  • DOKUMEN PENAWARAN CV. BARITO JAYA KONSTRUKSI

    PROGRAM :

    PENINGKATAN SARANA /PRASARANA APARATUR

    KEGIATAN :

    PEMELIHARAAN RUTIN BERKALA GEDUNG KANTOR

    PEKERJAAN :

    REHAB RUMAH JABATAN BUPATI

    LOKASI :

    KABUPATEN BARITO TIMUR

  • Nomor :018/CV. CBU/Pst.TL/VIII/2014 Tamiang Layang,07 September 2014 Lampiran : 1 (satu) berkas

    Kepada Yth : Pokja Konstruksi 1 ULP Kabupaten Barito Timur di

    TAMIANG LAYANG Perihal : Penawaran Pekerjaan Rehab Rujab Bupati Barito Timur

    Sehubungan dengan Pengumuman Pendaftaran dan Pengambilan Dokumen

    Pengadaan Nomor : 602.1.01/99/POKJA KONSTRUKSI 1/ULP/VIII/2014, tanggal 11 Agutus 2014 dan setelah kami pelajari dengan saksama Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan, dengan ini kami mengajukan penawaran untuk pekerjaan Rehab Rujab Bupati Barito Timur sebesar Rp 1.300.000.000,- (Satu milyar tiga ratus juta rupiah )

    Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum

    dalam Dokumen Pengadaan untuk melaksanakan pekerjaan tersebut diatas. Kami akan melaksanakan pekerjaan tersebut dengan jangka waktu pelaksanaan

    pekerjaan selama 90 (Sembilan puluh) hari kalender. Penawaran ini berlaku selama 45 (Empat puluh Lima) hari kalender sejak tanggal

    surat penawaran ini.

    Sesuai dengan persyaratan Dokumen Pengadaan, bersama Surat Penawaran ini kami lampirkan: a. Surat penawaran yang didalamnya mencantumkan;

    1. tanggal; 2. masa berlaku penawaran; 3. harga penawaran;

    2. Hasil Pemindaian (Scan) Jaminan Penawaran asli 3. Rekapitulasi, Daftar Kuntitas & Harga, analisa dan Harga satuan upah dan Bahan; 4. [Surat perjanjian kemitraan/kerja sama operasi, apabila ada]; 5. Dokumen penawaran teknis, terdiri dari;

    a. Metode Pelaksanaan; b. Jadwal Waktu Pelaksanaan; c. Daftar Personil Inti; d. Jenis, kapasitas, komposisi, dan jumlah peralatan utama minimal yang

    dibutuhkan; e. Spesifikasi Teknis; f. [Bagian pekerjaan yang akan disubkontrakan, apabila ada].

    6. [formulir rekapitulasi perhitungan tingkat komponen dalam negeri (TKDN), apabila memenuhi syarat untuk diberikan preferensi harga], dan

  • 7. Dokumen Kualifikasi 8. Dokumen Lain yang dipersyaratkan seperti: - Formulir Pra RK3K. - Surat Dukungan Peralatan apabila Tidak Milik Sendiri.

    Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua ketentuan yang tercantum dalam Dokumen Pengadaan.

    CV. BARITO JAYA KONSTRUKSI Pusat Tamiang Layang

    YASMUN Direktur

  • lE- uL\LRrL ^sLR{\LEHEAD OFFICE :Menara Global Lt. 2, Jl, Jend, Gatot Subroto Kav, 27, Jakarta 12950 - lndonesiaPhone. : (62-21 ) 5270470 (Hunting) , Fax. : (62-21\ 5270471Homepage : www.penskop.co.id email : [email protected]

    JAi}f I }{AH F E Iu-AIYARAHI{rmsr Jaminan : l{}.1.{il1$.{}#3?.1{-Fll{. H-ilei : Rp. 5,995.600r-i r-.*----- i.-:

    -i;.-".-.*,..-:-. 1-..r1..-.. i!.r*.; - CY. CAIBA ESA& . E'[A$A Bt" taniang tre.yangt. !-'uiEE!i it.l.l ulrii,aLEL:l!1, uii.:rrffii s.iiil[ .5*b*g*! F*rerta, sela:rjuu-rye di..*ur TEEJA,['I${. dsrr Hr. .*SIIE&I{ff B*SA&".&. SEH[SH.*.!F, CehnrgSarnpit JL S. Psrrftan ffa- l$ Eofrweringiu Tirn:r di Srmpit Kclimrntrn Tergah rebagai F*irjnrizi:q=eiriir*rr'r.'a dilSl'Jr- 'd:qai PEI{JAEII$, bwtm-rgpng j a:uxb drrr derrgar teg* tx-ikir pade :

    P03i}A Konstnrlcsi , UI,F I{abnrpaten Earito Bimuri+bsgEl i'}ElaHians tsEl*i*rrga4 relurjrfirS,x disebui FEHffilfuLlL lg],#tf&H stgl ErrE

    =ej:.nirtch F4. 5'995' 6O0t-(f,i,* Juta Senbilan Rattrs Sembilan Puluh Lima fi.i.bu Enem B*,tus Bupiah)';. li-'I*kg ks:?r:, TS:-Tidr"iB{ dsr FEI.I-T.{+II1{ d*'ig'rri rni i:'r'=rgik-*kan diri untuk melsfulk;s} perrrl:q1'ar*r

    -;,*-::1'&t*.sEbut ,iiiis,s ,i*rgur !...,4!k dsrr, bEnxr hilfflsns.T-E$-LqlvIl}{ tidsh nierrrutrlii k*'rsjiF-rrr rrhagrirr-rerrs ,lii-tspLgrrd.ei*riBdsrr,rn'iF#gadaar,gs.502,1 .A lf /wKl+ Ioffi,ryUiGl /sngg*l, 21 JuLi zfi 4urtuk F*isk5$iss."1Fei*lsngmi pehelssn : ULP[Y}-T{BO1 4

    Fembangunan IT,ETU Pangkan

    --__ 3:--1-----_--t__-_ _t-!_ ffi*Gnrf,i ?-4?Fnt* [iydllE, ur5HiHiii{tril cltHll UIH! .r.tJi.E-!(tl1'ljt rilt.lrJl.llrti!.

    l. S'i.u.at ixainarr ini brlak-r apebile TEE.IAB{IH :il. iliEri*-ih krfilbsli Fensrtsi-**'i],s leisns *ilskxrrekar-:rrys p*lelsrgar etau :e$ldstr din3-rtrks: sd:*g*i Ferri*isrig ,rj. urliltl .

    ili haclir r}tlsn: klsdfihali drr/atau rerifikasi h:slifikssi dalai:r p*i p**larrgrr diiskk$i d*:g;nF ascskual i f iks:i ; *rxtii irimrS'xshken.l-srrinen p*Ishtff-iaflr:stelsh ditunjuk

    =*uagei FEilrB:snEr. trriihst Hurpri, Holusi durrHepoti:n'ie {Hitt{'l; stllrd ::rri,:k:ksr: F*:ip::s1'3*m*rq:i*1 stsr u:fx:neri 3,sigl *i:Er!$ik& dsls'rr Sdttt:rsi Fs:s!T',r:-sg4. 5',r-ai.j',:r"rririsrrirriberl*-i..u +fel,:riir-irulsi'LEyrSEl, 1t &gugtus 201 4

    rli-npaiu*r,g*',i,g1'gga1. -Za_-OfctoGrrffi4 (?) Uari Kalend.er)

    :. FE-lffiAMI$ aken rrr*ribai"rF-rpadaffiFlEF-IEtrtr. JAtsIII{AI{ r*juml*niiai Jsr.ririantry'.et:',:t di*t* *Els*r-,arfi.}i.upaiiirg la:rrh* 14 {.*'r':p'S. b*la:,: irri }.rja tsrrpa :i'srat ill.*$Erml}i,:r:rrr?

    =rt*i'si: m*:si:t'ia iurlBrlrl pa:igi}ic-i =eii:r*tslulis deri FEltIEEIl,Irl JA}.,III{AF[ bet'dessr Hryrnr:an PmfE'gt&{A JfrMI$At'T nutrg*la: psig*-iar*:i ir*lili*iu*t TER&I&'IE{ t:d,=-s j ei-rj ir' rrr:pr*iaii.

    S. I,,'1:tiia-rjuk pau* F*:al 1El: HIII{ pe'dsrs deng*n ini dir*g*l'.ri "+"en:b*li Frshirs PE"}[JA},IUC m*i*pa:ii.,:n irsk--!:*-

    '---'- --sril-rtut atpsys trarta hlt:ds TERIAIliIff{ iebi}r dehuiu dixt* ds:: dijual grma 'd*p*t r:r*iurra:iMt!if'r',i !1 Li!lLU^4. II.tr

    turtsngrrSa :ebsgairrrene dirrekzud dxJsrr Ps:si I8i I If-UH p*'dsts"'- +.--r..!--.--.---i-- !---t--l--- f,fnTTi?ftii--,1---i--- ?----:----:--: L-----

    --l-L l:-:--l----

    --l---L-: l---t--L---^ l-!----

    rt;atlu i* itigs Fulul+ lisri kalEnd*r r*srrish hsrrkhim-?a rrrasa bdaku l$ninsrr i:1i.Sikrhisrlcan ili Tamiang IsyarlgTEHJAS,TIi{

    CY. CAffiA ,BT]AH& IICAI{*.

    pda hnggd, 0J agrr,etr:s 2014

    UTAwvT

    SirekturSurety menyatakan bahwa nilai jaminan yang berlaku dalam Seftifikat ini maksimum sebesar Rp.750.000.000,- (tujuh ratus lima puluh juta rupiah)

    ffiNo.73333 5

    ^AETERATTX^,lPEI,

    PE}ilA1{E{

    Eep*la {ah*ng

  • : PENINGKATAN SARANA DAN PRASARANA UMUM

    KEGIATAN : PENINGKATAN / PEMBANGUNAN FASILITAS PEMERINTAH

    : LANJUTAN / PENINGKATAN RUMAH JABATAN BUPATI BARITO TIMUR

    : KABUPATEN BARITO TIMUR

    TAHUN ANGGARAN : 2014

    A. ........................................................ Rp. 670.102.706,65

    B. REHAB BANGUNAN PENUNJANG, GERBANG SAMPING DAN AREA PARKIRAN ........................................................ Rp. 320.562.232,75

    C. PEMBANGUNAN POS 2 (Dua) DAN RUANG TUNGGU TAMU ........................................................ Rp. 191.400.271,14

    Rp. 1.182.065.210,55

    D. ........................................................ 118.206.521,05

    Rp. 1.300.271.731,60

    Rp. 1.300.000.000,00

    REKAPITULASI PENAWARAN BIAYA

    PROGRAM

    PEKERJAAN

    LOKASI

    REKAPITULASI ANGGARAN BIAYA FISIK KESELURUHAN

    NOJUMLAH

    (Rp)

    REHAB BANGUNAN UTAMA

    URAIAN PEKERJAAN

    JUMLAH A - C

    PAJAK PPn

    TOTAL KESELURUHAN

    PEMBULATAN

    TERBILANG : // SATU MILYARD TIGA RATUS JUTA RUPIAH //

    CV. BARITO JAYA KONSTRUKSI

    Pusat Tamiang Layang

    YASMUN

    Direktur

    Tamiang Layang, 07 September 2014

    Penawar,

  • : PENINGKATAN SARANA DAN PRASARANA UMUM

    KEGIATAN : PENINGKATAN / PEMBANGUNAN FASILITAS PEMERINTAH

    PEKERJAAN : LANJUTAN / PENINGKATAN RUMAH JABATAN BUPATI BARITO TIMUR

    : KABUPATEN BARITO TIMUR

    TAHUN ANGGARAN : 2014

    HARGA SATUAN

    (Rp)

    I.

