Top Banner
PEG Con: 1 Schlumberger Oilfield Services Production Enhancement Groups
19

PEG Concept

Apr 09, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 1/19

Page 2: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 2/19

 PEG Con: 2

Engineered Pro Active Solutions with non-traditional work.

Joint Expertise Dowell/Wireline/Anadrill/Geoquest

Creative Economics - Pay related to Production.

Production Enhancement Concepts

Int.

Page 3: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 3/19

 PEG Con: 3

IMPROVING OUR CLIENTS PRODUCTION IN EXISTING

WELLS THROUGH THE SYNERGISTIC TECHNOLOGIESOF THE SCHLUMBERGER COMPANIES.

Mission Statement

Page 4: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 4/19

 PEG Con: 4

Synergy

The Joint Actions of Companies Taken

Together Increase the Effectiveness of Each.

Client

DowellWireline &

Testing

PEG

Page 5: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 5/19

 PEG Con: 5

Objectives of Production

Enhancement

• Identify Wells with a Production Gap.

• Apply services that economically enhance production.

• Establish Feedback Loop.

• Improve Communication.

Page 6: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 6/19

 PEG Con: 6

Production Enhancement

- Well Evaluation

- Data Acquisition- Log Evaluation- Well Tests & Surveys- Production History

- Nodal Analysis- Recommend Services toenhance production- Execute services

- Evaluatepost-treatmentperformance

- Payback 

- ROR, ROI, NPV- Happy Client!

Page 7: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 7/19

 PEG Con: 7

Flowrate

- Single well IPR = f (t, Np)

- Pvt

- Plumbing - Pwf Caused By Pumps

- Restrictions- Acid

- Lift System Problems

Potential

Actual

Actual

Potential

Actual

Potential

Actual

Potential

SPANProduction LoggingRSTUltraSonic Imager 

Re-PerforateGravel PackSqueeze CementingAcidizing

Transient Test / Data PumpRSTProduction LoggingDipole Shear Sonic Imager 

Stimulation - Frac / AcidPerforateLateralsSqueeze Cementing

Calipers - TGS/MFCTUltraSonic Imager Production LoggingCollar Locator 

AcidizingScale Removal with CoilTubingCoil Tubing completionEarly Production Facility

Production LoggingData Pump

- P = f (q)

- Darcy's Law

- Physical Description

+ Impact

- Perfs

- Sand Control

- Classical Skin

- Zone Isolation

- Tubing & Flow Lines

- Traps

- Erosional Velocity

P

Services Services Services Services

Parameters Affecting

Performance

Parameters Affecting

Performance

Parameters Affecting

Performance

Parameters Affecting

Performance

Need DefinitionNeed Definition Need Definition Need Definition

Remedial Action / SolutionRemedial Action / Solution Remedial Action / Solution

Production Gap

RESERVOIR

PERFORMANCE

COMPLETION

PERFORMANCE

FLOW CONDUIT

PERFORMANCEARTIFICIAL LIFT

PERFORMANCE

OBJECTIVE

Bottom

HoleFlowing

Pressure

2spf 

12 spf 

OBJECTIVE OBJECTIVE OBJECTIVE

Flowrate Flowrate FlowrateBottom

HoleFlowing

Pressure

Bottom

HoleFlowing

Pressure

Page 8: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 8/19

 PEG Con: 8

The Production Gap

25%

65%

8% 2%

Reservoir

Completion

Flow Conduit

Artificial Lift

Classification:

Page 9: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 9/19

 PEG Con: 9

Project Loop

Presentation / Meeting

Team established (contact point)

Data Collected

Data Analyzed ( Houston)

Specific Proposal Made to client

Financial Objective/Terms set

Project Execution

Post Job Evaluation

Total Performance evaluation

Page 10: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 10/19

 PEG Con: 10

Analysis Process

Catalog Multiwell Info

Identify Production Anomalies

Choose first well

Analyze Existing Completion

Move to next zone

Aquire needed data (TDT,BU)

Submit Recommendation

Post Job Evaluation

• Log Analysis

• Transient Analysis

• Nodal Analysis

• Perforation Analysis

• Frac design & Analysis

• Decline Curve analysis

• Production History Match.

