Top Banner
BUREAU OF TRAFFIC OPERATIONS Signals , Lighting & ITS Systems Installation and Inspection Training Part 4: Signal Structures Joanna Bush
56

Part 4: Signal Structures

Dec 07, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Part 4: Signal StructuresJoanna Bush

Page 2: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Signal Structures

• Type 9, 10, 12 & 13 Structures• Concrete Bases (Type 10 & 13)• Anchor Bolt Tensioning• Connection Hardware Testing

Page 3: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

What is a “monotube”?

Page 4: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Why did we change our design?

Page 5: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Structure Types

Type 9/10 Structures• 15’ to 30’ mast arms• Type 10 concrete base

– SDD 9c11– 14’ deep– 30” diameter– 1 ½” anchor rods – 52”

length• 6 sets of 1” high strength bolts

for mast arm connection

Type 12/13 Structures• 35’ to 55’ mast arms

• Type 13 concrete base– SDD 9c12– 14’ 6” deep– 42” diameter– Wing extends 4’ out from

base– 1 ¾” anchor rods – 86”

length• 8 sets of 1 ½” high strength

bolts for mast arm connection

Page 6: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Concrete Base (Type 10 or 13) Basics

• Sonotube cannot be left in place. After it is removed, soil must be compacted in 1-foot lifts.

• Construction joints require written approval by engineer (must consult BOS).

• Top template must be removed after concrete sets (stabilizes anchor bolts during pour and provides guidance for arm orientation).

• Concrete must attain 3500 psi compressive strength before structure can be erected (7 days).

Page 7: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Bolt Projections

Type 10 Type 13

Page 8: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Material Responsibilities

WisDOT• Poles• Arms• Anchor Bolts• Templates

Contractor• Arm connection

hardware (incl. luminaire arms)

• Identification plaque

Page 9: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Standing the Structure

Page 10: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 11: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step One – Verify Anchor Rods

Page 12: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 13: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 2 – Plumb

Page 14: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 15: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 3 – Lubricant (wax based)

Page 16: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 17: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 4 – Level Leveling Nuts

Page 18: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 19: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 20: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 5 – Tools for the Job

Manual Torque Wrench Electric Torque Wrench

Page 21: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 22: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Match Marking

Page 23: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 24: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 25: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 26: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Anchor Bolt Tensioning – Form DT 2321

Page 27: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Arm Connection

Page 28: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Connection Hardware

• A325 Bolts only– Stored in an air tight container

• Required Documentation– Bolt Certs– Rotational Capacity Test Results

• Direct Tension Indicators (DTIs)• Required Testing

– Mechanical Testing – Pre-Installation Testing

Page 29: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Hardware Certification

Galvanizing

Mill Cert

Page 30: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Rotational Capacity Test

Page 31: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Mechanical Testing• Send two bolts (with 4 flat washers and 3 nuts)• Do not include DTI washers – will simply be

thrown away• DT 1499• Results will be posted in Highway Quality

Management System

Page 32: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Pre-Installation Verification Test

Page 33: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Load Cell

Torque ≠ Tension

Page 34: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Direct Tension Indicators

Page 35: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

“Squirters”

Page 36: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 37: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 1: Assembly Information

Page 38: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 39: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 2: Bolt Configuration

Signal structures require flat washers on BOTH sides of the plates.

Page 40: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 41: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 3: Lubricate Nut Face & Threads

Page 42: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 43: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322 – Tables 1 & 2

Type 9/10 Structures

Type 12/13 Structures

Page 44: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 45: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 5: Record Measured Values

Page 46: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 47: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Step 6: Check Values

Type 9/10 Structures Type 12/13 Structures

Page 48: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

DT 2322

Page 49: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Signatures

Page 50: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Installation & QC

Page 51: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Why do we do all this?

Page 52: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Above Ground Checklist

Page 53: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Bases & Pedestals

• Are they level?• Bonding lug present?• Bonding wire installed?• Where is the access door relative to traffic?• Anti-Seize used?• Shims used? Less than 4?

Page 54: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Poles & Arms• Proper pole type/arm installed?• Is pole plumb/level?• What is orientation of the hand hole in

relation to traffic?• Has the pole cap been installed?• Are the arms aligned properly?• Grommet installed?• Proper connection hardware?

Page 55: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Signal Heads• Is lens configuration in accordance with MUTCD?• Are overhead signals aimed properly? (pointing

down the proper lane, level, plumb, etc.)• Has the proper clearance been provided under

vehicle or pedestrian heads?• Are the overhead signals too high?• Were heads properly secured to standard or arm?• Correct PDM hardware?• Heads covered?

Page 56: Part 4: Signal Structures

BUREAU OF TRAFFIC OPERATIONS Signals, Lighting & ITS Systems Installation and Inspection Training

Cabinets

• Is cabinet oriented properly with the roadway?

• Are end bells present?• Have the cables leading into the cabinet

base been labelled?• Has debris/metal shavings been cleaned

out from the bottom of the cabinet?• Has cabinet been properly anchored?