    ANALISA HARGA SATUAN PEKERJAAN 

    PROYEK : PENYEDIAAN SARANA AIR BERSIH PDAM INTAN BANJAR

    PEKERJAAN : PENGADAAN DAN PEMASANGAN PIPA AIR BERSIH HDPE DIA. 500 MM - 2.725 METER

      & PIPA AIR BAKU HDPE DIA. 630 MM - 10 METER

    LOKASI : JL. GUBERNUR SYARKAWI, KABUPATEN BANJAR

    NO SATUAN UPAH BAHAN JUMLAH(Rp.) (Rp.) (RP.) (Rp.)

    1 4 5 6 7

    A PEKERJAAN TANAH

    1 1 m²  Membersihkan lapangan dan 0,005 org/hr Mandor -  - 

    pemerataan tanah 0,1647 org/hr Pekerja -  - 

    -  - 

    dibulatkan - 

    2 1 m' Pengukuran dan pemasangan 0,013 m³ Kayu balok meranti -  - 

    bowplank 0,0165 m³ Papan bekisting -  - 

    0,010 kg Paku -  - 

    0,050 hari Sewa alat ukur -  - 

    0,005 org/hr Mandor -  - 

    0,040 org/hr Juru Ukur -  - 

    0,050 org/hr Tukang kayu -  - 

    0,0860 org/hr Pekerja -  - 

    -  -  - 

    dibulatkan - 

    2 1 m² Pembuatan kantor sementara 1,250  bt Dolken galam Ø 10

    0,180  m³ Kayu

    0,850  kg Paku

    1,100  kg Besi beton

    35,000  kg Semen

    0,150  m³ Pasir pasang

    0,100  m³ Pasir beton

    0,150  m³ Koral beton

    30,000  biji Batu bata

    0,250  lbr Seng plat

    0,200  buah Jendela nako

    0,080  m² Kaca polos

    0,150  buah Kunci tanam

    0,060  lbr Plywood

    2,000  org/hr Tukang kayu

    1,000  org/hr Pekerja

    0,300  org/hr Kepala tukang

    0,050  org/hr Mandor

    -  -  - 

    dibulatkan - 

    3 1 m³ Galian tanah biasa 0,004 org/hr Mandor -  - 

    0,220 org/hr Tukang gali -  - 

    0,200 org/hr Pekerja -  - 

    -  -  - 

    4 1 m³ Galian tanah keras 0,005 org/hr Mandor

    0,961 org/hr Tukang gali

    0,3705 lot Alat bantu

    -  -  - 

    dibulatkan - 

    5 1 m³ Galian tanah lumpur 0,005 org/hr Mandor

    0,850 org/hr Tukang gali

    0,237 org/hr Pekerja

    0,250 jam Sewa pompa

    -  -  - 

    6 1 m³ Galian tanah berbatu untuk 0,006 org/hr Mandor

    berm/jalan 0,950 org/hr Tukang gali

    0,250 org/hr Pekerja

    0,550 jam sewa alat bantu

     jack hammer -  -  - 

    7 1 m³ Galian tanah dengan alat 0,107 org/hr Pekerja

    0,008 org/hr Mandor

    0,054 jam Excavator

    1,000 ls Alat Bantu-  -  - 

    8 1 m³ Mengurug tanah kembali -  x 1/3 - 

    dibulatkan - 

    HARGA

    PEKERJAAN

    2 3

    U R A I A N

    ANALISA

  • 8/19/2019 perpipaan 1

    2/15

    1 4 5 6 7

    9 1 m³ Membuang tanah galian 0,004 org/hr Mandor

    dilokasi proyek 0,324 org/hr Pekerja

    0,100 Ls Alat bantu

    -  -  - 

    10 1 m³ Urugan tanah dipadatkan 1,300 m³ Tanah urug

    tanah diangkut 0,004 org/hr Mandor

    0,323 org/hr Pekerja

    0,264 Jam Stamper

    -  -  - 

    dibulatkan - 

    11 1 m³ Urugan pasir dipadatkan 1,300 m³ Pasir Urug

    0,010 org/hr Mandor

    0,1315 org/hr Pekerja

    0,117 Jam Stamper

    -  -  - 

    dibulatkan - 

    12 1 m³ Urugan sirtu dipadatkan 1,155 m³ Sirtu

    0,010 org/hr Mandor

    0,210 org/hr Pekerja

    0,320 Jam Alat bantu (vibro)

