Top Banner
อุตสาหกรรมงานก่อสร้างครบวงจร(EPC) Civil & Structure Work Electrical & Instrument Work Mechanical & Piping Work
46
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: pegprofiles

อุตสาหกรรมงานก่อสร้างครบวงจร(EPC)

Civil & Structure Work

Electrical & Instrument Work

Mechanical & Piping Work

Page 2: pegprofiles

1. COMPANY INTRODUCTION 2. OUR SERVICE WORK 3. ORGANIZATION

4. VALUE PROPOSITION

5. EQUIPMENT AND TOOLS LIST 6. COMPANY EXPERIENCE & CLIENT

REFERENCE

Page 3: pegprofiles
Page 4: pegprofiles
Page 5: pegprofiles
Page 6: pegprofiles

2. OUR SERVICE WORK

Engineering Services (EPC, EPCm) Process Civil & Steel Structure Piping Mechanical Equipment Electrical & Instrument

Project EPC, EPCm, Plant Modification Petrochemical & Refinery Power Plant Waste Water Treatment Plant Steel Mill General Factory

Project Management Maintenance Service

(Shutdown, Turnaround) Material Management and

Supply

Page 7: pegprofiles
Page 8: pegprofiles
Page 9: pegprofiles
Page 10: pegprofiles

4. VALUE PROPOSITION • 4.1 Safety

Without any LTI accident Safety Behavior

• 4.2 Quality Control

Conformity requirement

• 4.3 Schedule & Planning Comply & meet to Master schedule, All Resource Planning

• 4.4 Cost and Budgetary

Saving Meet to Budgetary

Page 11: pegprofiles
Page 12: pegprofiles

5. EQUIPMENT AND TOOLS LIST

Page 13: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

1 Welding Machine

1.1 Argon 300/500 Amp 21 Sets

1.2 Arc 300 / 500 Amp 63 Sets

1.3 MIG/MAG 11 Sets

1.4 Rocket 400 Amp 12 Sets

1.5 HDPE 4 Sets

Welding Machine

Page 14: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

2 Cutting machine

2.1 Flame Cutting 2 Sets

2.2 Automatic Flame Cutting 12 Sets

2.3 Fiber Cutting 11 Sets

2.4 Plasma Cutting 1 Set

2.5 Jig Saw 3 Sets

2.6 Horizontal Band Saw 2 Sets

Cutting machine

Page 15: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

3 Loading / Unloading

3.1 Gantry Crane 10 Tons 2 Sets

3.2 Mobile Crane 25 Tons 1 Car

3.3 Forklift 3 Tons 1 Car

Loading / Unloading

Page 16: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

4 Bending Machine

4.1 Pipe Bending 8 Sets

4.2 Plate Bending 1 Set

Bending Machine

Page 17: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

5 Drilling Machine

5.1 Hydraulic Punching 1 Set

5.2 Magnetic Drilling 3 Sets

5.3 Electric Hand drill 5 Sets

5.4 Radiant Drilling 2 Sets

5.5 Jet Broach 8 Sets

Drilling Machine

Page 18: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

6 Electrode Oven

6.1 100 kgs 1 Set

6.2 50 kgs 1 Set

7 Grinding Machine

7.1 4” Grinding M/C 55 Ea

7.2 5” Grinding M/C 4 Ea

7.3 7” Grinding M/C 35 Ea

Electrode Oven & Grinding M/C

Page 19: pegprofiles

5.1 EQUIPMENT & TOOLS LIST

Item No.

Description Q’ty Unit

8 Milling Machine 1 Set

9 Lathe Machine 1 Set

10 Electrode Dryer 60 Ea

Milling , Lathe and Electrode Dryer

Page 20: pegprofiles

5.2 HEAVY EQUIPMENT

Item No.

Description Q’ty Unit

1 Truck Crane

1.1 5 tons 1 Car

1.2 4 Tons 1 Car

2 Wheel Truck

2.1 Ten wheel 2 Car

2.2 Six Wheel 1 Car

Truck Crane & Wheel Truck

Page 21: pegprofiles

5.2 HEAVY EQUIPMENT

Item No.

Description Q’ty Unit

3 Road Roller

3.1 4 tons 1 Car

3.2 10 tons 1 Car

4 Backhoe 3 Car

5 JCB 1 Car

Road Roller, Backhoe & JCB

Page 22: pegprofiles
Page 23: pegprofiles

6.1 PETROCHEMICAL INDUSTRIAL 6.2 WATER TREATMENT INDUSTRIAL 6.3 POWER PLANT 6.4 STEEL MAKING PLANT 6.5 GENERAL FACTORY

Page 24: pegprofiles

Item No.

Owner Project Name Description Year Value of Contract

(THB)

1 TY STEEL Steel Marking Plant Expansion

Civil and Building work

2014 94,000,000

2 UBE New Sulfur Furnace & Converter Improvement

Civil, Steel Structure and mechanical work

2014 48,500,000

3 TY STEEL Steel Marking Plant Expansion

Civil and Building work

2013 190,000,000

4 IRPC Waste Water Treatment Upgrading (PWTU)

PC 2012-2013

109,000,000

6. COMPANY EXPERIENCE

Page 25: pegprofiles

Item No.

Owner Project Name Description Year Value of Contract

(THB)

5 IRPC Improve Evaporation System (HDU-II)

EPC 2012-2013

209,000,000

6 TPSC Amata B. Grimm Power

Construction work 2012-2013

101,000,000

7 HMC Improvement Project

Construction work 2012 19,500,000

8 MTP HPPO (SCG-DOW Group)

HDPE Piping and Install Bio Cooling

Piping work 2012 9,000,000

6. COMPANY EXPERIENCE

Page 26: pegprofiles

CLIENT REFERENCE

UBE IRPC HMC

DOW Praxair(Thailand) Thai Polythylene

Page 27: pegprofiles

UBE EXPERIENCE

Page 28: pegprofiles

IRPC - HDU II PROJECT EXPERIENCE

Page 29: pegprofiles

HMC Polymers EXPERIENCE

Page 30: pegprofiles

DOW EXPERIENCE

Page 31: pegprofiles

Praxair(Thailand) EXPERIENCE

Page 32: pegprofiles

Thai Polythylene EXPERIENCE

Page 33: pegprofiles

IRPC DOW MOC

CLIENT REFERENCE

Page 34: pegprofiles

IRPC – PWTU PROJECT EXPERIENCE

Page 35: pegprofiles

DOW EXPERIENCE

Page 36: pegprofiles

MOC EXPERIENCE

Page 37: pegprofiles

AMATA B.GRIMM 1 & 2

CLIENT REFERENCE

Page 38: pegprofiles

ABPR1 & 2 EXPERIENCE

Page 39: pegprofiles

ABPR 1&2 EXPERIENCE

Page 40: pegprofiles

ABPR 1&2 EXPERIENCE

Page 41: pegprofiles

ABPR 1&2

EXPERIENCE

Page 42: pegprofiles

SYS TYS

CLIENT REFERENCE

Page 43: pegprofiles

SYS EXPERIENCE

Page 44: pegprofiles

TYS EXPERIENCE

Page 45: pegprofiles

TYS EXPERIENCE

Page 46: pegprofiles

THANK YOU