PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the Shopping Method (Small-Value Procurement) Based on Approved Annual Procurement Plan For CY 2012 Name Notice of Code Procurement ABC to Delivery Source Approved Budget of Contract Contract at Cost Delivery/ Branch/ (PAP) Program/ Proceed/ Date or of Fund Total MOOE CO Total MOOE CO Acceptance End-user Project PO No. PO Date PCA Governing Board/Office of the Corporate Secretary (OCS) Operation: P 158,300.00 Corporate 755 - Office Supplies 29,500.00 P Various 842 2/3/2012 Fund 19,650.00 16,650.00 Delivered/Accepted " 853 2/10/2012 25,000.00 12,115.00 " " 862 2/15/2012 5,000.00 3,758.50 " 1314 12/27/2012 10,800.00 8,320.00 - Telephone Expenses 118,800.00 " 786 - Subscription 10,000.00 Capital Outlay: P 171,500.00 Corporate - Desktop Computer 30,000.00 Fund - Fax Machine 10,000.00 - Printer 4,000.00 - Steel Storage Cabinet 25,000.00 - 1 unit Aircon 90,000.00 - 3 units Electric Fan 4,500.00 - 1 unit Monitor 5,000.00 - 1 unit Coffee Maker 3,000.00 Office of the Administrator (OFAD) : a Operation: P 1,201,650.00 755 Office Supplies 1,650.00 P " 877 2/29/2012 Corporate 5,000.00 3,600.00 Delivered/Accepted " 908 3/15/2012 Fund 14,500.00 12,300.00 " " 911 3/26/2012 12,000.00 11,400.00 " " 915 3/26/2012 23,000.00 22,800.00 " " 1281 12/10/2012 2,500.00 2,300.00
33

PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Jan 22, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

PHILIPPINE COCONUT AUTHORITY

PROCUREMENT MONITORING REPORT COVERING CY 2012

Under the Shopping Method (Small-Value Procurement)

Based on Approved Annual Procurement Plan For CY 2012

Name Notice

of Code Procurement ABC to Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ Proceed/ Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

PCA Governing Board/Office of the Corporate Secretary (OCS)

Operation: P 158,300.00 Corporate

755 - Office Supplies 29,500.00 P

Various 842 2/3/2012 Fund 19,650.00 16,650.00 Delivered/Accepted

" 853 2/10/2012 25,000.00 12,115.00 "

" 862 2/15/2012 5,000.00 3,758.50 "

1314 12/27/2012 10,800.00 8,320.00

- Telephone Expenses 118,800.00 "

786 - Subscription 10,000.00

Capital Outlay: P 171,500.00 Corporate

- Desktop Computer 30,000.00 Fund

- Fax Machine 10,000.00

- Printer 4,000.00

- Steel Storage Cabinet 25,000.00

- 1 unit Aircon 90,000.00

- 3 units Electric Fan 4,500.00

- 1 unit Monitor 5,000.00

- 1 unit Coffee Maker 3,000.00

Office of the Administrator (OFAD) : a

Operation: P 1,201,650.00

755 Office Supplies 1,650.00 P

" 877 2/29/2012 Corporate 5,000.00 3,600.00 Delivered/Accepted

" 908 3/15/2012 Fund 14,500.00 12,300.00 "

" 911 3/26/2012 12,000.00 11,400.00 "

" 915 3/26/2012 23,000.00 22,800.00 "

" 1281 12/10/2012 2,500.00 2,300.00

Page 2: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement ABC Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

Office of the Administrator (OFAD) : b

755 " 991 5/22/2012 9,000.00 8,100.00 "

" 1133 8/22/2012 2,500.00 2,300.00

" 1163 9/12/2012 19,500.00 16,200.00

" 1311 12/26/2012 5,000.00 3,840.00

771-775 Communication Expenses 250,000.00

- Router & wireless adapter 909 3/15/2012 8,500.00 7,993.00 Delivered/Accepted

- Subscription Plan (Dream) 925 4/2/2012 7,800.00 7,800.00 "

- Prepaid Cards for August 1115 8/3/2012 22,000.00 21,234.00 "

783 Representation Exp. 700,000.00 Fund

- Packaging of coconut cheese

for promotion by Admin 1277 8/10/2012 42,000.00 41,750.00 Delivered/Accepted

- Printing of Coco Cheese

Label 1294 12/20/2012 8,000.00 8,000.00 "

786 Subscription 50,000.00

(PRIO) 1089 7/17/2012 CF 65,992.00 61,372.56 Delivered/Accepted

Supp 823 - Repair of 1 unit computer 1213 11/6/2012 4,500.00 4,500.00 "

Supp. 883 Extra Ordinary Fund 1,000,000.00

- 1 pc Digital Camera 1187 9/28/2012 10,000.00 9,990.00 "

Capital Outlay: P 440,000.00

- 3 units Desktop Computers 90,000.00 CFAC

- 3 units Printer 15,000.00

- 1 unit Laptop 40,000.00

- Furniture & Fixtures (Carpet 80,000.00

* Supply, deliver & Install

floor carpet tiles 964 5/9/2012 79,000.00 75,000.00 Delivered/Accepted

- Roll-up Shades/Blinds 215,000.00 1071 7/10/2012 250,000.00 242,775.37 "

Page 3: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement ABC Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

- Management Services Office (MSO)

Operation: P 1,235,003.21

755 Office Supplies ) 35,003.21 1054 6/29/2012 3,800.00 3,029.00 Delivered/Accepted

771-775 Communication Expenses 200,000.00

- Connection cable, etc 1054 6/29/2012 3,800.00 3,029.00 "

- Prepaid

792 - Auditing Services 1,000,000.00

Capital Outlay: P 65,500.00

- 1 unit Computer w/ monigtor 30,000.00 Corporate

- 1 unit Printer 4,000.00 Fund

- Electric Fan 1,500.00 "

- Filing Cabinets 30,000.00 "

- Corporate Planning Office (CPO)

Operation: P 554,400.00 Corporate

753 - Workshops/Training / meetings 554,400.00 Fund

Capital Outlay P 37,000.00

- Desktop Computer 30,000.00

1253 11/21/2012 3,800.00 3,800.00 Delivered/Accepted

- Printer 4,000.00 1281 12/10/2012 Corporate 4,800.00 3,120.00 "

- 2 units Electric Fan 3,000.00 Fund

1290 12/14/2012 1,500.00 1,300.00 "

- Public Relation & Information

Office (PRIO)

Operation : P 408,720.00 Corporate

755 Office Supplies 50,000.00 Fund

765 Other Supplies 55,000.00

Page 4: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

- Public Relation & Information

Office (PRIO)

771-775 Communication Exp. 100,000.00

780 Ad, Promo & Mktg. Exp. 103,720.00

- Printing Info campaign 929 4/3/2012 4,270.00 4,150.00 Delivered/Accepted

- Cocowood Racking Chair 1022 6/7/2012 4,750.00 2,300.00 "

- Publication PCA

Programs 8/30/2012 170,000.00 160,298.73 "

781 Printing Expenses 50,000.00

- Printing of Agri Pinoy

Diretsong Ayuda frm DA. 1034 6/18/2012 1,600.00 1,440.00 "

- Printing PCA 114th

Anniversary Celebration 1035 6/19/2012 2,000.00 1,440.00 "

786 - Subscription : magazines, 50,000.00 867 2/17/2012 57,455.40 57,455.40 "

