8/28/2012 1 Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS Master CPIM, CSCP, Lean, Instructor Development Debra’s Cycle Count History Focus on the root cause and not the number of counts per day counts per day . View cycle counting like inspecting incoming materials. Annual inventory created more problems. Annual inventory created more problems. Needed change!
8

Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

Mar 29, 2018

Download

Documents

lamlien
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

1

Perfecting the Cycle Count

Debra A. Hansford, CPIM, CIRM, CSCPAPICS Master – CPIM, CSCP, Lean, Instructor Development

Debra’s Cycle Count History

• Focus on the root cause and not the number of counts per daycounts per day.

• View cycle counting like inspecting incoming materials.

• Annual inventory created more problems.Annual inventory created more problems.

• Needed change!

Page 2: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

2

The Goal?

Count all parts within a year?

Identify and correct process problems?

Traditional ABC

A items 12 times per year

B items 4 times per year

C items 2 timesC items 2 times per year

Page 3: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

3

ABC Tolerance

AWithin tolerance?

0 %

B+/‐ 2 %

C

Within tolerance?– consider correct– do not adjust

C+/‐5 %

Root Cause Analysis

Key to successKey to success

Keep it simple ‐ 5 Why

Identify actions that creates reactions

Look for process variances

Page 4: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

4

Controversy?

Inspecting parts increase quality or stop unacceptable quality?

Cycle counting increase i di llaccuracy or periodically 

“correct” balance?

Control Groups

Determine accuracy goal

Select numbers

Count every day

Root cause analysis to correct

Page 5: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

5

Selecting Challenging Part Numbers

By process By supplier By area used

By size By value ???By size By value ???

Add To Current Cycle Counts

KaizenKaizen

Identify Create small control group

potential process problems

Page 6: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

6

Simulation

Simulation Observations

Cycle count everything

Control group

Page 7: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

7

Simulation Observations

Cycle count everything

Control group

Perfecting The Cycle Count

• Consider adding control group

• Root cause analysis over counting parts

• Get the buy‐in from management

• May be viewed as “unconventional”

Page 8: Perfecting the Cycle Count Hansford - APICSmedia.apics.org/sites/AnnualConference2012/handouts/Foundations_in...Perfecting the Cycle Count Debra A. Hansford, CPIM, CIRM, CSCP APICS

8/28/2012

8

Thank You!

Hope you have some ideas to challenge the status quo 

if your current cycle count practices need a change!

Deb@PreCrest [email protected]