Page 1
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-04 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 1.00
0.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
WAIT ON DAYLIGHT move rig
none 5 831 0.00 N 32.4799 W -102.284
matierial handling 0 12/03/12 12/01/12 00:00
11/20/12 Todd Thomas - ssuperintendnt 6/5 No No 182.50
10/28/12 250 LOW 1000 H
11/23/12 12:00 - 8-15-2012 50 SEC
11/25/12 18:22 - 8-15-2012 45 SEC
0.00 0.00 0.00 0.00 0 0 0
156000.00 166000.00 131000.00 156000.00 6.00 - 9.00
0.00 0.00
0.00 0.00
00:00 0.00 0.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1744.55
202367.42
116.00
145.00
151.08
17525.00
116.00
06:00 18:00 12.00 1C Rig down with crews Rig down floor hang t/d hang blocks unstring dwlay over subs derrick start on electricaledward deleon ad 10-23-2012worked John askew And crew from 0600 to 2200
18:00 00:00 6.00 1C Rig down with crews rigged down pitts electrical lines water linesrig down line in derrick rig down derrick board
00:00 06:00 6.00 1D WAIT ON DAYLIGHTworked Justin Murphree from 1200 to 0000
24.00 24.00
21:22:23:Other
24.00 24.00
n/a n/a n/a 0 0.00 0.00 0.00 0.00 0.00 n/a 0.00
0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1092.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1092.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0
NONE
GEN 13512
0.000.00
882.000.00
GEN2351224.0024.00
890.000.00
GEN33512
0.000.00
527.000.00
CMP3306
0.000.000.000.00
HPUDEUT
3.003.00
644.000.00
0.002077.00290.00290.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00
0.00Justin D Murphree JRAS-2 K-1,Froklift ops L-1,Manlift opsJustin D Murphree PTW-3 lowering subs, lowering derrick, jetting pitsJustin D Murphree Fuel-21" 2077 Gals
move rig
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 2 Page 1 of 1US 2.40.1
Page 2
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-05 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 2.00
0.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
WAIT ON DAYLIGHT move rig
none 0 832 0.00 N 32.4799 W -102.284
matireal handle 0 12/04/12 12/01/12 00:00
11/20/12 Todd Thomas - ssuperintendnt 6/5 Yes yes Yes 198.00
10/28/12 250 LOW 1000 H
11/23/12 12:00 - 8-15-2012 50 SEC
11/25/12 18:22 - 8-15-2012 45 SEC
0.00 0.00 0.00 0.00 0 0 0
156000.00 166000.00 131000.00 156000.00 6.00 - 9.00
0.00 0.00
0.00 0.00
00:00 0.00 0.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1729.64
202367.42
117.00
145.00
151.03
17670.00
117.00
06:00 18:00 12.00 1A Move rig with truck truck arrived at 700 am started moving dpcranes showed up at 700 started moving rig had 15 haul trucks 3 tandems2 pole trucks 2 forklifts and man lift removed front yard hauled to new locationremove motor packages back yard hauled to new locationsplit derrick remove in two pieces from floor split subs and floorloaded out and sent to new location and set on edge of locationon new end set pits mud pumps mats an subs didnt get center steel ingot all rig exept for top house to and mics items to new locationtrucks left at 1800 total rig move miles was 13.2 milesEdward deleon ad 10-23-2012worked John crew from 600 to 2000worked Kevins crew from 600 to 1800
18:00 20:00 2.00 21 worked on removing valves and seats from pumps20:00 06:00 10.00 1D WAIT ON DAYLIGHT
worked Justins crew from 0600 to 2000
22.00 46.00
21: 2.00 2.0022:23:Other
24.00 48.00
n/a n/a n/a 0 0.00 0.00 0.00 0.00 0.00 n/a
0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1116.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1116.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0
NONE
GEN 13512
0.000.00
882.000.00
GEN23512
0.0024.00
890.000.00
GEN33512
0.000.00
527.000.00
CMP330624.0024.0024.000.00
HPUDEUT
0.003.00
644.000.00
0.002077.00
0.00290.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00
0.00John T Askew move rig rig upJustin D Murphree jra move rig and rig upJustin D Murphree fuel 27 "2077 gal
move rig
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 2 Page 1 of 1US 2.40.1
Page 3
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-06 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 3.00
0.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
rig up with crews,run lines in derrick,electrical lines,koomey lines, move rig
none 3 833 0.00 N 32.4799 W -102.284
matierial handaling 3 12/04/12 12/01/12 00:00
11/20/12 Todd Thomas - ssuperintendnt 6/5 Yes yes Yes 228.00
10/28/12 250 LOW 1000 H
11/23/12 12:00 - 8-15-2012 50 SEC
11/25/12 18:22 - 8-15-2012 45 SEC
0.00 0.00 0.00 0.00 0 0 0
156000.00 166000.00 131000.00 156000.00 6.00 - 9.00
0.00 0.00
0.00 0.00
06:00 n/a n/a n/a n/a n/a 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
4242.04
1750.93
206609.46
118.00
145.00
150.97
17815.00
118.00
06:00 14:30 8.50 1A Move Rig with trucks had 1 tandam 2 cranes and 5 haul truckssqaured up subs fist thing insatlled center steel set mud boat matsput derrick on floor set electrical suit cases install top house and ods househoucked up all hydrolic lines to raise cylinders on derrick set scr houseset motor packages and front yard realesed trucks at 1430
14:30 18:00 3.50 1B Rig up with crews install electical line to pits hooked up electrical betweenmotors rigged up derrick boardworked Joeys crew from 600 to 2000worked alcaries padron crew from 600 to 2200all crew members was on confrence call alsopatterson uti midland trucks moved us 13.20 miles
18:00 06:00 12.00 1B rig up with crews,run lines in derrick,electrical lines,koomey lines,connect t.d. track,hand railsworked Nobertos crew 1600 to 0600
24.00 70.00
21: 2.0022:23:Other
24.00 72.00
n/a n/a n/a 0.00 0.00 0.00 0.00 0.00 n/a
0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1140.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1140.00 2700.00 30.00 907.00
4.50 20.00 S135 6.25NC 46 (EH) 0 03.50 13.30 S135 4.75NC 38 (IF) 0 0
NONE
GEN 13512
0.000.00
882.000.00
GEN23512
0.0024.00
890.000.00
GEN3351212.0012.00539.00
0.00
CMP330624.0048.0048.000.00
HPUDEUT
0.003.00
644.000.00
0.001936.00141.00431.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00
0.00Joey Wiegman s/m move rig with trucksNorberto M Musico s/m power lines,jras=3 stops=2 ,k-1 forkliftNorberto M Musico l-1 manlift, A-7 elec. lines rig upNorberto M Musico fuel=20 "
move rig
0.00 0.00 0.00 0.000.00 0.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 1 Page 1 of 1US 2.50.0
Page 4
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-07 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 4.00
0.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
spud & drill f/105-t/110 spud and run casing
none 8 834 0.00 N 32.4799 W -102.284
matierial handaling 2 12/04/12 12/07/12 00:00
11/20/12 Todd Thomas - ssuperintendnt 6/5 Yes yes Yes 230.50
10/28/12 250 LOW 1000 H
11/23/12 12:00 - 8-15-2012 50 SEC
11/25/12 18:22 - 8-15-2012 45 SEC
110.00 110.00 220.00 0.50 0.00 0 0 0
56000.00 56000.00 55000.00 56000.00 6.00 - 9.00
0.00 0.00
0.00 0.00
06:00 8.40 27.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
4363.10
1772.88
210972.56
119.00
145.00
150.92
17960.00
119.00
06:00 18:00 12.00 1B Rig up with crews raise derrick subs hang flow lineback steps spool up drawworks hook up stand pipe in derrickand from pumps to subs unhang blocks worked on hook up t/dworked crews from 600 to 2200
18:00 00:00 6.00 1B rig up with crews,catwalk v-door,tongs,elevators,bails,windwalls framskill line,sub walkways
00:00 02:00 2.00 21 nipple up conductor and secure02:00 05:30 3.50 21 load and strap bha05:30 06:00 0.50 2 spud & drill f/105-t/110
spud @5:30 on 12/07/12
18.00 88.000.50 0.50
21: 5.50 7.5022:23:Other
24.00 96.00
1 17.50 ROCK BAKER 3113 3 x 22.00 105.00 5.00 1.00 1.00 new 5.00n/a n/a n/a 0.00 0.00 0.00 0.00 0.00 n/a
0.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00105.00 - 110.00 420.00 100.00 6.00 90.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1164.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1164.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0
NONE
GEN 13512
0.000.000.000.00
GEN23512
3.0027.003.000.00
GEN3351224.0036.00563.00
0.00
CMP330624.0072.0072.000.00
HPUDEUT
8.0011.00
652.000.00
7450.008837.00549.00980.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 17.00 0.00 1.701 BIT SUB 8.50 2.50 4.001 SHOCK SUB 8.50 2.50 12.291 8" D.C 8.00 2.50 30.601 REAMER 17.14 2.50 9.932 8" D.C 8.00 2.50 62.101 X-O SUB 8.00 2.50 3.648 6.5 D.C 6.50 2.38 249.72
01 31.51
405.49
0.50
0.00 0.00 0.000.00 0.00 0.000.00 0.00 0.00
Joey Wiegman s/mNorberto M Musico s/m hoist,jras=4 stops=2,c1 hoist,k1 forkliftNorberto M Musico l1 manlift,p/u bhaNorberto M Musico fuel=60" 8837.3 gals
spud in
0.00 0.00 0.00 0.00105.00 110.00 DRILL 110.00 15.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.40.1
Page 5
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-08 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 5.00
1.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
nipple up b.o.p pu bha and drill
none 10 835 0.00 N 32.4799 W -102.284
matirieal handlin cont 3 12/04/12 12/07/12 00:00
11/20/12 Todd Thomas - ssuperintendnt 5/5 No No 149.00
10/28/12 250 LOW 1000 H
11/23/12 12:00 - 8-15-2012 50 SEC
11/25/12 18:22 - 8-15-2012 45 SEC
425.00 315.00 63.00 5.00 0.00 0 0 0
56000.00 56000.00 55000.00 56000.00 6.00 - 9.00
13.58 425.00
9.58 5600.00
06:00 8.40 29.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
4948.08
1799.34
215920.64
120.00
145.00
150.88
18105.00
120.00
06:00 11:00 5.00 2 Drill f/ 120' to 425'11:00 11:30 0.50 5 Condition mud & circulate11:30 13:00 1.50 6 P.o.o.h, dh 100% tied off, ck c.o.m (JW)13:00 14:30 1.50 21 Lay down tools, and break bit14:30 15:00 0.50 21 Change out bails & elevators15:00 17:00 2.00 12 Hold safety meeting, rig up casing crew, run casing & rig down17:00 18:00 1.00 12 Hold safety meeting, rig up cementers & cement
Elevator watchman (Justin Youkey)18:00 22:00 4.00 12 wait on cement22:00 01:30 3.50 21 cut conductor,final cut on casing & weld on well head test @ psi 100001:30 06:00 4.50 14 nipple up b.o.p
88.005.00 5.50
0.50 0.501.50 1.50
7.00 7.00
4.50 4.50
21: 5.50 13.0022:23:Other
24.00 120.00
1 17.00 rock smith n/a 3 x 22.00 110.00 425.00 315.00 5.00 6.00 new 52.50
120.00 - 425.00 110.00 350.00 6.00 110.00 6.00 0.00 0.00 0.00 0.00 0.00425.00 - 425.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1188.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1188.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 0 350 03.50 13.30 S135 0.00 4.75NC 38 (IF) 0 0.00 0 0 0
NONE
GEN 13512
0.000.000.000.00
GEN23512
0.0027.003.000.00
GEN3351224.0060.00587.00
0.00
CMP3306
6.0078.0078.000.00
HPUDEUT24.0035.00
676.000.00
0.008087.00750.00
1730.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 17.00 0.00 1.501 BIT SUB 8.50 2.50 4.001 SHOCK SUB 8.50 2.50 12.291 8" D.C 8.00 2.50 30.601 REAMER 17.14 2.50 9.932 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.648 6.5 D.C 6.50 2.38 249.72
01 31.51
20.00425.29
5.50
0.00 0.00 0.00
Joey Wiegman s/m, material handling, 6 jra's, 4 stopsJoey Wiegman e-24 t.o.o.h, c-13 pull & set slips, h-1 casing crew rig upJoey Wiegman brk temp in/out 50, 43 psi, 223 gpm
s/m matrial handling,jras=4 stops=2,c1 hoistk1 forklift,l1 manlift,g3 nipple up b.o.pfuel=56" 8087.7 gal
drill out
120.00 425.00 DRILL 95.00 22.00425.00 425.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.40.1
Page 6
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-09 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 6.00
2.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
drill f/425-t/1876 pu bha and drill
none 10 836 0.00 N 32.4799 W -102.284
crane and mobil cranes 2 12/08/12 12/07/12 00:00
11/20/12 Todd Thomas - ssuperintendnt 5/5 No No 149.00
12/08/12 250 LOW 1000 H
11/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
1876.00 1451.00 116.08 12.50 0.00 0 0 0
86000.00 88000.00 84000.00 85000.00 6.00 - 9.00
13.58 425.00
9.58 5600.00
06:00 8.40 29.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
480.00
1788.44
216400.64
121.00
145.00
150.83
18250.00
121.00
06:00 12:00 6.00 14 Nipple up b.o.p's, hang flow line, turn buckels, & test 250 low, 1000 high12:00 13:30 1.50 21 Put collars & tools on racks, strap & caliber13:30 14:00 0.50 21 Change out bails & elevators14:00 15:00 1.00 7 Rig service, work manual ibop, man rider working & stored @ crown,15:00 17:30 2.50 6 Pick up tools, make up bit & t.i.h, dh 100% tied off, ck c.o.m (JW)17:30 18:00 0.50 2 Tagged cement @ 380' & drill out
Elevator watchman (Justin Youkey)18:00 06:00 12.00 2 drill f/425-t/1876
elevator watchman-Omar Rodriguezbrake=71 psi 220 gpm 64 temp in/out
88.0012.50 18.00
0.502.50 4.001.00 1.00
7.00
6.00 10.50
21: 2.00 15.0022:23:Other
24.00 144.00
2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 1451.00 12.00 12.00 new 120.92
425.00 - 425.00 110.00 630.00 6.00 110.00 6.00 0.00 0.00 0.00 0.00 0.00425.00 - 1876.00 386.00 1680.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1212.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1212.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 36 314 03.50 13.30 S135 0.00 4.75NC 38 (IF) 549 0.00 549 0 0
NONE
GEN 13512
0.000.000.000.00
GEN2351218.0045.0021.000.00
GEN3351224.0084.00611.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT
0.0035.00
676.000.00
0.007342.00745.00
2475.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66
11 1047.752 63.74
10.001876.06
111000.0018.00
1466.00 0.40895.00 0.50475.00 0.20
0.00 0.00 0.00
1244 12.50 12.50 12.50 1451.00 1451.00
Joey Wiegman s/m hoisting/cranes,jras,stopsJoey Wiegman jra k1 forklift,jra b4 nipple up,jra b11 acc.hosesJoey Wiegman brk temp in/out 63 , 43 psi, 223 gpm
s/m matrial handling,jras=6 stops=1,c1 hoistk1 forklift,c7 mix mud,c4 con w/ir,c8 conn w/td,c13 slipsfuel=52" 7342.5 gal
drill out
425.00 425.00 DRILL 35.00 6.00425.00 1876.00 DRILL 40.00 18.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.40.1
Page 7
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-10 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 7.00
3.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
drill f/3167-t/3794 drill
none 12 837 0.00 N 32.4799 W -102.284
cranes 2 12/08/12 12/07/12 00:00
12/07/12 gary wallace - rig manager 5/5 No No 149.00
12/08/12 250 LOW 1000 H
11/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
3794.00 1918.00 81.62 23.50 0.00 0 0 0
110000.00 112000.00 109000.00 110000.00 6.00 - 9.00
13.62 425.00
9.58 5600.00