Capital Outlay: P 78,000.00 Fund

- Desktop Computer w/ Printer 34,000.00

- Scanner 4,000.00

- 1 unit Video Camera 40,000.00

- Legal Affairs OfficeOperation: P 67,000.00 Corporate

771-775 - Communication Exp. 50,000.00 Fund

786 - Subscription 10,000.00

791 - Legal Services 7,000.00

Capital Outlay: P 5,500.00 Corporate

- Electric Fan 1,500.00 Fund

- 3 n 1 Printer 4,000.00

Supp. - 1 unit Computer Monitor 35,000.00

- 1 unit HP Printer 5,000.00

Page 5: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

Corporate Services Branch

Operation : P 3,670,000.00

755 - Office Supplies 20,000.00 Corporate x

1073 7/10/2012 5,900.00 5,400.00 Delivered/Accepted

771-775 Communication Exp. 50,000.00 Fund

792 Auditing Services 2,500,000.00

- HD Pencil Sharpener 1311 12/26/2012 450.00 450.00 "

793 Consultancy Services 100,000.00

969 Other MOOE 1,000,000.00 Corporate

- Clear glass & installation 1080 7/12/2012 3,500.00 3,400.00 Delivered/Accepted

- Various construction mats. 1081 7/12/2012 25,200.00 15,194.00 "

- Various paints & materials 1082 7/12/2012 6,580.00 6,580.00 "

- replacement ofAC wood frame 1083 7/13/2012 4,500.00 4,500.00 "

- various electrical

supplies 1091 7/18/2012 17,000.00 16,667.00 "

- Various PVC materials 1092 7/20/2012 18,100.00 15,490.00 "

- various electrical suplies

for replacement of grounded

main electric power suply 1100 7/23/2012 117,000.00 116,750.00 "

- Rental of exhibition booth

system for 11th National

cocoweek celebration 1119 8/11/2012 166,000.00 165,902.00 "

- Lunch Buffet for guests

during Cocoweek Celeb 1143 8/29/2012 84,000.00 84,000.00 "

- Meals served during Aug. 1

meeting on updates PCA

Projects/programs 1174 9/17/2012 8,250.00 5,885.00 "

- Various items as raffles

for Christmas celebration 1272 12/7/2012 102,500.00 102,459.00 "

- Lunch /snacks for serving

during 2012 Chrismas Party 1278 12/10/2012 135,000.00 133,200.00 "

Page 6: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

Corporate Services Branch

- Additional giveaways to

employees during Christmas

celebration 1280 12/11/2012 238,000.00 237,940.50 "

Capital Outlay: P 37,000.00 Fund

- 1 unit Computer w/ Printer 30,000.00 CFAC

- 1 unit Monitor 7,000.00

- Administrative & Gen Services Department (AGSD)

Capital Outlay: P 372,800.00

- Dormitory Equipments 128,000.00

1204 10/19/2012 10,000.00 8,435.00

1290 12/14/2012 10,500.00 10,500.00

- 2 units Desktop Computers 60,000.00

- 2 units Printer 8,000.00

- 2 units Calculators 3,000.00

- Electric Fan 1,500.00

- 1 unit Floor Polisher 35,000.00

- 1 unit Manual Typewriter 10,000.00

Capital Outlay:

- Motorpool Mechanic Tools

Equipment 50,000.00

- Maintenance Tools and

Equipment 77,300.00

907 3/14/2012 780.00 750.00 "

* Repair Aircon 921 3/29/2012 4,000.00 4,000.00 "

* Reburbishing of 2 units

passenger elevator 490,500.00 1088 7/17/2012 49,500.00 49,000.00

Page 7: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

* General Services Division (GSD) a

Operation : P 24,385,000.00 Corporate

755 - Office Supplies 10,000.00 Fund

- Fuel, Oil & Lubricants 75,000.00

- Other Supplies 115,000.00 Delivered/Accepted

Various 838 1/26/2012 119,700.00 4,000.00 114,868.50 3,000.00 "

" 839 1/27/2012 34,900.00 34,350.00 "

" 854 2/10/2012 3,800.00 3,570.00 "

" 860 2/14/2012 16,500.00 15,900.00 "

" 868 2/20/2012 5,500.00 5,500.00 "

" 881 3/1/2012 32,500.00 32,063.50 "

" 895 3/9/2012 1,200.00 1,120.00 "

": 907 3/14/2012 5,500.00 4,345.00 "

" 920 3/29/2012 7,800.00 7,220.00 "

1033 6/15/2012 8,000.00 7,800.00

766 Water Expenses 2,035,000.00 110,000.00 78,000.00

- purified drinking water 848 2/8/2012 110,000.00 78,000.00 "

-

767 Electricity Expenses 4,350,000.00

782 Rent 635,000.00

795 General/Janitorial Exp. 165,000.00 4,000.00 3,800.00

- Cleaning, shampooing, etc. 946 4/20/2012 4,000.00 3,800.00 "

797 Security Services 3,000,000.00 Note: pls refer to under Public Bidding procurement method

799 Other Professional Services 12,000,000.00 68,700.00 66,300.00

- treatment of termites 893 3/9/2012 60,000.00 58,000.00 Delivered/Accepted

- Cleaning & Shampooing

of carpets and sofas 993 5/24/2012 2,700.00 2,700.00 "

1055 6/29/2012 6,000.00 5,600.00

"

Page 8: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

End-user Project PO No. PO Date

* General Services Division (GSD)

811-841 R & M Motor Vehicles/ 2,000,000.00

Equipments 241,102.65 225,474.85

* Repair aircon SEP-526 840 1/27/2012 3,000.00 3,000.00 Delivered/Accepted

* Repair aircon SDX-616 844 2/7/2012 4,000.00 4,000.00 "

- Repair Alternator SDF-230 845 2/7/2012 5,500.00 5,000.00 "

- Check-up RJS - 938 864 2/17/2012 18,000.00 11,142.70 "

- Aircon repair SEP-555 879 3/1/2012 6,000.00 5,400.00 "

- Car tinted SEP-555 914 3/26/2012 4,500.00 4,300.00 "

- Complete malignment SEP-516 932 4/11/2012 2,000.00 1,850.00 "

- replacement Muffler SEP-526 937 4/17/2012 5,000.00 4,500.00 "

- repair of SDX-740 941 4/18/2012 3,500.00 3,400.00 "

- repair AC of SDP-230 957 5/8/2012 6,000.00 5,000.00 "

- Repair aircon SEP-506 965 5/9/2012 3,000.00 3,000.00 "

- Maintenance SJH-998 975 5/15/2012 18,000.00 17,406.80 "

- Repair aircon SDX-740 977 5/15/2012 3,000.00 3,000.00 "

- Repair SEP-555 982 5/17/2012 3,000.00 3,000.00 "

- repair Aircon SEG-882 986 5/18/2012 7,500.00 7,500.00 "

- repair aircon SEP-526 989 5/21/2012 4,800.00 4,800.00 "

- Repair typewriter 990 5/22/2012 3,300.00 3,300.00 "

- Check-up HJS-948 995 5/25/2012 18,000.00 15,702.70 "

- replace broken glass 930 4/10/2012 11,000.00 11,000.00 "

- replace various parts 933 4/11/2012 13,500.00 13,380.00 "

- repair various stand fan 943 4/20/2012 2,500.00 2,240.00 "

- Various vehicle parts 945 4/20/2012 10,020.00 10,020.00 "

- Trapal of various vehicles 979 5/16/2012 4,000.00 2,600.00 "

- Maintenance Service 1017 6/7/2012 18,082.65 18,082.65 "

