Depart. of EEE, IIUC 1 DESIGN, IMPLEMENTATION AND PERFORMANCE TEST OF A PREPAID ENERGY METER. Submitted by: Md.Chand Siddique (ET-111102) Md.Saimun Sarif (ET-111018) Department of Electrical and Electronic Engineering International Islamic University Chittagong June 2015 Under the supervision of Engr. Shafait Ahmed. Lecturer EEE,IIUC
16
Embed
Persentation slide Design emplementation and performance test of a prepaid energy meter
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Depart. of EEE, IIUC 1
DESIGN, IMPLEMENTATION AND PERFORMANCE TEST OF A PREPAID ENERGY METER.
Submitted by:Md.Chand Siddique (ET-111102)
Md.Saimun Sarif (ET-111018)
Department of Electrical and Electronic EngineeringInternational Islamic University Chittagong
June 2015
Under the supervision ofEngr. Shafait Ahmed.Lecturer EEE,IIUC
Design, implementation and performance test of a prepaid energy meter
Project Outlines
IntroductionMotivationObjectiveHistory of metering systemWhy prepaid energy meter- from customer point of view?Block DiagramProject ToolsCircuit DiagramFull device overviewPractical data for prepaid energy meterLimitationsFuture scopeconclusion
Depart. of EEE, IIUC 2
Design, implementation and performance test of a prepaid energy meter
Introduction
Prepaid energy meter which is based on the concept “Pay first and then use it”.
Prepaid energy meter also reduces the error made by humans while taking readings to a large extent and there is no need to take reading in it.
The prepaid energy meter uses a recharge card which is available in the prepayment electricity vending station.
In our project we are using keypad through which we can done our recharge.
Depart. of EEE, IIUC 3
Design, implementation and performance test of a prepaid energy meter
Motivation
Depart. of EEE, IIUC 4
Eliminate the billing delay.
The prepaid energy meter save the man power.
Save electrical power.
Save our money and time.
Design, implementation and performance test of a prepaid energy meter
Objectives
The main objective of our project is to minimise the cost of our
project which we design.
To overcome the problems or error in meter reading.
To overcome in the problems of traditional billing systems this
project is designed.
To reduce the loss of power and revenue.
Depart. of EEE, IIUC 5