06:00 9.60 29.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1773.78
216400.64
122.00
145.00
150.78
18395.00
122.00
06:00 16:00 10.00 2 Drill -/f 1876 -/t 304016:00 16:30 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown16:30 18:00 1.50 2 Drill -/f 3040 -/t 3167
Elevator watchman (Justin Youkey)Held B.O.P drill
18:00 06:00 12.00 2 drill f/3167-t/3794elevator watchman-Omar Rodriguezbrake-71 psi 217 gpm 60 temp in 81 out
88.0023.50 41.50
0.504.00
0.50 1.50
7.00
10.50
21: 15.0022:23:Other
24.00 168.00
2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 3369.00 35.50 47.50 new 70.93
1876.00 - 3167.00 150.00 2100.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.003167.00 - 3794.00 368.00 2216.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1236.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1236.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 36 314 03.50 13.30 S135 0.00 4.75NC 38 (IF) 549 0.00 549 0 0
NONE
GEN 1351212.0012.0012.000.00
GEN2351224.0069.0045.000.00
GEN3351212.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.0059.00
700.000.00
0.005513.001829.004304.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66
31 2950.892 63.63
25.003794.09
130000.0041.50
3377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40
895.00 0.50372.00 0.20
0.00 0.00 0.00
1244 23.50 36.00 36.00 1918.00 3369.00
s/m moble cranes,jras=6,stops=6jra k1 forklift,jra f6 pressure washing,jra c7 mix mud/chemicalsbrk temp in/out 72, 43 psi, 223 gpmp/u 132, s/o 126, r/w 130s/m material handling,jras=6 stops=2,c7 mix mudc1 hoist,c13 slips,c4 conn w/t.d,c8 conn w/i.r,k1 forkliftfuel=42''=5513.0 gals
drilling
1876.00 3167.00 DRILL 40.00 22.003167.00 3794.00 DRILL 40.00 30.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.40.1
Page 8
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-11 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 8.00
4.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
drill f/4466-t/4968 drill
none 6 838 0.00 N 32.4799 W -102.284
cranes 8 12/08/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 Yes no No 149.00
12/08/12 250 LOW 1000 H
11/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
4968.00 1174.00 49.96 23.50 0.00 0 0 0
154000.00 161000.00 145000.00 154000.00 6.00 - 9.00
13.62 425.00
9.58 5756.00
06:00 9.90 28.00 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
390.00
1762.53
216790.64
123.00
145.00
150.73
18540.00
123.00
06:00 16:30 10.50 2 Drill -/f 3794 -/t 436616:30 17:00 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown17:00 18:00 1.00 2 Drill -/f 4366 -/t 4466
Elevator watchman (Justin Youkey)18:00 06:00 12.00 2 drill f/4466-t/4968
elevator watchman-Omar Rodriguez
88.0023.50 65.00
0.504.00
0.50 2.00
7.00
10.50
21: 15.0022:23:Other
24.00 192.00
2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 4543.00 59.00 106.50 new 42.66
3794.00 - 4466.00 160.00 2400.00 6.00 80.00 6.00 80.00 0.00 0.00 0.00 0.004466.00 - 4968.00 368.00 2590.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1260.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1260.00 2700.00 30.00 907.00
4.50 20.00 S135 3.83 6.25NC 46 (EH) 350 11500.00 36 314 03.50 13.30 S135 0.00 4.75NC 38 (IF) 549 0.00 549 0 0
NONE
GEN 1351224.0036.0036.000.00
GEN2351224.0093.0069.000.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.0083.00
724.000.00
0.003293.002220.006524.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66
44 4188.440
25.004968.01
156000.0065.00
4893.00 1.100.00 0.00 0.00
4377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20
1244 23.50 59.50 59.50 1174.00 4543.00
Joey Wiegman s/m cranes cont.,jras 6,stops6Joey Wiegman jra k1 forklift,jra c4 conn.w/top drive,jra c8 conn.w/st80Joey Wiegman brk temp in/out 60, 43 psi, 223 gpmJoey Wiegman p/u 150, s/o 145, r/w 150
s/m material handling,jras=6 stops=2, c1 hoistc7 mix mud,c13 slips,c4 conn w/td,c8 conn w/ir,k1 forkliftp/u 161 s/o 148 r/w 154
drilling
3794.00 4466.00 DRILL 40.00 25.004466.00 4968.00 DRILL 40.00 22.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 2US 2.40.1
Page 9
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-12 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 9.00
5.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 432-212-6903 cooler
pump out 10 stds t.o.o.h d-man 100% tied off c-c-o-m (NM) drill
none 0 839 0.00 N 32.4799 W -102.284
walkways 0 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No No 149.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
5582.00 614.00 34.11 18.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
9.58 5582.00
06:00 10.3 39 9.00 19 3 16 8.00 0 0.00 0
no mud 1.5 0 0 0 0 9.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
6069.66
1797.26
222860.30
124.00
145.00
150.69
18685.00
124.00
06:00 09:00 3.00 2 Drill -/f 4968 -/t 503009:00 10:30 1.50 8E Repair t/d stand jump cylenders broke at the yoke soe remove sadle from blocks10:30 18:00 7.50 2 Drill -/f 5030 -/t 5321
Elevator watchman (Justin Youkey)18:00 01:30 7.50 2 drill f/5321-t/558201:30 04:00 2.50 5 circulate & pump sweep04:00 06:00 2.00 6 pump out 10 stds t.o.o.h d-man 100% tied off c-c-o-m (NM)
elevator watchman-Omar Rodriguez
88.0018.00 83.00
2.50 3.002.00 6.00
2.001.50 1.50
7.00
10.50
21: 15.0022:23:Other
24.00 216.00
2 12.25 FX65DM Halliburton 12035919 6 x 22.00 425.00 5582.00 5157.00 77.00 183.50 new 28.10
4968.00 - 5321.00 140.00 2700.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.005321.00 - 5582.00 368.00 2750.00 6.00 75.00 6.00 75.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1284.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1284.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.0060.0060.000.00
GEN2351224.00
117.0093.000.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT12.0095.00
736.000.00
7000.008087.002206.008730.00
OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 12.25 0.00 1.501 MOTOR 8.00 0.00 27.901 SHOCK SUB 8.50 2.50 12.291 FLOWDRIFT 8.00 2.58 4.921 3PT REAMER 8.00 2.58 8.711 8" D.C 8.00 2.50 30.601 3PT REAMER 8.00 2.58 10.132 8" D.C 8.00 2.50 62.101 X.O. 8.00 2.38 3.6414 6.5 D.C 6.50 2.38 436.661 JAR 6.50 2.50 31.464 6.5 D.C 6.50 2.38 124.66
50 4756.862 63.24
8.005582.67
160000.0083.00
5462.00 0.900.00 0.00 0.00
4893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20
1244 18.00 77.50 77.50 614.00 5157.00
Joey Wiegman s/m moble cranes, 9 jra's, 3 stopsJoey Wiegman c-13 pull & set slips, c-1 hoist operations, l-1 manlift operationJoey Wiegman brk temp in/out 57, 43 psi, 218 gpmJoey Wiegman p/u 160, s/o 154, r/w 158
s/m moble cranes,jras=6 stop=2,c1 hoistk1 forklift,c13 slips,c7 mix mud,c4 conn w/td,c8 conn w/irr/w 162 p/u 165 s/o 154
drilling
4968.00 5321.00 DRILL 40.00 36.005321.00 5582.00 DRILL 40.00 36.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 2US 2.50.0
Page 10
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-13 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 10.00
6.00
01/05/13
John G. Askew/ Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
cement cement 2 stages with DV Tool, nipple down, chg. spool,n/u stack, p/u 3.5 D.P.
none 8 840 0.00 N 32.4799 W -102.284
t.o.o.h, lay down directional tools, changing bales & elev.,run casing.5 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No 157.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
5582.00 0.00 0.00 0.00 0.0 0.0 0.0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
9.62
00:00 0 0.00 0
no mud 1.5 0 0 0 0 9.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1782.88
222860.30
125.00
145.00
150.64
18830.00
125.00
06:00 12:30 6.50 6 T.o.o.h, pull & ream out, dh 100% tied off, ck c.o.m (JW)12:30 14:30 2.00 21 Lay down all 8" tools & collars, break bit14:30 15:00 0.50 21 Change out bails & elevators & clean floor15:00 18:00 3.00 12 Hold safety meeting, rig up casing crew & run casing
Joey Wiegman & crew 1/2 hr. pre-post tour meeting and1/2 hr for Weekly Engagement callElevator watchman (Justin Youkey)
18:00 21:30 3.50 12 run casing21:30 22:00 0.50 8M repair hydraulic catwalk remove rollers to set trough back in place22:00 03:00 5.00 12 run casing wash down last joint03:00 04:00 1.00 5 circulate with rig pumps04:00 04:30 0.50 21 hold safety meeting and rig up cement crew04:30 06:00 1.50 12 cement
Norberto Musico & crew 1/2 hr pre-post meeting 1/2 Weekly Engagement callPedro Vilchez got 3 hrs extra need to Talk to Toddelev. watchman omar rodriguez
88.0083.00
1.00 4.006.50 12.50
2.000.50 2.00
13.00 20.00
10.50
21: 3.00 18.0022:23:Other
24.00 240.00
na NA
5582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.005582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1308.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1308.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351222.0082.0082.000.00
GEN2351224.00
141.00117.00
0.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT
0.0095.00
736.000.00
0.007342.00745.00
9475.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
14 6.5 D.C 6.50 2.38 436.664 6.5 D.C 6.50 2.38 124.66
50 4756.862 63.24
8.005389.42
160000.0083.00
0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20
1244 0.00 77.50 77.50 0.00 5157.00
Joey Wiegman s/m walkways,6 jras,stops 3Joey Wiegman jra l1 manlift,jrak1 forklift,jra e24Joey Wiegman Brk temp in/out 57, 43 psi, 217 gpmNorberto M Musico s/m walkways,jras=4 stops=2,c1 hoistNorberto M Musico k1 forklift,h2 casing,h13 cementNorberto M Musico fuel=52''=7341.5 gals
drilling
5582.00 5582.00 0.00 0.005582.00 5582.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 1 Page 1 of 1US 2.50.0
Page 11
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-14 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 11.00
7.00
01/05/13
John G. Askew/ Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
pressure test b.o.p's bleed psi pick up new bha & make up same, trip in hole
None 14 841 0.00 N 32.4799 W -102.284
cementing,rig down same,forklift/manlift use,n / d stack,r/up stack jacks7 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No 152.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
5582.00 0.00 0.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
9.62 5582.00
06:00 na 0.00 0
no mud 1.5 0 0 0 0 9.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
1347.50
1779.43
224207.80
126.00
145.00
150.60
18975.00
126.00
06:00 07:00 1.00 12 Cement, dropped plug @ 6:30, dropped bomb @ 6:40, rig up lines to circulate07:00 11:00 4.00 5 Circulate 4 hours11:00 14:00 3.00 12 Cement, dropped second plug @ 12:30, washed through stack & rigged down cmt crew14:00 18:00 4.00 21 Hold safety meeting,rig up stack jacks, lift stack,set slips @ 17:30 w/149k
& cut casing, & remove same & set stack down finished @ 18:00 tour change.Elevator watchman (Justin Youkey)
18:00 20:00 2.00 21 Finish nipple down,pick up stack, remove 13 5/8 10m DSA to 11"5m spool20:00 22:00 2.00 21 Make finish cut on casing & install B-Section test to 2500 psi22:00 23:30 1.50 21 Install 13 5/8 10m DSA to 9 5/8 3m spool & set down stack23:30 04:00 4.50 14 Nipple up B.O.P.'s & install koomey lines04:00 05:30 1.50 21 secure & center B.O.P's & install flowline05:30 06:00 0.50 15 pressure test b.o.p's
88.0083.00
4.00 8.0012.502.002.00
4.00 24.00
4.50 15.000.50 0.50
21: 11.00 29.0022:23:Other
24.00 264.00
na NA
5582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.005582.00 - 5582.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1332.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1332.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 13512
0.0082.0082.000.00
GEN2351224.00
165.00141.00
0.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT
0.0095.00
736.000.00
0.006971.00371.00
9846.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
14 6.5 D.C 6.50 2.38 436.664 6.5 D.C 6.50 2.38 124.66
50 4756.862 63.24
8.005389.42
160000.0083.00
0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20
1244 0.00 77.50 77.50 0.00 5157.00
Joey Wiegman s/m ladders,jras=6,stops=6Joey Wiegman jra k1 forklift,jra l1 manlift,jra g3 nipple down/set slipsJoey Wiegman brk temp in/out 60, 43 psi, 219 gpmNorberto M Musico s/m walkways,jras=3 stops=2,k1 forkliftNorberto M Musico c1 hoist,l1 manlift,g3 nipple down/up ,B-9,B-2,B-4,B-8,B-10,B-1Norberto M Musico welding H-11Norberto M Musico fuel=50" = 6971drilling
5582.00 5582.00 0.00 0.005582.00 5582.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 12
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-15 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 12.00
8.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
drill f/5899-t/7349 drill
none 15 842 0.00 N 32.4799 W -102.284
E-23 t.i.h, e-18 pick up tools off cat walk, c-1 hoists/m walkways,jras=6 stops=1,c1 hoist,c13 slips 9 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No 152.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
7349.00 1767.00 114.00 15.50 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
9.62 5582.00
06:00 8.4 29 0.00 0 0 0 100.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1765.42
224207.80
127.00
145.00
150.55
19120.00
127.00
06:00 07:30 1.50 21 Change out bails & elevators, rig out floor07:30 09:00 1.50 21 Strap and caliber tools & pick up & make up bit09:00 12:00 3.00 6 T.i.h to 1835 & tagged dv tool, ck c.o.m (JW) dh 100% tied off12:00 12:30 0.50 2 Drill out dv tool12:30 15:00 2.50 6 T.i.h, dh 100% tied off, tagged cement & 551315:00 15:30 0.50 2 Drill out float collar & shoe15:30 18:00 2.50 2 Drill -/f 5582 -/t 5899
Elevator watchman (Justin Youkey)18:00 06:00 12.00 2 drill f/5899-t/7349
elevator watchman-Omar Rodriguez
88.0015.50 98.50
8.005.50 18.00
2.002.00
24.00
15.000.50
21: 3.00 32.0022:23:Other
24.00 288.00
3 8.75 MM66D Halliburton 12075017 6 x 22.00 5582.00 1767.00 15.50 15.50 good 114.00
5582.00 - 5899.00 140.00 2100.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.005899.00 - 7349.00 360.00 2250.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1356.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1356.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
106.00106.00
0.00
GEN2351218.00
183.00159.00
0.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT
0.0095.00
736.000.00
5292.401678.60
11524.60OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 1.001 MOTOR 22.451 FLOWDRIFT 4.971 3PT REAMER 7.341 6.5 D.C 31.311 3PT REAMER 6.6817 6.5 D.C 530.01
70 6656.612 63.63
25.007349.00
180000.0098.50
7040.00 0.806563.00 0.506054.00 0.50
