Top Banner
Easy as Pie! 12 June 2015 Project Based Volunteering
20
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: PBV

Easy as Pie!12 June 2015

Project Based Volunteering

Page 2: PBV

Today’s To Do List • What is a Project Based Volunteer?

• What types of projects would a Project Based Volunteer do?

• Broadly Workshop Your Idea

• Discuss the Next Steps

Page 3: PBV

What is a Project Based Volunteer? • A temporary volunteer who completes a specific project within a defined

period of time using a specific set of professional skills

• An unpaid contractor

• Possible skills your project may need

• Familiarity with current DOT expectations—Jacob

• Ability to work with publisher and adobe softwares—Jessica

Page 4: PBV

What Types of Things Does a PBV Do? • What types of things does your department need help with?

• How often does this need occur?

• Does this need fit the definition of a Project Based Volunteer?

• A temporary volunteer who completes a specific project within a set period of time

Page 5: PBV

Workshopping Your Idea• In one sentence, what will your project accomplish?

• Like a personal ad…but not…

• Why does this project need to happen? How will it help the food bank run more effectively?

• Ex: “By updating, expanding, and strengthening the Chef’s Math course in the CCK education program, participants will more fluidly move within recipes and a formal kitchen setting by being able to make relevant, analytical, and critical decisions in an immediate fashion.”

Page 6: PBV

Workshopping Your Idea• Now that you have the end goal in mind, what skills are necessary to

get you there?

• Top 5-7 skills

• Looking at those skills• What skills are absolutely non-negotiable?

• What skills can be negotiated?

• What skills are desirable?

Page 7: PBV

Workshopping Your Idea• Now that you have the skill set in mind, what does success look like?

• What is the bare minimum that would allow you to feel like the project was accomplished?

• What is the highest ideal that would allow you to look at this project and feel like the project and more was completed?

• What is the middle range?

Page 8: PBV

Things to Consider at This Point • The infamous triangle

• When is it due?

• Is this worth my resources?

• If not, no worries

Good

Fast

Cheap

Page 9: PBV

After the Form Submission• The Volunteer Management Department begins recruitment

• When we find a viable candidate:

• Contact you, set up an interview with you, Volunteer Management, and the volunteer

• If the interview goes well, we check references

• References check out, we offer the position to the volunteer• Sit down with the volunteer to sign the Memorandum of Understanding

• Who/What/Where/When

• Check in frequency

• Benchmark establishment

Page 10: PBV

After the Project Completion• Evaluate the whole thing

• Exit interview the Volunteer

• Get feedback from them

• Give feedback to them

• Acknowledge them however you choose• Job recommendation or reference

Page 11: PBV

Questions? Sorry…no pie to enjoy…Chris is having a party next door, though!

Page 12: PBV

Click icon to add picture

Page 13: PBV
Page 14: PBV

Click icon to add picture Click icon to add picture Click icon to add picture

Page 15: PBV
Page 16: PBV
Page 17: PBV
Page 18: PBV
Page 19: PBV
Page 20: PBV

Click icon to add picture