EDEVELOPMENT Document Three: Development Code Park East Plan R Prepared for: Redevelopment Authority of the City of Milwauke e Prepared by: HNTB Corporation Planning & Design Institute, Inc. Date Adopted by RACM: Dec. 15, 2003 Date Adopted by City: June 15, 2004
6
Embed
Park East EDEVELOPMENT Plan - Milwaukee · 4 CITY OF MILWAUKEE PARK EAST REDEVELOPMENT PLAN 5 A B A B A B A B C A B C B A A B C A A A B A B B C A A B A B B A A B B A B t t t t t t
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
EDEVELOPMENTDocument Three:
DevelopmentCode
Park East
PlanRPrepared for:
Redevelopment Authority ofthe City of MilwaukeePrepared by:
Redevelopment Authority of theCity of MilwaukeePrepared by:
HNTB Corporation
Planning & DesignInstitute, Inc.
Date AAdopted bby RRACM: DDec. 115, 22003
Date AAdopted bby CCity: JJune 115, 22004
Acknowledgements
Park East Redevelopment Plan 1
City of Milwaukee
Tom Barrett, Mayor
Common CouncilAdopted 2004Ald. Willie Hines, PresidentAld. Ashanti HamiltonAld. Joe Davis, Sr.Ald. Michael S. D’AmatoAld. Robert BaumanAld. James A. Bohl, Jr.Ald. Michael McGee, Jr.Ald. Willie C. WadeAld. Robert G. DonovanAld. Robert PuenteAld. Michael J. MurphyAld. Joe DudzikAld. James WitkowiakAld. Terry L. WitkowskiAld. T. Anthony Zielinski
Redevelopment AuthorityAdopted 2003Tom Mellencamp, ChairAld. Fredrick G. Gordon, Vice ChairAld. Marlene E. Johnson-OdomLincoln FowlerKenneth L. JohnsonJustin L. MortaraKathryn M. WestJulie Penman, Executive SecretaryGreg Shelko, Assistant Director
City Plan CommissionRecommended 2003Robert Greenstreet, ChairJulilly Kohler, Vice ChairDouglas DrakeLarri Sue JacquartR. Gray MitchemJ. Allen StokesPatricia Torres
Department of City Development 2004Pat Algiers, CommissionerSteve Jacquart, Deputy CommissionerJohn Hyslop, Acting Planning DirectorMichael Wisniewski, Senior Economic Development SpecialistAllison Rozek, Senior PlannerGregory A. Patin, Zoning and Development CoordinatorChristopher R. Gleissner, Long Range Planning Intern
Department of Public Works 2004James P. Purko, Director of OperationsJeffrey S. Polenske, City EngineerPreston D. Cole, City ForesterJeffrey J. Mantes, Chief Planning & Development EngineerGhassan A. Korban, District Manager of ConstructionMichael Chaplock, Construction SupervisorMike D. Loughran, Project EngineerLois C. Gresl, Project Engineer
Special thanks to the following people who dedicated a large portion oftheir time to this project while working for the City of Milwaukee:
John O. Norquist, former Mayor
Julie Penman, former Department of City Development CommissionerMike Dawson, former Department of City Development DeputyCommissionerPeter Park, former Planning DirectorDan McCarthy, former Urban Development ManagerJohn Bratina, former Economic Development Policy Coordinator
Mariano A. Schifalacqua, former Department of Public WorksCommissionerJeffrey Dillon, former Transportation Design ManagerRobert Buffone, former Major Projects ManagerGeorge Roemer, former Structure Design manager
Planning & Design Institute, Inc.Larry Witzling, PresidentShaun Mularkey, AssociateMark C. Taylor, Former Associate
Hurtado Consulting, LLCGeoffrey F. Hurtado, PrincipalDyann Benson, Associate
Special thanks to the following people who dedicated a large portion oftheir time to this project while working for Milwaukee County:
Tom Ament, former County ExecutiveDave Zepecki, former Director of Economic and CommunityDevelopmentTimothy Russell, former Associate Director of Economic and CommunityDevelopment
Board of Supervisors 2004Sup. Lee Holloway, ChairSup. James G. WhiteSup. Toni ClarkSup. Gerry BroderickSup. Marina DimitrijevicSup. Joseph A. RiceSup. Michael Mayo, Sr.Sup. Ryan McCueSup. Paul CesarzSup. Elizabeth Coggs-JonesSup. Mark BorkowskiSup. Peggy WestSup. Willie Johnson, Jr.Sup. Richard D. Nyklewicz, Jr.Sup. Lynne DeBruinSup. John F. Weishan, Jr.Sup. Dan DevineSup. Roger QuindelSup. Jim Schmitt
County Economic and Community DevelopmentCommittee 2004Sup. Michael Mayo, Sr., ChairSup. Toni Clark, Vice ChairSup. James G. WhiteSup. Willie Johnson, Jr.Sup. Marina DimitrijevicSup. Joseph A. RiceSup. Peggy West
County Transportation, Public Works and TransitCommittee 2004Sup. James G. White, ChairSup. Michael Mayo, Sr., Vice ChairSup. Richard D. Nykiewicz, Jr.Sup. John F. Weishan, Jr.Sup. Dan DevineSup. Marina DimitrijevicSup. Peggy West
Milwaukee County Division of Economic and CommunityDevelopment 2004William W. Hatcher, DirectorLeonard Jackson, CoordinatorCraig C. Dillmann, Manager of Real Estate ServicesGerald Baker, Real Estate Agent
Consulting TeamsMilwaukee County
Scott Walker, County Executive
PARK EAST REDEVELOPMENT PLAN 3
Introduction / Table of Contents
CHAPTER ONE: GENERAL RULES AND DEFINITIONS
This section defines the general standards that apply to all development. This section explains the standards, terms, and diagrams used in the Development Code that con-trol building use, placement, height, entrances, site access, street level activation and design details. Page 5
CHAPTER TWO: REGULATING PLAN
This section controls the overall form of streets, blocks and buildings to create the physical character envisioned in the Master Plan. Each block is coded to indicate the combination of building types allowed. Page 10
CHAPTER THREE: BLOCK DEVELOPMENT STANDARDS
This section includes general site information and specific regulations for each block. The regulations include standards for building placement, site access, alley locations, landmark buildings, building height, street activation, special features, and alterna-tive standards where applicable. The Block Development Standards are organized by District.
McKinley Avenue District Page 12Lower Water Street District Page 38Upper Water Street District Page 64
APPENDICES
A Use Table Page 82B Building Height Map Page 85C Street Activation Map Page 86D Land Transfer of Public Rights-of-Way Dedications/Vacations Map Page 87
INTRODUCTION
The Development Code defines use and design stan-dards for all buildings in the Park East Redevelopment boundary. The standards primarily control aspects of buildings and site elements that define street edges and corners to create a pedestrian-friendly public realm. In general, diverse uses and shared uses are encouraged.
The Development Code will be administered by the Redevelopment Authority of the City of Milwaukee (RACM) through the Department of City Development (DCD) staff. All new construction and modifications to existing buildings must comply with the standards set forth in the Development Code and all other applicable codes in the City of Milwaukee.
The Development Code consists of 3 sections: General Rules and Definitions, Regulating Plan, and Block Devel-opment Standards.
4 CITY OF MILWAUKEE PARK EAST REDEVELOPMENT PLAN 5