- Mainteance of Flame

Photometer 1167 9/14/2012 10,000.00 9,000.00

- repair printer 1028 6/14/2012 1,500.00 1,300.00 Delivered/Accepted

- Aircon repair 1030 6/15/2012 1,900.00 1,850.00 "

- aircon repair aqt MC 1056 6/29/2012 5,500.00 5,300.00 "

Page 9: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* General Services Division (GSD)

- repair of 2 units compressor 856 2/13/2012 55,000.00 54,400.00 "

- repair of SDF-230 1062 7/4/2012 13,000.00 12,500.00 "

- repair of aircon 1064 7/5/2012 8,500.00 8,500.00

- vehicle maintenance items 1065 7/6/2012 38,900.00 38,450.00

- Engine overhauling

SDP280 1076 7/6/2012 47,000.00 43,190.00 "

- complete camber alignmengt 1084 7/13/2012 1,850.00 1,850.00

- Aircon repair at CorSec 1093 7/18/2012 3,500.00 3,500.00

822 - Re-upholstery of sofas 1269 12/5/2012 9,500.00 9,500.00

Supp. 823 - 1 pc. AGP Card 1284 12/12/2012 3,000.00 3,000.00

841 - 4 pcs. Tires 1097 7/26/2012 31,600.00 31,600.00

- 4 pcs. Tubeless tires 1106 7/27/2012 35,200.00 33,400.00

- 2 pcs Battery 1114 8/3/2012 8,000.00 7,800.00

- Engine overhauling of

SDX-740 1121 8/14/2012 48,000.00 43,190.00

- Injection pump

calibration SDP-280 1122 8/15/2012 20,000.00 17,000.00

- Rewiring of SEP-506 1123 8/15/2012 24,000.00 23,000.00

- Various spare parts 1116 8/6/2012 37,200.00 36,300.00

- Various spare parts 1128 8/22/2012 32,520.00 29,570.00

- aircon repair of Vehicle

w/ Plate no. SEP-555 1130 8/22/2012 5,000.00 4,500.00

- repair of SDP-280 1148 9/5/2012 18,000.00 17,000.00

- replacement of defective

spare parts SEP-506

& SDX- 616 1145 8/30/2012 6,350.00 6,350.00

- Injection pump

calibration SDX-740 1151 9/5/2012 18,500.00 17,000.00

- Injection pump

calibfration SDX-616 1152 9/6/2012 18,000.00 17,000.00

- Various spare parts 1316 12/27/2012 35,920.00 34,720.00

Page 10: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* General Services Division (GSD) a

- 1 pc Battery 1134 8/23/2012 4,000.00 3,900.00

- Change Oil SJH-927 1135 8/23/2012 18,000.00 11,148.15

- replacement of defective

spare parts of SEP-506

& SDX-616 1145 8/30/2012 6,350.00 6,350.00

- Vehicle AC repair

SEP-555 1153 9/7/2012 22,000.00 22,000.00

- Complete Camber

alignment SEG-830 1164 9/12/2012 2,000.00 1,850.00

- Floor Matting & Seat

cover of SEP-506 1169 9/14/2012 7,000.00 4,982.00

- Various wipers for

SEP-526 1165 9/12/2012 5,100.00 5,100.00

- Injection pump

calibration SEP-506 1173 9/14/2012 19,000.00 17,000.00

- Maintenance Services

of BJS-948 1178 9/21/2012 18,500.00 11,751.55

- 1 pc starter SDX-616 1176 9/17/2012 5,000.00 4,500.00

- Various spare parts 1182 9/21/2012 13,900.00 13,500.00

- Aircon repair SDP-181 1175 9/17/2012 4,000.00 3,000.00

- Floor matting & Crocodile

jack SEU-830 1183 9/24/2012 6,500.00 5,400.00

- 1 pc Battery 3 SNF 1189 10/2/2012 4,000.00 3,900.00

- Service Maintenance SJH-998 1190 10/3/2012 18,000.00 12,934.35

- Interior detailing SEU-830 1198 10/9/2012 4,000.00 3,200.00

- Interior & Exterior

detailing of RJS-948 1197 10/5/2012 6,500.00 6,100.00

- various vehicle spare parts 1200 10/15/2012 38,900.00 38,000.00

- Mahining of Profolir Shaft,

cutting welding. Etc 1214 11/6/2012 1,700.00 1,200.00

- Aircon repair SDP-230 1216 11/7/2012 18,000.00 17,000.00

Page 11: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* General Services Division (GSD)

- Starter repair SEP-506 1221 11/9/2012 2,800.00 1,590.00

- 1 pc. Battery 3 SMF

for SJN-948 1223 11/9/2012 5,000.00 4,439.00

841 - Various spare parts 1228 11/13/2012 37,000.00 36,000.00

- Repair of Aircon

SDX-740 1229 11/15/2012 8,500.00 8,500.00

- Aircon repair SEP-526 1239 11/19/2012 12,000.00 11,000.00

- 4 pcs. Tires for RJS-948

& SDX-616 1254 11/22/2012 34,400.00 32,600.00

- Camber /correction

alignment SDP-230 1256 11/23/2012 1,800.00 1,800.00

- Electrical wiring repair

SEP-555 1260 11/27/2012 3,000.00 2,975.00

- Fan motor rewinding, etc

Window-type aircon 1261 11/27/2012 2,500.00 2,200.00

- Maintenance Services

60,000 km Check-up 1268 12/5/2012 18,000.00 16,221.75

- 2 pcs. Tires 1266 12/4/2012 8,200.00 8,200.00

- Various vehicle parts 1291 12/14/2012 13,400.00

- Repair of 1 unit Diesel

tank for Mazda-SEP-555 1295 12/20/2012 2,000.00 1,500.00

- Alternator repair SEP-526 1305 12/21/2012 8,500.00 8,000.00

- Camber alignment SDX-616 1307 12/21/2012 1,900.00 1,850.00

821 - repair of defective

AC compressor 1132 8/22/2012 18,500.00 18,500.00

- repair of defective

fan motor and aircon 1141 8/28/2012 2,000.00 1,900.00

- repair of defective

window-type AC 1147 9/4/2012 5,500.00 5,300.00

- Aircon repair SDX-616 1177 9/21/2012 8,500.00 7,500.00

- Repair of HP Deskjet

Printer 1186 9/26/2012 1,500.00 1,500.00

Page 12: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* General Services Division (GSD)

- repair of fax machine 1194 10/3/2012 2,500.00 2,500.00

- Repair of 1 unit Printer 1195 10/4/2012 1,500.00 1,500.00

- Repair of Computer 1199 10/12/2012 4,500.00 4,500.00

- Repair of Printer 1202 10/19/2012 2,000.00 2,000.00

- repair of 1 unit HP Printer 1212 11/5/2012 1,700.00 1,700.00

- Repair of Printers 1218 11/8/2012 3,700.00 3,700.00

- time delay on break timer 1285 12/12/2012 2,100.00 1,900.00

- Repair of 1 unit printer 1292 12/14/2012 1,500.00 1,500.00

811 - 4 pails NIM Anti Algae (Food Grade)

