Page 1
STATE OF CALIFORNIA • CALIFORNIA TRANSPORTATION COMMISSION
Senate Bill (SB) 1 Proposed Project List Form
*Agency Name: (Select from dropdown list) LoCode:
*Agency Address: *City: *ZIP Code:
CA 95341
*Agency Contact: *Agency Contact Title:
*Agency Contact Phone No.: (i.e. 1234567890) *Agency Contact Email Address:
Funding for Fiscal Year: FY 17/18
Please briefly describe the budget support documentation being provided.
(Month) (Year)
Project Flexibility:
* Required information
N/A
A COPY OF THE FINAL BUDGET ROAD DIVISION WORK PROGRAM FOR FISCAL YEAR 2017/2018 INCLUDING
EXECUTED RESOLUTION.
Pursuant to SHC Section 2034(a)(1), this project list shall not limit the flexibility of an eligible city or county to
fund projects in accordance with local needs and priorities, so long as the projects are consistent with SHC
Section 2030(b). After submittal of the project list to the Commission, in the event a city or county elects to
make changes to the project list pursuant to the statutory provision noted above, formal notification of the
Commission is not required. However, the Project Expenditure Report form that is due to the Commission by
October 1st each year, will provide an opportunity for jurisdictions to annually communicate such changes to
the Commission as part of the regular reporting process.
JOE GIULIAN DEPUTY DIRECTOR OF ROADS
(209) 385‐7601 [email protected]
Measurement Date: Average Network PCI:
Additional Information: ?
*Budget Support Documentation:?
Part 1: General Information
Local Streets and Roads Program
Merced County 5939
715 MARTIN LUTHER KING JR. WAY MERCED
N/A
Page 2
STATE OF CALIFORNIA • CALIFORNIA TRANSPORTATION COMMISSION
Senate Bill (SB) 1 Proposed Project List Form
* Required
Type (Select from dropdown list)
Explanation
(if "Other" is selected,
please explain)
?
Pre‐
Construction (mm/yyyy)
Construction (mm/yyyy)
Min. Max.Sustainability
?Technologies
?
Climate
Change
?
Complete
Streets
Elements
?
Description of
Elements
PP01 5939JENSEN ROAD OVERLAY
PROJECT
ROAD NO. 425 Road Maintenance &
Rehabilitation
N/A OVERLAY 1.00‐MILES OF ROAD JENSEN ROAD IN BETWEEN GUSTINE CITY
LIMITS & BAMBAUER ROAD03/2018 06/2018 10 15
PP02 5939SHANKS ROAD OVERLAY
PROJECT
ROAD NO. 325 Road Maintenance &
Rehabilitation
N/A OVERLAY 0.35‐MILES OF ROAD SHANKS ROAD IN BETWEEN SCHENDEL
AVENUE & LEWIS CIRCLE03/2018 06/2018 10 15
PP03 5939GEER AVENUE OVERLAY
PROJECT
ROAD NO. 132 Road Maintenance &
Rehabilitation
N/A OVERLAY 0.90 ‐MILES OF ROAD GEER AVENUE IN BETWEEN COLUMBUS
AVENUE & PEAR STREET03/2018 06/2018 10 15
PP04 5939BELCHER AVENUE OVERLAY
PROJECT
ROAD NO. 164 Road Maintenance &
Rehabilitation
N/A OVERLAY 1.83‐MILES OF ROAD BELCHER AVENUE IN BETWEEN SANTA FE
DRIVE & SR5903/2018 06/2018 10 15
PP05 5939
SOUTH BEAR CREEK DRIVE
OVERLAY PROJECT
ROAD NO. R32 Road Maintenance &
Rehabilitation
N/A OVERLAY 2.00‐MILES OF ROAD SOUTH BEAR CREEK DRIVE IN BETWEEN
KIBBY ROAD & ARBOLEDA DRIVE 03/2018 06/2018 10 15
PP06 5939BLOSS AVENUE OVERLAY