    1 Pembersihan + Pengangkutan Hasil Bongkaran Lumpsum 1,00 Ls 2.500.000,00 2.500.000,00

    2 Pengukuran Lumpsum 1,00 Ls 2.300.000,00 2.300.000,00

    3 Papan Nama Kegiatan Lumpsum 1,00 Bh 250.000,00 250.000,00

    JUMLAH I Rp. 5.050.000,00

    II.

    1 Pek. Pembongkaran Dinding Lumpsum 3,20 M2 25.000,00 80.000,00

    2 Pek. Pas Dinding 012 6,60 M2 109.845,00 724.977,00

    3 Pek. Plesteran Dinding 032 13,20 M2 48.195,00 636.174,00

    4 Pek. Acian 048 13,20 M2 27.725,00 365.970,00

    JUMLAH II Rp. 1.807.121,00

    III.

    1 Pek. Lantai Kerja 013 0,47 M2 939.578,90 441.602,08

    2 Pek. Pondasi Telapak

    a. Bekesting 017 4,48 M2 142.374,50 637.837,76

    b. Pembesian 016 146,66 Kg 13.991,00 2.051.920,06

    015 1,57 M3 1.186.276,41 1.862.453,96

    3 Pek. Kolom 30 x 30 cm

    a. Bekesting 019 12,00 M2 247.190,80 2.966.289,60

    b. Pembesian 016 111,16 Kg 13.991,00 1.555.239,56

    014 0,90 M3 1.104.956,59 994.460,93

    4 Sloof 20 x 40 cm

    a. Bekesting 018 6,40 M2 151.874,50 971.996,80

    b. Pembesian 016 171,54 Kg 13.991,00 2.400.016,14

    014 0,64 M3 1.104.956,59 707.172,22

    5 Balok 20 x 40 cm

    a. Bekesting 020 36,00 M2 236.083,30 8.498.998,80

    b. Pembesian 016 406,74 Kg 13.991,00 5.690.699,34

    014 2,88 M3 1.104.956,59 3.182.274,98

    6 Balok 20 x 25 cm

    a. Bekesting 020 14,00 M2 236.083,30 3.305.166,20

    b. Pembesian 016 188,07 Kg 13.991,00 2.631.287,37

    014 1,00 M3 1.104.956,59 1.104.956,59

    7 Pek. Knonpy Dak Belakang

    a. Bekesting 021 10,50 M2 231.590,80 2.431.703,40

    b. Pembesian 016 189,72 Kg 13.991,00 2.654.372,52

    014 0,84 M3 1.104.956,59 928.163,54

    8 Pek. Atap Dak Belakang

    a. Bekesting 021 40,00 M2 231.590,80 9.263.632,00

    b. Pembesian 016 722,73 Kg 13.991,00 10.111.715,43

    014 4,80 M3 1.104.956,59 5.303.791,63

    JUMLAH III Rp. 69.695.750,91

    IV. PEKERJAAN LANTAI DAN PENUTUP DINDING

    1 Pek. Pembongkaran Lantai Keramik + Pembersihan Lumpsum 282,78 M2 10.000,00 2.827.800,00

    2 Pek. Pembongkaran Dinding Keramik WC/KM + Pembersihan Lumpsum 76,51 M2 25.000,00 1.912.750,00

    3 050 1.932,87 M2 9.987,50 19.304.539,13

    4 Pek. Mencuci Bidang Permukaan Tembok yang Pernah di Cat 051 1.932,87 M2 11.687,50 22.590.418,13

    5 Pek. Pasang Keramik Lantai Uk. 60x60 cm (Polished) 024 212,28 M2 515.419,00 109.413.145,32

    6 Pekerjaan Pasang Keramik Lantai Uk. 60x60 cm untuk WC/KM (UnPolished) 024 70,50 M2 515.419,00 36.337.039,50

    7 029 76,51 M2 268.893,50 20.573.041,69

    8 Pek. Pasang Dinding Wallpaper 030 495,11 M2 184.570,50 91.382.700,26

    9 Pek. Pengecatan Dinding 037 1.437,76 M2 42.611,70 61.265.397,79

    10 Pek. List keramik Uk. 10x60 cm 025 339,87 M' 45.713,34 15.536.592,53

    JUMLAH IV Rp. 381.143.424,33

    PROGRAM

    JUMLAH

    (Rp)

    Pek. Dinding Keramik WC/KM Uk. 30x60 cm (Polished)

    c. Beton

    c. Beton

    c. Beton

    c. Beton

    c. Beton

    Pek. Mengikis / Mengerok Permukaan Cat Tembok Lama

    NO URAIAN PEKERJAAN ANALISA VOLUME

    Halaman 1

    c. Beton

    PEKERJAAN PENDAHULUAN

    PEKERJAAN DINDING

    PEKERJAAN BETON

    c. Beton

    LOKASI

    REHAB BANGUNAN UTAMA

    PERINCIAN PENAWARAN BIAYA

  • HARGA SATUAN

    (Rp)

    V. PEKERJAAN PLAFOND DAN RANGKA

    1 Pek. Pembongkaran Rangka dan Penutup Plafond + Pembersihan Lumpsum 422,60 M2 17.000,00 7.184.200,00

    2 Pek. Rangka Plafond Hollow 031 422,60 M2 172.110,00 72.733.686,00

    3 006 422,60 M2 39.990,85 16.900.134,06

    4 Pek. List Plafond Gypsum 007 652,30 M' 22.331,25 14.566.674,38

    5 Pek. Pengecatan Plafond 037 422,60 M2 42.611,70 18.007.704,42

    JUMLAH V Rp. 129.392.398,85

    VI. PEKERJAAN KAYU

    1 Pek. Listplank Kayu Kls I 010 125,00 M' 120.352,15 15.044.018,75

    2 Pek. Kosen Kayu Kelas I (Ulin) Serut Rapi + Pasang Lumpsum 35,90 M' 95.000,00 3.410.500,00

    3 Lumpsum 4,00 Bh 650.000,00 2.600.000,00

    4 Pasang Kaca Bening 5 mm Lumpsum 2,43 M2 106.200,00 258.066,00

    JUMLAH VI Rp. 21.312.584,75

    VII. PEKERJAAN INSTALASI LISTRIK

    1 Pek. Instalasi Titik Nyala Lampu Lumpsum 178,00 Ttk 80.000,00 14.240.000,00

    2 Pemasangan Lampu TL Tunggal 18 watt Lumpsum 37,00 Bh 95.000,00 3.515.000,00

    3 Lumpsum 60,00 Bh 100.000,00 6.000.000,00

    4 Lumpsum 14,00 Bh 30.000,00 420.000,00

    5 Pasang Lampu Dawnlight+asesoris Lumpsum 67,00 Bh 100.000,00 6.700.000,00

    6 Pek. Stopkontak Lengkap Instalasinya Lumpsum 29,00 Ttk 155.000,00 4.495.000,00

    7 Lumpsum 19,00 Ttk 155.000,00 2.945.000,00

    8 Lumpsum 11,00 Ttk 155.000,00 1.705.000,00

    9 Pek. Jaringan AC+Asesoris Lumpsum 15,00 Ttk 375.000,00 5.625.000,00

    JUMLAH VII Rp. 45.645.000,00

    VIII. PEKERJAAN KUNCI DAN PENGGANTUNG

    1 Pasangan Kunci Pintu 039 5,00 Bh 214.025,00 1.070.125,00

    2 Pasangan Engsel Pintu 040 12,00 Bh 36.501,00 438.012,00

    3 043 2,00 Bh 26.930,00 53.860,00

    4 Lumpsum 2,00 Set 500.000,00 1.000.000,00

    JUMLAH VIII 2.561.997,00

    IX PEKERJAAN LAIN-LAIN

    1 Pembuatan Perancah dari Kayu Bulat Lumpsum 1,00 Set 6.000.000,00 6.000.000,00

    2 Pemasangan Kaca Bening Tebal 5 mm Pintu Utama Lumpsum 3,94 M2 106.200,00 418.428,00

    3 Lumpsum 2,00 Bh 1.250.000,00 2.500.000,00

    4 034 5,32 M2 115.247,10 613.114,57

    5 Lumpsum 1,00 Unit 3.962.887,24 3.962.887,24

    JUMLAH IX 13.494.429,81

    A.

    I. ........................................................ Rp. 5.050.000,00

    II PEKERJAAN DINDING ........................................................ Rp. 1.807.121,00

    III PEKERJAAN BETON ........................................................ Rp. 69.695.750,91

    IV PEKERJAAN LANTAI DAN PENUTUP DINDING ........................................................ Rp. 381.143.424,33

    V PEKERJAAN PLAFOND DAN RANGKA ........................................................ Rp. 129.392.398,85

    VI PEKERJAAN KAYU ........................................................ Rp. 21.312.584,75

    VII PEKERJAAN INSTALASI LISTRIK ........................................................ Rp. 45.645.000,00

    VIII PEKERJAAN KUNCI DAN PENGGANTUNG ........................................................ Rp. 2.561.997,00

    IX PEKERJAAN LAIN-LAIN ........................................................ Rp. 13.494.429,81

    670.102.706,65

    Penawar,

    CV. BARITO JAYA KONSTRUKSI

    Pusat Tamiang Layang

    YASMUN

    Direktur

    REHAB BANGUNAN UTAMA

    NO URAIAN PEKERJAAN ANALISA VOLUMEJUMLAH

    (Rp)

    Halaman 1

    Pintu Besi Belakang

    Pek. Genteng Metal

    Pek. Perbaikan Jaringan Instalasi Air Bersih dan Air Kotor

    Tamiang Layang, 07 September 2014

    REHAB BANGUNAN UTAMA

    PEKERJAAN PENDAHULUAN

    REHAB BANGUNAN UTAMA

    Halaman 2

    JUMLAH

    (Rp)URAIAN PEKERJAANNO

    Pek. Plafond Bahan Gypsum

    Pek. Pintu Kayu Kelas II + Politur (Terpasang)

    Pemasangan Lampu TL Ganda 18 watt

    Pek. Saklar Ganda Lengkap Instalasinya

    Pemasangan Lampu TL Bulat 8 watt

    REKAPITULASI

    Pek. Saklar Tunggal Lengkap Instalasinya

    Pasangan Grendel Pintu WC/KM

    Pasangan Hendle Pintu Depan Stainles

  • : PENINGKATAN SARANA DAN PRASARANA UMUM

    KEGIATAN : PENINGKATAN / PEMBANGUNAN FASILITAS PEMERINTAH

    : LANJUTAN / PENINGKATAN RUMAH JABATAN BUPATI BARITO TIMUR

    : KABUPATEN BARITO TIMUR

    TAHUN ANGGARAN : 2014

    HARGA SATUAN

    (Rp)

    I.