4 pails NIM Disinfectant (Food Grade) 1205 10/23/2012 48,500.00 47,880.00

- Aluminum awing and fixed

glass window 1206 10/23/2012 31,500.00 31,000.00

- Steel Drill/blind rivet 1207 10/19/1902 1,500.00 1,455.00

- THN # 4, etc 1207 10/23/2012 7,500.00 7,200.00

- 1 set car tinted 1201 10/19/2012 3,000.00 2,968.00

- Supply of labor, tools &

matrs. For annual check-up

of GENSET 1211 11/5/2012 32,000.00 31,500.00

- 2 units GE Elec. Wathour Meter

1 unit Calibrated water meter 1227 11/13/2012 46,500.00 46,500.00

- Various spare parts for

R & D and PSAD Bldg. 1241 11/19/2012 6,800.00 6,755.00

- Cement, Sabara, PVC tee,

pvc coupling, etc 1257 11/23/2012 2,000.00 1,775.00

- Supply labor, tools & mats.

for declogging of 1267 12/5/2012 5,000.00 5,000.00

Page 13: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* Property Management Division (PMD)

Operations: P 5,718,467.37

755 Office Supplies (common supplies & materials)1,117,758.47 Delivered/Accepted

* Various office Supplies 835 1/25/2012 46,500.00 43,570.00 "

" 842 2/3/2012 1,200.00 1,200.00 "

" 842 2/3/2012 270.00 270.00 "

" 843 2/6/2012 39,630.00 39,630.00 "

" 854 2/10/2012 3,500.00 3,495.00 "

" 880 3/1/2012 51,700.00 51,650.00 "

" 896 3/12/2012 20,000.00 18,300.00 "

" 897 3/12/2012 80,000.00 78,450.00 "

" 958 5/8/2012 37,250.00 37,250.00 "

" 959 5/8/2012 30,125.00 30,125.00 "

" 992 5/23/2012 53,900.00 53,900.00 "

" 1025 6/13/2012 4,530.00 4,140.00 "

" 1046 6/22/2012 45,200.00 45,200.00 "

" 961 5/8/2012 10,700.00 10,692.00 "

" 1005 6/4/2012 1,350.00 1,350.00 "

" 1050 6/27/2012 2,300.00 2,215.00

" (Radio Rm) 1157 9/11/2012 9,250.00 9,250.00

1158 9/11/2012 12,000.00 11,400.00

1156 9/10/2012 42,280.00 39,200.00

- Various Computer Ink 1171 9/14/2012 49,000.00 49,000.00

- Computer Ink (HVCC) 1180 9/21/2012 12,000.00 11,950.00

- Varsious Computer ink (HVCDP) 1181 9/21/2012 48,000.00 38,400.00

760 Med, Den & Lab Sup. 575,708.90 "

899 3/12/2012 Corporate 12,700.00 12,700.00

765 Misc./Other Supplies (Electrical) 500,000.00

- Plaque of Appreciation 837 1/26/2012 4,050.00 5,050.00 Delivered/Accepted

Page 14: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* Property Management Division (PMD)

765 - Plaque 898 3/12/2012 4,050.00 4,050.00 "

-= Plaque for retiree 985 5/17/2012 1,350.00 1,350.00 "

- Plaque for retirees 863 2/16/2012 2,700.00 2,700.00 "

- Plaque for retirees 1096 7/26/2012 5,400.00 5,400.00

- various office equipments 906 3/14/2012 Fund 8,500.00 8,100.00 "

- Various cleaning supplies 923 4/2/2012 18,200.00 17,348.25 "

- front seats for SEP-516 927 4/3/2012 5,500.00 5,100.00 "

- 2 pcs Phil. Flag 1203 10/19/2012 1,500.00 1,400.00

- door knob, barrel bolt 1207 10/23/2012 6,000.00 3,050.00

- 3 Plaques of Appreciation 1308 12/21/2012 4,200.00 4,050.00

765 Misc./Other Supplies (Electrical)

* Panel Glass replacement 928 4/3/2012 11,920.00 11,870.00 Delivered/Accepted

*Packaging Materials 931 4/11/2012 8,200.00 8,200.00 "

- Packaging materials 942 4/18/2012 27,000.00 6,650.00 "

- various construction mats. 988 5/18/2012 4,850.00 4,848.00 "

- various construction inst. 998 5/31/2012 1,600.00 1,548.00 "

- Battery- SLU-830 1003 6/1/2012 4,000.00 3,900.00 "

- Various vehicle parts 1004 6/4/2012 25,850.00 25,810.00 "

- Vehicle tires 1072 7/10/2012 30,800.00 30,800.00

- 1 c Battery 1075 6-0520-12 4,000.00 3,900.00

- Various Electrical items 1078 6-0498-12 17,245.00 17,105.00

- 2 pcs battery 1098 7/26/2012 8,400.00 8,400.00

- 4 tanks refill ultra high 1126 8/15/2012 26,640.36 26,640.36

- 3 pcs. Plaque of Appreciation

for 3 retirees 1139 8/25/2012 4,050.00 4,050.00

- Various Cleaning

supplies 1140 8/25/2012 9,500.00 9,150.00

- Panasonic Cordless

battery & Industrial

capacitor (PTAL/PQCRD) 1142 8/28/2012 1,890.00 1,860.00

Page 15: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

* Property Management Division (PMD)

765 - Air freshner & paper

towel 1154 9/7/2012 4,000.00 3,830.00

- 1 pail latext paint, flat 1172 9/14/2012 3,100.00 2,590.00

- Various hardware

materials 1191 10/3/2012 13,000.00 12,863.50

- spare parts for welding

machine 1193 9/3/2012 7,500.00 7,100.00

- 2 pcs HD Power surge

5 units AVR 1209 10/25/2012 4,500.00 3,750.00

- 4 box Fax Machine Ribbon 1224 11/9/2012 6,800.00 6,800.00

- Medical supplies 1234 11/16/2012 4,000.00 4,000.00

- Various vehicle supplies 1232 11/16/2012 29,500.00 24,680.00

- Plaque of Appreciation

for 5 retirees 1240 11/19/2012 5,400.00 5,400.00

- 1 pc. Storage battery 1244 11/19/2012 9,200.00 9,100.00

- Christmas Decorations 1245 11/20/2001 50,000.00 49,137.50

- Christmas Lanterns 1246 11/20/2012 5,000.00 4,875.00

- Various items for use

of Audio Visual operation 1259 11/23/2012 8,000.00 7,675.00

- Coconut tree, lights etc. 1296 12/20/2012 7,350.00 7,350.00

Extra-ordinary & 1,140,000.00

883-884 Miscellaneous Exp.

851 2/10/2012 11,250.00 5,940.00 Delivered/Accepted

-(CISF) 891 3/7/2012 9,000.00 8,736.00 "

- (CISF) 892 3/7/2012 9,000.00 8,799.00 "

" 997 5/28/2012 5,550.00 5,020.00 "

- Rental of service for 1 unit

copying machine 1027 6/14/2012 36,000.00 36,000.00 18,000.00 18,000.00 Delivered/Accepted

2,385,000.00

Page 16: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of

Office/ Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

* Property Management Division (PMD)

Other MOOE 653,834.45 611,483.98

- 2 panerl steel louvers 847 2/7/2012 12,000.00 12,000.00 "

969 - 1 panel glass 849 2/9/2012 8,700.00 8,000.00 "

- publication of invitation 850 2/9/2012 6,048.00 6,048.00 "

- 2 pcs tires 852 2/10/2012 15,500.00 15,200.00 "

- installation aluminum doors 865 2/17/2012 43,400.00 43,000.00 "

- lights rewiring SEP-506 884 3/1/2012 4,000.00 4,000.00 "

- Venyl tiles 886 3/2/2012 10,000.00 9,060.00 "

- Lavatory ITEMS 887 3/2/2012 16,500.00 14,265.00 "

- Repair Aircon 947 4/23/2012 11,000.00 10,700.00 "

