  • PEEM III Endstation Design Review

    Endstation LayoutSupport System Vessel Magnetic Shielding

  • PEEM III Endstation Design Review

    Endstation Layout Sector 11

  • PEEM III Endstation Design Review

    Endstation Layout

  • PEEM III Endstation Design Review

    MicroscopeSample Prep and transferGeneral HV UHV in Sample and Mirror Sections

    < 2x10-7 Gauss AC Field

    Nanometer Scale Stability-Sample to Optics

    Easy access to internal components

  • PEEM III Endstation Design Review

    Microscope - Details5-Axis Sample ManipulatorFiber-Optic Laser90 degree Optics and MirrorInternal SupportCCD CamerasUHV Sub-ChamberSeparator Replacement Optics

  • PEEM III Endstation Design Review

    Support SystemHigh stiffness - vibration isolated internal supportSemi-kinematic mountingEpoxy-granite filled baseVisco-elastic dampingIsolated chamber and external components

  • PEEM III Endstation Design Review

    Support System - AssemblyInstall/Align base stand with visco-elastic damping padsInstall/align filled baseSide mounting pads for jacks/ball platesMount internal table support legs and align fiducialized table (or plate)Install/align struts and chamber

  • PEEM III Endstation Design Review

    Vacuum Vessel

  • PEEM III Endstation Design Review

    Vacuum Vessel - DetailsHV required UHV desirableSS plate weldment Differentially pumped, double o-ring, window frame to lid sealStandard conflat ports

  • PEEM III Endstation Design Review

    UHV Sub-Chamber - DetailsAluminum conductance limited UHV-HV sub-chambersO-Ring base/lid sealGlass viewing windowBe-Cu sheet interface

  • PEEM III Endstation Design Review

    UHV Sub-Chamber - Details

  • Table 5. Gas loading on the Main Peem3 chamber and pressure after 100 hours with 10" OD tee pumping system, 800 l/s ion pump + 1000 l/s turbo

    Main PEEM3 vacuum tankOutgassing rate 100hrsAreaGas loadfraction torr l/s/cm^2cm^2torr l/s%Al tank 1.00E-10335003.35E-064Mu metal 1.00E-102032252.03E-0527Al optic table1.00E-1050005.00E-071Separator magnet1.00E-1035003.50E-070Epoxy Castal E301-KT,RT752.56E-071734.43E-0559kapton wires1.00E-0920002.00E-063Viton O-ring double (cm)3.00E-103009.00E-080Viton O-ring 20 KF40(cm)1.80E-082514.52E-066Total outgas rate7.54E-05torr l/sMain tank pump l/s880.95Pressure in main tank torr8.56E-08torr

  • Main microscope tankMu metal Stove PipeUHV sub-chamberMainPumpingTeeMainPumpingAdaptorTurboValveIon Pump 1Ion Pump 2MainPumpingBellowsHole for electronsCu/Be rolled sheetUHV Pump TeeUHV Pump bellows Schematic arrangement of Peem3 pumping for UHV sub-section and main tank Window

  • Table 7. Gas loading on the UHV sub-chamber and pressure after 100 hours with 8" OD tee pumping system and 800 l/s ion pump. Pressure in main tank = 8.5e-8 torr.

    Sub UHV chamberBox 20x20x20cm - 1/2" Al plate with viton O ring sealsOutgassing rate 100hrsAreaGas loadfraction torr l/s/cm^2cm^2torr l/s%Al sub chamber tank 1.00E-1024002.40E-0736Lenses 5.00E-101809.00E-0814Ceramic 2.30E-101804.14E-086Sample manipulator2.30E-104009.20E-0814Viton O-ring (cm) baked 3.00E-102407.20E-0811Total outgass rate5.35E-0781Leaks from main tankarea cm^2length cmConductance l/s25um gaps in overlap sleeve walls0.251.21.12038(2x4" and 3x1.5" sleeves)2mm Aperture for electrons0.031400.36688total leak conductance1.48726l/sGas load of leak torr l/s1.27E-0719Total gas load 6.63E-07100UHV sub-ch pump l/s269.65l/sP in UHV sub-cham torr2.46E-09torr

  • PEEM III Endstation Design Review

    Magnetic Shielding

  • Magnetic Shielding requirements require < 2x10-7 Gauss ACAC field on the floor of +-0.3mGauss (1Hz) Need attenuation of ~ 2500 Crude cylinder model indicate 2 layers attenuate ~16003 layers attenuate ~ 26000Better calculation by Amuneal suggest 3 layer attenuation ~ 7000Thickness of shield = 3mm for mechanical rigidity Shield spacing = 25mm as large as possible given space constrainsDegaussing of inner shield with AC and internal coils

    Magnetic field at Peem3 locationModel of mu metal shields with Vacuum chamberremoved

  • PEEM III Endstation Design Review

    Magnetic Shielding3 Concentric boxes with ~ 1 gapAssembled from outside inSeparated with aluminum spacers/handle mountsPEM fasteners @ ~3.5 spacingNo penetrations > 5 diameters in critical areas - tubulations~ 3 diameters in 2 pump sections

  • PEEM III Endstation Design Review

    Magnetic ShieldingTubulation Details

  • PEEM III Endstation Design Review

    The End (Hopefully)