    1 Pek. Mengikis / Mengerok Permukaan Cat Tembok Lama 050 304,00 M2 9.987,50 3.036.200,00

    2 Pek. Mencuci Bidang Permukaan Tembok yang Pernah di Cat 051 304,00 M2 11.687,50 3.553.000,00

    3 Pek. Pengecatan Dinding 037 304,00 M2 42.611,70 12.953.956,80

    JUMLAH I Rp. 19.543.156,80

    II.

    1 Pek. Mengikis / Mengerok Permukaan Cat Tembok Lama 050 1.170,00 M2 9.987,50 11.685.375,00

    2 Pek. Mencuci Bidang Permukaan Tembok yang Pernah di Cat 051 1.170,00 M2 11.687,50 13.674.375,00

    3 Pek. Pengecatan Dinding 037 1.170,00 M2 42.611,70 49.855.689,00

    JUMLAH II Rp. 75.215.439,00

    III.

    1 Pek. Pembongkaran Dinding Pagar Lumpsum 5,00 M2 50.000,00 250.000,00

    2 Pek. Galian Pondasi 001 5,20 M3 51.125,00 265.850,00

    3 Pek. Pondasi Batu Belah 004 1,70 M3 921.475,00 1.566.507,50

    4 Pek. Anstamping 005 5,20 M3 496.563,00 2.582.127,60

    5 Pek. Sloof Uk. 15x20 cm

    a. Bekesting 018 1,40 M2 151.874,50 212.624,30

    b. Pembesian 016 20,12 Kg 13.991,00 281.498,92

    014 0,12 M3 1.104.956,59 132.594,79

    6 Pek. Kolom Uk. 20x20 cm

    a. Bekesting 019 22,08 M2 247.190,80 5.457.972,86

    b. Pembesian 016 169,28 Kg 13.991,00 2.368.396,48

    014 1,28 M3 1.104.956,59 1.414.344,44

    7 Pek. Kolom Uk. 20x30 cm

    a. Bekesting 019 4,40 M2 247.190,80 1.087.639,52

    b. Pembesian 016 46,08 Kg 13.991,00 644.705,28

    014 0,26 M3 1.104.956,59 287.288,71

    8 Pek. Balok Uk. 10 x 60 cm

    a. Bekesting 020 17,76 M2 236.083,30 4.192.839,41

    b. Pembesian 016 125,62 Kg 13.991,00 1.757.549,42

    014 1,33 M3 1.104.956,59 1.469.592,26

    9 Pek. Plat Profil

    a. Bekesting 021 4,80 M2 231.590,80 1.111.635,84

    b. Pembesian 016 55,08 Kg 13.991,00 770.624,28

    014 0,24 M3 1.104.956,59 265.189,58

    10 Pek. Dinding 1/2 bata Camp. Spesi 1 PC : 4 PP 012 14,90 M2 109.845,00 1.636.690,50

    11 Pek. Plesteran 1 PC : 4 032 29,80 M2 48.195,00 1.436.211,00

    12 Pek. Acian Dinding, Balok dan Kolom 048 79,69 M2 27.725,00 2.209.405,25

    13 Pek. Kuda-kuda Kayu Kelas I (Balau) Diserut Rapi 052 0,01 M3 7.079.640,00 70.796,40

    14 053 0,19 M3 7.079.640,00 1.345.131,60

    15 Pek. Rangka Atap Kayu Kls II 054 34,00 M3 44.882,25 1.525.996,50

    16 Pek. Atap Genteng Metal 034 34,00 M2 115.247,10 3.918.401,40

    17 Pek. Bubungan Atap Genteng Metal 035 10,00 M' 66.330,60 663.306,00

    18 010 29,00 M' 120.352,15 3.490.212,35

    19 Pek. Cat Listplank 038 11,60 M2 31.636,40 366.982,24

    20 Pasang Pintu Pagar Dorong Rangka Besi Kombinasi Plat+Aksesoris Lumpsum 15,96 M2 475.000,00 7.581.000,00

    21 Pek. Profil Kolom 20x20 cm Lumpsum 16,00 M' 35.000,00 560.000,00

    22 Tanah Subur Lumpsum 1,00 M3 200.000,00 200.000,00

    23 Tanaman Perdu (Pucuk Merah) t = 1 M Lumpsum 6,00 Btg 75.000,00 450.000,00

    24 Pek. Pasang Pagar BRC Uk. 175x240 cm Lumpsum 135,17 M2 100.000,00 13.517.000,00

    25 Pek. Pondasi Tiang Pagar BRC + Cat (Rapi) Lumpsum 36,00 Ttk 125.000,00 4.500.000,00

    26 Pek. Instalasi Titik Nyala Lampu Lumpsum 4,00 Ttk 170.000,00 680.000,00

    27 Pasangan Lampu TL Tunggal 18 watt Lumpsum 2,00 Bh 125.460,00 250.920,00

    28 Pasangan Lampu TL Bulat 8 watt Lumpsum 2,00 Bh 30.000,00 60.000,00

    29 Asesoris Logo Kabupaten Bahan Mika Lumpsum 4,00 Bh 750.000,00 3.000.000,00

    JUMLAH III Rp. 73.581.034,44

    PROGRAM

    PEKERJAAN

    c. Beton

    c. Beton

    c. Beton

    c. Beton

    c. Beton

    Pek. Gording 5/10 dan Nok 5/7 Kayu Kls I (Balau) di Serut Rapi

    JUMLAH

    (Rp)

    Halaman 1

    PEKERJAAN REHAB BANGUNAN MUSHOLA

    PEKERJAAN REHAB BANGUNAN WISMA TAMU

    PEKERJAAN REHAB PINTU GERBANG SAMPING

    PERINCIAN PENAWARAN BIAYA

    LOKASI

    REHAB BANGUNAN PENUNJANG,GERBANG SAMPING DAN AREA PARKIRAN

    Pek. Listplank Kayu Kls I (Ulin)

    NO URAIAN PEKERJAAN ANALISA VOLUME

  • HARGA SATUAN

    (Rp)

    IV. PEKERJAAN AREA PARKIRAN

    1 Pek. Cor Blok Parkiran Area A

    a. Bekesting 017 19,00 M2 142.374,50 2.705.115,50

    016 1.175,00 Kg 13.991,00 16.439.425,00

    c. Beton 014 39,00 M3 1.104.956,59 43.093.307,01

    2 Pek. Cor Blok Parkiran Area B

    a. Bekesting 017 19,00 M2 142.374,50 2.705.115,50

    016 1.175,00 Kg 13.991,00 16.439.425,00

    c. Beton 014 39,00 M3 1.104.956,59 43.093.307,01

    3 Galian Tanah Untuk Rollag 001 5,32 M3 51.125,00 271.985,00

    4 Pek.Rollag Bata 1 Batu camp. 1 Pc : 4 Psr 011 56,00 M2 226.345,00 12.675.320,00

    5 003 30,00 M3 131.084,00 3.932.520,00

    6

    a. Pas. 1/2 Bata,Camp. Spesi 1 PC : 4 PP 012 40,32 M2 109.845,00 4.428.950,40

    b. Pek. Plesteran 1 Pc : 4 032 26,88 M2 48.195,00 1.295.481,60

    048 26,88 M2 27.725,00 745.248,00

    037 26,88 M2 42.611,70 1.145.402,50

    e. Tanah Subur Lumpsum 11,76 M3 200.000,00 2.352.000,00

    f. Tanaman Perdu (Pucuk Merah) t = 1 M Lumpsum 12,00 Bh 75.000,00 900.000,00

    JUMLAH IV 152.222.602,52

    B. REHAB BANGUNAN PENUNJANG,GERBANG SAMPING DAN AREA PARKIRAN

    I. ........................................................ Rp. 19.543.156,80

    II PEKERJAAN REHAB BANGUNAN WISMA TAMU ........................................................ Rp. 75.215.439,00

    III PEKERJAAN REHAB PINTU GERBANG SAMPING ........................................................ Rp. 73.581.034,44

    IV PEKERJAAN AREA PARKIRAN ........................................................ Rp. 152.222.602,52

    320.562.232,75

    URAIAN PEKERJAAN ANALISA

    CV. BARITO JAYA KONSTRUKSI

    Pusat Tamiang Layang

    YASMUN

    Direktur

    (Rp)

    REHAB BANGUNAN PENUNJANG,GERBANG SAMPING DAN AREA PARKIRAN

    Halaman 2

    REHAB BANGUNAN PENUNJANG,GERBANG SAMPING DAN AREA PARKIRAN

    NO URAIAN PEKERJAANJUMLAH

    NO

    Penawar,

    d. Pek. Pengecatan

    REKAPITULASI

    PEKERJAAN REHAB BANGUNAN MUSHOLA

    Tamiang Layang, 07 September 2014

    Halaman 2

    b. Pembesian

    b. Pembesian

    Pek. Pasir Urug Perataan Cor Blok t = 5 cm

    Pek. Pot Tanaman Area Parkir

    JUMLAH

    (Rp)VOLUME

    c. Pek. Acian Dinding

  • : PENINGKATAN SARANA DAN PRASARANA UMUM

    KEGIATAN : PENINGKATAN / PEMBANGUNAN FASILITAS PEMERINTAH

    : LANJUTAN / PENINGKATAN RUMAH JABATAN BUPATI BARITO TIMUR

    : KABUPATEN BARITO TIMUR

    TAHUN ANGGARAN : 2014

    HARGA SATUAN

    (Rp)

    I.

    1 Pembersihan dan Penataan Lokasi Bangunan lumpsum 1,00 Ls 1.000.000,00 1.000.000,00

    2 Pasang Bouwplank lumpsum 1,00 Ls 1.500.000,00 1.500.000,00

    JUMLAH I Rp. 2.500.000,00

    II.

    1 pek. Galian Pondasi 001 16,07 M3 51.125,00 821.578,75

    2 Pek. Urugan Tanah Bekas Galian 002 16,07 M3 18.416,67 295.955,83

    3 pek. Pasir urug Peninggian Peli Lantai 003 1,82 M3 131.084,00 238.572,88

    4 Pek. Pasir Urug Perataan Cor Blok Halaman 003 2,55 M3 131.084,00 334.264,20

    5 Pek. Urugan Tanah Peninggian Peli Lantai 003 14,54 M3 131.084,00 1.905.961,36

    JUMLAH II Rp. 3.596.333,02

    III. PEKERJAAN PONDASI

    1 Pek. Pondasi Batu Belah Camp. 1 PC : 4 Psr 004 12,56 M3 921.475,00 11.573.726,00

    2 Pek. Anstamping 005 5,27 M3 496.563,00 2.616.887,01

    3 Pek. Rollag Bata 1 Batu camp. 1 Pc : 4 Psr 011 21,28 M2 226.345,00 4.816.621,60

    4 Pek. Plesteran Pinggir Pondasi dan Rollag camp. 1 Pc : 4 Psr 032 13,00 M2 48.195,00 626.535,00

    5 Pek. Acian Pinggir Pondasi dan Rollag 048 13,00 M2 27.725,00 360.425,00

    6 Pek. Cor Beton Tumbuk Lantai Tangga naik 013 0,34 M3 939.578,90 319.456,83

    JUMLAH III Rp. 20.313.651,44

    IV.

