PENTAP AL ENGINEERING –CONSTRUCTION –MANAGEMENT Company Profile 2017
37

PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

May 02, 2018

Download

Documents

nguyenliem
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PENTAPALENGINEERING – CONSTRUCTION – MANAGEMENT

Company Profile2017

Page 2: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

INDEX

PentaPal Construction

General information of PentaPal

Background of PPC/Partners

Core Business Units 

Organizations and Partners

Capabilities and workforce 

Page 3: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

WHO WE ARE?

Brief introduction of PentaPal:

PentaPal is established to serve industry to deliver timely andoptimized Engineering, Construction and Management solutionstogether with experienced Partners and Co‐signees. ThesePartnerships are established based on the collaboration of differenthighly qualified Companies to focus on each project consideringspecific Project requirements and Customer needs. PentaPal ismanaged and supported by a team of highly experiencedprofessionals having diverse and extensive experience in PowerGeneration and O&M, Oil&Gas and Industrial ConstructionBusinesses. Our dedicated and committed team is always ready tosupport the Power and Oil&Gas businesses in the region, meetingwith our customers’ Engineering, Construction, Commissioning,Operation and Maintenance demands and needs.

Page 4: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

GENERAL OVERVİEW

Brief Introduction of Partners:

All our partners each have individually more than 20 years of technical andadministrative experiences in Engineering and Construction Businesses. Theyhave served successfully on numerous world class Power Generation Projects,Pipeline and Offshore projects as well as big size commercial and industrialcomplex projects as design/field engineer, engineering manager, fieldmanager, commissioning manager and project manager and director levels.

Details of working models of co‐signees:

PentaPal is a multi‐disciplinary company and serving its customer with a fullrange of Engineering, Procurement, Construction and Commissioning as wellas O&M services for Power Generation, Oil&Gas and Industrial Plantsprojects. PentaPal joints several companies in various fields; each of them hastheir own unique proven expertise in related fields.

Page 5: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

CUTTING EDGE SOLUTIONS

Core Values

• Safety• Quality • On Time Delivery• Added Value • Time and Cost 

Efficiency• Integrity & 

Transparency• Flexibility, Creativity & 

Innovation

Vision : PentaPal's vision is to become a globalplayer in Engineering, Supply, Consulting andProject Management with a special focus onEnergy and Oil&Gas Industries.

Mission Statement: Our mission is to expressour creativity, find unique solutions for ourClients, to be the premier provider of our lineof business, offering a comprehensive line ofmarketing techniques carried out in a highlyethical and professional manner. PP has madesafety, health, security and environmentalconsiderations a priority in its planning,processes and selection of new projects. PPpledges always to use best managementjudgment and decisions in conducting itsaffairs. ‐

Page 6: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

CORE BUSİNESS

Project Management

Site support services

Electro‐Mechanical Installation

‐Fabrication

Test and Commissioning

Plant Operation 

and  Maintanace

HVAC and Fire Systems

Engineering, Construction, Management

Page 7: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

BUSINESS UNITS / SOLUTIONS AND SERVICES

Project /Site Management Services

Power Generation Services

Electro Mechanical Installation and Fabrication

Plant Maintenance Services

Data, networking and communication services

HVAC Services

Site support services

Page 8: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECT/SITE MANAGEMENT EXPERIENCE

• Project Planning and Execution• Budget and Schedule preparation• Cost and Financial studies• Contract and Subcontract Execution• Resource Assessment and Allocation• Procurement of Equipments, Packages, Services and Consumables

• Evaluation of Team Performance and Implementation of KPI Measures

• Value Engineering for Cost Minimization and Resource Optimization

Page 9: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

POWER GENERATION AND INDUSTRIAL SERVICESCORE COMPATANCE

Engineering Services

• EPC tender preperation• EPC‐M for Power Projects• Consulting• Planning and Project 

Development• Project Support Services• Site Specific Basic Design and

Engineering• Conceptual Design• Feasibility Study• FEED• Owner’s Engineering Service

Construction Services

• Scheduling• QA/QC – HSE management• Mechanical Installation• Component and System level 

testing and commissioning• Electrical and I&C installation• Completion Services• Precommissioning Services• Cold and Hot commissioning• Performance testing

Page 10: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

INSTALLATION

• Aeoro Derivative CGTGs • E and F Class CGTGs• Gas and Diesel Engines• Small to Mid Range STGs• Vertical  ‐ Horizontal HRSGs• Direct Fired Boilers• Mechanical Package Plants• Small to Mid Size Rotating 

Equipment• Process and Plant Piping• Insulation, Tracing etc..

