TUGAS AKHIR – RI 1592 PENERAPAN LEAN PRODUCTION DAN SIMULASI PADA SISTEM PRODUKSI TABUNG GAS LPG 3 KG (STUDI KASUS: PT ENERGI MULTITECH INDONESIA) CINDY AYUNINGTYAS NRP. 2505 100 076 Dosen Pembimbing Prof. Dr. Ir. Budisantoso, M.Eng. Dosen Ko-Pembimbing Dr. Ir. Sri Gunani Partiwi, MT. JURUSAN TEKNIK INDUSTRI Fakultas Teknologi Industri Institut Teknologi Sepuluh Nopember Surabaya 2009
16
Embed
PENERAPAN LEAN PRODUCTION DAN SIMULASI PADA … · SISTEM PRODUKSI TABUNG GAS LPG 3 KG ... berhasil atau tidaknya penerapan lean dalam suatu perusahaan. ... has been done in PT Energi
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
TUGAS AKHIR – RI 1592
PENERAPAN LEAN PRODUCTION DAN SIMULASI PADA SISTEM PRODUKSI TABUNG GAS LPG 3 KG (STUDI KASUS: PT ENERGI MULTITECH INDONESIA) CINDY AYUNINGTYAS NRP. 2505 100 076 Dosen Pembimbing Prof. Dr. Ir. Budisantoso, M.Eng. Dosen Ko-Pembimbing Dr. Ir. Sri Gunani Partiwi, MT. JURUSAN TEKNIK INDUSTRI Fakultas Teknologi Industri Institut Teknologi Sepuluh Nopember Surabaya 2009
FINAL PROJECT – RI 1592
LEAN PRODUCTION APPROACH AND SIMULATION FOR PRODUCTION SYSTEM OF LPG 3 KG (CASE STUDY: PT ENERGI MULTITECH INDONESIA) CINDY AYUNINGTYAS NRP. 2505 100 076
Supervisor Prof. Dr. Ir. Budisantoso, M.Eng. Co-Supervisor Dr. Ir. Sri Gunani Partiwi, MT. DEPARTMENT OF INDUSTRIAL ENGINEERING Faculty of Industrial Technology Sepuluh Nopember Institute of Technology Surabaya 2009
i
PENERAPAN LEAN PRODUCTION DAN SIMULASI
PADA SISTEM PRODUKSI TABUNG GAS LPG 3 KG
STUDI KASUS PT ENERGI MULTITECH INDONESIA
Nama Mahasiswa : CINDY AYUNINGTYAS
NRP : 2505 100 076
Jurusan : Teknik Industri FTI-ITS
Doses Pembimbing : Prof. Dr. Ir. Budisantoso, M.Eng
Doses Ko-Pembimbing : Dr. Ir. Sri Gunani Partiwi, MT
ABSTRAK
Lean production merupakan metode untuk meningkatkan
produktivitas, kualitas, dan responsiveness perusahaan melalui
usaha pengurangan waste, dan continuous improvement. Simulasi
merupakan suatu tools yang digunakan sebagai alat evaluasi atas
berhasil atau tidaknya penerapan lean dalam suatu perusahaan.
Perpaduan antara penerapan lean yang berkelanjutan dengan
simulasi yang selalu dilakukan akan memperkuat keberhasilan
proses continous improvement tersebut. Penelitian tugas akhir ini,
dilakukan di PT Energi Multitech Indonesia (PT EMI).
Perusahaan ini memproduksi tabung gas LPG 3 kg.
Pada penelitian ini akan dibahas tentang implementasi
lean production di lantai produksi dengan identifikasi waste
menggunakan VALSAT, kemudian dilakukan evaluasi terhadap
implementasi tersebut dengan tools berupa simulasi dengan
menggunakan software ARENA.
Dari hasil identifikasi tersebut diketahui bahwa non-value
added time banyak disebabkan oleh defect, waiting, dan
transportation. Beberapa alternatif perbaikan direkomendasikan
untuk mengatasi waste yang terjadi dilantai produksi. Dari hasil
penelitian maka diperoleh penurunan WIP sebesar 3.250 atau
27.8% dan peningkatan output sebesar 2.250 atau sebesar 10.7%.
Kata kunci : lean production, VALSAT, value stream mapping,
simulation.
ii
LEAN PRODUCTION APPROACH AND SIMULATION FOR
PRODUCTION SYSTEM OF LPG 3 KG
CASE STUDY PT ENERGI MULTITECH INDONESIA
Name : CINDY AYUNINGTYAS
NRP : 2505 100 076
Department : Industrial Engineering FTI-ITS
Supervisor : Prof. Dr. Ir Budisantoso, M.Eng
Co-Supervisor : Dr. Ir. Sri Gunani Partiwi, MT
ABSTRACT
Lean production is a method which is used to increase
company’s productivity, quality, and responsiveness through
waste minimization and continuous improvement. Simulation is a
tool which can be used as an evaluator in measuring how
successful the implementation of lean in a company. The
unification between lean implementation and simulation will
strengthen the process of continuous improvement. This research
has been done in PT Energi Multitech Indonesia (PT EMI), a
company, that produce LPG 3 kg in their production system.