    1 Pek. Kolom Uk. 20x20 cm

    a. Bekesting 019 25,60 M3 247.190,80 6.328.084,48

    b. Pembesian 016 169,28 Kg 13.991,00 2.368.396,48

    014 1,28 M3 1.104.956,59 1.414.344,44

    2 Pek. Kolom Praktis Uk. 15x15 cm

    a. Bekesting 019 7,20 M3 247.190,80 1.779.773,76

    b. Pembesian 016 114,43 Kg 13.991,00 1.600.990,13

    014 0,72 M3 1.104.956,59 795.568,74

    3 Pek. Sloof Uk. 15x20 cm

    a. Bekesting 018 14,70 M3 151.874,50 2.232.555,15

    b. Pembesian 016 211,21 Kg 13.991,00 2.955.039,11

    014 1,26 M3 1.104.956,59 1.392.245,30

    4 Pek. Balok Uk. 15x15 cm

    a. Bekesting 020 9,00 M3 236.083,30 2.124.749,70

    b. Pembesian 016 95,36 Kg 13.991,00 1.334.181,76

    014 0,45 M3 1.104.956,59 497.230,47

    5 Pek. Ring Balk & Balok Gewel Uk. 15x15 cm

    a. Bekesting 020 20,25 M3 236.083,30 4.780.686,83

    b. Pembesian 016 321,83 Kg 13.991,00 4.502.723,53

    014 1,52 M3 1.104.956,59 1.679.534,02

    6 Pek. Knopy Dak

    a. Bekesting 021 12,42 M3 231.590,80 2.876.357,74

    b. Pembesian 016 224,41 Kg 13.991,00 3.139.720,31

    014 1,49 M3 1.104.956,59 1.646.385,32

    7 Pek. Dinding 1/2 bata Camp. Spesi 1 PC : 4 PP 012 95,71 M2 109.845,00 10.513.264,95

    8 Pek. Gewel 1/2 bata Camp. Spesi 1 PC : 4 PP 012 11,60 M2 109.845,00 1.274.202,00

    9 Pek. Plesteran 1 Pc : 4 032 203,03 M2 48.195,00 9.785.030,85

    10 Pek. Acian Dinding 048 203,03 M2 27.725,00 5.629.006,75

    JUMLAH IV Rp. 70.650.071,81

    c. Beton

    c. Beton

    c. Beton

    PROGRAM

    PEKERJAAN

    LOKASI

    PEMBANGUNAN POS 2 (Dua) DAN RUANG TUNGGU TAMU

    KOP PERUSAHAAN

    URAIAN PEKERJAAN ANALISA VOLUMEJUMLAH

    PERINCIAN PENAWARAN BIAYA

    Halaman 1

    PEKERJAAN PENDAHULUAN

    PEKERJAAN TANAH

    NO(Rp)

    PEKERJAAN STRUKTUR,BATA,DAN PLESTERAN

    c. Beton

    c. Beton

    c. Beton

  • HARGA SATUAN

    (Rp)

    V. PEKERJAAN LANTAI DAN LAPISAN

    1 Pek. Cor Beton Tumbuk 013 2,91 M3 939.578,90 2.734.174,60

    2 Pek. Lantai Keramik Uk. 40x40 cm 022 31,56 M2 180.527,00 5.697.432,12

    3 Pek. Lantai Keramik Tangga Uk. 40x40 cm 022 5,04 M2 180.527,00 909.856,08

    4 Pek. Lantai Keramik WC Uk. 20x20 cm 023 4,79 M2 182.290,00 873.169,10

    5 Pek. Dinding Keramik WC Uk. 20x20 cm 028 13,08 M2 277.406,80 3.628.480,94

    6 Pek. Plint Keramik Uk. 10x40 cm 026 27,10 M' 40.687,00 1.102.617,70

    7 Pek. Plint Keramik Dinding WC/KM Uk. 10x20 cm 027 9,34 M' 27.437,00 256.261,58

    JUMLAH V Rp. 15.201.992,12

    VI. PEKERJAAN KAYU KOSEN,DAUN PINTU,JENDELA DAN LISTPLANK

    1 Pek. Pintu Kayu Kelas II + Politur (Terpasang) Lumpsum 1,00 Bh 650.000,00 650.000,00

    2 Pek. Pasangan Daun Pintu WC/KM kelas i (Ulin)+Politur Terpasang Lumpsum 2,00 Bh 850.000,00 1.700.000,00

    3 Pek. Daun Jendela Panel Kaca Kayu Kelas II Lumpsum 5,00 Bh 400.000,00 2.000.000,00

    4 Pek. Pasangan Kaca Bening 5 mm Lumpsum 1,26 M2 180.000,00 226.800,00

    5 Pek. Ventilasi Kotak Kayu kelas I (Ulin) Serut Rapi+Pasang Lumpsum 7,00 Bh 125.000,00 875.000,00

    6 Pek. Kosen Pintu Kayu Kelas I (Ulin) Serut Rapi + Pasang Lumpsum 15,72 M' 95.000,00 1.493.400,00

    7 Pek. Kosen Jendela dan Ventilasi WC/KM Kls I (Ulin) Serut Rapi+Pasang Lumpsum 21,63 M' 95.000,00 2.054.850,00

    8 Pek. Listplank Kayu Kelas I (Ulin) 010 7,52 M2 120.352,15 905.048,17

    JUMLAH VI Rp. 9.905.098,17

    VII. PEKERJAAN KUNCI DAN PENGGANTUNG

    1 Pasangan Kunci Pintu 039 3,00 Bh 214.025,00 642.075,00

    2 Pasangan Engsel Pintu 040 9,00 Bh 36.501,00 328.509,00

    3 Pasangan Engsel Jendela 041 10,00 Bh 26.297,50 262.975,00

    4 Pasangan Pegangan Jendela / Hendle Lumpsum 5,00 Bh 15.000,00 75.000,00

    5 Pasangan Kait Angin jendela 042 10,00 Bh 21.371,00 213.710,00

    6 Pasangan Grendel Jendela+Pintu 043 8,00 Bh 26.930,00 215.440,00

    JUMLAH VII Rp. 1.737.709,00

    VIII. PEKERJAAN PLAFOND DAN RANGKA

    1 Pek. Rangka Plafond Besi Hollow 031 31,36 M2 172.110,00 5.397.369,60

    2 Pek. Plafond bahan Gypsum 006 31,36 M2 39.990,85 1.254.113,12

    3 Pek. List Plafond Gypsum 007 44,00 M' 22.331,25 982.575,00

    JUMLAH VIII Rp. 7.634.057,72

    IX. PEKERJAAN CAT / FINISHING

    1 Pek. Pengecatan Dinding,Kolom dan Balok 037 203,03 M2 42.611,70 8.651.453,45

    2 Pek. Pengecatan Plafond 037 43,78 M2 42.611,70 1.865.540,23

    3 Pek. Pengecatan Listplank 038 7,52 M2 31.636,40 237.905,73

    4 Pek. Pengecatan Pinggir Pondasi dan Rollag 037 13,00 M2 42.611,70 553.952,10

    JUMLAH IX Rp. 11.308.851,51

    X. PEKERJAAN INSTALASI LISTRIK

    1 Pek. Instalasi Titik Nyala Lampu Lumpsum 7,00 Ttk 170.000,00 1.190.000,00

    2 Pansangan Lampu TL Tunggal 18 watt Lumpsum 3,00 Ttk 125.460,00 376.380,00

    3 Pansangan Lampu TL Bulat 8 watt Lumpsum 4,00 Ttk 30.000,00 120.000,00

    4 Pek. Stopkontak Lengkap Instalasinya Lumpsum 3,00 Ttk 155.000,00 465.000,00

    5 Pek. Saklar Ganda lengkap instalasinta Lumpsum 2,00 Ttk 155.000,00 310.000,00

    6 Pek. Saklar Tunggal lengkap instalasinta Lumpsum 2,00 Ttk 155.000,00 310.000,00

    JUMLAH X Rp. 2.771.380,00

    XI. PEKERJAAN INSTALASI SANITASI

    1 Pek. Instalasi Air Kotor Pipa PVC 2" Lumpsum 10,00 M' 19.500,00 195.000,00

    2 Pek. Instalasi Air Bersih Pipa PVC 3/4" menuju Tower Lumpsum 100,00 M' 5.971,25 597.125,00

    3 Pek. Instalasi Kotoran (Tinja) Pipa PVC 4" Lumpsum 5,00 M' 56.000,00 280.000,00

    4 Pasangan Kran Air 046 2,00 Bh 25.110,00 50.220,00

    5 Pasangan bak Mandi Oval Fibre 65 cm Lumpsum 2,00 Bh 300.000,00 600.000,00

    6 Pasangan Floor Drain (saringan Limbah) 047 2,00 Bh 39.775,00 79.550,00

    7 Pasangan Kloset Duduk 044 2,00 Bh 1.812.141,85 3.624.283,70

    8 Pek. Pembuatan Septic Tank 6 M3 + Resapan Lumpsum 1,00 Bh 3.000.000,00 3.000.000,00

    JUMLAH XI Rp. 8.426.178,70

    Halaman 1

    PEMBANGUNAN POS 2 (Dua) DAN RUANG TUNGGU TAMU

    NO URAIAN PEKERJAAN ANALISA VOLUMEJUMLAH

    (Rp)

  • HARGA SATUAN

    (Rp)

    XII. PEKERJAAN RANGKA ATAP

    1 Pek. Rangka Atap Baja Ringan Galvalume (t = 0.75 mm ) Lumpsum 86,84 M3 200.000,00 17.368.000,00

    2 Pek. Atap genteng Metal 034 86,84 M2 115.247,10 10.008.058,16

    3 Pek. Bubungan Atap Genteng Metal 035 9,70 M' 66.330,60 643.406,82

    JUMLAH XII Rp. 28.019.464,98

    XIII PEKERJAAN COR BLOK HALAMAN

    1 Pek. Cor Halaman

    a. Bekesting 017 6,36 M2 142.374,50 905.501,82

    b. Pembesian 016 199,75 Kg 13.991,00 2.794.702,25

    014 5,10 M3 1.104.956,59 5.635.278,61

    JUMLAH XIII 9.335.482,68

    B. PEMBANGUNAN POS 2 (Dua) DAN RUANG TUNGGU TAMU

    I. ........................................................ Rp. 2.500.000,00

    II. PEKERJAAN TANAH ........................................................ Rp. 3.596.333,02

    III. PEKERJAAN PONDASI ........................................................ Rp. 20.313.651,44

    IV. PEKERJAAN STRUKTUR,BATA,DAN PLESTERAN ........................................................ Rp. 70.650.071,81

    V. PEKERJAAN LANTAI DAN LAPISAN ........................................................ Rp. 15.201.992,12

    VI. PEKERJAAN KAYU KOSEN,DAUN PINTU,JENDELA DAN LISLPANK ........................................................ Rp. 9.905.098,17