0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50372.00 0.20
1244 77.50 77.50 5157.00
Joey Wiegman s/m ladders, 9 jra's, 8 stopsJoey Wiegman E-23 t.i.h, e-18 pick up tools off cat walk, c-1 hoistJoey Wiegman brk temp in/out 65, 43 psi, 223 gpmJoey Wiegman p/u 157, s/o 149, r/w 157Zachary Ryan Savallo s/m walkways,jras=6 stops=1,c1 hoist,c13 slipsZachary Ryan Savallo c7 mix mud ,k1 forklift,c4 conn/t.d,c8 conn w/i.rZachary Ryan Savallo p/u 185 s/o 162 r/w 177drilling
5582.00 5899.00 DRILL 40.00 15.005899.00 7349.00 DRILL 40.00 15.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 2US 2.50.0
Page 13
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-16 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 13.00
9.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
hold safety meet,rig up and run gyro tripping
none 15 843 N 32.4799 W -102.284
jra c4 conn.w/top drive,jra c8 conn.w/st80,jra f6 pressure washingk1 forklift,c7 mix mud,c4 conn w/t.d,c8 conn w/i.r 4 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No 152.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
9400.00 2051.00 128.19 16.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
06:00 8.4 37 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 9.50 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
4843.01
1789.46
229050.81
128.00
145.00
150.51
19265.00
128.00
06:00 17:00 11.00 2 Drill -/f 7349 -/t 889517:00 17:30 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown17:30 18:00 0.50 2 Drill -/f 8895 -/t 894318:00 22:30 4.50 2 drill f/8943-t/940022:30 02:00 3.50 5 condition mud & circulate02:00 06:00 4.00 11 hold safety meet,rig up and run gyro
elevator watchma-Omar Rodriguez
88.0016.00 114.50
3.50 11.5018.00
0.50 2.502.00
4.00 4.0024.00
15.000.50
21: 32.0022:23:Other
24.00 312.00
3 8.75 MM66D Halliburton 12075017 6 x 22.00 5582.00 9400.00 3818.00 27.00 42.50 good 89.84
7349.00 - 8943.00 140.00 2700.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.008943.00 - 9400.00 360.00 2589.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1380.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1380.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
130.00130.00
0.00
GEN2351224.00
207.00183.00
0.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
119.00760.00
0.00
3783.701508.70
13033.30OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 1.001 MOTOR 22.451 FLOWDRIFT 4.971 3PT REAMER 7.341 6.5 D.C 31.311 3PT REAMER 6.6817 6.5 D.C 530.01
92 8749.791 31.59
15.009400.14
206000.00114.50
9037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.806563.00 0.506054.00 0.50
0.00 0.00 0.005462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.003377.00 0.402925.00 0.50 0.002425.00 0.90 0.001944.00 0.70 0.001466.00 0.40895.00 0.50
1244 77.50 77.50 5157.00
Zachary Ryan Savallo s/m ladders,jras=9,stops=4Zachary Ryan Savallo jra c4 conn.w/top drive,jra c8 conn.w/st80,jra f6 pressure washingZachary Ryan Savallo brk temp in/out 62, 43 psi, 223 gpmZachary Ryan Savallo p/u 202, s/o 195, r/w 198Zachary Ryan Savallo s/m walkways,jras=6 stops=,c1 hpist,c13 slipsZachary Ryan Savallo k1 forklift,c7 mix mud,c4 conn w/t.d,c8 conn w/i.rZachary Ryan Savallo p/u 210 s/o 195 r/w 203drilling
7349.00 8943.00 DRILL 40.00 16.008943.00 9400.00 DRILL 40.00 15.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 2US 2.50.0
Page 14
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-17 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 14.00
10.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
pick up hwdp&rent pipe tripping
none 9 844 0.00 N 32.4799 W -102.284
j-11 run gyro, e-24 t.o.o.h, c-13 pull & set slipss/m walkways,jras=3 stops=2,c1 hoist,h7 log 5 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No 149.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
9400.00 0.00 0.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
06:00 8.4 29 0 0.00 0
no mud 1.5 0 0 0 0 9.50 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
4054.65
1807.02
233105.46
129.00
145.00
150.47
19410.00
129.00
06:00 08:00 2.00 11 Wireline with gyro & rig down wireline08:00 09:30 1.50 5 Circulate bottoms up09:30 14:00 4.50 6 T.o.o.h, dh 100% tied off, ck com (JW)14:00 17:00 3.00 6 Lay down collars17:00 18:00 1.00 11 Hold safety meeting, rig up wireline truck & wireline
Elevator watchman (Justin Youkey)18:00 23:30 5.50 11 run wireline log23:30 06:00 6.50 6 pick up hwdp&rent pipe
elevator watchman-Omar Rodriguez
88.00114.50
1.50 13.0014.00 32.00
2.502.00
8.50 12.5024.00
15.000.50
21: 32.0022:23:Other
24.00 336.00
9400.00 - 9400.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.009400.00 - 9400.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1404.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1404.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
154.00154.00
0.00
GEN2351212.00
219.00195.00
0.00
GEN33512
0.0096.00623.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
143.00784.00
0.00
3134.30649.40
13682.70OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
92 8749.791 31.59
15.008796.38
206000.00114.50
0.00 0.00 0.009037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.806563.00 0.506054.00 0.505462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.00
1244 77.50 77.50 5157.00
Zachary Ryan Savallo s/m walkways & working surfaces 6 jra's, 3 stopsZachary Ryan Savallo j-11 run gyro, e-24 t.o.o.h, c-13 pull & set slipsZachary Ryan Savallo brk temp in/out 64, 43 psi, 223 gpmZachary Ryan Savallo s/m walkways,jras=3 stops=2,c1 hoist,h7 logZachary Ryan Savallo k1 forklift,Zachary Ryan Savallo fuel=28''=3134.3 gals
drilling
9400.00 9400.00 0.00 0.009400.00 9400.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 15
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-18 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 15.00
11.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
drill f/9564-t/9579 drill
none 12 845 0.00 N 32.4799 W -102.284
e-18 pick up tools off catwalk, e-23 t.i.h, c-1 hoist operationsc7 mix mus,c13 slips,e23 t.i.h,c-4 conn w/td,c4 conn w/ir 6 12/10/12 12/10/12 00:00
12/07/12 gary wallace - rig manager 5/5 No 149.00
12/08/12 250 LOW 1000 H
12/08/12 12:00 - 8-15-2012 50 SEC
12/08/12 18:22 - 8-15-2012 45 SEC
9579.00 179.00 21.06 8.50 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
06:00 8.4 40 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1793.12
233105.46
130.00
145.00
150.42
19555.00
130.00
06:00 11:00 5.00 6 Pick up rental pipe & hwdp, stand back in derrick, dh 100% tied off, ck c.o.m11:00 16:00 5.00 20 Pick up directional tools, load mwd, scribe & down load tool, make up bit16:00 18:00 2.00 6 T.i.h, dh 100% tied off, ck c.o.m (JW)
Elevator watchman (Justin Youkey)18:00 21:30 3.50 6 t.i.h c-c-o-m d-man 100% tied off (nm)21:30 03:30 6.00 2 slide f/9400-t/9500 tf/165 m03:30 04:00 0.50 2 drill f/9500-t/950504:00 04:30 0.50 2 slide f/9505-t/9532 tf/170 m04:30 05:00 0.50 2 drill f/9532-t/954005:00 05:30 0.50 2 slide f/9540-t/9564 tf/180 m05:30 06:00 0.50 2 drill f/9564-t/9579
elevator watchman-Omar Rodriguez
88.008.50 123.00
13.0010.50 42.50
2.502.00
12.5024.00
15.000.50
5.00 5.0021: 32.0022:23:Other
24.00 360.00
4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 179.00 8.50 8.50 21.06
9400.00 - 9400.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.009400.00 - 9579.00 140.00 2250.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1428.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1428.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
178.00178.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00120.00647.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
167.00808.00
0.007050.009024.001160.30
14843.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.901 MOTOR 28.911 FLOAT SUB 2.801 M.W.D. 20.021 ABS 14.981 NON MAG DRILL COLLAR 29.261 X.O. 2.161 FLEX COLLAR 27.4236 4.5 DP 1142.4242 H.W.D.P. 1289.11
73 6942.682 63.64
15.009579.30
206000.00123.00
9482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26
0.00 0.00 0.009037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.806563.00 0.506054.00 0.505462.00 0.904893.00 1.104377.00 1.00 0.003847.00 0.70 0.00
1244 77.50 77.50 5157.00
Joey Wiegman s/m scaffoling, 6 jra's, 4 stopsJoey Wiegman e-18 pick up tools off catwalk, e-23 t.i.h, c-1 hoist operationsJoey Wiegman brk temp in/out, 61, 43 psi, 223 gpmNorberto M Musico s/m walkways,jras=6 stops=2,c1 hoist,k1 forkliftNorberto M Musico c7 mix mus,c13 slips,e23 t.i.h,c-4 conn w/td,c4 conn w/irNorberto M Musico p/u 202 s/o 183 r/w 198Norberto M Musico fuel=61''=9024.8 galsdrilling
9400.00 9400.00 0.00 0.009400.00 9579.00 35.00 20.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 16
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-19 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 16.00
12.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
slide f/9837-t/10150 tf/10 r drill
none 12 846 0.00 N 32.4799 W -102.284
c13 pull and set slips, c4 conn. with top drive, k1 forkliftc-4 conn w/td,c8 conn w/id,k1 forklift 9 12/18/12 12/18/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 149.00
12/08/12 250 LOW 1000 H
12/18/12 01:00 - 51sec
12/18/12 19:20 - 8-15-2012 45 SEC
10150.00 571.00 24.30 23.50 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
06:00 8.6 38 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
3908.04
1809.26
237013.50
131.00
145.00
150.38
19700.00
131.00
06:00 07:30 1.50 2 Drill -/f 9579 -/t 963607:30 09:00 1.50 2 Slide -/f 9636-/t 966209:00 09:30 0.50 2 Drill -/f 9662 -/t 967409:30 10:00 0.50 2 Slide -/ 9674 -/t 969010:00 10:30 0.50 7 Rig service, manrider working & stored @ crown adjust stand jump10:30 11:00 0.50 2 Drill -/f 9690 -/t 970011:00 12:30 1.50 2 Slide -/f 9700 -/t 972412:30 14:30 2.00 2 Drill -/f 9724 -/t 9734, slide -/f 9734 -/t 975614:30 18:00 3.50 2 Drill -/f 9756 -/t 9761, slide -/f 9761 -/t 9837
Held B.O.P drillElevator watchman (Justin Youkey)
18:00 06:00 12.00 2 slide f/9837-t/10150 tf/10 relevator watchman-Omar Rodriguez
88.0023.50 146.50
13.0042.50
0.50 3.002.00
12.5024.00
15.000.50
5.0021: 32.0022:23:Other
24.00 384.00
4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 750.00 32.00 40.50 18.52
9579.00 - 9837.00 140.00 2200.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.009837.00 - 10150.00 160.00 2250.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1452.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1452.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
202.00202.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00144.00671.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
191.00832.00
0.00
7527.501496.50
16339.50OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.901 MOTOR 28.911 FLOAT SUB 2.801 M.W.D. 20.021 ABS 14.981 NON MAG DRILL COLLAR 29.261 X.O. 2.161 FLEX COLLAR 27.4236 4.5 DP 1142.4242 H.W.D.P. 1289.11
79 7513.472 63.83
15.0010150.28
211000.00146.50
9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26
0.00 0.00 0.009037.00 1.408565.00 1.10 0.008018.00 1.10 0.007518.00 1.00 0.007040.00 0.80
1244 77.50 77.50 5157.00
Zachary Ryan Savallo s/m openings & holes, 6 jra's, 6 stopsZachary Ryan Savallo c13 pull and set slips, c4 conn. with top drive, k1 forkliftZachary Ryan Savallo p/u 212,000 s/o 190,000 r/w 200,000Zachary Ryan Savallo brk temp 67 deg. flow 220 g.p.m.Zachary Ryan Savallo s/m walkways,jras= ,stops=,c13 slips,c7 mix mudZachary Ryan Savallo c-4 conn w/td,c8 conn w/id,k1 forkliftZachary Ryan Savallo p/u 213 s/o 196 r/w 209drilling
9579.00 9837.00 DRILL 35.00 19.009837.00 10150.00 DRILL 35.00 20.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 2US 2.50.0
Page 17
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-20 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 17.00
13.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
l/d 4 1/2 dp pick up pipe
none 12 847 0.00 N 32.4799 W -102.284
JRA'S-(9) C-1,Hoist ops C-13,Set and pull slips 3 12/18/12 12/18/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 167.00
12/08/12 250 LOW 1000 H
12/18/12 01:00 - 51sec
12/18/12 19:20 - 8-15-2012 45 SEC
10357.00 207.00 25.87 8.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
13.62 425.00
06:00 8.7 40 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
2122.81
1811.64
239136.31
132.00
145.00
150.34
19845.00
132.00
06:00 14:00 8.00 2 Slide F/10150 TD/ 1031514:00 14:30 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k. serv.catwalk14:30 15:30 1.00 5 Condition mud and circulate15:30 16:30 1.00 6 Pull 10 stand / Lay down drill pipe16:30 17:00 0.50 8 pipe wrangler rollers got off track,had to take the back two roller off
to adjust the trough to get it back in guide plates17:00 18:00 1.00 6 lay down drill pipe
crew stayed over .50 hours for safety stand upEleavtor watch man (Colten Herman)c.o.m. check o.k.B.O.P. drill 58sec
18:00 00:30 6.50 6 lay down drill pipe00:30 02:00 1.50 6 TIH d/m 100% tied off check com ok JA02:00 06:00 4.00 6 l/d 4 1/2 dp
Edward Deleon AD 10-23-12elevator watchman Gilbert Bejernoheld severe weather drill w/ crewcrew stayed over .50 for safety stand up
88.008.00 154.50
1.00 14.0014.00 56.500.50 3.500.50 2.50
12.5024.00
15.000.50
5.0021: 32.0022:23:Other
24.00 408.00
4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 10357.00 957.00 39.00 79.50 fare 12.04
10150.00 - 10315.00 165.00 2160.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.0010357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1476.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1476.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
226.00226.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00168.00695.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
215.00856.00
0.000.00
6235.001292.50
17632.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.901 MOTOR 28.911 FLOAT SUB 2.801 M.W.D. 20.021 ABS 14.981 NON MAG DRILL COLLAR 29.261 X.O. 2.161 FLEX COLLAR 27.4236 4.5 DP 1142.42
81 7704.051 31.41
22.009026.33
95000.00154.50
10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53
9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26
0.00 0.00 0.00
1244 77.50 77.50 5157.00
Zachary Ryan Savallo JRA'S-(9) C-1,Hoist ops C-13,Set and pull slipsZachary Ryan Savallo K-1,Forklift ops, C-8 CONNECTIONS W/Iron roughneck, C-14 Chk COMZachary Ryan Savallo C-7 Mixing mud and chemicals, D-59 Replace liner in pump, E-24 TOHZachary Ryan Savallo E-7 Laydown drill pipe w/o laydown machineZachary Ryan Savallo p/u 213 s/o 196 s/w 215Zachary Ryan Savallo pre tour- holes and openingZachary Ryan Savallo jras-3 stops=3 fuel 46"=6235 galsdrilling
