Top Banner
PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002
24
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

PET Year 1 ReviewEOTC

Susan T. Brown, Ph.D.

OSC

14 May 2002

Page 2: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 2

EOTC Technical Overview Overview of EOTC Strategy

• Top Priorities:– Provide training, when & where needed– Impact workforce pipeline– Integrate MSIs in PET activities

• Tactical Strategy:– Streamline training coordination through OKC– Set up persistent analysis of user needs– Increase graduate level PET participation– Implement effective and streamlined Summer Intern

Program– Implement MSI Visiting Faculty Program

Page 3: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 3

EOTC Technical Overview (1)• Overview of Efforts for Year 1

– Training Registration• Currently, registration local at each Component, Soon to be

implemented in OKC, Standard registration form developed for OKC– Training Schedule

• Current schedule kept at ERDC by Technologist, Posted on ERDC web site, Eventually to be implemented in OKC

– Training Content - Generated by FAPOCs, based on user demand

• 4 CE courses at 4 different locations (Component 1)• 1 ET course, 1 SIP course (Component 2)• 5 CFD courses at 3 locations, 2 EOTC seminar series (Component 3)• 3 CCM courses at 2 locations, 1 CEN course, 1 CEA course

(Component 4)

Page 4: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 4

EOTC Technical Overview (2)• Overview of Efforts for Year 1

– 6 of the 18 Summer Interns for Components 1, 2, 3 for Summer 2002 are grad students (Selection pending for Component 4)

– Summer Intern Program• 3 components centralized this contract year• Goal is to include the 4th component in the centralized system

next contract year.

– OKC staff working with Component Technologists to develop and implement Training Registration Wizard

– User requirements• Survey results for 2002• BoFs planned for UGC and SC02

Page 5: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 5

EOTC Technical Overview (3)• Overview of Efforts for Year 1

– MSI program• 5 of the 18 Summer Interns at Components 1, 2, 3 for Summer

2002 are from MSIs• Selection Pending for Component 4• JSU: Working with Dr. Willie Brown on reduced scope proposal,

Summer Institute in core• CAU: 2 proposals requested for next contract year, Visiting

Faculty proposed for next contract year, Graduate student Assistance

• FIU: Working with them for next year’s proposal process; Assisted in OKC development

• UH: Tailoring program to meet PET needs• CSU: Presentation at ASC, Workshop planned June 7, 2002• HPTi (other MSIs): UTEP included in CE project

Page 6: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 6

Technical (Metrics)

• User Codes Impacted by PET– Will begin this contract year to ask the question specifically.

– Several of those who took Advanced MPI said they would use some of the calls they learned in their codes – but codes were generally not named.

– Parallel Methods helped high resolution wave propagation models

– Parallel Processing Techniques will be applied in student projects in large scale computing in solid mechanics and materials

– Knowledge will be used “immediately and often”

Page 7: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 7

Technical (Metrics)

• User Contacts and Assistance– Component 1

• CE – MPI at ASC. 11 users x 16 hours = 176 contact hours

• CE - Advanced MPI at ARL. 14 users x 14 hours = 196 contact hours

• CE – Cross-Platform Performance Analysis Tools at ERDC. 7 users x 16 hours = 112 contact hours

• CE – C Programming at AEDC. 19 users x 24 hours = 456 contact hours

– Component 2• ET – EnVis at ERDC. 6 users x 8 hours = 48 contact hours

• SIP – Introductory MATLAB at ASC. 22 users x 16 hours = 352 contact hours

Page 8: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 8

Technical (Metrics)

• User Contacts and Assistance– Component 3

• EOTC – PET Frontier Lectures at ARL. 50 users x 4.5 hours = 225 contact hours

• CFD – Seminar at ARL. 9 users x 1.5 hours = 13.5 contact hours

• CFD – CAD Interface and Meshing workshop at ARL. 8 users x 21 hours = 168 contact hours