Electrical and I&CMechanical• HV Switchyards AIS and GIS• 31‐66/110‐154/220‐380 kV 

OHL (up to 100 km)• HV Cable • GSU – Auto – Auxiliary 

Transformers• MV / LV Switchgears• Plant Cabling • BOP Electrical Systems• Plant Instrumentation• DCS / SCADA /FO /XBus• CCTV, PA, PBX Systems

Page 11: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PRE‐COMMISSIONING/COMMISSIONING

• Turnkey Commissioning Services– Detail Design and Review– Loop Checks Hot/Cold– Energization– Start‐Up– Performance Testing– Operation Support

• Sigma Commissioning™– Froth Flushing ™– SigmaClean ™– SigmaBlow ™– SigmaSolv™

Partnered with

Page 12: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

AUTOMATION/CONTROL TELECOMMUNICATION & NETWORK

• PON/FFTx MFS and Backbone Fibre Optic Cable

• CCTV/VCS ‐ Intruder Detection Systems

• Fire Detection/ Alarm Systems• Access Control/Turnstile Systems, • Satellite Systems• Queue Management System• Call Systems for Hospital• IP Telephony Solutions• Public Address (PA), Voice Alarm 

System• Data Center Solutions • GPS and Master Clock Systems

Page 13: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

OIL&GAS

• Pipelines & Installations• Pumping Stations• Oil Treatment Plants• Terminals• Tank Farms• Underground Storage Facilities,• Compressor Stations• Gas R&M Stations• Gas Treatment Plants• Water Treatment Plants• Waste Water Treatment Plants

Partnered with

Page 14: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

FABRICATION

Workshop (access to over)

• 18.000 sqm closed area • 30.000 sqm open area 

Through workshops the following are delivered to customers Structural steel API 650 Storage tanks  Pressure vessels Cryogenic Vessels (LPG/LNG/N2) Evaporators Spool piping fabrication

– Carbon Steel– Stainless Steel– Alloyed Steel

Page 15: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PV SOLAR PLANTS

Cooperation with Major PV Technolgy Leader Manufacturers• CIGS Panels• BIPV Panels

Feasibility and Generation Capacity Studies

Selection of Best Fit Technology Installation and Commissioning of PV 

Plant Remote Generation Performance 

Monitoring

• SOLEL IMATHIA SA

• LOCATION: IMATHIA, NORTHERN GREECE• CAPACITY : 2MW  (43.470 X 46Wp PANELS OF HANERGY HNS 46)

BoE 048/THESS  SA

LOCATION: KARDITSA  , CENTRAL GREECE 

CAPACITY : 500MW  (7.992 X 60Wp PANELS OF HANERGY HNS 60)

Page 16: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

INDUSTRIAL MAINTANANCE SERVICES

Services

• Gas Turbine o In&Out Serviceso Major&Minor Inspections

• Steam Turbine o In&Out Serviceso Part Replacemento Major&Minor Inspections

• Generator• m‐BOP and e‐BOP 

o Predictive Maintenanceo Preventive Maintenanceo Troubleshooting

• Power Substation and Switchyard

Page 17: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

HVAC SYSTEMS

Turnkey Solutions

• Engineering and Consultancy• Heating / Cooling• AC / Ventilation• Medical HVAC, Clean Room • Gas Distribution• Control and Automation 

Systems for HVAC• Co/Tri Generation• District Heating Systems

Page 18: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

FIRE PROTECTION / DETECTION SYSTEMS

Turnkey Solutions

• Engineering and Consultancy• Fire Pump Stations• Sprinkler Systems, NFPA 13• Foam Systems, NFPA 11• Yard Hydrant and Monitors, NFPA 

24/15• Inert Gas Surpression Systems• Chemical Tank Farms Fire Systems• Offshore Berth/Pier Fire Systems• Fire Detection Systems, NFPA 72• Test& Commissioning, NFPA 3 

Page 19: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

SITE SUPPORT SERVICES

Turnkey Camp Solutions• Design & Development

– Site preperation– Camp installation, demobilization– Site clean up and rehabilitation

• Infrastucture and Utilities– Power, Water, Fuel 

• Camp Management• Catering Services• Supply Logisitics• Camp Operation and Camp 

Maintanance

Page 20: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

• Ankara‐Pozantı Highway 34,5 kV OHL, LV&MV Systems and Road Lighting  in Niğde, General Directorates of Highways.

