@djebtke www.ebtke.esdm.go.id @djebtke Ditjen EBTKE KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL ENERGI BARU TERBARUKAN DAN KONSERVASI ENERGI PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 Jakarta, 07 Desember 2018
12

PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

Jun 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtkewww.ebtke.esdm.go.id @djebtkeDitjen EBTKE

KEMENTERIAN ENERGI DAN SUMBER DAYA MINERALDIREKTORAT JENDERAL ENERGI BARU TERBARUKAN DAN KONSERVASI ENERGI

PERATURAN MENTERI ESDM

NOMOR 49 TAHUN 2018

Jakarta, 07 Desember 2018

Page 2: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 2Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

1. Unsur MENIMBANG : 3 unsur

2. Unsur MENGINGAT : 9 peraturan per-UU-an: 2 UU, 3 PP, 2 Perpres, dan 2 Permen

3. Unsur MEMUTUSKAN : 8 BAB, dan 19 Pasal:Pasal

Bab I : Ketentuan Umum (12 definisi/terminologi) 1Bab II : Penggunaan Sistem PLTS Atap 2-5Bab III : Perhitungan Ekspor Dan Impor Energi Listrik Dari Sistem PLTS Atap 6Bab IV : Pembangunan dan Pemasangan Sistem PLTS Atap 7-12

Bagian Kesatu : Permohonan 7-8Bagian Kedua : Pembangunan dan Pemasangan 10Bagian Ketiga : Pemeriksaan dan Pengujian 11Bagian Keempat : Pemasangan Meter kWh Ekspor-Impor 12

Bab V : Pelaporan 13Bab VI : Ketentuan Lain-lain 14-15Bab VII : Ketentuan Peralihan 16Bab VIII : Ketentuan Penutup 17-19

Konstruksi Permen:

Page 3: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 3Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

1. Masyarakat:▪ Penghematan/mengurangi tagihan listrik bulanan

▪ Membuka peranserta masyarakat dalam pemanfaatan dan pengelolaan energiterbarukan

2. Pemerintah dan PLN:▪ Meningkatkan peranan EBT dalam bauran energi nasional

▪ Percepatan peningkatan pemanfaatan energi surya

▪ Mendorong berlangsungnya industri energi surya dalam negeri

▪ Meningkatkan investasi EBT

▪ Meningkatkan kemandirian dan ketahanan energi

▪ Mengurangi emisi GRK

▪ Meningkatkan lapangan kerja

Tujuan/Manfaat

Page 4: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 4Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

Gambar ilustrasi

Sistem PLTS Atap

• Sistem PLTS Atap meliputi: modul surya, inverter, sambungan listrik pelanggan, sistem pengaman, dan meter kWh Ekspor-Impor.

• Pengguna: Konsumen PLN termasuk Sektor Industri.

• Kapasitas: 100% daya tersambung konsumen (Watt).

• Lokasi Pemasangan: diletakkan pada atap, dinding atau bagian lain dari bangunan milik konsumen PLN.

Page 5: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 5Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

PL T S A T A P

10%

90%

PR

OD

UK

SI P

LTS

ATA

P

Ekspor Pemakaian Sendiri

KonversiNilai 1

Konversi nilai 0,65

** Sumber : Salah satu pengguna PLTS Atap

Nilai kWh Ekspor dan Impor

Pemakaian Sendiri

Ekspor ke PLN

Page 6: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 6Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

• Transaksi kredit energi listrik pelanggan pada akhir bulan dihitung sebagai berikut:

Tagihan Listrik Pelanggan (kWh) = Jumlah kWh Impor – 65% Nilai kWh Ekspor

o Jumlah kWh Ekspor : Jumlah kWh yang diekspor pelanggan ke PLN yang tercatat pada meter kWh ekspor;

o Nilai kWh Impor : Nilai kWh yang diimpor pelanggan dari PLN;

Perhitungan Ekspor Dan Impor

CATATAN:

1.Dalam hal jumlah energi listrik yang diekspor lebih besar dari jumlah energi listrik yang diimpor pada bulanberjalan, selisih lebih akan diakumulasikan dan diperhitungkan sebagai pengurang tagihan bulan berikutnya.

