Paolo La Penna Virgo Commissioning Status N5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration European Gravitational Observatory
54

Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Mar 26, 2015

Download

Documents

Mia Lewis
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 1

VIRGO commissioning progress

Paolo La Pennafor the VIRGO collaboration

European Gravitational Observatory

Page 2: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 2

Status in December 2005

Virgo shutdown had started after C7 (19 September 2005) The new IB had been installed in the IB tower (end November 2005 The fake dihedron was still mounted on the bench The Nd:YAG beam (up to 5 W for the moment) had been sent into

the bench: some light (with even some interference) was visible at the end of the MC

The optics on the bench were being realigned using the IB actuators: this operation was performed staying inside the tower, with the laminar flux on and the LC closed

The alignment of the IMC was going on

(http://www.ego-gw.it/ILIAS-GW/WP1docs/lapenna_121205.ppt)

Page 3: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 3

Since then:

The IMC was fully aligned in vacuum at about mid December.

IMC locked at end of 2005. Beam at the end of the ITF at begin of January 2006. ITF alignment at mid of January. First ITF cavities lockings at end of January. Full RFC alignment at end of February. Full locking of the ITF going on now (mid of March).

The full restart of the ITF, after IB installation, took about three months

Page 4: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 4

I – Injection system restart

Page 5: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 5

Operation performed on the Injection System

Alignment and locking of the IMC in vacuum Alignment of the IB optics in vacuum Alignment of the beam on the ITF and telescopes tuning Alignment and locking of the RFC Setup and alignment of the EIB BMS IMC matching improvement IMC automatic alignment Power stabilization RFC automatic alignment

Page 6: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 6

Changes in Virgo after September shutdown

IB+RFC

EIB

PR mirror

Page 7: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 7

Injection systemLower stage

Upper stage

Page 8: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 8

Difference old-new IB

 

Old IB New IB

Page 9: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 9

IMC alignment: december 2005

HeNe autocollimation on the MC mirror

Acting on the IB alignment

(checked with a ccd)

Page 10: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 10

IMC alignment: december 2005

YAG beam direct beam centering

on the MC mirror acting on the

external steering mirrors

laser

Page 11: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 11

IMC alignment: december 2005

MC mirror alignment

until IMC resonances are visible

laser

Page 12: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 12

IMC locking: december 2005

IMC locking

Feedback on laser pzt

using the reflection as a trigger

laser

Pout 8 W

Page 13: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 13

ITF alignment: 13 january 2006

Page 14: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 14

RFC alignment and locking: february 2006

The Reference Cavity alignment has taken more time than expected

A first attempt to align it using the 20 W beam failed A second attempt after having aligned a probe beam

coming from the opposite direction, and looking at the RFC transmission, led to a poor RFC alignment (but it allowed to lock and start working on the ITF)

A third attempt overlapping the probe beam and the 20 W beam was successful

From the beginning to the end almost one month was necessary

Page 15: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 15

YAG from inverse path: fringes

Secondary YAG beam

1 V @ 25 Hz pzt scanning

Probe beam from the inverse pathProbe beam superposed to a HeNe passing through the RFC in the lower partCamera looking at the coils frame (hit by the RFC transmission): mode flashing visible

ccd photodiode

ccd CCD and PhD looking at

RFC reflection

Page 16: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 16

Contrast improvement and alignment

YAG probe Reflected beam

Contrast = 0.7

Page 17: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 17

RFC alignment using PR alignment

Page 18: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 18

RFC alignment using PR alignment

Page 19: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 19

Near Field of M13 and Far Field

1m-f

FF

NFScreens

Page 20: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 20

M14 movement

1m-f

NFMove M14 and observe overlapping with NF ccd

FF

Page 21: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 21

M13 movement

1m-f

Move M14 and observe overlapping with NF ccd

Correct with M13 to overlap on the FF ccd

NF

FF

Page 22: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 22

After alignment: the 20 W beam resonates in the RFC

ccd

PhD

Page 23: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 23

The RFC transmission is not visible with the RFC aligned

Inverse path beam and direct beam are being superposed below acting on M13 and M4 mirrorsWhen superimposed both beams should resonate

ccd

PhD

Page 24: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 24

RFC locked, reflected 20 W YAG beam: 1 March 2006

Contrast = 54 %

(it was 80% before the shutdown)