- Paints & Rollers 948 4/24/2012 10,600.00 10,600.00 "

- Replacement of concealed

overhead door closer 949 4/27/2012 5,800.00 5,800.00 "

Other MOOE

- repair of aircon 953 5/2/2012 3,000.00 1,770.00 Delivered/Accepted

- Complete alignment w/

969 camber SEP-526 954 5/2/2012 2,500.00 1,850.00 "

- Engine replacement of

SEU-830 956 5/7/2012 189,000.00 165,000.00 "

- Various vehicle parts 960 5/8/2012 7,500.00 7,500.00 "

- various vehicle parts 967 5/14/2012 19,600.00 19,500.00 "

- Freon gas 973 5/14/2012 1,500.00 1,250.00 "

- Med/Dental repair 978 5/15/2012 75,000.00 74,994.00 "

- Aluminum Coil Cleaner 983 5/17/2012 48,000.00 47,840.00 "

- Aluminum Glass Panel 1007 6/1/2012 41,000.00 40,500.00 "

- re-installation of tile carpet 1023 6/8/2012 15,000.00 14,500.00 "

- re-installation of parts

of panasonic digital ima-

ging machine 1029 6/15/2012 30,036.45 25,530.98 "

- Various Masonry materials 1032 6/15/2012 10,000.00 5,680.00 "

Page 17: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of

Office/ Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

* Property Management Division (PMD)

969 - Various Products 944 4/20/2012 3,000.00 2,826.00 "

- 2 pcs tires 984 5/17/2012 10,000.00 8,700.00 "

- Air Freshner 1014 6/1/2012 3,500.00 3,480.00 "

- Printing tarpaulin 1035 6/29/2012 2,000.00 1,440.00 "

- 1 pc Battery SDF-230 1059 7/2/2012 4,000.00 3,900.00

- 1 pc Storage Battery 1061 7/4/2012 9,100.00 9,100.00

- 6 pcs. Ties 1072 6-0541-12 30,800.00 30,800.00

-Various Electrical Supplies 1101 7/25/2012 12,000.00 11,431.00

- Sample preparation of soil

for total carbon analysis 1124 8/15/2012 4,000.00 4,000.00

- Various construction mats. (TMDB) 1131 8/22/2012 30,000.00 19,555.00

- Graphic designs and

layout for 2012 cocowk 1185 9/25/2012 29,841.44 29,840.56

- conversion of bushing to

bearing of AC 1196 10/4/2012 3,000.00 1,050.00

- Assorted Grocery items

for Christmas Celebration 1271 12/7/2012 338,000.00 248,807.00

- meca tube & stand fan 1207 10/23/2012 3,000.00 1,350.00

- Procurement Operations Division (POD)

Operations: P 25,850.00 Corporate

- Office Supplies 25,850.00 Fund

- Bids & Awards Committee (BAC)

- Publication of Invitation 1207 10/18/2012 8,000.00 6,048.00

- Publication of Invitaion

for 4 units Double Cab

Pick-up 1304 12/21/2012 7,056.00 7,056.00

Page 18: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of

Office/ Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

- Human Resource Dev't Dept. (a)

Operation: P 2,705,500.00

Other Supplies 5,500.00

- Storage box, mirror, hose 907 3/14/2012 Fund 1,000.00 900.00 Delivered/Accepted

- various 943 4/20/2012 1,000.00 950.00 "

753 - CDR w/ case 1074 7/10/2012 1,800.00 1,800.00

- Cocoframes & cost 1079 7/12/2012 20,350.00 20,305.00

771-775 Communication Exp. 2,700,000.00 Corporate

- prepaid cards for January 832 1/17/2012 Fund 16,300.00 15,875.00 Delivered/Accepted

- prepaid cards for February 855 2/13/2012 16,300.00 16,173.00 "

- Prepaid cards for March 894 3/9/2012 16,290.00 16,173.00 "

- prepaid cards for April 926 4/2/2012 16,800.00 16,668.00 "

- install smart bro internet 976 5/15/2012 6,000.00 5,800.00 "

- prepaid cards for May 974 5/14/2012 16,800.00 16,668.00 "

- prepaid cards for June 1006 6/5/2012 16,880.00 16,668.00 "

- prepaid card May & June Add'l 1048 6/26/2012 6,600.00 6,556.00 "

- prepaid card July, 2012 1077 7/10/2012 20,000.00 19,941.00

- prepaid card for Sept. 2012 1168 9/14/2012 20,900.00 20,739.00

- prepaid cards for October, 2012 1188 9/28/2012 18,900.00 18,759.00

- prepaid card November, 2012 1217 11/7/2012 18,800.00 18,653.00

- prepaid card December, 2012 1265 11/29/2012 18,800.00 18,653.00

Capital Outlay: P 232,500.00 2,500.00 1,350.00

- Personnel Mgt. Info System 100,000.00

- 1 Unit Stand Fan 1,500.00 943 4/20/2012 2,500.00

- 2 units Desktop Comp[uter 60,000.00 1,350.00 "

- Combo Binder w/ Cutter 18,000.00

- 1 unit Exhaust Fan 3,000.00

- GCU Meter 10,000.00

- LCD 40,000.00

Page 19: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of

Office/ Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

- Financial Mgt & Services Dept.

Operation : P 5,150,000.00 Corporate 7,600.00 7,100.00

Office Supplies 150,000.00

- flash drive & power supply 846 2/7/2012 Fund 2,600.00 "

- Portfolio Bag 918 9/8/1913 5,000.00 2,600.00 "

755 - Collapsible boxes 1074 7-0558/12 1,500.00 1,300.00

- Various 1220 11/8/2012 12,100.00 12,078.00

- 1 pc Ribbon for paymaster 1226 11/13/2012 3,000.00 3,000.00

792 Auditing Services 5,000,000.00 4,500.00

Capital Outlay: P 295,600.00

- 3 units Numbering Machine 15,000.00

- 3 units Adding Machine 18,000.00

- 2 units Desktop Computer 60,000.00

- 3 units Printer 21,000.00

- Ultra Portable Laptop 30,000.00 900 3/12/2012 Fund 38,000.00 35,699.00 Delivered/Accepted

- Heavy Duty Cutter 2,000.00

- 2 units Seagate External Drive 10,000.00

- 8 units Steel Rack 69,600.00

- 1 unit Airconditioner 70,000.00

- Accounting Division Corporate

Operations: P 230,000.00 Fund 55,475.00 44,135.00

755 Office Supplies 230,000.00 55,475.00

-Various 831 1/27/2012 44,135.00 "

- Various 1238 11/19/2012 10,000.00 9,990.00

- Budget Division

Operations: P 200,000.00 81,405.00 79,090.00

755 Office Supplies 200,000.00 857 2/13/2012 10,800.00 10,250.00 "

Various 858 2/13/2012 14,865.00 14,100.00 "

" 1058 6/29/2012 55,740.00 54,740.00 "

" 1086 7/17/2012 7,855.00 7,855.00

Page 20: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of

Office/ Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

- Budget Division

" 1111 8/2/2012 26,150.00 21,018.00

" 1220 11/8/2012 8,488.00 4,421.00

- CISF Assessment & Collection OfficeOperations: P 50,000.00 Corporate 6,880.00

755 Office Supplies 50,000.00 Fund 6,580.00

- computer ink 843 2/6/2012 2,880.00 2,880.00 "

- external disk portable 919 3/28/2012 4,000.00 3,700.00 "

