POWER SYSTEM UPGRADATION PROPOSAL
Sr.No.Details Dual Transformer Scheme Single Transformer Scheme - 1 Single Transformer Scheme - 2
1 Rating(KVA) 750(Old) + 1000(New) 1250(New) 1600(New)
2 Transformer Make G.E.C. + Raychem Raychem Kirloskar
3 Project Cost(lakhs) 32.7 23.1 30.6
4 Cost for C.D. increase by 500 KVA(Lakhs) 25 25 25
5 Commissioning Additional Charges Additional Charges Additional Charges
6 Total 57.7 48.1 55.6
7 AMRI Remarks Technically seek O.K Technically seek O.K1. Fast execution 2. Less Complex system design
Page 2
AMRI INDIA PVT LTD
COST - Two 750KVA & 1000 KVA Transformer
Technical Specifications Quantity Unit Amount (LACS) Remarks
1 1 INR 14.5 14.00
2 1 INR 4.5 4.50
3 1 INR 7.5 7.50
4 Earth Pits 6 INR 8000 0.485 Cable 200 INR 1100 2.20
6 1 INR 2 2.00
7 1 INR 2 2.00
8 1 INR N.A. 25.00
TOTAL 57.68
Sr. No.
Rate (INR)
11kV/0.433kV Transformer with OLTC & RTCC Panel, ONAN , 1000 KVA
Kirloskar Make
New PCC with 2400 amps ACB +4 feeders(600 amps)
11kV RMU Unit with 2 outgoings
Miscellaneous(LA , Cable Tray/Bus duct)
Civil Work(Fire wall , Expansion of Switch Yard)
Increasing Contract demand by 500 KVA
Deposit to MSDCL
Page 3
AMRI INDIA PVT LTD
COST - Single 1250 KVA Transformer
Technical Specifications Quantity Unit Amount (LACS) Remarks
1 1 INR 12 12.30
2 1 INR 2.6 2.60
3 1 INR 0.6 0.60
5 Cable required 100 INR 1100 1.10
6 1 INR 6.50 6.50
7 1 INR N.A. 25.00
TOTAL 48.10
Sr. No.
Rate (INR)
11kV/0.433kV Transformer with OLTC & RTCC Panel, ONAN ,1250 KVA
Old PCC retrofitting with New 2500amps ACB
1600 ACB retrofitting for DG Panel
New Indoor VCB in place of 4 pole structure with panel and relay protection
Increasing Contract demand by 500 KVA
Deposit to MSDCL
Page 4
AMRI INDIA PVT LTD
COST - 1600 KVA
Technical Specifications Quantity Unit Amount (LACS) Remarks
1 1 INR 18 18.00
2 1 INR 2.6 2.60
3 1 INR 0.72 0.72
4 Earth Pits 4 INR 8000 0.325 Cable 300sqmm x 3.5C 150 INR 1300 1.95
6 1 INR 5.5 5.50
7 Civil Work 1 INR 1 1.00
8 1 INR N.A. 25.00
9 Miscellaneous 1 INR 0.5 0.50TOTAL 55.59
Sr. No.
Rate (INR)
11kV/0.433kV Transformer with OLTC & RTCC Panel, ONAN ,1600 KVA
Old PCC retrofitting with New 2500amps ACB
1600 ACB retrofitting for DG Panel
New Indoor VCB in place of 4 pole structure with panel and relay protection
Increasing Contract demand by 500 KVA
Deposit to MSDCL
Page 5
Increasing Contract Demand for AMRI Unit IIMonth Maximum Demand(KVA)
March'15 537April'15 689May'15 751June'15 298July'15 620
August'15 616September'15 557
October'15 642November'15 587December'15 634January'16 639February'16 544
Year Average M.D. - A 593Plant 2 Load in KVA - B 233
New Cooling Tower Load : C 59
Total KVA - A+B+C 885Current Contract Demand- D 500
Difference 385
Recommended C.D. increase should be 500KVA to 1000 KVA
Page 6
Transformer Specifications to invite Quotations.