• CFD – Advanced Gridgen at ARL. 12 users x 14 hours = 168 contact hours

• EOTC – Features of the Compaq Alphaserver at ERDC. 11 users x 16 hours = 176 contact hours

• CFD – Introduction to CFD++ at NSWC. 14 users x 24 hours = 336 contact hours

• CFD – GASP workshop at ASC. 7 users x 8 hours = 56 contact hours

Page 9: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 9

Technical (Metrics)

• User Contacts and Assistance– Component 4

• CCM – Advanced Solid-State Modeling at ARL. 9 users x 7 hours = 63 contact hours

• CEN – Circuit Solvers and Optimizers at ARL. 3 users x 6 hours = 18 contact hours

• CCM – Computing workshop at ARL. 17 users x 14 hours = 238 contact hours

• CCM – MSI/Accelrys Seminar at ASC. 7 users x 4 hours = 28 contact hours

• CEA – SWITCH Workshop at ASC. 20 users x 16 hours = 320 contact hours

Page 10: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 10

Technical (Metrics)

• Tools introduced to community– Gridgen, 17-18 April 2002 at ARL

– EnVis (Environmental Visualization Environment), 8 February 2002 at ERDC

– Cross-Platform Performance Analysis Tools, 19 – 20 March 2002 at ERDC

– MATLAB, 24 – 25 January 2002 at ASC

– MSI/Accelrys, 5 February 2002 at ASC

– SWITCH, 7 – 8 March 2002 at ASC

– GASP, 27 March at ASC

Page 11: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 11

Technical (Metrics)• Presentations

– Central State visit to ASC

• Conferences

– MSI BOF at SC2001

• Workshops

– CCM Advanced Parallel Computing, Apr 2002

– ICEM CFD CAD Interface and Meshing, Feb 2002

– GASP (Version 4), Mar 2002

– SWITCH, Mar 2002

• Seminars

– MSI/Accelrys, Feb 2002

– CFD Seminar, Dec 2001

– PET Frontier Lectures, Mar 2002

Page 12: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 12

Technical (Metrics)• Training

– CCM Modeling, Jan 2002

– Advanced MPI, Mar 2002

– Circuit Solvers and Optimizers, Mar 2002

– Advanced Gridgen, Apr 2002

– Features of Compaq Alphaserver, Jan 2002

– EnVis Short Course, Feb 2002

– Cross-Platform Performance Analysis Tools, Mar 2002

– Introduction to CFD++, Mar 2002

– C Programming, Mar 2002

– MPI, Jan 2002

– Introductory MATLAB, Jan 2002

Page 13: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 13

Technical (Metrics)

• Technical Reports and Articles– None to date

– Will summarize User Requirements

– Will summarize User Evaluations

• Next year Training Plans

• Vendor courses

• FA training plan

Page 14: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 14

FA Training Plan• CFD

– UGC Tutorials– Current Trends in Computational Fluid-Structure Interactions (with CSM)

Workshop– CFD Validation & Verification Workshop– Interprogramming Languages Course– Parallel Programming Techniques in CFD – Overset Technology & OVERFLOW-D Training

• CDLT– CDLT Tools and Technologies

• OKC– Use of OKC for Support Staff and Portal Developers – Use of OKC for Content Developers

– OKC Technologies

Page 15: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 15

FA Training Plan• EQM

– Workshop on Mathematical, Algorithmic and Computer Science Issues in Multiphysics Couplings

– Workshop on Discontinuous Galerkin Methods and A Posteriori Error Estimation

• CCM– PET/CHSSI Workshop– Advanced Drug Discovery Methods– Advanced solid-state modeling (molecular dynamics)– Advanced pharmacophore design and analysis– Biomolecular modeling From Homology Modeling Through Genomics and

Proteomics - Theory and HPC Applications (Seminar Series)– Multi-phase molecular dynamics simulations– Transition state modeling (for biomolecular systems)– Electrochemical Modeling (i.e. Batteries) Workshop– QChem

