Page 1
Preliminary ExaminationESE 2017UPSC ENGINEERING SERVICES EXAMINATION
General Studies andEngineering Aptitude
Paper
Publications
www.madeeasypublications.org
Basics of Project Management
7
Comprehensive Theory with Practice Questions
As per new syllabus of ESE 2017
I
Page 2
MADE EASY PUBLICATIONS has taken due care in collecting the data and providing the solutions, before publishing this book. Inspite of this, if any inaccuracy or printing error occurs then MADE EASY PUBLICATIONS owes no responsibility. MADE EASY PUBLICATIONS will be grateful if you could point out any such error. Your suggestions will be appreciated.
© All rights reserved by MADE EASY PUBLICATIONS. No part of this book may be reproduced or utilized in any form without the written permission from the publisher.
MADE EASY Publications
Corporate Office: 44-A/4, Kalu Sarai (Near Hauz Khas Metro Station), New Delhi-110016E-mail: [email protected] : 011-45124660, 08860378007
Visit us at: www.madeeasypublications.org
ESE-2017 : Preliminary ExaminationPaper-I : General Studies and Engineering Aptitude
Basics of Project Management© Copyright, by MADE EASY Publications.
All rights are reserved. No part of this publication may be reproduced, stored in or introduced into a retrieval
system, or transmitted in any form or by any means (electronic, mechanical, photo-copying, recording or
otherwise), without the prior written permission of the above mentioned publisher of this book.
1st Edition : 2016
Publications
Page 3
PrefaceThe compilation of this book Basics of Project
Management was motivated by the desire to provide a
concise book which can benefit students to understand
the concepts of Project Management topics.
This textbook Basics of Project Management provides
all the requirements of the students, i.e. comprehensive
coverage of theory, fundamental concepts and objective
type questions articulated in a lucid language. The
concise presentation will help the readers grasp the theory of this subject with clarity and apply
them with ease to solve objective questions quickly. This book not only covers the syllabus of ESE
but also addresses the need of many other competitive examinations. Topics like ‘Basic Concepts
and Project Life Cycle, Initiation Process : Project Formulation and Appraisal, Project Organisation,
Planning Process : Project Planning and Scheduling, Execution Process: Project Monitoring and
Control, Closing Process: Project Evaluation and Termination, Tender and Contract’ are given full
emphasis, keeping in mind of our research on their importance in competitive examinations.
We have put in our sincere efforts to present detailed theory and MCQs without compromising the
accuracy of answers. For the interest of the readers, some notes, do you know and interesting facts
are given in the comprehensive manner. At the end of each chapter, sets of practice question are
given with their keys, that will allow the readers to evaluate their understanding of the topics and
sharper their question solving skills.
Our team has made their best efforts to remove all possible errors of any kind. Nonetheless, we would
highly appreciate and acknowledge if you find and share with us any printing and conceptual errors.
It is impossible to thank all the individuals who helped us, but we would like to sincerely thank all
the authors, editors and reviewers for putting in their efforts to publish this book.
With Best Wishes
B. Singh
CMD, MADE EASY
Page 4
Chapter 1Basic Concepts and Project Life Cycle .... 1 1.1 What is Project? ................................................................. 1
1.1.1 Characteristics and Features of a Project ... 1
1.1.2 Classification of Projects (Taxonomy of
Projects) ................................................................. 2
1.2 What is Management? .................................................... 3
1.3 What is Project Management? ..................................... 3
1.3.1 Characteristics of Project Management ..... 3
1.3.2 Different Types of Management ................... 4
1.4 Project Life Cycle ............................................................... 4
1.4.1 Project Life Cycle (4 Phases) ............................ 4
1.4.2 Level of Effort (Intensity of Activities) ......... 6
1.4.3 Level of Influence Vs. Cost of Changes
(Front-End Importance) .................................... 7
1.4.4 Product Life Cycle (10 Phases) ....................... 7
1.5 Project Management Process ....................................... 9
Objective Brain Teasers ...............................................11
Chapter 2Initiation Process :Project Formulation and Appraisal ...... 14 2.1 Project Formulation and Development ..................14
2.1.1 Pre-Investment Phase .....................................14
2.2 Project Appraisals ...........................................................16
2.2.1 Technical Analysis/Technical Appraisal ....16
2.2.2 Market and Demand Analysis ......................17
2.2.3 Financial Analysis/Financial Feasibility .....23
2.2.4 Economic Analysis (Economic Feasibility) ... 29
2.2.5 Social Cost Benefit Analysis (SCBA) ............29
2.5 Formulation of Detailed Project Reports (DPR)....34
2.6 Project Risk Analysis .......................................................36
Objective Brain Teasers ...............................................43
Chapter 3Project Organisation ............................. 49 3.1 Introduction ......................................................................49
3.1.1 Attributes/ Qualities of a Good Project
Manager ...............................................................49
