Page 1: Peru c o n s u l t i n g Peru Programme Assurance Method.

peruperuc o n s u l t i n gc o n s u l t i n g

PeruProgramme Assurance Method

Page 2: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Our Programme Assurance method provides clear focus

Slide 2

Business Objectives

Cost/Time/ Quality

Sourcing / Suppliers

TechnologyProcess

People

Relation-ships

ProgrammeAssurance

Page 3: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Using a simple, clear, tried and tested methodology. Emphasising the key risk areas likely to impact project delivery:

Project – Requirements against quality and timescales, and by implication budget.

People – Governance & structure, Relationships, skills and availability. Process – Methods, and quality assurance. Environment – Technology, Tools and the external environment.

Rapidly highlighting risks, issues and hidden dependencies that could impact success whilst defining pragmatic actions to resolve them.

Covering the breadth of the programme whilst allowing drill down on specific areas when issues are detected.

Linking with project delivery benchmarks to provide meaningful metrics

around cost, time and remaining effort.

We provide a practical assessment based on experience

Slide 3

Page 4: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Whilst making use of proven methods

Slide 4

Page 5: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Overcoming barriers to change

Slide 5

Page 6: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Our overall Assurance process

Slide 6

Agree termsof reference

Interview key staff

Document & data review

Site visits

Analysis Action

Peru &external data

Page 7: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Our Assurance is both broad and deep

Slide 7

Project

Scope & Requirements

DeliveryTimescale

QualityRequired

Cost

People

Organisation& Structure

Motivation& Focus

Skills &Experience

Number &Availability

A Project is delivered...

...by people & teams...

...using processes...

...onto an environment.

Page 8: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Example high level output is shown below

Slide 8

Project

Scope& Requirements

DeliveryTimescale

QualityRequired

Cost

People

Organisation& Structure

Motivation& Focus

Skills &Experience

Number &Availability

Processes

Stakeholder Management

QAMethods & Standards

ProjectManagement

• Timescales aggressive given level of staff skills and number, otherwise fine.

• Already one month behind, can be recovered but needs project governance to be strengthened .

• Critical: Staff resources approx 20%less than expected to meet dates.

• Critical: Staff have no previous experience of development tools or application set.

• Processes as expected on a project of this size and complexity.

• No changes required.

• Some external supplier risks. Mitigation Plan is attached.

• No urgent work required here.

Page 9: Peru c o n s u l t i n g Peru Programme Assurance Method.

© Peru Consulting 2014

Outputs from the assessment

Slide 9

Report content: Overall Health Assessment

Dashboard Health Check

Governance Themes Spreadsheet results

Areas of Concern

Recommended Actions

Agreed Action Plan

Learning Points