Good alignment

+

longitudinal mismatching

Page 25: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 25

RFC alignment: conclusion

The RFC alignment was more difficult than expected: the cavity axis was not where it was expected, maybe the RFC was not aligned inside its tank, or it had moved slightly during new IB assembling

The RFC is locked in a stable way, with the beam transmitted by the IMC: more stable with the alignment with respect to the previous setup

We cannot see the RFC transmission

Page 26: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 26

Further activities on RFC

RFC locking filter change: a new filter has been implemented, which allows a reduction of the frequency noise of the prestabilized beam

RFC automatic alignment: this activity is going on; it will allow to keep the beam aligned on the RFC using the two closed loop pzt placed before the RFC. This allows shifts of the beam on the upper part, in order to better align the upper part optics, without losing the RFC alignment

Page 27: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 27

Problems encountered

DPS misaligned

PM stuck

TS damaged

Wrong PSD

electronics

Beam clipped

RFC_trans clipped

Several problems/failure have occurred:

it has been necessary to open the IB tower twice

Page 28: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 28

Further activities involving the injection system

Beam Steering System IMC matching improvement IMC automatic alignment restarted Input power stabilization (the photodiode measuring the

IMC transmission has been changed) RFC automatic alignment PSD on the IB working (new homemade electronics)

After the restart of the IB, some new features and other activities have been performed:

Page 29: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 29

BMS: DC quadrants, ABP actuation

ABPs

(on laser

bench)

NF QFFF QF

BMS allows to keep beam aligned with respect to DC_quadrants placed on the External Injection Bench.

The signal from the DC quadrants is sent to the ABP (Automatic Beam Positioning) mirrors (pzt steered mirrors).

It allows a stable and repetitive positioning of the beam entering into the IMC; It allows performing pure translations and angle of the beam.

Page 30: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 30

IMC matching

With the help of BMS, IMC matching has been improved:

96% matching (it was 82%), 91% contrast (should correspond to about 1500 ppm

losses in the IMC).

IMC transmission is now about 8 W (at about the same level as before the shutdown)

This power is entering into the ITF (we had 0.7 W entering into the ITF before the shutdown)

Page 31: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 31

IMC automatic alignment

The AA of the MC is working again as before the shutdown (for the moment acting only on the MC mirror, correcting the FF_vert and the NF_horiz degrees of freedom.

The (new) AA of the IB is ready to be implemented: it should replace the LC of the IB

Page 32: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 32

Power Stabilization

Data from spectrum analyser is 50 times lower in the 100Hz region than dataDisplay measurent (above) (to be investigated)

Master laser

Diode current

IMC_trans HF

Page 33: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 33

RFC automatic alignment

Closed on the vertical DOF (1 Hz bandwidth) Horizontal DOF not working (M16_PZT horiz. not working properly)

M16

M15

Wavefront sensing

quadrants on the EIB

RFC AA now

separated from IMC AA

Page 34: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 34

New PR mirror: monolithic and higher R (0.95 vs 0.925)

Comparison between the old (black) and new monolithic (red) PR mirror

Page 35: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 35

II- ITF restart

Page 36: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 36

IB LC after RFC locking

The IB LC filters were changed after restart: frequency noise was reintroduced

Page 37: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 37

Frequency noise after RFC locking (ITF misaligned)

IB transfer function

Frequency noise

Page 38: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 38

IB LC filter upgrade

IB in high noise control IB in low noise control

Blue curves: MC in high/low noise (factor 100 G difference)