10150.00 10315.00 DRILL 35.00 35.0010357.00 10357.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 18
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-21 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 18.00
14.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
NIPPLE DOWN B.O.P. nipple up
none 7 848 0.00 N 32.4799 W -102.284
C13 pull and set slips, D14 general cleaning, E24 trip out of holeJRAS8-C1 air hoist opp, C8 connection with st80, 4 12/18/12 12/18/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 161.50
12/08/12 250 LOW 1000 H
12/18/12 01:00 - 51sec
12/18/12 19:20 - 8-15-2012 45 SEC
10357.00 0.00 0.00 0.00 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
06:00 8.7 40 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1798.02
239136.31
133.00
145.00
150.30
19990.00
133.00
06:00 08:00 2.00 6 Lay down drrill pipe and dir tools08:00 10:00 2.00 21 Change out elevator and bells rig up casing crew make up CRT tool10:00 18:00 8.00 12 Run casing
Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P drill 58 sec
18:00 22:30 4.50 12 RUN CASING22:30 23:30 1.00 12 rig down casing crew23:30 00:30 1.00 5 CONDITION MUD & CIRCULATE and rig up otex00:30 04:00 3.50 12 CEMENT04:00 04:30 0.50 12 RIG DOWN CEMENTERS04:30 06:00 1.50 14 NIPPLE DOWN B.O.P.
AD- EDWARD DELEON 10/23/12
88.00154.50
1.00 15.002.00 58.50
3.502.50
12.5017.50 41.50
1.50 16.500.50
5.0021: 2.00 34.0022:23:Other
24.00 432.00
4 8.75 FXD55M Halliburton 12009122 5 x 22.00 9400.00 10357.00 957.00 39.00 118.50 fare 8.08NA NA NA NA 0.00 0.00 0.00 0.00 0.00 fare
- 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0010357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1500.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1500.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
250.00250.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00192.00719.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
239.00880.00
0.00
5513.00722.00
18354.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00220000.00
154.50
10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53
9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26
0.00 0.00 0.00
1244 77.50 77.50 5157.00
Zachary Ryan Savallo JRAS8-C1 air hoist opp, C8 connection with st80,Zachary Ryan Savallo C13 pull and set slips, D14 general cleaning, E24 trip out of holeZachary Ryan Savallo K1 forklift opperation, K3 place equip on catwalk with forklift,Zachary Ryan Savallo rig up casing crew, run casing in holeZachary Ryan Savallo PRE TOUR- OVER HEAD HAZARDZachary Ryan Savallo JRAS-3 STOPS-2 FUEL= 42"=5513 GALS.
drilling
CORE 0.00 0.0010357.00 10357.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 19
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-22 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 19.00
15.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
p/u 3 1/2 dp drill
none 8 849 0.00 N 32.4799 W -102.284
JRA'S C-1 Hoist operations, B-1 Remove flowline,G-3 Nipple down set slips & nipple up,K-1 Forklift operations 4 12/18/12 12/18/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 161.50
12/08/12 250 LOW 1000 H
12/18/12 01:00 - 51sec
12/18/12 19:20 - 8-15-2012 45 SEC
10357.00 0.00 0.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
06:00 na na na na na 0.00 0 0.00 0
no mud 1.5 0 0 0 0 0.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
2574.39
1803.81
241710.70
134.00
145.00
150.26
20135.00
134.00
06:00 10:00 4.00 14 Nipple down B.O.P set slips10:00 18:00 8.00 14 Nipple up B.O.P Test well head 3000 psi change out pipe rams to 3 1/2
Elevator Watch Man (Colten Herman)18:00 19:30 1.50 21 strap bha and 3 1/2 dp19:30 23:30 4.00 21 change burn sub and dies install bails and elevators23:30 03:30 4.00 20 p/u and make up dir. tools03:30 06:00 2.50 6 p/u 3 1/2 dp
88.00154.50
15.002.50 61.00
3.502.50
12.5041.50
12.00 28.500.50
4.00 9.0021: 5.50 39.5022:23:Other
24.00 456.00
5 6.12 MDi611 smith jg4949 10357.00 0.00 newNA NA NA NA 0.00 0.00 0.00 0.00 0.00 fare
10357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0010357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1524.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1524.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
274.00274.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00216.00743.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
263.00904.00
0.007050.00
11982.00581.00
18935.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00220000.00
154.50
10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53
9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26
0.00 0.00 0.00
1244 77.50 77.50 5157.00
Zachary Ryan Savallo JRA'S C-1 Hoist operations, B-1 Remove flowline,Zachary Ryan Savallo G-3 Nipple down set slips & nipple up,K-1 Forklift operationsZachary Ryan Savallo pre tour-overhead hazardsZachary Ryan Savallo jras-3 stops-2 fuel- 77" = 11982 gal
drilling
10357.00 10357.00 0.00 0.0010357.00 10357.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 20
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-23 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 20.00
16.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
drill f/ 10360 t/ 10494 drill
none 6 850 0.00 N 32.4799 W -102.284
Jras 3 C1- Hoist Operation K1- Forklift Operation 2 12/18/12 12/18/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 161.50
12/21/12 250 LOW 1000 H
12/22/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
10494.00 137.00 19.57 7.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
06:00 8.6 36 0.00 0 00 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1790.45
241710.70
135.00
145.00
150.22
20280.00
135.00
06:00 18:00 12.00 6 Pick up 3 1/2 drill pipeElevator Watch Man (Colten Herman)C.O.M. check o.k.Trip drill 53 sec
18:00 20:00 2.00 6 P/U 3 1/2 DP20:00 21:30 1.50 21 count dp on location21:30 23:30 2.00 2 Drill out float and shoe and drill f/10298 t/ 1034023:30 01:00 1.50 20 slide f/ 10340 t/ 1036001:00 06:00 5.00 2 drill f/ 10360 t/ 10494
88.007.00 161.50
15.0014.00 75.00
3.502.50
12.5041.50
28.500.50
1.50 10.5021: 1.50 41.0022:23:Other
24.00 480.00
5 6.12 MDi611 smith jg4949 3 x 22.00 10357.00 137.00 8.50 8.50 new 16.12
10357.00 - 10357.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0010298.00 - 10494.00 290.00 2050.00 6.00 0.00 6.00 70.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1548.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1548.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
298.00298.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00240.00767.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
287.00928.00
0.00
11072.00910.00
19845.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 1\2 DP 7921.7239 H.W.D.P. 1197.52
13 1240.560
5.0010494.52
155000.00161.50
10180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53
9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.319831.00 30.95 160.769799.00 27.26 160.239703.00 18.29 157.159608.00 13.63 149.169514.00 12.05 152.329482.00 9.41 156.369450.00 6.24 160.589418.00 2.64 175.26
0.00 0.00 0.00
1244 77.50 77.50 5157.00
Zachary Ryan Savallo Jras 3 C1- Hoist Operation K1- Forklift OperationZachary Ryan Savallo E23 Tripping In The HoleZachary Ryan Savallo pre tour-overhead hazardsZachary Ryan Savallo jras-3 stops-2 fuel-72"=11072 galZachary Ryan Savallo p/u-165 s/o-145 tq-3
drilling
10357.00 10357.00 0.00 0.0010298.00 10494.00 DRILL 45.00 15.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 21
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-24 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 21.00
17.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
slide f 11352/ t/ 11362 drill
none 11 851 0.00 N 32.4799 W -102.284
C-8,ST-80 C-7,Mixing Mud, C-13,Slips C-14,Check C.O.M.D-28,ST-80 Dies Replacement K-1,Forklift ops 4 12/23/12 12/23/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 161.50
12/21/12 250 LOW 1000 H
12/22/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
11362.00 868.00 43.40 20.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
06:00 8.7 36 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1777.28
241710.70
136.00
145.00
150.18
20425.00
136.00
06:00 07:00 1.00 2 Drill F/10494 T/1059507:00 08:30 1.50 20 Slide F/10595 T/1061508:30 10:30 2.00 2 Drill F/10615 T/1069010:30 11:00 0.50 20 Slide F/10690 T/1070011:00 12:30 1.50 2 Drill F/10700 T/1077512:30 13:00 0.50 7 Lubriate rig, manrider working stored at crown,manual IBOP o.k.13:00 18:00 5.00 2 Drill F/10775 T/11030
Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P drill 58 sec
18:00 21:30 3.50 2 Drill f/ 11030 t/ 1106721:30 22:30 1.00 20 slide f/ 11067 t/ 1107722:30 05:30 7.00 2 Drill f/ 11077 t/ 1135205:30 06:00 0.50 20 slide f 11352/ t/ 11362
AD-EDWARD DELEON 10/23/20012ELEVATOR WATCHMEN- CLAY BARBEE
88.0020.00 181.50
15.0075.00
0.50 4.002.50
12.5041.50
28.500.50
3.50 14.0021: 41.0022:23:Other
24.00 504.00
5 6.12 MDi611 smith jg4949 3 x 22.00 10357.00 1005.00 32.50 41.00 new 24.51
10494.00 - 11030.00 290.00 2320.00 6.00 70.00 6.00 0.00 0.00 0.00 0.00 0.0011030.00 - 11362.00 246.00 2400.00 6.00 70.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1572.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1572.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
322.00322.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00264.00791.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
311.00952.00
0.000.00
9960.001112.00
20957.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 12 DP 7921.7239 H.W.D.P. 1197.52
22 2098.520
15.0011362.48
155000.00181.50
11167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.9510882.00 90.84 171.7410789.00 91.80 172.3610597.00 87.58 170.6910691.00 91.54 172.4510500.00 86.50 169.5510180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53
9957.00 46.87 165.949925.00 46.87 164.189894.00 37.55 164.189862.00 34.38 163.31
1244 77.50 77.50 5157.00
Zachary Ryan Savallo Jras-8 C-1,Air Hoist ops C-4,Conn Top DriveZachary Ryan Savallo C-8,ST-80 C-7,Mixing Mud, C-13,Slips C-14,Check C.O.M.Zachary Ryan Savallo D-28,ST-80 Dies Replacement K-1,Forklift opsZachary Ryan Savallo PRE TOUR- OVERHEAD HAZARDSZachary Ryan Savallo JRAS-3 STOPS-2 FUEL- 9960 gal 66inchesZachary Ryan Savallo PU-158 SO-148 TQ-5
drilling
10494.00 11030.00 DRILL 50.00 18.0011030.00 11362.00 DRILL 55.00 10.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 22
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-25 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 22.00
18.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
tih d/m 100% tied off JA drill
none 7 852 0.00 N 32.4799 W -102.284
Jras-5 C-1,Hoist ops C-7,Mix mud C-8,ST-80C-13,Slips F-6,Pressure washing0 12/23/12 12/23/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 161.50
12/21/12 250 LOW 1000 H
12/22/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
11808.00 446.00 34.31 13.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
06:00 trip 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1764.31
241710.70
137.00
145.00
150.15
20570.00
137.00
06:00 10:00 4.00 2 Drill F/11362 T/1154410:00 11:30 1.50 20 Slide F/11544 T/1155911:30 16:30 5.00 2 Drill F/11559 T/1172716:30 17:00 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k.17:00 18:00 1.00 2 Drill F/11727 T/11773
Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P. Drill 58 sec
18:00 21:00 3.00 2 DRILL F/11773 T/1180821:00 02:30 5.50 6 tooh d/m 100% tied off com working JA02:30 03:30 1.00 20 download data and change out motor03:30 04:00 0.50 20 make up motor and bit04:00 06:00 2.00 6 tih d/m 100% tied off JA
88.0013.00 194.50
15.007.50 82.500.50 4.50
2.50
12.5041.50
28.500.50
3.00 17.0021: 41.0022:23:Other
24.00 528.00
5 6.12 MDi611 smith jg4949 3 x 22.00 10357.00 11808.00 1451.00 44.50 85.50 new 16.976 6.12 FX64R security 11922159 3 x 22.00 11808.00 0.00
11362.00 - 11773.00 250.00 2560.00 6.00 70.00 6.00 70.00 0.00 0.00 0.00 0.0011773.00 - 11808.00 243.00 2571.00 6.00 70.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1596.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1596.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
346.00346.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00288.00815.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
335.00976.00
0.00
8837.001123.00
22080.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 12 DP 7921.7239 H.W.D.P. 1197.52
26 2478.542 62.65
18.0011808.15
155000.00194.50
11642.00 91.54 166.5611456.00 89.60 167.4411552.00 91.19 167.1711361.00 89.96 168.5811167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.9510882.00 90.84 171.7410789.00 91.80 172.3610597.00 87.58 170.6910691.00 91.54 172.4510500.00 86.50 169.5510180.00 68.59 167.5310116.00 61.47 167.5310211.00 72.98 167.7910148.00 65.25 167.3510084.00 57.07 167.53
1244 77.50 77.50 5157.00
Zachary Ryan Savallo Jras-5 C-1,Hoist ops C-7,Mix mud C-8,ST-80Zachary Ryan Savallo C-13,Slips F-6,Pressure washingZachary Ryan Savallo pre tour overhead hazardZachary Ryan Savallo Fuel-60"=8837 gals. jras-3 stops=2
drilling
11362.00 11773.00 DRILL 55.00 12.0011773.00 11808.00 DRILL 50.00 8.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 23
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-26 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 23.00
19.00
01/05/13
Ryan Savallo 903-570-5141 Fred Spruiell 806-891-9123 cooler
DRILL 12027/ 12361 drill
none 9 853 0.00 N 32.4799 W -102.284
JRA'S (6) E-23 T.I.O., C-14 Chk COM, E-24 Installrotating head, E-25 Well control procedures, K-1 Forklift 2 12/23/12 12/23/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 161.50
12/21/12 250 LOW 1000 H
12/22/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
12361.00 553.00 48.09 11.50 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
06:00 8.9 37 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1751.53
241710.70
138.00
145.00
150.11
20715.00
138.00
06:00 10:00 4.00 6 Trip in hole D.M. 100% tied off10:00 11:30 1.50 9 Slip and cut drill line 95ft11:30 12:00 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k.12:00 13:00 1.00 6 Trip in hole D.M. 100% tied off13:00 16:30 3.50 6 Trip in hole and circulaite gas out16:30 18:00 1.50 2 Drill F/11808 T/11871
Elevator Watch Man (Colten Herman)C.O.M. check o.k.