PROJECT
ROAD NO. 128 Road Maintenance &
Rehabilitation
N/A OVERLAY 2.00‐MILES OF ROAD BLOSS AVENUE IN BETWEEN GRIFFITH
AVENUE & HINTON AVENUE03/2018 06/2018 10 15
PP07 5939S.P. AVENUE OVERLAY
PROJECT
ROAD NO. R166 Road Maintenance &
Rehabilitation
N/A OVERLAY 2.20‐MILES OF ROAD S.P. AVENUE IN BETWEEN BUHACH ROAD &
FRANKLIN ROAD03/2018 06/2018 10 15
PP08 5939
LEGRAND ROAD OVERLAY
PROJECT
ROAD NO. 224 Road Maintenance &
Rehabilitation
N/A OVERLAY 5.40‐MILES OF ROAD LEGRAND ROAD IN BETWEEN MINTURN
ROAD & 0.85‐MILES WEST OF ATHLONE
ROAD
03/2018 06/2018 10 15
PP09 5939
TURNER ISLAND ROAD
PROJECT
ROAD NO. 289 Road Maintenance &
Rehabilitation
N/A OVERLAY 5.25‐MILES OF ROAD TURNER ISLAND ROAD IN BETWEEN HENRY
MILLER AVENUE & SAND SLOUGH ROAD 03/2018 06/2018 10 15
PP10 5939SAND SLOUGH ROAD
PROJECT
ROAD NO. 256 Road Maintenance &
Rehabilitation
N/A OVERLAY 1.00‐MILES OF ROAD SAND SLOUGH ROAD IN BETWEEN TURNER
ISLAND ROAD & NICKEL ROAD03/2018 06/2018 10 15
PP11 5939NICKEL ROAD PROJECT ROAD NO. 277‐6 Road Maintenance &
Rehabilitation
N/A OVERLAY 1.00‐MILES OF ROAD NICKEL ROAD IN BETWEEN SAND SLOUGH
ROAD & SANDY MUSH ROAD03/2018 06/2018 10 15
PP12 5939CHILDS AVENUE F.D.R.
PROJECT ‐ DESIGN ONLY
ROAD NO. 192 Road Maintenance &
Rehabilitation
N/A FULL DEPTH RECLAMATION OF 4.50‐MILES OF CHILDS
AVENUE ‐ PROJECT DESIGN
CHILDS AVENUE IN BETWEEN TOWER ROAD
& PLAINSBURG ROAD03/2019 06/2019 15 20
PP13 5939
LEGRAND COMMUNITY
PARK SIDEWALK INFILL
PROJECT
N/A Complete Streets
Components
N/A CONSTRUCT 700LF+‐ OF SIDEWALK LEGRAND COMMUNITY PARK
03/2018 06/2018 15 20
PP14 5939
AUGUST AVENUE CURB,
GUTTER, & SIDEWALK
PROJECT
N/A Complete Streets
Components
N/A CONSTRUCT 250LF+‐ OF CURB, GUTTER & SIDEWALK AUGUST AVENUE IN BETWEEN SHANKS
ROAD & COUNTRYSIDE AVENUE 03/2018 06/2018 15 20
PP15 5939
McKEE ROAD OVER BEAR
CREEK ‐ PEDESTRIAN
BRIDGE FEASIBILITY STUDY
N/A Complete Streets
Components
N/A FEASIBILITY STUDY FOR THE CONSTRUCT OF APPROX.
140LF+‐ PEDESTRIAN BRIDGE ACROSS BEAR CREEK ON
McKEE ROAD
McKEE ROAD OVER BEAR CREEK
03/2019 06/2019 20 25
PP16 5939
PP17 5939
PP18 5939
PP19 5939
PP20 5939
PP21 5939
PP22 5939
PP23 5939
PP24 5939
PP25 5939
PP26 5939
PP27 5939
PP28 5939
PP29 5939
PP30 5939
PP31 5939
PP32 5939
PP33 5939
PP34 5939
PP35 5939
PP36 5939
PP37 5939
PP38 5939
PP39 5939
PP40 5939
PP41 5939
PP42 5939
PP43 5939
Legislative District(s)
LoCode
Part 2: Project Information
Local Streets and Roads Program
Additional Project Elements
(Does the project include element(s) as described in SHC 2030 (c)‐(f)?
(Select Y/N from dropdown list)
?Proposed
Project
(PP#)
* Project Title Project ID
(if any)
* Project Description
?* Project Location
?
State SenateState
Assembly
* Estimated
Completion Date
* Estimated
Useful Life(# of Yr)
Project Type
?
1 of 3
Page 3
STATE OF CALIFORNIA • CALIFORNIA TRANSPORTATION COMMISSION
Senate Bill (SB) 1 Proposed Project List Form
Agency Contact:
JOE GIULIAN
(209) 385‐7601
LoCode: 5939 [email protected]
Pre‐
ConstructionConstruction Min. Max.