1109 7/31/2012 900.00 570.00

- Various 1235 11/16/2012 760.00 760.00

Capital Outlay: P 111,000.00

- 2 units Desktop Computer 60,000.00

- 2 units Printer 8,000.00

- 8 units Office Chairs 40,000.00

- 2 units Electric Fan 3,000.00

Trade and Market Development Branch (TMDB)

TMAD/ Market Regulation Division P 82,500.00 125,600.00 123,600.00

Operation:

Office Supplies 32,500.00

- Desk Calculator 842 2/3/2012 CF 600.00 600.00 Delivered/Accepted

755 Ad, Promo & Mktg. 50,000.00

- Printing of Coco Flyers 883 3/1/2012 125,000.00 123,000.00 "

- Printing of Tarpaulin

780 Makisaka 2012 1060 6-0529-12 5,000.00 4,800.00

Capital Outlay: P 150,000.00 CF 68,000.00 64,600.00

Reprogrammed Fund:

- IT Equipment & Software 95,000.00 905 3/14/2012 68,000.00 64,600.00 "

Page 21: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name of

Office/ Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Branch (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

TMAD/ Market Regulation Division

- Furniture & Fixtures 15,000.00

- Carpet 40,000.00

Priorities : P 2,103,000.00

- Other Machineries & Equipment

( Grinder, apinner, dryer, etc )1,500,000.00

1117 8/8/2012 40,000.00 40,000.00

118 8/8/2012 196,500.00 166,491.05

- Building & Other Structures

(Showroom) 600,000.00 1087 7/17/2012 313,500.00 312,002.88

1102 7/26/2012 50,000.00 50,001.22

1120 8/13/2012 46,200.00 46,129.00

1125 8/15/2012 6,000.00 5,280.00

- rental of air cooler 1127 8/17/2012 9,600.00 9,600.00

- design, delivery & install

customized modules for

showroom 1129 8/22/2012 130,000.00 129,500.00

- 2 units Electric Fan 3,000.00

* Trade Information & Regulation Division (TIRD)

Operation: P 20,607.40

Office Supplies Exp. 20,607.40

- Market Development Department (MDD)

755 Operations: P 1,219,585.00 223,800.00 111,600.00

Office Supplies 157,785.00

Other Supplies 96,800.00

Printing Expenses 150,000.00

- Priting of Kaanib leaflets 938 4/17/2012 220,000.00 107,800.00 Delivered/Accepted

Page 22: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

(PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

- Market Development Department (MDD)

781 Subscription Exp. 15,000.00

Other Professional Service 500,000.00

- Cleaner of 3 seater sofas 904 3/14/2012 3,800.00 3,800.00 "

786

799 R & M Office Bldg. 300,000.00

Research Development & Extension Branch (RDEB)

Operation: P 3,012,833.80 Corporate 109,998.00 102,490.00

Office Supplies 157,833.80 Fund

- Various computer ink 939 4/18/2012 7,000.00 6,270.00 "

1109 7/31/2012 3,800.00 3,793.00

755 - Various seedlings for

Icredep Projects 1235 11/19/2012 42,000.00 39,000.00

- Med, Dental & Laboratory 55,000.00

- publication of 2 general

Supp. circulaion/newsprint of

AO # 2 S 2012 for increase 94,000.00 1288 12/13/2012 46,500.00 46,300.80

780 Lab Fees 1287 12/13/2012 47,500.00 47,385.84

- Consultancy Services 300,000.00

* Coco Analysis 1024 6/8/2012 39,998.00 33,984.00 "

793 Other Professional Services 2,500,000.00

* Analytical Laboratory

service for carbon samples 1043 6/21/2012 63,000.00 62,236.80 "

799 - Analysis of Coco spread 1042 6/20/2012 1,500.00 1,064.00

- Proximate analysis of

coco sao drink 1041 2/20/2012 3,000.00 1,737.12

Page 23: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

of (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Project PO No. PO Date

Research Development & Extension Branch (RDEB)

799 - Analysis of 1 sample

Coco sugar 1039 6/20/2012 8,000.00 7,168.00

- Analysis of Coco

jam sample 1040 6/20/2012 4,500.00 2,484.16

- Muscuvan coco

analysis/shelf life 1090 7/17/2012 12,500.00 12,208.00

- Proximate analysis of

Coco Cheese milk 1250 11/21/2012 9,990.00 9,889.60

Capital Outlay: P 455,500.00

Reprogrammed Fund: CF

Furniture & Fixtures 20,500.00

- Install Aluminum Glass 1083 7/12/2012 4,500.00 4,500.00

- Laboratory Equipments 300,000.00

1262 11/27/2012 42,500.00 42,500.00

- Communications Equipment 15,000.00

- Office Equipment 120,000.00

1258 11/23/2012 15,000.00 11,999.00

Priorities: P 3,915,000.00 CF 751,700.00 714,988.00

- IT Equipment & Software 530,000.00

- Laboratory Equipments 3,050,000.00

* Lab various Equipment 873 2/22/2012 250,000.00 228,000.00 Delivered/Accepted

* Stainless Tube food grade 922 4/2/2012 11,700.00 11,688.00 "

* repair of furn. & Fixtures 1016 6/6/2012 490,000.00 475,300.00 "

- Office Equipment 30,000.00

- Power Sprayer 270,000.00 1070 7/10/2012 49,800.00 44,700.00

- Knapsack Sprayer 35,000.00 1070 7/10/2012 25,000.00 11,250.00

Page 24: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

of (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Office/ Project PO No. PO Date

Branch

Agricultural Research Management Department

* Monitoring Evaluation Documentation Division (MEDD)

Operation :

755 Office Supplies P 108,000.00

Various 108,000.00 874 2/22/2012 1,750.00 1,720.00 Delivered/Accepted

" 915 3/26/2012 3,700.00 3,450.00 "

" 939 4/18/2012 20,000.00 11,700.00 "

" 940 4/18/2012 3,000.00 2,431.00 "

1133 8/22/2012 8,725.00 8,725.00

1155 9/10/2012 10,800.00 10,050.00

Various 1297 12/20/2012 16,575.00 12,789.00

Operation:

Re-programmed Supplemental 1179 9/21/2012 62,000.00 57,945.00

* PSAD/PTAL (a)

755 Office Supplies P 1,290,853.49 380,313.36 326,226.00

628 30,000.00

760 Med. Dental & Lab Exp. 1,060,853.49 866 2/17/2012 1,700.00 1,600.00 Delivered/Accepted

" 869 2/20/2012 26,701.44 26,640.36 "

" 872 2/21/2012 1,500.00 1,499.00 "

" 901 3/14/2012 11,100.00 8,200.00 "

" 902 3/14/2012 34,700.00 5,890.00 "

" 903 3/14/2012 4,200.00 1,650.00 "

" 913 3/26/2012 18,000.00 11,896.50 "

" 917 3/28/2012 29,130.00 26,730.00 "

Various 924 4/2/2012 9,500.00 6,620.00 Delivered/Accepted

" 936 4/12/2012 5,050.00 2,650.00 "

" 950 4/27/2012 22,807.56 22,807.56 "

" 972 5/15/2012 10,700.00 10,650.00 "

" 980 5/17/2012 1,062.00 1,062.00 "

Page 25: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

of (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Office/ Project PO No. PO Date

Branch

* PSAD/PTAL (a)

Operation:

" 581 5/17/2012 3,250.00 3,250.00 "

" 999 5/31/2012 3,750.00 3,590.00 "

" 1000 5/31/2012 12,000.00 12,000.00 "