    -  -  - 

    dibulatkan - 

    B PEKERJAAN BETON

    1 1 m² Plesteran beton 1 pc : 3 ps,

    tebal 15 cm 7,07  kg Semen portland

    0,021  m3 Pasir pasang

    0,26  O/hr Pekerja

    0,20  O/hr Tukang batu

    0,02  O/hr Kepala tukang

    0,013  O/hr Mandor

      -  -  - 

    dibulatkan - 

    2 1 m³ Membuat beton tumbuk.

    1 Pc : 3 Ps : 5 Kr 218,00 kg Semen portland

    0,52 m³ Pasir beton

    0,87 m³ Koral beton

    1,65 O/hr Pekerja

    0,25 O/hr Tukang batu

    0,025 O/hr Kepala tukang

    0,08 O/hr Mandor

      -  -  - 

    dibulatkan - 

    3 1 m³ Membuat beton tumbuk.

    1 Pc : 3 Ps : 6 Kr 197,00 kg Semen portland

    0,47 m³ Pasir beton

    0,94 m³ Koral beton

    1,65 O/hr Pekerja

    0,25 O/hr Tukang batu

    0,025 O/hr Kepala tukang

    0,08 O/hr Mandor

      -  -  - 

    dibulatkan - 

    4 1 m² Membuat beton tumbuk tebal 5 cm,

    1 Pc : 3 Ps : 5 Kr 10,00 kg Semen portland0,026 m³ Pasir beton

    0,044 m³ Koral beton

    1,15 O/hr Pekerja

    0,02 O/hr Tukang batu

    0,002 O/hr Kepala tukang

    0,006 O/hr Mandor

      -  -  - 

    dibulatkan - 

    5 1 m³ Membuat beton tumbuk.

    1 Pc : 2 Ps : 3 Kr 232,00 kg Semen portland

    0,52 m³ Pasir beton

    0,78 m³ Koral beton

    1,65 O/hr Pekerja

    0,25 O/hr Tukang batu

    0,025 O/hr Kepala tukang

    0,08 O/hr Mandor-  -  - 

    dibulatkan - 

    2 3

  • 8/19/2019 perpipaan 1

    3/15

    1 4 5 6 7

    6 1 kg Pembesian dengan besi besi beton

    1,05 kg Besi beton polos -  - 

    0,015 kg Kawat beton -  - 

    0,007 O/hr Pekerja -  - 

    0,007 O/hr Tukang batu -  - 

    0,0007 O/hr Kepala tukang -  - 

    0,0003 O/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    7 1 m² Pasang bekesting untuk pondasi

    0,04 m³ Kayu terentang -  - 

    0,30 kg Paku biasa 2 - 5" -  - 

    0,10 ltr Minyak bekesting -  - 

    0,30 O/hr Pekerja -  - 

    0,26 O/hr Tukang batu -  - 

    0,026 O/hr Kepala tukang -  - 

    0,005 O/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    8 1 m² Pasang bekesting untuk sloof

    0,045 m³ Kayu terentang -  - 

    0,30 kg Paku biasa 2 - 5" -  - 

    0,10 ltr Minyak bekesting -  - 

    0,30 O/hr Pekerja -  - 

    0,26 O/hr Tukang batu -  - 

    0,026 O/hr Kepala tukang -  - 0,005 O/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    9 1 m² Pasang bekesting untuk kolom

    0,04 m³ Kayu terentang -  - 0,40 kg Paku biasa 2 - 5" -  - 

    0,20 ltr Minyak bekesting -  - 

    0,015 m³ Balok kayu meranti -  - 

    0,35 lbr Plywood tebal 9 mm -  - 

    2,00 btg Dolken /galam ø 8-10/4m -  - 

    0,33 O/hr Pekerja -  - 

    0,33 O/hr Tukang batu -  - 

    0,033 O/hr Kepala tukang -  - 

    0,006 O/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    10 1 m² Pembongkaran bekisting 0,400 org/hr Pekerja -  - 

