2

Technology provider.

Patented concept.

45 staff covering all elements.

Proven, scaleable & familiar business model

Incorporated 1998

~£45m invested

~£19m sales

~£10m grants

Electricity Markets

Component Suppliers, Sub-

contractors and Fabricators

Power Generation Projects

Project

Development

Pelamis Wave Power

Pelamis design, procurement,

assembly, installation, operation

& maintenance

PWP – Business Model

Only company in sector to have secured

supply contracts.

6 full-scale machines built & grid connected.

Page 3: Pelamis bilbao ukti pwp 2012

Commercial in Confidence

Commercial in Confidence

PELAMIS – Fundamental Principles

Survivability principles Absorption principles

Engineering embodiment Construction and O&M strategy

PELAMIS IS A UNIQUE COMBINATION OF THESE ESSENTIAL PRINCIPLES

Page 4: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 4

CF16539GG 1

Page 5: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 5

CF16539GG 1

Page 6: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 6

CF16539GG 1

Page 7: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 7

CF16539GG 1

Page 8: Pelamis bilbao ukti pwp 2012

Commercial in Confidence

8

Cost of Energy forecast to match Offshore Wind

B&V’s recent appraisal of Pelamis’ LCoE

trajectory agrees with PWP’s estimates

to within c.10% , this is clear indication

of the high level of confidence in PWP

LCoE modelling

” – B&V December

2011

Each of the customers completed LCoE DD prior to proceeding.

All analysis based on validated cost & yield inputs from real

machines – unique in sector.

Detailed LCoE validation study completed by Black & Veatch.

With the right partner we believe we can further accelerate this plan.

0

200

400

600

800

1,000

1,200

1,400

2008 2011 2014 2017 2020

Levelised cost of energy

2 MW

10 MW

50 MW 100 MW

2 MW

Historic LCoE Forecast LCoE

Profitable at 5 ROC’s

Offshore wind R3 2009-17

(approx.)

Source: Mott MacDonald, 2010

Page 9: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 9

CF16539GG 1

Scottish Context - Projects in Development

Client Pelamis Projects:

Orkney North [50MW], Orkney. E.ON

Marwick [49.5MW], Orkney. ScottishPower Renewables

Joint Ventures:

Aegir [10MW], Shetland. Vattenfall.

Pelamis Wave Power Projects:

Farr Point [50MW], Sutherland.

Bernera [10MW], Western Isles.

Project Pipeline – 200MW with Agreement for Lease from The Crown Estate.

Context to de-risk & commercialise Pelamis product for global market.

Page 10: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 10

Current Strategic Investment Process

Customer demand has prompted the search for an industrial partner.

Three of the world’s largest renewables generators are working with us and have been for several years.

Pelamis has generated £19m revenues to date.

The key requirement for a mass roll out is a strategic partner with complementary skills, capabilities and long term vision.

Customers now driving the need for a solid supplier to deliver product.

3+ years to get product rolling – timing is right now .

Page 11: Pelamis bilbao ukti pwp 2012

Commercial in Confidence 11

CF16539GG 1

www.pelamiswave.com

Facebook