Top Banner
Página 1/2
2

Página 1/2 AD2015.pdfFire verification according to EN1995-1-2 ( 4.2.2 and 4.2.3). IMPORT AND EXPORT • Import: Effel, IFC, SDNF, PSS, CIS2, DXF BIM synchronization with GRAITEC

Jan 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Página 1/2 AD2015.pdfFire verification according to EN1995-1-2 ( 4.2.2 and 4.2.3). IMPORT AND EXPORT • Import: Effel, IFC, SDNF, PSS, CIS2, DXF BIM synchronization with GRAITEC

Página 1/2

Page 2: Página 1/2 AD2015.pdfFire verification according to EN1995-1-2 ( 4.2.2 and 4.2.3). IMPORT AND EXPORT • Import: Effel, IFC, SDNF, PSS, CIS2, DXF BIM synchronization with GRAITEC

SERVIÇOS | SOFTWARE | EQUIPAMENTO

DISTRIBUIDOR EXCLUSIVO EM PORTUGAL E PALOP

os seus projectos | as nossas soluções

Avenida da República, 1629, 3º direito

4430-206 Vila Nova de Gaia, Portugal

www.siscad.pt | e-mail: [email protected]

Tel (+351) 223 773 140 | Fax (+351) 223 720 668

Página 2/2