up Riser Hatch Lockers Office Treatment Reception Prep Anaesthetics Recovery Acc. WC & change Patient change Waiting Gowned Waiting Goods lift Riser Staff base Stores Office Family Room MRI Imaging Control MRI Plant Switch Cupboards Meeting Room Riser Above m. Stores Training Room up Clean Utility Dirty Utility Patient change Patient change Hydr.Lift Pump Room Store Control Room 1 Plant Area Meeting Room Meeting Room Store Accelerator Chamber LIGHT system Riser Above Plant and Services Distribution area Staff Rest up sh. M sh. Bed Lift Staff Change Staff Change 35790 55 m² 15 m² 57 m² 18 m² 18 m² 26 m² 21 m² 12 m² 16 m² 5000 5750 Staff/ Plant Accelerator Control 30 m² Testing 25 m² Staff / Plant Power Room 48 m² Plant Redundant Room 48 m² Analogic Control 26 m² 9000 F E D C B A 1 2 3 4 5 6 7500 7500 7500 7500 9010 9000 9000 9000 6000 14 m² Control Room 3 5000 4000 Main stores Disposal Hold 55 m² Change Room 32 m² Acc. WC 21 m² 21 m² 7 m² 7 m² 16500 9000 9000 18000 2550 12 m² Control Room 2 Proton Treatment room 1 + CT scanner Proton Treatment room 2 Proton Treatment room 3 Proton Beam Dump 73 m² 110 m² 140 m² 4900 13550 The arrangement of the therapy floor: The basement level -2 is dedicated to the AVO treatment facility and its support accommodation. Eight zones are arranged around circulation points of access, and located to provide good circulation and adjacency. Patient Areas Treatment Area Proton beam generation and delivery Proton beam control Plant and services distribution Admin and Staff areas Treatment Support Circulation 608 m² 129 m² 410 m² 373 m² 600 m² 427 m² 359 m² 272 m² TOT areas 3178 m² + AVO Services Mezzanine 1970 m² 1:200@A1 Aug 2016 C 08.Aug.16 dks Layout amended to take AVO treatment areas onto a single floor at Basement level -2 SK15 revD