18:00 19:00 1.00 2 DRILL 11871/ 11923 com check ok19:00 20:00 1.00 20 slide 11923/1193320:00 21:30 1.50 2 DRILL 11933/ 1201721:30 22:30 1.00 20 slide 12017/ 1202722:30 06:00 7.50 2 DRILL 12027/ 12361
ad- edward deleonelevator watchmen- clay barbee
88.0011.50 206.00
15.008.50 91.000.50 5.00
2.501.50 1.50
12.5041.50
28.500.50
2.00 19.0021: 41.0022:23:Other
24.00 552.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 553.00 3.00 15.00 36.87
11808.00 - 11871.00 250.00 2600.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0011871.00 - 12361.00 240.00 3000.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1620.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1620.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 4.75NC 38 (IF) 546 546 0 0
NONE
GEN 1351224.00
370.00370.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00312.00839.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
359.001000.00
0.00
7527.001310.00
23390.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 0.651 MOTOR 29.781 FLOAT SUB 2.741 AWR 20.281 ABS 15.291 X.O. 1.131 NON MAG DRILL COLLAR 28.751 FLEX JOINT 31.10249 3 12 DP 7921.7239 H.W.D.P. 1197.52
32 3048.862 63.86
12361.68155000.00
206.00
12212.00 90.84 166.6511926.00 93.12 167.7912017.00 91.63 168.0511831.00 91.54 165.6811735.00 91.36 166.2011642.00 91.54 166.5611456.00 89.60 167.4411552.00 91.19 167.1711361.00 89.96 168.5811167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.9510882.00 90.84 171.7410789.00 91.80 172.3610597.00 87.58 170.6910691.00 91.54 172.4510500.00 86.50 169.55
1244 77.50 77.50 5157.00
Zachary Ryan Savallo JRA'S (6) E-23 T.I.O., C-14 Chk COM, E-24 InstallZachary Ryan Savallo rotating head, E-25 Well control procedures, K-1 ForkliftZachary Ryan Savallo operations, L-1 Manlift operations.Zachary Ryan Savallo pre tour-over head hazardsZachary Ryan Savallo jras-3 stops-2 fuel-53"=7527 gals.Zachary Ryan Savallo spr@ 12107 20-430psi 30-775 psi 40- 1150 psi
drilling
11808.00 11871.00 DRILL 55.00 10.0011871.00 12361.00 DRILL 55.00 15.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 1 Page 1 of 1US 2.50.0
Page 24
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-27 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 24.00
20.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
slide f/ 13037 t/ 13060 drill
none 0 854 0.00 N 32.4799 W -102.284
cold weather and electrical 0 12/23/12 12/23/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 141.00
12/21/12 250 LOW 1000 H
12/22/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
13061.00 700.00 43.75 16.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
5.50 17000.00
06:00 8.9 38 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1738.93
241710.70
139.00
145.00
150.07
20860.00
139.00
06:00 11:00 5.00 2 Drill F/12361 T/1259011:00 11:30 0.50 20 Slide F/12590 T/1259911:30 12:30 1.00 2 Drill F/12599 T/1261612:30 13:00 0.50 20 Slide F/12616 T/1263013:00 15:00 2.00 2 Drill F/12630 T/1267915:00 15:30 0.50 7 Lubriate rig15:30 16:00 0.50 2 Drill F/12679 T/1268516:00 16:30 0.50 20 Slide F/12685 T/1270016:30 18:00 1.50 2 Drill F/12700 T/12775
crew was on confrence callElevator Watch Man (Colten Herman)C.O.M check o.k.B.O.P Drill 58 sec
18:00 19:30 1.50 20 SLIDE F/12775 T/1280219:30 21:30 2.00 2 Drill f/ 12802 t/1287621:30 23:00 1.50 20 slide f/ 12875 t/1289523:00 02:00 3.00 2 Drill f/ 12895 t/ 1297102:00 03:00 1.00 20 slide f/ 12971 t/ 1298603:00 04:00 1.00 2 drill f/ 12986 t/ 1303704:00 06:00 2.00 20 slide f/ 13037 t/ 13060
crew was on confence callelevator watchman clay barbee
88.0016.00 222.00
15.0091.00
0.50 5.502.501.50
12.5041.50
28.500.50
7.50 26.5021: 41.0022:23:Other
24.00 576.00
6 6.13 fx64 security 119159 3 x 22.00 11808.00 1253.00 27.00 42.00 new 29.83
12361.00 - 12775.00 240.00 3100.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0012775.00 - 13061.00 255.00 3050.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1644.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1644.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
394.00394.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00336.00863.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
383.001024.00
0.000.00
6235.001292.00
24682.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
40 3812.510
13061.47155000.00
222.00
12594.00 89.60 165.5212403.00 90.04 165.7712690.00 88.46 91.1012498.00 89.60 165.4212307.00 90.84 165.6512212.00 90.84 166.6511926.00 93.12 167.7912017.00 91.63 168.0511831.00 91.54 165.6811735.00 91.36 166.2011642.00 91.54 166.5611456.00 89.60 167.4411552.00 91.19 167.1711361.00 89.96 168.5811167.00 90.75 170.9510977.00 89.78 171.3311262.00 89.96 170.0711072.00 90.84 170.95
1244 24.00 101.50 101.50 700.00 5857.00
Justin D Murphree Jras-4 C-1,Hoist ops C-13,Slips K-1,Forklift opsJustin D Murphree C-7,Mix mudJohn T Askew pre tour- electrical hazardsJohn T Askew jras= stops= fuel=46"=6235gals p/u-174 s/o-133 tq.-6John T Askew spr@ #1 pump 20 stks-470 psi 30 stks-720 psi 40 stks-1000 psi
drilling
12361.00 12775.00 DRILL 55.00 18.0012775.00 13061.00 DRILL 55.00 10.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 25
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-28 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 25.00
21.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
drill f/ 13659 t/ 13730 drill
none 0 855 0.00 N 32.4799 W -102.284
eletrical safety cont 0 12/23/12 12/23/12 00:00
12/18/12 Ryan Savallo - rig manager 5/5 No 124.00
12/21/12 250 LOW 1000 H
12/22/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
13730.00 669.00 38.23 17.50 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
5.50 17000.00
06:00 9.0 37 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
750.00
1731.86
242460.70
140.00
145.00
150.04
21005.00
140.00
06:00 12:30 6.50 2 Drill F/13061 T/1335812:30 13:30 1.00 20 Slide F/13358 T/1337413:30 16:00 2.50 2 Drill F/13374 T/1344316:00 16:30 0.50 7 Lubriate Rig man rider stored at crown lower ibop ok16:30 17:00 0.50 2 Drill F/13443 T/1345417:00 18:00 1.00 20 Slide F/13454 T/13474
Elevator Watch Man (Colten Herman)C.O.M. check o.k.B.O.P drill 58 sec
18:00 21:00 3.00 2 Drill f/ 13474 t/1357121:00 23:00 2.00 20 slide f/ 13571 t/ 1358623:00 02:00 3.00 2 Drill f/ 13586 t/ 1363902:00 04:00 2.00 20 slide f/ 13639 t/ 1365904:00 06:00 2.00 2 drill f/ 13659 t/ 13730
elevator watchman clay barbeec-o-m
88.0017.50 239.50
15.0091.00
0.50 6.002.501.50
12.5041.50
28.500.50
6.00 32.5021: 41.0022:23:Other
24.00 600.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 1922.00 63.00 105.00 new 38.00
13061.00 - 13474.00 255.00 3250.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0013474.00 - 13730.00 255.00 3350.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1668.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1668.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
418.00418.00
0.00
GEN23512
0.00219.00195.00
0.00
GEN3351224.00360.00887.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
407.001048.00
0.000.00
4806.001429.00
26111.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
47 4481.300
13730.26155000.00
239.50
134545.00 91.89 167.0913549.00 92.95 166.3813359.00 90.75 167.5313358.00 89.69 167.8813166.00 90.92 169.8113262.00 90.31 89.8713071.00 93.91 167.7912880.00 92.42 166.0312975.00 92.86 172.9712785.00 91.54 164.1812594.00 89.60 165.5212403.00 90.04 165.7712690.00 88.46 91.1012498.00 89.60 165.4212307.00 90.84 165.6512212.00 90.84 166.6511926.00 93.12 167.7912017.00 91.63 168.05
1244 23.50 125.00 125.00 669.00 6526.00
Justin D Murphree Jrs-3 C-1,Hoist ops C-13,Slips K-1,Forklift opsPRE TOUR- ELECTRICAL HAZARDSJRAS-3 STOPS-2 P/U-168 S/O-135 TQ.-6 fuel-38"-4806 gals
drilling
13061.00 13474.00 DRILL 55.00 12.0013474.00 13730.00 DRILL 55.00 12.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 26
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-29 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 26.00
22.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
drill f/ 14232 t/14493 drill
none 6 856 0.00 N 32.4799 W -102.284
cold weather 4 12/29/12 12/28/12 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No 111.50
12/21/12 250 LOW 1000 H
12/28/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
14493.00 763.00 40.16 19.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
5.50 17000.00
06:00 9.1 37 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
8486.25
1779.77
250946.95
141.00
145.00
150.00
21150.00
141.00
06:00 06:30 0.50 2 Drill F/13730 T/1373506:30 08:00 1.50 20 Slide F/13735 T/1375608:00 13:00 5.00 2 Drill F/13756 T/1392613:00 15:00 2.00 20 Slide F/13926 T/1394115:00 16:30 1.50 2 Drill F/13941 T/1401316:30 17:00 0.50 7 Lubriate Rig manrider stored at crown17:00 18:00 1.00 2 Drill F/14013 T/14047
Freddy Meise worked from 600 to 1800 12.5 hours could'nt get him off pick listElevator Watch Man (Colten Herman)C.O.M. check o.k.