2.Selisih lebih yang diperhitungkan diakumulasikan paling lama 3 bulan.

Page 7: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 7Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

Tagihan Sebelum Memasang PLTS Atap

Asumsi :1. Konsumsi listrik : 2.600 kWh/bulan2. Produksi PLTS Atap : 2.400 kWh/bulan

- Konsumsi PLTS Atap : 1.800 kWh (75%)

- Ekspor Listrik : 600 kWh (25%)

Tagihan = Kosumsi Listrik x TDL

= 2.600 kWh X Rp. 1.467

= Rp. 3.814.200

Impor Listrik = Konsumsi Listrik – Konsumsi PLTS Atap

= 2.600 kWh – 1.800 kWh

= 800 kWh

(Ekspor Listrik 600 kWh diperhitungkan pd bulan berikutnya)

Tagihan = Impor Listrik x TDL

= 800 kWh X Rp. 1.467

= Rp. 1.173.600

Impor Listrik = Konsumsi Listrik – Konsumsi PLTS Atap= 2.600 kWh – 1.800 kWh= 800 kWh

Tagihan = (Impor Listrik – (o,65 x Ekspor Listrik)) x TDL= (800 kWh – (0,65 x 600 kWh)) X Rp. 1.467= 410 kWh x Rp. 1.467= Rp. 601.470

Tagihan Listrik

Tanpa PLTS Atap

Tagihan Listrik

dengan PLTS Atap

Bulan I

Tagihan Listrik

dengan PLTS Atap

Bulan II

Ketentuan Lain-lainPenghematan Pelanggan PLTS Atap

Page 8: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 8Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

