RABRENCANA ANGGARAN BIAYAKEGIATAN:PEMBANGUNAN JALAN
LINGKUNGANLOKASI:LORONG PAWANG LEMANKECAMATAN:JOHAN PAHLAWANTAHUN
ANGGARAN:2007HARGAJUMLAHNO.URAIAN
PEKERJAANVOLUMEANALISASATUANHARGA(Rp.)(Rp.)1234567A. PEKERJAAN
PERSIAPAN1Pengukuran Bowplank0.0lsTaksir248,000.00248,000.002Papan
Nama Proyek0.0lsTaksir200,000.00200,000.003Mobilisasi /
Demobilisasi0.0lsTaksir1,250,000.001,250,000.004Administrasi /
Dokumentasi0.0lsTaksir300,000.00300,000.00Jumlah1,998,000.00B. PEK.
JALAN LINGKUNGAN LR. P. LEMAN1Pembersihan / Pembentukan Badan
Jalan1,200.00m2Taksir6,000.007,200,000.002Timbunan
Normalisasi87.92m3Anl. K.51490,566.677,962,621.333Paag
Laag525.00m2Anl. W.2 C28,282.8514,848,497.784Slyt Laag525.00m2Anl.
W.3 b32,924.6817,285,459.535Asmeen Sheet1,050.00m2Anl. L.15
b33,194.1934,853,894.56Jumlah82,150,473.20C. PEK. SALURAN
BETON1Galian Tanah21.00m3Anl. A.121,687.50455,437.502Timbunan Pasir
Bawah Lantai1.25m3Anl.
A.18b65,675.0082,093.753Aanstamping1.25m3Anl.
A.18d176,675.00220,843.754Papan Cetak / Bekisting20.00m2Anl.
F865,660.001,313,200.005Cor Beton 1 : 3 : 58.25m3Anl.
G.43472,250.003,896,062.506Urugan Kembali5.25m3Anl.
A.18b65,675.00344,793.757Pipa
Drain3.75m'Taksir10,000.0037,500.008Plasteran55.00m2SNI.T.03d24,950.001,372,250.00Jumlah7,722,181.25REKAPITULASIA.PEKERJAAN
PERSIAPANRp.1,998,000.00B.PEK. JALAN LINGKUNGAN LR. PAWANG
LEMANRp.82,150,473.20C.PEK. SALURAN BETON UK. 20 x 20 CM SJ 200
MRp.7,722,181.25Jumlah Rp.91,870,654.45OE$100,000,000(8.13)Jumlah
Total Rp.91,870,654.45Pembulatan
Rp.91,870,000.0018.5%$85,000,000$6,870,000Terbilang:Sembilan Puluh
Satu Juta Delapan Ratus Tujuh Puluh Ribu RupiahMeulaboh, 28 Juni
2007Penawar,CV. RAHMADRAHMAD IRMAYUDI, SEDirektur
Anl-1DAFTAR ANALISA HARGA SATUAN UPAHLOKASI:DALAM KABUPATEN ACEH
BARAT(Kec. Johan Pahlawan, Kec. Meureubo, Kec.
Samatiga)BIDANG:CIPTA KARYATAHUN:2007Anl. F.1 1 m3 Leger
kayu15.000Tukang [email protected],500.00Rp.637,500.001.500Kepala
[email protected],000.00Rp.82,[email protected],500.00Rp.137,[email protected],500.00Rp.10,625.001.100m3Kayu
Konstruksi/Sejenis kayu
[email protected],100,000.00Rp.2,310,000.00JumlahRp.3,178,125.00Anl. F.3 1
m3 Sandaran Kayu24.000Tukang
[email protected],500.00Rp.1,020,000.002.400Kepala
[email protected],000.00Rp.132,[email protected],500.00Rp.220,[email protected],500.00Rp.17,000.001.100m3Kayu
Klas II/Sejenis kayu
[email protected],600,000.00Rp.1,760,000.00JumlahRp.3,149,000.00Anl. F.8a
1 m2 Lantai Jembatan 8/20 cm0.500Tukang
[email protected],500.00Rp.21,250.000.050Kepala
[email protected],000.00Rp.2,[email protected],500.00Rp.5,[email protected],[email protected],000.00Rp.6,000.000.750kgPaku
[email protected],000.00Rp.8,250.001.100m3Kayu Klas II/Sejenis kayu
[email protected],600,000.00Rp.1,760,000.00JumlahRp.1,804,175.00Anl. F.8b
1 m2 Lantai Jembatan 4/20 cm0.500Tukang
[email protected],500.00Rp.21,250.000.050Kepala
[email protected],000.00Rp.2,[email protected],500.00Rp.5,[email protected],[email protected],000.00Rp.6,000.000.750kgPaku
[email protected],000.00Rp.8,250.001.100m3Kayu Klas II/Sejenis kayu
[email protected],600,000.00Rp.1,760,000.00JumlahRp.1,804,175.00Anl. H.8 1
m2 Seng Plat Cucur1.000m2Seng BJLS
[email protected],200.00Rp.31,200.004.000bhPaku
[email protected]
[email protected],500.00Rp.8,500.000.020Kepala
[email protected],000.00Rp.1,[email protected],500.00Rp.2,[email protected],500.00Rp.212.50JumlahRp.44,462.50Anl.