PP01 JENSEN ROAD OVERLAY PROJECT OVERLAY 1.00‐MILES OF ROAD JENSEN ROAD IN BETWEEN GUSTINE CITY 03/2018 06/2018 10 15
PP02 SHANKS ROAD OVERLAY PROJECT OVERLAY 0.35‐MILES OF ROAD SHANKS ROAD IN BETWEEN SCHENDEL 03/2018 06/2018 10 15
PP03 GEER AVENUE OVERLAY PROJECT OVERLAY 0.90 ‐MILES OF ROAD GEER AVENUE IN BETWEEN COLUMBUS 03/2018 06/2018 10 15
PP04 BELCHER AVENUE OVERLAY OVERLAY 1.83‐MILES OF ROAD BELCHER AVENUE IN BETWEEN SANTA FE 03/2018 06/2018 10 15
PP05 SOUTH BEAR CREEK DRIVE OVERLAY 2.00‐MILES OF ROAD SOUTH BEAR CREEK DRIVE IN BETWEEN 03/2018 06/2018 10 15
PP06 BLOSS AVENUE OVERLAY OVERLAY 2.00‐MILES OF ROAD BLOSS AVENUE IN BETWEEN GRIFFITH 03/2018 06/2018 10 15
PP07S.P. AVENUE OVERLAY PROJECT OVERLAY 2.20‐MILES OF ROAD S.P. AVENUE IN BETWEEN BUHACH ROAD
& FRANKLIN ROAD03/2018 06/2018 10 15
PP08LEGRAND ROAD OVERLAY
PROJECT
OVERLAY 5.40‐MILES OF ROAD LEGRAND ROAD IN BETWEEN MINTURN
ROAD & 0.85‐MILES WEST OF ATHLONE
ROAD
03/2018 06/2018 10 15
PP09TURNER ISLAND ROAD PROJECT OVERLAY 5.25‐MILES OF ROAD TURNER ISLAND ROAD IN BETWEEN
HENRY MILLER AVENUE & SAND SLOUGH
ROAD
03/2018 06/2018 10 15
PP10SAND SLOUGH ROAD PROJECT OVERLAY 1.00‐MILES OF ROAD SAND SLOUGH ROAD IN BETWEEN
TURNER ISLAND ROAD & NICKEL ROAD03/2018 06/2018 10 15
PP11NICKEL ROAD PROJECT OVERLAY 1.00‐MILES OF ROAD NICKEL ROAD IN BETWEEN SAND SLOUGH
ROAD & SANDY MUSH ROAD03/2018 06/2018 10 15
PP12CHILDS AVENUE F.D.R. PROJECT ‐
DESIGN ONLY
FULL DEPTH RECLAMATION OF 4.50‐MILES OF CHILDS
AVENUE ‐ PROJECT DESIGN
CHILDS AVENUE IN BETWEEN TOWER
ROAD & PLAINSBURG ROAD03/2019 06/2019 15 20
PP13LEGRAND COMMUNITY PARK
SIDEWALK INFILL PROJECT
CONSTRUCT 700LF+‐ OF SIDEWALK LEGRAND COMMUNITY PARK03/2018 06/2018 15 20
PP14AUGUST AVENUE CURB, GUTTER,
& SIDEWALK PROJECT
CONSTRUCT 250LF+‐ OF CURB, GUTTER & SIDEWALK AUGUST AVENUE IN BETWEEN SHANKS
ROAD & COUNTRYSIDE AVENUE03/2018 06/2018 15 20
PP15McKEE ROAD OVER BEAR CREEK ‐
PEDESTRIAN BRIDGE FEASIBILITY
STUDY
FEASIBILITY STUDY FOR THE CONSTRUCT OF APPROX.
140LF+‐ PEDESTRIAN BRIDGE ACROSS BEAR CREEK ON
McKEE ROAD
McKEE ROAD OVER BEAR CREEK03/2019 06/2019 20 25
PP16PP17
Estimated
Useful Life (# of yrs)
Local Streets and Roads Program
Project
No.Project Title Project Description Project Location
Estimated Completion Date(mm/dd/yyyy)
FY
17/18
Agency Name:
Merced County
Summary of Proposed Project List
3 of 3