PERHITUNGAN DIMENSI TULANGAN BALOK PORTAL AS D-D PADA PROYEK “THE MANHATTAN MALL AND CONDOMINIUM MEDAN” LAPORAN Ditulis untuk Menyelesaikan Mata Kuliah Tugas Akhir Semester VI Pendidikan Program Diploma III oleh: ANJU FABER MARIO SIDABUTAR ZEFRIZAL DOLOKSARIBU NIM 1405022018 NIM 1405022025 PROGRAM STUDI TEKNIK SIPIL JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI MEDAN MEDAN 2017
16
Embed
PERHITUNGAN DIMENSI TULANGAN BALOK PORTAL AS D-D …
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PERHITUNGAN DIMENSI TULANGAN BALOK PORTAL
AS D-D PADA PROYEK “THE MANHATTAN MALL AND
CONDOMINIUM MEDAN”
LAPORAN
Ditulis untuk Menyelesaikan
Mata Kuliah Tugas Akhir Semester VI
Pendidikan Program Diploma III
oleh:
ANJU FABER MARIO SIDABUTAR ZEFRIZAL DOLOKSARIBU
NIM 1405022018 NIM 1405022025
PROGRAM STUDI TEKNIK SIPIL
JURUSAN TEKNIK SIPIL
POLITEKNIK NEGERI MEDAN
MEDAN
2017
i
KATA PEGANTAR
Puji syukur kepada Tuhan Yang Maha Esa atas berkah dan rahmat-NYA
sehingga penulis dapat menyelesaikan Laporan Tugas Akhir ini.
Laporan yang berjudul Perhitungan Dimensi Tulangan Balok Portal as D-D pada
proyek The Manhattan Mall and Condominium Medan ini bermaksud untuk
menyelesaikan mata kuliah Tugas Akhir pendidikan Program Diploma III
Politeknik Negeri Medan. Dalam proses pembuatan laporan ini, penulis
berterimakasih kepada:
1. Bapak M.Syahruddin, S.T.,M.T., Direktur Politeknik Negeri Medan;
2. Bapak Ir.Samsudin Silaen, M.T., Ketua Jurusan Teknik Sipil Politeknik Negeri
Medan;
3. Bapak Ir.Sudarto, M.T., Kepala Program Studi Teknik Sipil Politeknik Negeri
Medan;
4. Bapak Ahmad Sumantri, S.T., M.T., Pembimbing penulis Tugas Akhir ini;
5. Bapak dan Ibu Dosen Jurusan Teknik Sipil dan seluruh sivitas akademik
Politeknik Negeri Medan.
Laporan tugas akhir ini adalah hasil karya penulis, bukan merupakan plagiat.
Walaupun penulis sudah berupaya semaksimal mungkin, namun penulis juga
menyadari kemungkinan terdapat kekurangan dan kesilapan.
Penulis sangat mengharapkan saran dan kritik yang dapat memperbaiki laporan
ini. Semoga tulisan ini dapat bermanfaat bagi siapapun yang membacanya.
Medan, September 2017
Hormat kami penulis:
Mahasiswa 1 Mahasiswa 2
Anju Faber Mario Sidabutar Zefrizal Dolok Saribu
NIM 1405022018 NIM 1405022025
ii
ABSTRAK
Perencanaan gedung bertingkat merupakan salah satu cara mengurangi
penggunaan lahan yang luas. Perencanaan struktur meliputi balok, kolom, pelat dan
dinding geser. Perencanaan balok harus dalam kondisi under reinforced agar
lendutan balok maksimum terjadi sebelum beton runtuh (collapse). Struktur balok
harus mampu menahan beban-beban yang bekerja pada pelat lantai lantai untuk
selanjutnya beban ditransfer ke kolom.
Tujuan dari laporan Tugas Akhir ini untuk mengetahui perhitungan dimensi
tulangan balok portal as D-D serta dapat mengontrol perhitungan penulangan hasil
anialisa dengan data shop drawing pada proyek. Perhitungan penulangan ini dapat
dijadikan acuan untuk membandingkan seberapa sama hasil perhitungan sendiri
dengan yang ada shop drawing. Metode perhitungan meruppakan penggabungan
antara analisa gaya-gaya dalam dengan SAP 2000 dan perhitungan penulangan
secara manual sesuai SNI 03-2847-2002.