L.2 10 m' Memakai
[email protected],000.00Rp.4,000.000.300kgSabut
[email protected],500.00Rp.3,150.000.800Tukang
[email protected],500.00Rp.34,000.000.080Kepala
[email protected],000.00Rp.4,400.00JumlahRp.45,550.00Untuk 1
M'Rp.4,555.00Anl. L.15 a 100 m2 Asmeensheet 3 Cm
Padat4.000m3Kerikil [email protected],000.00Rp.228,000.002.000m3Pasir
[email protected],000.00Rp.114,[email protected],550.00Rp.2,502,500.004.000m3Kayu
[email protected],000.00Rp.1,800,[email protected],500.00Rp.687,500.002.000Tukang
[email protected],500.00Rp.85,[email protected],500.00Rp.42,500.001.000Alat
[email protected],000.00Rp.50,000.00Biaya
Menggilas0.0013xRp.9,945,022.41Rp.12,928.53JumlahRp.5,522,428.53Untuk
1 M2Rp.55,224.29Anl. L.15 b 100 m2 Asmeensheet 2 Cm
Padat1.350m3Kerikil [email protected],000.00Rp.76,950.002.670m3Pasir
[email protected],000.00Rp.152,[email protected],550.00Rp.1,669,850.002.000m3Kayu
[email protected],000.00Rp.900,[email protected],500.00Rp.330,000.002.000Tukang
[email protected],500.00Rp.85,[email protected],500.00Rp.42,500.001.000Alat
[email protected],000.00Rp.50,000.00Biaya
Menggilas0.0013xRp.9,945,022.41Rp.12,928.53JumlahRp.3,319,418.53Untuk
1 M2Rp.33,194.19Anl. W.4 Biaya Menggilas 1
[email protected],000.00Rp.1,125,000.0025.000Pembantu
[email protected],000.00Rp.750,[email protected],500.00Rp.4,125,000.0030.000Sewa
Mesin
[email protected],834.08Rp.3,445,[email protected],000.00Rp.300,000.001.000Bahan
[email protected],000.00Rp.200,000.00JumlahRp.9,945,022.41Anl. Supl.
IX 10 m2 Mengecat Minyak4.260kgCat
[email protected],000.00Rp.110,760.000.225Tukang
cat/[email protected],500.00Rp.9,[email protected],500.00Rp.41,[email protected],500.00Rp.3,187.50JumlahRp.164,760.00untuk
1 m2Rp.16,476.00Anl. Supl. IXb 10 m2 Mengecat Tembok2.500kgCat
[email protected],000.00Rp.42,500.000.225Tukang
cat/[email protected],500.00Rp.9,[email protected],500.00Rp.41,[email protected],500.00Rp.3,187.50JumlahRp.96,500.00untuk
1 m2Rp.9,650.00Anl. G.53a 100 m2 Mengecat Tembok25.0000kgCat
[email protected],000.00Rp.425,000.0022.5000kgPlamir
[email protected],000.00Rp.337,500.0020.0000kgKertas
[email protected],000.00Rp.60,000.001.0000Tukang
[email protected],500.00Rp.42,500.000.1000Kepala
[email protected],000.00Rp.5,[email protected],500.00Rp.165,[email protected],500.00Rp.1,062.50JumlahRp.1,036,562.50untuk
1 m2Rp.10,365.63SNI. T. 03d1 m2 Plesteran 1 Pc : 4 Ps Tebal 15
mm0.130zakSemen [email protected],000.00Rp.4,810.000.020m3Pasir
[email protected],000.00Rp.1,[email protected],500.00Rp.340.000.132Kepala
[email protected],000.00Rp.7,[email protected],500.00Rp.6,[email protected],500.00Rp.4,812.50JumlahRp.24,950.00Anl.
A.18b1 m3 Urugan Pasir1.200m3Pasir
[email protected],500.00Rp.57,[email protected],[email protected],500.00Rp.8,250.00JumlahRp.65,675.00Anl.
