Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations Control Center Metasys® building management system to measure and manage environmental comfort, energy usage and lighting control Upgrading indoor air quality and providing efficient lighting Monitoring and management of critical systems including fire protection and emergency lighting
12

Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Dec 14, 2015

Download

Documents

Darrius Gamage
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

PentagonWashington, D.C.

UMCS contract for modernization of the Pentagon

Scope includes:

Design, engineering and commissioning of the Building Operations Control Center

Metasys® building management system to measure and manage environmental comfort, energy usage and lighting control

Upgrading indoor air quality and providing efficient lighting

Monitoring and management of critical systems including fire protection and emergency lighting

York® chillers for the refrigeration plant

Page 2: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Oak Ridge National LaboratoryOak Ridge, Tennessee

ESPC project funded by $8.2 million in guaranteed annual savings

Scope includes: Upgrading existing natural gas

steam plant to a wood gasification biomass plant

Upgrading outdated infrastructure in existing plant

Upgrading existing steam distribution system

Advanced metering networked to Metasys® building management system

Reduces fossil fuel consumption by over 80%

Page 3: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Aberdeen Proving GroundAberdeen, Maryland

Three ESPC projects with total projected savings of more than $5 million annually

Scope includes:

Decreased steam waste, effectively increasing plant capacity

Energy efficient lighting retrofits and upgrades for more than 100 buildings

Full automation of steam generation and distribution process

Improved steam and electrical system efficiency and reliability

Common platform for energy delivery, operation and maintenance decisions

Reliable and more efficient steam supply for heating and hot water at soldier barracks

Page 4: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Whiteman Air Force BaseWhiteman AFB, Missouri

Two projects: UMCS contract includes metering and additional contract for HVAC upgrade

Scope included: Installation and integration of electric and

natural gas meters

Steam plant upgrade to enable remote control

Outside air sensing and monitoring of 100 buildings

Complete controls upgrade for 30 buildings

Boiler and chiller upgrades for 13 buildings

Page 5: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Fort BlissFort Bliss, Texas

ESPC project with total projected savings of more than $500K annually

Developed in concert with USACE EEAP report

Scope included:

Installation of solar thermal renewable technology

Energy efficient lighting retrofits and upgrades for more than 50 buildings

Utility Monitoring and Control System (UMCS) LON platform covering 1.52 million square feet

Provided lighting occupancy sensors in 25 buildings

Page 6: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Marine Air Ground Task Force Training CommandTwentynine Palms, California

Three-phase ESPC project with projected savings around $7 million annually

Over past five years, savings have exceeded projections

Scope includes: Building 7.5 megawatt cogeneration

facility

Building 1.2 megawatt photovoltaic dual tracking solar array

Adding three new central chiller plants with 3,600 tons of cooling capacity

Providing renewal power systems and connections to the central water plants

Page 7: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Denver Federal CenterDenver, Colorado

Two-phase ESPC project with guaranteed energy savings of $450,000 per year

Scope included: Lighting retrofits

Upgraded HVAC equipment

Installed new, high-efficiency chillers and pumps

Recommissioned existing solar hot water heating systems

Improved irrigation control system yielding water savings of nearly 11 million gallons per year

Installed system to automate electric and gas meter readings in all major facilities

Page 8: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Fort BraggFort Bragg, North Carolina

Retrofit project including mechanical, controls, mold and mildew mitigation and energy plant

Scope included: Replaced boilers and chillers, air-

handling units and VAV boxes

Installation of new LON DDC controls

Base-wide integration of controls

Removal of contaminated sheetrock, paint and asbestos

Fire alarm and pumps installation

Advanced metering

Page 9: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

U.S. Navy BaseGuam

ESPC contract for energy conservation measures to reduce energy use by over 10%

Scope includes: Large-scale solar photovoltaic

power system

New induction lighting equipment

Base-wide Metasys® building management system

Page 10: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

NASA Ames Research CenterMoffett Federal Airfield, California

ESPC contract with guaranteed energy savings of more than $500,000 annually

Scope included: Lighting retrofits in Center’s older

buildings

Reprogrammed and recommissioned systems

Installed a windmill-driven mechanical pump to drain north basin

Coordinating schedules with site personnel and subcontractors, along with maintaining timetables and providing communications to on-site operations team

Page 11: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Fort HoodFort Hood, Texas

Two-phase Super ESPC contract for energy conservation measures with guaranteed savings of $1.77 million annually

Scope includes: Lighting Lighting Sensors

Utility Monitoring and Control System (UMCS) LON platform covering 2.5 million square feet

VFDs

Service agreement to include on-site controls technicians and HVAC mechanics

Page 12: Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.

Naval Aviation DepotCherry Point, North Carolina

UMCS contract to reduce energy costs and increase employee productivity

Scope includes: Metasys® building management

system to optimize energy consumption and maintain production schedules

Placed meters at 72 major utility substations and connected them to Metasys to enable better information and real-time adjustments