    10 m² 0,025 org/hr Tukang kayu -  - 

    0,006 org/hr Mandor -  - 

    -  -  - 

    1 m2 -  - 

    dibulatkan - 

    11 1 m³ Beton bertulang Camp. 1 : 2 : 3

    dengan tulangan 125 Kg/m³ B.5 Beton camp. 1:2:3 - 

    Tulangan besi 125 kg - 

    Bekisting 10m² - 

    Pembongkaran bekisting 10 m² - 

    -  - 

    2 3

  • 8/19/2019 perpipaan 1

    4/15

    1 4 5 6 7

    C PEKERJAAN PASANGAN

    1 1 m³ Pas. batu kosong / 1,288 m³ Batu gunung -  - 

    Aanstamping 0,234 org/hr Pekerja -  - 

    0,010 org/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    2 1 m³ Pasangan batu gunung 1: 4 1,200 m³ Batu gunung -  - 

    0,5271 m³ Pasir pasang -  - 

    3,500 zak Semen -  - 

    3,997 org/hr Pekerja -  - 1,450 org/hr Tukang batu -  - 

    0,120 org/hr Kepala tukang -  - 

    0,180 org/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    3 1 m² Pasangan bata 1 : 4 60,000 buah Batu bata -  - 

    0,130 m³ Pasir pasang -  - 

    0,500 zak Semen -  - 

    0,533 org/hr Tukang batu -  - 

    0,0416 org/hr Kepala tukang -  - 

    0,600 org/hr Pekerja -  - 

    0,050 org/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    4 1 m² Pasangan conblock 1 : 4 12,500 buah Conblock

    0,050 m³ Pasir pasang

    0,260 zak Semen

    0,620 org/hr Tukang batu

    0,112 org/hr Kepala tukang

    1,250 org/hr Pekerja

    0,044 org/hr Mandor

    -  -  - 

    dibulatkan - 

    5 1 m² Plesteran tebal 15 mm 0,020 m³ Pasir pasang -  - 

    camp. 1 :2 0,170 zak Semen -  - 

    0,250 org/hr Tukang batu -  - 

    0,0182 org/hr Kepala tukang -  - 

    0,400 org/hr Pekerja -  - 0,020 org/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    dibulatkan - 

    6 1 m² Plesteran tebal 15 mm 0,0251 m³ Pasir pasang -  - 

    camp. 1 : 4 0,100 zak Semen -  - 

    0,250 org/hr Tukang batu -  - 

    0,020 org/hr Kepala tukang -  - 

    0,377 org/hr Pekerja -  - 

    0,020 org/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    7 1 m² Acian PC 0,080 zak Semen -  - 0,107 org/hr Tukang batu -  - 

    0,015 org/hr Kepala tukang -  - 

    0,143 org/hr Pekerja -  - 

    0,010 org/hr Mandor -  - 

    -  -  - 

    dibulatkan - 

    D PEKERJAAN PENGECATAN

    1 1 m² Cat besi / logam 2 x cat 0,500 kg Meni besi

    0,520 kg Cat besi

    0,350 lbr Ampelas

    0,210 kg Minyak cat

    0,050 bh Kuas 3"

    0,160 org/hr Tukang cat

    0,0115 org/hr Kepala tukang0,081 org/hr Pekerja

    0,002 org/hr Mandor

    -  -  - 

    dibulatkan - 

    2 3

  • 8/19/2019 perpipaan 1

    5/15

    1 4 5 6 7

    2 1 m² Cat dinding dan plafound 2 x 0,386 kg Cat tembok

    0,250 kg Cat dasar

    0,010 bh Rol cat

    0,400 lbr Ampelas

    0,050 bh Kuas 3"