W.3 b 100 m2 Slyt lag Tebal 4 Cm
[email protected],500.00Rp.206,[email protected],500.00Rp.15,937.50Biaya
Menggilas0.2670xRp.9,945,022.41Rp.2,655,320.98Bahan5.280m3Kerikil
[email protected],000.00Rp.300,960.002.000m3Pasir
[email protected],000.00Rp.114,000.00JumlahRp.3,292,468.48untuk 1
m2Rp.32,924.68Anl. W.2 c 1 m2 Pag lag Tebal 7 Cm
[email protected],500.00Rp.10,[email protected],500.00Rp.807.50Biaya
Menggilas0.00013xRp.9,945,022.41Rp.1,292.85Bahan0.093m3Batu
[email protected],000.00Rp.13,020.000.050m3Pasir
[email protected],000.00Rp.2,850.00JumlahRp.28,282.85Meulaboh, 28 Juni
2007Penawar,CV. RAHMADRAHMAD IRMAYUDI, SEDirektur
Anl-2DIREKTORAT JENDERAL BINA MARGAANALISA BIAYA PEKERJAANK OD
EDIREKTORAT BINA PROGRAM JALANKONSTRUKSI LAPIS PONDASI BAWAH (LPB)
KLAS CSUB DIT. PERENC. JALAN LOKAL &KABUPATEN(MENGGUNAKAN
ALAT)K514PROPINSIKODEKABUPATEN :KODEDISIAPKAN OLEH :TANGGAL
:NANGGROE ACEH DARUSSALAM(11)ACEH BARAT05CV. RAHMAD28 JUNI
2007URAIAN :ANGGAPAN / ASUMSI :1.Kerikil ditimbun sepanjang jalan
oleh Leveransir.1.Menggunakan alat berat.2.Grader menghampar
kerikil dan ukuran yang2.Material ditimbun di sepanjang jalan oleh
Leveransir.besar dipisah.3.Material kerikil tanpa disaring
dikirimkan Leveransir sampai tempat pekerjaan.3.Pemadatan
menggunakan mesin dan truk air.4.6 % sirtu dengan ukuran lebih
dipisah pada saat penghamparan dengan grader.5.Dihampar setebal 15
cm dipadatkan menjadi 10 cm padat.6.Hasil Kerja 120 m2 per hari
(max 300 meter).TOTALP E K E R J AJUMLAHHARIKODEVOLUMEUPAH
(Rp./HR/B I A Y ASUB
JUMLAHORANG(HR/ORG)(Rp.)(Rp.)ORG)PMandor1.01.0L.0611.042,500.0042,500.00EKOperator
terlatih2.01.0L.0812.045,000.0090,000.00ERSopir1.01.0L.0911.042,500.0042,500.00JABuruh
tak
terlatih6.01.0L.1016.027,500.00165,000.00PEKERJA340,000.00HARGAM A
T E R I A LJUMLAHVOLUMEKODESATUANB I A Y ASUB
JUMLAHSATUAN(Rp.)(Rp.)(Rp.)MAlat
bantu0.2setM.17040,000.008,000.00AKerikil sungai tidak
disering160.0m3K.01157,000.009,120,000.00TERIALMATERIAL9,128,000.00P
E R A L A T A NJUMLAHHARIKODEJAMB I A Y AB I A Y ASUB
JUMLAHALATKERJAKERJA(Rp./Jam)(Rp.)(Rp.)PMotor Grader110
HP1.01.0E.0105.0175,000.00875,000.00ERMesin Gilas6-8
Ton1.01.0E.0805.072,500.00362,500.00ALTruk tangki air115
HP1.01.0E.1825.032,500.00162,500.00ATANPERALATAN1,400,000.00TOTAL
(Rp.)10,868,000.00VOLUME :120.0SATUANm3HARGA SATUAN Rp.90,566.67per
m3QUANTITY
Anl-AlatA N A L I S A B I A Y A P E R A L A T
ANKODEE-084PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :Harga
AlatKode AlatJenis AlatHarga SewaN A D11ACEH BARAT0528 MEI
2007(Rp.)JENIS ALAT:Roller Pneumatic, 8-15 TonTENAGA:95
HP235,000,000.00E-084Roller Pneumatic, 8-15
Ton125,541.61HARGA:Rp.235,000,000.0116,000,000.00E-182Water Tank
Truck, 115 HP121,615.92UMUR KERJA:FAKTOR (CRF):0.18062( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x235,000,000.00x0.18062x0.00067=Rp.25,594.762.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x235,000,000.00/$1,500=Rp.5,170.00Sub
Total=Rp.30,764.76B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x95x4,500.00=Rp.67,545.00Pelumas=0.005x95x25,000.00=Rp.11,875.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x25,594.76=Rp.15,356.85Sub
Total=Rp.94,776.85Total=Rp.125,541.61TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.30,764.76+
Rp.94,776.85=Rp.125,541.61/JamAtau :5x
Rp.25,108.32=Rp.125,541.61/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-182PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Water Tank Truck, 115 HPTENAGA:115
HPHARGA:Rp.116,000,000.0UMUR KERJA:FAKTOR (CRF):0.20483( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x116,000,000.00x0.20483x0.00067=Rp.14,327.452.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x116,000,000.00/$1,500=Rp.2,552.00Sub
Total=Rp.16,879.45B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x115x4,500.00=Rp.81,765.00Pelumas=0.005x115x25,000.00=Rp.14,375.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x14,327.45=Rp.8,596.47Sub
