Top Banner
Pedestrian Temporary Traffic Control Ed Cashman and Mary O’Brien 2019
36

Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Oct 04, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Pedestrian Temporary Traffic Control

Ed Cashman and Mary O’Brien

2019

Page 2: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Background

Page 3: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

A mode of transportation

Pedestrian

Page 4: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Photo credit: http://www.broward.org/BCT/Schedules/Pages/default.aspx

Page 5: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Photo credit: https://www.tripsavvy.com/best-beach-wagons-4158060Photo credit: http://megakidsnaples.com/product/stroller-1/

Page 6: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

For some, their only mode.

Photo credit: https://www.popalockofjacksonville.com/tag/children-safety/Photo credit: http://www.free-foundation.org/walkers---wheeled-walkers

Page 7: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Photo credit: https://www.wphf.org/2014/10/22/three-local-mayors-walk-with-students-on-international-walk-to-school-day/

Page 8: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Photo credit: http://www.sun-sentinel.com/features/sfl-blind-pedestrians-white-cane-safety-walk-20141015-photogallery.html

Page 9: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Photo credit: https://www.mountnittany.org/articles/healthsheets/183 Photo credit: https://www.tripsavvy.com/florida-special-needs-traveler-guide-1513987

Page 10: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary
Page 11: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Pedestrian Safety Statistics

Page 12: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

National: 2017

Source: https://www.workzonesafety.org/crash-information/work-zone-fatal-crashes-fatalities/#national

Page 13: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Florida: 2017

Source: https://www.workzonesafety.org/crash-information/work-zone-fatal-crashes-fatalities/#florida

Page 14: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

A Problem:

Pedestrian Detours that are too long

Page 15: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary
Page 16: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

So, what is FDOT doing to address this?

Page 17: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Pedestrian Temporary Traffic Control

1. CHANGESPedestrian Special DetourStaff Hours for Pedestrian TTCPs

2. CURRENT REQUIREMENTS FDOT Design Manual (FDM) 240Standard Plans, Index 102-660Standard Specifications, Section 102

Page 18: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Design Staff Hour Estimation Guidelines

Revised the Design Scope of Services and Staff Hour Estimation Guidelines to provide for pedestrian Temporary Traffic Control Plans (TTCPs)

Page 19: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Design Staff Hour Estimation Guidelines

Task 4.10 – Temporary Traffic Control Plan (TTCP) Analysis:

Page 20: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Design Staff Hour Estimation Guidelines

Task 4.11 – Master TTCP Design Files:

Page 21: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Design Staff Hour Estimation Guidelines

Based on these revisions:

• It is anticipated that a pedestrian TTCP will always be provided when pedestrian facilities are impacted.

• A “simple” TTCP (Level I) may include a master TTCP design file for only the pedestrian temporary traffic control.

Page 22: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Standard Specifications, Section 102

Added a new pay item for Pedestrian Special Detours, LS

Page 23: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Standard Specifications, Section 102

Added a new pay item for Pedestrian Special Detours, LS

Page 24: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Standard Specifications, Section 102

Pedestrian Special Detour Highlights:

• Pedestrian Special Detours are similar in usage to Special Detours.

• There is an associated Summary Box and secondary unit of measure for Pedestrian Special Detours. See the Basis of Estimates for additional information.

Page 25: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Pedestrian Temporary Traffic Control

1. CHANGESProject ManagementStandard Specifications, Section 102

2. CURRENT REQUIREMENTS FDOT Design Manual (FDM) 240Standard Plans, Index 102-660Standard Specifications, Section 102

Page 26: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

FDM 240

Page 27: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Standard Plans, Index 102-660

The alternative treatments:

• Pedestrian Detour

• Temporary Pedestrian Way

Page 28: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Standard Plans, Index 102-660

A temporary pedestrian way should be considered under the following conditions:

• A pedestrian detour is infeasible (e.g., travel time increase will be significant, curb ramp reconstruction, etc.).

• Existing pedestrian facilities are located on only one side of the roadway.

• Sufficient right-of-way exists for a temporary pedestrian way.

A pedestrian detour should be considered under the following conditions:

• There are sufficient existing pedestrian facilities for a pedestrian detour.

• The construction work can be staged in a manner that leaves one side of the roadway unaffected.

• Pedestrian access to existing businesses or attractions can be maintained.

• The increase in travel time for pedestrians will be minor.

Page 29: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Standard Specifications, Section 102Sub-article 102-6.2:

Page 30: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

EXAMPLE: A well-constructed temporary pedestrian way with pedestrian longitudinal channelizing devices.

Page 31: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

EXAMPLE: A poor temporary pedestrian way.

What’s wrong with this picture?

Issues:

• No LCDs delineating the way

• Incorrect placement of the LCD/barricade combination

• Dubious quality of the suface

Page 32: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Example #1

Objective:

- Reconstruct existing sidewalk curb ramps to standard.

How to maintain access during construction?

Existing Sidewalk

Existing Trail

Existing Sidewalk

Page 33: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Example #1

Construct a temporary pedestrian way (Pedestrian Special Detour pay item) to maintain access until the permanent curb ramps are completed.

Existing Sidewalk

Existing Trail

Existing Sidewalk

Temporary Pedestrian Way

Temporary Pedestrian Way

Page 34: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Example #2

Scope:

- Reconstruct existing sidewalk curb ramps to standard.

- Add crossings to all legs.

- Connect to trail, if possible.

How to maintain access during construction?

Existing Sidewalk

Existing Sidewalk

Existing Trail

Page 35: Pedestrian Temporary Traffic Control · Project Management Standard Specifications, Section 102 2. CURRENT REQUIREMENTS ... Sidewalk Existing Sidewalk Existing Trail. Pedestrian Temporary

Example #2

Stage the construction. Some elements such as the NE & SE quadrants can be constructed prior to tangling with the existing ramps in the NW & SW quadrants. Separate the curb ramps where possible.

Existing Sidewalk

Existing Sidewalk

Existing Trail