    0,050 bh Bak cat

    0,291 org/hr Tukang cat

    0,030 org/hr Kepala tukang

    0,021 org/hr Pekerja

    0,010 org/hr Mandor

    -  -  - 

    E PEKERJAAN BESI BAJA

    1 1 cm Pengelasan dengan las listrik 0,040 kg Kawat las

    0,030 ltr bahan bakar solar

    0,004 ltr Pelumas

    0,002 org/hr Kepala tukang

    0,002 org/hr Tukang besi

    0,003 org/hr Pekerja

    0,001 org/hr Mandor

    0,250 Ls Alat bantu

    -  -  - 

    dibulatkan - 

    2 1 kg Besi profil / siku 1,100 kg Besi profil / siku

    0,040 org/hr Tukang besi

    0,003 org/hr Kepala tukang

    0,028 org/hr Pekerja

    0,1355 lot Alat bantu

    -  -  - 

    dibulatkan - 

    3 1 titik Melobang kontruksi besi 0,003 org/hr Kepala tukang

    dengan bor 0,020 org/hr Tukang besi

    0,050 org/hr Pekerja

    0,001 org/hr Mandor

    0,250 lot Alat bantu

    -  - 

    dibulatkan - 

    4 1 kg Mengerjakan baja IWF 1,000 kg Besi IWF

    0,009 org/hr Kepala tukang

    0,060 org/hr Tukang besi

    0,080 org/hr Pekerja

    0,0022 org/hr Mandor

    0,137 lot Alat bantu

    -  -  - 

    dibulatkan - 

    5 1 unit Manhole uk. 70 x 70 cm 6,400 kg Besi L. 50.50.5

    11,540 kg Plat baja t = 3 mm

    8,000 buah Angkur besi dia. 12 mm

    2,000 buah Engsel besi

    1,000 buah Kunci gembok

    1,125 m² Cat besi350,00 cm Pengelasan

      1,000 ls Upah pasang

    -  -  - 

    dibulatkan - 

    2 3

  • 8/19/2019 perpipaan 1

    6/15

    1 4 5 6 7

    9 1 unit Grill dr besi beton dia. 16 mm 24,128 kg Baja L.50.50.5

    rangka baja L.50.50.5 uk 1 x 1m 31,600 kg Besi beton dia. 16 mm

    2,000 buah Angkur dia. 16 mm

      1,885 m² Cat besi

      240,00 cm Pengelasan

      -  -  - 

    dibulatkan - 

    10 1 unit Pintu besi dr plat baja 1,2 mm 260,00 kg Baja knl C.150.50.5 (18,6kg/m)

    uk. 1,5 x 2,5 m 170,00 kg Baja siku 50.50.5 (3,77kg/m)

    50,000 kg Plat strip t = 40 x 4 mm64,500 kg Plat baja t = 2 mm

    0,738 m² Ram Harminika

    6,325 buah Angkur dia. 12 mm

    3,000 buah Engsel

    330,00 cm Pengelasan

    7,640 m² Pengecatan

    1,000 buah Kunci gembok

    -  -  - 

    dibulatkan - 

    1 unit Pintu besi dr plat baja 1,2 mm 160,00 kg Baja knl C.150.50.5 (18,6kg/m)

    uk. 2 x 2 untuk reservoir 89,000 kg Baja siku 50.50.5 (3,77kg/m)

    27,500 kg Plat strip t = 40 x 4 mm

    62,000 kg Plat baja t = 2 mm

    6,325 buah Angkur dia. 12 mm

    6,000 buah Engsel

    385,00 cm Pengelasan

    9,875 m² Pengecatan

    1,000 buah Kunci gembok

    -  -  - 

    F PEKERJAAN KAYU

    1 1 unit Papan nama proyek 1,000 lbr Multiplek 4 mm

    0,130 m³ Kayu 5/7

    0,036 kg Paku 5 - 7

    2,500 ltr Cat minyak

    1,000 ls Penulisan

    1,000 ls Ongkos pasang

    -  -  - 

    2 1 unit Pembuatan rambu lalu-lintas 4,000 org/hr Pekerja

    1,000 org/hr Mandor

    1,000 ls Bahan & alat

    -  -  - 

    3 1 M3 Rangka Bawah Dari Kayu Ulin

    1,100 M3 m3 kayu ulin -  - 

    5,000 org/hr Pekerja -  - 

    0,250 org/hr Mandor -  - 

    15,000 org/hr Tukang Kayu -  - 

    1,500 org/hr Kepala Tukang Kayu -  - 

    -  -  - 

    G PEKERJAAN PENGASPALAN

    1 1 m² Pasangan onderlag batu belah 0,150 m³ Pasir pasang

    tebal = 20 cm 0,250 m³ Batu belah

    0,150 org/hr Pekerja(gali,urug,hampr)

    0,120 lot Peralatan

    -  -  - 

    2 1 m² Amparan batu pecah 5/7 0,120 m³ Batu pecah

    tebal = 10 cm 0,110 org/hr Pekerja(gali,urug,hampr)