    VII. PEKERJAAN KUNCI DAN PENGGANTUNG ........................................................ Rp. 1.737.709,00

    VIII. PEKERJAAN PLAFOND DAN RANGKA ........................................................ Rp. 7.634.057,72

    IX. ........................................................ Rp. 11.308.851,51

    X. PEKERJAAN INSTALASI LISTRIK ........................................................ Rp. 2.771.380,00

    XII. PEKERJAAN INSTALASI SANITASI ........................................................ Rp. 8.426.178,70

    XII. PEKERJAAN RANGKA ATAP Rp. 28.019.464,98

    XIII. PEKERJAAN COR BLOK HALAMAN ........................................................ Rp. 9.335.482,68

    191.400.271,14

    CV. BARITO JAYA KONSTRUKSI

    Pusat Tamiang Layang

    YASMUN

    Direktur

    PEKERJAAN PENDAHULUAN

    Halaman 2

    REKAPITULASI

    PEKERJAAN CAT/FINISHING

    Tamiang Layang, 07 September 2014

    Penawar,

    Halaman 1

    c. Beton

    PEMBANGUNAN POS 2 (Dua) DAN RUANG TUNGGU TAMU

    NO URAIAN PEKERJAANJUMLAH

    (Rp)

    PEMBANGUNAN POS 2 (Dua) DAN RUANG TUNGGU TAMU

    NO URAIAN PEKERJAAN ANALISA VOLUMEJUMLAH

    (Rp)

  • : PENINGKATAN SARANA DAN PRASARANA UMUM

    KEGIATAN : PENINGKATAN / PEMBANGUNAN FASILITAS PEMERINTAH

    : LANJUTAN / PENINGKATAN RUMAH JABATAN BUPATI BARITO TIMUR

    : KABUPATEN BARITO TIMUR

    TAHUN ANGGARAN : 2014

    A.

    NO Satuan

    Mandor Org / Hari 95.000,00

    Kepala tukang batu Org / Hari 90.000,00

    Kepala tukang besi Org / Hari 90.000,00

    Kepala tukang cat Org / Hari 90.000,00

    Kepala tukang kayu Org / Hari 90.000,00

    Tukang batu Org / Hari 80.000,00

    Tukang besi Org / Hari 70.000,00

    Tukang cat Org / Hari 70.000,00

    Tukang gali Org / Hari 65.000,00

    Tukang kayu Org / Hari 70.000,00

    Tukang las Org / Hari 65.000,00

    Tukang listrik Org / Hari 65.000,00

    Tukang pancang Org / Hari 65.000,00

    Pekerja Org / Hari 65.000,00

    KOP PERUSAHAAN

    DAFTAR HARGA BAHAN DAN UPAH

    PROGRAM

    PEKERJAAN

    LOKASI

    (Rp)

    HARGA SATUAN UPAH

    Uraian - Tenaga

    Harga

  • B.

    NO Satuan

    Air (Water Tank kap. 4000L) Ltr 37,50

    Ampelas Lbr 5.900,00

    Atap Genteng Metal M2 86.855,00

    Atap Genteng Aspal Motif Sirap Lbr 45.000,00

    Bumbungan Atap Genteng Aspal M' 50.000,00

    Bumbungan Atap Genteng Metal M' 32.346,00

    Batu -Bata Merah Bh 780,00

    Batu Kali/Pecah (Hayaping dan Sibung) M3 339.000,00

    Besi Beton Polos Kg 12.000,00

    Batu Pecah/Split 2-3 cm M3 479.000,00

    Batu Pecah/Split 2-3 cm Kg 354,81

    Balok Kayu Kelas I (Balau) M3 8.850.000,00

    Balok Kayu Kelas I (Ulin) M3 5.300.000,00

    Balok Kayu Kelas II M3 1.900.000,00

    Balok Kayu Kelas III M3 1.357.000,00

    Balok Kayu Bekesting M3 1.497.500,00

    Bak Mandi Fibere 70x70 sudut Bh 454.300,00

    Bak Mandi Oval Fibere 65cm Bh 300.000,00

    Cat Kayu Mengkilap Kg 45.560,00

    Cat Dasar / Menie Kg 30.090,00

    Cat Tembok (Dulux/Jotun/Mowilex) Kg 99.220,00

    Cat Dasar (Dulux/Jotun/Mowilex) Kg 85.000,00

    Closet Duduk Set 1.370.965,00

    Closet Jongkok Bh 123.900,00

    Daun Pintu KM/WC Kelas I (Ulin)+Politur Terpasang Bh 850.000,00

    Daun Jendela Panel Kaca Kayu Kelas II Bh 400.000,00

    Engsel Lokal "4" (Pintu) Set 23.600,00

    Engsel Lokal "3" (Jendela) Set 17.700,00

    Floor Drain Bh 29.750,00

    Grendel Lokal Bh 7.000,00

    Gypsum Lbr 72.530,50

    Gypsum Profil M' 10.625,00

    Hak Angin Besar Set 7.700,00

    Hak Angin. Bh 8.470,00

    Handle Jendela Bh 14.700,00

    Papan Kayu K-I (Ulin) M3 8.850.000,00

    Papan Kayu K-I (Balau) M3 5.300.000,00

    Papan Kayu K-II M3 1.900.000,00

    Papan Kayu K-III M3 1.357.000,00

    Papan Bekesting M3 1.497.500,00

    Pintu Kayu Kelas II+Politur (Terpasang) Bh 650.000,00

    Kosen Pintu Kayu Kelas I (Ulin) Serut Rapi+Pasang M' 95.000,00

    Kawat Beton (Bindrat) Kg 23.000,00 Kayu Dolken Galam (8-10) cm Btg 26.805,00 Kayu Bulat 6-10 cm panjang 4m Btg 7.800,00

    Kunci-kunci Tanam Merk Iseo/Setara Besar/Silinder Bh 177.000,00

    Kaca Bening Tebal 5 mm M2 106.200,00

    Keramik Uk. 20x20 cm Bh 4.800,00

    Keramik Uk. 40x20 cm Bh 19.400,00

    Keramik Granite Tile Homogenous Grade 1 Uk. 60x60 cm Bh 97.240,00

    Keramik Granite Tile Homogenous Grade 1 Uk. 30x60 cm Bh 50.320,00

    Kunci Sloot Bh 9.735,00

    Kran Air Bh 15.000,00

    Lem Kayu Kg 12.402,00

    Lampu Pijar Bh 12.525,00

    Lampu TL Bulat 8 Watt Bh 30.000,00

    Lampu TL Tunggal Panjang 18 Watt Bh 125.460,00

    Lampu TL Ganda Panjang 18 Watt Bh 150.000,00

    Lampu Downlight+asesoris Bh 170.200,00

    Plint Keramik 10x60 cm Bh 16.206,67

    Plint Keramik 10x40 cm Bh 8.500,00

    Plint Keramik 10x20 cm Bh 1.750,00

    Paku Kayu Biasa Kg 22.715,00

    Paku Ulin Kg 28.300,00

    HARGA SATUAN BAHAN

    Harga

    Uraian - Tenaga (Rp)

  • Paku Anti Karat Kg 28.300,00

    Paku Plywood Kg 31.130,00

    Paku Sekrup Kg 24.225,00

    Pasir Urug/Timbunan M3 78.195,00

    Pasir Pasang M3 190.000,00

    Pasir Pasang Kg 135,71

    Papan Kayu Bouwplank M3 1.934.400,00

    Plamur Tembok isi 5 Kg Kg 18.000,00

    Plywood/Triplek (3mm) Lbr 49.500,00

    Plywood/Triplek (4mm) Lbr 63.325,00

    Plywood/Triplek (9mm) Lbr 132.678,00

    Minyak Bekesting Ltr 27.500,00

    MCB 1X32A-NC 45 A Bh 41.905,00

    Rangka Atap Baja Ringan Galvalume M2 195.000,00

    Rangka Metal Hollow 40.40.2 mm M' 20.000,00

    Semen Portland/Kg Kg 1.500,00

    Semen Portland (1 Zak=50 Kg) Zak 98.120,00

    Semen Warna Kg 15.470,00

    Sabun Cuci Kg 5.000,00

    Stop Kontak+instalasi (Konstruksi Beton) Titik 165.200,00

    Schakelar (Standart) Bh 28.425,00

    Seal Tape Bh 3.400,00

    tepung Gypsum Kg 15.000,00

    Tinner Ltr 25.950,00

    Titik Nyala Lampu + Instalasi (Konstruksi Beton) Titik 165.200,00

    Ventilasi Kotak kayu Kelas i (Ulin) Serut Rapi+Pasang Bh 125.000,00

    Wallpaper M' 65.000,00

    Tamiang Layang, 07 September 2014

    Penawar,

    CV. BARITO JAYA KONSTRUKSI

    Pusat Tamiang Layang

    YASMUN

    Direktur

  • Standart

    Nasional

    Indonesia

    Progam PENINGKATAN SARANA DAN PRASARANA UMUM

    Kegiatan PENINGKATAN / PEMBANGUNAN FASILITAS PEMERINTAH

    Pekerjaan LANJUTAN / PENINGKATAN RUMAH JABATAN BUPATI BARITO TIMUR

    Lokasi KABUPATEN BARITO TIMUR

    Tahun Anggaran 2014

    SNI 2835 : 2008

    A PENETAPAN INDEKS HARGA SATUAN PEKERJAAN TANAH

    SNI 2835 : 2008

    001 Menggali 1 m3 tanah biasa sedalam 1 meter

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Pekerja OH 0,7500 65.000,00 48.750,00

    Mandor OH 0,0250 95.000,00 2.375,00

    51.125,00

    SNI 2835 : 2008

    002 Mengurug kembali 1 m3 galian

    Mengurug kembali 1 m3 galian dihitung 1/3 kali dari indeks pekerjaan galian

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    SNI 2835 : 2008

    003 Mengurug kembali pasir urug/tanah urug

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Bahan PU m3 1,2000 78.195,00 93.834,00

    Pekerja OH 0,5000 65.000,00 32.500,00

    Mandor OH 0,0500 95.000,00 4.750,00

    131.084,00

    SNI 2836 : 2008

    B PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PONDASI

    SNI 2836 : 2008

    004 Memasang 1 m3 pondasi batu belah campuran 1 PC : 4 PP

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Batu belah m3 1,2000 339.000,00 406.800,00

