OG&C Procurement 0 Bechtel Oil, Gas & Chemicals EIC Connect Oil & Gas 2012 Bechtel Wednesday 28 th November, 2012
25
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Phase II

OG&C Procurement

0

Bechtel Oil, Gas & Chemicals

EIC Connect Oil & Gas 2012

Bechtel

Wednesday 28th November, 2012

Page 2: Phase II

OG&C Procurement

1

BECHTEL OG&C Procurement

Agenda

• Organization & History

• Prospects

• Projects

Page 3: Phase II

OG&C Procurement 2

In case of emergency please leave by the nearest exit and go to your

assembly point which is the rear car park

Emergency Exit

Page 4: Phase II

OG&C Procurement 3

Bechtel Corporation

Founded in 1898, Bechtel is one of

the oldest and largest family-led,

private corporations based in the

United States.

Bechtel Corporation can boast:

• 114 years of experience

• Over 23,000 Projects

• Worked in 140 nations on 7 continents

• Revenues of $32 billion in 2011

• Annual procurement of products and

services exceeding $20 billion

• 52,700 employees

Page 5: Phase II

OG&C Procurement 4

Bechtel Offices Worldwide

Page 6: Phase II

OG&C Procurement 5

Bechtel Oil, Gas & Chemicals - London

For over 60 years Bechtel has

been engaged in:

• Petroleum refineries

• Chemical and petrochemical

plants

• Gas and liquids pipelines

• Oil and gas production

• Plant manufacturing

Page 7: Phase II

OG&C Procurement 6

London Procurement Organization – OG&C

Page 8: Phase II

OG&C Procurement

7

Prospects Houston Based:

Africa

North America

Australia

Asia

Russia

London Based:

Oman

Qatar

UAE

Bahrain

Kazakhstan

Azerbaijan

Russia

India

Africa

Other business lines (London)

UK

Europe

Page 9: Phase II

OG&C Procurement 8

APPROVED VENDOR LIST APPROVED SUBCONTRACTOR

LIST

Pre-Qualification

Page 10: Phase II

OG&C Procurement 9

Review information received and maintained in

Bechtel Procurement Systems to determine if

acceptable

ES&H

Quality

Performance (Previous)

Technical

Financial

Pre-Qualification

Page 11: Phase II

OG&C Procurement 10

The Procurement and Contracts groups value suppliers and contractors that focus on safety, quality and performance.

Bechtel’s Expectations

Page 12: Phase II

OG&C Procurement

11

OG&C Projects

Page 13: Phase II

OG&C Procurement

12

West Nile Delta Onshore Gas Processing Facilities

Project Name West Nile Delta Onshore Gas Processing Facilities

Jobsite Location Egypt

Project Description Onshore facility to treat fluids from the offshore fields to

meet a pipeline export specification for gas and

condensate. Comprising two gas processing trains having

a design capacity of 525 MMscfd each, capable of

receiving and processing up to 20,000 barrels per day of

stabilized condensate. Additional facilities include an

MEG regeneration and reclamation facility a water

treatment facility and export pipeline.

Status/Opportunities Prequalification is mandatory.

Major Equipment Packages are still to be awarded.

Tagged equipment / items / E&I bulks / Piping bulks

enquiries to be issued during the second half of 2013.

Page 14: Phase II

OG&C Procurement

13

Reliance J3 O's & U's, Marine Facilities and CPP

Project Name Reliance J3 O's & U's, Marine Facilities and CPP

Jobsite Location Jamnagar, India

Commercial Operation or

Mechanical Completion Date

July 2015

Project Description Reliance is expanding the existing facilities at Jamnagar to

include various additional process units and associated off-

sites and utilities under the project name “Jamnagar J3

expansion program”. The Bechtel contract covers offsites and

utilities systems, facilities and infrastructure, new Jetty

Facilities and new Captive Power Plants (CPP).

The Bechtel scope includes project management and control,

basic and detailed engineering including process design,

procurement services, inspection coordination, expediting and

interface management.

Status/Opportunities All major equipment and bulk materials are being purchased

by Reliance.

Bechtel Procurement will assist in some pre award activities

with management of most items during the post award phase

until shipment.

Page 15: Phase II

OG&C Procurement

14

Borouge 3 Project

Project Name Borouge 3 Project

Jobsite Location Ruwais, Abu Dhabi, UAE

Project Description Third phase expansion of the Borouge polymers

complex.

Project scope also includes downstream product

handling facilities and utilities and offsite systems.

Services being provided through an integrated PMT

consisting of Borouge, Bechtel, and Borealis

personnel.

Status/Opportunities Project is in the construction phase.