• Havza City Pass LV&MV Systems, General Directorates of Highways• Kayseri Northern Passage Works 34,5 kV OHL, LV + MV Systems, State 

Railway Authority,• City Electricity Distribution Systems in Görele , Çoruh Electric Utility Co.• Installation of 1000 KVA and 650 KVA Transformer Stations, Giresun 

University, 

PROJECTS      (COMPLETED)

Page 21: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

2 x 660 MW USCPP Coal Fired Power Plant• EPC delivery of 3.000 People 

Capacity Project Accommodation Facilities

• Manufacturing and Installation of 660MW Steam Turbine Anchorage Sets

• Manufacturing and Installation of 2 x 660MW Coal Fired USC Boiler Anchorage Sets

• Design and Installation of certain Steel Structures and Sheds >3.000 m2 so far

PROJECTS      (COMPLETED)

Page 22: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECTS      (COMPLETED)

• Test and Commissioning of Fire Pumps and Yard Fire Hydrant System (>3.500 gpm)

• Test and Commissioning of Mid Scale district heating system (3.500kW capacity, over 13.000 meters piping)

Page 23: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

2 x 660 MW USCPP Coal Fired Power Plant• Grouting Works for Boiler and 

Steam Turbine Anchorage Sets• Manpower Supply for 

Mechanical Installation Works (39.000 mhs per month) to be completed end of November

PROJECTS      (COMPLETED)

Page 24: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

450 MW Cogeneration Power Plant• EPC Delivery of 2.1 MW 

Heat Station

PROJECTS      (COMPLETED)

• EPC Delivery of +50 m3 LNG Storage and Distribution Station

Page 25: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

OMV  Samsun 890MW CC Power Plant

PROJECTS      (COMPLETED)

• HRSG Chemical Cleaning

• Steam Turbine Major OverhaulTechnical Consultancy

• Root Cause Analysis for HRSG TubeFailures

• System DCS Logic ans Startup LogicsEnhancement Modifications

• Additional Cold Reheat System add on and modification design

Page 26: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

GTU NanoTech Institute Building• EPC Delivery of Institute Building

PROJECTS      (COMPLETED)

Page 27: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

Trans Anatolion Gas Pipeline (TANAP) Project E90 Section. EPC Turnkey

PROJECTS      (COMPLETED)

• Construction and Installation of• 8.624 meters of Horizontal Drilling on route• 96.000 meters of HDPE Conduit installation• 123 pcs of Field Chambers installation• 26.000 m3 trench excavation and backfilling• 120 meters of Bridge Crossing with suspended steel structure• 72.000 meters of Fibre Optic Cable Installation• FOC Splicing 1.872 cores in total• Line OTDR Shootings

Page 28: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECTS      (COMPLETED)

• Turnkey EPC Delivery of Fibre Optic Cable Route between BV 34 and Main Control Center (MCC)

• Detail Design of the Route including• Expropriation studies• Topographical survey• Cadastral studies

• Procurement and Supply of;• 48.000 meters of HDPE Conduit for FOC 2x40 mm• 48.000 meters of HDPE Conduit for FOC 2x32+1x40 mm• 123 pcs of Field Chambers• 13.000 meters of PN16 Casing for Horizontal Drillings

Trans Anatolion Gas Pipeline (TANAP) Project E90 Section. EPC Turnkey

Page 29: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

SOLEL IMATHIA SA

LOCATION: IMATHIA, NORTHERN GREECECAPACITY : 2MW  (43.470 X 46Wp PANELS OF HANERGY HNS 46)

SOLEL ACHAIA SA

LOCATION: ORCHOMENOS , CENTRAL GREECE 

CAPACITY : 2MW  (36.320 X 55Wp PANELS OF HANERGY HNS 55)

BoE 017/THESS  SA

LOCATION: TRIKALA  , CENTRAL GREECE 

CAPACITY : 500MW  (8.298 X 60Wp PANELS OF HANERGY HNS 60)BoE 048/THESS  SA

LOCATION: KARDITSA  , CENTRAL GREECE 

CAPACITY : 500MW  (7.992 X 60Wp PANELS OF HANERGY HNS 60)