Total=Rp.104,736.47Total=Rp.121,615.92TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.16,879.45+
Rp.104,736.47=Rp.121,615.92/JamAtau :5x
Rp.24,323.18=Rp.121,615.92/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-010PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Motor Grader, 100 HPTENAGA:100
HPHARGA:Rp.626,500,000.0UMUR KERJA:FAKTOR (CRF):0.20483( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x626,500,000.00x0.20483x0.00067=Rp.77,380.572.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x626,500,000.00/$1,500=Rp.13,783.00Sub
Total=Rp.91,163.57B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x100x4,500.00=Rp.71,100.00Pelumas=0.005x100x25,000.00=Rp.12,500.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x77,380.57=Rp.46,428.34Sub
Total=Rp.130,028.34Total=Rp.221,191.92TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.91,163.57+
Rp.130,028.34=Rp.221,191.92/JamAtau :5x
Rp.44,238.38=Rp.221,191.92/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-082PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Roller Vibro Self-p, 6-7 TonTENAGA:51
HPHARGA:Rp.565,000,000.0UMUR KERJA:FAKTOR (CRF):0.33271( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x565,000,000.00x0.33271x0.00067=Rp.113,352.632.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x565,000,000.00/$1,500=Rp.12,430.00Sub
Total=Rp.125,782.63B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x51x4,500.00=Rp.36,261.00Pelumas=0.005x51x25,000.00=Rp.6,375.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x113,352.63=Rp.68,011.58Sub
Total=Rp.110,647.58Total=Rp.236,430.21TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.125,782.63+
Rp.110,647.58=Rp.236,430.21/JamAtau :5x
Rp.47,286.04=Rp.236,430.21/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-080PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Roller 3 Wheeled, 6-8 TonTENAGA:37
HPHARGA:Rp.427,500,000.0UMUR KERJA:FAKTOR (CRF):0.18062( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x427,500,000.00x0.18062x0.00067=Rp.46,560.682.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x427,500,000.00/$1,500=Rp.9,405.00Sub
Total=Rp.55,965.68B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x37x4,500.00=Rp.26,307.00Pelumas=0.005x37x25,000.00=Rp.4,625.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x46,560.68=Rp.27,936.41Sub
Total=Rp.58,868.41Total=Rp.114,834.08TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.55,965.68+
Rp.58,868.41=Rp.114,834.08/JamAtau :5x
Rp.22,966.82=Rp.114,834.08/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-153PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Sprayer Selfprop, 100 LtrTENAGA:25
HPHARGA:Rp.22,500,000.0UMUR KERJA:FAKTOR (CRF):0.20483( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x22,500,000.00x0.20483x0.00067=Rp.2,779.032.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x22,500,000.00/$1,500=Rp.495.00Sub
Total=Rp.3,274.03B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x25x4,500.00=Rp.17,775.00Pelumas=0.005x25x25,000.00=Rp.3,125.00Perbaikan
& Sparepart ( 60 % x Depresiasi )=0.600x2,779.03=Rp.1,667.42Sub
Total=Rp.22,567.42Total=Rp.25,841.45TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.3,274.03+ Rp.22,567.42=Rp.25,841.45/JamAtau
:5x Rp.5,168.29=Rp.25,841.45/JamA N A L I S A B I A Y A P E R A L A
T ANKODEE-221PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A
D11ACEH BARAT0528 MEI 2007JENIS ALAT:Flatbed Truck 3,5 Ton, 115
HPTENAGA:115 HPHARGA:Rp.105,000,000.0UMUR KERJA:FAKTOR
(CRF):0.33271( 1 tahun : 300 Hari Kerja )(Pada 12,5
%)atau:$1,500Jam( dengan 5 Jam/Hari )A.BIAYA PEMILIKAN ( OWNERSHIP
COST ) : Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x105,000,000.00x0.33271x0.00067=Rp.21,065.532.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x105,000,000.00/$1,500=Rp.2,310.00Sub
