PC With Spoilage Rework

Jun 02, 2018

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/10/2019 PC With Spoilage Rework

    1/32

    Compliance Non-ComplianceCosts Costs

    Prevention Appraisal Internal External Spoilage Rework

    FC

    1

  • 8/10/2019 PC With Spoilage Rework

    2/32

    2

  • 8/10/2019 PC With Spoilage Rework

    3/32

    Normal [Expected] AbnormalSpoilage Spoilage

    Difference betweenactual & normal

    spoilage

    3

  • 8/10/2019 PC With Spoilage Rework

    4/32

    AS NS AS NS

    LOSS GAIN

    4

  • 8/10/2019 PC With Spoilage Rework

    5/32

    Spoilage

    Ins pt before Ins ptE WIP % after E WIP %

    5

  • 8/10/2019 PC With Spoilage Rework

    6/32

    COG E WIPCompleted

    6

  • 8/10/2019 PC With Spoilage Rework

    7/32

    Allocate NS

    Only to COG completed

    7

  • 8/10/2019 PC With Spoilage Rework

    8/32

    0% 100%

    B ESNS AS

    C

    Good

    Spoiled

    8

  • 8/10/2019 PC With Spoilage Rework

    9/32

    DM DL CCCompletedNS

    ANSE WIP

    10

  • 8/10/2019 PC With Spoilage Rework

    10/32

    Cost DM DL CCB WIPCURRENT

    COST TO a/c for

    Calculate the cost per E.U?Prepare the cost distribution

    schedule.

    11

  • 8/10/2019 PC With Spoilage Rework

    11/3214

  • 8/10/2019 PC With Spoilage Rework

    12/32

    Normal [Expected] AbnormalRework Rework

    Difference betweenactual & normal

    rework

    15

  • 8/10/2019 PC With Spoilage Rework

    13/32

    AR NR AR NR

    LOSS GAIN

    16

  • 8/10/2019 PC With Spoilage Rework

    14/32

    Rework

    Ins pt before Ins ptE WIP % after E WIP %

    17

  • 8/10/2019 PC With Spoilage Rework

    15/32

    COG E WIPCompleted

    18

  • 8/10/2019 PC With Spoilage Rework

    16/32

    Allocate NR

    Only to COG completed

    19

  • 8/10/2019 PC With Spoilage Rework

    17/32

    0% 100%

    B ES

    C

    Calculate normal reworked units.Determine actual reworked units.Compute abnormal reworked units, if any.

    20

  • 8/10/2019 PC With Spoilage Rework

    18/32

    DM DL CCCompletedNR

    ANRE WIP

    22

  • 8/10/2019 PC With Spoilage Rework

    19/32

  • 8/10/2019 PC With Spoilage Rework

    20/32

    26

  • 8/10/2019 PC With Spoilage Rework

    21/32

    In relation to Spoilage [Refer to slides 2 11]: How much is actual spoilage, in units? What % and activity volume is used to express

    normal spoilage? How much is abnormal spoilage?

    How is abnormal spoilage treated? How is normal spoilage allocated to the cost of

    production?Dependent on where Ending WIP inventory %completion lies in relation to the Spoilage Inspection

    Point.If E WIP % is beyond Spoilage Ins Pt NS allocated to COGcompleted & E WIPIf E WIP % is before Spoilage Ins Pt NS allocated to COGcompleted only

    27

  • 8/10/2019 PC With Spoilage Rework

    22/32

    In relation to Rework [Refer to slides 14 23]: How much is actual reworked units? What % and activity volume is used to express

    normal rework? How much is abnormal rework?

    How is abnormal rework treated? How is normal rework allocated to the cost of

    production?Dependent on where Ending WIP inventory %completion lies in relation to the Rework Inspection

    Point.If E WIP % is beyond Rework Ins Pt NS allocated to COGcompleted & E WIPIf E WIP % is before Rework Ins Pt NS allocated to COGcompleted only

    28

  • 8/10/2019 PC With Spoilage Rework

    23/32

    In relation to both Spoilage & Rework: Where does the Rework Inspection Point lie in

    relation to the Spoilage Inspection Point?

    29

    RW

    Ins Pt

    RW

    Ins Pt

    SP

    Ins Pt

    SP

    Ins Pt

    Where to allocate costs of NR?

  • 8/10/2019 PC With Spoilage Rework

    24/32

    NS AS

    30

  • 8/10/2019 PC With Spoilage Rework

    25/32

    31

    COGCompleted E WIP

    NR is now allocatedin 4 ways: NS

    AS

  • 8/10/2019 PC With Spoilage Rework

    26/32

    32

    COGCompletedR is now allocated

    in 3 ways:

    NS AS

  • 8/10/2019 PC With Spoilage Rework

    27/32

    DO NOTAllocate NS

    toNR & AR

    33

  • 8/10/2019 PC With Spoilage Rework

    28/32

    COG E WIPCompleted

    34

    Allocation of NS

  • 8/10/2019 PC With Spoilage Rework

    29/32

  • 8/10/2019 PC With Spoilage Rework

    30/32

    0% 100%

    B ES

    RWBAL

    36

    G

    S

    RW

    Determine actual reworked units.Calculate normal reworked units.

    Compute abnormal reworked units, if any.

    Determine good units.Calculate normal spoilage.Compute abnormal spoilage, if any.

  • 8/10/2019 PC With Spoilage Rework

    31/32

    DM DL CCCompletedNS

    ANSNRANRE WIP

    38

  • 8/10/2019 PC With Spoilage Rework

    32/32

    Cost DM DL CCB WIPCURRENT

    COST TO a/c for

    Calculate the cost per E.U?Prepare the cost distribution

    schedule.