Sr.No. Specifications M/s Voltamp Transformers Kirloskar Electric
Content Specifications.` Rating(KVA) Oil Filled ,ONAN 1000 1000
2 On Load Tap Changer, Oil Filled. OLTC with RTCC & ARV Confirm Confirm
3 No Load Voltage Ratio. 11/0.433 KV Confirm Confirm
4 Winding Material Electrolytic Copper Wound Confirm Confirm
5 Type Core Type / IS : 2026; IS:1180 Confirm Confirm
6 Vector Group Dyn11 Confirm Confirm
7 Phases 3 \ Confirm
8 Frequency 50 Hz Confirm Confirm
9 Primary Delta Connected Confirm Confirm
10 Secondary Star Connected Confirm Confirm
11 Tapping range Confirm Confirm
12 OLTC Tapping Steps / HV Side. 8 Confirm Confirm
13 Termination HV Bare Bushing Confirm Confirm
14 Termination LV To be confirmed To be confirmed
15 Duty Out Door Confirm Confirm
16 Temp. Rise (Oil / Wdg.) 50 / 55 Deg Cen. Confirm Confirm
17 Impedance 6.25% as per IS Confirm Confirm
18 Insulation Level :
19 a) HV (KVp/KVrms) 75 KVp/28 KVrms. Confirm Confirm
20 b) LV 03KVrms Confirm Confirm
21 Type of Cooling ONAN Confirm Confirm
22 Type of Breather Silica Jel Breather with Oil Seal. Confirm Confirm
23 Paint Epoxy Paint (Shade # 631 of IS 5) Confirm Confirm
Plus 5% to Minus 15%, in the steps of 2.50%.
Page 7
24 Accessories :
25 a) Buchholz Relay (Main Tank & OLTC) With Alarm & Trip & Shut off Valve. Confirm Confirm
26 b) OTI Dia-6" with MRP, Alarm & Trip Confirm Confirm
27 c) WTI Dia-6" with MRP, Alarm & Trip Confirm Confirm
28 d) Marshalling Box d) Marshalling Box Confirm Confirm
29 e) Set of Radiators e) Set of Radiators Confirm Confirm
30 f) Conservator Tank f) Conservator Tank with MOLG Confirm Confirm
31 e) Explosion vent with diaphram e) Explosion vent with diaphram Confirm Confirm
32 As per IS : 335 of 1983 Confirm Confirm
33 No load Losses of Transformer Less than 4.5KW Confirm Confirm
34 Load Losses at rated current. Less than 13.5KW Confirm Confirm
35 Test Confirm Confirm
36 Guarantee, from date of commissioning. 12 Months Confirm Confirm
37 Commissioning In Supplier Scope Additional Charges Additional Charges
38 Qty. 01 No. Confirm Confirm
39 Quoted price (Lacs Rs.) 16.25 14.5
40 Delivery 2 Months 10 - 12 Weeks. 10 - 12 Weeks.
41 Other condition If any. No. No.
42 Contacted Person. Suchita/02025650612-103 Ekansh Vashisth/09899640486
Transformer Oil / First filling of Oil in Party scope, including Cooling Fins.
All routine (IS : 2026) Test in supplier scope, Type test cgargeable, If reqd.
Page 8
43
AMRI Remarks
Technically seek O.K Technically seek O.K
Page 9
M/s Raychem RPG M/s Crompton Greaves
1000 1000
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
To be confirmed To be confirmed
Confirm Confirm
Confirm 40-45 deg
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Page 10
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Additional Charges Additional Charges
Confirm Confirm
10.45 16.45
10 - 12 Weeks. 10 - 12 Weeks.
Mr. Purushottam Patel / 097115 66576 / 098112 35849
Mr. Srijan Kr Gpta / 096541 25252
Page 11
Technically seek O.KMeets all the satutory requirements
and is cost effective.
