Page 1: Performances analysis rmx

Performances Analysis of RMC

Arivusudar Nagarajan

Page 2: Performances analysis rmx

Agenda

• Quality control - Self • Plant Machinery - Mr kannan (Deputy Manager)

• Transport – Mr.Vetha• Maintenance – Mr Uma • Stores – Mr. Shan mugam

Page 3: Performances analysis rmx

New innovation for >EBITDA• Steel Fiber concrete : Increased load bearing capacity of

concrete , Reduction of concrete slab thickness , Labour Saving 15% .

• Preamble concrete : Rain Water Harvesting .• Triple Blended cement : Cement ,GGBS,Flyash (Optimizing).• Geo-polymer Concrete & Geo-cement : 100 % Cement Free

technology .

Page 4: Performances analysis rmx

Cost Saving benefits

• Introducing Triple blended cement – Trail period of 60 days - 50% Customer base –Rs.90/m3 saving

• Replacement of slurry Cement bags – Chemical lube. • Geo-polymer cement & concrete concept –Zero

percentage cement free concept .

Page 5: Performances analysis rmx
Page 6: Performances analysis rmx

Nov 14 vs. Nov 15

Page 7: Performances analysis rmx

Cement Content Grade wise

Page 8: Performances analysis rmx

Key focusing zone’s (Quality control)

1. Fixed Mix design – Clients.2. Giving Special attention to Special value

added concrete – Boost for ASP . 3. Optimizing Resources – In Quality control .4. Rapport with end customers – Pre concreting

& post concreting

Page 9: Performances analysis rmx

Office Excess

Page 10: Performances analysis rmx

Plant Spares/cum

Page 11: Performances analysis rmx

EB Charges /Cum

Page 12: Performances analysis rmx

Pipe-line & Spares

Page 13: Performances analysis rmx
Page 14: Performances analysis rmx

Key focus Area’s

• Spares • Diesel cost • Pipe-line Costing – JKS removed

–Rs.35,000/month & one gang removed . • E.B charges – Government charges increased

as compared to budget .

Page 15: Performances analysis rmx
Page 16: Performances analysis rmx

Over All Costing April 15 to Dec 15

Page 17: Performances analysis rmx

Transport (Staff Salary July15 to Dec15)

Page 18: Performances analysis rmx

Driver Salary (July15 to Dec 15)

Page 19: Performances analysis rmx

Diesel (July 15 to Dec 15)

Page 20: Performances analysis rmx

On-Trip (July 15 to Dec 15)

Page 21: Performances analysis rmx

Key focus Area’s

1. Staff salary – Reducing Man power .2. Chipping Cost .3. Optimizing Resources in Bulker ,miller etc 4. Increased KMPL in resources – Bulker &

Tipper (from 3.4Kmpl to 3.8 Kmpl ) .

Page 22: Performances analysis rmx

Spares (July 15 to Dec 15)

Page 23: Performances analysis rmx

Maintenance (July 15 to Dec15)

Page 24: Performances analysis rmx

Tyre (July 15 to Dec 15)

Page 25: Performances analysis rmx

Tyre Retread (July 15 to Dec 15)

Page 26: Performances analysis rmx

Innovation

1.Fabricating - Delivery chute , Funner , Hopper.2.Completely we stopped giving battery charger

out side . 3.Engine works – 4 Vehicles completed full

engine work – Own workshop . 4. Reusing used tubes

Page 27: Performances analysis rmx
Page 28: Performances analysis rmx

New Cabin – Completed

Page 29: Performances analysis rmx
Page 30: Performances analysis rmx

Cement Trips (July to Dec15)

Page 31: Performances analysis rmx

River Sand Trips (July to Dec15)

Page 32: Performances analysis rmx

Marketing

Page 33: Performances analysis rmx