“Gas for Indonesia “Gas for Indonesia 2020 2020-2030". 2030". Rovicky Dwi Putrohari Indonesian Association of Geologist
“Gas for Indonesia “Gas for Indonesia
20202020--2030".2030".
Rovicky Dwi PutrohariIndonesian Association of Geologist
BackgroundBackground
• Population growth of Indonesia require guarantees the
availability of natural resources to strengthen the resilience
and independence of the nation and the state in the future
• A need of strategies and models of governance as well as
a more accurate economic strategy.
• The provision of a secure environment (mitigation), to
conserve environment.conserve environment.
• Upgrade human resources potential (SDM) for operating
a more complex industries
Demographic BonusDemographic Bonus
2020-2030 ����160-180 Millions
working age
Widjojo Nitisastro
2020-2030 ����Window of opportunity
World Population GrowthWorld Population Growth
Rates %
Do we have enough resources? Do we have enough resources?
Indonesian Population will be 400 Mil in 2050.
Indonesia will surpass Amerika after China and
India. Total earth population 9.850 Millions (close to
10 Billion) on that year.
CIA World Fact Book
EnergiEnergi untukuntuk TransportasiTransportasi
((FutureFuture) )
Liquid Fuel
Dominated
BPPT 2013
Dominated
Gas Export Gas Export vsvs Local AllocationLocal Allocation
Long term contractLong term contract
LNG export
Projection of gas utilizationProjection of gas utilization
BPPT, 2013
Industry ChallengeIndustry Challenge
Projection of LNG production, Projection of LNG production,
consumption, export and importconsumption, export and import
Preparing gas importPreparing gas import
KebutuhanKebutuhan energy finalenergy final
PNTM (PNTM (PertamabahnPertamabahn NilaiNilai Tambang Mineral)Tambang Mineral)
MP3EI
KebutuhanKebutuhan EnergiEnergi IndonesiaIndonesia
� Tahun 2008 perkiraan 3x
lipat dalam 20 tahun.
Tahun 2012 BPPT
menghitung kebutuhan
dasar juga 3x lipat. �
Impor energi
� Dengan MP3EI menjadi 4.5
kali lipat. MP3EI
kali lipat.
� Artinya kebutuhan impor
anergi 2030 dapat
mencapai 2-4 juta SBM.
BPPT, 2012
0.5
1.0
1.5
2.0
2.5
3.0
Production
Condensates
Gas
Oil
Exploration and Exploration and ProductionProduction
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010
Series1Series2
Gas
Oil
Discovery D AlphaMinas Duri
01900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010
Undeveloped Gas in AcehUndeveloped Gas in Aceh
Some of undeveloped gas field Some of undeveloped gas field
were not include in the program were not include in the program
RingkasanRingkasan
�Pertumbuhan penduduk dan Bonus DemografiIndonesia 2020-2030 � 160-180 tenaga kerja aktif
�Perlu penyediaan lokasi yg aman (mitigasi), sehat(konservasi). � Infra Struktur
�Kebutuhan SDAlam dan SDEnergi perludiantisipasi.diantisipasi.
�Pengelolaan SDA dan SDE perlu mengutamakankebutuhan dalam negeri �
�Usaha mandiri dengan melakukan eksplorasi tetapharus diutamakan.
�Potensi bisnis migas masih menjadi industry strategis dengan pangsa investasi yang besar
RingkasanRingkasan
�Demography bonus Indonesia 2020-2030 � 160-180
Workforce � OPPORTUNITY
�Anticipate the need of energy resources and raw
material
�Focus on domestic demand
�Focus on infrastructure (incl, electric transmission)
Oil/Gas Licensing Time Line Oil/Gas Licensing Time Line
Exploration Wells2D/3D seismic
G&G
Exploration Stage (6-10years) Production Stage
License 30 years
GEOSCIENCEExploration Wells
Appraisal Wells
Development WellsInfill Wells
Constructions Maintenances
GEOSCIENCE
ENGINEERING
Discovery First Oil8-12 years
1st Period 2nd Period Production
2013 2014 2015 2016 2017 2018 2019