Page 12
Transformer Specifications to invite Quotations.
Sr.No. Specifications M/s Voltamp Transformers Kirloskar Electric
Content Specifications.` Rating(KVA) Oil Filled ,ONAN 1600 1600
2 On Load Tap Changer, Oil Filled. OLTC with RTCC & ARV Confirm Confirm
3 No Load Voltage Ratio. 11/0.433 KV Confirm Confirm
4 Winding Material Electrolytic Copper Wound Confirm Confirm
5 Type Core Type / IS : 2026; IS:1180 Confirm Confirm
6 Vector Group Dyn11 Confirm Confirm
7 Phases 3 \ Confirm
8 Frequency 50 Hz Confirm Confirm
9 Primary Delta Connected Confirm Confirm
10 Secondary Star Connected Confirm Confirm
11 Tapping range Confirm Confirm
12 OLTC Tapping Steps / HV Side. 8 Confirm Confirm
13 Termination HV Bare Bushing Confirm Confirm
14 Termination LV To be confirmed To be confirmed
15 Duty Out Door Confirm Confirm
16 Temp. Rise (Oil / Wdg.) 50 / 55 Deg Cen. Confirm Confirm
17 Impedance 6.25% as per IS Confirm Confirm
18 Insulation Level :
19 a) HV (KVp/KVrms) 75 KVp/28 KVrms. Confirm Confirm
20 b) LV 03KVrms Confirm Confirm
21 Type of Cooling ONAN Confirm Confirm
22 Type of Breather Silica Jel Breather with Oil Seal. Confirm Confirm
23 Paint Epoxy Paint (Shade # 631 of IS 5) Confirm Confirm
Plus 5% to Minus 15%, in the steps of 2.50%.
Page 13
24 Accessories :
25 a) Buchholz Relay (Main Tank & OLTC) With Alarm & Trip & Shut off Valve. Confirm Confirm
26 b) OTI Dia-6" with MRP, Alarm & Trip Confirm Confirm
27 c) WTI Dia-6" with MRP, Alarm & Trip Confirm Confirm
28 d) Marshalling Box d) Marshalling Box Confirm Confirm
29 e) Set of Radiators e) Set of Radiators Confirm Confirm
30 f) Conservator Tank f) Conservator Tank with MOLG Confirm Confirm
31 e) Explosion vent with diaphram e) Explosion vent with diaphram Confirm Confirm
32 As per IS : 335 of 1983 Confirm Confirm
33 No load Losses of Transformer Less than 4.5KW Confirm Confirm
34 Load Losses at rated current. Less than 13.5KW Confirm Confirm
35 Test Confirm Confirm
36 Guarantee, from date of commissioning. 12 Months Confirm Confirm
37 Commissioning In Supplier Scope Additional Charges Additional Charges
38 Qty. 01 No. Confirm Confirm
39 Quoted price (Lacs Rs.) 22.8 18
40 Delivery 2 Months 10 - 12 Weeks. 10 - 12 Weeks.
41 Other condition If any. No. No.
42 Contacted Person. Suchita/02025650612-103 Ekansh Vashisth/09899640486
Transformer Oil / First filling of Oil in Party scope, including Cooling Fins.
All routine (IS : 2026) Test in supplier scope, Type test cgargeable, If reqd.
Page 14
43
AMRI Remarks
Technically seek O.K Technically seek O.K
Page 15
M/s Raychem RPG M/s Crompton Greaves
1500 1600
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
To be confirmed To be confirmed
Confirm Confirm
Confirm 40-45 deg
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Page 16
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Additional Charges Additional Charges
Confirm Confirm
14.70 21.25
10 - 12 Weeks. 10 - 12 Weeks.
Mr. Purushottam Patel / 097115 66576 / 098112 35849
Mr. Srijan Kr Gpta / 096541 25252
Page 17
Technically seek O.KMeets all the satutory requirements
and is cost effective.