• NPV Economics

Page 11: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 11/19

 PEG Con: 11

Data Requirements

• Open hole logs

• Existing completions / workover history

•Transient analysis data, pressure surveys

• Production history / Decline curves

• PVT analysis, core test data

• Field maps, structure maps, sand plays etc.• Stratigraphic correlations

Page 12: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 12/19

 PEG Con: 12

Reservoir Monitoring & PEG

• Single well simulation

• History matching / Decline curve analysis

• Reserves estimates / Remaining reserves

• Production Gap - Candidate Recognition• Well Production & Intervention Services

• Economic analysis

• Full Field Simulation (with other Schlumberger companies

Page 13: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 13/19

 PEG Con: 13

Hydrocarbon Index

10 20 30 40 50 600

10

20

30

40

50

60

Cum Prod. MCF

40+

35 to 40

31 to 35

26 to 31

22 to 26

17 to 22

13 to 17

8 to 13

4 to 8

0 to 4

N

HYDROCARBON INDEX

NOT PERFORATED

Index

Potential

Page 14: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 14/19

 PEG Con: 14

Acid Job Case history

IPR Before Acid Job

IPR after Acid job

WELL:

Location:

Sate: TX

DOWELL SCHLUMBERGERSystem Analysis Model

3000

2250

1500

750

0

0500 1000 1500 2000

Production (Mscfd) a=base

1 2 3

a

1 skin = 3.0

2 skin = 1.03 Pws Curve

Pw

f(psig)

South Texas Edwards Lime

Pr 2200 psi

H 40 ft.

K 1 md.

Skin 3

Initial Production 750 mscf/day

Potential Production From Sam Analysis 1270 mscf/day

Actual Production after FoamMat Treatment 1400 mscf/day

Page 15: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 15/19

 PEG Con: 15

Reperforation Cased History

WELL:

Lcoation:

Sate: TX

DOWELL SCHLUMBERGERSystem Analysis Model

10000

7500

2500

00

250 5001000

Production (Bbls/d)a=base1 Lperf= 8 in

2 Lperf= 22in

3 Pws Curve

Pwf(psig)

5000

1 23

a

IPR Before Reperforating

IPR After Reperforating

DOLOMITE RESERVOIR

Pr 8500 psi

H 20 ft.

K 1.6 md.

Damaged Zone Radius 6 in.

Damaged Zone K .85 md.

Production after Perforating with XXX Casing Gun 55 BOPD

Production after Perforating with 1 11/16 EEJ 148 BOPDPredicted Potential Production 270 BOPD

Actual Production after Reperforating with Pivot Gun 277 BOPD

Page 16: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 16/19

 PEG Con: 16

Frac Job Cased History

WELL:

Lcoation:

Sate: TX

DOWELL SCHLUMBERGERSystem Analysis Model

3000

3750

2500

1250

00

500 1000 1500 2000

Production (Mscfd) a Pwh = 1000 psi

b Pwh = 2600 psi1 Base

3 Pws Curve

Pwf(p

sig)

IPR Before FRAC

WHP 2600 psi

Unloading rate for Condensate

1 2

a

WHP = 1000 psi

Unloading rate (water)

b

IPR after FRAC

or 550 mcf @ 2600 psi

SOUTH TEXAS WILCOX

Pressure 

4500 psi

Height  45 ft.

Perm  .09 md.

Initial Production 0 mcf 

Predicted Potential from Nodal Analysis 1500 mcf @ 1000 psi

Actual Production after Frac Treatment 600 mcf @ 2600 psi

Page 17: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 17/19

 PEG Con: 17

BHP\Z

Depletion?

Page 18: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 18/19

 PEG Con: 18

Exponential Decline

Economic Limit

Will stimulation pay out ?

Page 19: PEG Concept

8/8/2019 PEG Concept

http://slidepdf.com/reader/full/peg-concept 19/19

 PEG Con: 19

Return On Investment

Time (days)0 365

0

Payout 2

Payout 1

Added Value

Reduced Cost