3.1.2 Role of the Project Manager .........................50
3.2 Type of Project Organisations ....................................51
3.2.1 Functional Organisation/Traditional/
Classical Organisation .....................................51
3.2.2 Product Organisation ......................................52
3.2.3 Matrix Organisation .........................................53
3.2.4 The Strong, Weak or Balanced Matrix........55
3.3 Project Organisation Structure ..................................56
Objective Brain Teasers ...............................................57
Chapter 4Planning Process :Project Planning and Scheduling ......... 59 4.1 Planning .............................................................................59
4.2 Scheduling .......................................................................59
4.3 Implementation and Control ......................................59
4.4 Work Break Down Structure ........................................59
4.5 Techniques Used for scheduling ...............................61
4.5.1 Bar Charts ............................................................61
4.5.2 Mile-Stone Charts .............................................61
4.5.3 Line of Balance (LOB) Techniques ...............62
4.5.4 Network Method of Scheduling ..................62
4.6 Network Diagram ............................................................62
4.6.1 Elements of a Network ...................................63
4.6.2 Rules of a Network ...........................................66
4.7 Network Scheduling Techniques...............................67
4.7.1 Programme Evaluation and Review
Technique (PERT) ..............................................67
Basics of Project Management
ContentsGeneral Studies and Engineering Aptitude
Page 5
(v)
4.7.2 Critical Path Method (CPM) ...........................70
4.7.3 Comparison between PERT and CPM ......73
4.7.4 CPM Systems ......................................................73
Objective Brain Teasers ...............................................78
Chapter 5Execution Process:Project Monitoring and Control ........... 89 5.1 Project Control System ..................................................89
5.1.1 Tools Used for Project Control .....................89
5.1.2 Earned Value Analysis (EVA) ..........................90
5.1.3 Critical Ratio .......................................................92
5.1.4 Line of Balance (LOB) ......................................92
5.1.5 Graphical Evaluation and Review Technique
(GERT) ...................................................................93
5.1.6 Network Simulation .........................................95
5.1.7 Outsourcing Method .......................................96
5.1.8 Review Meetings ..............................................96
5.2 Tips for Efficient Implementation of Projects .......96
5.3 Project Information System .........................................97
5.4 Resource Allocation .......................................................97
5.4.1 Resource Leveling ............................................98
5.4.2 Resource Smoothening ............................... 100
5.5 Project Cost Control .................................................... 101
5.5.1 Time-Cost Trade-off ...................................... 101
5.5.2 Cost Model Analysis ...................................... 101
Objective Brain Teasers ............................................ 107
Chapter 6Closing Process:Project Evaluation and Termination .. 110 6.1 Project Evaluation ........................................................ 110
6.1.1 Project Evaluation Objectives ................... 110
6.1.2 Evaluation Methods ...................................... 110
6.2 Networking Updating of Network Diagram ....... 112
Objective Brain Teasers ............................................ 113
Chapter 7Tender and Contract ............................ 114 7.1 Project Contract ............................................................ 114
7.1.1 Type of Contracts ........................................... 114
7.2 Project Tender ............................................................... 115
7.3 Project Cost Estimate .................................................. 118
7.3.1 Objectives of Cost Estimate ....................... 118
7.3.2 Methods of Cost Estimate .......................... 118
7.3.3 Project Cost Components ........................... 119
7.3.4 Cost Funnel ...................................................... 119
7.4 Types of Cost Estimates ............................................. 120
7.4.1 Conceptual Cost Estimate .......................... 120
7.4.2 Semidetailed Cost Estimate ....................... 121
7.4.3 Detailed Cost Estimate ................................ 121
7.5 Project Sickness ............................................................ 122
7.6 Miscellaneous Topics .................................................. 124
7.6.1 What is Cost Overrun? ................................. 124
7.6.2 What is Credit Rating? .................................. 124
7.6.3 What is Capital Cost? .................................... 125
7.6.4 What is Operating and Maintenance Cost? ...125
7.6.5 What is Enterprise Resource Planning (ERP)? .....126
7.6.6 What is ABC Analysis? .................................. 127
7.6.7 What is Economic Ordering Quantity (EOQ)? .......
(Wilson Harris Model for Inventory Control) .127
7.6.8 What is Technical Consultancy
Organisations (TCOs)? .................................. 131
7.7 Value Analysis and Value Engineering .................. 131
Objective Brain Teasers ............................................ 135
nnnn