PERSIDANGAN PERANCANGAN STRATEGIC KEMENTERIAN KERJA RAYA TAHUN 2011 TAKLIMAT DARI JKR SARAWAK BY Ir. ZURAIMI HJ SABKI TIMBALAN PENGARAH (PENGURUSAN)
PERSIDANGAN PERANCANGAN
STRATEGIC KEMENTERIAN KERJA RAYA
TAHUN 2011
TAKLIMAT DARI JKR SARAWAK
BY
Ir. ZURAIMI HJ SABKI
TIMBALAN PENGARAH (PENGURUSAN)
Contents
BACKGROUND1
ACHIEVEMENTS RMK 92
TARGET & CHALLENGES 2011 & RMK 103
FUTURE DIRECTIONS4
CONCLUSION5
3
PWD (JKR) - established in 1882 during the reign of Rajah Charles Brooke
BACKGROUND
Changing Role from Builder to Manager
1900 – 1950s: Designed, built & maintained all public infrastructures & amenities
1950s – 1980s: Designed, built and maintained roads, airports and bridges supported by 15 MRCUs; operated water supplies
1980s – 1990s: Privatisation policy to accelerate project implementation by increasing private sector participation (outsourcing)
1990s– 2000s: Focusing on the Project management & maintenance management
6
RMK9 TOTAL EXPENDITURE : RM7.245 BILLION
ROAD
BUILDING
SCORE
WATER
ROAD PROJECTS
NO OF PROJECT : 374
TOTAL EXPENDITURE : RM 3.83 BILLION
WATER SUPPLY PROJECTS
NO OF PROJECT : 542
TOTAL EXPENDITURE : RM 1.55 BILLIONSCORE PROJECTS
NO OF PROJECT : 8
TOTAL EXPENDITURE : RM 0.25 BILLION
Achievements RMK 9
7
RM 2054.06 juta54%
RM347.96 juta9%
RM 268.96 juta7%
RM 1159.04 juta30%
Kementerian Kerja Raya
Kementerian Kemajuan Luar Bandar & Wilayah
Jabatan Perdana Menteri (RM1B Special Allocation)
Kementerian Pembangunan Infrastruktur & Perhubungan Sarawak
BREAKDOWN OF ROAD PROJECTS
DONE FOR VARIOUS AGENCIES 2006-2010
ROAD
Achievements RMK 9
8
BREAKDOWN OF BUILDING PROJECTS
DONE FOR VARIOUS AGENCIES 2006-2010
RM68,937,1544%
RM 178,462,18311%
RM21,759,1931%
RM164,828,33510%
RM188,915,69712%
STATE FUNDRM991,892,761
62%
STATE
FEDERAL
RM 1 BILLION SPECIAL ALLOCATION
EDUCATION
MEDICAL
SPECIAL PROJECTS
Building
Achievements RMK 9
9
BREAKDOWN OF WATER SUPPLY PROJECTS
DONE FOR VARIOUS AGENCIES 2006-2010
RM746,606,98248%
RM81,696,0835%
RM647,460,00042%
RM56,609,0914%
RM18,279,4311%
STATE
SCORE
KETTHA
RM1 BILLION SPECIAL ALLOCATION
NKRA
Water
Achievements RMK 9
11
PROJEK MENAIKTARAF JALAN KUCHING / SIBU, SARAWAK
( DARI SIMPANG JULAU KE PERSIMPANGAN
LAPANGAN TERBANG SIBU - Fasa 1)
Achievements RMK 9
•Improve project delivery for forthcoming
(2011 to 2015) development projects under
SCORE, NKRA rural roads, water supply & 10th
Malaysia Plan;
• Enhance the capacity & capability
of JKR Sarawak to meet the expected
increased workload:-
Volume of Workload : 9 MP to 10 MP
(i) 9 MP Workload:
=> RM 7.25 billion
(ii) 2011 – 2015 Workload (incl. 10MP)
=> RM 13.65 billion
• Strengthening the organisational structure to be
more effective to serve all the divisions.
Challenges
RM 6.4
Billion
Estimated Project Scheme Value
No. Project
Ceiling (RM)
(Year 2011 - 2015)
1. SCORE 3,286,000,000.00
2. NKRA Rural
Roads
938,500,000.00
3 NKRA
Water
426,340,000.00
4 10 MP 9,000,000,000.00
(est)
Total 13,650,840,00.00
Targets & Challenges 2011 & RMK 10
FUTURE DIRECTIONS
RURAL ROADS
HOUSES CONNECTED WITH WATER
2011
143 km
RM 364 MILLION
41,400 houses
RM 671 MILLION
2012
190 km
RM 594 MILLION
36,400 houses
RM493 MILLION
TO BE THE PREMIER ONE-STOP ENGINEERING AGENCY FOR THE PLANNING, DEVELOPMENT AND MAINTENANCE
OF ALL PUBLIC INFRASTRUCTURE & BUILDING FACILITIES IN SARAWAK
VISION
FUTURE DIRECTIONS
20112012
20132014
2015
For JKR Sarawak to be transformed
according to the 5 year strategic plan
agenda, the organisation needs to be
restructured
VISION &
MISSION
FUTURE DIRECTIONS
I• 5 Year Strategic Plan as a roadmap for the JKR transformation agenda
II• Re-organisation of JKR Hq into 4 main sectors – Infrastructure, Specialist,
Corporate Affairs & Asset Management Sectors
III• Setting up of the 3 Regional Project Offices (Northern, Central, Southern) to
focus solely on project implementation
IV• Redefining role of Divisional Offices to focus on Asset Management & minor
projects implementation;
V• Establishment of 146 new senior posts to be filled in the next five (5) years
Strategic outcomes
Key Thrusts of
Change
• Establish well equipped Material Testing
Laboratories;
• Institutionalize & enforce quality management
system;
• Certification of Central Material Lab to ISO
MS 17025 ( Will be the only lab in Sarawak
to be so accredited ).
Put in place an integrated asset management system ( focus on pre-emptive aspect ).
Asset Management
Integrated
Project Management
Regional
Project Offices
Quality Management
•Setting up of regional project offices focusing
on project delivery (northern/central/southern);
•Develop high performance project teams;
• Empowerment of contractual management with accountability.
Establish Project Management System that encompasses :-
• Utilization of state of the art project management software (eg. Primavera);
• Development of project development competency of JKR personnel;
• Effective & accurate reporting of project performance.
INTERIM STRATEGIC THRUSTS
CONCLUSION
Scope of challenges & targets for JKR Sarawak for year 2011 &
beyond will be a need to perform & deliver :
I. NKRA KPI’s
II. Rolling Plan 1 & Rolling Plan 2 (RMK 10)
III. New projects as announced during the recent State Elections.
The realisation of the restructured JKR Sarawak is crucial towards
the department achieving these performance demands.