Top Banner
Paul Dunbar Paul Dunbar Exploration Manager Exploration Manager
36

Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Mar 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Paul DunbarPaul DunbarExploration ManagerExploration Manager

Page 2: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

DISCLAIMERThis presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The informationcontained in this presentation is a professional opinion only and is given in good faith.

Certain information in this presentation has been derived from third parties and though Energy Metalshas no reason to believe that it is not accurate reliable or complete it has not been independentlyhas no reason to believe that it is not accurate, reliable or complete, it has not been independentlyaudited or verified by Energy Metals.

Any forward looking statements included in this presentation involve subjective judgement and analysisand are subject to uncertainties, risks and contingencies, many of which are outside the control of, andmaybe unknown to Energy Metals In particular they speak only to the date of this presentation theymaybe unknown to, Energy Metals. In particular they speak only to the date of this presentation, theyassume the success of Energy Metals’ strategies, and they are subject to significant regulatory, business,competitive and economic uncertainties and risks. Actual future events may vary materially from theforward looking statements and the assumptions on which these assumptions are based. Recipients ofthis presentation are cautioned not to place undue reliance on such forward looking statements.

Energy Metals makes no representation or warranty as to the accuracy, reliability or completeness ofinformation in this document and does not take responsibility for updating any information or correctingany errors or omissions which may become apparent after this presentation is released.

To the extent permitted by law Energy Metals and its officers employees related bodies corporate andTo the extent permitted by law, Energy Metals and its officers, employees, related bodies corporate andagents disclaim all liability, direct, indirect or consequential (and whether or not arising out of thenegligence, default or lack of care of Energy Metals and/or any of its agents) for any loss or damagesuffered by a recipient or other persons arising out of, or in connection with, any use or reliance on thispresentation or information.

All amounts in A$ unless stated otherwise.

Page 3: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 4: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Current EME Share Price $0.35 Current Spot Price $52.00

Long Term Uranium Price $62-65

Current EME Share Price $0.35 Current Spot Price $52.00

Long Term Uranium Price $62-65

Page 5: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 6: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

CGNPC (China Guangdong Nuclear Power Holding Co. Ltd)

• Clean energy group (established 1994)

Total assets US$39 7B • Total assets US$39.7B,

• Net Assets US$11.1B (Jan 2012)

• 6 operating nuclear power plants (6,110 Mwe) close to HK

• 15 power plants (17,540 MWe) under construction

• One of only 2 Chinese companies which can import

Uranium

Page 7: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

C it l St t Capital Structure (current)

Shares on Issue 153.8m

Sh h ld 1 000Shareholders ≈1,000

Cash (31 D b 2011) $ 24 5mCash (31 December 2011) $ 24.5m

CGNPC 93.1m shares 60.6% KangDeJindalee

19.5m shares 14.0m shares

12.7%9.1%

Page 8: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Highly Experienced Board

Mr Zuyuan He (Chairman) CGNPC - URC

Highly Experienced Board

Dr Weidong Xiang (Managing Director)

Mr Bin Cui (Finance Director)

CGNPC - URCCGNPC - URCMr Bin Cui (Finance Director)

Ms Zheng Xiaowei (Non Exec)

Mr Zhong Yu (N E )

CGNPC URCCGNPC - URC

KangDeMr Zhong Yu (Non Exec)

Mr Lindsay Dudfield (Non Exec)

KangDe

Mr Geoff Jones (Non Exec)

Xuekun Li (Company Secretary)

Page 9: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

U i T diUranium Trading

Page 10: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

U i T diUranium Trading

Unique Uranium Export Permit Granted• Unique Uranium Export Permit Granted

• Permit to Possess Granted• Permit to Possess Granted

• 150 000lb Uranium Concentrates purchased • 150,000lb Uranium Concentrates purchased and sold in export trial to be completed by the end of Aprilend of April.

• Further Purchase and Sales Contracts • Further Purchase and Sales Contracts expected.

Page 11: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 12: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 13: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 14: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Photo from Google

Page 15: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 16: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Bigrlyi June 2011 Resource* (250ppm cut off)Bigrlyi June 2011 Resource (250ppm cut off)

JORC Mt U3O8 U3O8 U3O8 V2O5 V2O5 V2O5JORC status

Mt U3O8ppm

U3O8t

U3O8Mlb

V2O5ppm

V2O5t

V2O5Mlb

Ind. 8.8 890 7,800 17.3 1,026 9,000 19.9

f 6Inf.

TOTAL

6.2

15

715

818

4,400

12,200

9.7

27

805

935

5,000

14,000

10.9

30.8

•Multiple Indicator Kriging; tonnes are metric (2204.62 pounds), figures may not total due to rounding.

, ,

•Announced 28th June 2011

Page 17: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Bigrlyi PFS Summary*Bigrlyi PFS Summary

• Excellent metallurgy (>95% recovery Acid leach)• Excellent metallurgy (>95% recovery Acid leach)

• Excellent geotechnical ground conditions

Total Ca e Plant Mining and infrastr ct re $270M• Total Capex Plant, Mining and infrastructure $270M

• Total Opex $160/t

• 8 year mine life

• Resource increase essential to improve Economics

• Feasibility Studies continuing including• Review of Pit Optimisation

* More details in 17th June 2011 ASX release

• Acid / Alkaline Leach Optimisation

Page 18: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Bigrlyi Drilling

Bigrlyi Camp Oct06 019.jpg

Page 19: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

- Significant Results 2011

BRD11114 49m @ 0.1% U3O8 from 80minc 8m @ 0.28% U3O8 from 87m

Page 20: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 21: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 22: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 23: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Photo from Google

Page 24: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Anomaly 15 East Drilling

Page 25: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 26: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Anomaly 15 East Section

Page 27: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Camel Flat Prospect

Page 28: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Camel Flat - CFD1001 (July 2010)

27m @ 0.27% U3O8 from 93.0m

94m

(incl 3 5m @ 1 82% U3O8 from 93 5m)(incl. 3.5m @ 1.82% U3O8 from 93.5m)

Note – True thickness estimated at 3 – 5m

Page 29: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 30: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 31: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 32: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 33: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 34: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

W t h t fWatch out for:

• Completion of Trial Uranium Export• Completion of Trial Uranium Export• Uranium Trading Transactions

• Exploration Updates•Bigrlyi, •Walbiri, •Camel Flat and Regional targets g g

• Bigrlyi Extensional and Infill Drilling• Resource UpdateResource Update• Increased Chinese investor interest

Page 35: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation
Page 36: Paul Dunbar Exploration Manager - Energy Metals · This presentation has been prepared by Energy Metals Limited (“Energy Metals or EME”). The information contained in this presentation

Compliance StatementCompliance StatementThe information in this presentation is based on information compiled by Mr Paul Dunbar and Mr Lindsay Dudfield, who are both Members of The Australasian Institute of Mining and Metallurgy and The Australian Australasian Institute of Mining and Metallurgy and The Australian Institute of Geoscientists. Mr Dunbar is a full time employee of the Energy Metals, Mr Dudfield is a consultant employed by Energy Metals. They both have sufficient experience which is relevant to the style of

i li ti d t f d it d id ti d t th ti it mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Dunbar and Mr Dudfield ,consent to the inclusion in this presentation of the matters based on the information in the form and context in which it appears.