    0,320 lot Peralatan

    -  -  - 

    3 1 m² Amparan batu pecah 2/3 0,060 m³ Batu pecah

    tebal = 5 cm 0,080 org/hr Pekerja(gali,urug,hampr)

    0,050 lot Peralatan

    -  -  - 

    4 1 m² Lapisan pengisi/penutup 0,012 m³ Batu pecah ½

    0,010 m³ Pasir beton

      0,050 org/hr Pekerja(gali,urug,hampr)

    0,950 lot Peralatan

    -  -  - 

    2 3

  • 8/19/2019 perpipaan 1

    7/15

    1 4 5 6 7

    5 1 m² Pengaspalan manual 0,005 m³ Batu abu / pasir beton

      4,000 kg Aspal

    0,030 m³ Kayu bakar

      0,060 org/hr Pekerja

    0,180 lot Peralatan

    -  -  - 

    6 1 m² Hotmix tebal = 3 cm u halaman 0,036 m³ Abu batu

      jalan kelas 6 ton kebawah 5,000 kg Aspal panas

    0,008 m³ Kayu bakar

      0,120 org/hr Pekerja

    0,010 org/hr Mandor

    0,098 lot Peralatan

    -  -  - 

    dibulatkan - 

    7 1 m² Hotmix pakai alat berat t = 5 cm 0,111 ton Hotmix jadi+alat brt+tng

    kelas jln kelas 6 ton kebawah 0,030 org/hr Pekerja

    0,150 org/hr Mandor

    -  -  - 

    dibulatkan - 

    8 1 m² Jalan aspal manual - 

    9 1 m² Jln aspal hotmix dibawah 6 ton - 

    10 1 m² Jalan aspal hotmix diatas 6 ton - 

    2 3

  • 8/19/2019 perpipaan 1

    8/15

    DAFTAR ANALISA (Pembuatan Bak Valve, Wash Out dan Ventil)

    PROYEK : PENYEDIAAN SARANA AIR BERSIH PDAM INTAN BANJAR

    PEKERJAAN : PENGADAAN DAN PEMASANGAN PIPA AIR BERSIH HDPE DIA. 500 MM - 3.620 METER

      & PIPA AIR BAKU HDPE DIA. 630 MM - 10 METER

    LOKASI : JL. GUBERNUR SYARKAWI, KABUPATEN BANJAR

    HARGA TOTAL

    NO. URAIAN PEKERJAAN ANLISA SATUAN VOLUME SATUAN BIAYA

    (Rp. -) (Rp. -)1 2 3 4 5 6 7

    L PEMBUATAN BAK VALVE, WASH OUT DAN VENTIL

    UNTUK :

    2 Valve dia. 500 mm

    1 Penggalian Tanah A.3 m3

    2 Pemancangan galam dia. 12 - 4 m k.13 Btg

    3 Pasir urug t = 10 cm A.11 m3

    4 Lantai kerja t = 5 cm camp. 1:3:5 B.4 m2

    5 Pengecoran beton tak bertulang lantai dan dinding 1:2:3 B.5 m3

    6 Pengecoran beton bertulang tutup dan bibir camp. 1:2:3 B.11 m3

    7  Pemasangan valve dan accessories dia 600 mm ls bh

    8  Handle untuk mengangkat tutup bak dari besi beton dia.

    16 mm termasuk moer ls bh

    0,00

  • 8/19/2019 perpipaan 1

    9/15

    DAFTAR ANALISA (Bongkar Jalan, Flusing dan Pengetesan Pipa)

    PROYEK : PENYEDIAAN SARANA AIR BERSIH PDAM INTAN BANJAR

    PEKERJAAN : PENGADAAN DAN PEMASANGAN PIPA AIR BERSIH HDPE DIA. 500 MM - 2.725 METER

      & PIPA AIR BAKU HDPE DIA. 630 MM - 10 METER

    LOKASI : JL. GUBERNUR SYARKAWI, KABUPATEN BANJAR

    NO U R A I A N ANALISA HARGA UPAH HARGA JUMLAH

    PEKERJAAN SATUAN KERJA BAHAN( Rp. - ) ( Rp. - ) ( Rp. - ) ( Rp. - )

