Welcome to Webinar on Accelerated Bridge Construction PennDOT’s Rapid Bridge Replacement Project Utilizing Folded Steel Plate Girder Bridge Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida International University Website: abc-utc.fiu.edu Email: [email protected] April 20, 2017 – 1:00 p.m. to 2:00 p.m. Eastern
27

PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Feb 19, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Welcome to Webinar onAccelerated Bridge Construction

PennDOT’s Rapid Bridge Replacement Project Utilizing Folded Steel Plate

Girder BridgeSponsored by

Accelerated Bridge Construction University Transportation Center(ABC-UTC) at

Florida International University

Website: abc-utc.fiu.eduEmail: [email protected]

April 20, 2017 – 1:00 p.m. to 2:00 p.m. Eastern

Page 2: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Today’s WebinarABC Announcements (10 minutes)Featured Presentation (35 minutes)

PennDOT’s Rapid Bridge Replacement Project Utilizing Folded Steel Plate

Girder BridgeTom Macioce, P.E., Chief Bridge Engineer, Pennsylvania

Department of Transportation; Charles Zugell, P.E., Design Build Coordinator, Walsh/Granite JV; and Curt Beveridge,

Project Manager, Walsh/Granite JV

Question and Answer (15 minutes)

Please post your questions in the question box

Page 3: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Reviews of abstracts are completed

We will be notifying the authors on Monday, April 24

Page 4: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

We are developing a Travel Scholarship fund to support bridge owners to attend the conference

During the 2014 and 2015 Conferences, we were able to support more than 150 bridge owners to attend each of the conferences; we hope to do the same for 2017

Each conference was attended by more than 750 bridge professionals

Page 5: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

State DOT, county engineers, and other bridge owners interested in receiving travel scholarships should send an email to Atorod Azizinamini at [email protected] with the following information:

1. Name and affiliation2. Job title3. Reason attending the Conference4. Whether you are planning to use ABC

in the near future

Page 6: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Travel scholarships will cover the following expenses:

1. Airline ticket2. Three nights of hotel at Hyatt Regency3. Conference Registration4. Per diem for three days, based on the

Florida State rate

There may be some minor changes to the items listed above

Page 7: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

We hope to see many of youat the Conference

Opportunities are available to exhibit

Please visit www.abc-utc.fiu.edufor more information

Page 8: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Congratulations on Retirement April 2017!

Wayne Seger, P.E.Director of the Division of Structures,Tennessee DOT• 37 years with TDOT in the Division of

Structures beginning in Hydraulic Design and then the Bridge Inspection and Repair side of the Division

• Last six years as Division Director• Graduate of

Tennessee Technological UniversityState Bridge Engineer,Tennessee

Page 9: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

ABC-UTC Quarterly Research Seminar

Friday, April 28, 2017 – 1:00-2:00 pm Eastern

Development of Prefabricated Bridge Railings:Phase I Testing and ResultsABC-UTC / Iowa State University

Researcher Team Presenters:• Terry Wipf, Ph.D., Chair & Professor, Department of Civil,

Construction, and Environmental Engineering, ISU• Ashley Ecklund, M.S.E., 2016 Graduate, ISU • Sri Sritharan, Ph.D., Professor, Department of Civil,

Construction and Environmental Engineering, ISU

Register at: http://abc-utc.fiu.edu/

Page 10: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Upcoming EventsEvery Day Counts Webinar Series:Ultra-High Performance Concrete for Prefabricated Bridge Elements Sponsored by Federal Highway Administration (FHWA)

Webinar 3 of 6: Structural Design, Detailing, and Specifying UHPC for Prefabricated Bridge Element Connections (PBEC)

May 9, 2017 – 1:00-2:30 pm EST

To register, go to the following link:http://www.fhwa.dot.gov/innovation/everydaycounts/

Page 11: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Upcoming Events2017 International Bridge Conference – National Harbor, MDJune 4-8, 2017Sponsored by Engineers’ Society of Western PA (ESWP)http://www.eswp.com/bridge/

ABC Sessions:• Tuesday, June 6, 8:00 am – 12:00 pm: ABC, Part 1• Tuesday, June 6, 2:00 – 5:00 pm: ABC, Part 2

ABC Workshops:• Wednesday, June 7, 9:00 am – 12:00 pm: W-06, FRP Composites Impact

to Sustainable Design of Concrete Bridges and ABC• Thursday, June 8, 8:00 am – 12:00 pm: W-12, ABC Systems – Concrete

Filled Steel Tubes for Bridge Applications-Seismic

Early bird registration deadline: May 5, 2017

Page 12: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Upcoming Events2018 Structures Congress – Fort Worth, TXApril 19-21, 2018Sponsored by ASCE/Structural Engineering Institute (SEI)http://www.structurescongress.org/

Call for Abstracts and Session Proposals Deadline: June 5, 2017http://www.structurescongress.org/call-submissions

Page 13: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

ABC-UTC Website Home Page(http://abc-utc.fiu.edu)

Page 14: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTshttp://abc-utc.fiu.edu/resources/state-dot-websites/

Page 15: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTshttp://abc-utc.fiu.edu/resources/state-dot-websites/

Page 16: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTs – MN

Page 17: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTs – MN

Page 18: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTs – MN

Page 19: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTshttp://abc-utc.fiu.edu/resources/state-dot-websites/

Page 20: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTs – WI

Page 21: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTs – WI

Page 22: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTs – WI

Page 23: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Resources: State DOTshttp://abc-utc.fiu.edu/resources/state-dot-websites/

Page 24: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

ABC-UTC Social Media(http://abc-utc.fiu.edu)

Page 25: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

ABC-UTC Social Media(http://abc-utc.fiu.edu)

Page 26: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Next WebinarThursday, May 18, 2017 (1:00 – 2:00 p.m. Eastern)

Featured Presentation

Virginia’s Rehabilitation of I-64 Dunlap Creek Bridges Using High-Performance

Link Slabs and Overlay Materials: ABC Component

by

Adam Matteo, P.E., Ass’t. State Structure & Bridge Engineer for Maintenance, VDOT; Rex Pearce, P.E, Staunton District Bridge Engineer, VDOT; and Celik Ozyildirim, Ph.D., P.E., Principal Research Scientist, Virginia Transportation Research Council

To register, visit: www.abc-utc.fiu.edu

Page 27: PennDOT’s Rapid Bridge Replacement Project Utilizing ...

Today’s WebinarABC Announcements (10 minutes)Featured Presentation (35 minutes)

PennDOT’s Rapid Bridge Replacement Project Utilizing Folded Steel Plate

Girder BridgeTom Macioce, P.E., Chief Bridge Engineer, Pennsylvania

Department of Transportation; Charles Zugell, P.E., Design Build Coordinator, Walsh/Granite JV; and Curt Beveridge,

Project Manager, Walsh/Granite JV

Question and Answer (15 minutes)

Please post your questions in the question box