18:00 23:00 5.00 2 drill f/ 14047 t/1421223:00 00:00 1.00 20 slide f/ 14212 t/ 1423200:00 06:00 6.00 2 drill f/ 14232 t/14493
Johnny Muck worked from 1800 to 0600 couldnt get him off picklistelevator watchman clay barbee
88.0019.00 258.50
15.0091.00
0.50 6.502.501.50
12.5041.50
28.500.50
4.50 37.0021: 41.0022:23:Other
24.00 624.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 2685.00 87.00 192.00 new 40.96
13730.00 - 14047.00 255.00 3100.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0014047.00 - 14493.00 255.00 3250.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1692.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1692.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351210.00
428.00428.00
0.00
GEN2351214.00
233.00209.00
0.00
GEN3351224.00384.00911.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
431.001072.00
0.007450.00
10888.001368.00
27479.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
56 5244.270
14493.23158000.00
258.50
14313.00 89.78 169.9014122.00 90.31 168.8414217.00 90.13 169.7214026.00 90.48 169.9913930.00 90.92 170.2513740.00 91.54 170.2513835.00 91.45 170.7813644.00 92.15 168.49134545.00 91.89 167.0913549.00 92.95 166.3813359.00 90.75 167.5313358.00 89.69 167.8813166.00 90.92 169.8113262.00 90.31 89.8713071.00 93.91 167.7912880.00 92.42 166.0312975.00 92.86 172.9712785.00 91.54 164.18
1244 23.50 148.50 148.50 763.00 7289.00
Jras-5 C-1,Air Hoist C-4,Topdrive C-13,slipsC-1,Manlift ops F-6,Pressure washingpre tour electrical hazardsjras-4 stops-2 p/u-168 s/o-142 tq-7 fuel=71"=10888 gals
drilling
13730.00 14047.00 DRILL 55.00 18.0014047.00 14493.00 DRILL 55.00 10.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 27
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-30 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 27.00
23.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
drill f/ 15021 t/15106 drill
none 8 857 0.00 N 32.4799 W -102.284
working together 4 12/29/12 12/29/12 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No 111.50
12/21/12 250 LOW 1000 H
12/28/12 15:55 - 53sec
12/22/12 19:20 - 8-15-2012 45 SEC
15106.00 613.00 38.31 16.00 0.00 0 0 0
162000.00 160000.00 154000.00 162000.00 6.00 - 9.00
7.62 10346.00
5.50 17000.00
06:00 9.0 37 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1767.23
250946.95
142.00
145.00
149.96
21295.00
142.00
06:00 08:00 2.00 2 Drill F/14493 T/1456708:00 10:00 2.00 20 Slide F/14567 T/1458210:00 14:00 4.00 2 Drill F/14582 T/1474614:00 16:00 2.00 20 Slide F/14746 T/1476616:00 16:30 0.50 2 Drill F/14766 T/1477516:30 17:00 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k.17:00 18:00 1.00 2 Drill F/14775 T/14810
Elevator Watch Man (Colten Herman)C.O.M. check o.k.B.O.P. Drill 58 sec also spill 1st on tour and H2S drill,medical and Firedrill
18:00 20:30 2.50 2 Drill f/ 14810 t/ 1487820:30 22:00 1.50 20 slide f/ 14878 t/ 1489822:00 01:00 3.00 2 Drill f/ 14898 t/ 1501101:00 03:00 2.00 20 slide f/ 15011 t/ 1502103:00 06:00 3.00 2 drill f/ 15021 t/15106
elevator watchman Clay BarbeeJohnny Muck worked from 1800 to 0600
88.0016.00 274.50
15.0091.00
0.50 7.002.501.50
12.5041.50
28.500.50
7.50 44.5021: 41.0022:23:Other
24.00 648.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 3298.00 99.00 291.00 new 11.336 6.12 FX64R security 11922159 3 x 22.00 11808.00 3298.00 111.00 303.00 new 10.88
14493.00 - 14810.00 255.00 3100.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0014810.00 - 15106.00 255.00 3250.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1716.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1716.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
452.00452.00
0.00
GEN2351224.00
257.00233.00
0.00
GEN33512
1.00385.00912.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
455.001096.00
0.000.00
9306.001582.00
29061.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
61 5815.541 31.85
10.0015106.35
158000.00274.50
14884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.1114405.00 90.22 170.6914313.00 89.78 169.9014122.00 90.31 168.8414217.00 90.13 169.7214026.00 90.48 169.9913930.00 90.92 170.2513740.00 91.54 170.2513835.00 91.45 170.7813644.00 92.15 168.49134545.00 91.89 167.0913549.00 92.95 166.3813359.00 90.75 167.53
1244 23.50 172.00 172.00 613.00 7902.00
Justin D Murphree JRAS-5 C-1,Hoist ops C-4,Conn Top Drive C-7,MixingJustin D Murphree mud C-13,Pulling slips C-14,check c.o.m.John T Askew pre tour valve replacement on pumpJohn T Askew jras-3 stops-2 p/u-180 s/o-142 tq-7 fuel-62"=9306 gals
drilling
14493.00 14810.00 DRILL 60.00 20.0014810.00 15106.00 DRILL 58.00 10.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 28
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2012-12-31 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 28.00
24.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
DRILL F/ 15653 T/15669 drill
none 6 858 0.00 N 32.4799 W -102.284
electical safety 4 12/29/12 12/30/12 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 111.50
12/21/12 250 LOW 1000 H
12/28/12 15:55 - 53sec
12/30/12 19:20 - 8-15-2012 45 SEC
15669.00 563.00 29.63 19.00 0.00 0 0 0
160000.00 165000.00 127000.00 160000.00 6.00 - 9.00
7.62 10346.00
5.50 17000.00
06:00 9.3 37 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1754.87
250946.95
143.00
145.00
149.93
21440.00
143.00
06:00 15:00 9.00 2 Drill F/15106 T/1534915:00 15:30 0.50 7 Lubriate rig15:30 17:00 1.50 20 Slide F/15349 T/1536617:00 18:00 1.00 2 Drill F/15366 T/15349
Freddy Meise worked from 600 to 1800Elevator (Colten Herman)C.O.M. check o.k.B.O.P Drill 58 sec
18:00 20:00 2.00 2 DRILL F/15349 T/ 1544920:00 21:30 1.50 20 SLIDE F/ 15449 T/ 1545921:30 04:00 6.50 2 DRILL F/ 15459 T/ 1564304:00 05:30 1.50 20 SLIDE F/ 15643 T/ 1565305:30 06:00 0.50 2 DRILL F/ 15653 T/15669
REVIEW DRILL PROCEDURES AND ALARMSJOHNNY MUCK WORKED FROM 1800 TO 0600
88.0019.00 293.50
15.0091.00
0.50 7.502.501.50
12.5041.50
28.500.50
4.50 49.0021: 41.0022:23:Other
24.00 672.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 3861.00 123.00 426.00 new 9.066 6.12 FX64R security 11922159 3 x 22.00 11808.00 3861.00 135.00 438.00 new 8.82
15106.00 - 15349.00 255.00 3400.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0015349.00 - 15669.00 255.00 3350.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1740.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1740.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
476.00476.00
0.00
GEN2351224.00
281.00257.00
0.00
GEN33512
0.00385.00912.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
479.001120.00
0.000.00
7527.001779.00
30840.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
67 6389.231 31.66
15669.85158000.00
293.50
15457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.7315264.00 91.01 165.5915073.00 91.63 166.8214884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.1114405.00 90.22 170.6914313.00 89.78 169.9014122.00 90.31 168.8414217.00 90.13 169.7214026.00 90.48 169.9913930.00 90.92 170.25
1244 23.50 195.50 195.50 563.00 8465.00
Justin D Murphree JRAS-4 C-1,Air Hoist C-13,slips C-7,mix mudJustin D Murphree C-1,Conn Top DriveJohn T Askew PRE TOUR ELECTRICAL HAZARDSJohn T Askew JRAS-3 STOPS-2 P/U-165 S/O-127 TQ.- 6 FUEL-53"=7527 GALS
drilling
15106.00 15349.00 DRILL 50.00 18.0015349.00 15669.00 DRILL 60.00 12.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 29
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-01 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 29.00
25.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
Drill f/ 16034 t/16120 drill
none 6 859 0.00 N 32.4799 W -102.284
electrical safety 4 12/29/12 12/30/12 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 111.50
12/21/12 250 LOW 1000 H
12/28/12 15:55 - 53sec
12/30/12 19:20 - 8-15-2012 45 SEC
16120.00 451.00 30.07 15.00 0.00 0 0 0
160000.00 168000.00 127000.00 160000.00 6.00 - 9.00
7.62 10346.00
5.50 17000.00
06:00 9.4 38 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1742.69
250946.95
144.00
145.00
149.90
21585.00
144.00
06:00 08:00 2.00 2 Drill F/15669 T/1573208:00 10:00 2.00 20 Slide F/15732 T/1574810:00 11:00 1.00 2 Drill F/15748 T/1578411:00 13:00 2.00 20 Slide F/15784 T/1580113:00 14:00 1.00 2 Drill F/15801 T/1582814:00 14:30 0.50 7 Lubriate rig,manrider working stored at crown,manual IBOP o.k14:30 16:00 1.50 2 Drill F/15828 T/1586116:00 17:30 1.50 20 Slide F/15861 T/1587517:30 18:00 0.50 2 Drill F/15875 T/15892
Freddy Meise worked from 600 to 1800Elevator Watch Man (Colten Herman)C.O.M. Check o.k.B.O.P drill 58 sec
18:00 20:00 2.00 2 Drill f/ 15892 t/1592920:00 21:30 1.50 20 slide f/ 15929 t/ 1593921:30 01:00 3.50 2 Drill f/ 15939 t/ 1602401:00 02:30 1.50 20 slide f/ 16024 t/ 1603402:30 06:00 3.50 2 Drill f/ 16034 t/16120
elevatorwatchman Clay BarbeeJohnny Muck worked from 1800 to 0600
88.0015.00 308.50
15.0091.00
0.50 8.002.501.50
12.5041.50
28.500.50
8.50 57.5021: 41.0022:23:Other
24.00 696.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 4312.00 159.00 597.00 new 30.00
15669.00 - 15892.00 255.00 3400.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0015892.00 - 16120.00 255.00 3650.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1764.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1764.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
500.00500.00
0.00
GEN2351224.00
305.00281.00
0.00
GEN33512
0.00385.00
0.000.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
503.001144.00
0.000.00
6235.001292.00
32132.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.781 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
72 6861.000
10.0016119.96
158000.00308.50
15939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.5015647.00 93.30 164.7115457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.7315264.00 91.01 165.5915073.00 91.63 166.8214884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.1114405.00 90.22 170.69
1244 23.50 219.00 219.00 451.00 8916.00
Justin D Murphree Jras-3 C1,Hoist ops K-1,Forklift C-13,SlipsJohn T Askew Pre Tour - Electircal SafetyJohn T Askew Fuel-46"=6235 gal JRA-3 STOP-3John T Askew p/u 168 s/o-128 tq. 8
drilling
15669.00 15892.00 DRILL 60.00 20.0015892.00 16120.00 DRILL 60.00 14.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 30
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-02 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 30.00
26.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
tih d/m 100% tied off drill
none 4 860 0.00 N 32.4799 W -102.284
electrical safety 2 12/29/12 01/01/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 111.50
12/21/12 250 LOW 1000 H
12/28/12 15:55 - 53sec
12/30/12 19:20 - 8-15-2012 45 SEC
16212.00 92.00 30.67 3.00 0.00 0 0 0
160000.00 168000.00 127000.00 160000.00 6.00 - 9.00
7.62 10346.00
5.50 17100.00
06:00 trip 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 11.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1730.67
250946.95
145.00
145.00
149.86
21730.00
145.00
06:00 09:00 3.00 2 Drill F/16120 T/1621009:00 12:30 3.50 5 Circulaite Mud and spot12:30 16:00 3.50 6 Trip out of hole D.M. 100% tied off16:00 17:00 1.00 5 Pulled 69 stands Circulaite Bottom up and spot pill17:00 18:00 1.00 6 Trip out of hole D.M. 100% tied off
Freddy Meise worked from 600 to 1800Eleavtor Watch Man (Colten Herman)C.O.M. check o.k.B.O.P drill 58 sec
18:00 22:30 4.50 6 Tooh d/m 100% tied off22:30 23:30 1.00 20 l/d motor and birt make up new motors and bit23:30 02:30 3.00 20 l/d mwd and awr p/u new mwd and awr scribe motors and program tools02:30 03:30 1.00 20 shallow test motor and mwd03:30 06:00 2.50 6 tih d/m 100% tied off
Johnny Muck worked from 1800 to 0600com ok JA
88.003.00 311.50
4.50 19.5011.50 102.50
8.002.501.50
12.5041.50
28.500.50
5.00 62.5021: 41.0022:23:Other
24.00 720.00
6 6.12 FX64R security 11922159 3 x 22.00 11808.00 4404.00 162.00 759.00 new 5.807 6.12 FX64R security 11620151 3 x 22.00 16220.00 0.00 0.00 0.00 new
16120.00 - 16210.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0016212.00 - 16212.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1788.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1788.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
524.00524.00
0.00
GEN2351224.00
329.00305.00
0.00
GEN33512
0.00385.00
0.000.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
527.001168.00
0.000.00
5334.00901.00
33033.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.651 MOTOR 4.00 0.00 29.801 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
73 6961.500
16210.48158000.00
311.50
16123.00 90.31 169.6415939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.5015647.00 93.30 164.7115457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.7315264.00 91.01 165.5915073.00 91.63 166.8214884.00 90.31 166.5614979.00 89.95 166.6514788.00 90.13 167.1714690.00 89.25 168.7614501.00 89.43 170.2514597.00 89.60 169.11
1244 3.00 222.00 222.00 92.00 9008.00
Justin D Murphree Jras-4 C-1 Airhoist op, C-4 Connection W/TopdriveJustin D Murphree C-8 Connections W/Ironroughneck, C-13 Pulling Slips, K-1 ForkliftJohn T Askew pre tour electrical safetyJohn T Askew jras-3 stops- 2 fuel- 41"=5334 gals
drilling
16120.00 16210.00 DRILL 0.00 0.0016212.00 16212.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 31
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-03 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 31.00
27.00
01/05/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
Drill -/f 16417 -/t 16788 drill
none 12 861 0.00 N 32.4799 W -102.284
electrical safety 4 01/02/13 01/02/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 141.00
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
16788.00 576.00 42.67 13.50 0.00 0 0 0
15000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17100.00
06:00 9.5 40 10.00 19 3 6 9.50 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1718.81
250946.95
146.00
145.00
149.83
21875.00
146.00
06:00 09:30 3.50 6 t.i.h c-c-o-m d-man 100% tied off (nm)09:30 10:30 1.00 5 circulate bottoms up10:30 11:00 0.50 7 lubricate rig work manual ibop (ok) manrider working stored @ crown11:00 15:00 4.00 6 continue t.i.h d-man 100% tied off (nm)15:00 16:00 1.00 3 wash and ream down 6 stands d-man 100% tied off (nm)16:00 16:30 0.50 5 circulate bottoms up16:30 18:00 1.50 2 dril f/16210-t/16303
elevator watchman-Omar Rodriguezcrew was on confrence call
18:00 21:00 3.00 2 Drill -/f 16303 -/t 1640721:00 22:00 1.00 2 Slide -/f 16407 -/t 1641722:00 06:00 8.00 2 Drill -/f 16417 -/t 16788
fuel = 32" 3783.7 galelevator watchman (Daniel Baltimore)
88.0013.50 325.00
1.00 1.00
1.50 21.007.50 110.000.50 8.50
2.501.50
12.5041.50
28.500.50
62.5021: 41.0022:23:Other
24.00 744.00
7 6.12 FX64R security 11620151 3 x 22.00 16210.00 578.00 1.50 1.50 new 42.817 6.12 FX64R security 11620151 3 x 22.00 16210.00 578.00 13.50 13.50 new 42.81
16210.00 - 16303.00 75.00 3900.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0016303.00 - 16788.00 75.00 4000.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1812.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1812.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
548.00548.00
0.00
GEN2351224.00
353.00329.00
0.00
GEN33512
0.00385.00
0.000.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
551.001192.00
0.000.00
3783.001551.00
34584.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.13 0.00 0.751 MOTOR 4.00 0.00 29.801 FLOAT SUB 4.00 2.50 2.741 AWR 4.00 2.50 20.281 ABS 4.00 2.50 15.291 X.O. 4.00 2.50 1.131 NON MAG DRILL COLLAR 4.00 2.50 28.751 FLEX JOINT 3.50 2.76 31.10249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
79 7534.050
5.0016788.13
158000.00326.00
16602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.64
0.00 0.00 0.0016123.00 90.31 169.6415939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.5015647.00 93.30 164.7115457.00 91.98 164.2715583.00 92.51 164.2715361.00 91.36 164.7115170.00 91.54 166.73
1244 13.50 235.50 235.50 576.00 9584.00
Norberto M Musico s/m electrical, jras=6 stops=1,c1 hoist,c13 slipsNorberto M Musico k1 forklift,e23 t.i.h,c7 mix chemicals,l1 manliftJoey Wiegman s/m electrical hazzards, 6 jra's, 2 stopsJoey Wiegman d-6 add methanol, c-13 pull & set slips, c-7 mix mudJoey Wiegman brk temp in/out 63, 43 psi, 217 gpmJoey Wiegman p/u 160, s/o 133, r/w 150
drilling
16210.00 16303.00 DRILL 60.00 15.0016303.00 16788.00 DRILL 58.00 15.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 32
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-04 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17000.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 32.00
28.00
01/07/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
Hold safety meeting, rig up logging tools log with tools
none 12 862 0.00 N 32.4799 W -102.284
electrical 6 01/03/13 01/02/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
17085.00 297.00 42.43 7.00 0.00 0 0 0
15000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17085.00
00:00 0 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1707.12
250946.95
147.00
145.00
149.80
22020.00
147.00
06:00 13:00 7.00 2 drill f/16788-t/1708513:00 15:00 2.00 5 condition mud & circulate15:00 18:00 3.00 6 t.o.o.h c-c-o-m d-man 100% tied off (nm)
elevator watchman-Omar Rodriguez18:00 00:00 6.00 6 T.o.o.h, dh 100% tied off, ck c.o.m (jw)00:00 01:30 1.50 20 Lay down directional tools, break bit01:30 06:00 4.50 11 Hold safety meeting, rig up logging tools
elevator watchman (Justin youkey)fuel=48"=6602.0 gls.