Nilai analisa SAP 2000 digunakan sebagai perhitungan penulangan, baik
tulangan longitudinal maupun tulangan geser. Hasil perhitungan penulangan balok
tulangan longitudinal untuk lantai 7-26 pada perhitungan manual dan analisa SAP
2000, tulangan tumpuan atas = 6D32 dan tulangan tumpuan bawah =5D22,
tulangan lapangan atas = 2D22 dan tulangan lapangan bawah =5D22. Tulangan
Geser (sengkang) = 10D – 150. Pada lantai 27-Atap, tulangan tumpuan atas =5D32
dan tulangan tumpuan bawah =4D22, tulangan lapangan atas =2D22 dan tulangan
lapangan bawah =4D22. Tulangan geser (sengkang) 10D – 200.
Perbedaan nilai penulangan balok terutama tulangan longitudinalnya
disebabkan oleh momen yang besar pada analisa menggunakan SAP 2000, momen
ini terjadi akibat pengaruh gaya gempa dan kombinasi pembebanan gaya
gempanya.
Kata Kunci : Penulangan balok, Tulangan longitudinal balok, Tulangan
sengkang balok, penggunaan SAP 2000
iii
DAFTAR ISI
Hal
LEMBAR PERSETUJUAN ........................................................................ i
LEMBAR PENGESAHAN ......................................................................... ii
KATA PENGANTAR .................................................................................. iii
ABSTRAK .................................................................................................... iv
DAFTAR ISI ................................................................................................. v
DAFTAR TABEL ........................................................................................ vii
DAFTAR GAMBAR .................................................................................... viii
DAFTAR LAMPIRAN ................................................................................ ix
DAFTAR NOTASI ...................................................................................... x
BAB I PENDAHULUAN
A. Latar Belakang ..................................................................... 1
B. Perumusan Masalah ............................................................. 3
C. Pembatasan Masalah ............................................................ 3
D. Tujuan Pembahasan ............................................................. 3
E. Manfaat Pembahasan ........................................................... 4
F. Metodologi ........................................................................... 4
G. Jadwal Persiapan, Pelaksanaan dan Penulisan Laporan
Tugas Akhir .......................................................................... 5
H. Sistematika Penulisan .......................................................... 6
BAB II TINJAUAN UMUM PROYEK
A. Data Umum Proyek .............................................................. 8
B. Data Teknis Struktur ............................................................ 9
C. Metode Pengumpulan Data .................................................. 10
D. Metode Perhitungan ............................................................. 10
E. Struktur Organisasi .............................................................. 12
iv
BAB III TINJAUAN PUSTAKA
A. Beton Bertulang ................................................................... 13
B. Pembebanan Gedung Bertingkat .......................................... 16
C. Kombinasi Pembebanan ....................................................... 28
D. Portal .................................................................................... 29
E. Balok .................................................................................... 29
F. Analisa Struktur Dengan SAP 2000 V.12 ............................ 34
BAB IV PERHITUNGAN
A. Perhitungan Gaya Gempa .................................................... 46
B. Perhitungan Beban Akibat Gaya Gravitasi .......................... 52
C. Perhitungan Gaya-Gaya Dalam ........................................... 76
D. Perhitungan Tulangan Lentur Portal as D-D ........................ 77
E. Perhitungan Tulangan Geser (Sengkang) ............................ 83
BAB V PENUTUP
A. Kesimpulan .......................................................................... 87
B. Saran ..................................................................................... 87
DAFTAR PUSTAKA ................................................................................... xi
LAMPIRAN
v
DAFTAR TABEL
Hal
Tabel 1.1. Jadwal Persiapan, Pelaksanaan dan Penulisan Laporan
Tugas Akhir ................................................................................ 5
Tabel 3.1. Kategori Risiko Bangunan Gedung dan Non Gedung ................ 19