" 1013 6/1/2012 3,000.00 3,000.00 "

" 1012 6/1/2012 9,000.00 9,000.00 "

" 1011 6/1/2012 560.00 560.00 "

" 1015 6/5/2012 9,540.00 9,540.00 "

" 1018 6/7/2012 38,250.00 38,250.00 "

" 1019 6/7/2012 9,800.00 9,800.00 "

" 1020 6/7/2012 15,510.00 15,510.00 "

" 1031 6/15/2012 14,500.00 9,480.00 "

" 1026 6/13/2012 5,500.00 4,848.30 "

" 1051 6/27/2012 26,640.36 26,640.36 "

- refill Liquigas 966 5/14/2012 26,600.00 26,600.00 "

- Lab supplies 970 5/15/2012 13,200.00 13,200.00 "

- Lab supplies 1063 7/4/2012 56,400.00 41,100.00

760 - Chemical Products 1099 7/25/2012 18,791.00 18,791.00

- various 1103 7/26/2012 24,000.00 24,000.00

" 1104 7/26/2012 4,000.00 2,700.00

" 1105 7/26/2012 90,000.00 68,700.00

" 1113 8/2/2012 3,800.00 3,546.45

- Hydrochloric Acid & 1162 9/12/2012 40,000.00 37,400.00

Anomethine H

- Sodium Carbonate 1159 9/11/2012 1,500.00 1,500.00

- Various Chemicals 1160 9/11/2012 16,550.00 16,550.00

- Lanthanum Chloride

& Hydroflouric Acid 1161 9/11/2012 16,950.00 16,950.00

- Various Lab Supplies 1210 9/25/2012 4,355.00 3,966.75

- 3 tanks Refill Argon UHP

2 tanks Refill Acetylene 1219 11/8/2012 29,462.56 29,462.56

Page 26: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

of (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Office/ Project PO No. PO Date

Branch

* PSAD/PTAL (a)

760 - Laboratory materials 1230 11/16/2012 16,895.00 16,719.00

- Wilkins Distilled Water 1236 11/19/2012 1,500.00 1,499.00

- 6 pcs. Filtering Flask 1247 11/20/2012 4,500.00 4,260.00

- 3 rolls Chart Paper 1248 11/25/2012 13,530.00 13,530.00

- Laboratory supplies 1263 11/27/2012 22,250.00 21,470.00

- Laboratory supplies 1264 11/27/2012 22,500.00 14,250.00

- aircon supplies 1285 12/12/2012 4,215.00 3,654.00

- Laboratory supplies 1289 12/14/2012 1,550.00 1,550.00

- Self-lock plastic &

transparent canister 1315 12/27/2012 9,770.00 9,767.50

- Laboratory gowns 1309 12/21/2012 3,150.00 2,450.00

811 R & M Office Bldg. 200,000.00

- repair of exhaust fan 1001 5/31/2012 12,000.00 12,000.00 "

" 834 1/20/2012 CF 69,000.00 55,000.00 Delivered/Accepted

- repair of defective

door lock 1170 9/14/2012 4,000.00 2,800.00

- Various materials

for painting 1172 9/14/2012 55,640.00 53,052.00

- Product Development Department (a)

Operation: P 3,246,049.73 Corporate 468,741.10 402,482.42

Office Supplies 268,200.00 Fund

- Various supplies 842 2/3/2012 300.00 300.00 Delivered/Accepted

- various computer ink 843 2/6/2012 3,400.00 3,220.00 "

755 - various supplies 934 4/12/2012 24,800.00 20,177.00 "

- Flsh drives 963 5/9/2012 6,000.00 5,100.00 "

- Transparent tape 1154 9/7/2012 500.00 500.00

Page 27: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

- Product Development Department (b)

760 Med, Dental & Lab Exp. 577,849.73

- Chemical products 875 2/23/2012 18,780.00 18,780.00 Delivered/Accepted

- Laboratory supplies 889 3/5/2012 2,375.00 2,375.00 "

- Laboratory cylinder 890 3/5/2012 1,580.00 1,090.00 "

- Insecticide spray 916 3/26/2012 1,646.10 1,646.10 "

- Various Lab supplies 944 4/20/2012 17,000.00 13,991.60 "

- Various Lab supplies 962 5/9/2012 2,950.00 2,670.00 "

- Lab supplies 968 5/14/2012 30,000.00 24,060.00 "

- Lab cylinder/breakers 969 5/14/2012 6,900.00 4,200.00 "

- Lab filter papers 971 5/15/2012 6,180.00 6,180.00 "

- Various Lab supplies 987 5/18/2012 5,500.00 5,500.00 "

- Magnetic contactor 996 5/28/2012 3,000.00 1,732.50 "

- Lab Chemical products 1010 6/4/2012 35,000.00 13,101.00 "

- Chemical products 1009 6/4/2012 35,000.00 21,760.00 "

- Chemicals 1021 6/7/2012 9,000.00 8,310.00 "

- Lab supplies 1026 6/13/2012 650.00 594.00 "

* Various Lab materials 1052 6/27/2012 7,600.00 7,152.10

* Cannisters various colors 1045 6/21/2012 2,500.00 2,000.00 "

* Various Lab Supplies 1050 6/27/2012 19,000.00 13,626.00 "

- Petroleum Ether 1066 7/10/2012 5,270.00 5,270.00

- Ethanol 1067 7/10/2012 3,500.00 3,500.00

- Sodiumn Sulfate &

Thiosulfate 1068 7/10/2012 3,330.00 3,330.00

- Tartaric Acid &

Potassium Iodide 1069 7/10/2012 13,164.00 13,164.00

- Crucible w/ cover 1095 7/10/2012 30,000.00 18,960.00

- 8 ltrs. Acetone 1166 9/12/2012 11,200.00 9,600.00

- Lab Supplies 1192 10/3/2012 2,800.00 2,510.00

- Lab supplies 1215 11/6/2012 9,000.00 5,130.00

- 12 distilled bottels

8 rolls paper towels 1236 11/19/2012 1,700.00 1,499.00

- 1 unit Electronic Kitchen

Page 28: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

- Product Development Department (b)

760 scale 1252 11/21/2012 2,000.00 2,000.00

- Blender abd 9V battery 1251 11/21/2012 1,499.00 1,499.00

- Laboratory supplies 1270 12/5/2012 46,000.00 24,600.00

- 1 bot. PH Buffer 7.0

1 bot. PH Buffer 4.0 1274 12/5/2012 1,500.00 1,260.00

- 8 liters Acetone 1275 12/7/2012 9,600.00 9,600.00

- 6 greams Sodium Sulfate 1276 12/7/2012 5,940.00 5,940.00

- Computer Ink 1281 12/10/2012 1,600.00 1,440.00

Supplemental budget 46,000.00

for PAH Analysis 9/25/12 45,000.00

760 Lab items 1,000.00 1290 12/14/2012 1,000.00 548.00

Supp.