    1 2 4 5 6 7

    H PEMBONGKARAN JALAN

    1 Pembongkaran jalan

    hotmix t = 7 cm

    2,000 org/hr Pekerja

    0,300 org/hr Mandor

    2 Pembongkaran Pondasi

     jalan t = 30 cm

    1,500 org/hr Pekerja

    0,200 org/hr Mandor

     

    3 Biaya menggilas sebulan 30,000 org/hr Masinis

    30,000 org/hr Kenek

    150,000 org/hr Pekerja

    30,000 org/hr Tukang Jaga

    20,000 org/hr Solar

    4 Pek. lapisan Pondasi

     jalan t = 30 cm dipadatkan 0,450 m³ Split (ukuran 2-3 Cm)

    0,050 m³ Pasir Urug

    0,760 org/hr Pekerja

    0,040 org/hr Mandor

      untuk 1 m2 Biaya menggilas 2/7500 x W.4

    5 Perbaikan hot mix

    5,500 kg Aspal

    1,000 kg Coating

    0,030 m³ Pasir Pasang

    0,030 m³ Split (ukuran 2-3 Cm)

    0,250 org/hr Pekerja

    0,040 org/hr Tukang Aspal

    0,020 org/hr Mandor

      untuk 1 m2

     Biaya menggilas 2/7500 x W.4

    6 Pengukuran dan pematokan BB.5 / 1000m'  kembali 1,000 org/hr Juru ukur

      6,000 org/hr Pekerja

    0,300 org/hr Mandor

    1,000 ls Bahan & Alat Pematokan

    Ls Pematokan

      untuk 1 m'

    3

  • 8/19/2019 perpipaan 1

    10/15

    1 2 4 5 6 7

    I FLUSHING & DISINFEKTAN  

    DAN PENGETESAN PIPA  

    2 Flushing dan disinfektan DF.2 / 200m

    0,095 bln pompa air 5 l/dt

      56,52 m³ air bersih

    20,000 ltr bahan bakar

      1,000 org/hr operator

    2,000 org/hr pekerja

    0,450 org/hr mandor

      untuk 1 m'

    3 Pengetesan Pipa PVC / HDPE DF.10 / 400m

    dia. 630 mm 0,081 bln pompa air 5 l/dt

    113,04 m³ air bersih

    30,000 ltr bahan bakar

      1,594 org/hr operator

      4,456 org/hr pekerja

    0,697 org/hr mandor

      untuk 1 m'

    4 Pengetesan Pipa PVC / HDPE DF.9/400 m

    dia. 500 mm 0,081 bln pompa air 5 l/dt

    78,5 m³ air bersih

    30,000 ltr bahan bakar

    1,594 org/hr operator

    4,456 org/hr pekerja

    0,697 org/hr mandor

      untuk 1 m'

    5 Pengetesan Pipa PVC / HDPE DF.9/400 m

    dia. 400 mm 0,081 bln pompa air 5 l/dt

    50,24 m³ air bersih

    30,000 ltr bahan bakar

    1,594 org/hr operator4,456 org/hr pekerja

    0,697 org/hr mandor

      untuk 1 m'

    6 Pengetesan Pipa PVC / HDPE DF.9/400 m

    dia. 300 mm 0,081 bln pompa air 5 l/dt

    28,26 m³ air bersih

    30,000 ltr bahan bakar

    1,594 org/hr operator

    4,456 org/hr pekerja

    0,697 org/hr mandor

      untuk 1 m'

    7 Pengetesan Pipa PVC / HDPE DF.9/400 m

    dia. 200 mm 0,081 bln pompa air 5 l/dt

    12,56 m³ air bersih

    30,000 ltr bahan bakar

    1,594 org/hr operator

    4,456 org/hr pekerja

    0,697 org/hr mandor

      untuk 1 m'

    3

  • 8/19/2019 perpipaan 1

    11/15

    1 2 4 5 6 7

    J PEKERJAAN KHUSUS  

    1 Membuat Papan Nama Proyek /Bh

    1,000 lbr Multiplek 4 mm

    0,130 m³ Kayu 5/7

    0,036 kg Paku 5 - 7

    2,500 ltr Cat minyak

    1,000 ls Penulisan

    1,000 ls Ongkos pasang

    2 Membuat rambu lalu lintas Bh

    4,000 org/hr Pekerja

    1,000 org/hr Mandor

    1,000 ls Bahan & alat

    3 Pemotongan pipa dia. 500 mm

    0,358 kg Acetelyn

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    1,00  ls Peralatan PenunjangPer Meter ( A )