    PC kg 163,0000 1.500,00 244.500,00

    PP m3 0,5200 190.000,00 98.800,00

    Pekerja OH 1,5000 65.000,00 97.500,00

    Tukang batu OH 0,7500 80.000,00 60.000,00

    Kepala tukang OH 0,0750 90.000,00 6.750,00

    Mandor OH 0,0750 95.000,00 7.125,00

    921.475,00

    SNI 2836 : 2008

    005 Memasang 1 m3 batu kosong (anstamping)

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Batu belah 15 cm/20 cm m3 1,20 339.000,00 406.800,00

    PU m3 0,43 1.500,00 648,00

    Pekerja OH 0,78 65.000,00 50.700,00

    Tukang batu OH 0,39 80.000,00 31.200,00

    Kepala tukang OH 0,04 90.000,00 3.510,00

    Mandor OH 0,04 95.000,00 3.705,00

    496.563,00

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    18.416,67

    Kebutuhan Satuan Indeks

    Jumlah harga per-satuan pekerjaan

    Mengurug kembali galian

    Jumlah harga per-satuan pekerjaan

    Satuan

    Indeks

    Indeks

    1 m3 galian tanah biasa sedalam 1 meter 001

    Tenaga kerja

    Tenaga kerja

    Bahan

    Tenaga kerja

    55.250,00

    Kebutuhan

    SNI TATA CARA PERHITUNGAN SATUAN PEKERJAAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

    DAFTAR ANALISA HARGA BAHAN

  • SNI 2839 : 2008

    C PENETAPAN INDEKS HARGA SATUAN PEKERJAAN LANGIT-LANGIT

    SNI 2839 : 2008

    006 Memasang 1 m2 langit-langit gypsum board ukuran (1200/2400) mm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Gypsum board Lembar 0,3640 72.530,50 26.401,10

    Paku sekrup kg 0,1100 24.225,00 2.664,75

    Pekerja OH 0,1000 65.000,00 6.500,00

    Tukang kayu OH 0,0500 70.000,00 3.500,00

    Kepala tukang OH 0,0050 90.000,00 450,00

    Mandor OH 0,0050 95.000,00 475,00

    39.990,85

    SNI 2839 : 2008

    007 Memasang 1 m' list plafond gypsum profil

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    List gypsum profil m' 1,0500 10.625,00 11.156,25

    tepung gypsum kg 0,1500 15.000,00 2.250,00

    Pekerja OH 0,0600 65.000,00 3.900,00

    Tukang kayu OH 0,0600 70.000,00 4.200,00

    Kepala tukang OH 0,0060 90.000,00 540,00

    Mandor OH 0,0030 95.000,00 285,00

    22.331,25

    SNI 3434 : 2008

    D PENETAPAN INDEKS HARGA SATUAN PEKERJAAN KAYU

    SNI 3434 : 2008

    008 Membuat dan memasang 1 m2 daun pintu panel,kayu kelas I atau II

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Papan kayu m3 0,0400 1.900.000,00 76.000,00

    Lem kayu kg 0,5000 12.402,00 6.201,00

    Pekerja OH 1,0000 65.000,00 65.000,00

    Tukang kayu OH 3,0000 70.000,00 210.000,00

    Kepala tukang OH 0,3000 90.000,00 27.000,00

    Mandor OH 0,0500 95.000,00 4.750,00

    388.951,00

    SNI 3434 : 2008

    009 Membuat dan memasang 1 m2 pintu dan jendela kaca,kayu kelas I atau II

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Papan kayu m3 0,0240 1.900.000,00 45.600,00

    Lem kayu kg 0,3000 12.402,00 3.720,60

    Pekerja OH 0,8000 65.000,00 52.000,00

    Tukang kayu OH 2,4000 70.000,00 168.000,00

    Kepala tukang OH 0,2400 90.000,00 21.600,00

    Mandor OH 0,0400 95.000,00 3.800,00

    294.720,60

    SNI 3434 : 2008

    010 Memasang 1 m' lisplank ukuran ( 2x20 ) cm, kayu kelas I

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Papan kayu m3 0,0110 8.850.000,00 97.350,00

    Paku 5 cm dan 7 cm kg 0,0100 22.715,00 227,15

    Pekerja OH 0,1000 65.000,00 6.500,00

    Tukang kayu OH 0,2000 70.000,00 14.000,00

    Kepala tukang OH 0,0200 90.000,00 1.800,00

    Mandor OH 0,0050 95.000,00 475,00

    120.352,15

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Bahan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Satuan

    Bahan

    Indeks

    Bahan

  • SNI 6897 : 2008

    E PENETAPAN INDEKS HARGA SATUAN PEKERJAAN DINDING

    SNI 6897 : 2008

    011 Memasang 1 m2 dinding bata merah ukuran ( 5x11x22 ) cm tebal 1 bata, campuran spesi 1 PC : 4 PP

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Bata merah buah 140,0000 780,00 109.200,00

    PC kg 26,5500 1.500,00 39.825,00

    PP m3 0,0930 190.000,00 17.670,00

    Pekerja OH 0,6000 65.000,00 39.000,00

    Tukang batu OH 0,2000 80.000,00 16.000,00

    Kepala tukang OH 0,0200 90.000,00 1.800,00

    Mandor OH 0,0300 95.000,00 2.850,00

    226.345,00

    SNI 6897 : 2008

    012 Memasang 1 m2 dinding bata merah ukuran ( 5x11x22 ) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Bata merah buah 70,0000 780,00 54.600,00

    PC kg 11,5000 1.500,00 17.250,00

    PP m3 0,0430 190.000,00 8.170,00

    Pekerja OH 0,3000 65.000,00 19.500,00

    Tukang batu OH 0,1000 80.000,00 8.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0150 95.000,00 1.425,00

    109.845,00

    SNI 7394 : 2008

    G PENETAPAN INDEKS HARGA SATUAN PEKERJAAN BETON

    SNI 7394 : 2008

    013 Membuat 1 m3 lantai kerja beton mtu f'c =7,4 Mpa (K100), slump (3-6)cm, w/c = 0,87

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    PC kg 230,0000 1.500,00 345.000,00

    PB kg 893,0000 135,71 121.189,03

    KR ( maksimum 30 mm ) kg 1.027,0000 354,81 364.389,87

    Air Liter 200,0000 37,50 7.500,00

    Pekerja OH 1,2000 65.000,00 78.000,00

    Tukang batu OH 0,2000 80.000,00 16.000,00

    Kepala tukang OH 0,0200 90.000,00 1.800,00

    Mandor OH 0,0600 95.000,00 5.700,00

    939.578,90

    SNI 7394 : 2008

    014 Membuat 1 m3 Beton Mutu f'c : 14,5 Mpa (K 175),Slump (122) cm, w/c = 0,66

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    PC kg 326,0000 1.500,00 489.000,00

    PB kg 760,0000 135,71 103.139,60

    KR ( maksimum 30 mm ) kg 1.029,0000 354,81 365.099,49

    Air Liter 215,0000 37,50 8.062,50

    Pekerja OH 1,6500 65.000,00 107.250,00

    Tukang batu OH 0,2750 80.000,00 22.000,00

    Kepala tukang OH 0,0280 90.000,00 2.520,00

    Mandor OH 0,0830 95.000,00 7.885,00

    1.104.956,59

    SNI 7394 : 2008

    015 Membuat 1 m3 Beton Mutu f'c : 21,7 Mpa (K 250),Slump (122) cm, w/c = 0,56

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    PC kg 384,0000 1.500,00 576.000,00

    PB kg 692,0000 135,71 93.911,32

    KR ( maksimum 30 mm ) kg 1.039,0000 354,81 368.647,59

    Air Liter 215,0000 37,50 8.062,50

    Pekerja OH 1,6500 65.000,00 107.250,00

    Tukang batu OH 0,2750 80.000,00 22.000,00

    Kepala tukang OH 0,0280 90.000,00 2.520,00

    Mandor OH 0,0830 95.000,00 7.885,00

    1.186.276,41

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Kebutuhan Satuan Indeks

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI 7394 : 2008

    016 Pembesian 10 kg dengan besi polos atau besi ulir

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Besi beton (polos/ulir) kg 10,5000 12.000,00 126.000,00

    Kawat beton kg 0,1500 23.000,00 3.450,00

    Pekerja OH 0,0700 65.000,00 4.550,00

    Tukang besi OH 0,0700 70.000,00 4.900,00

    Kepala tukang OH 0,0070 90.000,00 630,00

    Mandor OH 0,0040 95.000,00 380,00

    139.910,00

    13.991,00

    SNI 7394 : 2008

    017 memasang 1 m2 bekesting untuk pondasi

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kayu kelas II m3 0,0400 1.900.000,00 76.000,00

    Paku kayu kg 0,3000 22.715,00 6.814,50

    Minyak bekesting Liter 0,1000 27.500,00 2.750,00

    Pekerja OH 0,5200 65.000,00 33.800,00

    Tukang kayu OH 0,2600 70.000,00 18.200,00

    Kepala tukang OH 0,0260 90.000,00 2.340,00

    Mandor OH 0,0260 95.000,00 2.470,00

    142.374,50

    SNI 7394 : 2008

    018 memasang 1 m2 bekesting untuk sloof

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kayu kelas II m3 0,0450 1.900.000,00 85.500,00

    Paku kayu kg 0,3000 22.715,00 6.814,50

    Minyak bekesting Liter 0,1000 27.500,00 2.750,00

    Pekerja OH 0,5200 65.000,00 33.800,00

    Tukang kayu OH 0,2600 70.000,00 18.200,00

    Kepala tukang OH 0,0260 90.000,00 2.340,00

    Mandor OH 0,0260 95.000,00 2.470,00

    151.874,50

    SNI 7394 : 2008

    019 memasang 1 m2 bekesting untuk kolom

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kayu kelas II m3 0,0400 1.900.000,00 76.000,00

    Paku kayu kg 0,4000 22.715,00 9.086,00

    Minyak bekesting Liter 0,2000 27.500,00 5.500,00

    Papan bekesting m3 0,0150 1.497.500,00 22.462,50

    Plywood tebal 9 mm Lbr 0,3500 132.678,00 46.437,30

    Dolken kayu galam (8-10) cm panjang 4 m Batang 2,0000 7.800,00 15.600,00

    Pekerja OH 0,6600 65.000,00 42.900,00

    Tukang kayu OH 0,3300 70.000,00 23.100,00

    Kepala tukang OH 0,0330 90.000,00 2.970,00

    Mandor OH 0,0330 95.000,00 3.135,00

    247.190,80

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan untuk 10 kg

    Jumlah harga per-satuan pekerjaan untuk 1 kg

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI 7394 : 2008

    020 Memasang 1 m2 bekesting untuk balok

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kayu kelas II m3 0,0400 1.900.000,00 76.000,00

    Paku kayu kg 0,4000 22.715,00 9.086,00

    Minyak bekesting Liter 0,2000 27.500,00 5.500,00

    Papan bekesting m3 0,0180 1.497.500,00 26.955,00

    Plywood tebal 9 mm Lebar 0,3500 132.678,00 46.437,30

    Pekerja OH 0,6600 65.000,00 42.900,00

    Tukang kayu OH 0,3300 70.000,00 23.100,00

    Kepala tukang OH 0,0330 90.000,00 2.970,00

    Mandor OH 0,0330 95.000,00 3.135,00

    236.083,30

    SNI 7394 : 2008

    021 Memasang 1 m2 bekesting untuk plat lantai

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kayu kelas II m3 0,0400 1.900.000,00 76.000,00

