Top Banner
Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg
15

Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Dec 13, 2015

Download

Documents

Magdalene Walsh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Performance indicatorsEU-Twinning Project – Strengthening Public Procurement in

SerbiaClosing Conference

Belgrade, 28 November 2012 Lennart Emborg

Page 2: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Performance IndicatorsPurposes

• Improve performance -> improve procurement

• Set up performance indicators, in order to:– Identify problems and how they develop– Guide capacity development– Check impact of measures– Learning from good experience– Self-assessment and target setting

Page 3: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Performance indicatorsApproach

• Bottom-up approach:– Point of departure: The public

procurement process– Based on existing data available to

PPO– New types of data -> additional

indicators

Page 4: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Performance Indicators Based on Existing Data at PPO (I)

• Already there:– Ratio of cancelled or nullified

procedures– Use of non-competitive procedures– Number of bids in tenders– Ratio of low value procurements

Page 5: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Performance Indicators Based on Existing Data at PPO (II)

• Optional:– [Excessive use of a single contractor]– Absence of public notice for invitation to

bid– Absence of contract award notice, when the

negotiated procedure without prior notice has been applied

– Absence of necessary PP-officers

Page 6: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Development Perspective:Additonal performance indicators

• Need for existing but external data:– Complaints from bidders– Deficient procurement planning

• Need for additional data:– Insufficient reporting of procurement– Correspondence between

budgeted/accounted procurement and reported contracts

– Inspection of actual procurement

Page 7: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Ratio of tenders with only one bidder

Page 8: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

User functionalities

Access to the indicators on the PP Portal:

1. Indicators in general2. Ranking (benchmarking)3. Self assessment

Page 9: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Access to the indicators on the PP Portal

Page 10: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

General access to indicators

Page 11: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Example of output

Page 12: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Ranking

Page 13: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Example of ranking output

Page 14: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Self assessment

Page 15: Performance indicators EU-Twinning Project – Strengthening Public Procurement in Serbia Closing Conference Belgrade, 28 November 2012 Lennart Emborg.

Example of self-assessment output