Total=Rp.23,375.53B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x115x4,500.00=Rp.81,765.00Pelumas=0.005x115x25,000.00=Rp.14,375.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x21,065.53=Rp.12,639.32Sub
Total=Rp.108,779.32Total=Rp.132,154.85TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.23,375.53+
Rp.108,779.32=Rp.132,154.85/JamAtau :5x
Rp.26,430.97=Rp.132,154.85/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-252PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Concrete Mixer 0,25 M3, 10 HPTENAGA:10
HPHARGA:Rp.28,000,000.0UMUR KERJA:FAKTOR (CRF):0.33271( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x28,000,000.00x0.33271x0.00067=Rp.5,617.482.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x28,000,000.00/$1,500=Rp.616.00Sub
Total=Rp.6,233.48B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x10x4,500.00=Rp.7,110.00Pelumas=0.005x10x25,000.00=Rp.1,250.00Perbaikan
& Sparepart ( 60 % x Depresiasi )=0.600x5,617.48=Rp.3,370.49Sub
Total=Rp.11,730.49Total=Rp.17,963.96TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.6,233.48+ Rp.11,730.49=Rp.17,963.96/JamAtau
:5x Rp.3,592.79=Rp.17,963.96/JamA N A L I S A B I A Y A P E R A L A
T ANKODEE-089PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A
D11ACEH BARAT0528 MEI 2007JENIS ALAT:Concrete Vibrator, 4
HPTENAGA:4 HPHARGA:Rp.6,950,000.0UMUR KERJA:FAKTOR (CRF):0.28085( 1
tahun : 300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5
Jam/Hari )A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x6,950,000.00x0.28085x0.00067=Rp.1,177.002.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x6,950,000.00/$1,500=Rp.152.90Sub
Total=Rp.1,329.90B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x4x4,500.00=Rp.2,844.00Pelumas=0.005x4x25,000.00=Rp.500.00Perbaikan
& Sparepart ( 60 % x Depresiasi )=0.600x1,177.00=Rp.706.20Sub
Total=Rp.4,050.20Total=Rp.5,380.10TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.1,329.90+ Rp.4,050.20=Rp.5,380.10/JamAtau
:5x Rp.1,076.02=Rp.5,380.10/JamA N A L I S A B I A Y A P E R A L A
T ANKODEE-341PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A
D11ACEH BARAT0528 MEI 2007JENIS ALAT:Water Pump Dia. 2", 30
m3/hTENAGA:8 HPHARGA:Rp.1,250,000.0UMUR KERJA:FAKTOR (CRF):0.33271(
1 tahun : 300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5
Jam/Hari )A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x1,250,000.00x0.33271x0.00067=Rp.250.782.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x1,250,000.00/$1,500=Rp.27.50Sub
Total=Rp.278.28B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x8x4,500.00=Rp.5,688.00Pelumas=0.005x8x25,000.00=Rp.1,000.00Perbaikan
& Sparepart ( 60 % x Depresiasi )=0.600x250.78=Rp.150.47Sub
Total=Rp.6,838.47Total=Rp.7,116.75TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.278.28+ Rp.6,838.47=Rp.7,116.75/JamAtau :5x
Rp.1,423.35=Rp.7,116.75/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-001PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Bulldozer, 110 HPTENAGA:110
HPHARGA:Rp.475,000,000.0UMUR KERJA:FAKTOR (CRF):0.20483( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x475,000,000.00x0.20483x0.00067=Rp.58,668.432.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x475,000,000.00/$1,500=Rp.10,450.00Sub
Total=Rp.69,118.43B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x8x4,500.00=Rp.5,688.00Pelumas=0.005x8x25,000.00=Rp.1,000.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x58,668.43=Rp.35,201.06Sub
Total=Rp.41,889.06Total=Rp.111,007.49TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.69,118.43+
Rp.41,889.06=Rp.111,007.49/JamAtau :5x
Rp.22,201.50=Rp.111,007.49/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-087PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Roller Vibro ped, 1 TonTENAGA:12