88.007.00 332.00
1.00
2.00 23.009.00 119.00
8.502.501.50
4.50 17.0041.50
28.500.50
1.50 64.0021: 41.0022:23:Other
24.00 768.00
7 6.12 FX64R security 11620151 3 x 22.00 16210.00 17085.00 875.00 22.50 36.00 new 42.00
16788.00 - 17085.00 274.00 4150.00 6.00 75.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1836.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1836.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351220.00
568.00568.00
0.00
GEN23512
4.00357.00333.00
0.00
GEN3351224.00409.0024.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
575.001216.00
0.004000.006602.001181.00
35765.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 FLOAT SUB 4.00 2.50 2.301 UPPER LATCH 4.00 0.00 4.501 LOWER LATCH 4.00 0.00 5.501 slc 4.00 0.00 8.201 SPE 4.00 0.00 39.001 SMS 4.00 0.00 3.00249 3 1\2 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
82 7819.680
17.0017018.42
158000.00333.00
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.3216030.00 90.84 169.7215839.00 91.63 165.6815742.00 94.09 165.50
1244 7.00 242.50 242.50 297.00 9881.00
s/m elec.safety,jras=6 stops=2,c1 hoist,c13 slips24 t.o.o.h,k1 forklift,c4 conn w/td,c7 mix mud,c8 conn w/irs/m electrical hazzards continued, 6 jra's, 4stopsl-1 manlift, c-13 pull & set slips, e-24 t.o.o.hbrk temp in/out 53, 43 psi, 218 gpm
log with tools
16788.00 17085.00 DRILL 60.00 15.0017085.00 17085.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 33
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-05 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 33.00
29.00
01/07/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
pooh while logging with weatherford log with tools
none 9 863 0.00 N 32.4799 W -102.284
weather 4 01/04/13 01/04/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
17085.00 0.00 0.00 0.00 0 0 0
15000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17085.00
00:00 0 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
2492.37
1712.43
253439.32
148.00
145.00
149.76
22165.00
148.00
06:00 18:00 12.00 6 t.i.h w/logging tools c-c-o-m d-man 100% tied off (nm)elevator watchman-Omar Rodriguez
18:00 20:00 2.00 6 T.i.h, dh 100% tied off ck c.o.m (JW)20:00 22:30 2.50 5 Deploy logging tools, circulate bottoms up22:30 06:00 7.50 6 pooh while logging with weatherford
derrickman 100% tied off c-o-melevator watchman=justin youkeyfuel=43"=5692.4 gls.
88.00332.00
1.00
2.50 25.5021.50 140.50
8.502.501.50
17.0041.50
28.500.50
64.0021: 41.0022:23:Other
24.00 792.00
na 0.00 0 0 0 0.00 0.00 0.00 0.00 0.00 new 0.00
17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1860.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1860.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
592.00592.00
0.00
GEN23512
0.00357.00333.00
0.00
GEN3351224.00433.0048.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
599.001240.00
0.000.00
5692.00910.00
36675.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 FLOAT SUB 4.00 2.50 2.301 UPPER LATCH 4.00 0.00 4.501 LOWER LATCH 4.00 0.00 5.501 slc 4.00 0.00 8.201 SPE 4.00 0.00 39.001 SMS 4.00 0.00 3.00249 3 12 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
82 7819.680
17.0017018.42
158000.00333.00
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32
1244 0.00 242.50 242.50 0.00 9881.00
Norberto M Musico s/m ele. safety,jras=3,stops=1,c13 slips,c1hoistNorberto M Musico e23 t.i.h,c8 conn w/irJoey Wiegman s/m electrical continued,jras=6,stops=4Joey Wiegman jra c13 slips,jra e23 trip in hole,jra e24 trip out holeJoey Wiegman brk temp in/out 55, 43 psi, 220 gpm
log with tools
17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 34
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-06 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 34.00
30.00
01/07/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
T.i.h, dh 100% tied off ck c.o.m (JW) ream lay down dp
yes 0 864 0.00 N 32.4799 W -102.284
electrical safety 0 01/05/13 01/05/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 Yes No 149.00
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
17085.00 0.00 0.00 0.00 0 0 0
15000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17085.00
00:00 0 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1700.94
253439.32
149.00
145.00
149.73
22310.00
149.00
06:00 16:30 10.50 6 t.o.o.h w/logging tools16:30 18:00 1.50 21 laydown logging tools & equipment
elevator watchman-Omar Rodriguez18:00 20:00 2.00 21 Strap tools, pick up reamers & make up bit20:00 00:30 4.50 6 T.i.h, dh 100% tied off, ck c.o.m (JW)00:30 03:00 2.50 9 Hang blocks, slip & cut, unhang blocks03:00 03:30 0.50 7 Rig service, work manual ibop, manrider working & stored @ crown03:30 05:00 1.50 6 T.i.h, dh 100% tied off ck c.o.m (JW)05:00 06:00 1.00 3 REAMING f/10300 to 11595
Elevator watchman (Justin Youkey)Fuel=38"=4806.0 gls.
88.00332.00
1.00 2.00
25.5016.50 157.000.50 9.00
2.502.50 4.00
17.0041.50
28.500.50
64.0021: 3.50 44.5022:23:Other
24.00 816.00
8 618.00 xp30tps smith px4926 3 x 22.00 17085.00 0.00 0.00 0.00 used
17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 80.00 0.00 6.00 0.00 6.00 80.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1884.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1884.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
616.00616.00
0.00
GEN23512
0.00357.00333.00
0.00
GEN3351224.00457.0072.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
623.001264.00
0.000.00
4806.00886.00
37561.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.18 0.00 1.001 BIT SUB 4.00 2.50 3.431 3 1\2 DP 3.50 2.76 31.941 3PT REAMER 4.00 2.73 6.851 3 1\2 DP 3.50 2.76 31.931 REAMER 4.00 2.76 6.641 3 1\2 DP 3.50 2.76 31.951 3PT REAMER 4.00 2.76 6.811 3 1\2 DP 3.50 2.76 31.931 REAMER 3.50 2.76 6.67249 3 1\2 DP 3.50 2.76 7921.7239 H.W.D.P. 3.50 2.76 1197.52
00
9278.39
334.00
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32
1244 0.00 242.50 242.50 0.00 9881.00
s/m cold weather,jras=6,stops=2,c13 slips,e23,tooh,c8 conn w/ir,l1 manlift,k1 forklift,e24 tih,c1 hoistbrake-71 psi,219 gpm,59 out 90 in temps/m electrical, 6 jra's, 6 stopsd-27 slip & cut, c-1 hoist, e -23 t.i.hbrk temp in/out 60, 43 psi, 220 gpm
log with tools
17085.00 17085.00 0.00 0.0017085.00 17085.00 REAM 75.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 35
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-07 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 35.00
31.00
01/07/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
Lay down pipe lay down dp run casing
none 9 865 0.00 N 32.4799 W -102.284
hydroil hoist 7 01/05/13 01/06/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
17085.00 0.00 0.00 1455.00 0 0 0
15000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17085.00
00:00 0 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1689.60
253439.32
150.00
145.00
149.70
22455.00
150.00
06:00 16:30 10.50 3 reaming in hole f/11598-t/1708516:30 18:00 1.50 5 condition mud & circulate
elevator watchman-Omar Rodriguez18:00 20:00 2.00 5 Circulate20:00 21:00 1.00 8E Repair top/drive repaired line going to brake caliper21:00 01:00 4.00 6 T.o.o.h. to shoe,dh. 100 % tied off, ck c.o.m. (jw)01:00 01:30 0.50 5 Break circulation, pump pill 833 stks01:30 06:00 4.50 6 Lay down pipe
elevator watchman (justin youkey)fuel=32"=3783.7 gls.
88.00332.00
10.50 12.50
4.00 29.508.50 165.50
9.001.00 3.50
4.00
17.0041.50
28.500.50
64.0021: 44.5022:23:Other
24.00 840.00
8 618.00 xp30tps smith px4926 3 x 22.00 17085.00 0.00 0.00 used
17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 70.00 2500.00 6.00 0.00 6.00 70.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1908.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1908.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
640.00640.00
0.00
GEN23512
0.00357.00333.00
0.00
GEN3351224.00481.0096.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
647.001288.00
0.000.00
3783.001023.00
38584.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
1 BIT 6.18 0.00 1.001 BIT SUB 4.00 2.50 3.431 3 12 DP 31.941 3PT REAMER 4.00 2.73 6.851 3 12 DP 31.931 REAMER 4.00 2.76 6.641 3 12 DP 31.951 3PT REAMER 4.00 2.76 6.811 3 12 DP 31.931 REAMER 3.50 2.76 6.67249 3 12 DP 7921.7239 H.W.D.P. 3.50 2.76 1197.52
00
9278.39
344.50
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32
1244 0.00 242.50 242.50 0.00 9881.00
Norberto M Musico s/m electrical safety,jras=3,stops=1,c13 slipsNorberto M Musico e24 t.i.h,c8 conn w/ir,brake 71 psi 219 gpm temp 67 in 84 outJoey Wiegman s\m electrical safety,6 jras,6 stopsJoey Wiegman jra c13 slips,jra e24 trip out hole,jra e7 laydown drill pipeJoey Wiegman brk temp in/out 67, 43 psi, 218 gpm
lay down dp
17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 36
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-08 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 36.00
32.00
01/07/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
Hold safety meeting,rig up casing crew,run casing run casing
none 6 866 0.00 N 32.4799 W -102.284
hoist cont 4 01/07/13 01/07/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 No No 149.00
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
17085.00 0.00 0.00 0.00 0 0 0
150000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17085.00
00:00 0 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1678.41
253439.32
151.00
145.00
149.67
22600.00
151.00
06:00 12:30 6.50 6 lay down pipe & reamers12:30 13:00 0.50 7 lubricate rig work manual ibop (ok) manrider stored @ crown13:00 16:00 3.00 6 t.i.h c-c-o-m d-man 100% tied off (nm)16:00 18:00 2.00 6 lay down pipe
elevator watchman-Omar Rodriguez18:00 00:30 6.50 6 Lay down pipe00:30 04:00 3.50 21 Change out bails & elevators, change saver sub04:00 06:00 2.00 12 Hold safety meeting,rig up casing crew,run casing
elevator watchman (Justin Youkey)fuel=27"=2976.7 gls.