Ketentuan Lain-lainPotensi Pengguna sistem PLTS Atap

-

100,000

200,000

300,000

400,000

500,000

600,000

SOSIAL RUMAHTANGGA

BISNIS INDUSTRI PEMERINTAH

Pelanggan PLTS 5,149 524,989 73,767 4,203 6,224

Golongan Tarif TR/TM/TTJumlah

Pelanggan

Asumsi

Pelanggan PLTS

S.1 / 220 VA TR 1.954 0,00%

S.2 / 450 VA TR 478.140 0,00%

S.2 / 900 VA TR 516.991 0,00%

S.2 / 1.300 VA TR 220.197 1,00%

S.2 / 2.200 VA TR 112.576 1,00%

S.2 / 3.500 s/d 200 kVA TR 173.223 1,00%

S.3 > 200 kVA TM 1.782 5,00%

SOSIAL 1.504.863

R.1 / 450 VA TR 23.243.870 0,05%

R.1 / 900 VA TR 6.046.170 0,05%

R.1 M / 900 VA (non Subsidi)TR 20.136.019 0,05%

R.1 / 1.300 VA TR 10.395.078 1,00%

R.1 / 2.200 VA TR 2.701.811 10,00%

R.2 / > 3.500 s/d 5.500 VA TR 1.039.440 10,00%

R.3 / 6.600 VA ke atas TR 221.997 10,00%

RUMAH TANGGA 63.784.385

B.1 / 450 VA TR 443.797 0,00%

B.1 / 900 VA TR 800.970 0,00%

B.1 / 1.300 VA TR 692.161 1,00%

B.1 / 2.200 s/d 5.500 VA TR 1.035.932 1,00%

B.2 / 6.600 s/d 200 kVA TR 557.305 10,00%

B.3 / > 200 kVA TM 7.556 10,00%

BISNIS 3.537.721

I.1 / 450 VA TR 327 0,00%

I.1 / 900 VA TR 2.244 0,00%

I.1 / 1.300 VA TR 3.432 1,00%

I.1 / 2.200 VA TR 5.992 1,00%

I.1 / 3.500 s/d 14 kVA TR 17.299 5,00%

I.2 / > 14 kVA s/d 200 kVA TR 38.064 5,00%

I.3 / > 200 kVA TM 13.308 10,00%

I.4 / 30.000 kVA ke atas TT 96 10,00%

INDUSTRI 80.762

P.1 / 450 VA TR 15.144 1,00%

P.1 / 900 VA TR 39.094 1,00%

P.1 / 1.300 VA TR 38.969 1,00%

P.1 / 2.200 s/d 5.500 VA TR 46.873 1,00%

P.1 / 6.600 s/d 200 kVA TR 46.622 10,00%

P.2 / > 200 kVA TM 1.612 10,00%

P.3 (PJU?) TR 231.775 0,00%

PEMERINTAH 188.314

Asumsi:

Page 9: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 9Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

Proses Permohonan PLTS Atap

Penyediaan dan pemasangan meter kWh ekspor-impor

Evaluasi dan verifikasi

Persetujuan

Selesai

TIDAK

*15 HARI KERJA

*15 HARI KERJA

BADAN USAHA

LEMBAGA INSPEKSI TEKNIS

Permohonan dari Pelanggan

Pembangunan dan pemasangan PLTS

Atap

Sertifikat Laik Operasi (SLO)

YA*2 HARI KERJA(pemberitahuan kekurangan)

*15 HARI KERJA(melengkapi kekurangan)

Page 10: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 10Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

Ketentuan Lain-lain

❑ Konsumen industri dapat melakukan pemasangan dan pembangunan PLTS Atap,dengan ketentuan sebagai berikut :

- PLTS Atap ongrid dikenai biaya kapasitas (capacity charge) dan biaya pembelianenergi listrik darurat (emergency energy charge).

- PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biayapembelian energi listrik darurat (emergency energy charge)

❑ PLTS Atap untuk kepentingan sendiri oleh Non Konsumen PT PLN (Persero),mengikuti ketentuan peraturan perundang-undangan.

Ketentuan Lain-Lain

Page 11: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 11Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

1. TKDN: Mengikuti ketentuan peraturan perundang-undangan di bidang penggunaan barang/jasadalam negeri.

2. IZIN OPERASI (IO): Kapasitas lebih dari 200 kVA wajib memiliki IO.

3. KONSUMEN PRABAYAR: PLN Wajib mengubah menjadi pasca bayar.

4. PEMASANGAN: Dilakukan oleh Badan Usaha yang memiliki Sertifikat BU dan Izin Usaha JasaPenunjang Tenaga Listrik.

5. PEMERIKSAAN DAN PENGUJIAN: Dilakukan oleh Lembaga Inspeksi Teknis (LIT) untukmendapatkan SLO.

6. AKSES INFORMASI BADAN USAHA (BU) DAN LEMBAGA INSPEKSI TEKNIS (LIT): Disediakan dalamlaman PLN, DJK dan DJE, termasuk didalamnya informasi mengenai perkiraan biaya.

7. KETENTUAN PERALIHAN: Perhitungan ekspor-impor untuk pelanggan eksisting berlaku hingga 31Desember 2018.

8. KETENTUAN PENUTUP: Diberlakukan secara efektif tmt tanggal 01 Januari 2019.

Ketentuan Lain-lainKetentuan Lainnya

Page 12: PERATURAN MENTERI ESDM NOMOR 49 TAHUN 2018 · - PLTS Atap offgrid tidak dikenai biaya kapasitas (capacity charge) dan biaya pembelian energi listrik darurat (emergency energycharge)

@djebtke 12Ditjen EBTKE @djebtkewww.ebtke.esdm.go.id

TERIMA KASIHKEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL

Jl. Medan Merdeka Selatan No. 18, Jakarta

DIREKTORAT JENDERAL ENERGI BARU, TERBARUKAN DAN KONSERVASI ENERGI

Jl. Pegangsaan Timur No.1 Menteng, Jakarta