HPHARGA:Rp.3,500,000.0UMUR KERJA:FAKTOR (CRF):0.24688( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x3,500,000.00x0.24688x0.00067=Rp.521.042.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x3,500,000.00/$1,500=Rp.77.00Sub
Total=Rp.598.04B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x8x4,500.00=Rp.5,688.00Pelumas=0.005x8x25,000.00=Rp.1,000.00Perbaikan
& Sparepart ( 60 % x Depresiasi )=0.600x521.04=Rp.312.62Sub
Total=Rp.7,000.62Total=Rp.7,598.66TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.598.04+ Rp.7,000.62=Rp.7,598.66/JamAtau :5x
Rp.1,519.73=Rp.7,598.66/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-088PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Tamper Vibro Plate, 4 HPTENAGA:4
HPHARGA:Rp.185,000,000.0UMUR KERJA:FAKTOR (CRF):0.24688( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x185,000,000.00x0.24688x0.00067=Rp.27,540.702.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x185,000,000.00/$1,500=Rp.4,070.00Sub
Total=Rp.31,610.70B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x8x4,500.00=Rp.5,688.00Pelumas=0.005x8x25,000.00=Rp.1,000.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x27,540.70=Rp.16,524.42Sub
Total=Rp.23,212.42Total=Rp.54,823.12TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.31,610.70+
Rp.23,212.42=Rp.54,823.12/JamAtau :5x
Rp.10,964.62=Rp.54,823.12/JamA N A L I S A B I A Y A P E R A L A T
ANKODEE-251PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A D11ACEH
BARAT0528 MEI 2007JENIS ALAT:Concrete Mixer 0,125 M3, 6 HPTENAGA:6
HPHARGA:Rp.16,500,000.0UMUR KERJA:FAKTOR (CRF):0.33271( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x16,500,000.00x0.33271x0.00067=Rp.3,310.302.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x16,500,000.00/$1,500=Rp.363.00Sub
Total=Rp.3,673.30B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x10x4,500.00=Rp.7,110.00Pelumas=0.005x10x25,000.00=Rp.1,250.00Perbaikan
& Sparepart ( 60 % x Depresiasi )=0.600x3,310.30=Rp.1,986.18Sub
Total=Rp.10,346.18Total=Rp.14,019.48TOTAL BIAYA PEMILIKAN DAN BIAYA
OPERASI ALAT :A + B= Rp.3,673.30+ Rp.10,346.18=Rp.14,019.48/JamAtau
:5x Rp.2,803.90=Rp.14,019.48/JamA N A L I S A B I A Y A P E R A L A
T ANKODEE-020PROVINSIKODEKABUPATENKODEDISIAPKAN TANGGAL :N A
D11ACEH BARAT0528 MEI 2007JENIS ALAT:Excavator 1 m3, 90 HPTENAGA:90
HPHARGA:Rp.825,000,000.0UMUR KERJA:FAKTOR (CRF):0.33271( 1 tahun :
300 Hari Kerja )(Pada 12,5 %)atau:$1,500Jam( dengan 5 Jam/Hari
)A.BIAYA PEMILIKAN ( OWNERSHIP COST ) :
Rp./Jam1.Depresiasi=0.9xHarga AlatxFaktor
(CRF)x1/(Jam/tahun)=0.9x825,000,000.00x0.33271x0.00067=Rp.165,514.912.Lain-lain:(Asuransi
3 %/tahun + PPN 10 %)=0.033xHarga Alat /
(Jam/tahun)=0.033x825,000,000.00/$1,500=Rp.18,150.00Sub
Total=Rp.183,664.91B.BIAYA OPERASI ( OPERATING COST ) :
Rp./JamKebutuhan Bahan Bakar dan Pelumas tiap HP
:Diesel=0.158Liter/HP/JamBensin=0.167Liter/HP/JamPelumas=0.005Liter/HP/Jam=Harga
:Diesel=Rp.4,500.00Liter/HP/JamBensin=Rp.4,750.00Liter/HP/JamPelumas=Rp.25,000.00Liter/HP/JamBahan
Bakar=0.158x10x4,500.00=Rp.7,110.00Pelumas=0.005x10x25,000.00=Rp.1,250.00Perbaikan
& Sparepart ( 60 % x Depresiasi
)=0.600x165,514.91=Rp.99,308.94Sub
Total=Rp.107,668.94Total=Rp.291,333.85TOTAL BIAYA PEMILIKAN DAN
BIAYA OPERASI ALAT :A + B= Rp.183,664.91+
Rp.107,668.94=Rp.291,333.85/JamAtau :5x
Rp.58,266.77=Rp.291,333.85/Jam
BhnHARGA SATUAN BAHANIBU KOTA SUKA MAKMUEPROPINSI:NANGGROE ACEH
DARUSSALAM:KABUPATEN:ACEH BARATWILAYAH:KEC. JOHAN PAHLAWAN, KEC.
MEUREUBOTAHUN :2007DAN KEC. SAMATIGAVOLUMEHARGANO.BAHAN /
MATERIALKODESATUANSATUANKET.(Rp.)(Rp.)1234561Batu Gunung/QuariM.
010M3125,000.002Kerikil dari Galian BukitM. 011M353,500.003Kerikil
SungaiM. 012M366,500.004Batu KaliM. 013M3165,000.005Kerikil Sungai
AyakM. 014M371,500.006Batu Pecah 10 - 15 cmM. 020M3176,000.007Batu
Pecah 7 - 10 cmM. 021M3176,000.008Batu Pecah 5 - 7 cmM.
022M3176,000.009Batu Pecah 3 - 5 cmM. 023M3195,000.0010Batu Pecah 2
- 3 cmM. 024M3195,000.0011Batu Pecah 1 - 2 cmM.