This research will discuss about the complementation of
lean production at shop floor with waste identification using
VALSAT, and then evaluation of the implementation will be done
with simulation use ARENA software
From the result of waste identification, it can be inferred
that non value added time happens because of defect,
transportation, and waiting activity between each work process.
Several alternatives are recommended to overcome waste which
happen in shop floor. From this research, we know that the work
in process (WIP) unit decrease about 3.250 unit or about 28.7%
from eksisting WIP and the output increase about 2.250 unit or
about 10.7% for eksisting condition.
Keywords: Lean production, VALSAT, value stream mapping,
simulation.
iii
KATA PENGANTAR
Alhamdulillah, segala puji syukur penulis panjatkan atas
kehadirat Allah Subhanahu Wata’ala atas limpahan berkat,
rahmat, dan hidayah-Nya serta tidak lupa shalawat dan salam
bagi Nabi Muhammad saw atas segala teladan bagi seluruh umat
manusia, sehingga penelitian Tugas Akhir ini dapat berjalan
lancar dalam penyelesaiannya.
Selama pelaksanaan penelitian Tugas Akhir ini, penulis
mendapat bantuan dari berbagai pihak, oleh karena itu penulis
menyampaikan ucapan terima kasih kepada:
1. Kedua orang tua tercinta, Bapak Sukardiansyah dan
Ibu Tira Dian, serta saudara tersayang Mas Rino dan
Mas Nolly, yang tidak pernah putus untuk seluruh
doa, ilmu, nasihat, motivasi, dan dukungannya.
2. Bapak Prof. Dr. Budisantoso, MT, selaku dosen
pembimbing utama atas bimbingan, inspirasi,
pengarahan, dan motivasi yang diberikan selama
pengerjaan Tugas Akhir ini.
3. Ibu Dr. Ir. Sri Gunani Partiwi, MT, selaku dosen ko-
pembimbing. Terima kasih atas waktu dan masukan
yang diberikan selama diskusi bersama demi
terselesainya penelitian Tugas Akhir ini.
4. Ibu Syarifa Hanoum, ST, MT selaku koordinator
Tugas Akhir.
5. Seluruh Bapak dan Ibu Pengajar di Jurusan Teknik
Industri, atas jasa tanpa pamrih dalam memberikan
pelajaran yang sangat berharga.
6. Seluruh Bapak dan Ibu Karyawan Jurusan Teknik
Industri, atas bantuan dan pelayanan yang diberikan.
7. Ibu Ella selaku pembimbing dan seluruh Mas Mbak
di PT EMI atas waktu, pemikiran, dan kerjasama
yang diberikan selama penyelesaian Tugas Akhir ini.
iv
8. Teman-teman tercinta TI ITS 2005, atas segala
kenangan indah selama di Kampus Teknik Industri
ITS.
9. Teman-teman seperjuangan di PT EMI widya dan iva
atas pengalaman berharga yang tidak terlupakan. pitra
dan irna atas segala bantuannya selama penyelesaian
Tugas Akhir ini.
10. Keluarga besar IBC members sebagai sahabat-sahabat
seperjuangan terbaik atas ilmu dan pengalaman
berharga yang tidak terlupakan.
11. Mas Arii, atas bantuan dan doanya selama
penyelesaian Tugas Akhir ini.
12. Semua pihak yang tidak dapat saya sebutkan satu per
satu, atas segala bantuan dan do’a dalam
penyelesaian penelitian Tugas Akhir ini.
Penulis menyadari bahwa terdapat banyak kekurangan dalam
penulisan Tugas Akhir ini. Oleh karena itu, penulis memohon
maaf atas segala kekurangan yang ada. Pada akhirnya, semoga
penelitian Tugas Akhir ini dapat bermanfaat bagi semua pihak
pada umumnya dan bagi rekan-rekan di Teknik Industri ITS pada
khususnya.
Surabaya, Juli 2009
Cindy Ayuningtyas
xiii
DAFTAR ISI
Abstrak .................................................................................... i
Abstract ................................................................................... ii
Kata Pengantar ........................................................................ iii
Daftar Isi .................................................................................. v
Daftar Gambar ......................................................................... ix
Daftar Tabel ............................................................................. xi
BAB I PENDAHULUAN
1.1 Latar Belakang .................................................................. 1
1.2 Perumusan Masalah ........................................................... 3
1.3 Tujuan Penelitian ............................................................... 3
1.4 Ruang Lingkup Penelitian ................................................. 4