    1,570  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    4 Las pipa Diameter 500 mm 0,358 kg Acetelyn

    1,067 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    1,00  Peralatan Penunjang

    Per Meter ( A )

    1,570  Keliling Lingkaran ( B )

    4,710  3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    5 Pemotongan pipa

    dia. 600 mm 0,358 kg Acetelyn

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    1,00  ls Peralatan Penunjang

    Per Meter ( A )

    1,884  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    3

  • 8/19/2019 perpipaan 1

    12/15

    1 2 4 5 6 7

    6 Las pipa Diameter 600 mm

    0,358 kg Acetelyn

    1,067 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

      1,00  Peralatan Penunjang

    Per Meter ( A )

    1,884  Keliling Lingkaran ( B )

    5,652  3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    7 Pemotongan pipa

    dia. 800 mm 0,358 kg Acetelyn

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    2,512  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    8 Las pipa Diameter 800 mm0,358 kg Acetelyn

    1,067 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

      ls Peralatan Penunjang

    Per Meter ( A )

    2,512  Keliling Lingkaran ( B )

    7,536  3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    9 Pemotongan pipa

    dia. 400 mm 0,358 kg Acetelyn

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    1,256  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    10 Las pipa Diameter 400 mm

    0,358 kg Acetelyn

    1,067 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

      ls Peralatan PenunjangPer Meter ( A )

    1,256  Keliling Lingkaran ( B )

    3,768  3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    11 Pemotongan Pipa dia. 300 mm 0,358 kg Acetelyn0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,942  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    12 Las pipa Diameter 300 mm0,358 kg Acetelyn

    1,067 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,942  Keliling Lingkaran ( B )

    2,826 3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    1 2 4 5 6 7

    13 Pemotongan Pipa dia. 200 mm 0,358 kg Acetelyn

    3

    3

  • 8/19/2019 perpipaan 1

    13/15

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,628  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    14 Las pipa Diameter 200 mm0,358 kg Acetelyn

    0,092 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,628  Keliling Lingkaran ( B )

    1,884 3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    15 Pemotongan Pipa dia. 160 mm 0,358 kg Acetelyn

    0,092 org/hr Tukang Las0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,502  Keliling Lingkaran ( B )

      Total Harga Pemotongan =

      ( B x A )

    16 Las pipa Diameter 160 mm0,358 kg Acetelyn

    0,000 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,502  Keliling Lingkaran ( B )

    1,507 3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

    17 Pemotongan Pipa dia. 110 mm 0,358 kg Acetelyn0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,345  Keliling Lingkaran ( B )

      Total Harga Pemotongan =  ( B x A )

    18 Las pipa Diameter 110 mm 0,358 kg Acetelyn

    0,000 kg Kawat Las

    0,092 org/hr Tukang Las

    0,042 org/hr Kepala Tukang Las

    0,008 org/hr Mandor

    ls Peralatan Penunjang

    Per Meter ( A )

    0,345  Keliling Lingkaran ( B )

    1,036 3 x Pengelasan ( C )

    Total Harga Pengelasan =

    ( A xC )

  • 8/19/2019 perpipaan 1

    14/15

    DAFTAR ANALISA (Pemasangan Pipa)

    PROYEK : PENYEDIAAN SARANA AIR BERSIH PDAM INTAN BANJAR

    PEKERJAAN : PENGADAAN DAN PEMASANGAN PIPA AIR BERSIH HDPE DIA. 500 MM - 2.725 METER

      & PIPA AIR BAKU HDPE DIA. 630 MM - 10 METER

    LOKASI : JL. GUBERNUR SYARKAWI, KABUPATEN BANJAR

    NO U R A I A N ANALISA HARGA UPAH HARGA JUMLAH

    SATUAN KERJA BAHAN

    (Rp. - ) (Rp. - ) (Rp. - ) (Rp. - )