Red curves: MC in high/low noise (factor 100 G difference)

Page 39: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 39

MC-RFC locking filter: after restart

Too small G SSFS couldn’t engage

Page 40: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 40

Frequency noise after RFC locking (ITF misaligned)

Purple: C7

Black: after new IB RFC locking

Page 41: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 41

New MC-RFC locking filter upgrade

Page 42: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 42

New frequency noise: SSFS can engage

Page 43: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 43

Frequency noise: C7 (beam attenuated) vs now

C7

Now

Page 44: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 44

ITF restart: locking

Photodiodes gains readjusted for the higher power (10 times more than before shutdown) Automatic alignment restarted:

Tested the drift control of the two cavities Quadrant photodiodes gains adjusted Not gone further because it needs the full locking of the ITF

PR-NI PR-NE CITF NE-WE-BS NA WA Recombined SSFS Variable Finesse with PR misaligned ….

Now the full recycled ITF is being locked

Since end of January:

Page 45: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 45

SSFS

L1

L2l2l1

l0

B1p_DC

B5_ACpSSFS using CARM for the

Beam Frequency stabilization

B2_3f_ACp PR (PRCL)B1p_DC BS (MICH)B5_ACp SSFS (CARM)B8_ACp NE-WE (DARM)

B8p

B2_3f_ACp

Page 46: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 46

SSFS restart

The restart of SSFS required some gain tuning because:

RFC locking filter was different Frequency noise was different RFC gains are different

After tuning readjustment, IB LC filters and RFC locking filter SSFS is now working properly

Page 47: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 47

Towards the dark fringe

L1

L2l2l1

l0

STEP 7

B5_ACpSSFS using CARM

DF 0.05

B8p

B2_3f_ACp

B1p_DC

B2_3f_ACp PR (PRCL)B1p_DC BS (MICH)B5_ACp SSFS (CARM)B8_ACp NE-WE (DARM)

Page 48: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 48

ITF locking

Status on 16th March: ITF locked up to step 7 (0.05 of the dark fringe)

Here we are

Page 49: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 49

Parabolic telescope T2: M6 mirror misalignment

3 closed loop picomotors

Tilted: tx (650 rad) and ty (850

rad)

Page 50: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 50

Effect of M6 misalignment

M6 aligned (beam at 3 km)

M6 misaligned (beam at 3 km)

(x=650 rad

y=850 rad)

Page 51: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 51

Resulting beam shape

Beam size at NE:

wx= 60mm wy= 60mm

Beam size on Cam5:

wx= 0.7mm wy= 0.42mm

To fit these measurements, the beam parameters inside ITF with respect to BS position are (perfect matching for w=21.3, z=0):

wx= 15mm, zx= -400m wy= 23mm, zy= 800m

The matching on the FP cavities should be around 89% in these conditions: confirmed by measurement (88%).

Beam parameters before shutdown: wx= 18mm, zx= -500m wy= 18mm, zy= 500m)

Page 52: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 52

Short telescope T1 centering

YL1

f=130L2

f=-80

D=60mm

ccd

Page 53: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 53

Beam shape after the Faraday isolator

y=4 mm w/w = 9%y=2 mm w/w = 2%

Page 54: Paolo La Penna Virgo Commissioning StatusN5-WP1 8 TH MEETING, Frascati, 20/03/2006 1 VIRGO commissioning progress Paolo La Penna for the VIRGO collaboration.

Paolo La PennaVirgo Commissioning StatusN5-WP1 8TH MEETING, Frascati, 20/03/2006 54

Conclusion

The restart of the Injection System has required more than two months

The new Injection System is now working The ITF is close to final locking with full power (8 W)

Some problems involving the new IB remain open:

The RFC matching is poor and the RFC transmission is not sent out of the IB tower

The astigmatism of the beam has to be corrected

For the moment the effort is in achieve the full locking again and, since we can go on in these conditions, to pospone the solving of this problems to a later moment