davao Oriental. Humen mapasabot sa mga katungai, katuyuan ug tumong sa NJA - Lupon Inigation System ug sa among mga katuqd, lcnmi kinasing k a s i a g nga miuyon ug nanaad sa mga musunod:

1. Nga ako mitukod sa among balay ( ) payag ( ) diha aa kilid sa kanal( ) protection dike ( ) nga walay pagtugot sa opisina sa NIA - Lupon Irrigation System;

2. Nga ako nakasabot nga ang hum nga akong gitutk- sa among balay ( ) payag ( ) gipaaag-jaban sa NIA - Lupon Irrigation system; 6'

3. Nga ako miuyon ug w a y pagsupak o pasduha-duha sca pgguba d o n g g i t d o d nga ~ A Y ( 1 payag ( ug gikan

maong luna nga akong gitukoran sa panahon nga kami pahmwmn na sa PILA - Lupon Irrigation System,

4. Nga ako nanaad nga mohawa sa xnaong luna sa panabon nga gihabg nga lugway sa amoa sa NIA - Lupon Ifii98tion System;

5. Nga karni kinasingkasing nga m.ibngyo sa NIA - Lupon Irrigation System ug sa local govcrnmcnt units nga hatagan ug hinabang sa bisan unsang pamaagi sa takna sa among pagpahawa gikan 343 -ng hura;

Amn sa pagmatuod nga khing pakigsaad sa linaw nga pagpahawa tinuod s~lmRlR sa d o n g kabubut - on ug hapsay nga panghduna ako magapirma diri sa ubos ning petsa ! 3 bulan sa fl- tuig P B T d b h i sa , Lupon, Davao- O k t a l ,

Page 13: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

- -

PAKIGSAAD SA lYUUIIRAWONG PAGHAWA

Ako si Ginoong/ Ginang . qy3!&7 hamtong ang panuigon ( ) walay kabilioggan ( ) minyo ( ) balo. Tag-iya sa bakY ( ) payag ( ) nga gitukod sa kilid sa kandl ( ) protection dike ( ) ea NIA - Lupon higation System, Lupon, Davao Oriental. H u m a n mapasabot sa rnga katungod, katuyuan ug tumong sa NIA - Lupon Irrigation System u g sa among mga katungd, kami kinasing kasing nga miuyon ug nanaad sa mga musund:

1. Nga ako mitukod sa among baby ( ) payag ( ) diha sa kilid sa kanal ( ) protection dike ( ) nga H-alay pagtugo t sa opisirla sa NIA - Lupon Irrigation System;

2. Nga ako nakasabot llga ang luna nga akong gitukoran sa among b&y ( ) payag ( ) giprmag-iyaban sa NIA - Lupon Img~tio~l Svstem;

3. Nga a k o miuyon ug w a l a ~ pagsupak o pagduha-duha sa pagguba sa akor lg gitukod nga balay ( ) payag ( ) ug pagpahawa @an sa mclong luna nga akong gitukoran sa panahon nga kami pahawaon na sa N I A - L u p n Irrigation System;

4. Nga ako nanaad nga mohawa sa maong luna sa panahon nga gihatag nga lugway sa am- sa NIA - Lupon Jmgation System;

5. Nga kami kinasingkasing nga mihangyo sa NlA - Lupon Inigation System ug sa local government units nga hatagan ug hinabang sa bisan unsang pamaagi sa takna sa among pagpahawa gikan sa maong luna;

Aron sa pagmatud ilga kining palagsaad sa linaw nga pagpahawa tinuod sum& sa akong kabubut - on ug hapsay nga panghunahw ako magapuma diri sa ubos ning petsa -d--l~ . bulan sa f l d L tuig .-22@7 dinhi _._- , Lupon, Davw Oriental, Philippines.

Page 14: PHILIPPINES Participatory Irrigation Development Project ...documents.worldbank.org/curated/en/... · PHILIPPINES Participatory Irrigation Development Project (PO88926) ABBREVIATED

Republic of the Philippines OFFICE OF THE PRESIDENT

National Commission on Indigenous Peoples Region XI

E. Valeroso Bldg., E.B. Lopez St., Sandawa Plaza, SIR Matina, Davao City Tel. Nos. 298-0495 . 298-2957 Tel. Fax 298-2942

Website: www. ncip.gov.ph

CERTIFICATION PRECONDITION (Certificate of Com~liance to the FPlC Process and

~eitif ication that the community has given its consent)

TO WHOM IT MAY CONCERN:

THIS IS TO CERTIFY that ,the NATIONAL IRRIGATION ADMINISTRATION (NIA) has satisfactorily complied with the process for the issuance of the Certification Precondition for its Rehabilitation and Improvement of the lrrigation and Drainage System located at the municipalities of Lupon and Banaybanay, all in the province of Davao Oriental, as prescribed under NClP Administrative Order No. 01, Series of 2006.

Pursuant to Section 39 of Administrative Order No. 1, Series of 2006, the Regional Director duly concurred by the Ethnographic Commissioner approved the issuance of a Certification Precondition in favor of the Proponent subject to the terms and conditions incorporated in the Memorandum of Agreement entered into and among the Indigenous Cultural Communities belonging to the Mandaya Tribe of the municipalities of Lupon and Banaybanay, province of Davao Oriental, the proponent, National lrrigation Administration (NIA) and The National Commission on lndigenous Peoples.

Done this 5'th day of June o City, Philippines.

Concurred: \

Southern and Eastern Mindanao

Control No. RXI-2008-06-008

Cc: Office of the Secretary Ethnographic Region Concerned Records Section Region Concerned ApplicanVProponent

/" I

- - I