765 Printing & Binding 200,000.00

- Printing of MAFPS brochures 859 2/13/2012 100,000.00 98,000.00 "

- Printing PCA flyers 861 2/15/2012 8,500.00 7,850.00 "

781 - Scale insect flyers 876 2/23/2012 20,000.00 19,600.00 "

(MEDD) 994 9/20/1902 7,850.00 7,850.00 "

- Code of Practice 1036 6/20/2012 75,000.00 75,000.00 "

- Design and labelinf

printing of coco cheese

for product promotion 1283 12/12/2012 8,500.00 8,000.00

- Printing Job for info

dissemination 1286 12/13/2012 16,000.00 15,700.00

Transport & Delivery 1,000,000.00

Consultancy Services 200,000.00

Page 29: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

- Product Development Department (c)

784 - Proximist analysis of 912 3/26/2012 2,000.00 1,737.12 "

coco spread

836 RM- Technical & Science

machines exp./Lab Equipment1,000,000.00

- Magnetic contactor 885 3/2/2012 " 3,000.00 1,920.00 Delivered/Accepted

- Extension hub 910 3/15/2012 1,230.00 1,230.00 "

- repair of lab machine 935 4/12/2012 12,000.00 11,730.00 "

- repair of Lab digestion tube 1273 12/5/2012 22,800.00 22,800.00

Repair & Upgrading of PDD Lab

(BR # 099-2012 ) 1,500,000.00

850 - Repair & refurbishing of

Lab furniure & fixtures (811-815) 1225 11/13/2012 380,000.00 357,000.00

- 1 unit Digital Camera 15,000.00

- Various Kitchen apparatus 240,000.00

- Office furniture & Fixture 1293 12/14/2012 65,000.00 64,000.00

- cleaning and calibration

of various Lab Machines 1299 12/21/2012 15,000.00 13,485.76

1300 12/21/2012 30,000.00 26,400.00

Reprogrammed 240,000.00

1 unit electronic

weighing scale 1301 12/21/2012 13,000.00 11,700.00

233 - 1 unit vertical band sealer 1302 12/21/2012 30,000.00 24,000.00

- 1 unit coconut grater 1303 12/21/2012 9,000.00 9,000.00

- 1 unit steam/water

jacketed Kettle 1303 12/21/2012 143,000.00 142,500.00

- 1 unit Stainless Steel

Cabinet w/ 3 shelves 1303 12/21/2012 45,000.00 43,500.00

Page 30: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

Field Services Branch (FSB/FOB)- a

Operation: P 6,281,680.00 934,600.00 821,053.40

751-752 Traveling Expenses 3,193,410.00

753 Training Expenses 1,888,070.00

- Cadang-cadang containment 833 1/19/2012 5,560.00 5,560.00 Delivered/Accepted

- 1st Naqt'l Coco Sap Congress 871 2/21/2012 74,890.00 26,460.00 "

- (PDD) 888 3/5/2012 30,000.00 29,853.00 "

- PCA Teambuilding 951 4/30/2012 80,000.00 72,000.00 "

- Training/teambuilding 952 5/2/2012 405,000.00 356,400.00 "

- Midterm Planning Workshop 1002 5/31/2012 78,000.00 72,480.00 "

- Seminar/training on Dev't

& Mgt. of Kaanib Project 1037 6/21/2012 250,000.00 247,150.40 "

- Various materials for

production trial of

ICREDEP project 1057 6/29/2012 11,150.00 11,150.00 "

- Various office sup. 1208 10/24/2012 10,175.00 10,090.00

- Meals served for Coco

Farmers Conference

11/8-10/12 1222 11/9/2012 125,000.00 117,750.00

- Room Accommodation

& Function room Public Bidding

755 Office Supplies 10,000.00 Corporate

- Icredep Project supplies 1110 8/1/2012 25,000.00 24,871.00

- 1281 12/10/2012 5,595.00 5,295.00

771-775 Communication Exp. 190,200.00

784 Transport & Delivery 1,000,000.00

Page 31: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

Field Services Branch (FSB/FOB)

Capital Outlay: P 24,023,000.00

- 250 units Motorcycles 17,500,000.00 PB )

- 4 units Double cab pick-up 3,500,000.00 PB ) refer to monitoring repfort on Public Bidding

- 95 Units Computer 2,850,000.00 PB

- 5 Units UPS 10,000.00

Supp. * 5 units desktop comp. 1149 9/5/2012 Prjt Fund

RA8048 ad Cost 175,000.00 173,500.00

Supp. - Computers, Printers,

Monitors 1279 12/10/2012 297,000.00 259,407.00

Supp. 223 - 1 set desktop computer

2 units printer 43,490.00 43,490.00 43,490.00

- Super combo Binding Machine 15,000.00

- Paper Cutter 2,000.00

- Steel Filing Cabinets 75,000.00

- 4 units Electric Fans 6,000.00

- Mu8l-Media Projector 30,000.00

- Camera, SLR 35,000.00

Supp. 878 - 8 units Stihl Chainsaw 500,000.00 1282 12/12/2012 500,000.00 489,250.00

Operation Planning Department (a)

Operation: P 10,000.00 4,000.00 3,050.00

755 Office Supplies 10,000.00

- USB 841 2/1/2012 Corporate 3,000.00 2,400.00 Delivered/Accepted

- Various supplies 842 2/3/2012 Fund 1,000.00 650.00 "

- various supplies 1086 7/17/2012 7,900.00 7,825.00

Page 32: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

Field Services Branch (FSB/FOB)

Logistics Services Division (LSD)Operations : P 1,510,000.00 13,000.00 12,503.50

755 Office Supplies 10,000.00

- Various supplies 1025 6/13/2012 Corporate 13,000.00 12,503.50 "

- Various supplies 1154 7/7/2012 Fund 1,200.00 1,175.00

- 7 pcs. USB 1298 12/21/2012 24,500.00 24,500.00

792 Auditing Services 1,500,000.00

Capital Outlay: P 38,000.00 CF

- 2 units filing Cabinet 15,000.00

- 1 unit Printer 4,000.00

- 3 units Electric Fan 4,500.00

- 1 unit Monitor 5,500.00

- 1 uit Fax Machine 9,000.00

Field s Operations Division (FOD)

Operations: P 20,000.00 11,800.00 9,050.00

755 Office Supplies 20,000.00

843 2/6/2012 CF 4,800.00 2,210.00 "

882 3/1/2012 7,000.00 6,840.00 "

1233 11/16/2012 9,065.00 2,104.00

1281 12/10/2012 2,490.00 2,250.00

Salt/PCPP/INTER 200,000.00

780 Ads, Promotion & Mktg.P 100,000.00

1112 8/2/2012 2,800.00 2,400.00

781 Printing Expenses 100,000.00

- 10 Memo Pads 1137 8/23/2012 1,000.00 1,000.00

- 1000 pcs Brochure Scale

Insect Reprint 1138 8/24/2012 8,000.00 7,850.00

Page 33: PHILIPPINE COCONUT AUTHORITYpca.da.gov.ph/pdf/proc/procmonshopping2012.pdf · 2017. 7. 18. · PHILIPPINE COCONUT AUTHORITY PROCUREMENT MONITORING REPORT COVERING CY 2012 Under the

Name

of Code Procurement Notice Delivery Source Approved Budget of Contract Contract at Cost Delivery/

Office/ (PAP) Program/ to Proceed Date or of Fund Total MOOE CO Total MOOE CO Acceptance

Branch Project PO No. PO Date

781 - 1,000 pcs. Scale Insect

brochure 1242 11/19/2012 8,000.00 7,850.00

- Printing of Tarpaulin

for info/dissemination 1243 11/19/2012 2,560.00 2,304.00

- 2 boxes Calling Cards 1255 11/22/2012 3,000.00 3,000.00

T O T A L = MOOE

Capital Outlay

GRAND TOTAL APP CENTRAL OFFICE

Recommending Approval Approved By :

CARLOS B. CARPIO EUCLIDES G. FORBES

Prepared By: BAC Chairman Administrator/Procuring Entity

JENNIFER D. LUMAWAG

Head, BAC Secretariat