88.00332.0012.50
29.5018.00 183.500.50 9.50
3.504.00
17.002.00 43.50
28.500.50
64.0021: 3.50 48.0022:23:Other
24.00 864.00
na
17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1932.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1932.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351218.00
658.00658.00
0.00
GEN23512
6.00363.00339.00
0.00
GEN3351224.00505.00120.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
671.001312.00
0.000.00
2976.00807.00
39391.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00
344.50
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32
1244 0.00 242.50 242.50 0.00 9881.00
Norberto M Musico s/m hoist oper,jra=3,stops=1=c1 hoist,k1 forkliftNorberto M Musico c13 slips,c8 conn w/ir,Joey Wiegman s/m material handleing,jras=6,stops=4,Joey Wiegman jra h1 xcaseing rig up and run,c13 slips,c1 hoistJoey Wiegman brk temp in/out 60, 43 psi, 217 gpm
run casing
17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 37
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-09 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 37.00
33.00
01/09/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 cooler
Circulate while waiting on cement to arrive cement rig down
none 6 867 0.00 N 32.4799 W -102.284
electrical safety 6 01/07/13 01/07/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 Yes yes Yes 186.50
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
17085.00 0.00 0.00 0.00 0 0 0
150000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
5.50 17085.00
00:00 0 0 0.00 0 0 0 0.00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
1348.17
1676.23
254787.49
152.00
145.00
149.64
22745.00
152.00
06:00 07:30 1.50 12 run casing07:30 08:30 1.00 21 change out casing tongs08:30 12:30 4.00 12 run casing12:30 13:30 1.00 21 rig up C.R.T tool & make up x.o13:30 18:00 4.50 12 run casing18:00 02:00 8.00 12 Run casing02:00 06:00 4.00 5 Circulate while waiting on cement to arrive
elevator watchman (Justin Youkey)fuel=23"=2367.6 gls.
88.00332.0012.50
4.00 33.50183.50
9.503.504.00
17.0018.00 61.50
28.500.50
64.0021: 2.00 50.0022:23:Other
24.00 888.00
na
17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.0017085.00 - 17085.00 1900.00 0.00 6.00 0.00 6.00 50.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1956.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1956.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 0 546 0
NONE
GEN 13512
0.00658.00658.00
0.00
GEN2351224.00
387.00363.00
0.00
GEN3351224.00529.00144.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
695.001336.00
0.000.00
2367.00609.00
40000.00OFFROADINDUSTRIAL OIL
0
0.000.00
0.000.00
0.00
0 NA
00
0.00
344.50
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32
1244 0.00 242.50 242.50 0.00 9881.00
s/m material jras=3 stops=2,c1 hoist,k1 forkliftl1 manlift,
Joey Wiegman s/m hoist air hydrolic,jras=6,stops=4Joey Wiegman jra k1 forklift,jra h13 run casing,jra h8 rig down casing crewJoey Wiegman brk temp in/out 62, 43 psi, 221 gpm
cement rig down
17085.00 17085.00 0.00 0.0017085.00 17085.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 38
FUEL USED
5: COND. & CIRC
10: DEVIATION11: WIRELINE LOG12: RUN CSG & CMNT
14: NIPPLE UP BOP15: TEST BOP
16: DRILL STEM TEST17: PLUGBACK18: SQUEEZE CMNT
2: DRILLING
3: REAMING4: CORING
6: TRIPS7: LUBRICATE RIG8: REPAIR RIG
9: C/O DRILL LINE
13: WAIT ON CEMENT
19: FISHING
20: DIR. WORK
DATE RIG NO.
RIG PHONE NUMBER
DAYS FR SPUD
JOB NO.
WELLNAME
OPERATOR
WEATHER
SPUD DATE / TIME
WATER SOURCE
OPERATIONS @ REPORT TIME
DEPTH INCL AZM
CREW M / U MANHOURS PAST 24
ACCIDENTS OR NEAR MISSES:
PROJECTED TD
LAST INSPECTION
REP
OR
T R
EMA
RK
S
DEVIATION SURVEYS
Total Hours
(Today / Well)TIME BREAKDOWN
BIT# SIZE TYPE MAKE NOZZLES OUT @IN @ DRILLED HRS CONDITION R O PSERIAL #
BIT
S
LENGTHNO.
STANDS
WT of COLLARS / DRILLSTRING
DRILLING ASSEMBLY ( BHA )
SINGLES
HOURS SINCE LAST INSPECTION
KELLY DOWN
TOTAL
DRILL PIPEDIRECTIONS TO
MORNING REPORT JOB TYPE WELL TYPE
O.D.
DETAILS OF OPERATIONS IN SEQUENCEFROM TO HRS CODE
1: RIG UP / DOWN
BOILER #
HOURS
SIZE WEIGHT GRADE I.D. TJ O.D. THREAD # JNTS LENGTH IN HOLE ON RACK REPAIRS
DR
LLST
RG
Used Today
Used This Well
DELIVERED TODAY
On Hand
Fuel BrandRIG
FU
EL
Time Mud Wt IN / OUT Funnel Vis Fl. LossPV 10 S GEL
MU
D M
TR SERIAL # HRS LAST24
TOTALHRS
CUM.WELL HRS
FOOTAGELAST 24
TOTALFOOTAGE
TODAY
RIG MANAGER
SAFETY MEETING TOPICS
BOP TEST DATE / PRESSURE
LAST CASING SIZE & SET DEPTH RIG COSTS
BOP DRILL DATE / TIME
DAILY
AVERAGE
CUMULATIVE
CUMULATIVEDAYS
CUM. HRS
I.D.
WELL
STATE JOB START DATE DAYS ON JOB EST. RELEASE
G.P.S. COORDINATES
CROWN-O-MATIC CHECKED
OPERATIONS NEXT 24 HRS
CURRENT DEPTH FOOTAGE LAST 24 PEN. RATE ROT. HRS MAX. GAS BCKGR GAS CONN. GAS TRIP GAS
# STOP CARDS
# OF JSA's
NEXT CASING SIZE & SET DEPTH
DAILY CUM.
FILT CKYLD PT 10 M GEL
RENTALS & R
ENG
INES
Co. No.
HRS TODAY
HRS LAST CHGE
HRS ON WELL
LOCATION
DRILL STRING REMARKS
FUEL ADDED TO MUDTODAY
EXTRA CREWS / WHY? BOP DRILL DATE / TIME
CUM.MUD COSTS
CHANGED
HOOKLOAD PICKUP WEIGHT SLACKOFF ROTATING
RIG SAFETY DAYS
INSPECTION BY / TITLE
SAFETY RATE
OFFICE NOTIFIED
FROM TO CODE RPM W.O.B.DEPTH DRILLED
LAST MEETING DATE
RELEASE DATE / TIME
AVERAGE KVA
DISTRIBUTORBLOWDOWNVOLUMES
MU
DO
PSSA
FETY
HTHP FL HTTP FC
TIM
E LO
G
ROTARY TORQUE
pH MF PF CALCIUM CHLORIDES% SOLIDS % LCM % OIL% SAND % H2OMud Type
SHAKER TYPE SCREENSCENTRIFUGES
PUM
PSR
ENTA
L IT
EMS
OPERATORS REPRESENTATIVE
COUNTY / PARISH
LEGAL DESCRIPTION
CO. MAN PH NO.
BO
ILER
STDBY HRLYDESCRIPTION DAY RT
Depth GPM PRESSUREPump 1
Liner SPMPump 2
Liner SPMPump 3
Liner SPMPump 4
Liner SPM Pump 1Pump 2
Pump 3Pump 4
TYPE STROKE HRS Total HRS MAX PSI KILL (SPM)Manufacturer SPRKill Rate
PATTERSON-UTI DRILLING COMPANY 2013-01-10 215 HORIZONAL 25713 OIL
University 6-23 Unit 2H SEC 23,BLK 6,UL SUY 12/07/12 05:30 17085.00
W&T OFFSHORE, INC. Andrews TX 12/03/12 06:00 38.00
34.00
01/07/13
Gary Wallace 903-570-5141 Jessie Taylor 806-891-9123 01/10/13 01:00 cooler
Rig down flow line, back stairs,clean pits, rig down floor, hang top drive & rig down
none 8 868 0.00 N 32.4799 W -102.284
l1 manlift,k1 forklift,g1 l/d bop,h1 cementjra k1 forjklift,jra l1 manlift,jra i3 bridle up4 01/07/13 01/07/13 00:00
12/18/12 Ryan Savallo - rig manager 5/4 Yes 3 extra hands Yes 224.50
12/21/12 250 LOW 1000 H
01/02/13 15:55 - 53sec
01/02/13 19:20 - 8-15-2012 45 SEC
0.00 17085.00 0.00 0.00 0 0 0
150000.00 160000.00 133000.00 150000.00 6.00 - 9.00
7.62 10346.00
00:00 0 0.00 0
no mud 1.5 0 0 0 0 10.00 0 0 2180 156000
0.00 0.00
0.00 0.00
N/A N/A N/A No 0
0.00
1665.28
254787.49
153.00
145.00
149.61
22890.00
153.00
06:00 10:30 4.50 5 circulate while waiting on cement to arrive10:30 13:30 3.00 12 hold safety meet,rig up cement crew & cement13:30 14:00 0.50 21 rig down cement equipment14:00 14:30 0.50 21 rig up stack jacks14:30 17:00 2.50 14 nipple down bop & set slips cut casing17:00 18:00 1.00 14 nipple down l/d bop's install tubing head & jet pitts18:00 22:00 4.00 14 Nipple down b.o.p.'s, rig down stack jacks & install tubing head22:00 06:00 8.00 1C Rig down flow line, back stairs,clean pits, rig down floor, hang top drive &
blocks, unspool drill line from drumNorberto Musico and his crew worked over 2.5 hours 20:50fuel=18"=1662.5 gls.
8.00 96.00332.0012.50
4.50 38.00183.50
9.503.504.00
17.003.00 64.50
7.50 36.000.50
64.0021: 1.00 51.0022:23:Other
24.00 912.00
na
17085.00 - 17085.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.000.00 - 0.00 0.00 0.00 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00
12P160 12.00 NATIONAL 24.00 1980.00 2700.00 20.00 472.0012P160 12.00 NATIONAL 24.00 1980.00 2700.00 30.00 907.00
4.50 20.00 S135 3.64 6.25NC 46 (EH) 350 11000.00 153 197 03.50 13.30 S135 2.76 4.75NC 38 (IF) 546 369 177 0
NONE
GEN 1351224.00
682.00682.00
0.00
GEN23512
0.00387.00363.00
0.00
GEN33512
0.00529.00144.00
0.00
CMP3306
0.0078.0078.000.00
HPUDEUT24.00
719.001360.00
0.00
1662.00705.00
40705.00OFFROADINDUSTRIAL OIL
00.00 0.00
0.00
0 NA
00
0.00
344.50
0.00 0.00 0.0017000.00 86.17 166.9116983.00 86.35 166.3816888.00 87.67 167.3516793.00 88.64 167.4416602.00 90.57 168.1416506.00 90.84 168.9316411.00 90.84 168.7616316.00 89.60 168.4916220.00 90.13 169.6416123.00 90.31 169.6415939.00 91.63 168.32
1244 242.50 242.50 9881.00
Zachary Ryan Savallo s/m electrical safety,jras=6 stops=2,c1 hoistZachary Ryan Savallo l1 manlift,k1 forklift,g1 l/d bop,h1 cementZachary Ryan Savallo s/m electrical safety,jras=9,stops=2Zachary Ryan Savallo jra k1 forjklift,jra l1 manlift,jra i3 bridle up
run casing
17085.00 17085.00 0.00 0.000.00 0.00 0.00 0.00
take 349 to patricia turnwest on hiway 115 go 16.3miles to location rd onright go to first rd to leftfollow road 1.5 miles tolocation
Revision 0 Page 1 of 1US 2.50.0
Page 59
W & T OFFSHOREDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-23 #2H DATE: 2/25/13 DAY: 1OBJECTIVE: Run Gas Lift, Set PKR at 10,062' UNIT SIZE:SUPERVISOR: Jr Salinas SPM:OPERATOR: Rig #25 (Blackhawk) Daily Cost: $4,115 STROKE LENGTH:
Daily Cost: Prev. Cost:Blackhawk: $2,915 Cumm. Cost: $4,115
$500S & S: BOP $700
Daily Total: $4,115 ANCHORS: 2/13ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Coupling Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts Type Set at; Tension; etc.
PBTD: 17,001'
PERFS: 10,211'-16,971'
TAC:SN:EOT:
WORK PERFORMEDMove in pulling unit. Spot Rig, ND Frac Valve, NU BOP, Shutdown due to weather. Leave flowing to tanks.
CONTRACTORS:
Mustang:
Page 60
W & T OFFSHOREDAILY WORKOVER REPORT
LEASE NAME & WELL # UNIVERSITY 6-23 #2H DATE: 2/26/13 DAY: 2OBJECTIVE: Run Gas Lift, Set PKR at 10,062' UNIT SIZE:SUPERVISOR: Jr Salinas SPM:OPERATOR: Rig #25 (Blackhawk) Daily Cost: $32,463 STROKE LENGTH:
Daily Cost: Prev. Cost: $4,115Blackhawk: $4,930 Cumm. Cost: $36,578
$300Mustang $1,800Lufkin $25,433
Daily Total: $32,463 ANCHORS: 2/13ROD FAILURE PUMP FAILURE Size
Polish Depth Size Stuck Mo.In Hole
Sucker RFS Corrosion Yes Worn Split Pull Rod
Pony Pin Break No Scaled Up Corrosion Yes No
TUBING FAILURE Jts to Leak OTHER- Explain
Body Coating Failure Yes No
Pin Rod on Tbg Wear Yes No
Cplg Corrosion Yes No
Pulled Description Ran Ran Coupling Remarks:Footage: (wt., type, code, etc.) Footage: Number-Jts Type Set at; Tension; etc.
PBTD: 17,001'FOLLOWING TABS HAVE TBG& PKR DEPTHS PERFS: 10,211'-16,971'
TAC:SN:EOT:
WORK PERFORMEDRU Unit, Picked up Pkr w/ Valves and 314 jts of 2 3/8", Set Pkr, ND BOP, RU Tree, RD Pulling Unit, Clean location, Move off.
CONTRACTORS:
Key Pump Truck