025M3205,000.0012Batu Pecah 0,5 - 1 cmM.
026M3205,000.0013Gorong-gorong Beton dia. 60 cmM.
031M'75,000.0014Gorong-gorong Beton dia. 80 cmM.
033M'95,000.0015Gorong-gorong Beton dia. 100 cmM.
035M'115,000.0016Pasir Urug TimbunanM. 040M349,500.0017Pasir Ayak
untuk BetonM. 041M362,500.0018Sirtu (tak diayak)M.
042M359,500.0019Bahan Timbunan PilihanM. 050M347,500.0020Aspal
BitumenM. 061Kg5,250.0021Aspal BetonM. 062Kg29,500.0022Minyak
FluxM. 063Ltr42,500.0023Minyak TanahM. 065Ltr2,750.0024Kayu BakarM.
070M3425,000.0025Semen Type IM. 08040 Kg38,500.0026Kapur BakarM.
081M3650,000.0027Batu KapurM. 082M3475,000.0028Cat JembatanM.
090Kg22,500.0029Baja TeraliM. 161Kg10,500.0030Kawat BronjongM.
162Kg12,000.0031Baut BajaM. 163Kg12,000.0032Besi GalvanisM.
164Kg22,500.0033Baja KonstruksiM. 165Kg17,000.0034Paku JembatanM.
166Kg12,000.0035Baja Tulangan BetonM. 167Kg9,750.0036Alat-alat
BantuM. 170Set45,500.0037Kayu untuk PerancahM.
180M31,615,000.0038Kayu untuk Konstruksi JembatanM.
181M32,355,000.0039Minyak Diesel/SolarM. 183Kg4,500.0040Bensin
PremiumM. 184Ltr4,750.0041Minyak PelumasM. 185Ltr25,000.0042Seng
BJLS 0.20M. 186M227,500.0043Paku SengM. 187Bh250.0044Sabut PakalM.
188Kg9,500.0045LatekM. 189Kg9,500.0046Paku KayuM.
190Kg12,500.0047Kayu SeumantokM. 191M32,175,000.0048Cat TembokM.
192Kg18,500.0049Rambu Lalu-LintasM. 193Bh450,000.0050Patok KMM.
194Bh265,000.0051Batu Gunung-RoyaltyMR. 10M34,500.0052Kerikil
Sungai-RoyaltyMR. 12M34,500.0053Ganti Rugi Kerikil Sungai
RoyaltyMR. 42M326,950.0054Kayu Bekesting-M31,475,000.0055Pasir
Beton / Kerikil-M358,500.0056Cat Dasar-Kg16,500.0057Cat
Warna-Kg25,500.0058Cat Menie-Kg18,500.0059Kawat
Beton-Kg11,500.0060Bahan Timbunan Tanah GunungM.
039M352,500.0061Agregat Base Klas AM. 016M3285,000.0062Agregat Base
Klas BM. 017M3195,000.00Meulaboh, 28 Juni 2007Penawar,CV.
RAHMADRAHMAD IRMAYUDI, SEDirektur
AltDAFTAR SEWA PERALATAN PER JAMLOKASI:DALAM KABUPATEN ACEH
BARAT:(Kec. Johan Pahlawan, Kec. Meureubo, Kec.