    Paku kayu kg 0,4000 22.715,00 9.086,00

    Minyak bekesting Liter 0,2000 27.500,00 5.500,00

    Papan bekesting m3 0,0150 1.497.500,00 22.462,50

    Plywood tebal 9 mm Lebar 0,3500 132.678,00 46.437,30

    Pekerja OH 0,6600 65.000,00 42.900,00

    Tukang kayu OH 0,3300 70.000,00 23.100,00

    Kepala tukang OH 0,0330 90.000,00 2.970,00

    Mandor OH 0,0330 95.000,00 3.135,00

    231.590,80

    SNI 7395 : 2008

    H PENETAPAN INDEKS HARGA SATUAN PEKERJAAN PENTUP ATAP DAN DINDING

    SNI 7395 : 2008

    022 Memasang 1 m2 lantai keramikukuran (40x40) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Keramik 40x40 cm Buah 6,6300 19.400,00 128.622,00

    PC kg 9,8000 1.500,00 14.700,00

    PP m3 0,0450 190.000,00 8.550,00

    Pekerja OH 0,2500 65.000,00 16.250,00

    Tukang batu OH 0,1250 80.000,00 10.000,00

    Kepala tukang OH 0,0130 90.000,00 1.170,00

    Mandor OH 0,0130 95.000,00 1.235,00

    180.527,00

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI 7395 : 2008

    023 Memasang 1 m2 lantai keramikukuran (20x20) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Keramik 20x20 cm Buah 26,5000 4.800,00 127.200,00

    PC kg 10,4000 1.500,00 15.600,00

    PP m3 0,0450 190.000,00 8.550,00

    Pekerja OH 0,2700 65.000,00 17.550,00

    Tukang batu OH 0,1350 80.000,00 10.800,00

    Kepala tukang OH 0,0140 90.000,00 1.260,00

    Mandor OH 0,0140 95.000,00 1.330,00

    182.290,00

    SNI 7395 : 2008

    024 Memasang 1 m2 lantai keramikukuran (60x60) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Keramik 60x60 cm Buah 3,1000 97.240,00 301.444,00

    PC kg 9,6000 1.500,00 14.400,00

    PP m3 0,0450 190.000,00 8.550,00

    Semen warna kg 1,5000 15.470,00 23.205,00

    Pekerja OH 2,4000 65.000,00 156.000,00

    Tukang batu OH 0,1200 80.000,00 9.600,00

    Kepala tukang OH 0,0120 90.000,00 1.080,00

    Mandor OH 0,0120 95.000,00 1.140,00

    515.419,00

    SNI 7395 : 2008

    025 Memasang 1 m plint keramik ukuran (10x60) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Plint keramik Buah 1,7000 16.206,67 27.551,34

    PC kg 1,1400 1.500,00 1.710,00

    PP m3 0,0030 190.000,00 570,00

    Semen warna kg 0,1000 15.470,00 1.547,00

    Pekerja OH 0,0900 65.000,00 5.850,00

    Tukang batu OH 0,0900 80.000,00 7.200,00

    Kepala tukang OH 0,0090 90.000,00 810,00

    Mandor OH 0,0050 95.000,00 475,00

    45.713,34

    Kebutuhan Satuan Indeks

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Tenaga kerja

    Bahan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI 7395 : 2008

    026 Memasang 1 m plint keramik ukuran (10x40) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Plint keramik Buah 2,6500 8.500,00 22.525,00

    PC kg 1,1400 1.500,00 1.710,00

    PP m3 0,0030 190.000,00 570,00

    Semen warna kg 0,1000 15.470,00 1.547,00

    Pekerja OH 0,0900 65.000,00 5.850,00

    Tukang batu OH 0,0900 80.000,00 7.200,00

    Kepala tukang OH 0,0090 90.000,00 810,00

    Mandor OH 0,0050 95.000,00 475,00

    40.687,00

    SNI 7395 : 2008

    027 Memasang 1 m plint keramik ukuran (10x20) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Plint keramik Buah 5,3000 1.750,00 9.275,00

    PC kg 1,1400 1.500,00 1.710,00

    PP m3 0,0030 190.000,00 570,00

    Semen warna kg 0,1000 15.470,00 1.547,00

    Pekerja OH 0,0900 65.000,00 5.850,00

    Tukang batu OH 0,0900 80.000,00 7.200,00

    Kepala tukang OH 0,0090 90.000,00 810,00

    Mandor OH 0,0050 95.000,00 475,00

    27.437,00

    SNI 7395 : 2008

    028 Memasang 1 m2 dinding keramik ukuran (20x20) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Keramik Buah 26,5000 4.800,00 127.200,00

    PC kg 9,3000 1.500,00 13.950,00

    PP m3 0,0180 190.000,00 3.420,00

    Semen warna kg 1,9400 15.470,00 30.011,80

    Pekerja OH 0,9000 65.000,00 58.500,00

    Tukang batu OH 0,4500 80.000,00 36.000,00

    Kepala tukang OH 0,0450 90.000,00 4.050,00

    Mandor OH 0,0450 95.000,00 4.275,00

    277.406,80

    SNI 7395 : 2008

    029 Memasang 1 m2 dinding keramik ukuran (30x60) cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Keramik Buah 1,5500 50.320,00 77.996,00

    PC kg 4,8000 1.500,00 7.200,00

    PP m3 0,0225 190.000,00 4.275,00

    Semen warna kg 0,7500 15.470,00 11.602,50

    Pekerja OH 2,4000 65.000,00 156.000,00

    Tukang batu OH 0,1200 80.000,00 9.600,00

    Kepala tukang OH 0,0120 90.000,00 1.080,00

    Mandor OH 0,0120 95.000,00 1.140,00

    268.893,50

    SNI 7395 : 2008

    030 Memasang 1 m2 wall paper lebar 50 cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Wall paper m2 2,2000 65.000,00 143.000,00

    Lem kg 0,2500 12.402,00 3.100,50

    Pekerja OH 0,3500 65.000,00 22.750,00

    Tukang OH 0,1750 80.000,00 14.000,00

    Kepala tukang OH 0,0170 90.000,00 1.530,00

    Mandor OH 0,0020 95.000,00 190,00

    184.570,50

    Indeks

    Kebutuhan Satuan Indeks

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan

    Kebutuhan Satuan Indeks

    Kebutuhan Satuan Indeks

    Bahan

    Jumlah harga per-satuan pekerjaan

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Tenaga kerja

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Bahan

  • SNI 7395 : 2008

    031 Pemasangan 1 m2 Rangka Besi Hollow 1x40.40.2 mm, Modul 60x60 cm, Plafond

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Rangka Metal Hollow 40.40.2 mm m' 4,0000 20.000,00 80.000,00

    Asesoris (Perkuatan,Las dll) Ls 4,0000 10.000,00 40.000,00

    Pekerja OH 0,3500 65.000,00 22.750,00

    Tukang besi OH 0,3500 70.000,00 24.500,00

    Kepala tukang OH 0,0350 90.000,00 3.150,00

    Mandor OH 0,0180 95.000,00 1.710,00

    172.110,00

    SNI DT 91-0010-2007

    TATA CARA PERHITUNGAN HARGA SATUAN PEKERJAAN DINDING

    SNI DT 91-10.6.4

    032 1 m2 Plesteran 1 Pc:4 Ps tebal 15 mm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    PC kg 6,2400 1.500,00 9.360,00

    PP m3 0,0240 190.000,00 4.560,00

    Pekerja OH 0,3000 65.000,00 19.500,00

    Tukang batu OH 0,1500 80.000,00 12.000,00

    Kepala tukang OH 0,0150 90.000,00 1.350,00

    Mandor OH 0,0150 95.000,00 1.425,00

    48.195,00

    PEKERJAAN PENUTUP ATAP

    SNI 03-3436-1994-32

    033 1 m2 Pasang Atap Genteng Aspal

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Genteng aspal lbr 6,9000 45.000,00 310.500,00

    Plywood 4 mm lbr 0,3500 63.325,00 22.163,75

    Paku biasa 1/2"-1" kg 0,0300 28.300,00 849,00

    Plastic Aerator bh 0,5000 25.000,00 12.500,00

    Pekerja OH 0,2000 65.000,00 13.000,00

    Tukang kayu OH 0,3000 70.000,00 21.000,00

    Kepala tukang OH 0,0030 90.000,00 270,00

    Mandor OH 0,0100 95.000,00 950,00

    381.232,75

    SNI 03-3436-1994-33

    034 1 m2 Pasang Atap Genteng Metal

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Genteng Metal lbr 1,0200 86.855,00 88.592,10

    Paku anti karat kg 0,2000 28.300,00 5.660,00

    Pekerja OH 0,2000 65.000,00 13.000,00

    Tukang kayu OH 0,1000 70.000,00 7.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0010 95.000,00 95,00

    115.247,10

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    IndeksKebutuhan Satuan

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI 03-3436-1994-36

    035 1 m' Pasangan bubungan genteng metal

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Bubungan genteng metal lbr 1,1000 32.346,00 35.580,60

    Paku anti karat kg 0,0500 28.300,00 1.415,00

    Pekerja OH 0,2500 65.000,00 16.250,00

    Tukang kayu OH 0,1500 70.000,00 10.500,00

    Kepala tukang OH 0,0150 90.000,00 1.350,00

    Mandor OH 0,0130 95.000,00 1.235,00

    66.330,60

    SNI 03-3436-1994-37

    036 1 m' Pasangan bubungan genteng aspal

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Bubungan genteng aspal lbr 2,0000 50.000,00 100.000,00

    Paku biasa 1/2" - 1" kg 0,0500 28.300,00 1.415,00

    Pekerja OH 0,1250 65.000,00 8.125,00

    Tukang kayu OH 0,2500 70.000,00 17.500,00

    Kepala tukang OH 0,0250 90.000,00 2.250,00

    Mandor OH 0,0060 95.000,00 570,00

    129.860,00

    SNI PT.T.38-2000-C.14

    037 1 m2 Pegecatan Tembok Baru ( 1 Plamir,Lapis Cat Dasar, 2 Lapis Cat Penutup )

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Plamir kg 0,1000 18.000,00 1.800,00

    Cat Dasar kg 0,1000 85.000,00 8.500,00

    Cat Tembok kg 0,2600 99.220,00 25.797,20

    Pekerja OH 0,0200 65.000,00 1.300,00

    Tukang kayu OH 0,0630 70.000,00 4.410,00

    Kepala tukang OH 0,0063 90.000,00 567,00

    Mandor OH 0,0025 95.000,00 237,50

    42.611,70

    SNI PT.T.38-2000-C.8

    038 1 m2 Pegecatan Bidang Kayu Baru (1 Lapis Plamir), 1 Lapis Cat Dasar, 2lapis Cat Pentup

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Cat Meni kg 0,2000 30.090,00 6.018,00