Page 16: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 16

FA Training Plan• CE

– Intermediate UNIX

– Mixed-Mode Parallel Programming – MPI Programming– Features of Alpha Server System– Vector Tuning– Cross-platform Performance Analysis Tools– Dense and Sparse Linear Algebra Libraries– Advanced MPI– Performance optimization for HPC architectures– Debugging Parallel Code– C++ Programming

• FMS– Parallelization of Entity-Based Simulations

Page 17: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 17

FA Training Plan• IMT

– Principles of Data Warehousing and Data Mining – Distributed Services and Object Protocols

• SIP– Introduction to MATLAB– Advanced MATLAB Programming– Simulink– Signal/Image Processing– Signal Mining– SIP/CEA/CEN Workshop

• CEN– Use of Time Domain Techniques to Solving High-Frequency Circuit

Problems– Joint CEA/CEN/SIP Forum– Efficient Computational Methods for Circuits and Antennas

Page 18: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 18

FA Training Plan

• CSM

– CFD-CSM Joint Fluid-Structure Interaction

– Theory & Implementation of ALE Algorithms

• ET– Grid Generation & Grid Technology

• CWO– Comprehensive Introduction to Scientific Visualization for CWO

Research

– Making CWO Codes Portable and Efficient

• CEA– Joint CEA/CEN/SIP Forum

– The Characterization of Propagation Channels

– Efficient Computational Methods for Circuits and Antennas

Page 19: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 19

Staffing

• FAPOC– Institution not on contract – withdrew Dec 2001

– Replaced 1 January 2002

• Technologists– Component 1 continued from PET 1 (Brian Tabor)

– Component 2 continued from PET 1 (Mason Colbert)

– Component 3 hired March 2002 (Reginald Liddell)

– Component 4 officially unresolved, but practically continuing from PET 1 (Jennifer Moses)

Page 20: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 20

Summary

• MSI active participation still problematic

• MOU for technologist duties with HPTi unsuccessful to date

Page 21: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 21

Core Financial Summary (OSC)BUDGET VS EXPENDITURE & INVOICES

741954

0.00

5,000.00

10,000.00

15,000.00

20,000.00

25,000.00

30,000.00

35,000.00

40,000.00

1-Dec-011-Jan-021-Feb-021-Mar-021-Apr-021-May-021-Jun-02

BUDGETED

PROJECTED

INVOICED

Page 22: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 22

Backup

MSI Spending

0

5000

10000

15000

20000

25000

30000

35000

40000

45000

SeptemberOctober

NovemberDecemberJanuaryFebruary

March April

Month

Dollars

CAU

CSU

JSU

Page 23: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 23

BackupVendor Training Courses for the period June 2002 through May 2003

Training Course Vendor Location FA

iSIGHT Engineous Software ARL ET

OneSAF Sagacitec Redstone FMS

HLA AEgis Technologies ASC FMS

EnSight Computational Engineering International ERDC/NAVO ET

AVS Advanced Visual Systems, Inc. ASC ET

VTK Kitware, Inc. NAVO ET

ICEM ICEM CFD Engineering ASC ET

GRIDGEN Pointwise, Inc. AEDC ET/CFD

ZAPOTEC Sandia Labs. ERDC CSM

SEDRIS AEgis Technologies NAVO FMS

ANSYS ANSYS, Inc. ASC CSM

DADS LMS North America TARDEC IMT

ADAMS Mechanical Dynamics TARDEC IMT

LS-Dyna Muliphysics Simulation Engineering ARL CSM

OVERFLOW TBD ARL CFD

Matlab/RTExpress Mathematical Analysis Company ERDC CE

Page 24: PET Year 1 Review EOTC Susan T. Brown, Ph.D. OSC 14 May 2002.

13-17 May 2002 Contract Year 1 Review 24

Backup

• UAP members– Matt Grismer– Dean Hampton– Laura Bobo– Jeanie Osburn