BoE 019/THESS  SA

LOCATION: KARDITSA  , CENTRAL GREECE 

CAPACITY : 500MW  (8.298 X 60Wp PANELS OF HANERGY HNS 60)

PROJECTS SOLAR   (COMPLETED)

Page 30: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

Trans Anatolion Gas Pipeline (TANAP) Project LOT‐3 SectionFrom Yozgat to Eskişehir

PROJECTS      (ONGOING)

• Installation of Telecommunication Infrastructure• 2 x 96 Core SM Fibre Optic Cable 

• 1.016.340 meters in total• 512 FOC Drums

• 1 x 48 Core SM Fibre Optic Cable • 508.170 meters in total• 256 FOC Drums

• Field Splicing and Box Installations• 874 pcs Field Splice Box • 71.080 cores splicing

Page 31: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECTS      (ONGOING)

• Fiber Optic Cable OTDR Tests• Pre Installation OTDR Tests on FOC Drums

• 768 pcs in total• 71.080 cores tested

• Post Installation Line OTDR Tests• 2.225.000 meters of OTDR Shooting• OTDR Trace Analysis and Troubleshooting

• Fibre Optic Cable Terminations• FOC Terminations at ODFs within Block Valve Stations• 18.600 Terminations in total

Trans Anatolion Gas Pipeline (TANAP) Project LOT‐3 SectionFrom Yozgat to Eskişehir

Page 32: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

Trans Anatolion Gas Pipeline (TANAP) Project LOT‐4 SectionFrom Eskişehir to Greece Border

PROJECTS      (ONGOING)

• Installation of Telecommunication Infrastructure• 2 x 96 Core SM Fibre Optic Cable 

• 944.000 meters in total• 236 FOC Drums

• 1 x 48 Core SM Fibre Optic Cable • 472.000 meters in total• 118 FOC Drums

• Field Splicing and Box Installations• 454 pcs Field Splice Box • 26.240 cores splicing

Page 33: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECTS      (ONGOING)

• Fiber Optic Cable OTDR Tests• Pre Installation OTDR Tests on FOC Drums

• 354 pcs in total• 28.320 cores tested

• Post Installation Line OTDR Tests• 1.180.000 meters of OTDR Shooting• OTDR Trace Analysis and Troubleshooting

• Fibre Optic Cable Terminations• FOC Terminations at ODFs within Block Valve Stations• 13.700 Terminations in total

Trans Anatolion Gas Pipeline (TANAP) Project LOT‐4 SectionFrom Eskişehir to Greece Border

Page 34: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECTS      (ONGOING)

• Electrical and I&C Installation Works within BVS• CCTV / PAGA Systems Installation and Commissioning• UPS and DC System Installation and Commissioing• Instrumentation and Terminations• Intruder Detection System Installation and Commissioning

• Mechnanical Installation Works within BVS• Fire Suppression System Installation• HVAC System Installation

• Loop Checks and Pre Commissioning Works

• Commissioning Support

Trans Anatolion Gas Pipeline (TANAP) Project Block ValveStations Installation Works

Page 35: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

PROJECTS      (ONGOING)

• Electrical and I&C Installation Works• CCTV / PAGA Systems Installation and Commissioning• AWOS/DTRS/NDB System Installation and Commissioning• Instrumentation and Terminations• Intruder Detection System Installation and Commissioning

• Loop Checks and Pre Commissioning Works

• Commissioning Support

Trans Anatolion Gas Pipeline (TANAP) Project Eskişehir Compressor Station CS5 and Metering Station MS2

Page 36: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

HQ Workforce Process Engineer Electrical Engineer Mechanical Engineer Civil Engineer HSE Engineer

WORKFORCE (CURRENT)

PP has access to Certified Site Workforce, can expand up to 39.000 mhrs per month within 2 weeks

Site Workforce Project Manager x2 Site Manager x2 Site Lead Engineer x4 Fiber Optic Tech x 12 Splicing Tech x 9 Instrument Tech x12

Cost Control and Planning Engineer Accounting and Admin Manager Finance Manager Accounting and Admin Manager

Welder x2 Mechanical Tech x3 Electrical Tech x17

Page 37: PentaPalPresentation 1702 rev12pentapal.com/Content/Docs/PublicUploads/PentaPalPresentation_1702... · of 660MW Steam Turbine Anchorage Sets • Manufacturing and Installation of

QUESTIONS ??