    Plamir kg 0,1500 18.000,00 2.700,00

    Cat Dasar kg 0,1700 30.090,00 5.115,30

    Cat Kayu kg 0,2600 45.560,00 11.845,60

    Pekerja OH 0,0700 65.000,00 4.550,00

    Tukang kayu OH 0,0090 70.000,00 630,00

    Kepala tukang OH 0,0060 90.000,00 540,00

    Mandor OH 0,0025 95.000,00 237,50

    31.636,40

    Bahan

    Tenaga kerja

    Kebutuhan Satuan Indeks

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI PT.T.30-2000-C.2

    039 1 Buah Pasang Kunci Tanam Biasa

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kunci tanam biasa bh 1,0000 177.000,00 177.000,00

    Pekerja OH 0,0100 65.000,00 650,00

    Tukang kayu OH 0,5000 70.000,00 35.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0050 95.000,00 475,00

    214.025,00

    SNI PT.T.30-2000-C.5

    040 1 Buah Pasang Pintu Engsel

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Engsel pintu bh 1,0000 23.600,00 23.600,00

    Pekerja OH 0,0150 65.000,00 975,00

    Tukang kayu OH 0,1500 70.000,00 10.500,00

    Kepala tukang OH 0,0150 90.000,00 1.350,00

    Mandor OH 0,0008 95.000,00 76,00

    36.501,00

    SNI PT.T.30-2000-C.6

    041 1 Buah Pasang Engsel Jendela kupu-kupu

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Engsel jendela Bh 1,0000 17.700,00 17.700,00

    Pekerja OH 0,0100 65.000,00 650,00

    Tukang kayu OH 0,1000 70.000,00 7.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0005 95.000,00 47,50

    26.297,50

    SNI PT.T.30-2000-C.9

    042 1 Buah Pasang Kalt angin

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kalt angin bh 1,0000 8.470,00 8.470,00

    Pekerja OH 0,0150 65.000,00 975,00

    Tukang kayu OH 0,1500 70.000,00 10.500,00

    Kepala tukang OH 0,0150 90.000,00 1.350,00

    Mandor OH 0,0008 95.000,00 76,00

    21.371,00

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • SNI PT.T.30-2000-C.11

    043 1 Buah Pasang Kunci Selot

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kunci Selot bh 1,0000 9.735,00 9.735,00

    Pekerja OH 0,0200 65.000,00 1.300,00

    Tukang kayu OH 0,2000 70.000,00 14.000,00

    Kepala tukang OH 0,0200 90.000,00 1.800,00

    Mandor OH 0,0010 95.000,00 95,00

    26.930,00

    RSNI. T-15-2002.1

    044 Memasang 1 buah Kloset Duduk / Monoblok

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kloset duduk/monoblok bh 1,0000 1.370.965,00 1.370.965,00

    Perlengkapan 411.289,50 123.386,85

    Pekerja OH 3,3000 65.000,00 214.500,00

    Tukang batu OH 1,1000 80.000,00 88.000,00

    Kepala tukang OH 0,0010 90.000,00 90,00

    Mandor OH 0,1600 95.000,00 15.200,00

    1.812.141,85

    RSNI. T-15-2002.3

    045 Memasang 1 buah Kloset Jongkok

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kloset jongkok teraso bh 1,0000 123.900,00 123.900,00

    Bata merah bh 7,0000 780,00 5.460,00

    PC bh 6,0000 1.500,00 9.000,00

    PP m3 0,0100 190.000,00 1.900,00

    Pekerja OH 1,0000 65.000,00 65.000,00

    Tukang batu OH 1,5000 80.000,00 120.000,00

    Kepala tukang OH 0,3000 90.000,00 27.000,00

    Mandor OH 0,1100 95.000,00 10.450,00

    362.710,00

    RSNI. T-15-2002.4

    046 Memasang 1 buah Kloset Jongkok " atau "

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kran air bh 1,0000 15.000,00 15.000,00

    Seal tape bh 0,0250 3.400,00 85,00

    Pekerja OH 0,0100 65.000,00 650,00

    Tukang batu OH 0,1000 80.000,00 8.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0050 95.000,00 475,00

    25.110,00

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Tenaga kerja

    Kebutuhan Satuan Indeks

    Bahan

    Jumlah harga per-satuan pekerjaan

    Bahan

    Kebutuhan Satuan Indeks

    Bahan

    30% dari bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

  • RSNI. T-15-2002.5

    047 Memasang 1 buah Floor Drain

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Floor Drain bh 1,0000 29.750,00 29.750,00

    Pekerja OH 0,0100 65.000,00 650,00

    Tukang batu OH 0,1000 80.000,00 8.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0050 95.000,00 475,00

    39.775,00

    SNI DT 91-0010-2007-6.27

    048 Memasang 1 m2 acian

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    PC kg 3,2500 1.500,00 4.875,00

    Pekerja OH 0,2000 65.000,00 13.000,00

    Tukang batu OH 0,1000 80.000,00 8.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0100 95.000,00 950,00

    27.725,00

    SNI 2001 : 6.4

    049 1m' Pengukuran dan Pemasangan bouwplank

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Balok kayu kelas III m3 0,0120 1.357.000,00 16.284,00

    Papan (bouwplank 3/20) kls III m3 0,0070 1.497.500,00 10.482,50

    Paku kayu kg 0,0200 22.715,00 454,30

    Pekerja OH 0,1000 65.000,00 6.500,00

    Tukang kayu OH 0,1000 70.000,00 7.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0050 95.000,00 475,00

    42.095,80

    SNI 14.6.1

    050 1 m2 Mengikis/mengerok Permukaan Cat Tembok Lama

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Kebutuhan Satuan Indeks

    Bahan

    Satuan Indeks

    Jumlah harga per-satuan pekerjaan

    Tenaga kerja

    Kebutuhan Satuan Indeks

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Bahan

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan

    Kebutuhan Satuan Indeks

  • Pekerja OH 0,1500 65.000,00 9.750,00

    Mandor OH 0,0025 95.000,00 237,50

    9.987,50

    SNI 14.6.2

    051 1 m2 Mencuci bidang Permukaan Tembok yang Pernah di Cat

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Sabun cuci kg 0,3400 5.000,00 1.700,00

    Pekerja OH 0,1500 65.000,00 9.750,00

    Mandor OH 0,0025 95.000,00 237,50

    11.687,50

    SNI 06.6.28

    052 1 m3 Pasang konstruksi kuda-kuda kayu kls I

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Balok kayu kelas I m3 1,1000 5.300.000,00 5.830.000,00

    Paku kayu kg 0,8000 28.300,00 22.640,00

    Pekerja OH 4,0000 65.000,00 260.000,00

    Tukang kayu OH 12,0000 70.000,00 840.000,00

    Kepala tukang OH 1,2000 90.000,00 108.000,00

    Mandor OH 0,2000 95.000,00 19.000,00

    7.079.640,00

    SNI 06.6.28a

    053 1 m3 Pasang gording balok kayu kls I

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Balok kayu kelas I m3 1,1000 5.300.000,00 5.830.000,00

    Paku kayu kg 0,8000 28.300,00 22.640,00

    Pekerja OH 4,0000 65.000,00 260.000,00

    Tukang kayu OH 12,0000 70.000,00 840.000,00

    Kepala tukang OH 1,2000 90.000,00 108.000,00

    Mandor OH 0,2000 95.000,00 19.000,00

    7.079.640,00

    SNI 06.6.35

    054 1 m2 Rangka kaso 5/7 dan reng 3/5 cm

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Balok kayu kelas II m3 0,0140 1.900.000,00 26.600,00

    Paku kayu kg 0,1500 22.715,00 3.407,25

    Pekerja OH 0,1000 65.000,00 6.500,00

    Tukang kayu OH 0,1000 70.000,00 7.000,00

    Kepala tukang OH 0,0100 90.000,00 900,00

    Mandor OH 0,0050 95.000,00 475,00

    44.882,25

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Jumlah harga per-satuan pekerjaan

    Jumlah harga per-satuan pekerjaan

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

  • SUV. A.2.1

    055 1 m' tiang dipancang ke dalam tanah

    Harga Satuan Jumlah

    Bahan/Upah ( Rp )

    ( Rp )

    Dolken kayu galam (8-10) cm btg 0,2500 26.805,00 6.701,25

    Pekerja OH 0,0900 65.000,00 5.850,00

    Tukang kayu OH 0,0040 70.000,00 280,00

    Kepala tukang OH 0,0001 90.000,00 9,00

    Mandor OH 0,0050 95.000,00 475,00

    13.315,25

    53.261,00

    YASMUN

    Direktur

    Kebutuhan Satuan Indeks

    Bahan

    Tenaga kerja

    Tamiang Layang, 07 September 2014

    Penawar,

    CV. BARITO JAYA KONSTRUKSI

    Pusat Tamiang Layang

    Jumlah harga per-satuan pekerjaan

    Jumlah harga per-satuan pekerjaan untuk 1 batang

  • METODE PELAKSANAAN

    Pekerjaan

    Rehab Rujab Bupati Bartim

    BAB I

    PENDAHULUAN

    A. Latar Belakang

    Seiring dengan pertambahan penduduk dan meningkatnya pembangunan di Kabupaten

    Barito Timur di berbagai aspek kehidupan dan untuk menyeimbangkan pembangunan

    maka sangat diperlukan peningkatan sarana dan prasarana. Diantaranya dibidang

    pembangunan dan peningkatan sarana kesehatan untuk memperlancar proses pelayanan

    kesehatan kepada masyarakat.

    Untuk mewujudkan itu maka perlu adanya suatu pelaksanaan pekerjaan yang sistematis

    dan terorganisir yang berpedoman pada standar-standar teknis pelaksanaan pekerjaan

    sehingga menghasilkan proyek yang efektif dan efisien dengan menghasilkan mutu yang

    digariskan dalam pedoman teknis.

    Setelah kami mempelajari isi dokumen lelang ada beberapa hal yang menjadi perhatian

    dan pertimbangan kami dalam menyusun langkah-langkah metode pelaksanaan dalam

    pekerjaan ini.

    B. Maksud dan tujuan

    Adapun maksud dan tujuan dari pekerjaan ini untuk memberikan gambaran bagaimana

    proses pelaksanaan pekerjaan secara singkat mulai dari mobilisasi, urutan pelaksanaan

    pekerjaan, kebutuhan alat dan bahan, kebutuhan tenaga maupun manajemen waktu

    pelaksanaan pekerjaan

    C. Lokasi

    Pekerjaan ini adalah berlokasi di Bentot Kecamatan Pantangkep Tutui Kabupaten Barito

    Timur

    D. Lingkup Pekerjaan

    1. Pekerjaan Pendahuluan

    2. Pekerjaan Tanah

    3. Pekerjaan Pondasi Batu Belah

    4. Pekerjaan Beton Bertulang

    5. Pekerjaan Lantai

    6. Pekerjaan Dinding

    7. Pekerjaan Kusen,Pintu,Jendela dan Jalusi

    8. Pekerjaan Pasang Kunci dan Penggantung