Page 16: Phase II

OG&C Procurement

15

Gladstone LNG

Project Name Gladstone LNG (GLNG) Trains 1 & 2

Jobsite Location Gladstone, Queensland, Australia

Project Description A grassroots LNG complex including 2 x 3.9 mtpa

LNG liquefaction trains fed by coal seam gas, two

LNG storage tanks, a product loading jetty and a

material offloading facility to be located on Curtis

Island in Gladstone Harbor.

Status/Opportunities Home Office purchasing 85% complete.

Balance purchasing coordination being managed

from Australian Office.

Page 17: Phase II

OG&C Procurement

16

Queensland Curtis LNG

Project Name Queensland Curtis LNG Project (QCLNG)

Jobsite Location Gladstone, Queensland, Australia

Project Description Grassroots LNG complex including 2 x 4.2 (nominal)

mtpa LNG liquefaction trains fed by coal seam gas,

two 140,000 cubic meter full containment LNG

storage tanks, and a product loading jetty to be

located on Curtis Island in Gladstone Harbor.

Status/Opportunities Home Office Procurement Complete.

Page 18: Phase II

OG&C Procurement

17

Sabine Pass

Project Name Sabine Pass Liquefaction Project

(Trains 1 & 2)

Jobsite Location Sabine Pass, Louisiana

Project Description Conversion of the Sabine Pass LNG Import Terminal

into an import/export facility by adding four 4.5

mtpa LNG liquefaction trains to the existing facility

Status/Opportunities Mechanical – Purchasing Complete

Other: 50% Purchased

Additional trains being considered.

Page 19: Phase II

OG&C Procurement

18

Keystone XL Pipeline

Project Name Keystone XL Pipeline (KXL) Project

Jobsite Location Hardisty, Alberta to Steele City, Nebraska

Cushing, Oklahoma to the Texas Gulf Coast

Project Description A 700,000 barrel per day expansion of the Keystone

crude oil pipeline that will add a second line between

Hardisty, Alberta and Steele City, Nebraska and extend the

line southward from Cushing, Oklahoma to Port Arthur and

Houston, Texas. Project scope includes 1,704 miles of

36-inch pipeline; 30 Greenfield pump stations and three

pump station expansions in the U.S.; and 8 pump stations

and three oil storage tanks in Canada.

Status/Opportunities Limited most agreements already placed.

Page 20: Phase II

OG&C Procurement

19

Australia Pacific LNG Project

Project Name Australia Pacific LNG Project (APLNG)

Jobsite Location Gladstone, Queensland, Australia

Project Description Grassroots two-train 4.5 mtpa each LNG liquefaction plant fed

by coal seam gas, two LNG storage tanks, and a product

loading jetty to be located on Curtis Island in Gladstone

Harbor.

Status/Opportunities Home Office purchasing 85% complete.

Balance purchasing coordination being managed from

Australian Office.

Page 21: Phase II

OG&C Procurement

20

Wheatstone Project LNG

Project Name Wheatstone Project LNG Plant

Jobsite Location Onslow, Western Australia

Project Description A grassroots LNG plant including 2 x 5.0 mtpa LNG

liquefaction trains, two 150,000 cubic meter LNG

storage tanks, two 130,000 cubic meter

condensate tanks, domestic gas plant, LNG and

condensate product loading facility (PLF) with a 1.3

km jetty, marine offloading facility (MOF), 30 MM

cubic meters of dredging, utilities and

infrastructure facilities.

Status/Opportunities Prequalification is mandatory.

Procurement ongoing.

Page 22: Phase II

OG&C Procurement 21

Bechtel Civil (London) Projects

RAIL

BART Earthquake Safety Program

Crossrail & Reading Delivery Partner

Crossrail PDP

Dulles Corridor Metrorail

Rio Metro

Silicon Valley Rapid Transit

AVIATION

Gatwick Development Services

McCarran International Airport

Muscat International Airport

New Doha International Airport

INFRASTRUCTURE

Gabon Master Planning

Jubail

Kashagan Field Development

Khalifa Port & Industrial Zone

Kosovo Motorway

Riverside County Transportation

Romanian Motorway

Page 23: Phase II

OG&C Procurement 22

Working Together

Bidder Registration

Visit the Bechtel supplier and contractor portal at:

http://supplier.bechtel.com

http://contractor.bechtel.com

If you require assistance with the registration process/website, please send an email to [email protected] for assistance.

http://www.dnb.com/

https://iupdate.dnb.com/ iUpdate/companylookup.htm

Page 24: Phase II

OG&C Procurement 23

Summary

Bechtel Procurement acts on a global level

Close eye on changing market conditions

Process improvements – supplier performance

We are always looking for new high quality sources

Compliance focus on safety, quality, environment

Full, fair and reasonable conditions

Easy registration process

Page 25: Phase II

OG&C Procurement 24

Q & A