Top Banner
Permitting, BREF and best practice Matt Hindle, ADBA Training and Safety WG 20 November 2013
10

Permitting, BREF and best practice

Jan 02, 2016

Download

Documents

aline-osborn

Permitting, BREF and best practice. Matt Hindle, ADBA Training and Safety WG 20 November 2013. EA concerned about incidents. EA concerned about incidents. What’s going on?. EA/Defra leading a number of actions... Biowaste Regulatory Forum convened - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Permitting, BREF and best practice

Permitting, BREF and best practice

Matt Hindle, ADBA Training and Safety WG20 November 2013

Page 2: Permitting, BREF and best practice

EA concerned about incidents

5.21.61.31.20.80.70.60.40.30.2000

Number of serious pollution incidents per 100 permits from regulated industry in England, 2012

Total

Per 100 permits

46311165861161000

Page 3: Permitting, BREF and best practice

EA concerned about incidents

Page 4: Permitting, BREF and best practice

What’s going on?

EA/Defra leading a number of actions...• Biowaste Regulatory Forum convened• EA Technical Guidance due to be published shortly• BREF process underway

... but keen to see industry take a lead too• Using Practical Guide to AD• Supporting ADBA best practice scheme• Want to see other proactive work

Page 5: Permitting, BREF and best practice

Technical Guidance

What is it?• EA guidance to officers and operators on permit compliance• Suggests ‘indicative’ BAT, but other techniques allowed• Will inform EA approach to BREF process

When will it come in?• First draft published last year, significant issues raised• ADBA commented on second draft in September• Final publication expected shortly

Page 6: Permitting, BREF and best practice

BREF process

What is it?• Revision of European Waste Treatment BREF• Crosses technologies/techniques

How do we influence?• Through EA/UK government• Through European Biogas Association• Directly to the Commission

Final draft/implementation from late 2015/early 2016

Page 7: Permitting, BREF and best practice

BREF process: timetable

End 2014

New draft produced Comments on draft

March 2014

Questionnaire releasedJanuary 2014

Opinions on questionnaire to operators

List of operators willing to participate

November 2013

Kick off meeting, Seville Gathering initial comments

Page 8: Permitting, BREF and best practice

BREF – immediate actions

Operators• We need opinions/evidence on the existing proposals,

especially following the Seville meeting• Need operators to volunteer to fill in the questionnaire

Biofilters• Identified as a particular evidence gap• ESA leading a piece of work on MBT sites• Need to ensure AD operators represented too

Page 9: Permitting, BREF and best practice

Keeping track

Page 10: Permitting, BREF and best practice

Other issuesFIT degression• Joint industry campaign underway• Looking to raise profile through MPs• Gathering evidence of projects affected

RHI• Government response expected by end November• Should include news on support above 200kWth• Full review in 2014

PAS110• Full consultation document to be released in next few weeks