    1 2 4 5 6 7

    K PEKERJAAN PEMASANGAN PIPA

    2 PEK. PEMASANGAN PIPA PE DN. 630 MM /m

    Type Galian II - Asphalt Hotmix t = 7 cm

    1,030  H.1+H.2 Bongkar aspal hotmix

    1,267 A.7 Galian tanah dg alat

    0,381 A.11 Urugan pasir dipadatkan

    0,543 A.8 Urugan tanah kembali

    1,030  G.8 Perbaikan aspal jalan

    0,312 A.9 Pembuangan tanah

    0,550 jam Excavator

    0,200 jam Mesin Las

    0,200 jam Genset0,250 jam Loader

    0,250 jam Crane

    1,000 ls Alat Bantu

    0,200 org/hr Supervisor

    0,005 org/hr Mandor

    0,080 org/hr Tukang Pipa

    0,800 org/hr Pekerja

    3

    5 PEK. PEMASANGAN PIPA PE DN. 500 MM /m

    Type Galian I - Bahu jalan 1,760 A.7 Galian tanah dg alat

    1,560 A.8 Urugan tanah kembali

    0,200 A.9   Pembuangan tanah/m3

    0,275 jam Excavator/jam

    0,300 jam Mesin Las/jam

    0,150 jam Genset/jam

    0,200 jam Crane/jam

    0,200 org/h Supervisor/Oh

    0,004 org/h Mandor/Oh

    0,080 org/h Tukang Pipa/Oh

    0,600 org/h Pekerja/Oh

    6 PEK. PEMASANGAN PIPA PE DN. 500 MM /m

    Type Galian II - Asphalt Hotmix t = 7 cm 0,900 H.1+H.2 Bongkar aspal hotmix

    1,017 A.7 Galian tanah dg alat

    0,434 A.11 Urugan pasir dipadatkan

    0,333 A.8 Urugan tanah kembali

    0,900 G.8 Perbaikan aspal j alan

    0,196 A.9 Pembuangan tanah

    0,450 jam Excavator

    0,150 jam Mesin Las

    0,150 jam Genset

    0,200 jam Crane

    0,200 org/hr Supervisor0,005 org/hr Mandor

    0,080 org/hr Tukang Pipa

    0,600 org/hr Pekerja

  • 8/19/2019 perpipaan 1

    15/15

    DAFTAR ANALISA (Pembuatan Jembatan Perlintasan Pipa)

    PROYEK : PENYEDIAAN SARANA AIR BERSIH PDAM INTAN BANJAR

    PEKERJAAN : PENGADAAN DAN PEMASANGAN PIPA AIR BERSIH HDPE DIA. 500 MM - 2.725 METER

      & PIPA AIR BAKU HDPE DIA. 630 MM - 10 METER

    LOKASI : JL. GUBERNUR SYARKAWI, KABUPATEN BANJAR

    HARGA TOTAL

    NO. ANALISA SATUAN VOLUME SATUAN BIAYA

    (Rp. -) (Rp. -)

    1 2 3 4 5 6 7

    M PEKERJAAN PEMASANGAN JEMBATAN PIPA

    5 PEKERJAAN PEMASANGANAN JEMBATAN PIPA DN 500 MMKONSTRUKSI L= 4 m ( 1 unit )

    1 Penggalian Tanah m 5,0052 Pemancangan galam dia. 12 - 7 m Btg 183 Pemancangan galam dia. 12 - 4 m Btg 184 Pasir urug t=10 cm m 0,7705 Lantai kerja t=5 cm m2 0,2946 Pengecoran Support Beton bertulang camp. 1:2:3 m 2,3207 Pengecoran Thrust Block Beton bertulang camp. 1:2:3 m3 1,544

    8 Urugan tanah kembali m3

    3,3289 Plesteran camp. 1 : 4 m 5,00

    10  Pemasangan pipa Steel dia 500 mm m 811  Pengelasan sambungan pipa & Flange Steel ( 3 x Las ) titik 612  Pemotongan pipa titik 2

    13 Pemasangan box air valve dari besi plat ls 114  Pengecatan jembatan pipa Steel dia 500 mm m 9,42

     ( 2 xkali cat )15  Koneksi Pipa PE dia. 500 mm x dia. 500 mm ls 2,0016 Pembersihan lokasi / ijin ls 1,0017 Pengaman pipa dari besi beton dia. 12mm ls 2,00

    URAIAN PEKERJAAN