Page 18
Transformer Specifications to invite Quotations.
Sr.No. Specifications M/s Voltamp Transformers Kirloskar Electric
Content Specifications.` Rating(KVA) Oil Filled ,ONAN 1250 1250
2 On Load Tap Changer, Oil Filled. OLTC with RTCC & ARV Confirm Confirm
3 No Load Voltage Ratio. 11/0.433 KV Confirm Confirm
4 Winding Material Electrolytic Copper Wound Confirm Confirm
5 Type Core Type / IS : 2026; IS:1180 Confirm Confirm
6 Vector Group Dyn11 Confirm Confirm
7 Phases 3 \ Confirm
8 Frequency 50 Hz Confirm Confirm
9 Primary Delta Connected Confirm Confirm
10 Secondary Star Connected Confirm Confirm
11 Tapping range Confirm Confirm
12 OLTC Tapping Steps / HV Side. 8 Confirm Confirm
13 Termination HV Bare Bushing Confirm Confirm
14 Termination LV To be confirmed To be confirmed
15 Duty Out Door Confirm Confirm
16 Temp. Rise (Oil / Wdg.) 50 / 55 Deg Cen. Confirm Confirm
17 Impedance 6.25% as per IS Confirm Confirm
18 Insulation Level :
19 a) HV (KVp/KVrms) 75 KVp/28 KVrms. Confirm Confirm
20 b) LV 03KVrms Confirm Confirm
21 Type of Cooling ONAN Confirm Confirm
22 Type of Breather Silica Jel Breather with Oil Seal. Confirm Confirm
23 Paint Epoxy Paint (Shade # 631 of IS 5) Confirm Confirm
Plus 5% to Minus 15%, in the steps of 2.50%.
Page 19
24 Accessories :
25 a) Buchholz Relay (Main Tank & OLTC) With Alarm & Trip & Shut off Valve. Confirm Confirm
26 b) OTI Dia-6" with MRP, Alarm & Trip Confirm Confirm
27 c) WTI Dia-6" with MRP, Alarm & Trip Confirm Confirm
28 d) Marshalling Box d) Marshalling Box Confirm Confirm
29 e) Set of Radiators e) Set of Radiators Confirm Confirm
30 f) Conservator Tank f) Conservator Tank with MOLG Confirm Confirm
31 e) Explosion vent with diaphram e) Explosion vent with diaphram Confirm Confirm
32 As per IS : 335 of 1983 Confirm Confirm
33 No load Losses of Transformer Less than 4.5KW Confirm Confirm
34 Load Losses at rated current. Less than 13.5KW Confirm Confirm
35 Test Confirm Confirm
36 Guarantee, from date of commissioning. 12 Months Confirm Confirm
37 Commissioning In Supplier Scope Additional Charges Additional Charges
38 Qty. 01 No. Confirm Confirm
39 Quoted price (Lacs Rs.) 16.25 14.7
40 Delivery 2 Months 10 - 12 Weeks. 10 - 12 Weeks.
41 Other condition If any. No. No.
42 Contacted Person. Suchita/02025650612-103 Ekansh Vashisth/09899640486
Transformer Oil / First filling of Oil in Party scope, including Cooling Fins.
All routine (IS : 2026) Test in supplier scope, Type test cgargeable, If reqd.
Page 20
43
AMRI Remarks
Technically seek O.K Technically seek O.K
Page 21
M/s Raychem RPG M/s Crompton Greaves
1250 1250
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
To be confirmed To be confirmed
Confirm Confirm
Confirm 40-45 deg
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Page 22
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Confirm Confirm
Additional Charges Additional Charges
Confirm Confirm
12.30 19.00
10 - 12 Weeks. 10 - 12 Weeks.
Mr. Purushottam Patel / 097115 66576 / 098112 35849
Mr. Srijan Kr Gpta / 096541 25252
Page 23
Technically seek O.KMeets all the satutory requirements
and is cost effective.