Samatiga)BIDANG:CIPTA KARYATAHUN:2007Sudah termasuk PPNKODE
ALATSEWA/JAM ( RP )NO.JENIS PERALATANKAPASITASKET.1Bulldozer110
HPE.001275,000.00285,000.001.135323,475.00299,250.002Motor
Grader100
HPE.010175,000.00276,000.001.135313,260.00289,800.003Exavator90
HPE.020331,420.00292,000.001.135331,420.00306,600.004Crusher/scr 30
t/h185
HPE.031212,812.50187,500.001.135212,812.50196,875.005Screening
PlantE.04065,716.5057,900.001.13565,716.5060,800.006Loader
Wheeled115
HPE.052107,938.5095,100.001.135107,938.5099,850.007Traktor
Wheeled60 HPE.05346,937.9341,355.001.13546,937.9343,425.008Roller 3
Wheel6-8 TONE.08072,500.0047,790.001.13554,241.6550,175.009Roller
Tandem6-10 TONE.08151,506.3045,380.001.13551,506.3047,560.0010Self
Vibrator Roller6-7
TONE.08287,349.6076,960.001.13587,349.6080,800.0011Roller
Peneumatic8-15
TONE.084117,063.90103,140.001.135117,063.90108,300.0012Roller
Vibrator Ped1
TONE.08718,545.9016,340.001.13518,545.9017,150.0013Stamper Vibrator
Plate4 HPE.0883,700.103,260.001.1353,700.103,425.0014Concrete
Vibrator4 HPE.0892,315.402,040.001.1352,315.402,145.0015Sprayer
Selfrop1000 LE.15311,264.889,925.001.13511,264.8810,425.0016Aspal
Sprayer Towed400
LE.15424,311.7021,420.001.13524,311.7022,500.0017Aspal Mixing
Plant30 T/HE.155579,031.60510,160.001.135579,031.6053,600.0018Aspal
Finisher1.82 ME.15769,405.2561,150.001.13569,405.2564,200.0019Water
Tank Truck115
HPE.18232,500.0051,175.001.13558,083.6353,700.0020Trailer Towed1
TONE.1918,217.407,240.001.1358,217.407,600.0021Dump Truck 3,5
Ton115 HPE.21170,370.0062,000.001.13570,370.0065,100.0022Dump Truck
5 Ton145 HPE.21292,127.9581,170.001.13592,127.9585,225.0023Flat Bed
Truck 3,5 Ton115
HPE.22146,466.9040,940.001.13546,466.9042,975.0024Concrete Mixer
0,125 M36 HPE.2516,912.156,090.001.1356,912.156,400.0025Concrete
Mixer 0,25 M310
HPE.25214,062.6512,390.001.13514,062.6513,000.0026Concrete Mixer
0,5 M320
HPE.25310,941.409,640.001.13510,941.4010,150.0027Compressor Air210
M3/HRE.30123,244.8020,480.001.13523,244.8021,500.0028Water Pump
(0,5 cm)30
M3/HRE.3411,872.751,650.001.1351,872.751,725.0020,450.001.13523,210.7521,475.00Meulaboh,
28 Juni 2007Penawar,CV. RAHMADRAHMAD IRMAYUDI, SEDirektur
UphHARGA SATUAN UPAHIBU KOTA SUKA MAKMUELOKASI:DALAM KABUPATEN
ACEH BARATVOLUME:(Kec. Johan Pahlawan, Kec. Meureubo, Kec.
Samatiga)BIDANG:CIPTA KARYATAHUN:200700VOLUMEHARGANO.U P A
HKODESATUANSATUANKET.(Rp.)(Rp.)1234561Mandor
LapanganL.061org/hari50,000.002MekanikL.071org/hari67,500.003Mekanik
PembantuL.072org/hari50,000.004Kepala
TukangL.073org/hari60,000.005TukangL.079org/hari50,000.006Operator
TerlatihL.081org/hari65,000.007Operator Kurang
TerlatihL.082org/hari50,000.008Pembantu
OperatorL.083org/hari35,000.009Supir
TrukL.091org/hari40,000.0010Supir
PersonilL.092org/hari35,000.0011Pembantu
SupirL.099org/hari30,000.0012Buruh Lapangan Tak
TerlatihL.101org/hari30,000.0013Buruh Lapangan Kurang
TerlatihL.103org/hari32,500.0014Buruh Lapangan
TerlatihL.106org/hari35,000.00Meulaboh, 28 Juni 2007Penawar,CV.
RAHMADRAHMAD IRMAYUDI, SEDirektur
SchedulJADWAL PELAKSANAAN PEKERJAAN (TIME
SCHEDULE)KEGIATAN:PEMBANGUNAN JALAN LINGKUNGAN0:0LOKASI:LORONG
PAWANG LEMANKECAMATAN:JOHAN PAHLAWANTAHUN ANGGARAN:2007JUMLAHJANGKA
WAKTU PELAKSANAANNO.URAIAN PEKERJAANHARGABOBOTBULAN KE-IBULAN
KE-IIBULAN
KE-IIIKET.(Rp.)IIIIIIIVIIIIIIIVIIIIIIIVA.01Pengukuran/Pematokan248,000.000.02Direksikeet/Gudang
Sewa0.00.03Mobilisasi Alat0.00.04Pengupasan/Pembentukan Badan
Jalan0.0Land Clearing0.00.05Galian Parit1,250,000.000.06Timbunan
Tanah Setempat/Meratakan0.00.07Timbunan Tanah Badan
Jalan0.00.08Hamparan Kerikil/Japat0.00.09Box Culvert0.00.010Box
Culvert0.00.0Jumlah0.00.0PPN 10 %0.0Jumlah
Total0.0Dibulatkan0.0RENCANAMinggu0.00.00.00.00.00.00.00.00.00.00.00.0Kumulatif0.00.00.00.00.00.00.00.00.00.00.00.0Meulaboh,
28 Juni 2007Penawar,CV. RAHMADRAHMAD IRMAYUDI, SEDirektur
0 %10 %20 %30 %40 %50 %60 %70 %80 %90 %100 %